Loading...
HomeMy WebLinkAboutRevisions OFFICE USE ONLY: q DATE FILED: �,' I PERMIT# ' Q 1 REVISION FEE: �,ri RECEIPT# PLANNING&DEVELOPMENT SERVICES BUILDING&CODE REGULATION DIVISION 2300 VIRGINIA AVENUE 7NOV ECEIVED FORT PIERCE,FL 34982.5652 (772)462.1553 12 20gAPPLICATION FOR BUILDING PERMIT REVISIO %-re County, Permitting PROJECT INFORMATION — LOCATION/SITE ADDRESS: DETAILED DESCRIPTION OF PROJECT REVISIONS: 1g - CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: ST.LUCIE CO CERT. #: r BUSINESS NAME: QUALIFIERS NAME: ADDRESS: CITY: �5L STATE: V--k, ZIP: -)b'-A CV0 PHONE(DAYTIME): a,j -1 Cl�- W N FAX: OWNER/BUILDER INFORMATION: NAME: ADDRESS: CITY: V5STA 3A-, ZIP: Ck PHONE(DAYTIME: FAX: ARCHITECT/ENGINEER INFORMATION: NAME: ADDRESS: CITY: STATE: ZIP: PHONE(DAYTIME): FAX: SLCCC: 9/23/09 Revised 06/30/17 REVISION QD RECEIVED NOV 12 2019 AA ®r� Shower Pan Liners ST. Lucie County, Permitting Product Specifications MAINLINE' FEATURES • For use in the shower and other concealed water-proofing applications • Poly Vinyl Chloride (PVC) • PVC membrane is gray with lines every 6" to facilitate measuring and cutting • No underlay mount required, may be glued directly to drain for a positive seal LISTINGS AND APPROVALS • IAPMO listed C • Meets ASTM D-4551 s • Meets FHA and HUD requirements for c shower pan liner -411 ; ,' To Part# Description Pack WeighA Submit • ML11044 4 ft x 50 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 60 ML11045 5 ft x 40 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 60 ML11046 6 ft x 50 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 90 ML11144 4 ft x 100 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 100 ML11145 5 ft x 100 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 120 ML11146 6 ft x 100 ft 40 mil Gray PVC Shower Pan Liner 1 Roll 175 ML11247 PVC Shower Pan Liner Cement(Pint) 12 19LE C"'O"PY MADE IN SPC Warranty See warranty information for more details. u. O All dimensions listed are nominal.MAINLINE®reserves the right to make product and material changes at any time without notice. Contact your sales representative for more information or visit our website at mainlinecollection.com Revised 912112017 RECEIvep-.___ 0 ® Shower Pan Liner rie C ty �q ST Lucie Count APPLICATION INSTRUCTIONS y, Permitting Tile Shower Drain Oatey provides several products needed Dam Corners-Use dam corners over for tile shower installations. Choose from preformed curbs and to flash left and the list below before you start your project: right outside corners. Dam corners can Strainer ==_ _ PVC or CPE Pan Liner-referred to as pan be installed during PVC or CPE pan liner liner or membrane in our instructions. applications with use ofX-15 Bonding Tile Shower Drain-PVC for PVC drain Adhesive. pipe or ABS drain pipe.Each isNote.Oatey pan liner instructions assume g the shower framing has been constructed Adjustable - available insquare or circle barrel design g with a variety of strainer finishes available. and the flooring is plywood. Generally, Drain Barrel Collar the same principles apply to concrete Baits Use X-15 Bonding Adhesive when joining flooring where the sloped mortar bed is PVC shower pan liner membrane together applied beneath the pan liner.Also, the or installation of Oatey PVC dam corners. instructions apply to either PVC pan liner - -' Use Oateyweld Bonding Adhesive when or CPE pan liner which are installed the Reversible joining CPE shower pan liner membrane same with the exception of the bonding Clamping Ring together, but installation of Oatey PVC adhesive used for seaming and dam dam corners requires X-15 Bonding corner applications.If you have questions Adhesive. regarding pan liner installation that are PVC or ABS Solvent Cement-Use not covered in these instructions,contact Drain Base _ approved Oatey cements(and primer for Oatey Customer Service at 800-321-9532 PVC)to solvent weld ABS and PVC drain and you will be referred to someone who Pipe installations. can assist you. Shower Pan Installation 1.For typical wood subfloor cut a 4.5"diameter hole in the center 2.Cover the drain base opening with duct tape to keep debris from of the shower floor where the tile shower drain would normally entering the drain.Begin by applying Portland Cement/Sand be positioned.Disassemble the tile shower drain.Lay the tie mixture mortar bed over the subfloor at 1/4"per foot slope shower drain base in the opening so the flange of the drain base from the wall framing to the top of,but not over,the drain base. rests on top of the subfloor.Solvent weld the drain base to the After this step the sloped mortar bed should be flush with the drain pipe using the appropriate solvent cement.See Figure A. top surface of the drain