Loading...
HomeMy WebLinkAboutGAF underlayment 2017TRINITY ERD EVALUATION REPORT GAF 1Campus Drive Parsippany, NJ 07054 (800)766-3411 EXTERIOR RESEARCH & DESIGN, LLC. Certificate of Authorization #19503 353 CHRISTIAN STREET, UNIT#13 OXFORD, CT 06478 (203) 262-9245 Evaluation Report 01506.04.08-1113 FL10626-1113 Date of Issuance: 04/25/2008 Revision 13: 09/22/2017 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use Of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 0 Edition (2017) Florida Building Code sections noted herein. DESCRIPTION: GAF Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinityl ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Cade Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 9. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANF1983 The facsimile seal appearing was authorized by Robert Nieminen,. P.E. on 09/22/2017. This does not serve as an electronically signed document. Signed, sealed hardcopies have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: I. Trinityl ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinityl ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. TRINITY ERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub -Category: Underlayment Compliance Statement: GAF Roof Underlayments, as produced by GAF, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein. 2. STANDARDS: Section Prope Standard Year 1504.3.1 Wind Uplift FM 4474 2011 1507.2.3 / 1507.1.1 Physical Properties ASTM D6757 2016 1507.2.4 / 1507.1.1, 1507.2.9.2 Physical Properties ASTM D1970 2015 1507.3.3 Physical properties FRSA/TRI April 2012 (04-12) 2012 1507.11.2 Physical Properties ASTM D6164 2011 1523.6.5.2.1 Physical Properties TAS 103 1995 3. REFERENCES: gutint Examination Reference Date ERD (TST 6049) FRSA/TRI April 2012 (Slippage) 634150.08.11 11/14/2011 ERD (TST 6049) ASTM D6164 G40630.01.14 -2B 01/07/2014 ERD (TST 6049) ASTM D6164 G46160.09.14 -3A 09/09/2014 ERD (TST 6049) ASTM D1970 GAF-SC13285.03.17-3 03/01/2017 ERD (TST 6049) ASTM D1970 GAF-SC13285.03.17-4 03/01/2017 PRI (TST 5878) ASTM D1970 GAF -026-02-01 03/26/2002 PRI (TST 5878) ASTM D1970 GAF -027-02-01 03/26/2002 PRI (TST 5878) Physical properties GAF -042-02-01 06/03/2005 PRI (TST 5878) ASTM D1970 GAF -238-02-01 03/03/2010 PRI (TST 5878) ASTM D1970 GAF -275-02-01 11/11/2010 PRI (TST 5878) Wind Uplift GAF -434-02-01 09/16/2013 PRI (TST 5878) Wind Uplift GAF -434-02-03 09/16/2013 PRI (TST 5878) Wind Uplift GAF -434-02-04 09/16/2013 UL (TST 1740) Physical properties 02NK22569 06/04/2002 UL(TST 1740) ASTM D6757 10NK11990 05/18/2011 Miami -Dade (CER 1592) HVHZ compliance 14-0915.02 09/10/2015 Miami -Dade (CER 1592) HVHZ compliance 16-1216.02 02/02/2017 ICC -ES (EVL2396) IBC compliance ESR -1322 01/01/2017 UL, LLC. (QUA 9625) Quality Control Inspect, File R10689 INC) 06/28/2017 UL, LLC. (QUA 9625) Quality Control Inspect, File 810689 (GA) 05/19/2016 UL, LLC. (QUA 9625) Quality Control Inspect, File R10689 (IN) 06/14/2017 4. PRODUCT DESCRIPTION: 4.1 Self -Adhering Underlayments: 4.1.1 Liberty' SBS Self -Adhering Base/Ply Sheet is a smooth -surfaced, fiberglass -reinforced, self -adhering SBS modified bitumen roof underlayment; meets ASTM D1970. 4.1.2 StormGuard® Film Surfaced Leak Barrier is a film -surfaced, fiberglass -reinforced, self -adhering SBS modified bitumen roof underlayment; meets ASTM D1970. StormGuard® Film Surfaced Leak Barrier is also used as a secondary water barrier to seal roof decks. 4.1.3 UnderRooflm HT High Temperature Leak Barrier is a polyester -mat -surfaced, fiberglass -reinforced, self - adhering SBS modified bitumen roof underlayment; meets ASTM D1970. Exterior Research and Design, LLC. Evaluation Report 01506.04.08-R13 Certificate o/Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-1113 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 2 of 9 TR.INITi ERD 4.1.4 WeatherWatchO Mineral Surfaced Leak Barrier is a mineral -surfaced, fiberglass -reinforced, self -adhering SBS modified bitumen roof underlayment; meets ASTM D1970. WeatherWatcho Mineral Surfaced Leak Barrier is also used as a secondary water barrier to seal roof decks. 