HomeMy WebLinkAboutSLC # 220 PERMITCOMCAST ## 220
Itl(;FI'F-1[11'•t4',� j'1:It+1II'[ APPLIC'A'UQN-, ,) INI
ST-LUCIE'C',Qt,.JN'IT FNGINEERIN,!G DIVI I(IN,
2300 VIRGINA AVl',NUF,, 2ND FI,00(t, F'T. PIERCE, FL349'82 772) 462-1707
Submit via email at: 12i�=hfoft4'rtr I'crtr:itl'a:stlucircu.n
N.AA1EoFAPPL1CANT C04ICAST PHOXENo.561-227-4127
MAILINfi ADDRESS 3860 RGA BLVD STE 6002. PALM BCH GARDENS, =L 33410 EMiklt wade_hagoay(i cable Comcast Com
TYPE OF PROJECT (CHECK ONE) rRESIDENTIAL PCOMMERCIAL nUTILITY ❑DEt'ELOPMENT ORDER
;game of WNER responsible f'or utility after installation COMCAST
PHONE, No 561-227-4127 i:hiAu. wad e_hagariy@cah e.camcast corn
Ultimate OWNER does not take possession until acceptance of work.
PERNUTTEE REPRESENIATIVE RESPONSInl:ls FOR NOTIFYING ST. 1,€1CIF: COUN'rY 24 HOURS PRIOR TO WORKING IN COUNTY RIGHT-OF-WAY
NAME Cary J Gifford PIIONF. No 772-286-0954
WE SIIAI,t, CIiMMI1 N(:F:, ('ONS'I'RUC'I'ION OF "I'Hf.: )'t.:IL17r"I'I'F:i) INS'I'Al.1.A'I'ION €)N upcn issuance ANI) CONIPt.t.'I'E: Wl'1'nIN A5 IMVS TI1EKEOF.
CONTRACTOR'S NANIE Gary J Gifford, Inc
MAILING Ar)DRESS 350 SW Linden St Stuart FL 34997
P1i()NE:iF1%4A1L 772-286-0954 giifelec@comcast.net
As the Applicant, we request perrnission to construct road drainage, or combination drainage/utility, in Right -of -Way or easements deeded to
or maintained by St. Lucie County, or dedicated to the public areas of St. Lucie County, (hereinafter referred to as "County Right -of -Way").
Type of work that is being performed in County Right-oi' Wiy, and name of County Road'
FTI, Service address - 58 11 Deer Run Dr #CA'FV - Install new Comcast power supply cabinet on the scuth side of FPL pole located
approx. 105 ft south of Furnpike Feeder ltd. 19 ft west of Deer Run Dr. Re€rloj J darnaged cabinet when the new cabin t is cuerg.ized.
The following MUST be submitted with an original signed copy of this application (3 COPIES OF EACH).
1) Detailed maintenance of traffic plan from FDOT's " Desipi Standards 600 Series", If traffic control requires detours, and/or road
closures, a Florida Registered Professional Engineer will be required to design, sign, and seal said plans.
2) Show on an attached set of plans (i l"xl7" preferred) the location and character of the work, and detail the aspect of the work that will
disturb County maintained improvements (hereinafter referred to as "IMPROVEMENT'S"),
Alsplic" ) t14r WADE HAGERTY i"
PERMIT COORDINATOR
M _ DateALn,ailfl'honeWadehagety@cable.comcast.com / 561 662-8792
mg with insttionofwork covered by ibii agree to comply with the "GENERAL AND SPECIAL
CONDITIONS OF THE RIGHT-OF-WAY PERMIT".
