Loading...
HomeMy WebLinkAboutProduct Approval 5 EXTERIOR RESEARCH&DESIGN,LLC. Certificate of Authorization#9503 QOTRINITYIERD 353 CHRISTIAN STREET, UNIT#13 OXFORD,CT 06478 (203)262-9245 EVALUATION REPORT TRI-BUILT Materials Group,LLC Evaluation Report A42960.10.12-R6 PO Box 70 FL16048-116 Rutherford, NJ 07070 Date of Issuance:10/25/2012 (800)516-1485 Revision 6: 09/25/2017 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 6ch Edition (2017) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Roof Underlayments LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes,the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 6. Prepared by: km — y Robert J.M. Nieminen,P.E. +.S8O�t?i ,.•. r ti�.0 The facsimile seal appearing was authorized by Robert Nlemtnen, .Florida Registration No.59166,Florida DCA ANE1983 P.E.on 09/25/2017.This does not serve as an electronically signed document. CERTIFICATION OF INDEPENDENCE: 1. Trinity IERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or distributing products it evaluates. 2. Trinity I ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E.does not have, nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report,or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. QOc TRINITYIERD ROOFING COMPONENT EVALUATION: 1. SCOPE: Product Category: Roofing Sub-Category: Underlayment Compliance Statement: TRI-BUILT Roof Underlayments, as produced by TRI-BUILT Materials Group, LLC, have demonstrated compliance with the following sections of the 6`h Edition (2017)Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/ Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1504.3.1 Wind Resistance FM 4474 2011 1504.3.1 Wind Uplift UL 1897 2012 1504.6 Accelerated Weathering ASTM G155 2005 1507.2.4/1507.1.1,1507.2.9.2 Physical Properties ASTM D1970 2015 1507.3.3 Physical Properties FRSA/TRI April 2012(04-12) 2012 3. REFERENCES: Entity Examination Reference Date ERD(TST6049) Physical Properties S40540.02.13-1 02/19/2013 ERD(TST6049) Physical Properties S40540.11.13 11/19/2013 ERD(TST6049) Physical Properties S40540.03.14 03/26/2014 ERD(TST6049) ; Physical Properties S44870.04.14-2 04/02/2014 ERD(TST6049) Physical Properties S44870.04.14-3 04/02/2014 ERD(TST6049) Physical Properties S44870.04.14-1 04/10/2014 ERD(TST6049) Physical Properties S44870.04.14-4 04/10/2014 ERD(TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014 ERD(TST6049) Physical Properties 543530.05.14 05/28/2014 ERD(TST6049) Physical Properties S40540.10.14 10/31/2014 ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015 ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015 ERD(TST6049) Wind Resistance SC14045.05.17-R1 06/07/2017 UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 12/10/2015 UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.07/18/2020 4. PRODUCT DESCRIPTION: 4.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS modified bitumen roof underlayment,with a 36-inch sheet width;meets ASTM D1970. 4.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified bitumen roof underlayment;meets ASTM D1970 and FRSA/TRI April 2012. 4.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering, glass-mat reinforced, film-surfaced, SBS modified bitumen roof underlayment;meets ASTM D1970. S. LIMITATIONS: 5.1 This is a building code evaluation. Neither TrinityJERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions. 5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials Directory for fire ratings of this product. Exterior Research and Design,LLC. Evaluation Report A42960.10.12-116 Certificate of Authorization#9303 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL16048-R6 TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017 Page 2 of 6 } TRINITY I ERD 5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically referenced within FBC approval documents. If not listed, a request may be made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable Roof Covers: TABLE 1: ROOF COVER OPTIONS Underlayment Asphalt Nail-On Tile Foam-On Tile Metal Wood Shakes Slate Shingles &Shingles Tri-Built Sand-R SA Shingle Yes No No No Yes Yes Underlayment Tri-Built S/A HT TU Yes Un .1derlayment Yes Yes See 5.5 Yes Yes Yes Tri-Built Smooth HT S/A Yes No No Yes Yes Yes Underlayment 5.5.1 "Foam-On Tile"is limited to use of the following Approved tile adhesives/underlayment combinations. TABLE IA:ALLOWABLE TILE ADHESIVE UNDERLAYMENT COMBINATIONSI Adhesive Florida Product Approval Underlayments ICP Adhesives PolysetO AH-160 FL6332 Tri-Built S/A HT TU Underlayment Dow TileBondl FL22525 Tri-Built S/A HT TU Underlayment 5.6 Allowable Substrates: 5.6.1 Direct-Bond to Deck: Tri-Built Sand-R SA Shingle Underlayment,,Tri-Bu)It S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: ➢ Plywood;ASTM D41 primed plywood; OSB;ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41 primed Southern Yellow Pine;ASTM D41 primed structural concrete. While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT Materials Group,LLC recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT Materials Group, LLC requires tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-adhering underlayment. 