HomeMy WebLinkAboutProduct Approval I
7/812016 Florida Building Code Online
�a
9 OEM
I{ d+,N.,5�ir^All? SCIS Home Log In ? User Registration { Hot Topics i Submit Surcharge i Stats&Fads ; Publications ; FBC Staff j BCIS Site Map ' Unks I Search I
Busines -
���rafessiNI Product Approval
- USER;Public User
egulativan
fRMIlw91•tIM I Product Approval Menu>Product or Aoolicatlon Search>Application List>Application Oetaili
5i= FL# FL7006-R9
1 Application Type Revision
Code Version 2014
Application Status Approved
(i
*Approved by DBPR.Approvals by BPR shall be reviewed and ratified
by the POC and/or the Commission if necessary.
19'
Comments
Archived
Product Manufacturer IKO Industries,Ltd
Address/Phone/Email 40 Hansen Road South
i
Brampton,NON-US L6W 3114
(708)496-2800 Ext 200
rmetz0010tampabay.rccom
Authorized Signature Robert Metz
rmetz001@tampabay.rr.com I'
Technical Representative Bob Metz
Address/Phone/Email REMCO of Pinellas
�i
456 Avila Circle NE !�'
Saint Petersburg,FL 33703
(727.) 776-5261 3
rmetz0010tampabay.rr.com j
i
Quality Assurance Representative Don Shaw l i
Address/Phone/Email IKO Industries LTD
120 Hay Rd.
Wilmington, DE 19808
(717) 579-6706 j
don.shaw@iko.com
Category Roofing
Subcategory Asphalt Shingles
Compliance Method Certification Mark or Listing
ii
Certification Agency FM Approvals-CER
Validated By Locke Bowden
Validation Checklist-Hardcopy Received
i
,I
Referenced Standard and Year(of Standard) Standardea
ASTM D3161 modified to 110 mph 2009
ASTM D3462 2009
ASTM D7158 Class H 2008
ASTM E108 ;I 2007
i i f
Equivalence of Product Standards
Certified By
httpsJ/www.floridabi ilding.org/pr/pr app M aspx4param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVX122Npl7DJ1Epk3d' 1/3
"I
.I
I
7/8/2016 Florida Building Code Online
Product Approval Method Method 1 Option A
Date Submitted 06/26/2015
Date Validated 06/30/2015
Date Pending FBC Approval
Date Approved 07/06/2015
i
Summa rV of Products
FL# Model,Number or Name Description
7006.1 Cambridge,Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle
Biltmore AR manufactured at IKO`s Kankakee,IL; Hawkesbury,Ont.;
Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15-
Approved for use outside HVHZ:Yes 2015 pd :I
Impact Resistant:N/A EL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6
Design Pressure:N/A 15.pdfi
Other; FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
15 •odf ! I
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructloni
87006 R9 II IKO-133-02-01 Letter-Installation
Instructions for FBC FL7006.odf
Verified By: Duc T Nguyen 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
7006.2 Filp and Ridge 12 Cap fiberglass This is a 12"x 12"flberglass asphalt shingle used to cover
shingles the hip and/or ridge of ah asphalt shingle roof system
manufactured in Toronto,;Ont.and Brampton, Ontario
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15-
Approved for use outside HVHZ:Yes 2015 .pdf .
Impact Resistant: N/A FL7006 R9 C CAC FM Letter ASTM d3462 letter 5 6
Design Pressure:N/A 15.odf
Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
15 odf
Quality Assurance Contr ct Expiration Date
12/31/2020
Installation Instructions
FL7006 R9 IT in and Ridge Cao Shingle Installation
Instructions.odf
97006 119 II IKO.133-02!01 Letter-Installation
Instructior)s for FBC FL70b6.odf
Verified By: Duc T Nguyeri PE 65034
CreaEed by Independent;Third Party: No
Evaluation Reports
Created by Independent!Third Party:
7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at
Starter Strip ' the bottom of a roof system manufactured in Brampton and
Hawkesbury,Ontario plants
Limits of Use Certification Agency Certificate
Approved for use In HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15-
Approved for use outside HVHZ:Yes 2015 .pd f :1
Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter- 5 6
Design Pressure: N/A 15.odf
other. FL7006 R9 C CAC FM Letter.-ASTM E 108 letter- 5 3
15 .odf
Quality Assurance Corrtract Expiration Date
22/31/2020
Installation Instructions
FL7006 R9 IT IKO-133-02-01 Letter- Installation
Instructions for FBC FL7006.odf
FL7006 R9 IT Roofing-Products-Leading-Edge Plus-
Aoolication-W I).odf
Verif led By: Duc T Nguyen,PE 65034
Created by Independent Third Party: No
Evaluation Reports
� Created by Independent Third Party:
7006,4 Marathon 25 AR,CRC Superglass 13 tab fiberglass asphalt shingle manufactured at IKO`s ^ ��
JAvww.floridabLildi o
https• ng.org/pr/pr app �l.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVX122Np170J1E/o3d 2/3
7/8/2016 Florida Building Code Online
M25AR Brampton,Ontario, Hawkesbury Ont.,Toronto, Ont.;
Sylacauga,AL and Kanakakee,IL plants
Limits of Use Certification Agency Certificate
Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15-
Approved for use outside HVHZ:Yes 2015 .Pdf
Impact Resistarit: N/A EL740§ R9 C CAC FM letter-ASTM d3462 letter-5 6
Design Pressure:N/A 15.odf .'
Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3
15 .Pd f 'i I
Quality Assurance Contract Expiration Date
12/20/2020
Installation instruction's
FL7006 R9 II IKO-133-02-01 Letter-installation
Instructions for FBC FL70d6,gdf
Verlfled By: Duc T Nguyen 65034
Created by Independent Third Party: No
Evaluation Reports I
Created by Independent Third Party:
Nacls• Nnoa
j
Contact Us:;2601 Blair Stone Road,Tallahassee FL 32399 Phone:850-487.1824
The State of Florida Is an AA/g0 employer.Copyright 2007-2013 State of Florida.::Privacy Statement::A ssihillty Statement:;Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to I public-records request,do not send electronic
mall to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please'.contact 850.487.1395.-Pursuant to Section
455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they fiave
one:The emails provided may be used for official communication with the licensee.However email addresses are publlc record.If you do not wish to supply a
personal address,please provide the Department with an email address which can be made available to the public.Tb'determine If you are a licensee under Chapter
455,F S.,please dict IaLe.
Product Approval Accepts:
C.rGdGi Card' .
X19
I
i
I .
I
I
httpsJlwww,floridabuildirg.orgfprlpr app dfl.aspx7param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVA22NN7OJ1E%3d -i 313.
F Alrals�
FM Approvals i owiwr of ike PM u
1151 Boston-Providence Turnpike
P.O.Box 9102 Norwood,MA 02062 USA
T:781762 4300 F:781 762 9375 www.fmapprovals.com
May 3,2015
is
Mr.Donald Shaw p,!
IKO Industries,Ltd.
40 Hansen Road South j
Brampton,Ontario L6W 3H4
Canada
Customer ID: 1000000686• a'
Subject: IKO Industries Ltd.'s FM Approved asphalt roof shingles
Dear Mr. Shaw,
This letter is being written following in regards to your recent inquire regarding verification of the ASTM
D3161 testing of IKO Industries Ltd's asphalt roof shingles. TKO's shingles that are FM Approved have
been tested in accordance with ASTM D3161 (reports 3040947 and 3038510).
FM ApprovedProducts-,
:: i flaip usi es;a l Crowne Slate,Cambridge',Hip&Ridge 12,Marathon 25 AR,Marathon
Ultra AR,Cambridge IR,Leading Edge Plus,Cambridge HD,Marathon .
25,Hip&Ridge Plus,Dynasty with Arm
ourzone
i oo ;Colr rati ti I tG: Biltmore,Hip&Ridge 12(CRC),Superglass 25 MAP,Superglass
:,_:,:;;: >:-:::°:.; ..' : ;:. ,..:,..•..;::::;..:.: Ultra AR, CRC Hip&Ridge Plus C i
i
Please be advised that shingles noted above tested to previous versions of ASTM D3161 continue
to meet the test criteria of the current version of ASTM D3161.
�i
If you have any questions please do not hesitate to contact me.
i
Very truly yours,
David L.Alves Phillip J. Smith
Senior Engineer-Materials Group Principal Engineer-AVP
FM Approvals FM Approvah
1151 Boston-Providence Turnpike
Norwood,MA 02062
T:781 255 4856
E:david.alves@fmapprovals:com
iii
CE APNW APPRM
i.
CONSTRUCTION MATERIALS
TECHNOLOGIES
i
March 30, 2015
i, .
IKO Industries, Ltd
120 Hay Rd.
Wilmington, DE 19809
Re: FBC FL7006
I
Sir(s),
.PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2014 Florida Building Code. I"
This review was completed based on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle Application Instructions—3-Tab Shingles
(EN-3Tab—Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida)
2) IKO Laminated Shingles Application Instructions -
1 1
(EN-Laminated',Appins-8TTEFS-2012-04—reformatted 2013-02-rev07/13-Florida)
3) IKO Hip and Ridge 12 Application Instructions
(EN-HipandRidge12_3HRTri-2013-08 reformatted 2013-08)
4) IKO Leading Edge Plus Shingle Application Instructions
(EN-3LEP-Tri-2012-06—reformatted 2013-03)
5) ASTM D3161 Test Report(FM Approvals Project No.3040947)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict, these instructions shall govern.
Statement of Independence:PRI Construction Materials Technologies and/or Duc T:Nguyen,FL P.E.do not
have nor pian to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
Signed: '71 Signed:
Brad Grtyrbo ski Duc T. u en
Managing D rector Florida Re re rofessional Engine r
P.E.N"mbar:65034
Date: April 30, 2015 Date: April 30;2015
Attachments: A) IKO Shingle Application Instructions-3-Tab
13) IKO Laminated Shingles Application Instructions
C) IKO Hip and Ridge 12 Application Instructions
D) IKO Leading Edge Plus Application Instructions
IKO-133-02-01
li •
PRI Construction Materials Techrologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-57TT Fax:813.821-5840 e-mail:materialstesting(gplicmt.com WebSite:htlpJlaww.pdcmLcam
i
IKO
Installation Instructions for
Asphalt Shingles
Page 2 of 5
IKO Shingle Application Instructions — 3-Tab; Shingles
(ASTM D3161,Class F—IKO Marathon 25 AR and CRC Supergrass M25AR)
NOTE: THESE INSTRUCTIONS SHALL SE USED IN CONJUCTION WITH' IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT' THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of undedayment conforming to building code
requirements,the first sheet overlapping the save protection by 19",followed by full ill,36"widths overlapping
each preceding course by 19"or other Approved undedayments in accordance with ilia qualified application
instructions. For areas where the roof slope .is 4" per foot or greater, cover the'deck with one ply of
underlayment laid parallel to the eaves;with 2"horizontal laps and 4"and laps. Apply„metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
I
1
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/81 diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt
edge,approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is
-flush with, but not cutting into shingle surface. i j
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60")or more,use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistenng; CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight."' 3
3
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8".
STEEP SLOPES.
I;I
1.1rYt-1rr .
SEALING SMTP ! •. ! {;• �'^ �•••R.
