HomeMy WebLinkAboutProduct Approval lie
• '" a o a s r yt* 'fir c�a
BCIS Home Log In User Registration a Hot Topics Submit Surcharge Stats&Facts Publications Contact Us I BCIS Site Map Links Search
�IOrida
Product Approval
fit'. - - USER:Public User =RECEIVr—D
t_ I ar`�sGF�jsr. urnProduct Approval Menu>Product or Application Search>Application Llst>Application Detail
FLTi'651=R3a.* ( DY`Y�•c Application Type Revision
Code Version 2017
Application Status Approved -k He Copy
Comments �
Archived 7
cProduct-Manufacturer (Gulf-Coast-Supply-WManufacturing;,L
Address/Phone/Email 4020 S.W.449th Street
Horseshoe Beach,FL 32648
(352)498-0778
info@gulfcoastsupply.com
Authorized,Signature Eng David ' e � ®�
info@gulfcoastsupply.com n� �9
Technical Representative David Eng �t1/���p/C� � �
Address/Phone/Email 14429 SW 2nd PI ®OE r`1G ,,��
Ne Ste G30 -berry, FL 32669 ®OYIr"L �`�rt' C
(352)498-0778 T'o LUCIE p�p}�, � � Q�
info@gulfcoastsupply.com G VOu T
BOC
Quality Assurance Representative David Eng
Address/Phone/Email 14429 SW 2nd PI
Ste G30
Newberry, FL 32669
(352)498-0778
david.eng@gulfcoastsupply.com
Category-,, Roofing
Subcatego; CMetal-Roofing
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida
Professional Engineer
U Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed the Daniel S. Kuhn
Evaluation Report
Florida License PE-75519
Quality Assurance Entity Keystone Certifications,"Inc.
Quality Assurance Contract Expiration Date 04/12/2024
Validated By Locke Bowden P.E.
✓' Validation Checklist-Hardcopy Received.
Certificate of Independence FL11651 R3 COI Cert of Independence 2017-10-09.pdf
Referenced Standard and Year(of Standard) Standard Year
FM 4471 1992
TAS 100 1995
TAS 110 2000
TAS 125 2003
UL 1897 2012
UL 580 I 2006
' 1
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure: +N/A/-156.5PSF Created by Independent Third Party: Yes
Other:-108.5 psf @ 12"o.c.fastener spacing.-156.5 psf @ Evaluation Reports
6"o.c.fastener spacing.Install per manufacturers details. For FL11651 R3 AE FL11651 12 R3 265vCrimp 15-
use in HVHZ Zones. 32Plywood HVHZ-signed.pdf
Created by Independent Third Party:Yes
11653:13 ,26_Gar5V•Crimp) Min26-Ga:5V,Crimp-oyer_-15/32"=PIyW6odS
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL11651 R3 II FL11651 13 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure:+N/A/-131.PSF Created by Independent Third Party:Yes
Other:-94:25-psf-@-16"-o:c.fastener-pattern=13.1 0_p fs @" Evaluation Reports
16"-o:c.fastener-pattem—InstalPper manufactureis— ails—Nots FL11651 R3 AE FL11651 13 R3 265vCrimp 15-
for�use-in-HVHZ=Zone 32Plywood NonHVHZ-signed.pdf
Created by Independent Third Party:Yes
11651.14 26 Ga.5V Crimp Min 26 Ga.5V Crimp Roof Panel over 1x4 Wood Purlins over
15/32"Plywood
Limits of Use Installation Instructions
Approved for use in HVHZ:No FL11651 R3 II FL11651 14 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure: +N/A/-156.5PSF Created by Independent Third Party:Yes
Other:-108.5 psf @ 12"o.c.fastener spacing.-156.5 psf @ Evaluation Reports
6"o.c.fastener spacing.Install per manufacturers details.For FL11651 R3 AE FL11651 14 R3 265vCrimp 1x4 15-
