HomeMy WebLinkAboutProduct Approval (3) Business &
Professional . 1 -
SCIS Home I Log In I User Registration ; Hot Topics I Submit Surcharge Stats&Facts Publications FBC Stall I BMS Site Map, Unks Search
b
-� product Approval
,! aUSER:Public User
n 7o
Product Approval Menu>Product or AuDlication Search>Application List>Application Detall
W11111111111119-IR ILI FL# FL17800-112
Application Type Revision
Code Version 2017
Application Status Approved
Comments
Archived ❑
Product Manufacturer IKO Industries,Ltd
Address/Phone/Email 40 Hansen Road South
Brampton,NON-US L6W 3H4
(708)496-2800 Ext 200
rmetz001@tampabay.rr.com
.Authorized Signature Robert Metz
rmetz001@tampabay.rr.com
Technical Representative Bob Metz
Address/Phone/Email REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg,FL 33703
(727)776-5261
rmetzCO1@tampabay.rr.com
Quality Assurance Representative Don Shaw
Address/Phone/Emall IKO Industries LTD
120 Hay Rd.
Wilmington,DE 19808
(717)579-6706
don.shaw@iko.com
Category Roofing
Subcategory Asphalt Shingles
Compliance Method Test Report
Testing Lab PRI Construction Materials Technologies,LLC
Quality Assurance Entity FM Approvals-QA
Quality Assurance Contract Expiration Date 12/31/2020
Validated By Locke Bowden
R Validation Checklist-Hardcopy Received
Certificate of Independence FL17800 R2 COI FM-COI 2015 pdf
FL17800 R2 COI PRI CMT Cert of Indeoendence.odf
Referenced Standard and Year(of Standard) SUndard Year
D3161 Modified to 110 MPH 2016
D3462 2010
E108 2011
TAS 100 1995
TAS 107 1995
Equivalence of Product Standards
Certified By Approved Certification Agency
FL17800 R2 Eauiv Letter-ASTM D3161 letter-(9-26-2017)from
FM_odf
FI 17800 R2 EQuiv Letter-ASTM E108 letter-(9-26-20171.odf
Product Approval Method Method i Option B
Date Submitted 10/23/2017
Date Validated 10/28/2017
Date Pending FBC Approval 10/30/2017
Date Approved 12/12/2017
Summarlif of Products
FL# Model,Number or Name Description
17800.1 Dynasty Laminated Shingle A Cambridge type laminated shingle with an additional
reinforcing tape applied to the specific normal nail line area
Identified as Armourzone that provides for enhanced nail pull
resistance for the shingle.
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL17800 R2 II Dynasty Application Instructlons.Ddf
Approved for use outside HVHZ:Yes FL17800 R2 II I1<0-186-0 -01 Letter-Installation
Impact Resistant:N/A Instructions for FOC FL17800 for 2017 code 10-27-2017.pdf
Design Pressure:N/A Verified By: Duc T Nguyen 65034
Other: Test Reports
FL27800 R2 TR 3013597-Dynasty shinDle.ndf
FL17800 R2 TR IKO-125-02-01 KE Dynasty TAS 107
D3161.pdf
FL17800 R2 TR IKO-127-02-01 KE Dynasty D3462.odf
FL17800 R2 TR IKO-148-0 -01 Report-TAS 100 for
Dyriesty-(Kankake ILl(6 nalls).Di f
Back Ne:t
Contact Us::2601 Blair Stone Road.Tallahassee-FL 32399 Phone.850.487-1824
The State of Florida Is an AA/EEO employer.Copyright 2007-2013 State of Florida_::Privacy Statement::Accessibility Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mall.If you have any questions,please contact 850.487.1395.-pursuant to Section 455.275
(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they have one.The
emaus provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,
please provide the Department with an email address which can be made available to the public.To determine If you are a licensee under Chapter 455,F.S.,please
click hae_.
.
Product Approval Accepts:
HEM '®
Credit Card
Safe
y.n'st rmour one. ing es
Ap;p: ., :onl:nst.ructions .
DIRECTIONS
NOTE: SHINGLES MUST BE APPLIED PROPERLY.WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING
FROM POOR APPLICATION OR:FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER,OR FAILURE TO
PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW
ALL APPLICABLE BUILDING CODES,MINIMUM PROPERTY STANDARDS AND REQUIREMENTS PRIOR TO APPLYING THESE
SHINGLES USING THE APPLICATION INSTRUCTIONS FOUND ON THE WRAPPER.PLEASE USE CAUTION WHEN STACKING
BUNDLES ON SLOPED ROOFS.
ROOF DECK: Must be smooth,firm,dry and securely nailed.Plywood must be exterior grade,conforming to building
code requirements.Half-inch plywood is recommended for best deck performance.The installation of asphalt shingles on
dimensional lumber(including shiplap/board decks)isnot recommended as it may potentially cause buckling problems.
