Loading...
HomeMy WebLinkAboutProduct Approval (3)Professional Res c BCIS.Home I Log In I User Registration Hot Topics Submit Surcharge Stats & Facts Publications FBC Staff I BCIS Site Map j Links Search Florida Product Approval a, USER: Public User Product'Aooroval-Menu>Product or Application Search >Aoollcatlon List> Application Uetail - - FL '# FL7006-R10 ` Application Type Revision Code Version 2017 Application Status Approved *Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. Comments Archived Product Manufacturer Address/Phone/Email Authorized Signature Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Subcategory Compliance Method Certification Agency Validated By Referenced Standard and Year (of Standard) Equivalence of Product Standards Certified By IKO Industries, Ltd 40 Hansen Road South Brampton, NON -US L6W 31-14 (708) 496-2800 Ext 200 rmetz001@tampabay.rr.com Robert Metz rmetzOOI@tampabay.rr.com Bob Metz REMCO of Pinellas 456 Avila Circle NE Saint Petersburg, FL 33703 (727) 776-5261 rmetz001@tampabay.rr.com Don Shaw IKO Industries LTD 120 Hay Rd. Wilmington, DE 19808 (717) 579-6706 don.shaw@iko.com Roofing Asphalt Shingles Certification Mark or Listing FM Approvals - CER Locke Bowden OV Validation Checklist - Hardcopy Received Standard ASTM D3161 modified to 110 mph ASTM D3462 ASTM D7158 Class H ASTM E108 Year 2016 2010 2011 2011 Product Approval Method Method 1 Option A Date Submitted 10/08/2017 Date Validated 10/30/2017 Date Pending FBC Approval Date Approved 11/01/2017 Summary of Products FL # Model, Number or Name Description 7006.1 Cambridge, Cambridge HD, Laminated architectural fiberglass asphalt shingle Biltmore and Biltmore HD manufactured at IKO's Kankakee, IL; Hawkesbury, Ont.; Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 RSO C CAC Letter - ASTM D3161 letter - (9 -26 - 2017) from FM.odf Approved for use outside HVHZ: Yes Impact Resistant: N/A FL7006 RIO C CAC Letter - ASTM D3462 letter - (9 -26 - 2017).Ddf Design Pressure: N/A Other: FL7006 RIO C CAC Letter - ASTM E108 letter - (9-26- 2017).pdf Quality Assurance Contract Expiration Date 2017).Ddf 12/31/2020 Installation Instructions FL7006 RSO II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.pdf Installation Instructions Verified By: Duc T Nguyen 65034 Instructions.pdf Created by Independent Third Party: No Evaluation Reports Instructions for FBC FL7006.pdf Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap This is a 12" x 12" fiberglass asphalt shingle used to cover One piece fiberglass asphalt shingle used as a starter strip at the hip and/or ridge of an asphalt shingle roof system Starter Strip manufactured at IKO's Kankakee, IL, Toronto, Ont. and Brampton, Ontario plants. Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 RIO C CAC ASTM D 3462 - Shingle letter Surveillance Audit Location - (6-28-2017).pdf Approved for use outside HVHZ: Yes Impact Resistant: N/A FL7006 RSO C CAC Letter - ASTM D3161 letter - (9 -26 - 2017) from FM.pdf Design Pressure: N/A Other: FL7006 R10 C CAC Letter - ASTM D3462 letter - (9-26- 2017).r)df FL7006 RIO C CAC Letter - ASTM E108 letter - (9-26- 2017).Ddf 12/31/2020 Quality Assurance Contract Expiration Date 12/31/2020 Instructions for FBC FL7006.Odf Installation Instructions FL7006 R10 II Hip and Ridge Cao Shingle Installation Instructions.pdf FL7006 RIO II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.pdf Created by Independent Third Party: No Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury, Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 R10 C CAC Letter - ASTM D3161 letter - (9 -26 - 2017) from FM.rdf Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure: N/A FL7006 R10 C CAC Letter - ASTM D3462 letter - (9 -26 - 2017. df Other: FL7006 R10 C CAC Letter - ASTM E108 letter - (9-26- 2017).Ddf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 RIO II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.Odf FL7006 R10 II Roofing-Products-Leading-Edge-Plus- ApDlication-ENM.ndf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.4 Marathon Plus AR, Superglass Plus 3 tab fiberglass asphalt shingle manufactured at IKO's AR Brampton, Ontario, Hawkesbury Ont., Toronto, Ont.; Sylacauga, AL and Kanakakee, IL plants Limits of Use Certification Agency Certificate Approved for use in HVHZ: Yes FL7006 RIO C CAC Letter - ASTM D3161 letter - (9 -26 - 2017) from FM.Ddf Approved for use outside HVHZ: Yes Impact Resistant: N/A FL7006 RSO C CAC Letter - ASTM D3462 letter - (9 -26 - 2 17). df Design Pressure: N/A Other: FL7006 RSO C CAC Letter - ASTM E108 letter - (9-26- 2017).Ddf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 RIO II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.pddf Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: Back Next Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer. Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275 (1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine If you are a licensee under Chapter 455, F.S., please click here . Product Approval Accepts: ® eGieik Credit Card Safe CONSTRUCTION MATERIALS TECHNOLOGIES October 27, 2017 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2017 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions — 3 -Tab Shingles (EN-3Tab Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN -Laminated Appins_8TTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidge12_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report (FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence: PRI Construction Materials Technologies and/or Duc T. Nguyen, FL P.E. do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. r , Signed: C' Signed:( Brad Grzybo ski Duc T.YNduven Managing Dfrector Florida Re ered Professional Engineer P.E. Number: 65034 Date: October 27, 2017 Date: October 27, 2017 Attachments: A) IKO Shingle Application Instructions - 3 -Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-187-02-01 PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: matedalstesting@pricmt.com WebSite: hfp:/Avww.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3 -Tab Shingles (ASTM D3161, Class F — IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed 6-1/8" above the butt edge, approx. 1" and 13" from each end and 1/2" above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (600) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES — — —� — 1 — -- SEALING STRIP — — a 0 0 i i t r I �1t8 NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: materialstesting@pricmt.com WebSite: hffp://www.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F — Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nail line 7-3/8" below the top edge, approx. 1" and 13" in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (600) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8" 63/ NAIL LINE NAILING - STEEP SLOPES APPLICATION Use six nails as shown. PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: materialstesting@pricmt.com WebSite: http://www.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F — IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 5 1/8" (130 mm) exposure. (For a neater appearance, the top of each side of each piece has been factory trimmed on a 1" (25 mm) taper (see drawing). Bend each piece over the hip or ridge, and nail 5 5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note: To obtain a three-dimensional effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2 pieces on top of one another, the lower piece extending about 3/4" (19 mm) further than the top piece (see diagram). The final shingle should be set in cement, and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE: SHINGLES MUST BE APPLIED PROPERLY. THEY ARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY; AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POORAPPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW ALL APPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS, AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. ,.. t25 mma TAPER CUT PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: materialstesting@pricmt.com WebSite: http://www.pdcmt.com IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F — IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required. 2. Each 39 3/8" x 131/4" (1000 mm x 336 mm) IKO Leading Edge Plus strip is perforated lengthwise for separation into two (2) shingles. Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8" x 6 5/8" (1000 mm x 168 mm) and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up, with the factory installed sealant adjacent to the eaves. The shingle should overhang the rake edge and eaves by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with nails located 3" to 4"(75 mm to 100 mm) from the eave edge and 1" (25 mm) in from each end. 4. Take the leftover 20" (500 mm) piece shingle. Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof. The shingle should overhang the rake edge by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with fasteners located 3" to 4" (75 mm to 100 mm) from the rake edge and 1" (25 mm) in from each end. 5. Repeat Steps 3 — 4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" (9 mm) diameter heads, long enough to penetrate through plywood or 3/4" (20 mm) into boards. Use 4 nails per shingle placed 3" to 4" (75 mm to 100 mm) from the eave edge and approximately 1" and 13" (25 mm and 330 mm) in from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4" (6 mm) minimum. Fasten the shingles to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge, 4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first -course field shingles and help keep them from lifting in high winds. PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 e-mail: materialstesting@pricmt.com WebSite: http:/Avww.pNcmt.com