OFFIC1F USE: OI ,Y
RIGHT -OP -WAY DESCRIP['10I4: ,1.�S2S� 7L T✓� QI_
�1 LO �UJ
REVIEWEDBYACQuISRIONSI?tV1SIC) DA"IT
Rpm..FWF:f.) By ROAD & BRIDGE DIVISION DA'T'E
The aforestated installation is hereby permitted under the following provisions
BOARD OF COUNTY COMMISIONERS. ST. LUCIE COUNTY, FLORIDA
BY
Uountz Engineer -enforcing of iiciat
SEP 19 2011
17 r
DAJ'F, R/W PERMIT NO
Revised January 2017
Page I of 3
RECEIVED
SEP 18 2017
ENGINEERING
FA
The applicant declares that prior to filing this application, he/she has (1) ascertained the location of existing utilities that would be
affected by the proposed installation, and (2) notified such affected utility owners in writing regarding same, and (3) correlated the
proposed installation with owners of such utilities and determined that the proposed installation can be made without detriment to such
existing utilities. If granted a permit for construction of proposed installation on County rights-of-way, the applicant agrees to the
following:
I _ Safety: All construction work shall comply with the safety provisions of all federal, state and local laws.
2. Traffic Control,: Measures shall be provided during construction in accordance with the FDOT Design Standards 600 Series.
'I raffic shall be maintained to the degree required by the County Engineer.
3, To Save Harmless the Board of County Commissioners and each and every member thereof' from the payment of any
compensation or damages resulting from the exercise ofrights and privileges herein granted.
1, In the event that modification cxr rein of the ifmf�r�t�_rncni�_on aforestated County right-of-way becomes necessary, to
promptly move/remove the installation permitted herein, as requested by the Board of County Commissioners of St. Lucie
County, Florida, at no cost to the County.
Removal of Installation: In the case of noncompliance with the requirements stated herein, the installation permitted herein
will be promptly brought into compliance or removed from County right-of-way by applicant at no cost to the County.
6 repair of Ito )-overnent,,, by Permittee:_ Applicant agrees to promptly repair any damage/injury to improvements on County
right-of-way caused by reason of the exercise of rights and privileges herein granted, restoring same to a condition equal to
that which existed immediately prior to the infliction of such damage or .injury in a manner satisfactory to the County.
7, Permit Life: If this permit is granted, it shall be valid for a period of 180 calendar days from date of approval subject to
termination by the County in the event that improvements on aforestated County right-of-way are to be
constructed/reconstructed, or in the event that such right-of-way shall be closed, abandoned, vacated or discontinued.
8. The attached sketch(sl covering details of the permitted installation shall be made a part of this permit. Deviations from the
approved work or maintenance of traffic plan shall require prior approval of the County Engineer.
9. Notification to County Fsnt?ineer: The County Engineer's office shall be notified twenty-four (24) hours in
advance of starting work on County rights-of-way. New construction that is discovered to have begun
without notification will be subject to a stop work order until proper permits have been acquired. Unless
the work activity is accomplished in continuous work days (exciuding weekends and holidays), re -
notification shall be required upon any lapses.
10. Permit on Job_ Site: All projects requiring a County Right -Of -Way or Driveway Permit will be required to have a copy of the
permit on the job site and be able to produce said copy when requested. Failure to do so will be considered as operating without
a valid permit and operations shall cease and desist. As in the past, field work that is classified as maintenance will not be
subject to the above. The exception on maintenance would be in the event excavation adjacent to a roadway is to be left open
overnight. We. would want notification for the purpose of inspecting for adequate barricades, lights, etc.
11. Rights ora Prior Permit ec:: The construction and maintenance of aforestated installation shall not interfere with the property
and rights of a prior permittee.
12. [anal l seer lion,, The County Engineer's office shall be notified by the applicant upon completion of the installation permitted
herein, so that a final inspection may be made.
13, Other Cntities: This permit in no way waives the authority and/or jurisdiction of any other governmental entity. Applicant is
solely responsible for ensuring that all other stakeholders affected by the work or that have ownership of the work site, or
portions thereof, have been adequately notified and have given permission to perform work.
