Loading...
HomeMy WebLinkAboutProduct Approval lie • '" a o a s r yt* 'fir c�a BCIS Home Log In User Registration a Hot Topics Submit Surcharge Stats&Facts Publications Contact Us I BCIS Site Map Links Search �IOrida Product Approval fit'. - - USER:Public User =RECEIVr—D t_ I ar`�sGF�jsr. urnProduct Approval Menu>Product or Application Search>Application Llst>Application Detail FLTi'651=R3a.* ( DY`Y�•c Application Type Revision Code Version 2017 Application Status Approved -k He Copy Comments � Archived 7 cProduct-Manufacturer (Gulf-Coast-Supply-WManufacturing;,L Address/Phone/Email 4020 S.W.449th Street Horseshoe Beach,FL 32648 (352)498-0778 info@gulfcoastsupply.com Authorized,Signature Eng David ' e � ®� info@gulfcoastsupply.com n� �9 Technical Representative David Eng �t1/���p/C� � � Address/Phone/Email 14429 SW 2nd PI ®OE r`1G ,,�� Ne Ste G30 -berry, FL 32669 ®OYIr"L �`�rt' C (352)498-0778 T'o LUCIE p�p}�, � � Q� info@gulfcoastsupply.com G VOu T BOC Quality Assurance Representative David Eng Address/Phone/Email 14429 SW 2nd PI Ste G30 Newberry, FL 32669 (352)498-0778 david.eng@gulfcoastsupply.com Category-,, Roofing Subcatego; CMetal-Roofing Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer U Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed the Daniel S. Kuhn Evaluation Report Florida License PE-75519 Quality Assurance Entity Keystone Certifications,"Inc. Quality Assurance Contract Expiration Date 04/12/2024 Validated By Locke Bowden P.E. ✓' Validation Checklist-Hardcopy Received. Certificate of Independence FL11651 R3 COI Cert of Independence 2017-10-09.pdf Referenced Standard and Year(of Standard) Standard Year FM 4471 1992 TAS 100 1995 TAS 110 2000 TAS 125 2003 UL 1897 2012 UL 580 I 2006 ' 1 Approved for use outside HVHZ:Yes signed.pdf Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure: +N/A/-156.5PSF Created by Independent Third Party: Yes Other:-108.5 psf @ 12"o.c.fastener spacing.-156.5 psf @ Evaluation Reports 6"o.c.fastener spacing.Install per manufacturers details. For FL11651 R3 AE FL11651 12 R3 265vCrimp 15- use in HVHZ Zones. 32Plywood HVHZ-signed.pdf Created by Independent Third Party:Yes 11653:13 ,26_Gar5V•Crimp) Min26-Ga:5V,Crimp-oyer_-15/32"=PIyW6odS Limits of Use Installation Instructions Approved for use in HVHZ: No FL11651 R3 II FL11651 13 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes signed.pdf Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure:+N/A/-131.PSF Created by Independent Third Party:Yes Other:-94:25-psf-@-16"-o:c.fastener-pattern=13.1 0_p fs @" Evaluation Reports 16"-o:c.fastener-pattem—InstalPper manufactureis— ails—Nots FL11651 R3 AE FL11651 13 R3 265vCrimp 15- for�use-in-HVHZ=Zone 32Plywood NonHVHZ-signed.pdf Created by Independent Third Party:Yes 11651.14 26 Ga.5V Crimp Min 26 Ga.5V Crimp Roof Panel over 1x4 Wood Purlins over 15/32"Plywood Limits of Use Installation Instructions Approved for use in HVHZ:No FL11651 R3 II FL11651 14 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes signed.pdf Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure: +N/A/-156.5PSF Created by Independent Third Party:Yes Other:-108.5 psf @ 12"o.c.fastener spacing.-156.5 psf @ Evaluation Reports 6"o.c.fastener spacing.Install per manufacturers details.For FL11651 R3 AE FL11651 14 R3 265vCrimp 1x4 15- use in HVHZ Zones. 32Plywood NonHVHZ-signed.pdf Created by Independent Third Party: Yes 11651.15 26 Ga. Gulf Lok Min 26 Ga. Gulf Lok 16"Wide Roof Panel over 15/32"Plywood Limits of Use Installation Instructions Approved for use in HVHZ:Yes FL11651 R3 II FL11651 15 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes signed.pdf Impact Resistant: N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure: +N/A/-161.OPSF Created by Independent Third Party:Yes Other:-63.5 psf @ 5 3/16"o.c.fastener spacing.-121.75 psf Evaluation Reports @ 5 3/16"spacing.