HomeMy WebLinkAboutBPM 012017 BackupBEAR POINT MITIGATION BANK
PROJECT SITE
St. Lucie County, Florida
FDEP Permit #0175246-001
Semi-annual Status Report
In Support of Specific Condition #29
July through December, 2016
_4
Prepared for:
Glenn Henderson, Interim Director
St. Lucie County Mosquito Control District
3150 Will Fee Road
Ft. Pierce, FL 34982
(772)462-1692
FAX (772) 462-1565
Prepared by:
Hobe Sound Environmental Consultants, Inc.
9512 S. E. Duncan Street
Hobe Sound, Florida 33455
(772) 545-3676
E-mail: bobhsenv@gmail.com
TABLE OF CONTENTS
Section
Description
Page
1.00
INTRODUCTION ...............................................
1
2.00
AUTHORIZATION ..............................................
1
3.00
SUBMITTALS/CORRESPONDENCE/MEETINGS...................
2
4.00
INSPECTION/MONITORING....................................
3
5.00
ACTIVITIES ...................................................
4
6.00
MAPS/FIGURES.........................................
4
7.00
DATA/LEDGERS..........................................
4
8.0
PHOTOS & ASSESSMENT .......................................
6
9.0
COMPLIANCE & PLANNING ....................................
6
10.0
CERTIFICATION ..........................................
7
LIST OF EXHIBITS
Exhibit
Description
Page
A
Authorizations...................................................
A
B
Synopsis of Monthly Wildlife Reports ................................
B
C
Water Quality Graphs .............................................
C
D
Exotic Vegetation Management ......................................
D
E
Activities and Costs ...............................................
E
F
Water Level Graphs ...............................................
F
G
Rainfall Graphs ..................................................
G
HMaps
......................................................
H
I
Site Photographs .................................................
I
NOTE: This Report, together with the concepts and design presented herein, as an instrument of service, is intended only for the specific purpose and
Client for which it was prepared. Reuse of and improper reliance on this Report without written authorization and adaptation by Hobe Sound
Environmental Consultants, Inc. shall be without liability to Hobe Sound Environmental Consultants, Inc.
HSE 12-005.23 -i- 7 February 2017
BEAR POINT MITIGATION BANK
FDEP PERMIT # 0175246-001
STATUS REPORT IN SUPPORT OF SPECIFIC CONDITION #26
7 FEBRUARY 2017
Submitted by Hobe Sound Environmental Consultants, Inc.
On behalf of. St. Lucie County
c/o Glenn Henderson, Director
St. Lucie County Mosquito Control District — Permittee
1.0 Introduction
Bear Point Mitigation Bank (BPMB) was originally permitted on 17 November 2003 and
a perpetual modification was issued on 29 January 2010. The BPMB was determined to
be in compliance with its original permitted conditions, including the installation of 24
culverts, five years of monitoring, establishment of a financial assurance reserve account,
a credit assessment, and acceptance of a Long Term Management Plan. Water quality
data, water level data and wildlife usage will continue to be monitored in perpetuity and
results included in the semi-annual status reports.
2.0 Authorizations
Please refer to Exhibit A for authorized signatures, as required. The permittee for
BPMB is:
St. Lucie County
c/o Mr. Glenn Henderson, Director
St. Lucie County Mosquito Control District
3150 Will Fee Road
Ft. Pierce, FL. 34982
Authorized representative:
Mr. Glenn Henderson, Director
Phone:
772 462-2818
Fax:
772 462-1565
E-mail:
Hendersong(a-,stlucieco.org
The authorized agent is:
Hobe Sound Environmental Consultants, Inc.
9512 SE Duncan Street
Hobe Sound, FL. 33455
HSE 12-005.23 1 7 February 2017
Authorized representative:
Freda R. Posin, Senior Project Manager
Phone: 772 545-3676
E-mail: fredahsenv(agmail.com
The approved QMS is:
Hobe Sound Environmental Consultants, Inc.
9512 SE Duncan Street
Hobe Sound, FL. 33455
Authorized representative:
Freda R. Posin, Senior Project Manager
Phone: 772 545-3676
E-mail: fredahsenv(a,gmail.com
3.0 Submittals/Correspondence/Meetings
8 August 2016 - Received minutes from BPMB Management Committee meeting of 5-
25-16.
17 August 2016 - Received revised agenda for 31 August quarterly BPMB Management
Committee meeting.
26 August 2016 - Received WA #26 from Lauri Heistermann from SLCMCD for
continuing MS services for 2016-2017.
31 August 2016 - Quarterly BPMB Management Committee meeting held. It was
reported that a purchase of 0.10 dual credits had been made by Larry Winter. Mr.
Henderson reported that the Bank has 7.4 Federal and 8.5 State credits available that have
not been reserved. He also reported that the budget currently has $666,201.94 in pooled
cash, which represents an increase of ±$2,325.29 from the previous balance due to
interest income.
1 September 2016 - Received e-mail from Lauri Heistermann from Mosquito Control &
Coastal Management Services regarding the beginning of exotic removal maintenance.
11 October 2016 - Received vendor copy for professional services for exotic removal and
maintenance.
