HomeMy WebLinkAboutProduct Approval Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wG...
Business & u�
Prokssional Regulation
BCIS Home I Login User Registration I Hot Topics ( Submit Surcharge Stats&Facts I Publications I Contact Us BCIS Site Map I Links Search
b
a
wt-� F, L Product Approval
j.USER:Public User
d
Product pproval Menu>Product or Application Search>Application List>Application Detail
FL# FL10497-R6
Application Type Revision Code Version 2017Application Status Approved L:aj
Comments
Archived ❑
Product Manufacturer Mule-Hide Products Co.,Inc.
Address/Phone/Email 1195 Prince Hall Dr
Beloit,WI 53511-5481
(608)365-3111 Ext 809
lindar@nemoetc.com
Authorized Signature Timothy McFarland
lindar@nemoetc.com
Technical Representative Tim McFarland —��Z�
Address/Phone/Email 1195 Prince Hall Dr R G i/1"EOW(V ED FOR
Suite A
Belot,WI 535115481 CODE COMPLIANCE
(608)365-3111
tim.mcfarland@mulehide.com ST, LUCIE'�+�COUNTY
Quality Assurance Representative BOCC
Address/Phone/Email
Category Roofing
Subcategory Modified Bitumen Roof System
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
❑ Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 09/13/2021
Validated By John W.Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence FL10497 R6 COI 2017 01 COI_Nieminen.pdf
Referenced Standard and Year(of Standard) Standard Year
ASTM D6163 2008
ASTM D6164 2011
ASTM D6222 2011
FM 4470 2012
FM 4474 2011
Equivalence of Product Standards
Certified By File Cop)
1 of 2 1/9/2020,4:28 PM
Florida Building Code Online https://www.floridabuilding.org/pr/pr_app_dtl.aspx?paratn=wG...
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 09/11/2017
Date Validated 09/13/2017
Date Pending FBC Approval 09/21/2017
Date Approved 12/12/2017
Summary of Products
FL* Model,Number or Name Description
10497.1 Mule-Hide SBS and APP Modified Self-adhering modified bitumen roof systems
Bitumen Roof Systems
Limits of Use Installation Instructions
Approved for use in HVHZ:No FL10497_R6 II 2017 09 FINAL Al ER MULE-
Approved for use outside HVHZ:Yes HIDE_FL10497-R6.pdf
Impact Resistant:N/A Verified By: Robert Nieminen PE-59166
Design Pressure:+N/A/-480 Created by Independent Third Party:Yes
Other: 1.)The design pressure in this application relates to Evaluation Reports
one particular assembly over concrete deck.Refer to the ER FL10497_R6 AE_2017_09 FINAL ER_MULE-HIDE_FL10497-
Appendix for other systems and deck types.2.)Refer to ER, R6.Ddf
Section 5 for other Limits of Use. Created by Independent Third Party:Yes
Back Next
Contact Us::7601 Blair Stone Road,Tallahacc F 127199 Phone:850-487-1824
The State of Florida is an AA/EEO employer.C2p_ydght 2007-2013 State of Florida.::Privacy.Statement::Accessibility.Statement::Refund Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section
455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have
one.The emalls provided may be used for official communication with the licensee.However email addresses are public record.if you do not wish to supply a personal i
address,please provide the Department with an email address which can be made available to the public.T6 determine If you are a licensee under Chapter 455,F.S.,
please click here_.
Product Approval Accepts:
i Credit Card I
Safe
2 of 2 1/9/2020,4:28 PM
EXTERIOR RESEARCH&DESIGN,I.I.C.
(_)0 Certificate of Authorization#19503
TRINITY I ERD 353 Christian Street
Oxford,Ci 06478
(203)262-9245
EVALUATION REPORT
Mule-Hide Products Co.,Inc. Evaluation Report M10000.03.08-116
1195 Prince Hall Drive,Suite A FL10497-R6
Beloit,WI 53511 Date of Issuance:03/28/2008
(608)365-3111 Revision 6:09/08/2017
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E.for use of the product under the Florida Building Code. The product described herein has been evaluated for
compliance with the 6u'Edition(2017)Florida Building Code sections noted herein.
DESCRIPTION: Mule-Hide SBS and APP Modified Bitumen Roof Systems
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPUANCE:This Evaluation Report is valid until such time as the named product(s)changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity)ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT:The Evaluation Report number preceded by the words"Trinity I ERD Evaluated"may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION:Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 5,plus a 22-page Appendix.
