Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Project Information
Design Data and Installation Schedule JOSE VAZQUEZ PAGE -01 Opening Shutter Anchorage Shutter Wind Anchor Type Max. Anchor Notes Number Type Top/Bottom Height Pressure Tapcon, Rawl Spacing C, M, W Inches PSF Neg. Lag ect. Inches ---Upper/Lower U er/Lower 1 __ACCORDION I CEMENT 51 39.4 TAPCONS 12/12 2 L ACCORDION CEMENT 51 L_— 39.4 TAPCONS 12/12 3 28G PANELSCEMENT 68 39.4ANELMATES 12/12 _FRONT 4 ACCORDION _ CEMENT 63 39.4 TAPCONS 12/12 5 ACCORD-1 C - MENT RDION CE51 39.4 TAPCONS 12/12 i Lit � --_ 6 ACCORDION _ CEMENT T`63 — 394—� TAPCONS _ 12112 7 L ACCORDION CEMENT 63 39 4 TAPCONSrr 12/12 __ — �_ _ 1 8 ACCORDION CEMENT _ 26` 39.4 — TAPCONS 12/12 r T 9 ACCORDION CEMENT 51 39.4 TAPCONS 12/12 10 I 28GPANELS CEMENT 79y 39.4_ PANELMATES _ 12/12_ BACK 11 L_28G PANELS 1� CEMENT 102 39.4 PANELMATES_� 12/12 BACK 12 I ACCORDION r CEMENT _53 39_.4 TAPCONS 12/12 13 I ACCORDION CEMENT` - 27 39.4 TAPCONS 12/12 J _ 14 ACCORDION CEMENT 63 39.4 f TAPCONS 12/12 15 ACCORDION CEMENT 51 39.4 TAPCONS 12/12 16 _ 17 18 19 20 21 22 23 24 25 26 27