HSE 12-005.23 2 7 February 2017
25 October 2016 - Received copy of estimate from TSI Disaster Recovery, LLC for
Impoundment 1 to provide and place fill and clean rock rip rap on existing dike.
4 November 2016 - Received copy of estimate from TSI Disaster Recovery, LLC for
Impoundment 1 for stump removal, transfer chipped material, and debris.
17 November 2016 - Received agenda fro quarterly BPMB Management Committee
meeting of 7 December 2016.
9 December 2016 - Sent a QMS Additional work to Glenn Henderson.
27 December 2016 - E-mail from from Lauri Heistermann from SLCMCD advising that
the FCT report for July to December 2016 will be submitted late.
30 December 2016 - Received Maintenance activities and costs from Glenn Henderson.
4.0 Inspection/Monitoring
Monthly inspections for wildlife usage, security issues, construction conditions, exotic
vegetation, water levels, and trash pick-up were conducted and the results tabulated. The
July through December 2016 inspections and reports were completed by Andrew
Esieman and Shailah Steck. A synopsis of the monthly inspections (July - December
2016) can be found in Exhibit B.
Biologists observed and recorded all wildlife utilization. Wildlife utilization was
determined by sighting, scat, calls, nests, burrows, tracks, etc. Current conditions within
the mitigation bank are conducive to the life cycle productivity for various wildlife
species. Species composition within the BPMB is indicative of a healthy, productive
system and observed fauna indicates a diverse and abundant wildlife usage within the
bank. The vegetation within the BPMB appears healthy, with no outward signs of
disease or insect infestation. Natural recruitment of desirable native vegetation is evident
throughout the area. Exotic and invasive species are being treated and maintained on a
regular basis not to exceed the 1 % cover per acre in accordance with the Long Term
Management Plan, Attachment D of FDEP Permit modification Number: 0175246-014.
Exotic vegetation was minimal during this six month period.
Inspections of docks, culverts, levee, trash receptacles, gates and signage were performed
and status recorded in the monthly inspection reports. Additional details about the
culverts and levee can be found in Exhibit B.
Condition of submerged aquatic vegetation (SAV) at the culverts is also observed
monthly and noted only in case of deterioration. It is natural for SAV to move around
and disappear from one area and re -appear in another. Currently, SAV appears healthy.
HSE 12-005.23 3 7 February 2017
5.0 Activities
Activities that occurred from July 2016 through December 2016 include:
Monthly water quality testing, including DO, temperature, salinity, pH and Eh data
collection. Dates of collection were 18 July, 5 August, 20 September, 23 October and 14
November. Water quality was not collected in the month of December due to equipment
failure and has since been rectified. Water quality graphs can be found as Exhibit C.
Semi-annual exotic vegetation management occurred on 5 and 10 of September 2016.
(Exhibit D).
Weekly general dike maintenance continues, which includes trash pick-up and mowing,
as necessary. Due to the Hurricane Matthew on 7 October 2016, there was substantial
damage to the dikes and piers. The impoundment has been closed to the public since the
storm for safety issues. The dike repairs are now complete and it will be re -opened to the
public as soon as the grass has grown enough to provide stability for vehicular traffic.
The piers will remain closed until they are repaired, which is in process. (Exhibit B).
Water level data was collected every 15 minutes (Exhibit F) and rainfall was collected
daily (Exhibit G). Water level station 4 began to malfunction at the end of October
continuing into December but has since been repaired.
Monthly monitoring for wildlife and general inspection continues (Exhibit B).
Please refer to Exhibit E for BPMB maintenance and monitoring activities and costs for
July through December 2016.
6.0 Maps/Figures
Figure 1 of 6 depicts the Bank itself and the locations for data collection, including water
level and water quality data, as well as areas that were maintained. Figure 2 of 6 is the
2015 aerial photograph of the Bank showing the original are for Brazilian pepper
removal in the north. Figures 3-6 depict the Bank from a drone. All figures can be found
in Exhibit H.
7.0 Data/Ledgers
Water level, rainfall & water quality
Water levels inside the impoundment remained above the lagoon levels from July
through August when the culverts were closed and the pumps were all running. Water
level data from outside (WL 4 & 5) and inside (WL 1 & 3) the impoundment areas are
well correlated and follow daily tidal regimes while culverts were open from September
through December 2016. However, in September and October there appears to be n
eqipment malfunction for the impoundment water level data loggers, WL 1 and WL 3.
During both of these months the water level within the impoundment appears to be 2.5
HSE 12-005.23 4 7 February 2017
feet higher than in the lagoon, which it was not. Although there were some high tides,
this would not account for that great a discrepancy. By November, the equipment
appears to be functioning correctly. Success criteria 21b, Permit Modification Number:
0175246-014). (Exhibit F).
November 2016 experienced the lowest amount of total monthly rainfall (0.68 inches)
while August 2016 experienced the highest amount of monthly rainfall (7.60 inches). The
average monthly rainfall from July 2016 to December 2016 was ±3.11 inches, whereas
the average monthly rainfall in the Ft. Pierce area is ±5.34 inches according to South
Florida Water Management District. The largest amount of rainfall in a 24 hour period
occurred on 7 August 2016 when 2.35 inches were recorded. This period (July to
December 2016) exhibited slightly below average rainfall during all months, especially
in July, compared to the area's average rainfall. (Exhibit G).