4.1.5 WeatherWatchO XT Mat Surfaced Leak Barrier is a coated -mat -surfaced, fiberglass -reinforced, self - adhering SBS modified bitumen roof underlayment; meets ASTM D1970. 4.2 Mechanically Fastened Underlayments: 4.2.1 VersaShield® Fire -Resistant Roof Deck Protection is a non -asphaltic, fiberglass -based roof underlayment and/or fire barrier; meets physical requirements of ASTM 176757. 4.3 Asphalt -Applied Underlayments: 4.3.1 RuberoidO Mop Granule is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof underlayment; meets ASTM D6164. 4.3.2 Ruberoid® Mop Granule FR is a granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof underlayment; meets ASTM D6164. S. LIMITATIONS: 5.1 This is a building code evaluation. Neither Trinity[ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in FBC HVH2 jurisdictions. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory or test report from accredited testing agency for fire ratings of this product. 5.4 GAF Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable Roof Covers: TABLE 1: ROOF COVER OPTIONS Asphalt Foam -On Wood Slate or Underlayment Nail -On Tile Metal Shakes & Simulated Shingles Tile a Shingles Slate VersaShield® Fire -Resistant Roof Deck Protection Yes No No No No No Liberty— SBS Self -Adhering Base/Ply Sheet Yes No No No No No StormGuard® Film Surfaced Leak Barrier yes No No Yes No No UnderRoof- HT High Temperature Leak Barrier Yes No No Yes No No WeatherWatch® Mineral Surfaced Leak Barrier Yes No No No No No WeatherWatch* XT Mat Surfaced Leak Barrier Yes No No No No No Ruberoid® Mop Granule Yes Yes Yes No Yes Yes See 5.5.1 Ruberoid" Mop Granule FR Yes Yes Yes No Yes Yes See 5.5.1 Exterior Research and Design, I.I.C. Evaluation Report 01506.04.08-1113 Certificote ofAuthorizotion #9503 6T" EDITION (2017) FBC NON-HVH2 EVALUATION FL10626-1113 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 3 of 9 TRINITY ERD 5.5.1 "Foam -On Tile" is limited to use of the following Approved tile adhesives / underlayment combinations. TABLE 1A: ALLOWABLE TILE ADHESIVE / UNDERLAYMENT COMBINATIONSI Adhesive Florida Product Underlayments Approval Dow TlleBondT" FL22525 Ruberoid' Mop Granule; Ruberoid® Mop Granule FR 5.6 Allowable Substrates: 5.6.1 Direct -Bond to Deck: ✓ LibertyTM SBS Self -Adhering Base/Ply Sheet; StormGuardO Film Surfaced Leak Barrier; UnderRoof" HT High Temperature Leak Barrier; WeatherWatch'O Mineral Surfaced Leak Barrier and WeatherWatch® XT Mat Surfaced Leak Barrier self -adhered to new untreated plywood or existing untreated ASTM D41 primed plywood. ✓ Ruberoid* Mop Granule and Ruberoid" Mop Granule FR in hot asphalt to ASTM D41 primed structural concrete. 5.6.2 Bond to Mechanically Attached Base layer: ✓ LibertyTM SBS Self -Adhering Base/Ply Sheet; StormGuard" Film Surfaced Leak Barrier; UnderRoof" HT High Temperature Leak Barrier; WeatherWatch" Mineral Surfaced Leak Barrier and WeatherWatch XT Mat Surfaced Leak Barrier self -adhered to ASTM D226, Type II felt ✓ Ruberoid® Mop Granule and RuberoidO Mop Granule FR in hot asphalt to GAFGLAS® #80 Ultima'" Base Sheet or RuberoidO 20 Smooth. 