5.6.2 Bond-to-Insulation: Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: ➢ Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board. For installation under mechanically attached prepared roof coverings, insulation shall be attached per minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations under foam-on tile systems (Tri-Built S/A HT TU Underlayment only), insulation attachment shall be designed by a qualified design professional and installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D or TAS 114,Appendix J. 1 Refer to Tile Manufacturer's orAdhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance. Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-R6 Certifcate;ofAuthorization N9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL16048-R6 TRI-BUILT Roof Underlayments;(800)516-2485 Revision 6:09/25/2017 Page 3 of 6 Q0TR1N1-[Y1'ERD' 5.6.3 Bond to Mechanically Attached Base Laver: Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A Underlayment applied to: ➢ ASTM D226,Type I or II felt. For installations under mechanically attached prepared roof coverings, base layer shall be attached per minimum codified requirements. For installations under foam-on tile systems (Tri-Built S/A HT TU Underlayment only), base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04- 12). 5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12) does not address wind uplift resistance of all underlayment systems beneath foam-on the systems, where the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck underlayment systems that are not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on tile applications. Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FRSA/TRI April 2012(04-12),Appendix A,Table 1A or FBC 1609 for determination of design wind pressures. #1 _Maximum Design Pressure=-45.0 psf: Deck: Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: (Optional)ASTM D41 or RESISTO EXTERIOR PRIMER Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. #2 Maximum Design Pressure=-67.5 psf: Deck: Structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction. Primer: Soprema Eiastocoi 600c Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. #3 Maximum Design Pressure=-150.0 psf: Deck: Min. 15/32-inch APA-rated BCX plywood (may be installed C-side up) to meet project requirements to satisfaction of Authority Having Jurisdiction. Deck Preparation: Plywood shall be thoroughly cleaned to remove dust and debris that may inhibit adhesion. All sheathing fasteners shall be driven flush with the surface. All sharp splinters and wood projections shall be removed/sanded. Primer: (Optional)RESISTO EXTERIOR PRIMER Underlayment: Tri-Built S/A HT TU Underlayment, self-adhered, shall be thoroughly roll using hand roller and/or weighted roller to ensure there are no voids, and ensure there are no voids/bridging at side and end-laps. #4 Maximum Design Pressure=-60.0 psf: Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: Soprema Sopra-G or Modified Sopra-G mechanically attached with nails (FBC 1517.5.1) and tin caps (FBC 1517.5.2)spaced 6-inch o.c. at the 4-inch laps and 6-inch o.c.in three, equally spaced rows in the center of the sheet. Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered. Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R6 Certificate of Authorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL16048-116 TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017 Page 4 of 6 s QOTRINI-rYIERD 5.6.4.1 For mechanically attached Base Sheet,the maximum design pressure for the selected assembly shall meet or exceed that required under FRSA/TRI April 2012(04-12),Appendix A,Table 1A. Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(January 2026)for Zone 2/3 enhancements. 5.7 Exposure Limitations: Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left exposed for longer than 30-days after installation Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation. j 5.8 Tile Slippage Limitations(TAS 103 per FRSA/TRI April 2012(04-12)): II When loading roof tiles on the underlayment in direct-deck tile assemblies,the maximum roof slope shall be as follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles. TABLE 2: TILE SLIPPAGE LIMITATIONS FOR DIRECT-DECK TILE INSTALLATIONS Underlayment Tile Profile Staging Method Maximum Slope Flat Max.10-tile stack 6:12 Lugged Max.10-tile stack 5:12 Max.10-tile stack(bottom 2-tile stack shall be inverted,followed by 8 tiles high 6:12 on slope,as shown below) ..: i Tri-Built S/A HT TU } Underlayment Lugged ti Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-116 Certificate of Authorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION 171.16048-116 TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017 Page 5 of 6 6. INSTALLATION: Q0_rR1N1TY1'E'RD 6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT Materials Group, LLC published installation requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below. 