HomeMy WebLinkAboutProduct Approval ti
12/14/2017 Florida Building Code Online
k.� �' ,£
y�v� € .x. z `�rp �acR��,3a�u`" �S"e^ t,3'}•F•F� _ f � F �, �+� �
,..*�, . ,z• �y, z_ .�
BCIS Home Log In I User Registration p Hot Topics Submit Surcharge Stats&Facts { Publications 1 FBC Staff BCIS Site Map, Links Search p
Flaiid
W Product Approval
USER:Public User
44 s1£`2'fsJ"t3
Product Approval Menu>Product or Application Search>Application List>Application Detail
FL# FL10124-R20
Application Type Revision
Code Version 2017
Application Status Approved
a Comments
Archived wa1
s Product Manufacturer GAF
q Address/Phone/Email 1 Campus Drive
Parisppany,NJ 07054
r (800)766-3411
mstieh@gaf.com
Authorized Signature Robert Nieminen
"r lindareith@trinityerd.com
fvH
Technical Representative William Broussard
_ Address/Phone/Email 1 Campus Drive
Parsippany,NJ 07054
(800)766-3411
TechnicaIQuestionsGAF@gaf.com
Quality Assurance Representative
Address/Phone/Email
4a Category Roofing
# h Subcategory Asphalt Shingles
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida
T
� Professional Engineer
" Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed the Robert Nieminen
4 Evaluation Report_ y. Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/20/2018
Validated By John W.Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence FL10124 R20 COI 2017 01 COI Nieminen odf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2015
ASTM D3161 2016
ASTM D3462 2010
°`a w ASTM D7158 2011
TAS 107 1995
Equivalence of Product Standards
Certified By
https://wwwfloddabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDquracBeVCbdMQNZD6Zesy3BoOyLwXhMdCmfpylEOIVYCAp/o3d%3d 1/2
12/142017 Florida Building Code Online
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 09/20/2017
Date Validated 09/27/2017
3
" ;• Date Pending FBC Approval 09/28/2017
� r
Date Approved 12/12/2017
roma Of PruiiCts...„,".,fin`--^,;
AFL# Modet,�Numberor Name=�_ Descrlptlon �,
10124.1 GAF Asphalt Roof Shingles Fiberglass reinforced 3-tab,laminated,5-tab and hip/ridge
asphalt shingles
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL10124 R20 II 2017 09 FINAL ER GAF Asphalt
Approved for use outside HVHZ:Yes Shinqles FL10124-R20.pdf
Impact Resistant:N/A Verified By: Robert Nieminen PE-59166
6 Design Pressure:N/A Created by Independent Third Party:Yes
' Other: Refer to ER,Section 5. Evaluation Reports
FL16124 R20 AE 2017 09 FINAL ER GAF Asphalt
Shingles FL10124-R20.pdf
X Created by Independent Third Party:Yes
#� Contact Us::2601 Blair Stone Road.Tallahassee FL 32399 Phone:850-487-1824
r
r+ The State of Florida is an AA/EEO employer.Copyright 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),
Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails
_,. provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please
provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here.
Product Approval Accepts:
fix'_ "'<� ® �hK♦
., .Safe
https://www.floridabuilding.org/pr/pr app_dti.aspx?param=wGEVXQwtDquracBeVCbdMQNZD6Zety3BoOyLwXhMdCmfpy[EOlvyCA%3d`/o3d 2/2
EXTERIOR RESEARCH&DESIGN,LLC.
Certificate of Authorization#9503
T�� TRINJTY
353 CHRISTIAN STREET,UNIT#13
ERD OXFORD,CT 06478
(203)262-9245
EVALUATION REPORT
GAF Evaluation Report 01506.01.08-1122
1 Campus Drive FL10124-R20
Parsippany, NJ 07054 Date of Issuance:01/03/2008
(800)766-3411 Revision 22:09/20/2017
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 6th Edition (2017) Florida Building Code
sections noted herein. ,
DESCRIPTION: GAF Asphalt Roof Shingles
LABELING: Labeling shall be-in accordance with the requirements the Accredited Quality Assurance Agency noted
herein and FBC 1507.2.7.1/R905.2.6.1.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the
referenced Quality Assurance documentation changes, or provisions of the Code that relate to the product change.
Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the
product'changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete
review of this Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT:The Evaluation Report number preceded by the words "Trinity)ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 6.