5.6.3 Bond to Other Substrate Tvoes: ✓ ASTM D41 primed metal (flashing metal, valley metal, etc.) 5.6.4 Wind Resistance for Underlayment Systems in Foam -On Tile Applications:. FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam -on or mortar -set tile systems, where the underlayment forms part of the load -path. The following wind uplift limitations apply to underlayment systems that are not addressed in FRSA/TRI April 2012 (04- 12) and are used in foam -on or mortar -set tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FRSA/TRI April 2012 (04-12), Appendix A, Table 1A or FBC 1609 for determination of design wind loads. #1 Maximum Design Pressure= -45 psf. Deck: Min. 19/32 -inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Layer: GAFGLAS11 #80 Ultima TM Base Sheet or RuberoidO 20 Smooth mechanically attached with 12 ga., min. 1.25 -inch long ring shank nails through 32 ga., 1-5/8 inch diameter tin caps spaced 9 -inch o.c. at the 4 -inch wide side laps and 9 -inch o.c. at two (2), equally spaced, staggered center in the field of the sheet. Top Layer: Ruberoid® Mop Granule or Ruberoid' Mop Granule FR applied in full mopping of ASTM D312, Type 1V hot asphalt at 20 to 25 lbs/square. 1 Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance. Exterior Research and Design, LLC. Evaluation Report 01506.04.08-R13 Cerlicote of Authorirotion #9503 6T" EDITION (2017) FBG NON-HVHZ EVALUATION FL10626-R13 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 4 of 9 TRINITY ERD #2 Maximum Design Pressure = -75 psf. Deck: Min. 19/32 -inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Layer: GAFGLAS® #80 UltimaTm Base Sheet or RuberoidO 20 Smooth mechanically attached with 12 ga., min. 1.25 -inch long ring shank nails through 32 ga., 1-5/8 inch diameter tin caps spaced 8 -inch o.c. at the 4 -inch wide side laps and 8 -inch o.c. at three (3), equally spaced, staggered center in the field of the sheet. Top Layer: Ruberoid' Mop Granule or RuberoidO Mop Granule FR applied in full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. #3 Maximum Design Pressure = -442.5 psf. Deck: Min. 2,500 psi structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction Base Layer: GAFGLAS #75 Base Sheet, Tri -Ply #75 Base Sheet, GAFGLAS #80 Ultima Base Sheet, GAFGLAS Ply 4, Tri -Ply Ply 4 or GAFGLAS FlexPly 6 applied in full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. Top Layer: Ruberoid® Mop Granule or Ruberoid® Mop Granule FR applied in full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. 5.6.4.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or exceed that required under FRSA/TRI April 2012 (04-12), Appendix A, Table 1A. Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements. 5.7 Exposure Limitations: LibertyTM SBS Self -Adhering Base/Ply Sheet; StormGuardO Film Surfaced Leak Barrier; UnderRoofT" HT High Temperature Leak Barrier; WeatherWatch® Mineral Surfaced Leak Barrier and WeatherWatchO XT Mat Surfaced Leak Barrier shall not be left exposed for longer than 30 -days after installation. VersaShield® Fire -Resistant Roof Deck Protection, Ruberoid® Mop Granule and RuberoidO Mop Granule FR shall not be left exposed for longer than 180 -days after installation. 5.8 Tile Slippage Limitations (TAS 103 per FRSA/TRI April 2012 (04-12)); When loading roof tiles on the underlayment in direct -deck the assemblies, the maximum roof slope shall be as follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles. TABLE 2: TILE SLIPPAGE LIMITATIONS FOR DIRECT -DECK TILE INSTALLATIONS Underlayment Tile Profile Staging Method MaximumSlope Ruberoid® Mop Granule Flat Max. 10 -tike stack 4:12 Flat Max. 6 -tile stack (4 over 2) 5:12 Lugged Max. 10 -tile stack 5:12 Ruberoid Mop Granule FR Flat or Lugged Max. 6 -tile stack (4 over 2) 5:12 Lugged Max. 10 -tile stack 4:12 Exterior Research and Design, LLC. Evaluation Report 01506.04.08-R13 Certificate of Authari:ation #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R13 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 5 of 9 "JTRINITY ERD 6. INSTALLATION: 6.1 GAF Roof Underlayments shall be installed in accordance with GAF published installation instructions subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application, and prime the substrate (if applicable). 6.3 Install self -adhering underlayments when ambient temperatures are minimum 45°F and rising. 