Loading...
HomeMy WebLinkAboutWindows/Door Schedule WINDOW/DOOR SCHEDULE (F.9 anitnesvoc01-4-41-- A._„--.7)::A142.0i -CON APPDX IMPACT PROTECTION NO OPENING DESIGNATION TYPE IMPACT NEW * REMARKS GLASS S11UTFER E (q/3 SHUXISTINGTTER 37"X 63" 25 SH X ' EXAMPLE 1 q(, )(4,1 doleicla A Pi( 44+4.4.5 2y' ( 1 1 x 3 VS)Cg 4 17X13 tl P??— . x 6 �773x 7 ?7Xk3 7 5i. A 8 17119 B 5 9 10 11 12 13 14 15 16 17 18 19 # NA, MOW ifig—t1M g/t 140 41144211474-16 20 21 22 23 24 25 26 27 28 29 30 *Window Replacement using existing shutters to comply with impact protection will require the existing shutters to meet the requirements of the FBC 5th Edition (2014)Residential 8301.2.1.2 TOTAL GLAZED OPENING AREA FOR STRUCTRE: S.F. PERCENTAGE OF NEW GLAZED AREA: (TOTAL INSTALLED GLAZED AREA DIVIDED BY TOTAL GLAZED OPENINGS FOR STRUCTURE) NOTE:The replacement of more than 25%of the aggregate area of exterior glazing(windows&doors)in one&two family dwellings within a 12 month period will require impact protection on all proposed glazed opening replacement(approved shutters or impact resistant glazing)as per FBC 5th Edition(2014)EXISTING BUILDING 706.4. **TYPE WINDOWS SH—SINGLE HUNG AWN—AWNING SL—SLIDING DH—DOUBLE HUNG CAS—CASEMENT FIX—FIXED