Water quality parameters (i.e. water temperature, dissolved oxygen, salinity) from July to
December 2016 were within the success criteria in Permit Modification No. 0175246-
014. Water quality was not collected for the month of December due to equipment
failure; equipment has since been replaced.
There was a DO probe malfunction during the month of July, which appears to have been
corrected. The DO and temperature graphs correlate, as the lower water temperatures
result in higher DO concentrations. There was an anomaly in all water quality stations
from mid -October to mid November, as all parameters appear to be moving in the
opposite direction of what would be expected. For instance, the DO should be rising as
the water temperature is going down. Since the probes in all water quality stations
completely malfunctioned in the month of December, this could be indicative of the
beginning signs of the equipment failure. Water temperatures stayed below the
maximum of 35 degrees Celsius and DO stayed above the 1.0 PPM minimum for the
sixth month period from July through December 2016. The DO probes have been
replaced and are functioning properly.
Eh levels from July through December were well above criteria of a minimum of 0.1 MV
minimum. There is one low reading for Eh from Mit 9 (lagoon) for 18 July but the
reading was still within acceptable levels and rose appreciably after that. The pH levels
were also well above the minimum requirement of 6.0 throughout the six-month period.
Salinity remained below the 40 ppt maximum. All of the probes appears to be in good
working order at this time. Refer to Exhibit C for water quality graphs.
Ledger
There were two State credit purchases made. A purchase of 0.12 credits was made on 14
October 2016 by All Aboard Florida and a purchase of 0.20 credits was made by
Moorings Yacht Club (Joe Vargas) on 8 November 2016. These have been deducted
from the ledger and the ledger balances are 37.596 Federal credits and 42.63 State
credits.
HSE 12-005.23 5 7 February 2017
8.0 Photos & Assessment
Monthly inspections conducted from July through December 2016 verify that Success
Criteria 24a-e of Permit Modification Number 0175246-014 are being met regarding
security, construction condition, exotic vegetation, water levels, and wildlife. Issues
observed and noted during monthly inspections were addressed immediately following
monthly inspection report submittal. It should be noted that the signs for the mitigation
bank are fading and need to be replaced. This replacement is in process. Please refer to
Exhibit B. No permit modifications are anticipated for the upcoming status report
period. Continued maintenance of levee, pumps and culverts, water level and water
quality equipment are expected as needed, along with exotic and invasive maintenance,
treatment and removal. Representative photographs of Bear Point Mitigation Bank are
provided in Exhibit I.
9.0 Compliance & Planning
For the past six months water quality (WQ2 & WQ3 impoundment and WQ9 & WQ10
lagoon - Exhibit C) and water level (WL1 & WL3 impoundment and WL4 & WL5
lagoon - Exhibit F) have been recorded and plotted. Water Quality will continue to be
monitored and recorded on a monthly basis as per Permit Modification Number 0175246-
014.
Monthly monitoring of wildlife and inspection of the general condition of the Bank has
continued (Exhibit B).
The semi-annual exotic removal and maintenance program was conducted on the 5 and
10 of September 2017. (Exhibit D).
The impoundment was maintained according to Specific Condition #13 of Permit
Modification #0175246-014. The annual drawdown began 27 June and ended 5 July. The
following is a list of activities and dates of permitted operating procedures that occurred
during the July through December 2016 time period:
1 July Culverts #3, A & B fully open, culverts 4 & 5 closed, 7 pumps
running, 6 aerators running.
2 - 4 July Culverts #3, A, B & 4 fully open, culvert 5 closed, 7 pumps
running, 6 aerators running.
5 July Culverts #3 & A fully open, culverts B, 4 & 5 closed, 7 pumps
running, 6 aerators running, end of drawdown.
6 -10 July Culvert #3 fully open, Culverts A, B, 4, & 5 closed, 7 pumps
running, 6 aerators running.
11 - 23 July Culvert #3 half open, culverts A, B, 4, & 5 closed, 7 pumps
running, 6 aerators running.
24 -31 July Culvert #3 fully open, Culverts A, B 4, & 5 closed 7 pumps
running, 6 aerators running.
HSE 12-005.23 6 7 February 2017
I - 17 August
Culverts #3 fully open, Culverts A, B, 4, & 5 closed, 6 pumps
running, 6 aerators running. Pump G malfunctioning.
18-21 August
Culverts #3 half open, Culverts A, B, 4, & 5 closed, 6 pumps
running, 6 aerators running.
22-24 August
Culvert #3 is fully open, Culvert A is half open, Culverts B, 4, & 5
are closed, 6 pumps running, 6 aerators running.
25-28 August
Culverts #3 & A is fully open, Culvert B is half open, Culverts 4 &
5 closed, 6 pumps running, 6 aerators running.
29 August -
Culverts #3, A, B, 4 & 5 are fully opened, 6 pumps running, 6
10 Sept.
aerators running.
11 - 12 Sept.
