Loading...
HomeMy WebLinkAboutProduct Approval (2) Regulation - _ fBCIS.Home I'Log In I User Registration Hot Topics I submit Sbrcharde Stats&Facts Publications I FBG Staff SCIS Site Map'i Links Search C (Oro Product ApprovalUSER:Public User --- ProducYAoorovalMenu>Product or AnollGatldn-Searchb Aoo1104100 Llst>Applieation Detail - III FL'# FL7006-R10 ;I Application Type Revision ! Code Version 2017 ! Application Status Approved *Approved by DBPR.Approvals by DB PR shall be reviewed and ratified by the POC and/or the Commission if necessary. I ! Comments Archived ❑ Product Manufacturer IKO Industries,Ltd II. Address/Phone/Email 40 Hansen Road South Brampton,NON-US L6W 3H4 ' (708)496-2800 Ext 200 rmetz001@tampabay.rr.com I j i lig j Authorized Signature Robert Metz rmetz001@tampabay.rr.com II it Technical Representative Bob Metz j ! Address/Phone/Email REMCO of Pinellas i j 456 Avila Circle NE Saint Petersburg,FL 33703 (727)776-5261 I I rmetz001@tampabay.rr.com ' III Quality Assurance Representative Don Shaw Address/Phone/Email IKO Industries LTD 120 Hay Rd. Wilmington,DE 19808 (717)579-6706 don.shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals-CER Validated By Locke Bowden ❑O Validation Checklist-Hardcopy,Received i I+ R Referenced Standard and Year(of Standard) Standard i I Year ASTM D3161 modified to 110 mph 2016 ASTM D3462 II 2010 ASTM D7158 Class H 2011 ASTM E108 i i 2011 ' Equivalence of Product Standards I Certified By !I. I II I I Product Approval Method Method 1 Option A I !i I I Date Submitted 10/08/2017 Date Validated 10/30/2017 !' I ' i Date Pending FBC Approval Date Approved 11/01/2017 ! Summary of Products i it FL# Model,Number or Name Description 7006.1 Cambridge,Cambridge HD, Laminated architectural fiberglass asphalt shingle Biltmore and Biltmore HD manufactured ae IKO's Kankakee,IL; Hawkesbury,Ont.; Wilmington,DE;ISylacauga,AL and Toronto,Ont. plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 RIO C I CAC Letter-ASTM D3161 letter-(9-26- Approved for use outside HVHZ:Yes 2017)from FM.pdf I;I Impact Resistant:N/A FL7006 R10 C I CAC Letter-ASTM D3462 letter-(9-26- Design Pressure:N/A 2 df I ' Other: FL7006 RIO C CAC Lettt:r-ASTM E108 letter-(9-26- 2017).)df I !j Quality Assuralnce Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO III IKO-187102-01 Letter-Installation Instructions for FBC FL70(j6.odf Verified By: Duc T Nguyen 65034' Created by Independent!Third Party: No Evaluation Reports i.; Created by IndependentThird Party: 7006.2 Hip and Ridge 12 Cap This Is a 12"x 112"fiberglass asphalt shingle used to cover the hip and/or ridge of anlasphaltshingle roof system manufactured at IKO's Kankakee,';IL,Toronto,Ont.and Brampton,Ontario plants:' Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 RIO O CAC AS-[M D 3462-Shingle letter Approved for use outside HVHZ:Yes Surveillance Audit Location-(6-28-2017).pdf Impact Resistant:N/A FL7006 RIO G CAC Letter-ASTM D3161 letter-(9-26- Design Pressure:N/A 2017)from FM.pdf J, Other: FL7006 RSO C CAC Letter-ASTM D3462 letter-(9-26- 1 2017 . df FL7006 RIO C CAC Letter-ASTM E108 letter-(9-26- 2017). 9-26- 2 1 . df I H;; .1 Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions i FL7006 RIO Ii Hip and!Ridge Cao Shinale Installation Instructions.odf FL7006 RIO II IKO-181,02-01 Letter-Installation Instructions forlFBC FL700§,gd_f ' Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports , Created by IndependentlThird Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury,Ontario plants Limits of Use Certification Agency Certificate g Approved for use in HVHZ:Yes FL7006 RIO C CAC Le'!, .ter-ASTM D3161 letter-(9-26- Approved 9 26- Approved for use outside HVHZ:Yes 2017)from FM)Ddf ;I' Impact Resistant:N/A FL7006 RIO C CAC Le!L7er-ASTM D3462 letter-(9-26- Design Pressure:N/A 01 d I 11! I' Other: FL7006 RIO C CAC Letter-ASTM E108 letter-(9-26- 2017),)df Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO II IKO-10-'02-01-Letter-Installation Instructions for FBC FL7006.Ddf , i FL7006 R10 II Roofing_Products-Leading-Edge-Plus- Application-EN(1).Ddf 'I; Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports I Created by Independent Third Party: u i' i ill� 11 Ili 7006.4 Marathon Plus AR,Superglass Plus 3 tab fiberglass asphalt shingle manufactured at IKO's AR Brampton,Ontario,Hawkesbury Ont.,Toronto,Ont.; Sylacauga,AL and Kanakakee,IL plants Limits of.Use Certification Agency Certificate!, Approved for use in HVHZ:Yes FL7006 RSO C .CAC Letter-ASTM D3161 letter-(9-26- Approved for use outside HVHZ:Yes 2017)from FM.r)af 1!' Impact Resistant:N/A