6.4 All metal surfaces shall be primed with Matrix"" 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer prior to application of self -adhering membranes. 6.5 VersaShield® Fire -Resistant Roof Deck Protection: 6.5.1 Shall be installed in compliance with the codified requirements for ASTM D6757 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are permitted. 6.5.2 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty'" SBS Self - Adhering Base/Ply Sheet; StormGuardO Film Surfaced Leak Barrier; UnderRoof" HT High Temperature Leak Barrier; WeatherWatch® Mineral Surfaced or WeatherWatch® XT Mat Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment, leaving 6 to 8 -inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the underlayment. 6.6 Liberty'" SBS Self -Adhering Base/Ply Sheet: 6.6.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.6.2 The minimum and maximum roof slopes are %:12 and 6:12, respectively. Back -nailing is required when slope is 1:12 or greater. Back -nailing shall consist of minimum 1 -inch square or round cap nails spaced 18" o.c. within 3 -inch side laps. 6.6.3 Non -Tile Applications: Shall be fully self -adhered to the substrates noted in Section 5.6. For direct -bond to deck applications plywood shall be primed with Matrix'" 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer at%to % gallon per square. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2 -inch overhang at eaves and rakes. Roll out sheet and allow to 'relax' for min. 30 minutes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2 -inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8 -inch troweling of Matrix'" 201 Premium SBS Flashing Cement over drip edge. Continue upslope in a similar manner, maintaining minimum 3 -inch side -laps and minimum 6 -inch end - laps. Ensure all end laps are staggered at least 18 -inch apart. Use a weighted lawn or linoleum roller to ensure complete adhesion to the substrate. Use a hand roller to firmly bond side and end laps. Exterior Research and Design, U.C. Evaluation Report 01506.04.08-1113 Certificate OfAuthorization #9503 6"' EDITION (2017) FBC NON-HVH2 EVALUATION F1.10626-1113 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 6 of 9 TRINITY ERS 6.7 StormGuardO Film Surfaced Leak Barrier: 6.7.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.7.2 Back -nailing is required. Back -nailing shall consist of minimum 1 -inch square or round cap nails spaced 18" o.c. within 3 -inch side laps. 6.7.3 Non -Tile Applications: Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2 -inch overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2 -inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8 -inch troweling of MatrixTm 201 Premium SBS Flashing Cement over drip edge. Continue upslope in a similar manner, maintaining minimum 3 -inch side -laps and minimum 6 -inch end - laps. Ensure all end laps are staggered at least 18 -inch apart. Use a hand roller to firmly bond side and end laps. 6.8 UnderRoof I HT High Temperature Leak Barrier: 6.8.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.8.2 The minimum and maximum roof slopes are 1:12 and 12:12, respectively. Back -nailing is required when slope is 4:12 or greater. Back -nailing shall consist of minimum 1 -inch square or round cap nails spaced 12" o.c. within 4 -inch side laps. 6.8.3 Non -Tile Applications: Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2 -inch overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2 -inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8 -inch troweling ofTopCoat' FlexSeal'm Caulk Grade over drip edge. Continue upslope in a similar manner, maintaining minimum 4 -inch side -laps and minimum 6 -inch end - laps. Ensure all end laps are staggered at least 3 -feet apart. Use a hand roller to firmly bond side and end laps. Exterior Research and Design, U.C. Evaluation Report 01506.04.08-1133 Certipcote ofAuthoriration #9503 6T" EDITION (2017) FBC NOM-HVHZ EVALUATION FL10626-R13 GAF Roof Underlayments; (800) 766.3411 Revision 13:09/22/2017 Page 7of9 TRINITY ERD 6.9 WeatherWatch® Mineral Surfaced Leak Barrier or WeatherWatcho XT Mat Surfaced Leak Barrier: 6.9.