I
j Prepared by:
j S
Robert J.M.Nieminen P.E. s; '"
r t0. , `,' The facsimile seal appearing was authorized by Robert Nieminen,
Florida Registration No.59166 Florida DCAANE1983 � P.E.on 09/20/2017.This does not serve as an electronically signed
document. -
i CERTIFICATION OF INDEPENDENCE:
1. Trinity]ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinityl ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity ERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
TRINITY. ERD
ROOFING SYSTEMS EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Asphalt Shingles
Compliance Statement: GAF Asphalt Roof Shingles, as produced by GAF, have demonstrated compliance with the
following sections of the 6th Edition (2017) Florida Building Code and Florida Building Code, Residential Volume
through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements
and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4/1507.1.1, Physical Properties ASTM D1970 2015
R905.2.3/R905.1.1
1507.2.5,R905.2.4 Physical Properties ASTM D3462 2010
1507.2.7.1,R905.2.6.1 Wind Resistance ASTM D3161 2016
1507.2.7.1,R905.2.6.1 Wind Resistance ASTM D7158 2011
1507.2.7:1,R905.2.6.1 Wind Resistance TAS 107 1995
3. REFERENCES:
Entity Examination Reference Date
GAF(PDM 1915) Letter of Equivalency Seal-A-Ridge Impact Resistant IR 01/13/2012
PRI(TST 5878) Physical Properties GAF-025-02-01 03/27/2002
PRI(TST 5878) ASTM D3462 GAF-059-02-01 09/02/2004
PRI(TST 5878) ASTM D3462 GAF-080-02-01 05/25/2005
PRI(TST 5878) Physical Properties GAF-324-02-01 12/01/2011
PRI(TST 5878) Wind Driven Rain GAF-407-02-01 01/21/2013
UL(TST 1740) ASTM D3462 93NK6295 11/29/1993
UL(TST 1740) ASTM D3462 99NK43835 01/12/2000
UL(TST 1740) TAS 107 94NK9632 03/29/2000
UL(TST 1740) ASTM D3462 01NK06632 02/02/2001
UL(TST 1740) ASTM D3161,TAS 107 OINK9226 05/21/2001
UL(TST 1740) ASTM D3161 01NK37122 12/18/2001
UL(TST 1740) ASTM D3462 01NK37122 12/19/2001
UL(TST 1740) ASTM D3161,TAS 107 02NK12980 04/10/2002
UL(TST 1740) ASTM D3161,TAS 107 02NK30871 09/09/2002
UL(TST 1740) ASTM D3161 03CA5367 03/11/2003
UL(TST 1740) ASTM D3462 03NK26444 10/17/2003
UL(TST 1740) ASTM D3462 04NK13850 06/07/2004
UL(TST 1740) ASTM D3161 04NK13850 06/23/2004
UL(TST 1740) ASTM D3161 04NK30546 03/10/2005
UL(TST 1740) ASTM D3462 04NK22009 05/06/2005
UL(TST 1740) ASTM D3161 04NK22009 05/09/2005
UL(TST 1740) ASTM D3462 05NK27924 02/10/2006
UL(TST 1740) ASTM D3161 05NK27924 02/11/2006
UL(TST 1740) ASTM D3161,D3462 06CA18077 06/05/2006
UL(TST 1740) ASTM D3161,D3462 06CA18074 06/16/2006
UL(TST 1740) ASTM D3161,D3462 06CA35251 10/18/2006
UL(TST 1740) ASTM D3462 06CA31603 12/01/2006
UL(TST 1740) ASTM D3161,D3462 06CA41095 12/27/2006
UL(TST 1740) ASTM D3161 07NK05228 03/13/2007
UL(TST 1740) ASTM D3161 06CA31611 04/04/2007
UL(TST 1740) ASTM D3161 06CA61148 04/09/2007
UL(TST 1740) ASTM D3161,D3462 07CA31742 11/08/2007
UL(TST 1740) ASTM D3161,D7158,D3462 08CA06100 03/13/2008
Exterior Research and Design,U.C. Evaluation Report 01506.01.08-1122
Certificate ofAuthori:ation#9503 6'EDITION(2017)FBC NON-HVH7 EVALUATION FL10124-R20
GAF Asphalt Roof Shingles Revision 22:09/20/2017
Page 2 of 6
�11Y ER
1�
Entity Examination Reference Date
UL(TST 1740) ASTM D3161,D3462 07CA55908 04/01/2008
UL(TST 1740) ASTM D3161,D3462 09CA10592 03/26/2009
UL(TST 1740) ASTM D3161,D3462 09CA06856 05/15/2009
UL(TST 1740) ASTM D3161,D7158,D3462 09NK06647 08/01/2009
