Loading...
HomeMy WebLinkAboutProduct Approval, underlayments '4/9/201.9 , Florida Building Code Online Y.(aJ2 BCIS Home I Log In, User Registration Hot Topics ' Submit Surcharge Stals&Fad Publications ContactUs j+ BCfS Srte Map Links j e,Search NrProduct Approval � USER:Public User Product Approval Menu>Product or Application Search>Application List>Application Detail FRECE7j ,f FL# FL11602-R7 Application Type RevisionCode Version 2017 Application Status Approved S1'. Lucle county, FePf11It;CIPIg Comments Archived Product Manufacturer Owens Corning Roofing and Asphalt,LLC Address/Phone/Email One Owens Coming Parkway Toledo,OH 43645 (740)321-6345 Greg.Keeler@owenscoming.com Authorized Signature Keeler Greg Greg.Keeler@owenscoming.com r. Technical Representative Greg Keeler [File V Address/Phone/Email 2790 Columbus Road ©l.P�� Granville,OH 43023 �D (740)321-6345 greg.keeler@owenscoming.com REVIEWS Quality Assurance Representative ®®®E �� Address/Phone/Email ST. LUCIE � Category Roofing Subcategory Underlayments BOCL' Compliance Method Evaluation Report from a Florida Registered Architect or a Ucensi d Florida Professional Engineer Evaluation Report-Hardcopy Received j I Florida Engineer or Architect Name who developed the Robert Nieminen Evaluation Report Florida License PE-59166 Quality Assurance Entity Intertek Testing Services NA,Inc.-QA Entity Quality Assurance Contract Expiration Date 12/31/2020 Validated By John W. Knezevich, PE ,' Validation Checklist-Hardcopy Received Certificate of Independence FL11602 R7 COI 2018 01 COI NIEMINEN Ddf Referenced Standard and Year(of Standard) Standard Year ASTM D1970 2015 ASTM D226(physicals) 2009 ASTM D4798 2011 FRSA/TRI April 2012 2012 TAS 117(B) 1995 Equivalence of Product Standards .Certified By https:/tfloridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgsQFc5K`/p2ffrZeHYB7UCe5KMr5EmR4gtpLet7gKPIfFBaeQ%3d%3d 1/2 •4/9/2019 Florida Building Code Online Sections from the Code i Product Approval Method Method 1 Option D Date Submitted 08/16/2018 Date Validated 10/08/2018 Date Pending FBC Approval 08/23/2018 Date Approved 10/18/2018 Summary of Products i FL# Model,Number or Name Description 11602.1 Titanium Roof Undedayments Synthetic sheet-type roof undedayments Limits of Use Installation Instructions Approved for use in HVHZ:No FL11602 R7 II 2018 09 FINAL2 ER OWENS Approved for use outside HVHZ:Yes CORNING FL11602-R7.pdf Impact Resistant-N/A Verified By: Robert Nieminen PE-59166 Design Pressure:+N/A/-45 Created by Independent Third Party:Yes Other: 1.)The design pressure noted herein pertains to use of Evaluation Reports a specific underlayment system beneath foam-on file sytsems. FL11602 R7 AE 2018 09 FINAt2 ER OWENS Refer to ER Section 5.6.3 for details. 2.)Refer to ER Sections 5 CORNING FL11602-R7.Ddf j and 6 for other Limits of Use. Created by Independent Third Party:Yes �aCiC li�vt Contact Us::2601 Blair Stone Road,Tallahassee FL 32399 Phone:850-487-1824 The State of Florida is an AAIEEO employer.Cocvri(lht 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Stat)ment Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275(1), Florida Statutes,effective October 1,2012,licensees licensed under Chapter 45S,FS.must provide the Department with an email address if they have one.The emaft provided may be used for official communication with the licensee.However email addresses are public record.If you do rat wish to supply a personal address,please Provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F S.,please dick here. Product Approval Accepts: agm Credit Card Safe i https_//floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQwtDgsQFc5K%2rrrZeHYB7UCe5KMr5EmR4gtpLet7gKPIf'rBaeQ%3d°/`3d 2/2 NEW �ietc. Certificate of NEW #32455 353 Christian Street, Unit#13 Oxford,CT1106478 (203)262-9245 ENGINEER EVALUATE TEST CONSULT CERTIFY REPORTEVALUATION Owens Corning Roofing and Asphalt,LLC Evaluation Report 111980.11:08-R8 One Owens Corning Parkway FL11602-R7 Toledo,OH 43659 Date of Issuance:11/03/2008 (740)321-6345 Revision 8:09/14/2018 I SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E.for use of the product under the Florida Building Code and Florida Building Code,Residential Volume. The products described