Culverts #3, A, B, 4 & 5 are fully opened, 6 pumps running, 2
aerators running
13 Sept. - 4 Oct.
Culverts #3, A, B, 4 & 5 are fully opened, 5 pumps running, 2
aerators running
5 - 13 Oct.
Culverts #3, A, B, 4 & 5 are fully opened, 3 pumps running, 2
aerators running
14 - 20 Oct.
Culverts #3, A, B, 4 & 5 are fully opened, 1 pump running, 2
aerators running
21 Oct. - 2 Dec.
Culverts #3, A, B, 4 & 5 are fully opened, 0 pumps running, 2
aerators running
3 - 30 Dec.
Culverts #3, A, B, 4 & 5 are fully opened, 0 pumps running, 0
aerators running
Culverts, generators and telemetry equipment continue to be maintained throughout the
Bank on a regular basis. Pumps are removed for maintenance at the end of the
drawdown each year (December) to be cleaned and the bearings replaced. They are then
re -installed in April prior to the drawdown event. Please refer to Exhibit E for yearly
maintenance activities and associated costs.
In the next 6 months, typical site management, including debris removal, monthly
wildlife monitoring, exotic vegetation removal, water level and rainfall data collection
and monthly water quality data collection will continue.
Dike and interior exotic vegetation control and debris collection efforts are ongoing on a
weekly basis. Pier replacement/repair will be on -going until complete.
10.0 Certification
This report represents a true, accurate, and representative description of the
activities and site conditions at the time of this report.
Freda R. Posin
Senior Project Manager
Hobe Sound Environmental Consultants, Inc.
Date: 7 February 2017
HSE 12-005.23 7 7 February 2017
EXHIBIT A:
AUTHORIZATIONS
2.0 Authorizations January 2017
Please refer to Exhibit A for authorized signatures, as required. The permittee for
BPMB is:
St. Lucie County
c/o Mr. Glen Henderson, Director
St. Lucie County Mosquito Control District
3150 Will Fee Road
Ft. Pierce, FL, 34982
Authorized representative:
Mr. Glen Henderson, Directo'
Phone: 772 462-2818
Fax: 772 462-1565
E-mail: hendersongnstlucieco.or
The authorized agent:
Hobe Sound Environmental Consultants, Inc.
9512 SE Duncan Street
Hobe Sound, FL. 33455
Authorized representative:
Freda R. Posin, Senior Project
Phone: 772 545-3676
E-mail: fredahsenvngmail.com
The approved QMS is:
Hobe Sound Environmental Consultants, Inc.
9512 SE Duncan Street
Hobe Sound, FL. 33455
Authorized representative:
Freda R. Posin, Senior Project Mana
Phone: 772 545-3676 774 /Y
E-mail: fredahsenv. ,,gmail.com
EXHIBIT B:
SYNOPSIS OF MONTHLY INSPECTION SHEETS
SPECIES OBSERVED AT BEAR POINT MITIGATION BANK
FROM JULY THROUGH DECEMBER 2016
BIRDS
Common Name
Scientific Name
Number of Times Observed
Brown pelican
Pelecanus occidentalis
22
Osprey
Pandion heliaetus
62
Little blue heron
Egretta caerulea
23
White ibis
Eudocimus alba
TNTC
Great blue heron
Ardea herodias
42
Tri-colored heron
Egretta tricolor
13
Yellow-rumped warbler
Setophaga coronata
8
Great egret
Ardea alba
21
Turkey vulture
Cathartes aura
6
Anhinga
Anhinga anhinga
15
Belted kingfisher
Megaceryle alcyon
33
Mourning dove
Zenaida macroura
13
Double -crested cormorant
Phalacrocorax auritus
15
Palm warbler
Setophaga palmarum
TNTC
Wood stork
Mycteria americana
13
Pied -billed grebe
Podilymbus podiceps
3
Snowy Egret
Egretta thula
12
Eastern Phoebe
Sayornis phoebe
2
Black vulture
Coragyps atratus
46
Green heron
Butorides virescens
4
Common ground dove
Columbina passerina
1
Laughing gull
Leucophaeus atricilla
26
Northern cardinal
Cardinalis cardinalis
2
HSE 12-005.23 Page 1 of 6 7 February 2017
Black -crowned night heron
Nycticorax nycticorax
4
Reddish egret
Egretta rufescens
2
Yellow -crowned night heron
Nyctanassa violacea
2
Ruddy turnstone
Arenaria interpres
1
Eastern towhee
Pipilo erythrophthalmus
1
Blue jay
Cyanocitta cristata
2
Merlin
Falco columbarius
1
Northern mockingbird
Mimus polyglottos
1
Red -bellied woodpecker
Melanerpes carolinus
1
European starling
Sturnus vulgaris
3
Least sandpiper
Calidris minutilla
3
Sanderling
Calidris alba
1
Red knot
Calidris canutus
1
American crow
Carvas brachyrhynchos
6
Black skimmer
Rynchops niger
10
Cattle egret
Bubulcus ibis
27
Fish crow
Carvus ossifragus
13
Mottled duck
Anas fulvigula
6
Roseate spoonbill
Ajaia ajaja
2
MAMMALS
Common Name
Scientific Name
Number of Times Observed
American raccoon
Procyon lotor
3
Rat
Rattus sp.