-
♦ - t
NAILS NAILS'l
DO NOT NAIL INTO OR ABOVE THE.sEALiNr.snug
I,
I�
Ij
I,l.
j
I
PRI Construction Wedals Techrtclogles,LLC.6412 Badger Drive Tamps,FL 33610 Tel:813-6215777 Fax:813-621-5840 a-mall:materialstoOng@prlcmt.com MbSite:hltpJhvnw✓.pdcmtcom
' L�I •
• is
I
IKO
Installation Instructions for !!
Asphalt Shingles
Page 3 of 5
IKO Laminated Shingles Application Instructions
(ASTM D3161, Class F—Cambridge,Cambridge HD, and CRC Biltmore AR)
ii
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
,I.
ROOF DECK: Solidlysheathed and fastened deck conforming to 2014 FBG.
9
UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or other Approved undedayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
undedayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Appli;metal drip edges on top
of.any underlay along rake edges and directly to the deck along eaves in accordapce with building code
requirements.
j.
NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8r diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails'per shingle placed in the nail line 7-3/8"
below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with,
but not cutting into shingle surface.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed
as shown below. Ensure that no nail's within 2"of a jointicutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering) CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE- Installed shingles shall have a maximum average exposure of 5-7/8".,
-NO&ING:STEEP SLOPESAPIPLICATIM
use six nails as shown.
7 3i'8"
V' t^ ..► ► eta "� r .t„ 4r
NAIL LINEZ
j '
.NAILS CEMENT
i
PROPERAPPUCATION REQUIRES THAT THE NAILS PEMIt TRATE BOTH THE OVERLAY AND UNDERLAY PORTIGNSOFTHE St INGLJE
I
i
i
!
PRI Construction Materials Technologies,LLC.6412 Badger Orive Tampa,FL 33610 Tel:813.821-5777 Fax:813821-5840 e-mail:materialatesting&cmtmm WebSite:httpIMM.pdcrntcam
it
�i
IKO
Installation Instructions for
Asphalt Shingles
Page 4 of 5
IK0 Hip and Ridge 12 Application Instructions
(ASTM D3161, Class F--IKO Hip and Ridge 12)
' I
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are
designed for a 51/8"(130 mm)exposure.(For a neater appearance,the top of each'side of each piece has
been factory trimmed on a 1"(25 mm)taper(see drawing).Bend each piece over the hip or ridge,and nail 5
5/8" (143 mm)above the butt edge 1" (25 mm) in from each edge, exposing each,j piece 51/8"(130 mm).
Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge
pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end
opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional
effect,(which is recommended,but not required),apply hip and ridge shingles double;thickness bystacking 2
pieces on top of one another,the lower piece extending about 3/4"(19 mm)furtherjthan the top piece(see
diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be
covered with cement. Prior to application in cold weather,storing the shingles in'a heated area will allow for
easier bending.
NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USEAS HIP AND RIDGE
SHINGLES ONLY,AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS.WE ASSUME NO
RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO
PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER
VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW
ALLAPPLICABLE BUILDING CODES,.MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR
TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS.
la
314' 1^
129 rhml
' (19 mmY
T1lPER CRTC
S Sir �, 1
f130mm �'
1
63M
nee mml
III
• 1
PRI CanshwUan Materials Technologles,LLC.8412 Badger Drive Tampa,FL 33610 Tel:813.621.5T/7 Fax 813-821.5840 e-mail:matmemmung@pricmt com WebSite:http.-thy .pricmt.com
• i
IKO
Installation Instructions for
Asphalt Shingles
Page 5 of 5
IK0 Leading Edge Plus Application Instructions
(ASTM D3161, Class F—IKO Leading Edge Plus) i'
'i
NOTE: THESE INSTRUCTIONS SHALL BE USED IN. CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
i
1. Apply any underlayment, eave protection,valley flashings, or drip edges to r.iof deck as required.
2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is pprtorated lengthwise for
separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to
separate.
3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately
200(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up,with the
factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves
by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with nails located 3"to 4"(75
mm to 100 mm)from the eave edge and•1"(25 mm)in from each and.
4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge
with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang
the rake edge by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with fasteners
located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end.
5. Repeat Steps 3—4 for the right lower comer of the roof deck.
�I
NAILING: Use galvanized(zinc coated) roofing nails, 11 or 12 gauge,with at least
3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20
mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm toI100 mm)from
the save edge and approximately 1"and 13"(25 mm and 330 mm)in from each end.
6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install
the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles
should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimums Fasten the shingles to
the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle.
7. Apply roof shingles as per the instructions printed on each product's package1. Make certain the first
course of field shingle lies flush with the edges of the fastened IKO Leadind Edge Plus. In this way,
the sealant on the IKO Leading Edge Plus shingles will adhere to the first-co"urse field shingles and
help keep them from lifting in high winds.
;i
I
�i
'I
III
PRI ConsbacUen Materials Tedmd4es,LLC. 6412 Badger Drive Tempa,FL 33810 Tel:813.8215777 Fax:8135215840 e-mat matedalstestinpdcmtcom WebSite:httpl www,plcmtoom
I
http://www.floridabuildirtg.org/pir�lpr app dtl.aspx?param=:iN,(iEVX..-
Florida Building Code Onlibe
?!
QL
Publications F5C Staff BCIS Site Ma
submit Surcharge Stats&Facts Pubu
Istra b : i
B05 Home Loy fns
• UserReg t n Hot Top ubm a
PrbdUct Approval
Y,:T ie.'. :.i:.. n
Profess i
Bus USER:Publir user
�na
>Apptkmtlon Detall
> ApctliratUn
FL# FL2569-R11
Application Type Revision
Code Version 2014
Application Status Approyed
Comments
Archived
Product Manufacturer Soprema,Inc. (Canada)
Address/Phone/Email 1640 rue Haggarty
Drummondville, NON-US;
00000
(819)478-2400 Ext 3321;
memathieu@soprema-ca!:.