Prepared by:
OF;:W:
Robert J.M.Nieminen,P.E. The(aaimileseal appearing wasauhor¢ed by Robert Nieminen,
Florida Registration No.59166,Florida DC4 ANE1983 P.E.on 09108/2017.This does not serve as an electronically signed
document.
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research&Design,I.I.C.d/b/a Trinity I ERD does not have,nor does it intend to acquire or will it acquire,a financial interest
in any company manufacturing or distributing products it evaluates.
2. Exterior Research &Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or
distributing products it evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity I ERD nor Robert Nieminen,P.E.are,in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
TRINITY I ERD
ROOFING SYSTEMS EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Modified Bitumen Roof Systems
Compliance Statement: Mule-Hide SBS and APP Modified Bitumen Roof Systems, as produced by Mule-Hide
Products Co., Inc., have demonstrated compliance with the following sections of the 6th Edition (2017) Florida
Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation
Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1504.3.1 Wind FM 4474 2011
1504.7 Impact FM 4470 2012
1507.11.2 Physical Properties ASTM D6163 2008
1507.11.2 Physical Properties ASTM D6164 2011
1507.11.2 Physical Properties ASTM D6222 2011
3. REFERENCES:
Knifty Examination Reference Date
ERD(TST6049) Physical Properties P10490.10.08-2 10/30/2008
ERD(TST6049) FM 4470/4474 P13760.09.09 09/10/2009
ERD(TST6049) FM 4470/4474 P13770.09.09 09/10/2009
ERD(TST6049) FM 4470/4474 P30540.11.09-R1 11/30/2009
ERD(TST6049) FM 4470/4474 P30550.12.09 12/02/2009
ERD(TST6049) Physical Properties P33960.12.10 12/30/2010
ERD(TST6049) FM 4470/4474 P33970.03.11 03/15/2011
ERD(TST6049) Physical Properties P37590.03.13-3A 03/06/2013
ERD(TST6049) FM 4470/4474 P39680.03.13 03/04/2013
ERD(TST6049) Physical Properties P37590.03.13-1-R1 06/26/2013
ERD(TST6049) Physical Properties P37590.03.13-2-R1 07/01/2013
ERD(TST6049) Physical Properties P37590.07.13-2 07/01/2013
ERD(TST6049) Physical Properties P37590.03.13-5-R1 07/01/2013
ERD(TST6049) Physical Properties P37590.07.13-1 07/02/2013
ERD(TST6049) FM 4470/4474 P41630.08.13 08/06/2013
ERD(TST6049) Physical Properties P45940.09.13 09/04/2013
ERD(TST6049) Physical Properties P44370.10.13 10/04/2013
ERD(TST6049) FM 4470/4474 SC6160.11.14 11/10/2014
ERD(TST6049) Physical Properties SC5170.05.15 05/08/2015
ERD(TST6049) FM 4474 SC8085.05.15 05/19/2015
ERD(TST6049) FM 4470/4474 SC8905.15 11/24/2015
FM Approvals(TST1867) FM 4470 2W7A7.AM 08/04/1994
FM Approvals(TST1867) FM 4470 0D3A3.AM 04/04/1997
FM Approvals(TST1867) FM 4470 2DOAO.AM 12/23/1998
FM Approvals(TST1867) FM 4470 2D5A9.AM 06/22/1999
FM Approvals(TST1867) FM 4470 3006646 01/04/2000
FM Approvals(TST1867) FM 4470 3001334 01/25/2000
FM Approvals(TST1867) FM 4470 3001334 02/15/2000
FM Approvals(TST1867) FM 4470 3000857 01/12/2000
FM Approvals(TST1867) FM 4470 3004091 01/12/2000
FM Approvals(TST1867) FM 4470 3006115 05/02/2001
FM Approvals(TST1867) FM 4470 3012321 07/29/2002
FM Approvals(TST1867) FM 4470 3014692 08/05/2003
FM Approvals(TST1867) FM 4470 3014751 08/27/2003
FM Approvals(TST1867) FM 4470 3007170 01/13/2004
Exterior Research and Design,I.I.C. Evaluation Report M30000.03.08-116
CertiTicate OfAuthorizatfon 49503 6'EDITION(2017)FBC NON-HVHZ EVALUATION FL10497-R6
Mule-Hide Modred Bitumen Roof Systems;(608)365-3111 Revision 6:09/08/2017
Page 2 of 5
TRINITY l ERD
Enti Examination Reference Date
FM Approvals(TST1867) FM 4470 3019317 06/30/2004
FM Approvals(TST1867) FM 4470 3020703 07/30/2004
FM Approvals(TST1867) FM 4470/4474 3018332 01/31/2006
FM Approvals(TST1867) FM 4470/4474 3023368 03/20/2006
FM Approvals(TST1867) FM 4470/4474 3024594 05/23/2006