Buckling is not covered by our Limited Warranty.REROOFING:.Split'and re-nail curled or buckled shingles,replace any
missing shingles,remove loose or protruding nails,and sweep surface clean.Roof slope should be 4:12 or steeper.For
slopes 4:12 to 2:12,see special underlayment requirements outlined below.Never apply asphalt shingles to roof slopes
less than 2:12.
EAVE PROTECTION:Apply eave protection as per building code requirements,overhanging eaves by a nominal 7/4"
minimum and extending up the roof at least 24" beyond the interior wall line.Ice&Water Protector is recommended for
best performance,applied according to instructions printed on each wrapper.
UNDERLAYMENT: For areas where-the roof slope is less than 4" per foot down to 2" per foot, use one layer of ICE AND
WATER PROTECTOR,.applied according to instructions printed.on each wrapper. Alternately, use 2 layers of asphalt
saturated felt (or equivalent), the first sheet overlapping the eave protection by 19", followed by full 36" widths
overlapping each preceding course by 19". (NOTE: IF THESE PROCEDURES.ARE FOLLOWED,SHINGLES APPLIED TO SLOPES
3:12 TO 4:12 WILL BE WARRANTED FOR THE FULL WARRANTY TERM FOR THE SHINGLE. SHINGLES ON SLOPES 2:12 TO
3:12 WILL BE WARRANTED FOR 12 YEARS.)For areas where the roof slope is 6" per foot down to 4" per foot,it is strongly
recommended to cover the remainder of the deck with one ply asphalt saturated felt(or equivalent) laid parallel to the
eaves, with 2" horizontal laps and 4"'end laps. Apply metal drip edges on top of any underlay along rake edges and
directly to the deck along eaves.
CHALK LINES: Sufficient chalk lines should be stuck-to ensure accurate vertical and horizontal alignment of shingles.
Vertical chalk lines every 4 to 5 shingle lengths are recommended.
FLASHINGS: Base flashing should be in place before shingles are applied.Cap flashings of sheet metal and base flashing
of metal or mineral surfaced roofing should be used at chimneys, skylights, vents, walls and other vertical surfaces and
sealed with asphalt,plastic cement. Flashing shall conform to the requirements of applicable building codes and good
roofing practice.
Page 1 EN-Dynasty-Armourzone-Appins_BTrDYAZEFS-2015-05_reformatted 2015.05
Dynasty Armourzone Shingles
Application Instructions
NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long.enough
to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nailing area, either between
the lines or on the lines,spaced as shown below. Drive nails straight so that nail head is flush with, but not cutting into
shingle surface.
NAILING ON STEEP SLOPES: On slopes.of 21" per foot(600)or more, use 6 instead of 4 nails per shingle placed as shown
below. Ensure that no nail is within 2" of a.joint/cutout of the underlying shingle. NOTE:Each nail MUST penetrate both
layers of the shingle by nailing into the lower nail line only.Nominal nail zone cannot be used to ensure penetrating both
layers. Seal down each shingle at time of application with three 1" diameter(approx. size and thickness of a quarter)
spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the
underlying course when the factory applied asphalt:sealant is sufficiently warmed by the heat of direct sunlight.When
application conditions might limit the effectiveness of the sealing strip,such as in cool weather or in areas subject to high
winds or blowing dust,shingle adherence should be ensured through manual sealing as described above.
To ensure coverage under the High.Wind Resistance Limited Wind Resistance Warranty;
- Manual sealing is not required in the state of Florida.
- Starter strip shingles must be used at all eaves.Rake application of starter strips is not required.
OPEN METAL VALLEY: (FIGURE 1)For longer roof performance,metal valleys are recommended.Complete valley flashing
before shingles are applied.Center a 36"width strip of ICE&WATER PROTECTOR(A)in the valley.Ensure flashing is tight
to the deck,then fasten with only enough nails to hold in place,nailing at the edges only.Center a minimum 24"wide,
minimum 28 gauge pre-finished/galvanized metal valley, liner(B)in the valley,and fasten with only enough nails to hold
in place,nailing at the edges only.Snap two chalk lines(C)the full length of the valley,6" apart at the top and increasing
STEEP SLOPE NAIL
� ♦1, ♦ PLACEMENT
-► t
6 3!8'
El
NAILS
CEMENT
Page 2 EN-Dynasty_lrmour7,one—Appins_8TTDYAZEF5-2015-05_reformatted 2015-05
Dynasty Armouraone Shingles
Application Instructions
in width 1/8" per foot towards the bottom.When the shingles are FIGURE 1 C
being applied, lay them over the valley flashing,trim the ends to B D
the chalk line,and cut a 2" triangle off the comer to direct water
into the valley(D).Embed the valley end of each shingle into a 3" A
band of asphalt plastic cement(E),and nail the shingles 2" back E
from the chalk line,7 3/8"down from the top edge of the shingle.