1
Bobcat
Lynx rufus
1
Opossum
Didelphis virginiana
1
Rabbit
Sylvilagus palustris
1
HSE 12-005.23 Page 2 of 6 7 February 2017
River otter Lutra canadensis 1
FISH
Common Name
Scientific Name
Number of Times Observed
Needlefish
Strongylura sp.
TNTC
Mosquitofish
Gambusia holbrooki
TNTC
Common snook
Centropomus undecimalis
2
Black (striped) mullet
Mugil cephalus
TNTC
Atlantic Tarpon
Megalops atlanticus
1
Mangrove snapper
Lut anus griseus
TNTC
Lane snapper
Lu Janus synagris
3
White mullet
Mugil curema
1
Sheepshead
Archosargus
probatocephalus
4
Catfish
ktalurus sp.
2
Bay anchovy
Anchoa mitchilli
TNTC
CRUSTACEANS
Common Name
Scientific Name
Number of Times Observed
Mangrove tree crab
Aratus pisonii
TNTC
Fiddler crab
Uca spp.
TNTC,
Giant land crab
Cardisoma guanhumi
TNTC
Blue crab
Callinectes sapidus
TNTC
Barnacles
Cirripedia
TNTC
Oysters
Ostreoidea
TNTC
Hermit crab
Paguroidea
TNTC
Horseshoe crab
Limulus polyphemus
1
Brown shrimp
Farfantepenaeus aztecus
TNTC
HSE 12-005.23 Page 3 of 6 7 February 2017
REPTILES
Common Name
Scientific Name
Number of Times Observed
Brown anole
Anolis sagrei
TNTC
Large head anole
Anolis cybotes
TNTC
Cuban night anole
Anolis equestris equestris
2
Green anole
Anolis carolinensis
2
*TNTC= Too Numerous To Count
HSE 12-005.23 Page 4 of 6 7 February 2017
SYNOPSIS OF BANK CONDITIONS
JULY THROUGH DECEMBER 2016
Security: The levees, gates and barriers were in good condition
and functioning properly. However the staff gauge
on the north end and several signs on the interior
culverts have fallen. Numbers are missing at culverts
21 4, 9, 20 and 22. The preserve signs are fading and
the crab sign is incorrect. At SG4 there are a few
warped and splintering boards.
Construction Condition: The pumps were functioning properly, except for
pump G that malfunctioned on 1 August 2016.
Culverts are in good condition. However, Hurricane
Matthew and extremely high tides have caused
extreme erosion on the levees. There are multiple
portions of the levee where the ground cloth is
exposed due to the rip -rap washing away or being
displaced. In addition, there is major washout at the
pump station. There continues to be both
maintenance and clean-up efforts due to the
hurricane. The entire impoundment has been closed
due to damage from the hurricane since 7 October
2016. Repairs on the dike are now complete and the
impoundment will re -open to the public as soon as
the grass has grown in enough to stabilize the dike.
The boardwalks and piers remain closed to the
public.
Exotic Vegetation: Exotic vegetation was observed along the trail these
past six months. This included umbrella tree,
Australian pine, Durban crowfoot grass, balsam
apple and false buttonweed. As these species were
observed, they were flagged so the maintenance
crews as well as the exotic removal contractor can
easily identify them. This has been working well
and the exotics are being eradicated on a regular
HSE 12-005.23 Page 5 of 6 7 February 2017
schedule.
Water Levels: Water levels ranged from roughly 1.3 to 2.9 feet
within the impoundment during the six month time
period. The staff gauge inside the impoundment
needs to be cleaned.
Trash Pick-up: Although there was an ample amount of trash, such
as water bottles, beer cans and plastic debris, it is
removed on an on -going basis as part of the regular
Bank maintenance.
HSE 12-005.23 Page 6 of 6 7 February 2017
EXHIBIT C:
WATER QUALITY GRAPHS
-c-
35
30
25
10
5
It
TEMPERATURE
JULY-DECEMBER 2016
(35 DEGREES CELCIUS MAXIMUM)
7/18/2017 8/18/2017 9/20/2017 10/23/2017 11/14/2017 DECEM BER
DATE
Mit 2
IMP
Mit 3
IMP
Mit 9
LAG
—Mit 10
LAG
20
18
16
14
12
a
a 10
O
8
6
4
2
0
DISSOLVED OXYGEN (DO)
JULY-DECEMBER 2016
(1.0 PPM MINIMUM)
7/18/2017 8/18/2017 9/20/2017 10/23/2017 11/14/2017 DECEM BER
DATE
Mit 2
IMP
—Mit3
IMP
Mit 9
LAG
—Mit 10
LAG
40
35
30
25
15
10
5
0
SALINITY
JULY-DECEMBER 2016
(40 PPT MAXIMUM)
7/18/2017 8/18/2017 9/20/2017 10/23/2017 11/14/2017 DECEM BER
DATE
Mit 2
IMP
Mit 3
IMP
—Mit9
LAG
—Mit 10
LAG
8.2
8
7.8
7.6
a
7.4
7.2
7
6.8
pH LEVELS
JULY-DECEMBER 2016
(6.0 MINIMUM)
7/18/2017 8/18/2017 9/20/2017 10/23/2017 11/14/2017 DECEM BER
DATE
Mit 2
IMP
—Mit3
IMP
-Mit9
LAG
—Mit 10
LAG
0.7
0.6
0.5
0.4
t
w
0.3
0.2
0.1
0
Eh LEVELS
JULY-DECEMBER 2016
(0.1 MV MINIMUM)
7/18/2017 8/18/2017 9/20/2017 10/23/2017 11/14/2017 DECEM BER
DATE
Mit 2
IMP
-Mit3
IMP
Mit 9
LAG
Mit 10
LAG
EXHIBIT D:
EXOTIC VEGETATION MANAGEMENT
W!