FM Approvals(TST1867) FM 4470/4474 3023458 07/18/2006
FM Approvals(TST1867) FM 4470/4474 3030668 09/12/2007
FM Approvals(TST1867) FM 4470/4474 3032172 06/12/2009
FM Approvals(TST1867) FM 4470/4474 3049631 04/21/2014
PRI(TST5878) Physical Properties PUSA-062-02-01 12/04/2007
PRI(TST5878) Physical Properties PUSA-061-02-02 01/28/2008
PRI(TST5878) Physical Properties PUSA-064-02-02 02/27/2008
PRI(TST5878) Physical Properties PUSA-062-02-02 12/04/2008
Miami-Dade(CER1592) HVHZ Compliance Various NOAs Various
Miami-Dade(CER3592) Proposal for Review 10-0823 10/12/2010
UL LLC(QUA9625) Quality Control ML File No.R13850 09/23/2015
UL LLC(QUA9625) Quality Control Service Confirmation Exp.10/06/2018
4. PRODUCT DESCRIPTION:
This Evaluation Report covers Mule-Hide Modified Bitumen Roof Systems installed in accordance with Mule-Hide
Products Co.,Inc.published installation instructions and the Limitations/Conditions of Use herein. The following
membranes make up the subject systems.
' TABLE 1:ROLL-GOODS FOR MULE-HIDEMODIFIED BITUMEN ROOF SYSTEMS
Type Product Specification
Reference Grade Type
Nail Base ASTM D6163 S I
SA Base Sheet ASTM D6163 S I
SBS Membranes SA Base Sheet(FR) ASTM D6163 S I
SA-SBS Cap Sheet ASTM D6164 G I
SA-SBS Cap Sheet(FR) ASTM D6164 G I
APP Torch Base ASTM D6509 N/A N/A
APP Torch S ASTM D6222 5 I
APP Torch G ASTM D6222 G I
APP Torch KoolCap G ASTM D6222 G I
APP Membranes APP Torch G FR ASTM D6222 G I
APP Torch KoolCap G FR ASTM D6222 G I
SA-APP Cap Sheet ASTM D6222 G I
SA-APP KoolCap G ASTM D6222 G I
SA-APP Cap Sheet(FR) ASTM D6222 G I
SA-APP KoolCap G FR ASTM D6222 G I
Exterior Research and Design,U.C. Evaluation Report M30000.03.08-116
Certowte of Authorization#9503 6TxEDITION(2017)FBC NON-HVHZ EVALUATION FL10497-R6
Mule-Hide Modred Bitumen Roof Systems;(608)365-3111 Revision 6:09/08/2017
Page 3 of 5
TRINITY I ERD
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity]ERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used
for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions.
5.3 Refer to a current Approved Roofing Materials Directory for fire ratings of this product.
5.4 For steel deck installations,foam plastic insulation shall be separated from the building interior in accordance
with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.6 apply.
5.5 The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural
members shall be in accordance with FBC requirements to the satisfaction of the Authority Having
Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC
Approval documentation.
5.6 For recover installations,the existing roof shall be examined in accordance with FBC 1511.
5.7 For mechanically attached insulation or membrane or strip-bonded insulation,the maximum design pressure
for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with
FBC Chapter 16. Zones 2 and 3 shall employ an attachment density designed by a qualified design
professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD3,FM Loss
Prevention Data Sheet 1-29,Roofing Application Standard RAS 117 and Roofing Application Standard RAS
137. Assemblies marked with an asterisk' carry the limitations set forth in Section 2.2.10.1 of FM Loss
Prevention Data Sheet 1-29(January 2016)for Zone 2/3 enhancements.
5.8 For assemblies with all components fully bonded in place,the maximum design pressure for the selected
assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No
rational analysis is permitted for these systems.
5.9 For mechanically attached insulation or membrane over existing roof decks,fasteners shall be tested in the
existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison
to the minimum requirements for the system. Testing and analysis shall be in accordance with ANSI/SPRI
FX-1 or Testing Application Standard TAS 105.