CLOSED CUT OR WOVEN VALLEYS ARE ALSO ACCEPTABLE.
STARTER COURSE: (FIGURE 2)Use Leading Edge Plus shingles or
if 3-tab shingles are used,cut off the tabs along a line level with
the top of the cutouts.Install the starter course with the factory
applied sealant adjacent to the eaves overhanging the rake edge
and eaves by a nominal 1/4" minimum.Begin starter course(A)
with a shingle cut 4"short so that joints will not coincide with
joints between first course shingles.
FIRST COURSE: Start with a complete shingle applied flush with
starter course at rake and eave(B).Nail as described above and
continue across roof with full shingles.
SECOND,THIRD AND FOURTH COURSES: (FIGURE 2)
Trim off 10",20",and 30" respectively,from the left FIGURE 2 UImERLAYMEM
end of the starting shingle and apply to overhang
rake edge by 1/4"to 3/8".Continue each course `i'-4
across the roof with full shingles butting ends loosely, "' "" "'�- -"" T
Align the bottom.edge of the shingles with the tops &-20-�
of the saw teeth of the shingles in the underlying
course(C).Note that other offsets between 4" -10" jare permitted. c'' 10, � O
FIFTH AND SUCCEEDING COURSES: Repeat the METALDWEDGE
sequence of the first four courses up the roof. f
For maximum wind protection,cement shingles -- -------
at rake edges. e A
Page 3 EN-Dynasty_Armourzone_Appins_8TMYAZEPS-2015-05_reformatted 2015.05
CONSTRUCTION MATERIALS
TECHNOLOGIES
October 27,2017
IKO Industries, Ltd
120 Hay Rd. I
Wilmington,DE 19809
Re:FBC FL17800
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2017 Florida Building Code.
This review was completed based on the receipt of following evidence from IKO Industries,Ltd:
1) IKO Dynasty Armourzone Shingles Application Instructions
(EN-Dynasty_Armourzone Appins_BTTDYAZEFS-2015-01_reformatted 2015-02)
2) ASTM D3161 /FBC.(HVHZ)TAS 107 Test Report(PRI Project No.IKO-125-02-01)
3) FBC(HVHZ)TAS 100 Test Report(PRI Project No. IKO-148-02-01)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict,these instructions shall govern.
Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen,FL P.E.do not
have no plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
0
Signed: Signed:
Brad Grcybo sk Due T. n
Managing D rector Florida re Professional Engineer
P.E.Number:65034
Date: October 27,2017 Date: October 27,2017
Attachments: A)IKO Dynasty Armourzone Shingles Application Instructions
IKO-186-02-01
PM Construction MatedalsTechmlogles,LLC.6412 Badger Ddve Tampa,FL33610 TeL•813.621-5177 F=813.621-wo a-mail:matMatstedriap&mtcom WebSite:http•JAvww.pdcmtcom
IKO
Installation Instructions for
Asphalt Shingles
Page 2 of 2
IKO Dynasty Armourzone Shingle Application Instructions
(ASTM D3161, Class F—IKO Dynasty Armourzone Laminated Shingle)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT,THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC.
UNDERLAYMENT:Applied in accordance with building code requirements.Forareas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping
each preceding course by 19"or other Approved underlayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid parallel to the eaves,with 2"horizontal laps and 4"and laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING:Use galvanized(zinc coated)roofing nails,11 or 12 gauge,with at least 3/8"diameter heads,long
enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nailing area,
either between the lines or on the lines,spaced as shown below.Nailing area is 1-1/4"wide and located 6-
5/16"to 7-9/16" below the top edge. Drive nails straight so that nail.head is flush with, but not cutting into
shingle surface.
Additional for FBC(HVHZ):Asphaltic shingles shall be installed in accordance with RAS 115.Installation shall
be limited to a roof mean height of 33'. Use 6 approved roofing nails (e.g. approved 12 gauge by 1-1/4"
corrosion-resistant annular ring-shank roofing nails) per shingle as shown below for steep slope nail
placement,except asphalt plastic cement is not required.
NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each
shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt
plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8".
STEEP SLOPE NAIL
PLACEMENT
EM
• . .. _
e+. Notts -- - t`: -
CEMENT
PRI ConshcOon Matedals Technologies,LLC.6412 Badger Detre Tampa,FL 33610 Tel;81&621-5777 Fax 81&6215840 a mai:matedahtesting@pdcmtoom WebSlte:htWAYWw.pdcmtcom