HomeMy WebLinkAboutRevisions OFFICE USE ONLY: J J
DATE FILED: / PERMIT#
REVISION FEE: RECEIPT#
PLANNING & DEVELOPMENT SERVICES
BUILDING&CODE REGULATION DIVISION
2300 VIRGINIA AVENUE
FORT PIERCE,FL 34982.5652
(772)462.1553
APPLICATION FOR BUILDING PERMIT REVISIONS
PROJECT INFORMATION
i
LOCATION/SITE
ADDRESS:
" 1
DETAILED DESCRIPTION OF PROJECT
REVISIONS:
CONTRACTOR INFORMATION: /-
STATE of FL REG./CERT. #: ���' L/,, U � ST. LUCIE CO CERT. #:
BUSINESS NAME:
QUALIFIERS NAME:
ADDRESS: 4 T S
CITY: STATE: ZIP:
PHONE(DA TIME): FAX:
OWNER/BUILDER INFORMATION:
NAME:
ADDRESS:
CITY: STATE: ZIP:
PHONE (DAYTIME: FAX:
ARCHITECT/ENGINEER INFORMATION:
NAME:
ADDRESS:
CITY: STATE: ZIP:
PHONE(DAYTIME): FAX:
SLCCC: 9/23/09
Revised 06/30/17
r
111- d�10'1 QOTRINIWIERD
APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE �a; ...........
Table Deck Application Type Description Page
IA-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4
1A-2 Wood New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5
113 Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 5
1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 6
11) Wood New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 6
1E-1 Wood New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof ver 7
1E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded R 8
1F Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 8
2A Steel or Conc. New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation, n o ver 9
2B Steel or Conc. New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 10
2C Steel or Conc. New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonde o11
3A-1 Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 12-14
3A-2 Concrete New or Reroof(Tear-Off) A-1 Bonded Temporary Roof,Bonded Insulation,Bonded Roof Cover Ak 15
3B Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 15
4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 16-17
4B LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 17
4C LWIC New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 18-20
SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 21
5B CWF New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 22
5C CWF New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 22
51) CWF New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 23
5E CWF New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 23
6A Gypsum New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 24
6B Gypsum New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 25
6C Gypsum New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 25
6D Gypsum New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 25
7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 26-27
7B Various Recover F Non-Insulated,Bonded Base Sheet,Bonded Roof Cover 27
The following notes apply to the systems outlined herein: '� r
1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirem nts to the sat'ji to t* resis a the
roof deck shall be documented through proper codified and/or FBC Approval documentation. IN G DIVISION
2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement: FORRev# WED
REVIEWED R COMP
Wood: Minimum 0.75-inch penetration. DATE
'r By
Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
Concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions. MUST PLANS
E KEPTOERI IT
3. Unless otherwise noted,insulation may be any one layer or combination of polyisocyanurate,polystyrene,wood fiberboard,perlite,Dens Deck,Dens De a S4NC1Vygiy ��FC''(966rd or SE UROCK
Glass-Mat Roof Board that meets the CIA requirements of F.A.C.Rule 61G20-3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC 2603.4.1 or 2603.6,w eLrfD� .
Exterior Research and Design,LLC.d/b/a Trinity)ERD Evaluation Report A42970.10.12-RI for FL16027-R1
Certificate of Authorization#9503 Revision 1:03/23/2015
Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 27
TRINITY ERD
14. Unless otherwise noted,refer to the following references for bonded base,ply or cap sheet applications.
TABLE 1:TRI-BUILT ROOF COVERS
Reference Layer Material Application
BP-AA Base FBC Approved ASTM D4601,Type II
(Base and Ply sheets,Asphalt-Applied) Ply FBC Approved ASTM D2178,Type IV or VI HA at 20-40 lbs/square
SBS-AA
(SBS,Asphalt-Applied) Cap TriBuilt SBS Granular HA at 20-40 lbs/square
SBS-TA
(SBS,Torch-Applied) Cap TriBuilt SBS Granular Torch-Applied
SBS-SA Base TriBuilt SA SBS Base
(SBS,Self-Adhering) Cap TriBuilt SA SBS Cap Self-Adhering
APP-TA Base or Ply TriBuilt APP Smooth
(APP,Torch-Applied) Torch-Applied
Cap TriBuilt APP Smooth,TriBuilt APP Granular
APP-SA
(APP,Self-Adhering) Cap TriBuilt SA APP Cap Self-Adhering
15. The following represent priming requirements for gypsum-based coverboards:
Dens Deck and Dens Deck Prime shall be field-primed with ASTM D41 primer prior to self-adhering or torch-applied membrane application. No priming is required for hot-asphalt membrane applications.
r SECUROCK Gypsum-Fiber Roof Board does not require field priming for any membrane application.