use in HVHZ Zones. 32Plywood NonHVHZ-signed.pdf
Created by Independent Third Party: Yes
11651.15 26 Ga. Gulf Lok Min 26 Ga. Gulf Lok 16"Wide Roof Panel over 15/32"Plywood
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL11651 R3 II FL11651 15 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure: +N/A/-161.OPSF Created by Independent Third Party:Yes
Other:-63.5 psf @ 5 3/16"o.c.fastener spacing.-121.75 psf Evaluation Reports
@ 5 3/16"spacing.-161.0 psf @ 5 3/16"o.c.fastener spacing. FL11651 R3 AE FL11651 15 R3 26GuIfLok 16 15-
Install per manufacturers details.For use in HVHZ Zones. 32Plywood HVHZ-signed.pdf
Created by Independent Third Party:Yes
11651.16 26 Ga.Gulf Lok Min 26 Ga.Gulf Lok 16"Wide Roof Panel over 15/32"Plywood
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL11651 R3 II FL11651 16 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant:N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure: +N/A/-63.5PSF Created by Independent Third Party: Yes
Other:-63.5 psf @ 5 3/16"o.c.fastener spacing.-121.75 psf Evaluation Reports
@ 5 3/16"fastener spacing.-161 psf @ 5 3/16"fastener FL11651 R3 AE FL11651 16 R3 26GulfLok 16 15-
spacing.Install per manufacturers details.Not for use in HVHZ 32Plywood NonHVHZ-signed.pdf
Zones. Created by Independent Third Party:Yes
11651.17 26 Ga.GulfPBR Min 26 Ga.Gulf PBR Roof Panel over 15/32"Plywood
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL11651 R3 II FL11651 17 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes signed.pdf
Impact Resistant:N/A Verified By: Dan Kuhn,P.E.75519
Design Pressure: +N/A/-154.7PSF Created by Independent Third Party:Yes
Other:-59.25 psf @ 24"o.c.fastener pattern. -154.75 psf @ Evaluation Reports
12"o.c.fastener pattern.Install per manufacturer details. Not FL11651 R3 AE FL11651 17 R3 26GulfPBR 15-
for use in HVHZ 32Plywood NonHVHZ-signed.pdf
Created by Independent Third Party:Yes
11651.18 26 Ga.GuIfPBR Min 26 Ga.GuIfPBR Roof Panel over 1x4 Wood Purlins over
15/32"Plywood I
Limits of Use Installation Instructions
Approved for use in HVHZ:Yes FL11651 R3 II FL11651 18 R3 Metal Roof Panel Detail-
Approved for use outside HVHZ:Yes ;zgned.Of
Impact Resistant: N/A Verified By: Dan Kuhn; P.E. 75519
Design Pressure:+N/A/-151.7PSF Created by Independent Third Party: Yes
Other:-100.5 psf @ 24"o.c.fastener spacing. -151.75 psf @ Evaluation Reports
12"fastener spacing.Install per manufacturer's details. For use FL11651 R3 AE FL11651 18 R3 26GuIfPBR 1x4 15-
in HVHZ Zones 32P wood HVHZ-signed.pdf
Created by Independent Third Party:Yes
11651.19 26 Ga. GulfPBRMin 26 Ga.GulfPBR.over 15/32"Plywood
I
I
f
Am
4 GulfcoOt
u ar i.
SUPPLY & MANUFACTURING
5VCR.IMP
26 GA. 5VCRIMP ROOF PANEL OVER 15/32" PLYWOOD
FLORIDA .RO. APPROVAL N • 11651.13
OF
TM
TYPE 1 FASTENER PATTERN
(1 ) #9-15 x 1 -1 /2" HWH w/Sealing Washer
12" 12"
At Panel Lap
TYPE 2 FASTENER PATTERN
(1 ) .#9-15 x 1 -1 /2" HWH w/Sealing Washer
211 9.5.11 II 9.511 211
S•
*
No,= � 75579
STATE OF
'O���S' �< ORIDP .•����
0/01V
Lit
i
FL#11651.13 R3•OCTOBER 5,2017
t�-: �,�. Nx,� Y `� f � 1' k f Gc//$ S x;• ,ill.