FI 7006 RIO C ICAC Letter' -ASTM D3462 letter-(9-26- Design Pressure:N/A 2017).Ddf I I i Other: FL7006 RSO C CAC Letter-ASTM E108 letter-(9-26- 2017).12d ;I Quality Assurance Contract Expiration Date 12/20/2020 ih Installation Instructionsl FL7006 RIO II I1<0-187 02-01 Letter-Installation Instructions for FBC FL700;k.odf Verified By: Due T Nguyen'•65034 Created by Independent Third Party: No Evaluation Reports ! l Created by Independent,Third Party: Back Next l • i Contact Us::2601 Blair Stone Read,Tallahassee FL 32399 Phone:850-487 1'824 I Ii �l The State of Florida Is an AA/EEO employer.Copyright 2007-2013 State of Florida.:;Privacy Statement� ::Accessibllityti Statementi ::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released inlresponse to a'public-records request,do not send electronic mall to this entity..Instead,contact the office by phone or by traditional mall.If you have any questions,please contect1850.48711395.-Pursuant to Section 455.275 (1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with anlemail address if they have one.The emalls provided may be used for official communication with the licensee.However email addresses are public recordi'If,you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public.To determine if you'1,�are a licensee under Chapter 455,F.S.,please click here, Product Approval Accapts: �! Credit Card l Safe I I I I. I II� I' I I l�, l• �I I :J, I li, II i RY CONSTRUCTION MATERIALS I TECHNOLOGIES I i I October 27, 2017 IKO Industries, Ltd ' 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 � iii i u Sir(s), I � I I PRI Construction Materials Technologies has completed a technical review,and attached,sealed shingle i instructions in compliance the 2017 Florida Building Code. I This review was completed based on the receipt of following evidence from IKO Iridustries,Ltd: 1) IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Flo6da) 2) IKO Laminated Shingles Application Instructions (EN-Laminated Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13=Florida) I 3) IKO Hip and Ridge 12 Application Instructions I �! i (EN-HipandRidge12_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions j (EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report(FM Approvals Project No. 3040947) I j The attached instructions should be used in conjunction with the published manufacturers application instructions and applicable code. In the event the instructions conflict, these instr6dtlons!shall govern. I , II Statement of Independence:PRI Construction Materials Technologies and/or Duc�:Nguyen, FL P.E.do not have-nor plan to acquire a financial interest in any company manufacturing or or products for which the test reports are issued. i I I Signed: t Signed: Brad Grzybo)rlslei D'uc T. u en Managing rector Florida Rgl;`fered Professional Engine r Number:65034 Date: October 27, 2017 Date: October 27, 2017 Attachments: A)'IKO Shingle Application Instructions-3-Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions ! D) IKO Leading Edge Plus Application Instructions I l IKO-187-02-01 ! PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:materialstestiog@pdcmtcom WebSite:httpAwm.pricmtcom I I �I II� ii i I , IKO Installation Instructions for Asphalt Shingles Page 2 of 5 i IKO Shingle Application Instructions — 3-TabShingles (ASTM D3161, Class F—IKO Marathon 25 AR and CRC Sluperglass M25AR) I I NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH, IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. I UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is i less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming oto building code requirements, the first sheet overlapping the eave protection by 19",followed by full;36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with Ithe qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. ; f NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 318"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge;approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60°)or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle!I Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a�quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. i Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. I EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8'! 1 li STEEP SLOPES i ' I —. I.