6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application,and prime the substrate(if applicable). 6.3 Tri-Built Sand-R SA Shingle Underlavment Tri-Built S/A HT TU Underlavment or Tri Built Smooth HT S/A Underlavment• 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.3.2 Non-Tile applications: While priming is optional, TRI-BUILT Materials Group, LLC recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of release film. Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane tight. Firmly roll, broom or hand-press the membrane into place to achieve a bond. Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6- inches and staggered not less than 2-ft from vertical seams in the course below,sealed in accordance with TRI-BUILT Materials Group,LLC requirements. When installing at slopes above 8:12, TRI-BUILT Materials Group, LLC recommends back-nailing in the overlap area at the top of the sheet at 12-inch o.c. For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in each direction. For valleys,apply the sheet starting at the lowest point and work upward. 6.3.3 Tile Applications(Tri-Built S/A HT TU Underlavment only): Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions noted above as a guideline. For foam-on tile applications, reference is made to Section 5.6.4 herein for wind resistance limitations that fall outside the scope of FRSA/TRI April 2012(04-12). Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. See Table 2 herein, and TRI-BUILT Materials Group, LLC published requirements for the staging. 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Gulfport, MS 9. QUALITY ASSURANCE ENTITY: UL, LLC—QUA9625;(314)578-3406; k.chancellor@us.ul.com -END OF EVALUATION REPORT- Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-116 Certificate of Authorization#9503 CH EDITION(2017)FBC NON-HVHZ EVALUATION FL16048-R6 TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017 Page 6 of 6 MIAMI DADE COUNTY MIAM PRODUCT CONTROL SECTION +■ ilium 11805 SW 26 Street,Room 208 $= DEPARTMENT OF REGULATORY AND ECONOM C RESOURM(RER) Miami,Florida 33175-2474 BOARD AND CODE ADMINISTRATION DIVISION T(786)315-2590 F(786)315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidadeaov/economy GAF y 1 Campus Drive - Parsippany,NJ 07054 SCOPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials.The documentation submitted has been reviewed and accepted by Miami-Dade County RER-Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction(AHJ). This NOA shall not be valid after the expiration date stated below. The Miami Dade County Product Control Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product or material tested for quality assurance purposes.If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke,modify,or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein,and has been designed to comply with the Florida Building Code including the High Velocity Hurricane Zone of the Florida Building Code. DESCRIPTION: GAF Timberline HD®,Timberline®Natural Shadow®,Timberline'American Harvest',and Fortitudim Shingles LABELING: Each unit shall bear a permanent label with the manufacturer's name or,logo,city,state and following statement: "Miami-Dade County Product Control Approved",unless otherwise noted herein. RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION,of this NOA will occur after the expiration date or if there has been a revision or change in the materials,use,and/or manufacture of the product or process.Misuse of this NOA as an endorsement of any product, for sales;advertising or any other purposes shall automatically terminate this NOA.Failure to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed,then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This NOA renews and revises NOA# 14-1022.20 and consists of pages 1 through 6. The submitted documentation was reviewed by Alex Tigera. rtiarn•Dane courrrr NOA No.:16-0811.11 Expiration Date:02/21/22 Approval"Date:02/09/17 Page 1 of 6 ,. ROOFING ASSEMBLY APPROVAL Category: Roofing ' Sub-Category: Asphalt Shingles Materials-. Laminate Deck Type: Wood SCOPE This approves GAF Timberline HD®,Timberline®Natural Shadow®,Timberline American®Harvest®,and FortitudeTM Shingles as manufactured by GAF as described in this Notice of Acceptance. PRODUCT DESCRIPTION . Product Dimensions Test Product Description Specifications GAF Timberline HD® 13 1/a x 39 3/8" TAS 110 Fiberglass reinforced heavy weight asphalt Manufacturing roof shingle,with a laminate profile i Locations#1,2,3,4,5,6,7 GAF Timberline Natural 