Southeast
Soil & Environmental
SerT ce, inc. 4511 S. Indian River Dr.,Ft. Pierce, FI 34982
September 12, 2016
TO: Lauri Heisterman
St. Lucie County Mosquito Control & Coastal Management Services
3150 Will Fee Road
Ft. Pierce, FL 34982
FROM: Gregory J. Sawka, CPSS
PROJECT: Bear Point - # P1601450
Exotic removal / Maintenance- SEPTEMBER-2016
Southeast Soil & Environmental Service is please to complete exotic
removal & maintenance- September, 2016 at Bear Point. Hand pulling of
smaller sprouts < 1/2-inch diameter sprouts and chemical spraying of exotics
dominated by Brazilian pepper with a few Australian pines were conducted
during the first few weeks of September. Small sprouts were common on the
southern end of the parcel between the north property berm and sand flats. A
few larger trees were also uncovered and treated. Total ± 317 property was
surveyed from the southern perimeter trail north to the upper sand flats.
J. Sawka, CPSS
CPSS No. 02625
page 1
VIddoeI!
I P
Ar y
.,�. lipial* •, .r
� � P .; 1 jf, •tom-.. .?.;1,.
Pre and Post Treatment at Bear Point (SEPTEMBER 2016)
Ilk
Ar�T co
a
Brazilian Pepper
Tire Removal
r
EXHIBIT E:
ACTIVITIES & COSTS
eye
ST. LUCIE COUNTY
BOARD OF COUNTY
CONMSSIONERS
CHRIS D7.ADOVSKY
CHAIRMAN
DISTRICT 1
TOD MOWERY
VICE-CHAIRMAN
DISTRICT 2
LINDA BARTZ
DISTRICT 3
FRANME HUTCHINSON
DISTRICT 4
CATHY TOWNSEND
DISTRICT b
HOWARD N. TIPTON
COUNTY ADMINISTRATOR
DAN McIN YRE
COUNTY ATTORNEY
MAILING ADDRESS
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34982
PHONE
(772) 462-2818
TDD
(772) 462-1428
FAX
(772) 462-1 565
E-MAIL
HENDERSONG@
STLUCIECO.ORG
WEBSITE
WWW.STL.UCIECO.GOV
iviosquito l.onirol a i_oastai management �iervice5 irector
December 30, 2016
Freda Posin
Hobe Sound Environmental
9512 SE Duncan St.
Hobe Sound, FL 33455
RE: Bear Point Mitigation Bank Maintenance Activities
Dear Ms. Posin,
Outlined below, Please find the maintenance activities for Bear Point Mitigation
Bank, from July through December, 2016.
Account AdWity
Cost
Salaries and Benefits Water Quality Testing & Dike Maintenance S 366.48
Contracted Services Exotic Maintenance — SE Soil $ 2,599.00
Conmiunications Telenietry $ 313.04
Equipinent Maintenance Telenietry $ 3,711.15
QMS Services Monitoring $ 7,782.50
Total $14,772.17
If you have any questions or require any additional information, please feel free to
contact me.
Sincerely,
Glenn Henderson,
Mosquito Control Director
GH111h
LU(��E
EXHIBIT F:
WATER LEVEL GRAPHS
-F-
P
W
W
LA.
J
W
7
W
J
W
H
Q
3
2.5
1.5
0.5
-0.5 -
BPMB WATER LEVEL (WL) COMPARISON CHART
3-4JULY2016
pp P A5 P 3p P-o Pop p, D� Pop PokeRo op'3pe��e opQoe�p P�� pop �� pip p�� pop poQ opQ��Q opQoQ opQ��Q�
,�L. ti• 3• p.
WL 1 IMP
WL 3 IMP
WL 4 LAG
WL 5 LAG
BPMB WATER LEVEL (WL) COMPARISON CHART
8 - 9 AUGUST 2016
2.5
2 —
1.5 1 —
p
W
W
U.
-I
W
L 1
W
J
W
0.5
Ell
I
-0.5
-'T00 P �' P�0 P� '' P 00 P �� pS30 P��Q Ope R�Q�3pQ01�Q Ope p5Q�0 P�5 P 00 P �' P�0 P �' P Op P ��Q�OQ��Q Ope A�Q030Q��Q�
WL 1 IMP
WL 3 IMP
W L 4 LAG
WL 5 LAG
BPMB WATER LEVEL (WL) COMPARISON CHART
20 - 21 SEPTEMBER 2016
5
4.5
4
3.5
P 3
W
W
LL
.J
W
W 2.5
J
W
a
3 2
1.5
1
0.5
0
3? �-o5 'I �
WL 1 IMP
WL 3 IMP
W L 4 LAG
AWL 5 LAG
BPMB WATER LEVEL (WL) COMPARISON CHART
6 - 7 OCTOBER 2016
6
5
4
P
w
w
U.