-161.0 psf @ 5 3/16"o.c.fastener spacing. FL11651 R3 AE FL11651 15 R3 26GuIfLok 16 15- Install per manufacturers details.For use in HVHZ Zones. 32Plywood HVHZ-signed.pdf Created by Independent Third Party:Yes 11651.16 26 Ga.Gulf Lok Min 26 Ga.Gulf Lok 16"Wide Roof Panel over 15/32"Plywood Limits of Use Installation Instructions Approved for use in HVHZ: No FL11651 R3 II FL11651 16 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes signed.pdf Impact Resistant:N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure: +N/A/-63.5PSF Created by Independent Third Party: Yes Other:-63.5 psf @ 5 3/16"o.c.fastener spacing.-121.75 psf Evaluation Reports @ 5 3/16"fastener spacing.-161 psf @ 5 3/16"fastener FL11651 R3 AE FL11651 16 R3 26GulfLok 16 15- spacing.Install per manufacturers details.Not for use in HVHZ 32Plywood NonHVHZ-signed.pdf Zones. Created by Independent Third Party:Yes 11651.17 26 Ga.GulfPBR Min 26 Ga.Gulf PBR Roof Panel over 15/32"Plywood Limits of Use Installation Instructions Approved for use in HVHZ: No FL11651 R3 II FL11651 17 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes signed.pdf Impact Resistant:N/A Verified By: Dan Kuhn,P.E.75519 Design Pressure: +N/A/-154.7PSF Created by Independent Third Party:Yes Other:-59.25 psf @ 24"o.c.fastener pattern. -154.75 psf @ Evaluation Reports 12"o.c.fastener pattern.Install per manufacturer details. Not FL11651 R3 AE FL11651 17 R3 26GulfPBR 15- for use in HVHZ 32Plywood NonHVHZ-signed.pdf Created by Independent Third Party:Yes 11651.18 26 Ga.GuIfPBR Min 26 Ga.GuIfPBR Roof Panel over 1x4 Wood Purlins over 15/32"Plywood I Limits of Use Installation Instructions Approved for use in HVHZ:Yes FL11651 R3 II FL11651 18 R3 Metal Roof Panel Detail- Approved for use outside HVHZ:Yes ;zgned.Of Impact Resistant: N/A Verified By: Dan Kuhn; P.E. 75519 Design Pressure:+N/A/-151.7PSF Created by Independent Third Party: Yes Other:-100.5 psf @ 24"o.c.fastener spacing. -151.75 psf @ Evaluation Reports 12"fastener spacing.Install per manufacturer's details. For use FL11651 R3 AE FL11651 18 R3 26GuIfPBR 1x4 15- in HVHZ Zones 32P wood HVHZ-signed.pdf Created by Independent Third Party:Yes 11651.19 26 Ga. GulfPBRMin 26 Ga.GulfPBR.over 15/32"Plywood I I f Am 4 GulfcoOt u ar i. SUPPLY & MANUFACTURING 5VCR.IMP 26 GA. 5VCRIMP ROOF PANEL OVER 15/32" PLYWOOD FLORIDA .RO. APPROVAL N • 11651.13 OF TM TYPE 1 FASTENER PATTERN (1 ) #9-15 x 1 -1 /2" HWH w/Sealing Washer 12" 12" At Panel Lap TYPE 2 FASTENER PATTERN (1 ) .#9-15 x 1 -1 /2" HWH w/Sealing Washer 211 9.5.11 II 9.511 211 S• * No,= � 75579 STATE OF 'O���S' �< ORIDP .•���� 0/01V Lit i FL#11651.13 R3•OCTOBER 5,2017 t�-: �,�. Nx,� Y `� f � 1' k f Gc//$ S x;• ,ill. BQS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications Contact Us �• BQS Site Map' Links Search b a MAI% ;u Product Approval �('�'• C-1 �USER:Public User R C'/'�[--Y` , D Z' M39 Product Aoproval Menu>Product or Application Search>eQplication List>Application Detail � JULu0 2019 1>01 > - -I; i FC5259,-R28:s ST. Lucie Coun Application Type Revision ty, Permitting Code Version 2017 Application Status Approved Comments Archived w �Product-Manufacturer� fPOLYG�L'ASS-USA(j ' Address/Phone/Email 1111 W. Newport Center Drive Deerfield Beach, FL 33442 (954)233-1378 Ext 242 alender@polyglass.com Authorized Signature Ariel Lender alender@polyglass.com Technical Representative Maury Alpert Address/Phone/Email 1111 W. Newport Center Drive Deerfield Beach, FL 33442 (912)429-8610 MAIpert@polyglass.com EVIEWE® FOR Quality Assurance Representative Ariel Lender CODE COMPLIANCE Address/Phone/Email 1111 W. Newport Center Drive COMPLIANCE Deerfield Beach,FL 33442 ST. LUICIE COUNTY (954)233-1230 ALender@polyglass.com B®cc (Sat egory (Roofng Subcategory Underlayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed the Robert Nieminen Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 10/05/2018 Validated