herein have been evaluated for compliance with the 6u'Edition 2017 Florida Building Code sections note P ( ) g � d herein. DESCRIPTION: Titanium'Roof Underlayments LABELING: Labeling shall be in accordance with the requirements of the Accredited Quality Assurance Agency jnoted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s)changes,the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptalnce of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen,P.E.of any changesito the product(s),the Quality Assurance or the production facility location(s). NEMOI etc. requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERnsEMENT: The Evaluation Report number preceded by the words "NEMO I etc. Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufact Irer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 7. Prepared by: Robert J.M.Nieminen,P.E. •' Fs: ` The facsimile seal appearing was authorized by Robert Florida Registration No.59166,Florida DCA ANE1983 `i=5v,'„;;�..•�' Nieminen,P.E.on 09/14/2018.This does not serve as an electronically signed document CERTIFICATION OF INDEPENDENCE: 1. NEMO ETC, LLC does not have,nor does it intend to acquire or will it acquire,a financial interest in any company manufacturing or distributing products it evaluates. 2. NEMO ETC,LLC is not owned,operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process)of the product. 5. This is a building code evaluation. Neither NEMO I etc.nor Robert Nieminen,P.E.are,in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. i I I I ONEMO etc. ROOFING COMPONENT EVALUATION: Product Category: Roofing Sub-Category: Underlayment Compliance Statement: Titanium'Roof Underlayments,as produced by Owens Coming Roofing and Asphallt,LLC, have demonstrated compliance with the intent of the following sections of the 6th Edition (2017) Florida Building Code through testing in accordance with applicable sections the following Standards. Compliance is subject!to the Installation Requirements and Limitations/Conditions of Use set forth herein. 2. i STANDARDS: Section Pro a Standard Year 1507.1.1,R905.1.1 Exception Unrolling,Breaking Strength,Pliability ASTM D226 2009 1507.1.1,R905.1.1 Exception Tear Strength ASTM D1970 2015 1507.1.1,T1507.1.1,1507.2.9.2 Physical Properties ASTM D1970 2015 1507.3.3 Physical Properties FRSA/TRI April 2012(04-12) 2012 TAS 110 Accelerated Weathering ASTM D4798 2011 TAS 110 Pull-through resistance TAS 117(6) 1995 3. REFERENCES: Enti Examination Reference Date ERD(TST6049) Physical Properties 115010.04.09 04/29/2009 ERD(TST6049) Physical Properties 115010.05.10 05/14/2010 ERD(TST6049) Physical Properties 135520.06.11 06/15/2011 ERD(TST6049) ASTM D226 138010.08.11 08/11/2011 I ERD(TST6049) Wind Uplift 135520.08.11-1 08/12/2011 ITS(TST1509) ASTM D226 311801000Q-003 04/26/2007 ITS(TST1509) ASTM D226 3130639COQ-002A 08/21/2007 ITS(TST1509) Physical Properties 3126617COQ-005 10/31/2007 ITS(TST1509) ASTM D226 101823107COQ-011 01/23/2015 Owens Coming Product equivalency Declaration 06/18/2018 PRI(TST5878) ASTM D1970 OCF-341-02-01 09/20/2017 PRI(TST5878) ASTM D1970;Tear strength OCF-331-02-02 10/03/2017 PRI(TST5878) ASTM D1970;Tear strength OCF-332-02-02 10/03/2017 PRI(TST5878) ASTM D1970;Tear strength OCF-334-02-02 10/03/2017 PRI(TST5878) FRSA/TRI April 2012(0412),partial OCF-343-02-01 11/09/2017 PRI(TST5878) ASTM D4798 OCF-341-02-01 11/27/2017 PRI(TST5878) TAS 117(8);Pull-through DCF-422-02-02 04/03/2018 PRI(TST5878) FRSA/TRI April 2012(04-12),partial OCF-425-02-01 08/13/2018 ITS(QUA1673) Quality Control ITS Listings Current ITS(QUA1673) Quality Control Service Confirmation 09/30/2017 4. PRODUCT 4.1 Self-Adhering Underlayments: 4.1.1 Titanium'" PSU-30 is an unreinforced polymer modified bitumen material adhered to the underside of a polymer- coated,synthetic woven sheet. The underside is backed with a release film. Unit weight 24 lbs/square. Meets ASTM D1970 and FRSA/TRI April 2012. NEMO ETC,LLC Evaluation Report 111980.11.08-R8 Certificate of Authorization#32455 6n'EDITION(2017)FBC NON-HVHZ EVALUATION FL11602-R7 Titanium Roof Underlaymerns Revision 8:09/14/2018 Page 2 of 7 ONEMOle tc. 4.2 Mechanically Fastened Underlayments: 4.2.1 Titanium' UDL-25 is a synthetic sheet-type underlayment comprised of a woven core coated on one side with a polymer coating. Unit weight 2.5 lbs./square;meets FBC 1507.1.1&R905.1.1(Exception). 