Loading...
HomeMy WebLinkAboutMisc Letters F F OLNEYA RESTORATION GROUP License CGC1330974 CCC1520287 R E C E I!'7_D OCT 092017 Olneya Restoration Group DATE:SEPTEMBER 21,2017 4253 SW I-Egli Meadows Ave. Palm City,FL 34990 772-222-5019 EXPIRATION DATE OCTOBER 20,2017 Bhougli@Olneya.com TO Bob Mcallister Unit A16 Venture 3 Jensen Beach,FL 34957 910-728-2371 Work Proposal Estimate: Olneva Restoration Group will provide all necessary materials and labor to perform the folloNving work in accordance with Florida Building Codes,Local Codes,OSHA and standard building practices: Roof Replacement with GAF Dimensional Shingles: 1. Remove entire 22sq of existing roof shingles. 2. Re-nail roof deck to meet current code. 3. Install new synthetic underlayment. Option of peel and stick 4. Install new GAF starter. 5. Install new valley•metal. 6. Install all new flashings,boots and jacks. 7. Install new GAF Timberline Dimensional Shingle. 8. Install new box vents. 9. Install 2 new Miami Dade Impact rated skylights. 10. Includes replacing up to 3 sheets of decking. 11. Includes standard style gutters on North and Sides,no down spouts. 12. Includes disposal of all debris,necessary permitting and completing all required inspections_ 13. Includes 2 year workmanship and all manufacturers warranties. 14. Shingle Color Chosen: W/Y/TB7 Contract Price: Timberline HD HD ShiWles w/peel and stick underlayment and gutters: $10,000.00 ted: Signature Date �! lay . eya est. Gro u ep. Date Payment Terms: *40%due upon signing of contract and 60%upon completion of scope of work. (� (OPV off' (001-el (or 17ceclecl L)Nra DI kL_J/4 1A7