Loading...
HomeMy WebLinkAboutProduct Approval I i I i SETUP AND INSTALLATION OF SINGLE WIDE SHED (yam/�' SETUP AND INSTALLATION OF DOUBLE WIDE SHED - 1.BUIUXNG 6 PLACED IN REQUESTED LOCATION ON SCHEDULE 40 PVC TO ALLOW FOR II ` 1.BUILIM PLACED 14 REQUESTED LOCATION. ME SRST SECTION OF ME DOUBLE WTDE IS MOVEMENT TO PWM OR SQUARE UNIT TO HOUSE.FENCE PROPERTY LINE.M. Y RACED ON ME HIGHEST LOCATION OF GROUND AND IS LEVELED UP. 2.ONCE UNR IS SOCARE AND ME HIGH SPOT OF ME GROUND IS ESTABLISHED,ME 7T 2.SLOCKs ARE MEN PLACED AT THE END.CENTER.AND OMER END TO LEVEL ONCE ME BULLRING IS BLOCKED ON ME NIGH SPOT AND LEVELED. ME OTHER ENO OF ME II'. BUMDIG 6 LEVEL.BLOCKS ME ADDED TO ACHIEVE ME CORRECT SPACING(SEE TABLE 3). BUILDING IS BROUGHT UP TO LEVEL AND BLOCKED. MEN ME CENTER OF ME BUILDING t�IVIY1 \ 3.ME NEZT SECTION OF ME SHED 6 BACKED INTO PIACE AND UNLOADED PARALLEL WITH ME 6 `I SUPPORTE TO D LEVEL BLOCKED.AND MEN SHUMD FIRST SECTION.ME TWO SECTIONS ARE CONNECTED AT ME LOWER CORNER WITH(1)}'.dj• 3.AFTER ME BUILDING 6 LEVEL.MORE BLOCI6 ME ADDED TO ACHIEVE ME CORRECT BOLT AND NUT. ME SECOND SECTION IS MEN LEVELED AND THE OMER BOLT HOLES ME R SPACING(SEE TABLE 3). \ CANED UP AND BOLTED SECURE ME REST OF-WE BLOCKING 6 MEN COMPLETED. M6 4.ANCHOR PLACEMENT IS ESTABLISHED BY ME WIDTH OF ME BUNTING. HOLES ME DRILLED 30•AUGER ANCHOR PROCEDURE 6 REPEATED FOR MULTIPLE SECTION SHEDS UNTIL ALL SECTORS ME M PLACE CODE I W T MRU ME 2•.4•BOTTOM RATE WITH A 1/2•AUGER BIT_1/2•EYEBOLT OR OPTIONAL (4.900LB) � 4,GROUND ANCHORS ARE MEN ADDED(SEE TAME 40). 1/2'INRFADED ROD(FORA H SET-)6 SECURED THRU ME HOLE INSIILEO.PM MYIUFACTURM'S 5.ONCE ME BUILDING 6.PROPERLY BLOCKED AND BOLTED TOGETHER,ME SUPPORT BRACING 6 5.ANCHORS ME NOT REONIRED IN ME BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO A6TR11G1IO16 EIEIEf AT REMOVED, LOOTER(GARAGE DOORS TOR ON)LPLE). HEADER DESIGN TRANSFERS THESE LOADS. 1� M9SOM OF s•ABOVE GRADE. 6.ANCHORS ARE NOT REODIREO IN ME BODOM PLATE FOR DOORS AND DOORWAYS WITH NO 6.IT ME UNIT HAS A FLOOR,EITHER A HOLE 6 DUG FOR ME 30•'AUGER ANCHOR AND ��- LOOTER(GARAGE DOORS FOR DIUMPLE). HEADER DESIGN TRANSFERS THESE LOADS. RP[ BACKFUED AND SECURED AS PER THE DETAIL OR A 1/2-HOLE 6 DRILLED INTO ME CONCRETE 1-1/2.OFF OF RIY'NEST. ME EYEBOLT IS FASTENED MRU ME BOMW aAntam AT901 RATE AND A SIMPSON A-24(OR EQUAL)IS SECURED TO ME CONCRETE WITH A 1/2- WEDGE ANCHOR. GENERAL NOTES & SPECIFICATIONS FOR