-I
w
�w 3
J
w
1
He
1ti�� ob 300 �0 oo . � �0o�0 Q P.
0 b o 0� 9 0l0 30 v0 zoo - � �00 ' 1 oo� i pl0 y 6 0 Nlb 9 0<Q0 ,.
WL 1 IMP
WL 3 IMP
W L 4 LAG
- WL 5 LAG
BPMB WATER LEVEL (WL) COMPARISON CHART
11 - 12 NOVEMBER 2016
3.5
c
2.5
WL 1 IMP
WL 3 IMP
W L 4 LAG
WL 5 LAG
1
0.5
I
0
titi. 1• 3• 5• 1 • 4i. ,yp•. 7�:• '1;. 3• 5• 1 • °�•. ti0'• -yti• ti• R'• 5•• 1•• 9'• titi• ti'l;. �;. �•. 6•. 1•. 9•. ,��;.
2.5
P 1.5
0.5
He
BPMB WATER LEVEL (WL) COMPARISON CHART
21- 22 DECEMBER 2016
3��C��Q p3 oQ �� �� l0 l �p �o��� �3�9 �� o�� o�� pQ �6 0 to ���Q0
WL 1 IMP
WL 3 IMP
W L 4 LAG
WL 5 LAG
EXHIBIT G:
RAINFALL GRAPHS
a]
s
A
Lu
W
= 5
U
z
J
J
LL
z 4
�3
2
1
0
AVERAGE vs ACTUAL RAINFALL
JULY- DECEMBER 2016
JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
MONTH
■ ACTUAL
■ AVERAGE
A
A
5
IA
W
C.l
z
-1 4
J
Q
z
m
1
W
JULY AUGUST
ACTUAL RAINFALL (INCHES)
JULY- DECEMBER 2016
SEPTEMBER OCTOBER NOVEMBER DECEMBER
MONTH
■ ACTUAL
EXHIBIT H:
MAPS
-H-
NOT A SURVEY
of
L
NORTH
600' 1200' 2400'
SCALE: 1" =12001
SOURCE: ST. LUCIE COUNTY MOSQUITO CONTROL DISTRICT, 2015 ANNUAL BEAR POINT AERIAL PHOTOGRAPH
4800'
ST. LUCIE COUNTY SEC. TWP. I R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT H
FLORIDA 12-005.23 01- MAINT & MON.DWG 31 JANUARY 2017 FIGURE:
12,13 35S 40E 1 OF 2
LATITUDE: N270 26.250' 1 LONGITUDE: W080017.495' I DESIGNED BY: FRP I DRAWN BY: FRP CHECKED BY: RLW
BEAR POINT MITIGATION BANK
SEMI-ANNUAL STATUS REPORT: JANUARY 2017
MAINTENANCE AND MONITORING SITES
HHobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
Hobe Sound, FL. 33455
E(772) 545-3676, E-mail: bobbsenv@gmail.com
- - . • - ti terry --•�� y _- ` � - �--.` y _ ��
Ybit
1 ,A
PHOTOGRAPH #01: NORTH END OF BANK
Ah
3
7�.p1'r.
1w
PHOTOGRAPH #02: SOUTHEAST PORTION & INTERIOR OF BANK
SOURCE: PHOTOGRAPHS BY DRONE, ST. LUCIE COUNTY MOSQUITO CONTROL DISTRICT
ST. LUCIE COUNTY SEC. TWP. R. HSE JOB NO.: DRAWING NAME: DATE: FIGURE:
FLORIDA 12,13 1 35S 40E 12-005.23 EX H - 03 - AERIALS.DWG 31 JANUARY 2017 3 OF 6
LATITUDE: N27° 26.250" I LONGITUDE: W080°17.495" DESIGNED BY: FRP DRAWN BY: FRP CHECKED BY: RLI
BEAR POINT MITIGATION BANK
SEMI-ANNUAL STATUS REPORT: JANUARY 2017
2016 AERIAL PHOTOGRAPHS
HHobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
Hobe Sound, Fl. 33455
E(772)545-3676, E-mail: bobhsenv@gmail.com
PHOTOGRAPH #03: INTERIOR OF BANK
PHOTOGRAPH #04: CURVE AT NORTH END OF BANK SHOWING INTERIOR WALKWAY
ST. LUCIE COUNTY SEC. TWP. R. HSE JOB NO.: DRAWING NAME: DATE: FIGURE:
FLORIDA 12,13 35S 40E 12-005.23 EX H - 04 - AERIALS.DWG 31 JANUARY 2017 4 OF 6
LATITUDE: N270 26.2501, LONGITUDE: W080017.495" DESIGNED BY: FRP DRAWN BY: FRP CHECKED BY: RLW
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JANUARY 2017 Hobe Sound, Fl. 33455
2016 AERIAL PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
PHOTOGRAPH #05: WEST SIDE OF BANK
PHOTOGRAPH #06: PUMPS RUNNING ON SOUTH END OF DIKE OUTSIDE OF BANK
ST. LUCIE COUNTY I SEC. I TWP. R. HSE JOB NO.: DRAWING NAME: DATE: FIGURE:
FLORIDA 12,13 35S 40E 12-005.23 EX H - 05 - AERIALS.DWG 31 JANUARY 2017 5 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: FRP DRAWN BY: FRP CHECKED BY: RLW
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JANUARY 2017 Hobe Sound, Fl. 33455
2016 AERIAL PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
;e
i - A - 1 ✓
PHOTOGRAPH #07: INTERIOR OBSERVATION DECK
r it,
s
4U
PHOTOGRAPH #08: TRAUB DOCK IN LAGOON AT SOUTH END EAST OF BANK
ST. LUCIE COUNTY SEC. TWP. R. HSE JOB NO.: DRAWING NAME: DATE: FIGURE:
FLORIDA 12,13 35S 40E 12-005.23 EX H - 06 - AERIALS.DWG 31 JANUARY 2017 6 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: FRP DRAWN BY: FRP CHECKED BY: RLW
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JANUARY 2017 Hobe Sound, Fl. 33455
2016 AERIAL PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
EXHIBIT I:
SITE PHOTOGRAPHS
-I-
PHOTOGRAPHS 6Y[ISE
PHOTOGRAPH #01: PUMPS RUNNING IN THE IMPOUNDMENT.