UL(TST 1740) ASTM D3161,D7158,D3462 09CA27281 08/27/2009
UL(TST 1740) ASTM D3161,D7158,D3462 10CA35554 03/05/2010
UL(TST 1740) ASTM D3161,D7158,D3462 10CA13686 05/15/2010
UL(TST 1740) ASTM D3462 10CA07264 05/27/2010
UL(TST 1740) ASTM D3462 10CA11953 10/29/2010
UL(TST 1740) ASTM D3161,D7158,D3462 1ONK11951 10/30/2010
UL(TST 1740) ASTM D3161,D7158,D3462 10NK12070 11/04/2010
UL(TST 1740) ASTM D3161,D7158,D3462 08CA06100 01/30/2010
UL(TST 1740) ASTM D3161,D7158,D3462 10CA53934 03/31/2011
U L(TST 1740) ASTM D3161,D7158,D3462 11CA48924 10/22/2011
UL(TST 1740) ASTM D3161,D7158,D3462 11CA47919 12/03/2011
UL(TST 1740) ASTM D3161,D7158,D3462 11CA48408 12/08/2011
UL(TST 1740) ASTM D3161,D7158,D3462 11CA48725 12/09/2011
UL,LLC.(TST 9628) ASTM D3462 12CA34891 10/12/2012
UL,LLC..(TST 9628) ASTM D3161,D7158,D3462 12CA58151 02/15/2013
UL,LLC.(TST 9628) ASTM D3161 12CA38083 02/26/2013
UL,LLC.(TST 9628) ASTM•D3161 13CA32332 06/18/2013
UL,LLC.(TST 9628) ASTM D3161 13CA37934 08/02/2013
UL,LLC.(TST 9628) ASTM D3161,D7158,D3462 4786875675 07/17/2015
UL,LLC.(TST 9628) ASTM D3161,D7158,D3462 4787434542 C5/17/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Mobile,AL 10/25/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Myerstown,PA 10/20/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Tuscaloosa,AL 11/11/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Michigan Cty,IN 11/01/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Shafter,CA 11/17/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Savannah,GA 11/11/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Minneapolis,MN 10/25/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Mt.Vernon,IN 10/25/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Baltimore,MD 10/21/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Tampa,FL 11/17/2016
UL,LLC.(QUA 9625) Quality Control- Inspection Report,R21,_Dallas,TX 11/04/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Ennis,TX 11/03/2016
UL,LLC.(QUA 9625) Quality Control Inspection Report,R21,Fontana,CA 11/01/2016
4. PRODUCT DESCRIPTION:
4.1 Asphalt Shingles:
4.1.1 Marquis° WeatherMax°, Royal Sovereign® and Sentinel® are a fiberglass reinforced 3-tab asphalt roof
shingles.
4.1.2 Camelot®, Camelot® II, Fortitude TM, Glenwood'"", Grand Canyon®, Grand Sequoia®, Grand Sequoia® IR,
Grand Sequoia® ArmorShieldlm, Monaco', Sienna®, Timberline® American Harvest®, Timberline®
ArmorShieldTM ll,Timberline® Natural Shadow®,Timberline HD®,Timberline® Cool Series®,Timberline Ultra
HD°and Woodland®are fiberglass reinforced,laminated asphalt roof shingles.
4.1.3 Slateline®is a fiberglass reinforced 5-tab asphalt roof shingle.
4.2 Hip&Ridge Shingles:
4.2.1 Seal-A-Ridge® Ridge Cap Shingles, Seal-A-Ridge° IR Impact-Resistant Ridge Cap Shingles, Seal-A-Ridge®
ArmorShieldTm Ridge Cap Shingles and Timbertex®Premium Ridge Cap Shingles are fiberglass reinforced,hip
and ridge asphalt roof shingles.
Exterior Research and Design,LLC. Evaluation Report 01506.01.08-RZ2
Certificate of Authorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL10124-1120
GAF Asphalt Roof Shingles Revision 22:09/20/2017
Page 3 of 6
TRIM,. I ERD
4.3 Accessory Starter Strips:
4.3.1 Pro-Start® Eave/Rake Starter Strip Shingles and WeatherBlocker'" Premium Eave/Rake Starter Strip Shingles
are starter strips for asphalt roof shingles.