AUGER ANCHORS 7.IF THE UNIT IS A'NO FLOOR'11.ANCHOR WITH 1/YES'WEDGE ANCHOR THRU THE Nse 4m 9Ym v 2•.4'..M PLATE 1.BUILDING ANCHORS SHALL BE'MOBILE HOME'TYPE HP-1 SINGLE HE11X EYE AUGER ANCHOR BY HOME PRIDE OF BRISTOL.VA OR EQUAL AVERAGE HOLDING SMENGM 6 NOT LESS THAN 4,900 LBS. 2.ANCHORING SYSTEM M GROUND PER LOCAL BUNTING CODE(BY DEALER). TABLE 1 TABLE 2 TABLE 3 LOCATE ANCHORS PER TABLE 4A OR 40. AAYaNZT rAPu�..mT ANCH m RSPACING- TTP - 3.THREADED ROD WITH EYEBOLTS SHALL BE PLACED THRU ME BOTTOM PLATE SHAD WIDTH UPUET(PUT)ANQmR SPACVm SHED MG. .1 u x] IRE vAp L1MENNONS MAIL LOAD' WTDBAL (FLOOR SYSTEM)AND ATTACHED TO ANCHOR THESE CAN BE DaENUEO WITH THREADED ROD(OR STRAPS WITH EQUAL OR GREATER STRENGTH)FOR ELEVATED 20'-0' 1. s8 13'-B• 1'-IOf' 1'_ID)' I'-10) I r.8114 IS]A8S CMENf ANO SAND W. PORTONS OF SHEDS ON LEVELING BLOCKS. _ 13'-B• 200 1-6• 11'-B• 2'-B• w-a' - T P.B118• SSWLE6 AWEf BLED TABLE FE110d AND SAND Ya 30•AUGER ANCHOR SPACING-SINGLE WIDE Y iuAo N tuu.rune.ARE N 11'-B•, 2. 1C 10'-0• 1'-)• W-HY - DI HF.Ir s954H5 ABS PLASTIC PADS SHED WIDTH Err uRsr(PLF)END MCHI H-MA4 IflTE SPACNG••• IooAe ra rumn 10'-0' 2W s-w e'-0• d-9• 6•-6• - N Ww.,• I- =AND SAND YR 13'-B• T.W 2a] dd mYd ID'-O• B'-0• 16D 1!- 6'-O• d-Iw 51• - WI mooPST SIDE--0mAAv4 n I _j eDo 6'-0•I tl4T.IY-w Ym[SK05 Iq sS W 9m. .4•IImAnT REvaWN4 I I'-B• 2W do'm 14 „I.d-• 12 WI.I7 , REVISIONS 10'-0• .R^ 06CRPTON PATE B v I¢DueRp Wilt'Ab 15'-w Am[SNAWIT. - •/Wr n m TABL 3 LW 13e d-a' s-a ld-o• z wn. n i SUPPORT FOOTING PAD SPACING FOR RUNNER BLOCKNG FOR SINGLE&DOUBLE WIDE SHEDS -_ 6'-0• aW' 1W d-IFm14 Id-D' SHED OESCRPD011 PAD UWUUU LOAD AND PAD JO•ADGER ANCHOR SPACING-DOUBLE WIDE SHED WAWN TAPE LM`(Pli) END PAD MAY.SDA441C END PAp SIDE RUN I, INI'm SIDE RUNNM Ap SHIED WIDTH LW UN+IwI(Pti)DID ANCHOR^YA4 BITERWt 5PAt91G••• N um 4 1f18 IY-B• SW/OW 4.,5/= d m w 15. 193B8 L 4 A OR N IBmLB 4 4 N.W N 20'-0• 10.W ADD d-w m S-W !'-w 0 I l'-W• SW/OW 6A0/I80 T m w W-D• 2SSNB 4 0.10.DR N 21]NR L P.4 DR IV ^ W W � = 1/26/IB 10'-U•I SW/DR 5.W/4W IF TO w W-0• 21 I.A.A4 OR N 210gB 4 0.A4 OR IV •••YNAWY RAPIIc ANovex (n 01, B'-0• SW I /320 WRIT 2D29LB 4 4 C4.. 21ss1D L It H.OR N I mb6 G DF9U®tl vM A92-T. LyJ w' 6'-0' SW 3.W/210 l m w I.,. IBS®B 4 4 N.W N I.