16. "MDP"=Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads.Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design,LLC.d/b/a Trinity I ERD Evaluation Report A42970.10.12-111 for FL16027-R1
Certificate of Authorization#9503
Revision 1:03/23/2015
Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 3 of 27
a � '
TRINITY ERD
TABLE 1E-2:WOOD DECKS—NEW CONSTRUCTION,REROOF(TEAR-OFF)OR RECOVER
SYSTEM TYPE E: NON-INSULATED,MECHANICALLY ATTACHED BASE SHEET,BONDED ROOF COVER
System Deck(See Note 1) Base Sheet Roof Cover MDP
No. Base Fasteners Attach Ply Cap (psf)
Polyglass Elastobase,Polyglass Elastobase
Min.19/32-inch OMG Flat Bottom Plates(square)with 12-inch o.c.in 4-inch lap and 12-inch (Optional)One or
W-1 plywood at max. Poly,Polyglass G2 Base,CertainTeed Roofgrip#14,Dekfast Hex with Dekfast#14 o.c.in two,equally spaced,staggered more BP-AA or SBS-AA,SBS- -52.5
24-inch spans Glasbase,Firestone MB Base,JM Perma- or TruFast MP-3 with TruFast HD center rows App-TA TA,APP-TA
Ply 28,Tamko Glass Base or GAFGLAS#75
Min.19/32-inch 12-inch o.c.in 4-inch lap and 12-inch SBS-SA,APP-
Polyglass Elastobase or Polyglass Dekfast Hex with Dekfast#14 or TruFast MP- One or more SBS- *
W-2 plywood at max. Elastobase Poly with poly top surface 3 with TruFast HD O.C.in two,equally spaced,staggered SA SA,SBS-TA or -52.5
24-inch spans center rows APP-TA
Min.19/32-inch Polyglass Elastobase or Polyglass OMG Flat Bottom Plates(square)with 12-inch o.c.in 4-inch lap and 12-inch (Optional)One or SBS-AA,SB5-
W-3 plywood at max. Elastobase Poly Roofgrip#12 o.c.in two,equally spaced,staggered more BP-AA or TA APP TA -60.0
24-inch spans center rows APP-TA
Min.19/32-inch 12-inch o.c.in 4-inch lap and 12-inch SBS-SA,APP-
W-4 plywood at max. Polyglass Elastobase or Polyglass OMG Flat Bottom Plates(square)with o.c.in two,equally spaced,staggered One or more SBS
SA SA,SBS-TA or -60.0*
24-inch spans Elastobase Poly with poly top surface Roofgrip#12 center rows APP-TA
TABLE 1F:WOOD DECKS—NEW CONSTRUCTION OR REROOF(TEAR-OFF)
SYSTEM TYPE F:NON-INSULATED,BONDED ROOF COVER
System Deck Primer Roof Cover MOP
No. Joint Treatment Base Ply Cap (Psf)
Min.15/32-inch plywood (Optional)SBS-SA or SBS-SA,APP-SA,SBS-TA
W 5 at max.24-inch spans (Optional)ASTM D41 None SBS-SA APP-TA or APP-TA 90.0
Min.15/32-inch plywood Plywood joints are covered with 4-inch wide strips of TriBuilt SA (Optional)SBS-SA or SBS-SA,APP-SA,SBS-TA
W 6 at max.24-inch spans (Optional)ASTM D41 SBS Base,rolled into place to create continuous ond. TriBuilt SA SBS Base APP-TA or APP-TA 97'5
04�
Exterior Research and Design,LLC.d/b/a Trinity ERD Evaluation Report A42970.10.12-R1 for FL16027-R1
Certificate of Authorization#9503 Revision 1:03/23/2015
Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 8 of 27
t