HomeMy WebLinkAboutMisc Letters F F
OLNEYA
RESTORATION GROUP
License CGC1330974 CCC1520287 R E C E I!'7_D OCT 092017
Olneya Restoration Group DATE:SEPTEMBER 21,2017
4253 SW I-Egli Meadows Ave. Palm City,FL 34990
772-222-5019 EXPIRATION DATE OCTOBER 20,2017
Bhougli@Olneya.com
TO Bob Mcallister
Unit A16 Venture 3
Jensen Beach,FL 34957
910-728-2371
Work Proposal Estimate:
Olneva Restoration Group will provide all necessary materials and labor to perform the folloNving work in accordance with
Florida Building Codes,Local Codes,OSHA and standard building practices:
Roof Replacement with GAF Dimensional Shingles:
1. Remove entire 22sq of existing roof shingles.
2. Re-nail roof deck to meet current code.
3. Install new synthetic underlayment. Option of peel and stick
4. Install new GAF starter.
5. Install new valley•metal.
6. Install all new flashings,boots and jacks.
7. Install new GAF Timberline Dimensional Shingle.
8. Install new box vents.
9. Install 2 new Miami Dade Impact rated skylights.
10. Includes replacing up to 3 sheets of decking.
11. Includes standard style gutters on North and Sides,no down spouts.
12. Includes disposal of all debris,necessary permitting and completing all required inspections_
13. Includes 2 year workmanship and all manufacturers warranties.
14. Shingle Color Chosen: W/Y/TB7
Contract Price:
Timberline HD HD ShiWles w/peel and stick underlayment and gutters: $10,000.00
ted:
Signature Date �!
lay .
eya est. Gro u ep. Date
Payment Terms:
*40%due upon signing of contract and 60%upon completion of scope of work. (�
(OPV off' (001-el (or 17ceclecl L)Nra DI kL_J/4 1A7