— t" t"�I •--- � 1- �.. � t 1fY' It 1J2" 1"--• •— ---�—+—-— -- SEALING STRIP I—— • �i • �— 6 VT NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP I i I I I , PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:Iaterialstesting@pricmtcbm WebSite:http://www.pdcmtcom I , I 'I III it 'I. t' IKO Installation Instructions for Asphalt Shingles 1' Page 3;of 5 IKO Laminated Shingles Application Ilnstr'luctions (ASTM D3161, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less.than 4" per foot down to 2" per foot, use 2 layers of underlayment confo'rming'to building code requirements, the first sheet overlapping the eave protection by 19",followed by full+36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with'lthe qualified application instructions. For areas where the roof slope is 4" per foot or greater', cover tRe deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply1metal drip edges on top. of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. j NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 318"diameter heads, long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in,the nail line 7-3/8" below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. 1,11 it NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60°)or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle;, Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a;quarter)'spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. I I EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8. Il I I,', i NAILING-STEEP SLOPES APPLICATION Use six nails es shown f nl i 7 3/8" I� NAIL LINE 63/81' — -- — - 11 NAILS GEMENT 1 PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF THE SHINGLE I Ij' I it I I I • II. ' II' I !I• PRI Construction Materials Technologies,LLC. 6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:materialstesting@pricmLcom WebSite:http:/M m.pdcmt.com II II i i ' IKO Installation Instructions for Asphalt Shingles Page 4;of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F— IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. h' Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 51/8"(130 mm)exposure. (For a neater appearance,the top of eacAlside of each piece has been factory trimmed on a 1"(25 mm)taper(see drawing). Bend each piece over the hip dr ridge,and nail 5 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing eachijplece,5 1/8" (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip hoofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional effect,(which is recommended,but not required),apply hip and ridge shingles doub6thickness by stacking 2 pieces on top of one another,the lower piece extending about 3/4"(19 mm)furthe'r,'than the top piece(see diagram).The final shingle should be set in cement,and the exposed nail heads of the finallshingle should be covered with cement. Prior to application in cold weather,storing the shingles In a heated area will allow for easier bending. NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY; AND SHOULD NOT BE USED FOR ANY OTHER APPLICATI,QNS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW ALLAPPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. i 718 \ t (133 0 I , l (162" I I lig �I l 'I PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 email:iaterialstesdi 1v6pricmt.cp WebSite:Mp:/Miww.pricmt.com it i it i,I f IKO Installation Instructions for Asphalt Shingles Page 5 of 5 i IKO 'Leading Edge Plus Application Instructions (ASTM D3161, Class F—IKO Leading Edge Plus)I! NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO,'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to!roof deck as required. 2. Each 393/8"x13 1/4"(1000 mm x 336 mm)IKO Leading Edge Plus�strip isperforated lengthwise for separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. ' 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up,with the factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge and 1"(25 mm) in from each end. 4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof.The!shingle,'should overhang ' the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to thelroof deck with fasteners located 3"to 4"(75 mm to 100 mm)from the rake edge and 1" (25 mm) in.;from each end. 5. Repeat Steps 3—4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge,with at least 3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20 mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to;100 mm)from the eave edge and approximately 1"and 13"(25 mm and 330 mm)in'from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. ! 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course;field shingles and help keep them from lifting in high winds. I'I I I I• PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813-621-5840 e-mail:materialstesting@pricmtcom WebSite:http:Nwww.p6cmtcom II , I