4.3.2 QuickStart' Peel & Stick Starter Roll is a is a mineral-surfaced, fiberglass-reinforced, self-adhering SBS
modified bitumen starter strip, nominal 9-inch x 33 ft roll,for use with asphalt shingles with exposure of 6-
inch or less.
4.3.3 StarterMatchTM Starter Strip Shingles are color-coordinated starter strips for use with Grand Canyon® and
Grand Sequoia' series asphalt shingles. StarterMatch'" are installed as the second starter for Grand
Canyon'and Grand Sequoia'series installations.
5. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials•
. Directory for fire ratings of this product.
5.4 Wind Classification:
5.4.1 The GAF asphalt shingles noted in Section 4.1 are Classified in accordance with FBC Tables 1507.2.7.1 and
R905.2.6.1 to ASTM D3161,Class F and/or ASTM D7158,Class H, indicating the shingles are acceptable for
use in all wind zones up to Vasd=150 mph (V„it=194 mph). Refer to Section 6 for installation requirements
to meet this wind rating.
5.4.2 The GAF hip &ridge shingles noted in Section 4.2 are Classified in accordance with FBC Tables 1507.2.7.1
and R905.2.6.1 to ASTM D3161,Class F, indicating the shingles are acceptable for use in all wind zones up
to Vasa=150 mph(V"I,=194 mph). Refer to Section 6 for installation requirements to meet this wind rating.
5.4.3 Classification by ASTM D7158 applies only to exposure category B or C, as defined in FBC 1609.4.3, and a
mean roof height of 60 feet or less. Calculations by a qualified design professional are required for
conditions outside these limitations. Contact the shingle manufacturer for data specific to each shingle.
5.5 All products in the roof assembly shall have quality assurance audit in accordance with F.A.C.Rule 61G20-3.
6. INSTALLATION:
6.1 Underlayment:
6.1.1 Underlayment shall be acceptable to GAF and shall hold current Florida Statewide Product Approval, or be
Locally Approved per Rule 61G20-3,per FBC 1507.2.3,1507.2.4 or R905.2.3.
6.2 . Starter Shingles or Starter Strip:
6.2.1 Installation of Pro-Start Eave/Rake Starter Strip Shingles,WeatherBlocker Premium Eave/Rake Starter Strip
Shingles and QuickStart Peel&Stick Starter Roll shall comply with the GAF current published instructions.
6.3 Asphalt Shingles:
6.3.1 Installation of asphalt shingles shall comply with the GAF current published instructions, using minimum four
(4)nails per shingle in accordance with FBC 1507.2.7 or R905.2.6,with the following exceptions:
➢ Camelot, Camelot II, Grand Canyon, Grand Sequoia, Grand Sequoia IR, Grand Sequoia ArmorShield,
and Woodland require minimum five(5) nails per shingle.
➢ Slateline requires minimum six(6)nails per shingle.
6.3.2 Fasteners shall be in accordance with manufacturer's published requirements,but not less than FBC 1507.2.6
or R905.2.5. Staples are not permitted.
6.3.3 Where the roof slope exceeds 21 units vertical in 12 units horizontal, special methods of fastening are
required. Contact the GAF for details.
Exterior Research and Design,I.I.C. Evaluation Report 01506.01.08-1122
Certificate of Authorization#9503 6EDITION(2017)FBC NON-HVHZ EVALUATION FL10124-R20
GAF Asphalt Roof Shingles Revision 22:09/20/2017
Page 4 of 6
QTR,1'N1TY1ERD
6.4 Hip&Ridge Shingles:
6.4.1 Installation of Seal-A-Ridge Ridge Cap Shingles, Seal-A-Ridge IR Impact-Resistant Ridge Cap Shingles and
Seal-A-Ridge ArmorShield Ridge Cap Shingles shall comply with the GAF current published instructions with
a minimum two (2) nails, minimum 3/8-inch head diameter, per shingle and nominal 0.25-inch diameter
beads of Henkel"Loctite PL S30 Roof&Flashing Sealant".
115` -Sealant
7, (292 mm):-
1" rSellarite-
(26 mm) (25 in Enituit d'etanchOW
� t
Natl (305 aim)
•Clavo
6 518 7 518" Clouer
(168-194.mm)
12 ..