base. Figure A Studding Water Proof Board Upper Section TOW,Set Settin Bed of Drain j Adjusts to i Locking Rin Rj� Tile Height of Tile g 9�• f -of Drain Concrete Mortar (Bolts to Hold _ ti ' Down Liner) subfloor` Tile Shower"Drain Pea —Drain Pipe Shower an Liner . (Wood or Concrete) Mounted on Top Gravel of Subfloor to Cover Weep Holes 3.After the sloped mortar bed has cured,the pan liner dimensions 9.The clamping ring has an inner thread pattern that will accept need to be determined.Pan liner dimensions should be the drain barrel and strainer assembly.Once you determine the sufficient to completely cover the floor,tum up all sidewalls at finished height of the shower thread the drain barrel into the least 2"above the finished curb height,and adequately cover inside clamping ring thread so the finished floor will be flush the curb.Lay the pan liner on a clean floor surface,measure, with the top of the drain barrel.As mentioned in Step 7 you can and cut to the appropriate dimensions. increase the shower drain height by inverting the clamping ring. Note:Seaming may be required in larger showers.See 10.A bed of mortar needs to be applied over the membrane(see Figure B.Follow Figure B Step 11),but before doing so nail water proof board to the instructions on wall studs to approximately 1"above the pan liner surface.If bonding adhesive. :~ using water proof board,please see manufacturer's 4.Before installing the pan recommendations for installation height as it may vary with liner remove the tape from is certain materials.Note:The use of mortar vs.drywall for the drain base and apply a the curb should be considered because you can avoid the 1/4"-3/8"bead of 100% use of nails as you construct this part of your installation. silicone caulk around the 11.Before the final mortar application place some pea gravel upper surface of the drain base approximately 1"in from the over the weep holes outside edge.This will provide a seal between the underside of so the mortar doesn't Figure E the pan liner and the drain base surface.Thread all clamping completely cover them. bolts into drain body three full turns.Before the caulk dries lay Now lay the minimum __the pre-measured pan liner on the floor over the drain body. 1-1/2"reinforcement At the top of each bolt slit an"X"so the pan liner slides down mortar bed of concrete each bolt to lay flat on drain base surface.Press pan liner firmly over the pan liner from into place to ensure a seal between the drain base and the the wall to the drain bottom surface of the pan liner.Place clamping ring over the barrel,leaving enough bolts and slide the ring counter clockwise so it locks in place. room for the final thinset Tighten the bolts so they're snug. and tile application.See 5.Work the pan material from the drain body to the sidewall Figure E. framing and curb threshold so it lays flat on the floor surface.If - desired an adhesive can be used to bond pan liner to the floor and curb.Prior to use of adhesive,confirm compatability of adhesive to the pan liner by visiting FAQs on www.oatey.com -W,. ��� ����. or calling Customer Service at 800-321-9532.Fold comers 0 AE E N OR and nail or staple pan liner ■ O to the sidewall framing or Fi ure C Nail or Staple S wall studs 1/2"below the g ■ upper edge of the material ■ ® N to hold it in place.Nail or . a ' •FR, E E E E staple the remainder of the b pan liner to the sidewall � framing or wall studs 1/2" H :i E E below the upper edge of the material.See Figure C. Figure D 6.For outside comers or curbs,where it's necessary to cut the pan liner,use a dam corner to cover the cut 4 ' ` •�. area.To bond dam corners in the cut area use X-15 Bonding Adhesive for PVC b �` and CPE liner installations. See Figure D. 7.Locate where the drain hole is on the drain base and cut out the pan liner material to the dimension of the drain hole on the drain base.Make sure the weep holes are clear of any residual pan liner material or silicone.Note:The clamping ring can increase the height of the finished shower floor by approximately 3/411.You will see the extension if you turn the ring upside down.Simply tighten it to the drain basedb6ea rbom ®11TEYSCS® ®at! the way you normally would,only inverted. 8.Water test the installation by closing off the drain pipe opening 4700 W.160th Street,Cleveland,OH 44135 1 800-321-9532 with a pneumatic or mechanical test plug.Fill the shower floor www.oatey.com 02(g with water just below the top of the curb and let it sit for 4 hours. IVE Check for leaks and repair if necessary.Re-test the installation. RECE --� Repeat until the installation is leak free.Completely drain the water before proceeding to Step 9. NOV 12 2099 I.CS993 7/16 ST. Lucie County, Permitting