BQS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications Contact Us �• BQS Site Map' Links Search
b
a
MAI% ;u Product Approval
�('�'• C-1
�USER:Public User R C'/'�[--Y` , D
Z' M39
Product Aoproval Menu>Product or Application Search>eQplication List>Application Detail � JULu0 2019
1>01
> - -I; i FC5259,-R28:s ST. Lucie Coun
Application Type Revision ty, Permitting
Code Version 2017
Application Status Approved
Comments
Archived w
�Product-Manufacturer� fPOLYG�L'ASS-USA(j '
Address/Phone/Email 1111 W. Newport Center Drive
Deerfield Beach, FL 33442
(954)233-1378 Ext 242
alender@polyglass.com
Authorized Signature Ariel Lender
alender@polyglass.com
Technical Representative Maury Alpert
Address/Phone/Email 1111 W. Newport Center Drive
Deerfield Beach, FL 33442
(912)429-8610
MAIpert@polyglass.com EVIEWE® FOR
Quality Assurance Representative Ariel Lender CODE COMPLIANCE
Address/Phone/Email 1111 W. Newport Center Drive COMPLIANCE
Deerfield Beach,FL 33442 ST. LUICIE COUNTY
(954)233-1230
ALender@polyglass.com B®cc
(Sat
egory (Roofng
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida
Professional Engineer
Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed the Robert Nieminen
Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/05/2018
Validated By John W.Knezevich,PE
L' Validation Checklist-Hardcopy Received
Certificate of Independence FL5259 R28 COI 2018 01 COI NIEMINEN.pdf
i
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2015
ASTM D226 2009
ASTM D4798 2011
ASTM D6164 2011
ASTM D6222 2011
FM 4474 2011
FRSA/TRI April 2012 I 2012
UL 1897 2012
I
Equivalence of Product Standards
Certified By
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 01/24/2018
Date Validated 01/29/2018
Date Pending FBC Approval 01/30/2018
Date Approved 04/10/2018
Summary of Products
FL# Model,Number or Name Description
5259.1 Polyglass Roof Roofing underlayments
Underlayments
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL5259 R28 II 2018 01 FINAL ER POLYGLASS UNDERLAYMENTS FL5259-
Approved for use outside HVHZ:Yes R28.pdf '
Impact Resistant: N/A Verified By: Robert Nieminen PE-59166
Design Pressure: +N/A/-622.5 Created by Independent Third Party:Yes
Other: 1.)The design pressure in this Evaluation Reports
application relates to one particular FL5259 R28 AE 2018 01 FINAL ER POLYGLASS UNDERLAYMENTS FL5259-
underlayment system(over concrete deck)for R28.pdf
use under foam-on tile systems(where the Created by Independent Third Party:Yes
underlayment forms part of the load-path).
Refer to ER Section 5.6.4 for other systems,
other deck types and associated maximum
design pressures.2.) Refer to ER Section 5 for
other limits of use.
Back Next
Contact Us::2601 Blair Stone Road,Tallahassee FL 32399 Phone:850-487-1824
The State of Florida is an AA/EEO employer.Coo right 2007-2013 State of Florida.::Privacy Statement::Accessibility,Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In responseto a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1),
Florida Statutes,effectiveOctober1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails
provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please
provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here.
Product Approval Accepts:
® tLheck
11101
Credit Card
i
i
t
MEMO etc.
{ Certificate of Authorization#32455
353 Christian Street, Unit##13
Oxford, CT 06478 -
(203) 262-9245
ENGINEER EVALUATE TEST CONSULT CERTIFY
EVALUATION REPORT
Polyglass USA, Inc. Evaluation Report P12060.02.09-R24
1111 West Newport Center Drive FL5259-1128
Deerfield Beach, FL 33442 Date of Issuance:02/24/2009
(954)233-1230 Revision 24:01/24/2018
{
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E.
for use of the product.under the Florida Building Code and Florida. Building Code, Residential-Volume. The products
described herein have been evaluated for compliance with the 61h Edition (2017) Florida,Building Code sections noted
herein.
DEscRIPTIoN Polyglas.'Roof Underlayments 'I
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named,product(s) changes, the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this
Evaluation Report by the named client constitutes agreement ,to notify Robert Nieminen, P.E. of any changes to the
product(s), the Quality Assurance or the.production facility location(s). NEMOletc. requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle:
ADVERTISEMENT: The Evaluation Report, number preceded by the words ""NEMO l etc. Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its
distributors and shall be available for inspection at the job site at the request of the Building,Official.
This Evaluation Report consists of pages 1 through 14.
Prepared by: ����`S�"�,r•,lJ''••n
Robert J.M. Nieminen P.E.
The facsimile seal appearing was authorized by Robert Nieminen,
Florida Registration No.59166,Florida DCA ANE1983 '';�`s.• - P.E.on 01/24/2018. This does not serve as an electronically
`'��•f�•�•�r�"' signed document:
CERTIFICATION OF INDEPENDENCE: {
1. NEMOIetc. does not have; nor does it intend to acquire or will,it acquire, a financial.interest in any company manufacturing or
distributing products it evaluates.
2. NEMO I etc.is not owned,operated or controlled by any company manufacturing or distributing'products it evaluates.
3. Robert Nieminen,P.E'does not have nor will acquire,a financial interest in any company manufacturing.or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither NEMOIetc. nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose. J
ONEMOjetc.