(305 mm),
6.4.2 Installation of Timbertex Premium Ridge Cap Shingles shall comply with GAF current published instructions
with a minimum two (2) nails, minimum 3/8-inch head diameter, per shingle and beads of Sonneborn NP1
Gun Grade Polyurethane Sealant or Henkel PL Roofing and Flashing Sealant.
' 1����'Lrttrtt� 1" DllorAcr
y MM) (25rim aduiE d'iStartCh�z !
i
min)
( 15 Wei
6.4.3 Fasteners shall be in accordance with GAF published requirements, but not less than FBC 1507.2.6 or
R905.2.5. Staples are not permitted.
Exterior Research and Design,U.C. Evaluation Report 01506.01.08-R22
Certificate of Authorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL10124-R20
GAF Asphalt Roof Shingles Revision 22:09/20/2017
Page 5 of 6
qot�JNJ ' JERD
y
7. LABELING:
7.1 Labeling shall be in accordance with the requirement's the Accredited Quality Assurance Agency noted
herein.
7.2 Asphalt shingle wrappers shall indicate compliance with one of the required classifications detailed in FBC
Table 1507.2.7.1/R905.2.6.1.
8. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
9. MANUFACTURING PLANTS:
Contact the named QA entity for information on which plants produce products covered by Florida Rule 61G203 QA
requirements.
10. QUALITY ASSURANCE ENTITY:
UL LLC—QUA9625;(847)664-3281
END OF EVALUATION REPORT-
Exterior
EPORT-Exterior Research and Design,LLC. Evaluation Report 01506.01.08-R22
Certificate of Authorization#9503 0 EDITION(2017)FBC NON-HVHZ EVALUATION FL10124-R20
GAF Asphalt Roof Shingles Revision 22:09/20/2017
Page 6 of 6
6/3/2018 Florida Building Code Online
■ r �
BCIS Home Log In User Registration Hot Topic [ Submit Surcharge i Stats&Facts Publications ? FBC Staff SCIS Site Map Links Search
tlflt�d
Product Approval
sUSER:Public User ,y
A
Product Approval Menu>Product or Application Search>Application Lis l>Application Detail /I „ •
,..
FL# FL2346-R7 & 71-10
Application Type Revision F� o�y,
Code Version 2017
Application Status Approved
Comments.
Archived %1
I
Product Manufacturer Warrior Roofing Manufacturing
Address/Phone/Email 3050 Warrior Road
Tuscaloosa,AL 35404
(205)553-1734 Ext 115
Steven@WarriorRoofing.net
Authorized Signature Steven Crew
Steven@WarriorRoofing.net
Technical Representative Steven Crew
Address/Phone/Email 3050 Warrior Road
Tuscaloosa,AL 35404
(205)553-1734 Ext 1024
Steven@WarriorRoofing.net
Quality Assurance Representative Steven Crew
Address/Phone/Email 3050 Warrior Road
Tuscaloosa,AL 35.404
(205)553-1734 Ext 1024
Steven@WarriorRooflng.net
Category Roofing
Subcategory . Underlayments
Compliance Method Test Report
Testing Lab PRI Construction Materials Technologies,LLC
Quality Assurance Entity Keystone Certifications,Inc.
Quality Assurance Contract Expiration Date 10/05/2021
Validated By Jesus Gonzalez, P.E.
Rj Validation Checklist-Hardcopy Received
Certificate of Independence FL2346 R7 COI PRI CMT Cert of Independence.pdf
Referenced Standard and Year(of Standard) Standard Year
ASTM D226 2009
ASTM D.4869 2016
Equivalence of Product Standards
Certified By Approved Testing Lab
FL2346 R7 Equiv FBC 2017 Standards Equivalency_pdf
https://www.floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOc8bnSknRpsgx%2fSloLpOST46ODBB%2baF4%3d 112
1
6/3/2018 Florida Building Code Online
r Product Approval Method Method 1 Option B
Date Submitted 01/17/2018
Date Validated 01/17/2018
Date Pending FBC Approval 01/17/2018
Date Approved 04/10/2018
Summary of Products
FL# Model,Number or Name Description
2346.1 #15 and#30 roofing felt ASTM D 226 Tested
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL2346 R7 II InstallationInstructions.pddf
Approved for use outside HVHZ:Yes Verified By: PRI Construction Materials Technologies,LLC
Impact Resistant: N/A Test Reports
Design Pressure:N/A FL2346 R7 TR 15A Test Report.pdf
Other:Primary roof covering should be installed immediately FL2346 R7 TR 30A Test Reportpdf
after felt.Roofing felt is not intended to be an unprotected
weathering surface.