Authorized Signature Marc-Etienne Mathieu
memathieu@sctprema.ca
Technical Representative Marc-Etienne Mathieu
Address/Phone/Email 1688 lean-Berchmans-Michaud
Drummondville,NON-US 00000
(819)478-2400 Ext 3327'
mernathieu@soprem.a.ca
Quality AssuranceRepresentative lean-Francois Cote,Ph.D.'
Address/Phone/Email 1640 rue Raggarty
Drummondville
(888)811-3145
jfcote@soprema.ca
Category Roofing
Subcategory Underlayments
Compliance Method Evaluation Report from a!Florida Registered Architect o
Florida Professional Engineer.
er
Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed lRdbert J. tyl.Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Cont-act Expiration Date 10/16/2017
Validated By John W. Knezevich, Pr-
of3 11512016 3:08 PM
iloridaBuilding Code Online http://www.11oridabuilding.org/pi/pr app_dtl.aspx?param=wGEVX...
V Validation Checklist-Hardcopy Received
Certificate of Independence -L2L&�_RjC01 2015 tit C NieminEi of
Referenced Standard and Year(of Standard) Standard
ASTM D1970
ASTM D6163
ASTM D6164
FM 4474
FR5A/TRI April 2012 (04- 2)
TAS 103
TAS 110
Equivalence of Product Standards
Certified By
Sections from the Code I
Product Approval Method Method 1 Option D
Date Submitted 10/15/2015
Date Validated 10/19/2015
Date.Pending FBC Approval 10/21/2015
Date Approved 12/15/2015
Summary of Products
FL# Model,Number or Description
Name
2569.1 Soprema Roof Self adhering roof underlayments
Underlayments
Limits of Use installation Instructions
Approved for use in HVHZ: No 171-7-569 R11 II 2015 10 FINAL. ER SOPREMA. CA UNDERLAYP
Approved for use outside R1 i pd
HVHZ:Yes Verified By: Robeft Nlemineri, P.E.IPE-59166
Impact Resistant:N/A. Created by Independent Third Party: Yes
Design Pressure: +N/A/-90 Evaluation Reports
Other: 1.) Refer to ER Section 5 for EL2569 R11 AE 2015 10 FINAL OR SQPREMA CA UNDERLAY
Limits of-Use.2.)The design pressure €211.,1L
noted berein pertains to underiayment Created by Independent Third Party.. Yes
systems'used beneath adhesive-set tile'
systems. Refer to ER Section 5.6.4 For
details.
• :Back rNNeX�ti ..
Contact ::1940 North Monroe Street.11i fahassee FL 32399 Phone,850-487=1824
The State of Florida is an AA/EEO employer.r'n nvriaht 2007-2Di 3 State of Florida_::PrtvaW Stat)Ment::ArcrnsSibilb Statement;;R
Under Flo ride law,email addresses are pubic recd rds.If you do not want your e-mail address released In response to a public-records req
of 1 1%5/2016 3.08 PMI
Florida Building Code Online http://www.floridabuilding.orgjpr/pr_app_dtl,aspx?param=svGEVX..:
I
• I
elactrone mall to tbls entity.Instead,contact the office by phone or by traditional mall.If you have any Questions,please contact 850.487.
Section 455,275(1),Florida Statutes,effective October 1,2012,kinsees licensed under Chapter'455,F.S.must provide the Department wl
they have one,The emak provided may be used for official communication with the licensee.However email addresses are public record.it
supply personal address,please provide the Department with an emall address which can be made available to the public.To determine I yo
Chapter 455,F.S.,please dickie,
Product Approval Accepts:
Wt '® dna
sccvriYv .
• i
I '
I
• it
. I
of 3 1./5/20'1.6.3:08 PM
i
i
EXTERIOR RESEARCH&DESIGN,I.I.C.
Certificate ofAuthorization#9503
353 CHRISTIAN STREET,UNIT#13
ERD j OXFORD,CT 06478
? ! PHONE:(203)'262-9245
FAX:(203)262-9243
EVALUATION REPORT
SoRrema,Inc. Evaluation'Report 518010.06.09-R9
FL2569-R11
1640 rue Haggerty'
Drummondville,QuebecJ2C 5P8 Dat' of Issuance:06/15/2009
Revision 9:10/12/2015
Canada
SCOPE!
This Evaluation Report•is issued under Rule 61G20-3 and the applicable rules and regulations governing the.use of
b Rob
construction materials in the State of Florida.The documentation submitted has been revie�wed ert Nieminen,
Y
P.E. for use of the product under the Florida Building Code and Florida Building Cpde,i fiesidential Volume. The
pro ducts described herein have been evaluated for compliance with the 5a' Edition (2014) Florida Building Code
.-sections noted herein.
DEscRIPTION: Soprema Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTiRLIED COMPLIANCE: This Evaluation Report is valid until such time as the named products)changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report 'by the named client constitutes agreement to notify Robert . iemInen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. 'Trinity i ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTLSEMENT: The Evaluation Report number preceded by the words "TrinityIERD Evalu;a�ted" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done iri its entirety,
IN5PECTJOIN:Upon request,a copy of this entire Evaluation Report shall be provided to the use. by the manufacturer or
its-distributors and shall be available for inspection at the job site.at the request of the Buildin11 g Official.
l
This Evaluation Report consists of pages 1 through 7.