Entity Examination Reference Date
ERD(TST 6049) Physical Properties P40390.08.12-1 08/06/2012
ERD(TST 6049) Physical Properties P40390.08.12-2 08/07/2012
ERD(TST 6049) Physical Properties C41420.09.12-3 09/11/2012
ERD(TST 6049) Wind Uplift P39680.03.13 03/04/2013
ERD(TST 6049) Physical Properties P45370.04.13 04/26/2013
ERD(TST 6049) Wind Uplift P1738.02.07-R2 04/29/2013
ERD(TST 6049) Wind Uplift 11757.04.01-1-R1 04/30/2013
ERD(TST 6049) Wind Uplift P41630.08.13 08/06/2013
ERD(TST 6049) Wind Uplift P11751.05.03-R1 11/26/2013
ERD(TST 6049) Wind Uplift P11781.11.03-R1 11/26/2013
ERD(TST 6049) Physical Properties P45270.05.14 05/12/2014
ERD(TST 6049). Physical Properties 6020.07.14-1 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-2 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-3 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-4 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-5 09/08/2014
ERD(TST 6049) Physical Properties 6020.09.14-6 09/08/2014
ERD(TST 6049) Physical Properties P46520.10.14 10/03/2014
ERD(TST 6049) Physical Properties P43290.10.14 10/17/2014
ERD(TST 6049) Physical Properties PLYG-SC7550.03.15 03/24/2015
ERD(TST 6049) Physical Properties P40390.04.15 04/03/2015
ERD(TST 6049) Physical Properties P44360.10.14-R1 05/18/2015
ERD(TST 6049) Physical Properties PLYG-SC8080.05.15-1 05/20/2015
ERD(TST 6049) Wind Uplift PLYG-SC8905.05.16-1 05/17/2016
ERD(TST 6049) Physical Properties PLYG-SC8080.07.16 07/16/2016
ERD(TST 6049) Wind Uplift PLYG-SC12025.10.16 10/12/2016
ERD(TST 6049) Physical Properties PLYG-SC13040.12.16 12/27/2016
ERD(TST 6049) Physical Properties PLYG-SC11900.03.17 03/10/2017
ERD(TST 6049) Physical Properties PLYG-SC12115.08.17 ` 08/08/2017
ICC-ES(EVL 2396) IBC Compliance ESR-1697 11/01/2014
Miami-Dade(CER 1592) HVHZ Compliance NOA 14-0717.08 01/22/2015
Polyglass USA Manufacturing Affidavit Products Current 02/18/2009
Polyglass USA PA Affidavit Mule-Hide Cross Ltg 03/01/2008
Polyglass USA Materials Affidavit Polystick SA Compound 08/18/2011
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/05/2018
4. PRODUCT DESCRIPTION:
4.1:. Mechanically Fastened+Underlayments:
4.1.1 Elastobase is a fiberglass reinforced,SBS modified bitumen base sheet.
4.1.2 Elastobase P is a polyester-reinforced,SBS modified bitumen base sheet.
4.1.3 Polyglass G2 Base is a fiberglass-reinforced,asphaltic base sheet.
4.1.4 Polyglass APP Base is a fiberglass-reinforced,APP modified bitumen base sheet.
4.2,
Self-Adhering Underlayments:
',4i%2- Polystick;MTS or Polystick MTS PLUS`is a nominai`6l)-mil thick rubberized.asphalt waterproofing-membrane;`glass
�. fiber reinforced,surfaced with"polydlefinic film surface; meets FRSA/TRI April 2012.'
4.2.2 Polystick IR-Xe is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with an
aggregate surface;meets ASTM D1970.
4.2.3 Polystick TU Plus is a nominal 80-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with a
polyester fabric surface; meets ASTM D1970 and FRSA/TRI April 2012.
NEMO ETC,I.I.C. Evaluation Report P12060.02.09-R24
Certificate'ofAuthorization#32455 CH EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28
Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018
Page 3 of 14
i
ONEMO etc.
