Loading...
HomeMy WebLinkAbouttest documentAPPLICATION #:AP1262922 STATE OF FLORIDA PERMIT #:56 -SF -1719598 DEPARTMENT OF HEALTH DOCUMENT # : F11 164545 ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID: 11/09/2016 FEE PAID : 51 5.00 RECEIPT #:56 -PID -3139448 APPLICANT: Peter & Jody Hays AGENT: Charles Paschal (Cole Construction) PROPERTY ADDRESS: TBD S Brocksmith Rd Fort Pierce, FL 34945 LOT: 2 BLOCK: SUBDIVISION: ID#: 2317-500-0003-000-5 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [01] TANK SIZE [1] 1090.00 [2] 483.00 [ ] [27] SURFACE WATER 100 FT [ ] [02] TANK MATERIAL Polyethylene [ ] [28] DITCHES FT [ ] [03] OUTLET DEVICE [ ] [29] PRIVATE WELLS 100 FT [ ] [04] MULTI-CHAMBERED [ Y N ] [ ] [30] PUBLIC WELLS FT [ ] [05] OUTLET FILTER Polylok PL -68 [ ] [31] IRRIGATION WELLS FT [ ] [06] LEGEND 1. 70-143-11DC3 2. 70-143-54SC4 [ ] [32] POTABLE WATER 100 FT [ ] [07] WATERTIGHT [ ] [33] BUILDING FOUNDATIONS 6 FT [ ] [08] LEVEL [ ] [34] PROPERTY LINES 100 FT [ ] [09] DEPTH TO LID [ ] [35] OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [10] AREA [1] 509.4 [2] SQFT [ ] [36] DRAINFIELD COVER [ ] [11] DISTRIBUTION BOX HEADER X [ ] [37] SHOULDERS [ ] [12] NUMBER OF DRAINLINES 1. 5.00 2. [ ] [38] SLOPES [ ] [13] DRAINLINE SEPARATION [ ] [39] STABILIZATION 03/19/2018 [ ] [14] DRAINLINE SLOPE [ ] [15] DEPTH OF COVER ADDITIONAL INFORMATION [ ] [16] ELEVATION [ ABOVE / BELOW ]BM 20.00 [ ] [40] UNOBSTRUCTED AREA [ ] [17] SYSTEM LOCATION [ ] [41] STORMWATER RUNOFF [ ] [18] DOSING PUMPS 1.00 [ ] [42] ALARMS [ ] [19] AGGREGATE SIZE [ ] [43] MAINTENANCE AGREEMENT [ ] [20] AGGREGATE EXCESSIVE FINES [ ] [44] BUILDING AREA [ ] [21] AGGREGATE DEPTH [ ] [45] LOCATION CONFORMS WITH SITE PLAN [ ] [46] FINAL SITE GRADING FILL / EXCAVATION MATERIAL [ ] [47] CONTRACTOR MICHAEL W STUHR (ASHTO [ ] [22] FILL AMOUNT [ ] [48] OTHER INFILTRATOR Quick4 Plus EQ36 LP [ ] [23] FILL TEXTURE [ ] [24] EXCAVATION DEPTH ABANDONMENT [ ] [25] AREA REPLACED [ ] [49] TANK PUMPED [ ] [26] REPLACEMENT MATERIAL [ ] [50] TANK CRUSHED & FILLED Comments: Comments are on page 2. / St. Lucie CHD DATE: 12/01/2017 CONSTRUCTION[ APPROVED DISAPPROVED ] ' E viron ental Specialist ri J Ingram (ENVIRONMENTAL HEALTH) FINAL SYSTEM [ APPROVED / DISAPPROVED ] :z St. Lucie CHD DATE: 03/19/2018 Environmental Specialist II iin J Ingram (ENVIRONMENTAL HEALTH) (Explanation of Violations on following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1262922. EID1719598 STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Violation Number Comment Comments APPLICATION # : API 262922 PERMIT #:.56 -SF -1 719598 DOCUMENT #:F11164545 DATE PAID :11 /09/2016 FEE PAID :51 5.00 RECEIPT #:56 -PID -3139448 The system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 300 gpd. New ST and DT installed. Liberty 1/3 hp pump. 5x9 long DF. No violations, system ok to cover. Contractor Notified onsite. Needs final inspection for mound system, alarm check, and site grading. Final system approved. Contractor and building department emailed final approval. DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1262922 EID'1719598