Loading...
HomeMy WebLinkAboutProduct Approval (3) Business & Professional ` r, , .. .... .. • . . ��fYiiY'fiii�fAi33C7ilfiiiii6lEil BCIS,Xeme I Log In I User Registration Hot Topla I Submit Surcharge Stats a Facts Publications I FBC Staff I BCIS Site Map Links Search i bpr a Product App-11-" RECEIVE® USER:Public User f�QucYAooroval'Menu i.Produa or"Abollcailun'SeamR rAoolLcatlon LlsE>�ppplleallen etaii FL7006-R10 S •'Lucie County, Permitting Application Type ". Revision _ ---- Code Version .. 2017 Application Status... '•. Approved *Approved by DBPR.Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. •Comments" Archived ❑ " Product Manufacturer IKO Industries,Ltd Address/Phone/Emall 40 Hansen Road South Brampton,NON-US L6W 3H4 (708)496-2800 Ext 200 rmetzOO1@tampabay.rr.com Authorized Signature Robert Metz rmetzOOI@tampabay.rr.com Technical Representative Bob Metz Address/Phone/Small REMCO of Pinellas 456 Avila Circle NE Saint Petersburg,FL 33703 (727)776-5261 rmetz001@tampabay.rr.com Quality Assurance Representative Don Shaw Address/Phone/Emali IKO Industries LTD 120 Hay Rd. Wilmington,DE 19808 (717)579-6706 don.shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals-CER 4 Validated By Locke Bowden O Validation Checklist-Hardcopy Received Referenced Standard and Year(of Standard) Standard Year ASTM D3161 modified to 110 mph 2016 ASTM D3462 2010 ASTM D7158 Class H 2011 ASTM E108 2011 . Equivalence of Product Standards Certified By Product Approval Method Method 1 Option A Date Submitted 10/08/2017 Date Validated 10/30/2017 Date Pending FBC Approval Date Approved 11/01/2017 Summary of Products FL# Model,Number or Name Description 7006.1 Cambridge,Cambridge HD, Laminated architectural fiberglass asphalt shingle Biltmore and Blltmore HD manufactured at IKO's Kankakee,IL; Hawkesbury,Ont.; Wilmington,DE;Sylacauga,AL and Toronto,Ont.plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R10 C CAC Letter-ASTM D3161 letter--(9-26- Approved for use outside HVHZ:Yes 2017)from FM.pdf Impact Resistant:N/A FL7006 RIO C CAC Letter-ASTM D3462 letter-(9-26- Design Pressure:N/A 20171.0f Other: FL7006 RIO C CAC Letter-ASTM E108letter-(9-26- 2017).odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO 11 TKO-187-02-01 Letter-Installation Instructions for FBC FL7006.pdf Verified By: Duc T Nguyen 65034 Created by Independent Third Party:No Evaluation Reports Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap This is a 12"x 12"fiberglass asphalt shingle used to cover the hip and/or ridge of an asphalt shingle roof system manufactured at IKO's Kankakee,IL,Toronto,Ont.and Brampton,Ontario plants. Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 RIO C CAC ASTM D 3462-Shingle letter Approved for use outside HVHZ:Yes Surveillance Audit Location-(6-28-2017).pdf Impact Resistant:N/A FL7006 RSO C CAC Letter-ASTM D3161 letter-(9-26- Design Pressure:N/A 2017)from FM.pdf Other: FL7006 RIO C CAC Letter-ASTM D3462letter-(9-26- 2 17).pd EL7006 RIO C CAC Letter-ASTM E108letter-(9-26- 2 1 df Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO II Hip and Ridge Cao Shingle Installation Instructions.odf FL7006 RIO II IKO-187-02-01 Letter-Installation Instructions for FBC FL7006.pdf Verified By:Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury,Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 RIO C CAC Letter-ASSM D3161 letter-(9-26- Approved for use outside HVHZ:Yes 2017)from FM.odf Impact Resistant:N/A FL7006 R10_C GAG Letter-ASTM D3462 letter-(9-26- Design Pressure:N/A 2017).odf Other: FL7006 RSO C CAC Letter-ASTM E108 letter-(9-26- 2017).cdf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO II IKO-187-02-01 Letter-Installation Instructions for FBC FL7006.pdf FL7006 R10 II Roofing-Products-Leading-Edge-Plus- ep of ica tion-EN(1).n df Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.4 Marathon Plus AR,Superglass Plus 3 tab fiberglass asphalt shingle manufactured at IKO's AR Brampton,Ontario,Hawkesbury Ont.,Toronto,Ont.; Sylacauga,AL and Kanakakee,IL plants Limits of Use Certification Agency Certificate Approved for use In HVHZ:Yes FL7006 RIO C CAC Letter-ASTM D3161 letter-(9-26- Approved for use outside HVHZ:Yes 2017)from FM.Ddf Impact Resistant:N/A FL7006 RIO C CAC Letter-ASTM D3462 letter-(9-26- Design Pressure:N/A 2017).Ddf Other: FL7006 RSO C CAC Letter-ASTM E108 letter-(9-26- 2017).Ddf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 RIO II IKO-187-02-01 Letter-Installation Instructions for FBC FL7006..df Verified By: DucT Nguyen 65034 Created by Independent Third Party:No Evaluation Reports Created by Independent Third Party: Back Next Contact Us::2601 Blair Stone Road.Tallahassee FL 32399 Phone:850-487-1824 The State of Florida Is an ANEW employer.Copyright 2007-2013 State of Florida.::Privacy Statement;;Accessibility Staten ;:Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to a public-records request,do not send electronic mall to this entity.instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.