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.9.2 WeatherWatcha Mineral Surfaced Leak Barrier may be installed as a secondary water barrier using minimum 4 -inch wide rolls to seal plywood deck joints prior to installation of the primary underlayment system. 6.9.3 Back -nailing is required. Back -nailing shall consist of minimum 1 -inch square or round cap nails spaced 18" o.c. within 4 -inch side laps. 6.9.4 Non -Tile Applications: Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2 -inch overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2 -inch over the eave and nail into place 12" o,c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8 -inch troweling of MatrixT" 201 Premium SBS Flashing Cement over drip edge. Continue upslope in a similar manner, maintaining minimum 3 -inch side -laps and minimum 6 -inch end - laps. Ensure all end laps are staggered at least 18 -feet apart. Use a hand roller to firmly bond side and end laps. 6.10 Ruberold® Mop Granule; RuberoidO Mop Granule FR: 6.10.1 Ruberoid* Mop Granule or RuberoidO Mop Granule FR shall be installed in compliance with current GAF published installation requirements. 6.10.2 For use in tile applications, Ruberoid® Mop Granule or RuberoidO Mop Granule FR are for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened tile roof systems or the Hot Asphalt applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems. 6.10.3 Fully adhere in ASTM D312, Type IV hot -asphalt to the substrates noted in Section 5.6. Side laps shall be minimum 4 -inch and end -laps minimum 6 -inch wide, and offset end -laps minimum 3 -feet from course to course. Side and end -laps shall be fully adhered in a complete mopping of hot asphalt with asphalt extending approximately 3/8 -inch beyond the lap edge. 6.10.4 Consult GAF instructions regarding back -nailing requirements. 6.11 Tile Staging (RuberoidO Mop Granule; RuberoidO Mop Granule FRI: 6.11.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to Table 2 herein, and GAF published requirements for tile staging. 6.11.2 Battens and/or Counter -battens, as required by the tile manufacturer and FRSA/TRI April 2012 (04-12) must be used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or nail -boards, to prevent tile sliding and/or damage to the underlayment during the loading process. Exterior Research and Design, I.I.C. Evaluation Report 01506.04.08-R33 Certificate of Authorisation #'9503 6T" EDITION (2017) FBC NON-HVH2 EVALUATION F1.10626-1113 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 8 of 9 � PTRINITY ERD 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted CEA agency for information on product locations covered for F.A.C. 61(320-3 QA requirements. The following plants have qualified products under their respective physical properties specifications. Plant Specification Product Us Conover, NC ASTM D6757 VersaShield® Fire -Resistant Roof Deck Protection Mt. Vernon, IN ASTM D1970 Liberty— SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier; WeatherWatch°' Mineral Surfaced Leak Barrier North Branch, NJ ASTM D1970 UnderRoof" HT High Temperature Leak Barrier; WeatherWatchO Mineral Surfaced Leak Barrier; WeatherWatch® XT Mat Surfaced Leak Barrier Savannah, GA ASTM D1970 StormGuard® Film Surfaced Leak Barrier; WeatherWatch® Mineral Surfaced Leak Barrier ASTM D6164 Ruberoid® Mop Granule; Ruberoid® Mop Granule FR 9. QUALITY ASSURANCE ENTITY: UL, LLC. — QUA9625; (847) 664-3281 - END OF EVALUATION REPORT - Exterior Research and Design, I.I.C. Evaluation Report 01506.04.08-1113 Certificate ofAunhorlration #9503 6T" EDITION 12017) FBC NON-HVH2 EVALUATION F1.10626-1113 GAF Roof Underlayments; (800) 766-3411 Revision 13: 09/22/2017 Page 9 of 9