2346.2 15w and 30w roofing felt ASTM D 4869 Tested
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL2346 R7 II In stall at!on Instructions.pdf
Approved for use outside HVHZ:Yes Verified By: PRI Construction Materials Technologies,LLC
Impact Resistant: N/A Test Reports
Design Pressure: N/A FL2346 R7 TR 15w Test Report.pdf
Other: Primary roof covering should be installed immediately FL2346 R7 TR 30w Test Reportpdf
after felt. Roofing felt is not intended to be an unprotected
weathering surface.
' Back racxt
Contact Us::2601 Blair Stone Road,_Tallahassee FL 32399 Phone:850-487-1824
The State of Florida is an AA/EEO employer.Coyrlght 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section
455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have
one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal
address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,
please click here.
Product Approval Accepts:
® M
Credit turd: M
f :Safe
https://www.floddabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgtOc8bnSknRps9x%2fSloLpOST46ODBB%2baF4%3d 2/2
WARRIOR® ROOFING MANUFACTURING
P.O.BOX 40185+TUSCALOOSA,AL 35404•PHONE(2D5)5534734*FAX(205)5W755
193 LEROY ANDERSON ROAD+MONROE,GA 30655+PHONE(770)207-0695•FAX(770)207-0775
00 323 DEVELOPMENT AVENUE CHAMBERSBURG,PA 17201+PHONE(717)709-0323 FAX(717)709-0027
Roofing Felt Installation Recommendations
Be aware that roofing felt should not be walked upon prior to fastening into position.
Proper safety equipment is recommended for all installations. Also,the-roof decking
should be clear of debris and moisture prior to installation of the roofing felt.
Roofing felt should be installed from the bottom of the roof in horizontal layers to
increase the water shedding ability of the felt. The initial layer of felt should be installed
to cover the bottom edge of the decking,from edge to edge. Overhang is not required.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out
across the roof. Pay careful attention to roll the felt out smoothly,avoiding wrinkles as
you move across the roof. The top edge of the felt should be fastened no less than every
eight inches. The middle and bottom edge should also be fastened no less than every
eight inches. Fasteners should be applied no less than every eight inches along the eaves.
The next.course of felt should also be aligned with the roof edge and should overlap the
previous course two inches(sometimes referred to as head lap). In the event you get to
the end of a roll prior to getting to the opposite edge of the roof,begin a new roll with a
four inch overlap over the end of the prior roll (sometimes referred to as end lap). The
same fastening pattern used on the middle and bottom of the initial course should be used
for each subsequent course. For the top of each subsequent course,fasten intermittently
to hold the top edge in place until the next course is applied. The fasteners in the bottom
of the next course will hold the top of the previous course securely.
Continue up the roof in this manner. Be sure to firmly fasten the top of the final course if
it terminates at the top edge of the roof. Otherwise,overlap the felt over the ridge and
secure then begin at the bottom of the other side of the ridge and repeat the process.
In valleys,lay a vertical section of roofing felt the length of the valley prior to the
installation of the horizontal runs of roofing felt. If you use more than one section of
roofing felt in a valley,be certain to start at the bottom and overlap each,subsequent-
length aminimum of two inches as you move up the valley tQ insure prczpcater.
shedding .
u
x+
'�x•�wiyl o-1�.t�� '.x{Yu aG � C.
r c`fib
In the event some wrinkles are created while fastening down a course of felt,slice the
wrinkles and fasten them flat to the deck. Then seal the cuts with waterproofing cement.
Installation of the primary roof covering(ex. Shingles)is recommended immediately
after felt installation.
NOTE: LOCAL BUILDING CODES MAY REQUIRE A DIFFERENT FASTENING
PATTERN AND/OR SPECIFIC FASTENER TYPES THAN RECOMMENDED BY
THESE INSTRUCTIONS. PLEASE CONTACT YOUR LOCAL BUILDING CODE
ADMINISTRATOR FOR THE EXISTENCE OF REGIONALLY SPECIFIC
FASTENING REQUIREMENTS.
t
of s3z sv ,
Vie
PS �s
S�t�x'�4?*•ems'•. '�b_��.� '�' � ...