-Pursuant to Section 455.275 (1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emalls provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address, please provide the Department with an email address wh"can be made available to the public.To determine If you are a licensee under Chapter 455,F.S.,please click hem. Product Approval Aecepta: ®® eCMi Credit Card Safe CONSTRUCTION MATERIALS TECHNOLOGIES October 27,2017 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2017 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab Appins 8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated Appins 8TTEFS-2012-04 reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidge12 3HRTri-2013-08—reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06—reformatted 2013-03) 5) ASTM D3161 Test Report(FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict,these instructions shall govern. Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen,FL P.E.do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. Signed: C Signed: Brad Grcybo ski Due T. u en Managing rector Florida Re ered Professional Engine r P.E.Number:65034 Date: October 27,2017 Date: October 27,2017 Attachments: A) IKO Shingle Application Instructions-3-Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-187-02-01 PRI Constu tion Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813.6215840 e-mail:ma soalslesting(alpricmtcom Website:h#p:/hvww.pdcmtcom i IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161,Class F—IKO Marathon 25 AR and CRC Superglass M26AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge,approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES Imo ', 1_yI 142" 1-10 SEALING STRIP !. �' i • i.— 6.118' 12' NAILS NAILS DO NOT NAIL INTO ORABOVETHE SEALING STRIP PRI Conslruclion Maledals Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813.821-5777 Fax:813621-5840 e-mail:malerialslesting@pricmtcom INebSfte:hllpJMww.pdcmtcom IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F—Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a jointicutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)'spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". NAILING-STEEP SLOPES APPLICATION Use sit nails as shown. 7 M. � r �,. �,. -► . , ��.. .tom � r t � � F— NAIL LINE 6 3/8"t NAILS CEMENT PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL33610 Tel:813.621-5777 Fax:813-621-5840 e-mail:matedalstesting@p0cmtcom website:http:/Anvw.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F—IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide.These shingles are designed for a 51/8"(130 mm)exposure.(For a neater appearance,the top of each side of each piece has been factorytrimmed on a 1"(25 mm)taper(see drawing).Bend each piece over the hip or ridge,and nail 5 5/8" (143 mm) above the butt edge 1"(25 mm) in from each edge, exposing each piece 51/8"(130 mm). Apply hip pieces starting at the lower end of the hip,working up toward the ridge. On hip roofs,apply ridge pieces starting at each end; meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end.Note:To obtain a three-dimensional effect,(which is recommended,but not required),apply hip and ridge shingles double thickness bystacking 2 pieces on top of one another,the lower piece extending about 3/4"(19 mm)further than the top piece(see diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather,storing the shingles in a heated area will allow for easier bending. NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY;AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS.WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POORAPPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW ALLAPPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. (19mn) 1 TAPER 011T� " � t saw (162" PRI Construction Materials Technologies,I.I.C.6412 Badger Drive Tampa,Fi.33610 Tel:81 3.6215777 Fax:813.621-5840 e-mail:materialstesting@pricmt.com Website:hl1pJAvww.pdcmtcom IKO Installation Instructions for Asphalt Shingles .Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F—IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment,eave protection,valley flashings, or drip edges to roof deck as required. 2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately 20"(500 mm). Install this shingle on the lower left comer of the roof deck,granule side up,with the factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge and 1"(25 mm)in from each end. 4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang the rake edge by a nominal 1/4P(6 mm)minimum.Fasten the shingle to the roof deck with fasteners located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end. 5. Repeat Steps 3—4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8 (9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20 mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end. 6. Applyfull-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and help keep them from lifting in high winds. PRI CoreWchon MatedalsTechnologim LLC.6412 BadgerDrive Tampa,FL33610 Tel:8%621-5177 Fax:813.621-5840 e-mail:materlalstesting@pricmtcom WebSite:http:Nmw.pdcmtcom