By John W.Knezevich,PE L' Validation Checklist-Hardcopy Received Certificate of Independence FL5259 R28 COI 2018 01 COI NIEMINEN.pdf i Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2015 ASTM D226 2009 ASTM D4798 2011 ASTM D6164 2011 ASTM D6222 2011 FM 4474 2011 FRSA/TRI April 2012 I 2012 UL 1897 2012 I Equivalence of Product Standards Certified By Sections from the Code Product Approval Method Method 1 Option D Date Submitted 01/24/2018 Date Validated 01/29/2018 Date Pending FBC Approval 01/30/2018 Date Approved 04/10/2018 Summary of Products FL# Model,Number or Name Description 5259.1 Polyglass Roof Roofing underlayments Underlayments Limits of Use Installation Instructions Approved for use in HVHZ: No FL5259 R28 II 2018 01 FINAL ER POLYGLASS UNDERLAYMENTS FL5259- Approved for use outside HVHZ:Yes R28.pdf ' Impact Resistant: N/A Verified By: Robert Nieminen PE-59166 Design Pressure: +N/A/-622.5 Created by Independent Third Party:Yes Other: 1.)The design pressure in this Evaluation Reports application relates to one particular FL5259 R28 AE 2018 01 FINAL ER POLYGLASS UNDERLAYMENTS FL5259- underlayment system(over concrete deck)for R28.pdf use under foam-on tile systems(where the Created by Independent Third Party:Yes underlayment forms part of the load-path). Refer to ER Section 5.6.4 for other systems, other deck types and associated maximum design pressures.2.) Refer to ER Section 5 for other limits of use. Back Next Contact Us::2601 Blair Stone Road,Tallahassee FL 32399 Phone:850-487-1824 The State of Florida is an AA/EEO employer.Coo right 2007-2013 State of Florida.::Privacy Statement::Accessibility,Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released In responseto a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1), Florida Statutes,effectiveOctober1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here. Product Approval Accepts: ® tLheck 11101 Credit Card i i t MEMO etc. { Certificate of Authorization#32455 353 Christian Street, Unit##13 Oxford, CT 06478 - (203) 262-9245 ENGINEER EVALUATE TEST CONSULT CERTIFY EVALUATION REPORT Polyglass USA, Inc. Evaluation Report P12060.02.09-R24 1111 West Newport Center Drive FL5259-1128 Deerfield Beach, FL 33442 Date of Issuance:02/24/2009 (954)233-1230 Revision 24:01/24/2018 { SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product.under the Florida Building Code and Florida. Building Code, Residential-Volume. The products described herein have been evaluated for compliance with the 61h Edition (2017) Florida,Building Code sections noted herein. DEscRIPTIoN Polyglas.'Roof Underlayments 'I LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named,product(s) changes, the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement ,to notify Robert Nieminen, P.E. of any changes to the product(s), the Quality Assurance or the.production facility location(s). NEMOletc. requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle: ADVERTISEMENT: The Evaluation Report, number preceded by the words ""NEMO l etc. Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building,Official. This Evaluation Report consists of pages 1 through 14. Prepared by: ����`S�"�,r•,lJ''••n Robert J.M. Nieminen P.E. The facsimile seal appearing was authorized by Robert Nieminen, Florida Registration No.59166,Florida DCA ANE1983 '';�`s.• - P.E.on 01/24/2018. This does not serve as an electronically `'��•f�•�•�r�"' signed document: CERTIFICATION OF INDEPENDENCE: { 1. NEMOIetc. does not have; nor does it intend to acquire or will,it acquire, a financial.interest in any company manufacturing or distributing products it evaluates. 2. NEMO I etc.is not owned,operated or controlled by any company manufacturing or distributing'products it evaluates. 