Prepared by: _
P•• 3��a g!���.�,� �
'-'kr,
•'sy� ��I, .t,�J,.. ThefautmAe.sealappearh�SwuauthorkedbytiobettNlemtnen,
Robert J.M.Nieminen,P.E. ..•-eS P.6 an10/12/7DSS.TfifsdoesnotserveasanelectionteoOYsignad
Florida Registration IVa.59166,Florida DC4 ANE1983 i'�,- �.y'.�`� document.Stpned,sealed hardeoples have bsen ttanwitted tothe
,• ProductAppravalAdm stratorandtothenameddlent
CERTIFICATIONOFINDEPENDENa: '
1. TrinityJERD does not have, not does it intend to acquire or will it acquite, a financial interest In any company manufatturing or
distributing products it evaluates.
.7. Trinityl ERD Is not owned,operated or controlled by any company manufacturing or distributing product It evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufactulrtl g or distributing products for
which the.evaluatlon reports are being issued.
4. Robert Nleminen,P.E.does not have,nor will acquire,a financial Interest in any other entity involved in-the approval process of the
product. j
5. This is a building code evaluation. Neither TrinitylERD nor Robert Nieminen, P.E.are,in any way,jthe.Designer of Record for any
project on which this Evaluation Report;'or previous versions thereof,is/was used for permitting or tll?sigrr guidance unless retained
specifically for that purpose.
.i.
'i
ROOFING COMPONENT EVALUATION:
1. SCOPE: j
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: Roof Underlayments, as produced by Soprema, have demonstrated compliance with the
following sections of the Florida Building Code through testing in accordance with the following-'Standards.
Compliance is-subject to the installation Requirements and Limitations/Conditions of Use set forth herein.
�. STANDARDS:
Section Property Standard Year
1504.3:1 Wind Resistance FM 4474 2004
1507.2,4,1507.2.8, Physical Properties ASTM D1970 2009
1507.2.9.2,1507.4.5.1,
1507.5.3,1507.7-3
1507.11.2 Physicai Properties ASTM D6163 2000
1507.11.2 Physical Properties ASTM D6164 2005.
15216.5.2.1 Physical Properties TAS 103 ! 1995
TAS'110 Accelerated Weathering TAS 110 2000
1507.3..3 Installation Practice FRSA/TRI April 2012(04-12) 21012
3. REFERENCES:
Ln-t#y Examination Reference Date
ERD(TST6049) ASTM D1970/TAS 110 2968.05.04-2 05/14/2004
ERD(TST6049) Physical Properties 2757.02.05 02/03/2005
ERD(TST6049) ASTM D1970/TAS 110 2974.03.052 05/17/2005
ERD(TST6049) Wind Resistance 2778.07.05 07/15/2005
ERD(TST6049) Wind Resistance 2779.11.05-111 04/18/2007
ERD(TST6049) TAS 103/TAS 110 57120.11.07-2 11/02/2007
ERD(TST6049) ASTM D1970/TAS 110 S13190.02.09-R1 04/01/2010
ERD(TST6049) ASTM D1970/TAS 110 531370.03.10-1-R1 04/07/2010
ERD(TST6049) Physical Properties/Tensile Adhesion 511150.05.10-R1 09/09/2010
ERD(TST6049) Physical Properties/Tensile Adhesion 511150.05.09-R2 10/05/2010
ERD(TST6049) ASTM D1970 537210.11.11 11/09/2011
ERD(TST6049) ASTM D1970 540540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties/Tensile Adhesion 543530.02.14-1 02/21/2014
ERD(TST6049) Physical Properties/Tensile Adhesion SOPC-SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SOPC-SC8520.14 04/17/2015
M-D(CERi592) HVHZ Compliance. 09-1005.02 11/04/2010
M-D(CER1592) HVHZ Compliance 13-0530.02 11/27/2014
ICC-ES(EVL2396) 2012,2009 and 2006 IBC Compliance ESR-1524 ! 10/01/2014
PRI(TST5878) Physical Properties SOP-064-02-01 12/03/2013
Soprema,Inc.(PDM3511) Equivalency Declaration SA SMOOTH PLY 40 05/29/2015
UL,LLC(QUA9625) Quality Control Service Confirmation Exp.10/A/2017
4. PRODUCT DESCRIPTION:
4.1 Lastobond TU HT is a self-adhering, non-woven polyester fabric surfaced, ,Si S modified bitumen roof
underlayment.
4.2 Lastobond Shield is a self-adhering, woven polyethylene surfaced, SBS modified bitumen roof
underlayment available in two widths;36 and 45 inch.
4.3 RESISTO SA SMOOTH PLY 40 is a self-adhering, woven polyethylene surfaced,;SBS modified bitumen roof
underlayment;available in 33ft x 65 ft rolls.
I
Exterior Research and Design,I.I.C. Evaluatlan Report 518050.08.09-R9
Certffrnte ofauthoriwtian Jt95D3 Fl2569-1131
.. . Revision 9:10/12/2015
Page 2 of 7
I
EK
4:4 Lastobond Shield HT is a self-adhering, woven polyethylene surfaced, high aemperature, SBS modified
bitumen roof underlayment.
4:5 Lastobond Pro HT-N is a self-adhering, woven polyethylene surfaced, SBS modified bitumen roof
underlayment available in two widths;36 and 45 inch.
4:6 Lastobond Pro HT-S is a self-adhering, woven polyethylene surfaced, high temperature, SBS modified
bitumen roof underlayment. i
4.7 Lastobond. 195 is a self-adhering, glass-mat reinforced,, sand-surfaced, SBS modified bitumen roof
I
underlayment
4.8 Lastobond is a self-adhering; glass-mat reinforced, sand-surfaced, SBS; modified bitumen roof
underlayment.
4.9 Lastobond Eco is a self-adhering, glass-met reinforced, sand-surfaced, S8S modified bitumen roof
underlayment.
4.10 Lastobond Smooth Seal HT'is a self-adhering, glass-mat reinforced, film-surfal ced, SBS modified bitumen
roof underlayment.
1'
4.11 RESISTO LB1236 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified .bitumen roof
underlayment,with a 36-inch sheet width.