- 4 0.0.DR N V¢YaONVY NIl@M Alnlus 5 ML IQ AlroAn POR FAW AVAmT4 0 GM NO PING A>a:NOT PMf 1r16 AVID WOIx?wAT W nNVA a AVmoNla ADWmI Ilon6 ARE REMrID 4 SOIdc 6 YRK n4N tdc ?i nAK SET N0 AI6:WmAm Bi IDNi. ADR[EN INDCS. Ag6gLTIAl1. [{� RS 941E rt W SWC WAYS TAW+I W101 D4 9m 6 NA®NDIT m IN ExNn rRAY T16 reG ro So NF 6 FT>;D ro CM vian¢cDDw m cDnw. 4 O�mren IARO�ARti�.uom uN AEn.rm W na ew WWs b avu J 2 o¢nc/Wx5m5wtvl mR vM SECANT > YK W W Y�•CwC mn ANOAW 9•p4 m 1 IFW m 1[-WAN OflYS Z) V6NW1gN 14NKGYMIS N YE£TC'WE 0 O A uj 1 Yu'TXVANRFO eA9AD V, C` A 22 ON.v VLN9QR ImR�Ar4L iW 1m SET' -WArtO®a 80.T Z oo,a4Lln•name m Im ors wL>t�amol emI 1/rw Tn to .~ 7W I.RI� l2nv GWWu�Eo la rDlmu w r io WIIw oIA,E /4• - Flsam.lfiVoue 9PM TAAAOM _ 1/ 2 m�v�.T.I Ld 1 ) Intilr rW®_T .. -� 2 o ,omHTR WW Inu• 4 A 4 as � Ems Nu 6mH(env uLvwxm I vT 1�®1�� 9�mmII x1 _-� 9.vNDe, s �q(2mwB 91FM V•PAWQ a anurm AS L�ua[S). tcNO¢i[n t umop m4L La LL aus um A��Wr� .� T �' a sE1 W�.�WI 6�7fTg .�` SHED WITH SKID SHED WITH'NO FLOOR'OPTIONTO PAD OR.8WCKING ,;,"``_;ti•�A ANCHORED TO CONCRETE ANCHORED TO CONCRETE _ • � __ _ J C�MpIUw T.BWfiinPE�I IS-DOWN DETAILS z 9..Y AD-1 OF 1 I . Florida pe_partmentofsusinPss FLA ManufacturedBuildngProgram &Professional Regulation 2601 Blair Stone Road Tallahassee,Florida32359-9772 Phone:850.487.1824•Fax 850.414.8435 Halsey Beshears, Secretary Ron DeSantis, Got+emor August 07,2019 Alex Martens Superior Sheds,Inc. 2323 S.Volusia Ave Orange City,FL 32763 RE: Manufacturer Certification, ID MFT-113; Expiration Date:August 07,2022 Dear Alex Martens It is my pleasure to inform you that Superior Sheds,Inc., located at 2323 S.Volusia Ave,Orange City, FL 32763, has been approved under the Manufactured Buildings Program,as provided for under Chapter 553, Part I, Florida Statutes,to manufacture Storage Sheds, Manufactured Buildings for installation in Florida. Construction or modification on a manufactured building cannot begin until the Third Party Agency has approved the plans in accordance with the current Florida Building Code. Your Third Party Agency is a contractor for the Department and has statutory authority and responsibilities that must be met to maintain approved status.You may expect and demand quality plans review and inspections. Each Code change will make your plans obsolete until they have been reviewed,approved and indicated fon the cover page of the plans]for compliance with the Code by your Third Party Agency for plans review. Please ensure that your puns are in compliance and are properly posted on our website.All site-related installation issues are subject to