5.5 Allowable Roof Covers:
TABLE 1: ROOF COVER OPTIONS
Underlayment Asphalt Shingles Nail-On Tile Foam-On Tile Metal Wood.Shakes Slate
&Shingles
Elastobase Yes Yes Yes Yes Yes Yes
(Base Sheet In 2-ply system) (Base Sheet in 2-ply system)
Elastobase P Yes Yes Yes Yes Yes Yes
(Base Sheet in 2-ply system) (Base Sheet in 2-ply system)
Polyglass G2 Base No Yes Yes No No No
(Base Sheet in 2-ply system) (Base Sheet in 2-ply system)
Yes
es
Polyglass APP Base No (Base Sheet in 2-ply system) (Base Sheet iNo No No
n 2-ply system)
Polystick MTS or MTS.P_LUS Yes Yes ` No Yes Yes Yes
Polystick IR-Xe Yes No No No Yes Yes
Polystick TU P No Yes Yes (See 5.5.1) No No No
Polystick TU Plus Yes Yes Yes (See 5.5.1) Yes Yes Yes
Polystick TU Max No Yes Yes (See 5.5.1) Yes No No
Polystick Dual Pro Yes No No Yes Yes Yes
Polystick Tile Pro Yes Yes Yes (See 5.5.1) Yes Yes Yes
Polystick MU-X Yes No No Yes Yes Yes
Elastoflex S6 G Yes Yes Yes (See 5.5.1) No Yes Yes
Elastoflex S6 G FR Yes Yes No No Yes Yes
Elastoflex G TU Yes Yes Yes (See 5.5.1) No Yes Yes
Polyflex G Yes Yes Yes (See 5.5.1) No Yes Yes
Polyflex G FR Yes Yes No No Yes Yes
Polyflex SAP or SAP FR Yes Yes Yes (See 5.5.1) No Yes Yes
Mule-Hide SA-APP Cap Sheet Yes Yes Yes (See 5.5.1) No Yes Yes
or SA-APP Cap Sheet(FR)
5.5.1 "Foam-On Tile"is limited to use of the following Approved tile adhesives/underlayment combinations.
TABLE 1A:ALLOWABLE TILE ADHESIVE UNDERLAYMENT COMBINATIONS)
Adhesive Florida Product Underlayments
Approval
DAP Foam Touch'n Seal StormBond Roof FL14506 Polystick TU Plus,Polystick TU Max
Tile Adhesive
Dow TileBondTM' FL22525 Polystick TU P,Polystick TU Plus,Polyflex SAP or Tile Pro
Polystick TU P,Polystick TU Plus,Polystick TU Max,Polystick Tile Pro,
ICP Adhesives Polyset®AH-160 FL6332 Elastoflex G TU,Elastoflex 56 G,Polyflex G,Polyflex SAP,Polyflex SA Cap FR,
Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR)
Polystick TU P,-Polystick TU Plus,Polystick TU Max,Polystick Tile Pro,
ICP Adhesives Polyset®RTA-1 FL6276 Elastoflex G TU,Elastoflex S6 G,Polyflex G,Polyflex SAP,Polyflex SA Cap FR,
Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR)
1 Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance.
NEMO ETC,I.I.C. Evaluation Report P12060.02.09-R24
Certificate of Authorization#32455 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-1128
Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018
Page 5 of 14
I
Y
O
MEMO etc.
5.6 Allowable Substrates:
i�5;w6.1____,._Direct-Bond to Deck,-1 '
Polystick(all variations), Dual Pro,Tile Pro, Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet
(FR)self-adhered to:
➢ New untreated plywood;ASTM D41 primed new untreated plywood; Existing plywood;ASTM D41 primed existing
plywood; New or existing, unprimed OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed
Southern Yellow Pine; ASTM D41 primed structural concrete; Huber Engineered Woods "ZIP System" Panels
(designed and installed to meet wind loads for project).
Note: Polyglass does not require priming of new or existing plywood or OSB sheathing. New or existing plywood or
OSB sheathing should be cleaned of all dirt and debris prior to application of Polystick membranes. .
Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to:
➢ ASTM D41 primed structural concrete.
Polyflex G or Polyflex G FR torch-applied to:
➢ ASTM D41 primed structural concrete.
5.6.2 Bond-to-Insulation:
Polystick(all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR) self-adhered
to:
➢ ASTM C1289, Type Il, Class 1 polyisocya nu rate or Type V polyisocyanurate-composite insulation; Dens Deck
DuraGuard; Dens Deck Prime;or SECUROCK Gypsum-Fiber Roof Board.
Elastoflex G TU,Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to:
➢ Dens Deck Prime or SECUROCK Gypsum-Fiber Roof Board.
Polyflex G or Polyflex G FR torch-applied to:
➢ ASTM D41 primed structural concrete;Dens Deck Prime or SECUROCK Gypsum-Fiber Roof Board.
