HomeMy WebLinkAboutProposalSoutheast General
Contractors Group, Inc.
PROPOSAL
PROPOSAL SUBMITTED TO: _
Date: 1112812017
Job Name: Icon Smith
Job Location: 3114 Avenue S Fort Pierce, Fl. 34947
Phone: (772) 370-6502
10380 SW Village Center Drive - 232
Port St Lucie, Florida 34987
Office: (877) 407-3535
Fax: (877) 756-0007
www.southeaStcontracting.com
CGC060247
CCC1330002
Job Description: Remove existing roofing and install a CERTAINTEED roof system
Flat Deck:
• Provide roofing permit
• Provide dumpsters
• Remove existing roofing down to the wood deck
• Replace all bad decking (not to exceed #3 sheets)
• Re -nail deck as required by Hurricane Mitigation Retrofit Manuel (Based on 553.844 F.S.)
• Install CERTAINTEED FLINTLASTIC - SA NAIL BASE
• Install CERTAINTEED FLINTLASTIC — GTA CAP SHEET
• Install new primed drip edge 3"x3" aluminum with MatrixTM 201 Premium SBS Flashing Cement
(COLOR WHITE)
Install new metal 16" - 26ga set in Matrix"' 201 Premium SBS Flashing Cement
at sloop roof tie-in
Not included:
Gutters Metal fascia trim
Truss repair Satellite dish removal or replacement
Additional Items:
TONAL PRICE. $5500.00
Screens and screen enclosures
Skylights
r
ACCEPTANCE OF PROPOSAL
The above prices,. peeifcatians an copditions are hereby accepted. Your are authorized to do the work
as specified. Pa ent will be malfe as outlined above—
Date:
bove
Date:
Signature:
Date:
Plywood: Cost $65.00 per sheet labor and material
Fascia: Cost $8.80 Uf labor and material
Second layer removal Cost $28.00 per square
Gutter removal Cost $.50
Skylight replacement and flashing Cost $475.00 each
General Terms and Conditions:
1. This proposal, including all terms and conditions, shall become a legally binding attachment to any
contract between Southeast General Contractors Group, Inc. and the financially responsible person for
which the work shall be performed.
2. Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In
addition, the total price increased or decreased to reflect the change, and the same shall be in writing and
signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon
ordering the work called for in such "change order" or upon execution of the change order as required
by the contractor.
3. Labor and material warrantied for a period of 5 years from date of completion.
4. Southeast General Contractors Group, Inc. is responsible for completion of work in compliance with
contract documents and for quality of material and workmanship in accordance with standard
specifications.
We hereby propose to fiirnish labor and materials complete in accordance with the above specifications, for the
sum of:
(001100 Dollars) with payments to be made as follows.
Deposit: $ 1000.00 Due when contract is signed
Drawl: $ 4500.00 Due upon completion
All material is guaranteed to be as specified. All work to be completed in a workman like manner per the
construction standard practices. Any alteration or deviation from above specifications involving extra cost, will
be executed only upon written orders, and will become an extra charge over and above the estimate. All
agreements are contingent upon strikes, accidents or delays beyond our control. All agreements are contingent
upon strikes, accidents or delays beyond our control. This proposal subject to acceptance within 10 days
and is void thereafter at the option of the undersigned.
Authorized
AAAlSignature:'' , President
SOUTHE ST GENERAL CONTRACTORS GROUP, INC.
Date: r W 1Y