13 1/4"x 39 3/g" TAS 110 Fiberglass reinforced heavy weight asphalt Shadow® roof shingle,with a laminate profile Manufacturing Locations#1,2,3,4,5,6,7 GAF Timberline®American 13 1/4"x 39 31C TAS 110 Fiberglass reinforced heavy weight asphalt 'Harvest® roof shingle,with a laminate profile Manufacturing Locations#2,4,5,6 GAF FortitudeTm 13 1/4"x 39 3/s" TAS 110 Fiberglass reinforced heavy weight asphalt' Manufacturing roof shingle,with a laminate profile Location#4 MANUFACTURING LOCATION 1. Tampa,FL 2. Michigan City,IN 3. Baltimore,MD 4. Myerstown,PA 5. Ennis,TX 6. Tuscaloosa,AL 7. Dallas,TX MIAMMADE COUNTY NOA No.:16-0811.11 • . Expiration Date:02/2�/22 Approval Date:02/09/17 Page 2 of <, EVIDENCE SUBMTMD Test Agency Test Identifier Test Name/Reno Date Underwriters Laboratories,LLC -ASTM D3462 4787344101 07/25/16 Underwriters Laboratories,Inc. ASTM D3462 1ICA48924 10/24/11 Underwriters Laboratories,Inc ASTM D3462 IOCA21994 04/22/11 Underwriters Laboratories,Inc ASTM D3462 10CA28717 07/26/11 Underwriters Laboratories,Inc. ASTM D3462 05CA47541 11/10/06 Underwriters Laboratories,Inc. ASTM D3462 06CA31580 11/30/06 PRI Asphalt Technologies,Inc. ASTM D3462 GAF-101-02-02 11/02/05 Underwriters Laboratories,Inc. ASTM D3462 06NK05159 08/09/06 PRI Asphalt Technologies,Inc. ASTM D3462 GAF-098-02-02 11/08/05 Underwriters Laboratories,Inc. ASTM D3462 . 02NK41809 09/11/02 Underwriters Laboratories,Inc. ASTM D3462 03NK26444 10/17/03 Center for Applied Engineering ASTM D3462 257989 05/13/97 Underwriters Laboratories,Inc. TAS 107 OINK45803 04/13/94 Underwriters Laboratories,Inc.. TAS 107 06NK05159 08/09/06 Underwriters Laboratories,Inc. TAS 107 04NK04273 02/20/04 Underwriters Laboratories,Inc. TAS 107 05CA42840 11/11/05 Underwriters Laboratories,Inc. TAS 107 02NK41811 11/11/02. Underwriters Laboratories,Inc. TAS 107 03CA35209 10/17/03 Underwriters Laboratories,Inc. TAS 107 04CA13850 08/30/04 Center for Applied Engineering TAS 100 257989 04/01/97 PRI Asphalt Technologies,Inc. TAS 100 GAF-044-02-01 01/13/04 PRI Asphalt Technologies,Inc. TAS 100 GAF-098-02-01 1.1/08/05 PRI Asphalt Technologies,Inc. TAS 100 GAF-101-02-01 11/09/05 PRI Asphalt Technologies,Inc. TAS 100 GAF-116-02-02 03/23/06 PRI Asphalt Technologies,Inc. TAS-100 ELK-083-02-01 10/16/02 ELK-0 84-02-01 10/15/62 ELK-085-02-01 10/14/02 ELK-086-02-01 10/24/02 ELK-087-02-01 10/21/02 ELK 088-02-01 10/16/02 ELK 107-02-01 10/09/03 ELK-108-02-01 10/09/03 ELK-109-02-01 10/09/03 LIMITATIONS 1. Fire classification is not part of this acceptance; refer to a current Approved Roofing Materials Directory for fire ratings of this product. 2. Shall not be installed on roof mean heights in excess of 33 ft. 3. All products listed herein shall have a quality assurance audit in accordance with the Florida Building Code and Rule 61G20-3 of the Florida Administrative Code. MIA1Al•DADE COUNTY NOA No..16-0811.11 .•••. Expiration Date:02/21/22 Approval Date:02/09/17 Page 3 of 6 t INSTALLATION 1. Shingles shall be installed in compliance with Roofing Application Standard RAS 115. 2. Flashing shall be in accordance with Roofing Application Standard RAS 115 3. The manufacturer shall provide clearly written application instructions. 4. Exposure and course layout shall be in compliance with Detail'A',attached. 5. Nailing shall be in compliance with Detail W,attached. LABELING- Shingles shall bear the imprint or identifiable marking of. the manufacturer's name or logo, city and state of manufacturing facility,and following statement: "Miami-Dade County Product Control Approved" or the Miami-Dade County Product Control Seal as shown below. MIAMI DADE COUNTY BUILDING PERMIT REQUIREMENTS 1. Application for building permit shall be accompanied by copies of the following: 1.1 This Notice of Acceptance. .1.2 Any other documents required by the Building Official or the applicable code in order to properly evaluate the installation of this system. NOA No.:16-0811.11 MIAMMADE COUNTY Expiration Date:02/21/22 Approval Date:02/09/17 Page 4 of 6 r DETAm A COURSE LAYOUT I DECK FULL 5th 17" OFF 4th 11" OFF 3rd 6" OFF 2nd FULL 1 st NOA No.: 16-0811.11 MAMIMADE COUNTY Expiration Date:02/21/22 Approval Date:02/09/17 Page 5 of 6 DETAIL B OVERALL DmNSIONS AND NAILING PATTERN 39-3/8" 0m) 14-12"-17-117 141/2"-17-12" (368-445mm) (368-445mm) ail guideline '( 1 p6/,4 n s-u ss 5-W4•-&114• t�) I c, -Zs,mna (146mm-159mm) 7mm 12 z-��, —1 -�- -♦ S— fmm bottom of shingle go— cu-es 7 elf seal ' adhesive on back ENHANCED NAILING PATTERN -six nails per shingle* required by some local codes and required for enhanced wind coverage on certain products. See limited warranty for details. These shingles MUST be nailed a nominal 6"(152mm)from bottom of of shingle, above the cut outs, as shown. Nails must not be exposed. END OF TMS ACCEPTANCE MMM NOA No.:16-0811.11 M%MI.DADa courmr Expiration Date:02/21/22 Approval Date:02/09/17 Page 6 of 6