3. Robert Nieminen,P.E'does not have nor will acquire,a financial interest in any company manufacturing.or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither NEMOIetc. nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. J ONEMOjetc. Entity Examination Reference Date ERD(TST 6049) Physical Properties P40390.08.12-1 08/06/2012 ERD(TST 6049) Physical Properties P40390.08.12-2 08/07/2012 ERD(TST 6049) Physical Properties C41420.09.12-3 09/11/2012 ERD(TST 6049) Wind Uplift P39680.03.13 03/04/2013 ERD(TST 6049) Physical Properties P45370.04.13 04/26/2013 ERD(TST 6049) Wind Uplift P1738.02.07-R2 04/29/2013 ERD(TST 6049) Wind Uplift 11757.04.01-1-R1 04/30/2013 ERD(TST 6049) Wind Uplift P41630.08.13 08/06/2013 ERD(TST 6049) Wind Uplift P11751.05.03-R1 11/26/2013 ERD(TST 6049) Wind Uplift P11781.11.03-R1 11/26/2013 ERD(TST 6049) Physical Properties P45270.05.14 05/12/2014 ERD(TST 6049). Physical Properties 6020.07.14-1 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-2 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-3 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-4 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-5 09/08/2014 ERD(TST 6049) Physical Properties 6020.09.14-6 09/08/2014 ERD(TST 6049) Physical Properties P46520.10.14 10/03/2014 ERD(TST 6049) Physical Properties P43290.10.14 10/17/2014 ERD(TST 6049) Physical Properties PLYG-SC7550.03.15 03/24/2015 ERD(TST 6049) Physical Properties P40390.04.15 04/03/2015 ERD(TST 6049) Physical Properties P44360.10.14-R1 05/18/2015 ERD(TST 6049) Physical Properties PLYG-SC8080.05.15-1 05/20/2015 ERD(TST 6049) Wind Uplift PLYG-SC8905.05.16-1 05/17/2016 ERD(TST 6049) Physical Properties PLYG-SC8080.07.16 07/16/2016 ERD(TST 6049) Wind Uplift PLYG-SC12025.10.16 10/12/2016 ERD(TST 6049) Physical Properties PLYG-SC13040.12.16 12/27/2016 ERD(TST 6049) Physical Properties PLYG-SC11900.03.17 03/10/2017 ERD(TST 6049) Physical Properties PLYG-SC12115.08.17 ` 08/08/2017 ICC-ES(EVL 2396) IBC Compliance ESR-1697 11/01/2014 Miami-Dade(CER 1592) HVHZ Compliance NOA 14-0717.08 01/22/2015 Polyglass USA Manufacturing Affidavit Products Current 02/18/2009 Polyglass USA PA Affidavit Mule-Hide Cross Ltg 03/01/2008 Polyglass USA Materials Affidavit Polystick SA Compound 08/18/2011 UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/05/2018 4. PRODUCT DESCRIPTION: 4.1:. Mechanically Fastened+Underlayments: 4.1.1 Elastobase is a fiberglass reinforced,SBS modified bitumen base sheet. 4.1.2 Elastobase P is a polyester-reinforced,SBS modified bitumen base sheet. 4.1.3 Polyglass G2 Base is a fiberglass-reinforced,asphaltic base sheet. 4.1.4 Polyglass APP Base is a fiberglass-reinforced,APP modified bitumen base sheet. 4.2, Self-Adhering Underlayments: ',4i%2- Polystick;MTS or Polystick MTS PLUS`is a nominai`6l)-mil thick rubberized.asphalt waterproofing-membrane;`glass �. fiber reinforced,surfaced with"polydlefinic film surface; meets FRSA/TRI April 2012.' 4.2.2 Polystick IR-Xe is a nominal 60-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with an aggregate surface;meets ASTM D1970. 4.2.3 Polystick TU Plus is a nominal 80-mil thick rubberized asphalt waterproofing membrane,glass fiber reinforced,with a polyester fabric surface; meets ASTM D1970 and FRSA/TRI April 2012. NEMO ETC,I.I.C. Evaluation Report P12060.02.09-R24 Certificate'ofAuthorization#32455 CH EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28 Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018 Page 3 of 14 i ONEMO etc. 5.5 Allowable Roof Covers: TABLE 1: ROOF COVER OPTIONS Underlayment Asphalt Shingles Nail-On Tile Foam-On Tile Metal Wood.Shakes Slate &Shingles Elastobase Yes Yes Yes Yes Yes Yes (Base Sheet In 2-ply system) (Base Sheet in 2-ply system) Elastobase P Yes Yes Yes Yes Yes Yes (Base Sheet in 2-ply system) (Base Sheet in 2-ply system) Polyglass G2 Base No Yes Yes No No No (Base Sheet in 2-ply system) (Base Sheet in 2-ply system) Yes es Polyglass APP Base No (Base Sheet in 2-ply system) (Base Sheet iNo No No n 2-ply