PHOTOGRAPH #02: THE STAFF GAUGE ON THE SOUTH SIDE OF THE PROPERTY THAT NEEDS
TO BE CLEANED.
ST. LUCIE COUNTY SEC. TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12-005.23 01 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
12,13 35S 40E 1 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK
SEMI-ANNUAL STATUS REPORT: JULY 2016
SITE PHOTOGRAPHS
HHobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
Hobe Sound, Fl. 33455
E(772)545-3676, E-mail: bobhsenv@gmail.com
PHOTOGRAPHS BY HSE
PHOTOGRAPH #03: RIP -RAP DAMAGE ALONG DIKE
PHOTOGRAPH #04: RIP -RAP DAMAGE JUST SOUTH OF THE PUMP STATION
ST. LUCIE COUNTY SEC. TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12-005.23 02 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
12,13 355 40E 2 OF 6
LATITUDE: N270 26.250" 7LONGITUDE: W080017.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JULY 2016 Hobe Sound, Fl. 33455
SITE PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
ruOTOCRAMIS BY ❑SE
v�1
a
PHOTOGRAPH #05: HURRICANE DAMAGE INFLICTED ON THE LAGOON SIDE NEAR THE
PUMPS.
PHOTOGRAPH #06: DAMAGE CAUSED BY THE HURRICANE TO THE RIP RAP
ST. LUCIE COUNTY SEC- TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12,13 1 355 40E 3 OF 6 12-005.23 03 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
LATITUDE: N27126.250" LONGITUDE: W080°17.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JULY 2016 Hobe Sound, Fl. 33455
SITE PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
ruOTOCRAMIS By [ISE
CLOSED
DUE
TO
STORM
DAMAGE
Danger
PHOTOGRAPH #07: SIGN ON OUTSIDE GATE INFORMING PUBLIC OF IMPOUNDMENT CLOSING
PHOTOGRAPH #08: ONE OF THE CLOSED PIERS AT THE MITIGATION BANK
ST. LUCIE COUNTY I SEC. I TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12-005.23 04 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
12,13 355 40E 4 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JULY 2016 Hobe Sound, Fl. 33455
SITE PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
ruOTOCRAMIS BY [ISE
PHOTOGRAPH #09: FADED SIGN AT ENTRY TO IMPOUNDMENT
11
7
F Sr a
kk
PHOTOGRAPH #10: FADED SIGN AT ENTRY TO MITIGATION BANK
ST. LUCIE COUNTY I SEC. I TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12-005.23 05 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
12,13 355 40E 5 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JULY 2016 Hobe Sound, Fl. 33455
SITE PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com
PHOTOGRAPHS BY HSE
PHOTOGRAPH #07: OSPREY HUNTING FROM RIP -RAP
PHOTOGRAPH #08: MUD CRAB AND MANGROVE MOSQUITO FISH
ST. LUCIE COUNTY I SEC. I TWP. R. HSE JOB NO.: DRAWING NAME: DATE: EXHIBIT I
FLORIDA 12-005.23 06 - PHOTOS.DWG 7 FEBRUARY 2017 FIGURE:
12,13 355 40E 6 OF 6
LATITUDE: N270 26.250" LONGITUDE: W080017.495" DESIGNED BY: RLW DRAWN BY: SGS CHECKED BY: FRP
BEAR POINT MITIGATION BANK H Hobe Sound Environmental Consultants Inc.
S 9512 SE Duncan Street
SEMI-ANNUAL STATUS REPORT: JULY 2016 Hobe Sound, Fl. 33455
SITE PHOTOGRAPHS E (772)545-3676, E-mail: bobhsenv@gmail.com