HomeMy WebLinkAboutBuilding Permit Application All APPLICABLE INFO MUST BE COMPLETED FOR APPLICATION TO,BE ACCEPTED
Date:le- /7 Permit Number: _ MM
I - RECEIVED
Building Permit Applicatio 1 NOV 0 4 2019
Planning and-Development Services
ST. Lucie County, Permitting
Building and Code Regulation Division C /��� /
2300 Virginia Avenue,Fort Pierce FL 34982 �+
Phone: (772)462-1553 Fax: (772)462-1578 Commercial Residential
PERMITTYPE:
P.W,111-65 @ I DI IMPROVEMENT LOCATION:
Address: �� ti
Property Tax ID#: /a —y7 —Dd n �2— 00 Lot No.
Site Plan Name: Block No.
Project Name:
DETA(CED DESCRIPTIO/NOF WORK:
���/.�/lC.�j�4'�� V.A •�D ,��J�i%14 S ���GJ%��rp �9r�
CONSTRUCTION I INFORMATION:
Additional work to be performed under this permit—check all that apply:
_Mechanical _Gas Tank _Gas Piping _Shutters _Windows/Doors
klflectric _Plumbing _Sprinklers _Generator _Roof Pitch
Total Sq. Ft of Construction: Sq. Ft. of First Floor:
Cost of Construction:$ Utilities: _Sewer _Septic Building Height:
OWNER/1111 EE: CONTRACTOR:
Name 4W4 Name:
Address:/ , CIe- el Company:
City: State: Address:
Zip Code: " Fax: City: State:
Phone No. -�0/ — Zip Code: Fax:
E-Mail:��/c� tea:(A i'>'rf 4C_/C-le co/n Phone No
Fill in fee simple Title Holder on next page(if different E-Mail
from the Owner listed above) State or County License
If value of construction is$2500 or more,a RECORDED Notice of Commencement is required.
If value of HVAC is$7,500 or more,a RECORDED Notice of Commencement is required.
PAR MIREMANTAL CfJN'STI JCTIDN LIEN LAW lNF�RMATlUN:
DESIGNER/ENGINEER:: Not Applicable MORTGAGE COMPANY: Not Applicable
Name: Name:
Address: Address:
City: State: City: State:
Zip: Phone Zip: Phone:
FEE SIMPLE TITLE HOLDER: Not Applicable BONDING COMPANY: Not Applicable
Name: Name:
Address: Address:
City: City:
Zip: Phone: Zip: Phone:
OWNER/ CONTRACTOR AFFIDVIT: Application is hereby made to obtain a permit to do the work and installation as indicated.
I certify that no work or installation has commenced prior to the issuance of a permit.
St. Lucie County makes no representation that is granting a permit will authorize thepermit holder to build the subject structure
which is in conflict with any applicable Home Owners Association rules,bylaws or and covenants that may restrict or prohibit such
structure. Please consult with your Home Owners Association and review your deed for any restrictions which may apply.
In consideration of the granting of this requested permit,I do hereby agree that I will,in all respects, perform the work
in accordance with the approved plans,the Florida Building Codes and St. Lucie County Amendments.
The following building permit applications are exempt from undergoing a full concurrency review: room additions,
accessory structures,swimming pools,fences,walls,signs,screen rooms and accessory uses to another non-residential use
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING
TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND
POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT."
Signature of Owner/Lessee/Contractor as Agent for Owner Signature of Contractor/License Holder
STATE OF FLORIDA STATE OF FLORIDA
COUNTY OF COUNTY OF
The forgoing instrument was acknowledged before me The forgoing instrument was acknowledged before me
this day of 20_ by this day of 20_ by
Name of person making statement. Name of person making statement.
Personally Known OR Produced Identification Personally Known OR Produced Identification
Type of Identification Type of Identification
Produced Produced
(Signature of Notary Public-State of Florida) (Signature of Notary Public-State of Florida)
Commission No. (Seal) Commission No. (Seal)
REVIEWS FRONT ZONING SUPERVISOR PLANS . VEGETATION SEA TURTLE MANGROVE
COUNTER REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW
DATE
RECEIVED
DATE
COMPLETED
ev. 2/7/19
Pi�nnittgfCgafevero:'lafioservisio Non-Residential Farm Buildrig,=Exemption�-
Build -Code Regulaisan Division
230d;Virgin,lWavenue
F¢rE:Pierce,;6t.34982
Phone.(77214622172 Fax:(772)462.6"3
Date: November 04, 2019
Location: 24909 ORANGE AVE , FORT PiERCE, FL 34945
Parcel id: 211244100030006
SUBJECT: Non-Residential Farm Building
Exemption FILE
Permit Exemption# 1911-0030
Name: SCOTT S CRIPPEN 1 Lindsey A Crippen
Project/Structure ELECTRICAL HOOK-UP TO EXISTING AGRICULTURE BARN.
To Whom It May Concern:
The Building & Code Regulation Division has reviewed the request for a nonresidential farm exemption for
the above referenced property. We accept your claim that the property qualifies as land used for bona fide
agricultural purpose. Nonresidential farm buildings located on land used for bona fide agricultural purposes
are exempt from the Florida Building Code and do not require a building permit pursuant to Section 604.50,
Florida Statutes.
Any building claimed to be exempt is not eligible to receive a Certificate of Occupancy as defined in the
Florida Building Code. Additionally, since the building was not issued a building permit or certificate of
occupancy, the Florida Building Code will not apply to any potential future use of the building.
This exemption letter applies solely to the above referenced permit number or project. Future
improvements to the property related to building, electrical, plumbing or mechanical require a permit
application be submitted to the Permitting Section for review by the Building Official, or designee for the
issuance of either the applicable permits or a nonresidential farm permit exemption.
While this project qualifies for an exemption from the building code and is exempt from requiring an electrical
permit, the power company may require an inspection by a county inspector prior to energizing. Accordingly,
the county would require an electrical permit prior to an inspection, you would be responsible for any
applicable permit fees.
You may wish to keep a copy of this letter as evidence at the property that the building or buildings are
lawfully exempt from the requirement for a building permit. A power company may also ask to see this letter
before energizing any electrical service connections for this project.
Sincerely,
James McGuinness
- CBO, MCP
Building Official