`I
•4.12 PrimeSource Grip-Rite Eave&Valley Protector is a self-adhering,glass-mat reinforced,sand-surfaced,SBS-
modified bitumen roof underlayment,with a 36-inch sheet width.
4.13 RESISTO L81244 is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof
underlayment,with a 44-inch sheet width. .
4.14 Colphene FR GR is a self-adhering, fiberglass reinforced, granule surfaced, SBS modified bitumen roof
underlayment.
4,15 Unilay (e) is a mechanically attached, polyester reinforced, granule-surfaced`SBS modified bitumen roof
underlayment.
5: LIMITATIONS: j
5.1 This is a building code evaluation, Neither Trinityl,ERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project-on which this Evaluation Report, or previous•versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose,
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this.report; refer to current Approved goofing!Materials Directory for fire
ratings-of this product.
5.4 Soprema Roof Underlayments may be'used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering:
5.5 Allowable.roof covers applied atop the underlayments are follows:
TABLE 1: ROOF COVER OPTIONS
Asphalt Nail-Ori Foam-On ,' Wood Shakes&
• Underlayment Metal' Slate
.shingles Tile Tile Shingles
Lastobond TU HT Yes Yes Yes Yes j' Yes Yes
See 5.5:1
Lastobond Shield/Pro HT-N/ Yes No No No Yes Yes
RESISTO SA SMOOTH PLY 40
Lastobond Shield HT/Pro HT-5 Yes No No Yes Yes Yes
Lastobond/Lastobond 195 Yes No No No Yes Yes
Exterior Research and Design,LLC. Evaluation Report 516010.06.09-1119
.Cerd lcateofAWth"&0Von#9503 FL2569-Rll
Revision 9:10/12/2015
I I Page 3 of 7
TABLE 1: ROOF COVER OPTIONS
Asphalt Nail-On Foam-On
Underlayment am-On wood Shakes
&
Shingles Ille. Tile Metall', Shingles Slate
Lastobond ECO /RESISTO j
L131236,Grip-Rite Eave&Valley Yes. No No No j. Yes Yes
Protector/RESISTO LB1244
Lastobond Smooth Seal HT Yes No No Yes Yes Yes
Yes
Colphene FR GR Yes Yes See 55.1 No Yes Yes
i
Unflay(e) Yes Yes Yes No I'� No No
Batten Only See 5.5.1
5.5.1 "Foam-On Tile" is limited to.use of the following adhesives unless tensile adhesion/long term aging data
from art accredited testing laboratory is provided.
Underlayment Adhesive(s) J 1
Lastobond TU HT 3M 2-Component Foam Roof Tile Adhesive AH-160(FL6332)or Dow Chemlcal TileSond*"'Roof
Tile Adhesive(FL717)
Colphene FR GR 3M 2-Component Foam Roof Tlie Adhesive AH-160(FL6332)
Unflay(e) 3M 2-Component Foam Roof Tile Adhesive AH-160(FL6332)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck: . J
Lastobond Shield, Lastobond Pro HT-N, RESISTO SA SMOOTH PLY 40, Lastobond Shield HT, Lastobond Pro
HT-S, Lastobond TU HT, Lastobond, Lastobond 195,.Lastobond ECO, RESISTO LB1236, Grip-Rite Eave &
Valley Protector,RESISTO LB1244 or Lastobond Smooth Seal HT applied to: ;J
> Plywood,ASTM D41 primed plywood; OSB;ASTM D41 primed OSB;Sout4n Yellow Pine;ASTM D41
primed Southern Yellow Pine;ASTM D41 primed structural concrete.
Colphene FR GR applied to:
➢ Plywood;ASTM D41 primed plywood;ASTM D41 primed structural concrete.
I
Note:
While not required over plywood, OSB or Southern Yellow Pine substrates, Soprema recommends
priming with Elastocol Stick or Efastocol 60bc if the final roof cover is not'slated for installation within
24 hours.
Soprema requires tongue-and-groove board decking be covered wfth'dplywood or OSB prior to
installation of the self-adhering underlayment.
5.6.2 Bond-to-Insulation,
Lastobond Shield, Lastobond Pro HT-N, RESISTO SA SMOOTH PLY 40, Lastobond Shield HT, Lastobond Pro
HT-S, Lastobond TU HT, Lastobond,. Lastobond 195, Lastobond ECO, RESISTO L61236, Grip-Rite Eave &
Valley Protector,RESISTO L51244,Lastobond Smooth Seal HT or Colphene FR GR applied to.:
> Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
' For Installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's ProductJApprovai. For installations
under foam-on tile systems.(Lastobond TU HT only),insulation attachment shall be designed by a qualified
design professional and installed based on testing of the insulation/underlayment system in accordance
with FM 4474,Appendix D or TAS 114,Appendix J.
j
'i
Exterior Research and Design,LM Evaluation Report 51$030.06.09-R9
C"ficate ofAuthorhatlon#9503 FL2569-R11
Revision 9•:10/12/2015
Page 4 of 7
J
5.6.3 Bond to MachanicallV Attached Base Laver:
Lastobond Shield,Lastobond Pro HT-N,RESISTO SA SMOOTH PLY 40, Lastobond Shield HT, Lastobond Pro'
HT-S, Lastobond TU HT, Lastobond, Lastobond 195, Lastobond ECO, RESISTO'j LB1236, Grip-Rite Eave &
Malley Protector,RESISTO LB1244,Lastobond Smooth Seal HT or Colphene FR GR applied to:
A ASTM 0226,Type I or it felt,Sopra-G;Modified Sopra-G.