Revised January 3 2017
Page 2 of 3
p 2 a KT1[iU►TM[i
I . Applicant agrees that in case of future damage (test of time) to the right-of-way or pavement due to subject installation, the
applicant shall repair and restore same to condition acceptable to the County Engineer.
2. Applicant agrees that the expense far any modifications to subject utility installation required before, during or after any future
right-of-way, drainage or roadway improvements are implemented shall be borne solely by the applicant, including but not
limited to: removal, relocation, manhole adjustments, etc.
3. All work done within right-of-way shall be done Monday through Friday, 8:00 AM - 5:00 PM, excluding County observed
holidays and County closures, unless otherwise approved by the County Engineer. Alii ►ySZrh per_fornted after huUts abilll
bC r'' v 3 rInspector
CELE.
4. Any road closures shall be requested in writing, along with an accompanying traffic detour plan for review, to the County
Engineer twenty-one (21) days prior to requested closure. The County Engineer reserves the right to modify the maintenance
of traffic (MOT) as needed based upon performance..
5. Any approved open pavement cut or treneh cut in proposed limits of future pavement shall be restored to FDOT and St. Lucie
County standards.
6. No excavation shall take place within a minimum of five (5) feet of the edge of pavement or within the Clear Recovery None
(CRL).'I'his distance may be increased by County Engineer dependent upon posted speed limit of roadway.
f. Minimum cover of 36" under the travelway and 30" elsewhere, including swales/ditches, shall be maintained over the utility.
Conflicting utilities shall maintain 18" separation unless specifically approved by County Engineer.
S. lack & Bore or Directional Bore installations shall be done per FDOT specifications. Casings under the travelway shall extend
a minimum of eight (8) feet beyond the edge of the travelway. Bentonite or drilling fluid shall be removed from Right-of-
Way/project site same days as drilling operations.
9. Driveways, roadways, trenches and/or sidewalks shall be restored per the detail approved on the plans or specified in this
permit. Proof of compaction shall be copied to the County Engineer.
10. Two (2) sets of certified record drawings shall be submitted to this office immediately upon completion of subject
utility installation.
1 1. Dependent upon the type of project, additional permit(s) and/or agreement(s) may be required prior to approval of the right-of-
way permit.
Revised January 3 2017
Page 3 of 3
Notes for completing a St. Lucie County Right -of -Way Permit
Name of Applicant: this is the name of the entity requesting the permit (i.e. FPL, FPUA, AT&T,
Comcast, etc)
Name of Owner responsible for utility after installation: if a utility is being installed by a
contractor not hired by a utility, the utility company MUST accept the work before it can be
transferred.
upon issuance
"We shall commence construction of the permitted installation on and complete the same
within 45 days thereof." The Right -of -Way Permit is valid for 180 days from the date it is
approved by the County. Your anticipated start date and anticipated duration of the work is
REQUIRED.
Permittee Representative: the person who is responsible to coordinate with the County
regarding schedules, begin and end work, and inspections. The County will be randomly
following up on coordination and schedules so this contact information is critical.
Contractors Name (and contact information): if you have selected a contractor, that information
should be included. However it is not required.
Please complete the description of the work to be done as accurately and completely as
possible.
Three copies are not required for emailed applications. However the applicable detail from
FDOT's 600 series for Maintenance of Traffic is required. Detours and road closures require
additional coordination with St. Lucie County Engineering and the design must be signed and
sealed by a registered Florida Professional Engineer.
0
N
N
U
O
U
04-8 sale -s
m
r
O
W ti
CL
U
CL17
CL cv
L
a 'Z t
r � �
E W�
P4
� �d
� N N
a
LL
CLa10.1LL
ip uny jaap
1Q unv jaBQ
I
6
LM
b
r
i;
d
v
r-
�n
0
0
cm
W
O
N
uj
O
NIm
c 4
U J
-
21 m
1Q unv jaBQ
I
6
LM
b
r
i;
d