Loading...
HomeMy WebLinkAboutPermit Renewal 04/06/2018 07:09AM 7724612036 Steve Smith A/C PAGE 01/02 PLANNING AND DEVELOPMENT SERVICES DEPART-NIENT BUILDING AND CODE REGULATIONS DIVISION 2300 YIRGEYIA AVE RECEIVED JFOZ27C PIlE)EiCE1 k L 34982 (772)462-1553 Fax(772)462-1578 APR 0 6 2018 PERMIT RENEWAL,REQUEST ST. Lucie County, Permitting PERMI NUMBER: ADDRESS: 'J-7, ItY�J i, am requesting that the above permit be renewed. I uz1 erstand that I must schedule and pass all required inspections for the permit to be fl aled. Further, I understand that this is a ONE TIME RENEWAL and the permit shall expire should I not receive a passing inspection during any six month period during the r newalperiog. Justification 'z/1 �' OWNER/Bf,DR QR CONTRACTOR SIGNATURE DATE Print Name STATE OF FLORIDA COUNTY OF �T- ULtCtfZ�) ACKNOWLEDGEDBEFORE ME THIS DAY OF t f 70 I BY J �C• 5�" (r WHO ISS PERSONALLY KNOWN TO ME OR HAS PROVIDED -t ( rG1 �3 UC AS IDENTIFICATION. STATE OF FLORIDA,County of �T• 1, � __ .immiw A Reid NOTARYPUBUC jSl ARY STATE OR FLORIDA E1pkea 7127/= F>FIClE USE ONLY: Number of Open Inspections: Total Inspections: (Divide open by total to get%of open inspections) Percentage- Original permit fee: x%open = $ �� ' -Renewal fee Example: [15 divided by23=.65(%)] S175(pennit fee)x.65=5113.75(renewal fee) Revised 7/213014