For installations under mechanically attached prepared roof-coverings, base la er shall be attached per
minimum codified requirements. For installations under foam-on tile systems (Lastobond TU HT only),
base layer shall be attached in accordance with FRSA/TRJ April 2012(04-12). 1
.5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Apufications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath foam-on the systems;where
the underlayment forms part of the load-path. The following wind uplift limitations apply to underlayment
systems that are not addressed in FRSA/TRI April 2012 (04-12)and are used iri foam-ori the applications.
Maximum Design Pressure is the result of testing for wind load resistance based on ailowable*wind loads,
and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has
already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 psf. !,r 1
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional)Elastocol Stick or Elastocol 6001
Underlayment: Lastobond TU HT or Colphene FR GR,'self-adhered.
5.6.4.2 Maximum Design Pressure=-67.5 psf.
Deck: Structural concrete to meet project requirements to satisfaction of AHJ.
Prlmer: Elastocol600c
Underlayment: Lastobond TU HT or Colphene FR GR,self-adhered.
5.6-4.3 Maximum Design Pressure=-60.0 psf.
Deck: Min.19/32-Inch plywood to meet project requirements to satisfaction of AHJ.
Base Sheet: Sopra-G or Modified Sopra-G mechanically attached with nails (FBC 151.7.5.1) and tin
caps(FBC 1517.5.2)spaced 6-inch o.c.at the 4-inch laps and!' Inch o.c.in three,equally
spaced rows in the center of the sheet.
Underlayment: Lastobond TU HT or Colphene FR GR,self-adhered
5.6.4.4 Maximum Dgsign Pressure=-90.0 psf.
Deck: Min.19/32-inch plywood to meet project requirements to satisfaction of AHJ.
Underlayment: Unilay(e) mechanically attached with Soprafix Polymer Batten Bar (PBI)) or Soprafix
Metal Batten Bar(MBB)with Soprema#15-EL fasteners spaced 6-inch o.c,within the 5-
inch wide, self-adhering side laps. End laps are 6-inch wide and sealed using either
heat-welding or hot-air welding techniques.
5.7 Exposure Limitations: '
j!
Lastobond, Lastobond 195,Lastobond Eco, Lastobond Smooth Seal HT, RESISTO LB1236, Grip-Rite Eave& i
Valley Protector or RESISTO LB1244 shall hot be left exposed for longer than 30:"days after installation.
Lastobond Shield, Lastobond Pro HT-N, RESISTO SA SMOOTH PLY 40, Lastobond Shield HT or Lastobond
Pro HTS shall not be left exposed for longer than 90-days after installation.
Lastobond TU HT or Colphene FR GR or Uniiay(e)shall not be left exposed for';ionger'than 180-days.after
instailatfon.
Exterior Research and Design,l3 t Evaluation Report SZ803Q.o6.p9-R9
CerRifrcat a ofAdIhorkadon#9303
FL2569-RII
.:Revision 9:10/12/101.5.
Page•5 of 7
i�'
TRINITY:ERD
6. INSTALLATION:
6.1 Soprema Roof Underlaymentg shall be Installed in accordance 'with Soprema published installation
requirements subject to-the Limitations set forth In Section 5 herein and the spe lii'ics noted below.
6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application, and prime the substrate with Elastocol Stick or
Elastocol•600c(if applicable).
E.3 Lastobond TU HT Lastobond Shield Lastobond Pro HT-N,RESISTO SA SMO OTFI PLY 40 Lastobond Shield
HT Lastobond Pro HTS Lastobond Lastobond 195 Lastobond Eco LastobordlSmoath Sea!HT,itESISTO
L81236 Gria-Rite Eave&Valley Protector RESISTO Li 1244 or Colohene FR GR-.,l
6.3.1 Shall be installed In compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile Applications:
While priming Is optional,Soprema recommends priming with Elastocol Stick or Elastocol 600c if the,final
roof cover is not slated for'installation within.24 hours.
Apply sheet parallel to the roof edge. R611 out approximately 10 ft of membrane and peel back the first 3
ft of release.film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
� I
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight..Firmly roil the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
Inches and staggered not less than 2-ft from vertical seams in the course below. All overgranule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12,Soprema recommends back-nailing in the overlap area-at the top of
the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place,working from the center of the valley or ridge in
each direction: For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Appllcatlons(Lastobond TU HT or Colphene FR GR only):
I
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and ITable 1 herein, using the
instructions'noted above as a guideline.
For foam-on tile applications,reference is-made to Section•5.6.4 herein for wind resistance limitations that
fall outside the scope of FRSA/TRI April 2012(04-12).
Tile shall be loaded and staged in a manner that prevents tiie slippage and/or damage to the
underlayment.
Unlla
6.4.1 Non-Tlle Applications or Nail-On Battened Tile Apolications:
Reference is made to Table 1 herein and FRSA/TRI April 2012(04-12)Installation Manual(if applicable).
' Apply sheet parallel to the roof edge and, starting at the eave with the selvedge-edge upslope,
mechanically attach the 5-inch wide selvedge-edge to the wood deck with nails and tin caps or round cap-
nails spaced 36-inch o.c. Apply'the.second course in a water-shedding manner with self-adhering side-
laps. Vigorous hand or motorized roller pressure is applied to the self-adhering!laps to ensure a watertight
application.
�i
Vertical seams should be 6-inches and staggered not less than 2-ft from ve>jtical seams in the course
below. All over-granule end-laps shall be sealed using either heat-welding or hot air.welding techniques.