4.2.2 Titanium^"UDL-30 is a synthetic sheet-type underlayment comprised of a woven core coated on both sides with a polymer coating. Unit weight 4.0 lbs./square;meets FBC 1507.1.1&R905.1.1(Exception). 4.2.3 Titanium'" UDL-50 is a synthetic sheet-type underlayment comprised of a woven core coated on both sides with a polymer coating. Unit weight 4.7 lbs./square;meets FBC 1507.1.1&R905.1.1(Exception). S. LIMITATIONS: 5.1 This is a building code evaluation. Neither NEMO ETC,LLC nor Robert Nieminen,P.E.are,in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions. 5.3 Fire Classification is not part of this report; refer to current Approved Roofing Materials Directory for fire ratings of this product. 5.4 Titanium' Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed,a request may be made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable Roof Covers: TABLE 1: ROOF COVER OPTIONS ASPHALT WOOD SHAKES UNDERLAYMENT SHINGLES NAIL-ON TILE FOAM-ON TILE METAL &SHINGLES SLATE Titanium PSU-30 Yes Yes Yes Yes Yes Yes (Dubai,UAE) (See 5.5.1) Titanium PSU-30 (Brentwood,NH) Yes Yes No Yes Yes Yes Titanium UDL-25 Yes No No Yes Yes Yes Yes Yes Titanium UDL-30 Yes (Base Sheet int-ply (Base Sheet int-ply Yes Yes Yes system) system) Titanium UDL-50 Yes No No Yes Yes Yes 5.5.1 "Foam-On Tile"is limited to use of following Approved tile adhesives/underlayment combinations. TABLE 1A:ALLOWABLE TILE ADHESIVE/UNDERLAYMENT COMBINATIONS' ADHESIVE FLORIDA PRODUCT`APPROVAL UNDERLAYMENTS Dow TileBond'" FL22525 Titanium PSU-30(Dubai,UAE) ICP Adhesives Polyset®AH-160 FL6332 Titanium PSU-30(Dubai,UAE) i I i I 'Refer to Tile Manufacturers or Adhesive Manufacturer's Florida Product Approva/for Overturning Moment Resistance Performance. NEMO ETC,LLC Evaluation Report 111980.iL08-RS Cerdkate ofAuthorkation#32455 6'"EDITION(2017)FBC NON-HVHZ EVALUATION FI-11662-R7 Titanium Roof Underlayments Revision 8:09/14/2018 Page 3 of 7 5.6 Allowable Substrates:Titanium PSU-30: ONEMOle tc. 5.6.1 Direct-Bond to Deck: ➢ New untreated plywood; Existing untreated plywood,primed as needed with D41 primer to achieve bond. 5.6.2 Bond to Mechanically Attached Base Sheet: ➢ ASTM D226,Type I or II felt. ➢ Titanium UDL-30(primed with D41 primer)or UDL-30(inverted). 5.6.3 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRl April 2012(04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on the systems,where the underlayment forms part of the load-path. The following wind uplift limitations apply to underlayment systems that arie not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design PressIIis the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety per FBC 1504.9 has already been applied).Refer to FRSA/TRI April 2012(04-12),Appendix A,Table 1A or FBC 1609 for determination of design wind loads. #1 Maximum Design Pressure=-45 psf: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: (Optional)ASTM D41 Underlayment: One or two plies, Titanium PSU-30 (Dubai, UAE), self-adhered and back-nailed max. 12" o.c. in accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. #2 Maximum Design Pressure=-30 psf*: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Titanium UDL-30(inverted) I Fasteners: 12 ga.annular ring shank nails having not less than 20 rings per inch,heads not less than 3/8 inch diameter and length sufficient to penetrate through the thickness of deck not less than 3/16-inch with min.32 ga.,1-5/8"diameter tin caps Spacing: 6-inch o.c.at 4-inch wide side laps and 12-inch o.c.at three(3),equally spaced center rows. Primer: ASTM D41 primer required at all tin-caps. Underlayment: One or two plies, Titanium PSU 30 (Dubs, UAE), self-adhered and back-nailed max. 12" o.c. in accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. #3 _Maximum Design Pressure=-30 psf*: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Titanium UDL-30(printed side up) Fasteners: 12 ga.annular ring shank nails having not less than 20 rings per inch,heads not less than 3/8 inch diameter and length sufficient to penetrate through the thickness of deck not less than 3/16-inch with