5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear off)or recover installation,the
existing deck or existing roof surface shall be examined for compatibility with the adhesive to be installed. If
any surface conditions exist that bring system performance into question,field uplift testing in accordance
with ANSI/SPRI IA-1,ASTM E907,FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS
124 shall be conducted on mock-ups of the proposed new roof assembly.
5.11 For bonded insulation or membrane over existing substrates in a recover installation, the existing roof
system shall be capable of resisting project design pressures on its own merit to the satisfaction of the
Authority Having Jurisdiction,as documented through field uplift testing in accordance with ASTM E907,FM
Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS 124.
5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with
FBC Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 or Roofing Application Standard
RAS 111, except the basic wind speed shall be determined from FBC Figure 1609.3(1), 1609.3(2) or
1609.3(3).
5.13 All products in the roof assembly shall have quality assurance in accordance with FAC Rule 610320-3.
Exterior Research and Design,U.C. Evaluation Report M10000.03.08-R6
[ervTscate ofAuthorizauon#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION F1.10497-116
Mule-Hide Modred Bitumen Roof Systems,(608)365-3111 Revision 6:09/08/2017
Page 4 of 5
TRINITY I ERD
6. INSTALLATION:
6.1 Mule-Hide Modified Bitumen Roof Systems shall be installed in accordance with Mule-Hide Products Co.,Inc.
published installation instructions,subject to the Limitations/Conditions of Use noted herein.
6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP"=Maximum
Design Pressure is the result of testing for wind load resistance based on allowable wind loads,and reflects
the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been
applied).Refer to FBC 1609 for determination of design wind loads.
6.3 Any FBC Approved coating listed for use with SBS or APP modified bitumen may be applied to the top roof
membrane without adverse effect on the system wind load performance. Refer to current Roofing Materials
Directory for fire ratings associated with coating usage.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C. Rule 61G20-3 QA
requirements
9. QUALITY ASSURANCE ENTITY:
UL LLC—QUA9625;(314)578-3406,k.chancellor@us.ul.com
-THE 22-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT-
Exterior Research and Design,I.I.C. Evaluation Report M10000.03.08-R6
CertiTicote ofAuthorkatlon#9503 6Tx EDITION(2017)FBC NON-HVHZ EVALUATION F1.10497-116
Mule-Hide Modified Bitumen Roof Systems;(608)365-3111 Revision 6:09/08/2017
Page 5 of 5
TRINITY I ERD
APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE
Table Deck Application Type Description Page
1A Wood New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 4
1B-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4
18-2 Wood New,Reroof(Tear-Oft)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5
1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 6
SD Wood New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 7
1E-1 Wood New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet(nails),Bonded Roof Cover 8
1E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet(screws&plates),Bonded Roof Cover 9
IF Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 9
2A Steel or Conc. New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 10
2B Steel or Conc. New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 11
3A Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 12-14
3B Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 14
4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 15-16
4B LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 16
4C LWIC New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 17-18
SA CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 19
SB CWF New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 19
SC CWF New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 19
6A Gypsum Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 20
6B Gypsum Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 21
7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 21-22
The following notes apply to the systems outlined herein:
1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation.
2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement:
➢Wood: Minimum 0.75-inch penetration.
➢Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
➢Concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
3. Unless otherwise noted,insulation may be any one layer or combination of polyisocyanurate,polystyrene,wood fiberboard,perlite,gypsum-based roof board or mineral-wool roof board that meets the QA
requirements of F.A.C.Rule 61G20-3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC Chapter 26,when installed with the roof cover.
4. Minimum 200 psi,minimum 2-inch thick lightweight insulating concrete may be substituted for rigid insulation board for System Type D(mechanically attached base sheet,bonded roof cover),whereby the base
sheet fasteners are installed through the LWIC to engage the structural steel or concrete deck.The structural deck shall be of equal or greater configuration to the steel and concrete deck listings. Roof decks and
structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC
Approval documentation.
S. Preliminary insulation attachment for System Type D:Unless otherwise noted,refer to Section 2.2.10.1.3 of FM Loss Prevention Data Sheet 1-29(January 2016).