Exterior Research and Design,LLC. Ev i luation Report S18010.06.09-R9
Cart7Jicate oMthor&atlan 1!9503 F.L2569-R11
Revision 8:10/12/2015
Page 6 of 7
I I
i'
Tile(if applicable)shall be loaded and staged in a manner that prevents tile slippl ge and/or damage to the
underlayment: j
6.4.E Foam-On Tile Applications:
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual,Table 11 herein and Section 5.6.4.4
herein. j
Apply sheet parallel to the roof edge and, starting at the eave with the selvedge-edge upslope,
mechanically.attach the 5-inch wide selvedge-edge-to the Wood deck Soprafix Polymer Batten Bar(PSB)or
Soprafix Metal Batten Bar (MBB) with Soprema #15-EL fasteners spaced 6-inch o.c. Apply the second
course in a water-shedding manner with self-adhering side-laps. Vigorous, hand or motorized roller
pressure is applied to the self-adhering laps to ensure a watertight application."
Vertical seams should be 6-inches and staggered not less than 2=ft from vertical seam's in the course
below. All over-granule end-laps shall be sealed using eitherheat-welding or hot air welding techniques.
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to .the
underlayment.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly, valuate the installation of
thls.product.
B. MANUFACTURING PLANTS: i
Contact the manufacturer or the named QA entity for information on plants covered under-Rule 61G20-3 QA
requirements.
9. QUALITY•ASSURANCE ENTITY:
UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com
-END OF EVALUATION REPORT-
• it
�i
Exterlor Research and Design,I.I.C. Eivaluation.Report S19010.06.09-119
FLU69-Rll
CerttWC9te of AuthOrization.#9503
Revision 9:10/12/2015
Page 7-of 7
T
i
i
li
I"
BQS Home { Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publi atims FBC Stall SCIS Site Map ' Links Search
Utl Product Approval
:USER:Public User
i
product Approval Menu>Product or Aooiication Search>Application List>Application Detall
FL# FL2847-R8
Application Type Revision
I
Code Version 2014
. I,
Application Status Applied For
I jI
Comments
Archived ❑
Product Manufacturer Lomanco,Inc
Address/Phone/Email 2101 West Main Street
Jacksonville,AR 72076 I
(501)982-6511
acarter@lomanco.com
Authorized Signature Andrew Carter
acarter@lomanco.com
i
I1
Technical Representative Andrew Carter
Address/Phone/Email 2101 West Main Street
Jacksonville,AR 72076
(501)982-6511 Ext 361
acarter@lomanco,com
i'
Quality Assurance Representative Andrew Carter j
Address/Phone/Small 2101 West Main Street
Jacksonville,AR 72078 j
(501)982-6511 Ext 361
acarter@lomanco.com
i
Category Roofing j
Subcategory Roofing Accessories that are an Integral Part of the Roofing System
I
Compliance Method Evaluation Report from a Product Evaluation Entity
Evaluation Entity Miami-Dade BCCO-EVL �.
Quality Assurance Entity Miami-Dade BCCO-QUA
Quality Assurance Contract Expiration Date 09/04/2018 i l
Validated By Miami-Dade BCCO-VAL
Ii
Certificate of Independence
Referenced Standard and Year(of Standard) Standard YARE
Miami-Dade TAS 100(A) 1995
Equivalence of Product Standards
Certified By
Sections from the Code
Product Approval Method Method 1 Option C
I
II
j
I
I
Date Submitted 08/16/2016
Date Validated
� I
Summary of Products
FL# Model,Number or Name Description
2847.1 Lo-OmniRidge LOR9-4 Gun Nailable 4'Ridge Vent for 9"Cap Shingles
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL2847 R8 II LOR9-4 13070110 Ddf
Approved for use outside HVHZ:Yes Verified By: Miami-Dade BCCO-EVL
Impact Resistant:N/A Created by Independent Tt i'rd Party:
Design Pressure:N/A Evaluation Reports
other:1.Refer to applicable building codes for required FL2847 R8 AE 1-0119-4 13070110,11d
ventilation.2.Omni Roll Rldge Vent shall not be Installed on
roof hips.3.Omni Roll Ridge Vent shall not be connected at
ridge intersection,nor within 12"of any side wall or roof
protrusion,with a ventilation slot clearance of 12"from such
obstructions.5.Omni Roll Ridge Vent shall not be installed
on roof mean heights greater than 33 feet.
�n
2847.2 Lo-OmniRoll LOR-30 30'Gun Nailable Shingle Over Ridge Vent
Limits of Use Installation Instructions,
Approved for use in HVHZ:Yes FL2847 R8 Ii LOR-30 13070111.Ddf
Approved for use outside HVHZ:Yes Verified By: Miami-Dade BCCO-EVL
Impact Resistant:N/A Created by Independent Third Party:
Design Pressure:N/A Evaluation Reports .
Other:1.Refer to applicable building codes for required FL2847 R8 AE LOR-30 13070111.ndf
ventilation,2.OmniRidge Vent shall not be installed on roof
mean heights greater than 33 feet. i
2847.3 OmnlRidge OR-4 4'Shingle Over Ridge Vent;
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL2847 RS II Lomanco OR -NOA 16051027.Ddf
Approved for use outside HVHZ:Yes Verified By: Miami-Dade BC-4 CO-EVLImpact Resistant:N/A Created by Independent Thiid Party:
Design Pressure:N/A Evaluation Reports
Other:1.Refer to applicable building codes for required FL2847 R8 AE Lomanco OR-4-NOA 16051027.0df
ventilation.2.OmniRidge Vent shall not be installed on roof
mean heights greater than 33 feet.
Back Ptaxt
Contact Us::2601 Blair Stone Road.Tallahassee FL 32399 Phone:850-487-1824
!I
The State of Florida is an AA/EEO employer.Coovrlaht 2007-2013 State of Florida.::Privacy Statement:;Accesslblllty Statement::Refund Statement
under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic
mall to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please contact 850.487.1395.-Pursuant to Section 455.275
(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department,'with an email address If they have one.The
emalls provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,
please provide the Department with an email address which can be made available to the public.To determine If you area licensee under Chapter 455,F.S.,please
click here.
Product Approval Accepts:
_ i