min.32 ga.,1-5/8"diameter tin caps. Spacing: 6-inch o.c.at 4-inch wide side laps and 12-inch o.c.at three(3),equally spaced center rows. Primer: ASTM D41 primer required over printed side of UDL-30. Underlayment: One or two plies, Titanium PSU 30 (Dubs, UAE), self-adhered and back-nailed max. 12" o.c. in accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. NEW ETC,LLC Evaluation Report 111980.11.0&118 Certificate of Authorization#32455 0 EDITION(2017)FBC NON-HVHZ EVALUATION F1.11602-117 Titanium Roof Underlayments Revision 8:09/14/2018 Page 4 of 7 it ONEMOletc. #4 Maximum Design Pressure=-45 psf*: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Titanium UDL-30(inverted) Fasteners: 12 ga.annular ring shank nails having not less than 20 rings per inch,heads not less than 3/8 inch diameter and length sufficient to penetrate through the thickness of deck not less than 3/16-inch with min.32 ga.,1-5/8"diameter tin caps Spacing: 6-inch o.c.at 4-inch wide side laps and 8-inch o.c.at three(3),equally spaced center rows. Primer: ASTM D41 primer required at all tin-caps. Underlayment: One or two plies, Titanium PSU 30 (Dubai, UAE), self-adhered and back-nailed 12" o.c. in accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. #5 Maximum Design Pressure=-45 psf*: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Titanium UDL-30(printed side up) Fasteners: 12 ga.annular ring shank nails having not less than 20 rings per inch,heads not less than 3/8 inch diameter and length sufficient to penetrate through the thickness of deck not less than 3/16-inch with min.32 ga.,1-5/8"diameter tin caps. Spacing: 6-inch o.c.at 4-inch wide side laps and 8-inch o.c.at three(3),equally spaced center rows. Primer: ASTM D41 primer required over printed side of UDL-30. Underlayment: One or two plies, Titanium PSU 30 (Dubai, UAE), self-adhered and back-nailed 12" 6.c. in j accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. 5.6.4.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or exceed that required under FRSA/TRI April 2012(04-12),Appendix A,Table IA. Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC 1609. In this case Zone II I n attachment d i Zones 2 and 3 shall employ a ens ty designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117. Assemblies marked with an asterisk*carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016)for Zone 2/3 enhancements. 5.7 Exposure Limitations: Titanium UDL-25,Titanium UDL-30 or Titanium UDL-50 shall not be left exposed for longer than 30-days. Titanium PSU-30 shall'not be left exposed for longer than 180-days. 5.8 Tile Slippage Limitations[per FRSA/TRI April 2012(041211• When loading roof tiles on the underlayment in direct-deck the assemblies, the maximum roof slope shall be-as follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles. TABLE 2: TILE SLIPPAGE LwITATIONS FOR DiREcT-DECK TILE INSTALLATIONS UNDERLAYIVIENT TILE PROFILESTAGING METHOD MAXIMUM SLOPE Titanium PSU-30(Dubai, UAE) Flat Max.10-tile stack 5:12 Lugged I Max.10-tile stack 6:12 Titanium PSU-30(Brentwood,NH) Tiles shall be loaded and staged atop battens,regardless of tile profile for slope NEMO ETC,LLC Evaluation Report 111980.1_08-R8 Certificate of A uthorizatfon 1132455 0 EDITION(2017)FBC NON-HVHZ EVALUATION FL11602-R7 Titanium Roof Underlayments Revision 8:09/14/2018 Page 5 of 7 I I I • I NEnno etc. 6. INSTALLATION: 6.1 Titanium Roof Underlayments shall be installed in accordance with Owens Corning Roofing and Asphalt, LLC published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Titanium'UDL-25,Titanium UDL-30 or Titanium ILIAL-50.: 6.3.1 Shall be installed in compliance with the requirements for ASTM D226,Type 1 or II underlayment in FBCITable 1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed,considering the wider sheet-width. 6.3.2 Fasteners: Mechanical attachment of Titanium UDL-25 and Titanium UDL-30 Is limited to ring shank roofing nails with minimum 1-inch diameter plastic caps. Mechanical attachment of Titanium UDL-50 is limited to ring shank roofing nails with minimum 3/8-inch diameter heads;ring shank roofing nails with minimum 1-inch diameter plastic caps;screws and plates;or plastic cap staples. 