Loading...
HomeMy WebLinkAboutContract/bill of saleSoutheast General Contractors group, Inc- CONTRACT PROPOSAL SUBMITTED TO: Owner Date: ]February 8, 2018 Job Name: Slope Roof -- Tamko Shingles and Rhino Underlayment Customer: Elijah Smith Job Location: igo2 Ave, -%we 0 • port Ftiei-ce s FL Phone: � 7 `) -35:a - CSG Email: sfvi,tV+ _� ti -18 CP cJt-' NzA 3121 Skyway Circle Suite F Melbourne FL 32934 Office: (877) 407-3535 Fax: (877) 756-0007 www. southeasteontracting.com CGC060247 CCC 1330002 Job Description: Remove existing roofing and install new asphalt shingles Shingle Color - M X Drip Edge Color - X TAMKO HERITAGE: Provide roofing permit Provide trash removal to a legal off-site facility : Remove existing roofing down to the wood deck • Replace all bad decking Msheets included additional sheets billed at $80.00 each) Re -nail deck as required by Hurricane Mitigation Retrofit Manuel (Based on 553.844 F.S.) Install RHINNO synthetic Underlayment mechanically attached Install all new valley metal 16" 26ga set in plastic roofing cement. (If required) Install new drip edge 3"x 3" aluminum • Install new Low Profile Ridge Vent/Cobra Ridge Vent X Install new exhaust vents (Galvanized) and lead boots install TAMKO STARTER SHINGLE • Install TAMKO 3 -TAB HIP AND RIDGE . Install TAMKO HERITAGE 130MPH shingle ADDITIONAL ITEMS: • TAM G TAM -FELT Underlayment $6,175.00 • Install RESISTO SA underlayment in valleys and eaves S Notes: Install RESISTO SA underlayment on entire deck S (Recommended) Qualifies as a Secondary Water Resistance (SWR): SWR (also called Sealed Roof Deck) Self -adhering polymer modified -bitumen roofing underlayment applied directly to the sheathing or foam adhesive SWR barrier (not foamed. -on insulation) applied as a supplemental means to protect the dwelling from water intrusion in the event of roof covering loss. FLAT ROOF:. Provide roofing permit • Provide trash removal to a legal off-site facility • Remove existing roofing down to the wood deck • Replace all bad decking (billed at $80.00 each) • Re -nail deck as required by Hurricane Mitigation Retrofit Manuel (Based on 553.844 F.S.) • install CERTAINTEED ALL WEATHER EMPIRE BASE/PLY • Install CERTAINTEED FLINTLASTIC — GTA CAP SHEET • Install new primed drip edge 3"x 3" aluminum with MatrixTM 201 Premium SBS Flashing Cement • Install new metal 16" - 26ga set in MatrixTM 201 Premium SBS Flashing Cement at sloop roof tie-in Not Included WIND MITIGATION: • Southeast General Contractors Group, Inc. will provide a Wind Mitigation Report for an additional fee of $175.00. t, 1lll;.4k Ja-Ek Not included: Gutters Metal fascia trim. Metal roof structures Satellite dish removal or replacement Screens and screen enclosures Solar heater removal or replacement Skylights Truss repair Priming and painting Additional Mems: Plywood: Fascia: Second layer removal: Chimney flashing: Flashing, step, counter or base: Gutter removal: Rafter tail repairs: Skylight replacement and flashing: Stucco repair General Terms and Conditions Cost $80.00 per sheet labor and material Cost $18.801/f labor and material Cost $28.00 per square Cost $225.00 plus stucco if required at $37.50 per s/f Cost $17.25 IN labor and material Cost 5.50 Cost $120.00 each Cost $475.00 each Cost $37.50 per square foot 1. Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In addition, the total price increased or decreased to reflect the change, and the same shall be in writing and signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon ordering the work called for in such "change order" or upon execution of the change order as required by the contractor. 2. The Owner is responsible for removing personal items, plants, vehicles, etc. from the work area. 3. Existing gutters will be removed or detached to allow for the installation of the new roofing system. Contractor will attempt to save the gutters but in the event, they are damaged the Owner accepts foil responsibility for said gutters. 4. Customer authorizes the contractor and the material supply companies access to the property. Customer accepts full responsibility for any unforeseen damage to the walks, driveway, septic tank and drain field, landscaping etc. to the property except for the following: 5. Due to the rising cost in labor and materials the Owner agree to allow the Contractor to submit for additional claims coverage to the Insurance Company. Any additional funds received by the Owner will be released to the Contractor. 6. Labor Warranty 5 year on workmanship. Material Warranty 30 -year limited warranty. Southeast. General Contractors Group, Inc shall not be held responsible for damage caused by hurricanes, tropical storms, tornadoes, earthquakes, fires, floods or other causes beyond the reasonable control of the Contractor. Contractor cannot be held responsible for interior damages, 7. Sarre as Cash(SAC)Financing (3,6,12,18,24 months) options will require an additional upfront fee. Standard (1-12) years financing is offered with no upfront fees. All financing is contingent upon credit approval. Standard Home Improvement financing offered from 9.99% APR for A and A+ credit rating. Southeast General Contractors Group Inc partners with EnerBank Improvement loans.. 8. Quoted price is a cash price which includes all rebates and discounts, an additional 3.5% convenience fee will be added to payments made by credit card. 9. Entire Agreement - This Contract, from the time it shall take effect, shall supersede any and all prior Agreements whether claimed to be oral or in writing. The parties have incorporated in this Contract their entire understanding. No oral statement or prior written matter extrinsic to this Contract shall have any force or effect. We hereby propose to furnish labor and materials complete in accordance with the above specifications, for the sum of. $6,175.00 (Six Thousand One Hundred Seventy -Five And 001100 Dollars) Schedule of Values: Deposit: Is due upon executing this contract. $1,200.00 Draw 1: Is due when the roof is dried -in. $3,775.00 Draw 2: Is due upon the final inspection. $1,200.00 All material is guaranteed to be as specified. All work to be completed in a workman life manner according to standard practices. All agreements are contingent upon strikes, accidents or delays beyond our control. This proposal is subject to acceptance within 10 days and is void thereafter at the option. of Southeast General Contractors Group, Inc.. AUTHORIZED Signature: Id" V"4& - Date: February 8, 2018 SOUTHEAST GENERAL CONTRACTORS GROUP, INC. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Accepted: Signature: 14_1 Date: Signature: f� �-f�r Date. I�� �T.