Loading...
HomeMy WebLinkAboutCompaction test (2) KsIks KELLER, SCHLEICHER & MacWILLIAM ENGINEERING A.N11D TESTING, INC. MARTIN(772)337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 �.SEBASTIAN(772)589-0712 PALM BEACH(561)845-7445 www.ksmengineering.net MELBOURNE(321)768-8488 FAX(561)845-8876 E-Mail:KSM@KSMENGINEERING.NET ST.LUCIE(772)229-9093 C.A.:5693 FAX(772)589-6469 SOIL COMPACTION REPORT ASTM D 1667 and ASTM D 2922 DATE TESTED February 12, 2019 KSM JOB# : 190631-1 d/SS/il PERMIT# 1902-0143 Epa CONTRACTOR Keith Pearson KECEI'VEDA JOB LOCATION 4780 Jorgensen Road FEB 2019 Fort Pierce, Florida Permitting Department ITEM TESTED Compacted Foundation Fill for the Garage Pad St. Lucie County, FL TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1. S.W. 011- 12" 50+ 109.7 112.9 97.2 2. N.W. 50+ 108.6 It it 96.2 3. Center If 50+ 110.7 It 98.1 4. N.E. 50+ 112.5 it 99.6 5. S.E. 50+ 110.0 97.4 Soil Description: Brown Sand 114,0 in Place Moisture: W 7.1 Percent E 1110 Optimum Moisture: G 11.0 Percent H T 112.0 -j— Max. Dry Density: P 1119 P.C.F. I C 111.0 @ Test Locations The Density& Penetrometer F Readings Indicate the 110.0 Degree of Compaction Meets Minimum Required for D ndation R UPaked6Q4 y 109.0 8 9 10 11 12 13 14 ed: Moisture-%of Dry Weight GeE " ., ie C Pr6sidy Orr irATAW-14j -0. eirsenrd@gmaii.com *!*Lucie County Building Department Ronald G.Keller,P.E.:37293/SI Lic.No.:860 Julie E.Keller,P.E.:68366