Loading...
HomeMy WebLinkAboutCertificate of Termite Treatment/Construction Soil Treatment (2) 09/17/2018 17:56 770 JMGM PAGE 01 . . S;tittlellE"1:4-A(,,,,,......"‘er COLINTY FLOR IDA - . , • , 300 Virginia Ave . Fort Pierce, FL 34982 .. 772-462-2172 Fax 772-462-6443 . . •:;- 4 ERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMI ii#: TO . Oc-A I u JOB ADDRESS: 375-0 14.3A,.-teid , I . • d.. . 1.. BUILDE J/CONTii ,CTOR: 12A01( Lis.) , . _ __ ____ PEST 6iNTROL CoNTRACTOR: . 1 PEST CI,NTROL LICENSE #: -.7- - .7...i-o — 1 1 . • I We, the u dersigned, hereby certify that we have pretreated the above described construction for us bterran;In termites it, accordance with the standards of the National Pest Control Association. 1 -----, Square fe:1' if area treated: ) 3 . 11 ‘D Chemicals used: 1 "1"4-5 r --) / Percentag. of solution: —. S iD Total gallons used: li ,i Date of Tr:atrnent: 411 9// 8' Time of Treatment: F?: / 5— . . I • , Fool.ng Slab , 11 . • 1Treatr rient 1sTreatment. / i Ri-Treat Re-Treat • Drivzi ayPools . , .- _ •8 • 11, ist Treatmnt 1st Treatment' . . Re-Treat ••• •.t Oth;II u erlmete for 'I'm Inspection _ . , 1 ist Treatment 00 , . - HL Re-Treat ' --- airmen' . • 1 . Signatur- o glY"rmlnator 1 . ,, Note; 77>ermust be a pleted form for each required treatment or re-treatment and this form must be on tile job site to be p ked up by th inspector at time of each Inspection or the scheduled inspection will fall and a re-Inspectior. fee charge.. II lj 1 F8ci.04,2. Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board , shall be pro!lided to receiv9 duplicate Treatment Cvtificates as each required protective treatment Is completed, providing a 'al/provide for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate s;all pnOvide the product used, identity of the applicator, time and date of the treatment, site location, area treated, ch-!. !cal used, percent concentration and number of gallons used, to establish a verifiable record of 'protective ' atment. If tie soil chemical barrier method for termite prevention is used, fine/exterior treatment shall be complet-, pr/or to final building approvB/. St Lucie C1 1,unty requires for the final inspection for CO, a Permanent Sticker to be placed on the elect ilat panel hex cover- listing eh the treatments and dates of'applications. . . . ' .• •