6.3.2.1 Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 states: "...except metal cap nails shall be required where the ultimate design wind speed, Vaaw equals or exceeds 150 mph." Owens Corning Roofing and Asphalt,LLC has furnished data to permit the use of 1-inch diameter plastic cap nails in lieu of metal cap nails for these applications,when the Titanium*"UDL-25,Titanium UDL-30 or Titanium UDL- 50 underlayment is installed beneath mechanically fastened prepared roof covers referenced in FBC Table 1507.1.1 or R905.1.1. 6.3.3 Slopes of 4:12 or greater: End(vertical)laps shall be minimum 6-inches and side(horizontal)laps shall be minimum 4-inches. Minimum attachment shall be in accordance with FBC Table 1507.1.1 or R905.1.1. When batten systems are to be installed atop the underlayment,the underlayment need only be preliminarily attached pending attachmlent of the battens. 6.3.4 Slopes of 2:12 to less than 4:12: Double layer application;begin by fastening a 25-inch wide strip along the eaves.Place a full-width sheet over the starter,completely overlapping the starter course. Continue as noted in 6.3.3,but maintaining minimum 25-inch side(horizontal)laps,resulting in a double-layer application. 6.4 Titanium'PSU-30: 6.4.1 Non-Tile Installations: Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBG Table 1507.1.1 for the type of prepared roof covering to be installed, and Owens Corning published requirements. TitaniumTM PSU-30 shall be back-nailed max. 12"o.c. in accordance with Owens Corning Roofing and Asphalt, LLC published installation requirements. 6.4.2 Tile Applications: Shall be installed in compliance with the requirements for Self-Adhered Membrane underlayment set forth in FRSA/TRI April 2012(0412),and Owens Corning published requirements. TitaniumTM PSU-30 shall be back-nailed max.12"o.c.in accordance with Owens Corning Roofing and Asphalt,LLC published installation requirements. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to Table 2 herein,and Owens Corning Roofing and Asphalt,LLC published requirements for tile staging. NEMO ETC,LLC Evaluation Report 111980.iL08I-R8 Certificate ofAutho6zation#32455 67"EDITION(2017)FBC NON-HVHZ EVALUATION FL11602-R7 Titanium Roof Underlayments Revision 8:09/14/2 Ti018 Page 61of 7. fONEM01P tC. 6.5 Titanium 2-Ply System:. 6.5.1 The Titanium 2-Ply System consists of a base layer of Titanium UDL-30(top-surface primed or sheet inverted) mechanically attached to the wood roof deck followed by Titanium PSU-30,self-adhered. 6.5.2 Non-Tile Applications: Install Titanium UDL-30(top surface primed orsheet inverted)in accordance with Section 6.3 followed by Titanium PSU-30 in accordance with Section 6.4. 6.5.3 Tile Applications: For nail-on the installations, install Titanium UDL-30 (top surface primed or sheet inverted) in accordance with FRSA/TRI April 2012(0412),using Section 6.3 as a guide,and considering the wider sheet width relative t4l STM D226 felt. Then apply Titanium PSU-30 in accordance with Section 6.4. For adhesive-set tile roofing,refer to Section 5.6.3 herein. Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. Refer to Table 2 herein,and Owens Corning Roofing and Asphalt,LLC published requirements for tile staging. 7. BUILDING PERMIT hEQUIIiEMENTS: As required bythe Building Official or Authority Having Jurisdiction in order to properly evaluate the installation Of this product. 8. MANUFACTURING PLANTS: I Contact the noted QA agency for information on product locations covered for F.A.C.61G20-3 QA requirements. The following plants have qualified products under their respective physical properties specifications. Plant Specification Products Mission,BC,Canada FBC 1507.1.1(Exception) Titanium UDL-30;Titanium UDL-50 Qingdao,China FBC 1507.1.1(Exception) Titanium UDL-25;Titanium UDL-30;Titanium UDL-50 Dubai,UAE FRSA/TRI 04-12(2-ply system) Titanium PSU-30(Dubai,UAE) Brentwood,NH ASTM D1970,FRSA/TRI 04-12 Titanium PSU-30(Brentwood,NH) 9. QUALITY ASSURANCE ENTITY: Intertek Testing Services NA Inc.—QUA1673;(604)520-3321 -END OF EVALUATION REPORT- I I I NEMO ETC,LLC Evaluation Report 111980.1L08-R8 Certificate of Authorization#32455 0 EDITION(2017)FBC NON-HVHZ EVALUATION FL11602-R7 Titanium Roof Undedayments Revision 8:09/14/2018 Page 7 of 7