the local authority having jurisdiction. The Department's contractor will make unannounced monitoring visits at least once each year. You must grant complete access to your manufacturing facility and records to remain in compliance with the rules and regulations of this program. Your certification is approved for three years from this date.You will receive a renewal notice by Email generated by the BCIS(www.floridabuildina.oro)for online renewal. If you have questions you may contact Robert Lorenzo at 850-717-1835 or our FAX at 850-414-8436. Please visit our website at www.floridabuildina.org to see valuable information on the Florida Manufactured Buildings Program.A copy of this letter must accompany applications for local building permits. Sincerely, Robert Lorenzo Manufactured Buildings Program cc:Top Line Engineering, LLC 2018-12-20 TOP LINE ENGINEERING APPROVAL PLAN#SS-B-180-C Side Wall Header Schedule NeOC) End Wall HeadeFScheduln Teec w w AWWNUY PnOr SMAIIwF Sae _ Fwlarcn Matny strepp ua spw xEq J'y a•4a. can L°�� ea a-�i.. �_• .. _," . a-rxnnr we ` w�vw��mmemwwl.�..a an a„rrr><a• sv e-rxnurwa. ztir d --L,r_�—� 4•�.�. . _ ae iv No. vales �• W'°q -�I __�a.__ 4W-Nubererfaal abefnWllre le avppM sYtl. alb 84 auet pa 38 anmaY ` - etlael+�da b.xlnloeapenrgs Uvl Nm non Nsn 5n16 runiEaM LW ene sEea �s"-'�•�� a4 Eelwr.MwMae medmrlrea0eracleOila •� ✓ a Sn Ieaem Me6 traemule IarNi to a31r mhr V.T. s_gym m a��® d vyltreAra""dun'"m Ir 1eD Wla wee uvn lure ua cmMmE a4r'71A Se'm ITaE�Hi • eywnknl mdmol�e lue sltle6 �v Rdglyda � Yaarralaml �_ S O �•ac F�� v®moanr .:e om.wx �„r� m .une.sc Inww a sml� � a•YAt nvc eem vm rAv rxVn - HYDROVENT-'�oRAn SIDE WAIL WINDOWS END WALLS WINDOWS& (OPRONALI @DOORS DOOR 6'WIDE OR LE55 4'xd'W/2'xd' aevaq¢noa�� _ �i� G.F.I. -WI+ OUTLET rnarc le ua a-eea Ye rAar. UGC'�k'fY"'' rm vio wo SOURCE N Q =wua N,N9iiurT�mm. rml va uro _ ocvcll FSLssmrtz � v unc FaoF w. ROOF FRAMING PLAN L _L_. "MN(0G DIAGRAM U. " � 7 sEv oEscawron ogre e w z Iz/Iz/Iz � NA .,� „� i u�i ss-e-IeeC ..n. r �"'�"�r '— STANDARD WALL DETAIL + Q 0 r r p w atr`�n �0 x ELEVATION CROSS-SECTION END EMn,LEV�ATION .r w� rm -a. VI� rreioRan"maay. Z �® \\111111111//// °46 d �.��.•••L%CENS,••'.o��� m rr ue na - � `Q,•; /�//�1ryd0/5p r ue no � i �r e�r.mrwa.s� w i��:• STATE m. wnaao+• I -0•+ FRO R111 r d rr.a ama r. •• gel ' END ELEVATION END ELEVATION _ Z SSB-1 OF 1 Ymx roar ooe BOOR FRAMING PLAN c m SnrcO k