For installation under, mechanically attached prepared roof coverings, insulation,shall be attached per minimum
requirements of the prepared roof covering manufacturer's Product Approval., For installations under foam-on tile
systems, insulation attachment shall be designed by a qualified design professional and installed based on testing of
the insulation/underlayment system in accordance with FBC Section 1504.3.1.
5.6.3 Bond to Mechanically Attached Base Laver:
Polystick (all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) Dual Pro or
Tile Pro self-adhered to:
➢ ASTM D226,Type'I or II felt; Elastobase;Elastobase P or Mule-Hide Nail Base.
Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to:
➢ ASTM D226,Type I or II felt; Elastobase;Elastobase P,Mule-Hide Nail Base or Polyglass G2 Base.
Polyflex G or Polyflex G FR torch-applied to:
➢ Elastobase;Elastobase P,Mule-Hide Nail Base,Polyglass G2 Base or Polyglass APP Base.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum
codified requirements. For installations under foam-on tile systems, base layer shall be attached per minimum
requirements of FRSA/TRI April 2012(04-12),Appendix A,Table 1, or as listed in Section 5.6.4 herein,or as tested in
accordance with FBC Section 1504.3.1.
NEMO ETC,U.C. Evaluation Report P12060.02.09-R24
Certificate of Authorization#32455 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28
Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018
Page 6 of 14
i
i
ONEMOletc.
6. INSTALLATION: i
6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements
subject to the Limitations set forth in Section 5 herein and the specifics noted below.,
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the;substrate thoroughly to remove
any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Elastobase,Elastobase Por Mule-Hide.Nail Base:
6.3.1 Non-Tile Applications:
Shall be installed in compliance with the codified requirements for ASTM D226, Type II underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
Elastobase, Elastobase P or Mule-Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP, Polyflex SA
P FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR), self-adhered, Elastoflex G TU, Elastoflex S6 G or
Elastoflex 56 G FR in.hot asphalt or Polyflex G or Polyflex G FR,torch applied. Roof cover limitations are those are
those associated with the top-layer underlayment,as set forth in Table.,1.
6.3.2 Tile Applications:
Elastobase,Elastobase P or Mule-Hide Nail Base are limited to use as a mechanically attached base sheet in the"Two
Ply System"from FRSA/TRI April 2012(04-12). Reference is made to Table 1 and Section 5.6.4 herein,coupled with
FRSA/TRI April 2012(04-12)Installation Manual.
6.4. Polystick. MTS,MTS PLUS,IR-Xe,TU PJU Plus,TU Max;Dual Pro,Tile Pro or MU-X'or Polyflex SAP,Polyflex SAP FR;
Mule-Hide SA-AP_P Cap Sheet or Mule-Hide SA-APP Cap:Sheet(FR):
6.4.1 Shall be installed in compliance with the codified requirements for ASTM D1970 (except Polystick TU P) underlayment
in FBC Table 1507.1.1 for the type of prepared roof covering to be installed.
6.4.2 Direct-to-Deck with Mechanically Fastened Roof Covers:
All self-adhering materials, with the exception of Polystick TU Plus, Polyflex SAP or SAP FR and Mule-Hide SA-APP
Cap Sheet or SA-APP Cap Sheet(FR)should be back-nailed in selvage edge seam in accordance with Polyglass/Mule-
Hide back nailing guidelines. Nails shall be corrosion resistant, 11 gauge ring-shank type with a minimum 1-inch
diameter metal disk or Simplex-type metal cap nail,at a minimum rate of 12"o.c. Polystick TU Plus should be back-
nailed using the above noted fasteners and spacing, in area marked "nail area, area para clavar" on the face of
membrane. The head lap membrane is to cover the area being back-nailed.
All seal-lap seams (selvage laps) must be
firmly rolled with a minimum 28 Ib. hand
roller to ensure full contact and adhesion.
For Dual Pro and Tile Pro, align the edge of
the top sheet to the end of the glue patternr?
(the sheet will overlap the fabric). F
fPr2 Ami ,.
View of Ovelap Seam of Dual Pro and Tile Pro
All over-fabric and over-granule end-laps shall have a 6-inch wide, uniform layer of Polyplus 50 Premium Modified
Wet/Dry Cement or Polyglass PG500 Modified Cement applied in between the application of the lap.
Polystick TU Plus, Dual Pro and Tile Pro may not be used in any exposed application such as crickets,exposed valleys,
or exposed roof to wall details
NEMO ETC,U.C. Evaluation Report P12060.02.09-R24
Certificate of Authorization#32455 CH EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28
Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018
Page 12 of 14