Loading...
HomeMy WebLinkAboutInspection Docs RECEIVED Planning &Development Services x. v as i Building &Code Regulation Division SEP 13 2019 2300 Virginia Ave • R I • A Fort Pierce,FL 34982 ST. Lucie County, Permitting 772-462-2172 Pax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 54&/904 0G6T JOB ADDRESS: g92-5" F L BUILDER/CONTRACTOR: Ve-4 ,; ca C d�p vyi kk,c2 c� PEST CONTROL CONTRACTOR: :Z wv k m `v PEST CONTROL LICENSE #: Sf-ZV Z l39 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: _ Chemicals used: ywilar Percentage of solution: a �g Total gallons used: q Date of Treatment: I3 l Time of Treatment: Footing Slab 1St Treatment 1St Treatment Re-Treat. Re-Treat _Driveway Pools 1St Treatment 1St Treatment Re-Tr t Re-Treat X 6+ her iFRO Perimeter for Final Ins a 'on 1St Treatment Re-Treat SigrAture of Exterminator Date Note: .There must be a completed form for each required treatment or ie-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a ie-inspection fee charged. FBC104.2.6 Certificate ofProtecfive Treatment for prevention of termites A weather resistant joh5ite pasting bwrd shall be provided to receive duplicate Treatment Certificates as each required protective treatment cs completed, providing a copy for the person the permit cs Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatmen4 site location,area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment if the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014