system) Polystick MTS or MTS.P_LUS Yes Yes ` No Yes Yes Yes Polystick IR-Xe Yes No No No Yes Yes Polystick TU P No Yes Yes (See 5.5.1) No No No Polystick TU Plus Yes Yes Yes (See 5.5.1) Yes Yes Yes Polystick TU Max No Yes Yes (See 5.5.1) Yes No No Polystick Dual Pro Yes No No Yes Yes Yes Polystick Tile Pro Yes Yes Yes (See 5.5.1) Yes Yes Yes Polystick MU-X Yes No No Yes Yes Yes Elastoflex S6 G Yes Yes Yes (See 5.5.1) No Yes Yes Elastoflex S6 G FR Yes Yes No No Yes Yes Elastoflex G TU Yes Yes Yes (See 5.5.1) No Yes Yes Polyflex G Yes Yes Yes (See 5.5.1) No Yes Yes Polyflex G FR Yes Yes No No Yes Yes Polyflex SAP or SAP FR Yes Yes Yes (See 5.5.1) No Yes Yes Mule-Hide SA-APP Cap Sheet Yes Yes Yes (See 5.5.1) No Yes Yes or SA-APP Cap Sheet(FR) 5.5.1 "Foam-On Tile"is limited to use of the following Approved tile adhesives/underlayment combinations. TABLE 1A:ALLOWABLE TILE ADHESIVE UNDERLAYMENT COMBINATIONS) Adhesive Florida Product Underlayments Approval DAP Foam Touch'n Seal StormBond Roof FL14506 Polystick TU Plus,Polystick TU Max Tile Adhesive Dow TileBondTM' FL22525 Polystick TU P,Polystick TU Plus,Polyflex SAP or Tile Pro Polystick TU P,Polystick TU Plus,Polystick TU Max,Polystick Tile Pro, ICP Adhesives Polyset®AH-160 FL6332 Elastoflex G TU,Elastoflex 56 G,Polyflex G,Polyflex SAP,Polyflex SA Cap FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR) Polystick TU P,-Polystick TU Plus,Polystick TU Max,Polystick Tile Pro, ICP Adhesives Polyset®RTA-1 FL6276 Elastoflex G TU,Elastoflex S6 G,Polyflex G,Polyflex SAP,Polyflex SA Cap FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide SA-APP Cap Sheet(FR) 1 Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance. NEMO ETC,I.I.C. Evaluation Report P12060.02.09-R24 Certificate of Authorization#32455 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-1128 Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018 Page 5 of 14 I Y O MEMO etc. 5.6 Allowable Substrates: i�5;w6.1____,._Direct-Bond to Deck,-1 ' Polystick(all variations), Dual Pro,Tile Pro, Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR)self-adhered to: ➢ New untreated plywood;ASTM D41 primed new untreated plywood; Existing plywood;ASTM D41 primed existing plywood; New or existing, unprimed OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed Southern Yellow Pine; ASTM D41 primed structural concrete; Huber Engineered Woods "ZIP System" Panels (designed and installed to meet wind loads for project). Note: Polyglass does not require priming of new or existing plywood or OSB sheathing. New or existing plywood or OSB sheathing should be cleaned of all dirt and debris prior to application of Polystick membranes. . Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to: ➢ ASTM D41 primed structural concrete. Polyflex G or Polyflex G FR torch-applied to: ➢ ASTM D41 primed structural concrete. 5.6.2 Bond-to-Insulation: Polystick(all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR) self-adhered to: ➢ ASTM C1289, Type Il, Class 1 polyisocya nu rate or Type V polyisocyanurate-composite insulation; Dens Deck DuraGuard; Dens Deck Prime;or SECUROCK Gypsum-Fiber Roof Board. Elastoflex G TU,Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to: ➢ Dens Deck Prime or SECUROCK Gypsum-Fiber Roof Board. Polyflex G or Polyflex G FR torch-applied to: ➢ ASTM D41 primed structural concrete;Dens Deck Prime or SECUROCK Gypsum-Fiber Roof Board. For installation under, mechanically attached prepared roof coverings, insulation,shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval., For installations under foam-on tile systems, insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FBC Section 1504.3.1. 5.6.3 Bond to Mechanically Attached Base Laver: Polystick (all variations), Polyflex SAP or SAP FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR) Dual Pro or Tile Pro self-adhered to: ➢ ASTM D226,Type'I or II felt; Elastobase;Elastobase P or Mule-Hide Nail Base. Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot asphalt to: ➢ ASTM D226,Type I or II felt; Elastobase;Elastobase P,Mule-Hide Nail Base or Polyglass G2 Base. Polyflex G or Polyflex G FR torch-applied to: ➢ Elastobase;Elastobase P,Mule-Hide Nail Base,Polyglass G2 Base or Polyglass APP Base. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems, base layer shall be attached per minimum requirements of FRSA/TRI April 2012(04-12),Appendix A,Table 1, or as listed in Section 5.6.4 herein,or as tested in accordance with FBC Section 1504.3.1. NEMO ETC,U.C. Evaluation Report P12060.02.09-R24 Certificate of Authorization#32455 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28 Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018 Page 6 of 14 i i ONEMOletc. 6. INSTALLATION: i 6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below., 6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the;substrate thoroughly to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Elastobase,Elastobase Por Mule-Hide.Nail Base: 6.3.1 Non-Tile Applications: Shall be installed in compliance with the codified requirements for ASTM D226, Type II underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. Elastobase, Elastobase P or Mule-Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP, Polyflex SA P FR, Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR), self-adhered, Elastoflex G TU, Elastoflex S6 G or Elastoflex 56 G FR in.hot asphalt or Polyflex G or Polyflex G FR,torch applied. Roof cover limitations are those are those associated with the top-layer underlayment,as set forth in Table.,1. 6.3.2 Tile Applications: Elastobase,Elastobase P or Mule-Hide Nail Base are limited to use as a mechanically attached base sheet in the"Two Ply System"from FRSA/TRI April 2012(04-12). Reference is made to Table 1 and Section 5.6.4 herein,coupled with FRSA/TRI April 2012(04-12)Installation Manual. 6.4. Polystick. MTS,MTS PLUS,IR-Xe,TU PJU Plus,TU Max;Dual Pro,Tile Pro or MU-X'or Polyflex SAP,Polyflex SAP FR; Mule-Hide SA-AP_P Cap Sheet or Mule-Hide SA-APP Cap:Sheet(FR): 6.4.1 Shall be installed in compliance with the codified requirements for ASTM D1970 (except Polystick TU P) underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.4.2 Direct-to-Deck with Mechanically Fastened Roof Covers: All self-adhering materials, with the exception of Polystick TU Plus, Polyflex SAP or SAP FR and Mule-Hide SA-APP Cap Sheet or SA-APP Cap Sheet(FR)should be back-nailed in selvage edge seam in accordance with Polyglass/Mule- Hide back nailing guidelines. Nails shall be corrosion resistant, 11 gauge ring-shank type with a minimum 1-inch diameter metal disk or Simplex-type metal cap nail,at a minimum rate of 12"o.c. Polystick TU Plus should be back- nailed using the above noted fasteners and spacing, in area marked "nail area, area para clavar" on the face of membrane. The head lap membrane is to cover the area being back-nailed. All seal-lap seams (selvage laps) must be firmly rolled with a minimum 28 Ib. hand roller to ensure full contact and adhesion. For Dual Pro and Tile Pro, align the edge of the top sheet to the end of the glue patternr? (the sheet will overlap the fabric). F fPr2 Ami ,. View of Ovelap Seam of Dual Pro and Tile Pro All over-fabric and over-granule end-laps shall have a 6-inch wide, uniform layer of Polyplus 50 Premium Modified Wet/Dry Cement or Polyglass PG500 Modified Cement applied in between the application of the lap. Polystick TU Plus, Dual Pro and Tile Pro may not be used in any exposed application such as crickets,exposed valleys, or exposed roof to wall details NEMO ETC,U.C. Evaluation Report P12060.02.09-R24 Certificate of Authorization#32455 CH EDITION(2017)FBC NON-HVHZ EVALUATION FL5259-R28 Polyglass Roof Underlayments;(954)233-1230 Revision 24:01/24/2018 Page 12 of 14