HomeMy WebLinkAboutDrawing Attachment A
Concrete must be a minimum of off 30'
5' from your left and back property
lot line. 14' 5' 8'
I, Marilyn Minix owner of the Road
Runner Travel Resort give 8' x 8' Box
permission to install concrete on Shed
P-02 with the requirements listed
above and have prepared this lot
plan.
A/c ❑
Marilyn Minix May 21, 2019
Scale P = 10' New Con- P-02
crete 12'x 34'
Patio Park
8' X 24' Model 67'
Nofth paid for by Shed
RRTR
8' X10'
80' paid for by
Customer
FILE C
Height of t
door is
Applicant has been advised NO structures 33 1/2pat33i off
o
can be erected within a ease ent or
right of way unless proved.
Applicant Initial '
r 25'
� ) 20' X 25'
Driveway
ROAD in front of Lot P-02