Exterior Research and Design,U.C.d/b/a Trinity l ERD Evaluation Report M30000.03.08-R6 for FL30497-R6
Certificate of Authorization#9503 EDITION(2017)FBC NON-HVH2 EVALUATION Revision 6:09/08/2017
Prepared by:Robert Nieminen,PE-59166 Mule-Hide Modified Bitumen Roof Systems;(608)365-3111 Appendix 1,Page 1 of 22
TRINITY I ERD
6. Unless otherwise noted,insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application;the ribbons/beads shall expand as noted in the manufacturer's published instructions.
➢Hot asphalt: Full coverage at 25-30 lbs/square.
D Dow Insta-Stik Roofing Adhesive(D-I5): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c.
➢Millennium One Step Foamable Adhesive(M-OSFA): Continuous 0.25 to 0.5-inch wide ribbons,12-inch o.c.
➢OMG OlyBond 500(OB500): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c.(PaceCart or SpotShot).Nate:OlyBond Green maybe used where OlyBond 500 is referenced.
➢OlyBond Classic(OB Classic): Full coverage at 1 gal/square.
➢ICP Adhesives CR-20: Continuous 2.5-3.5-inch wide ribbons,12-inch o.c.
➢Note:When multiple layers(s)of insulation and/or coverboard are installed in ribbon-applied adhesive,board%oints shall be staggered.
➢Note:The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing.
7. Unless otherwise noted,all insulations are flat stock or taper board of the minimum thickness noted.Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Maximum
Design Pressure(MDP)limitations. In no case shall these values be used to'Increase'the MDP listings in the tables;rather if MDP listing below meets or exceeds that listed for a particular system in the tables,then
the thinner board listed below may be used as a drop-in for the equivalent thicker material listed in the table:
➢Millennium One Step Foamable Adhesive(M-OSFA): MDP -157.5 psf (Min.0.5-inch thick)
➢OMG OlyBond 500(OB500): MDP -45.0 psf (Min.0.5-inch thick Multi-Max FA-3)
➢OMG OlyBond 500(OB500): MDP -187.5 psf (Min.0.5-inch thick ISO 95+GL)
➢OMG OlyBond 500(OB500): MDP -315.0 psf (Min.0.5-inch thick ENRGY 3)
➢OMG OlyBond 500(OB500): MDP -487.5 psf (Min.0.5-inch thick ACFoam II,Poly ISO 2)
➢ICP Adhesives CR-20: MDP -117.5 psf (Min.1.0-inch thick)
8. Bonded polyisocyanurate insulation boards shall be maximum 4 x 4 ft.
9. For mechanically attached components or partially bonded insulation,the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC
Chapter 16,and Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD3,FM Loss
Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117.Assemblies marked with an asterisk*carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(January 2016)for
Zone 2/3 enhancements.
10. For assemblies with all components fully bonded in place,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16,and no
rational analysis is permitted.
11. For mechanically attached components over existing decks,fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the
minimum requirements for the system.Testing and analysis shall be in accordance with ANSI/SPRI FX-1 or Testing Application Standard TAS 105.
12. For existing substrates in a bonded recover or re-roof installation,the existing roof surface or existing roof deck shall be examined for compatibility and bond performance with the selected adhesive,and the existing
roof system(for recover)shall be capable of resisting project design pressures on its own merit to the satisfaction of the Authority Having Jurisdiction,as documented through field uplift testing in accordance with
ANSI/SPRI IA-1,ASTM E907,FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS 124.
13. For Recover Applications using System Type D,the insulation is optional;however,the existing roof system shall be suitable for a recover application.
14. Lightweight Insulating Concrete(LWC)shall be cast in accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWC is referenced,refer to current LWC
Product Approval for specific deck construction and limitations. For systems where specific LWC is not referenced,the minimum design mix shall be 300 psi. In all cases,the minimum top-coat thickness is 2-inches.
For LWC over structural concrete,reference is made to FBC Section 1917.4.1,Point 1.
Exterior Research and Design,U.C.d/b/a Trinity)ERD Evaluation Report M10000.03.08-R6 for FL30497-R6
Certificate of Authorization#9503 0 EDITION(2017)FBC NON-HVHZ EVALUATION Revision 6:09/08/2017
Prepared by:Robert Nieminen,PE-59166 Mule-Hide Modred Bitumen Roof Systems;(608)365-3111 Appendix 1,Page 2 of 22
. TRINITY I ERD
TABLE 1C:WOOD DECKS—NEW CONSTRUCTION,REROOFTEAR-OFF)OR RECOVER
SYSTEMTYPEC:MECHANICALLY ATTACHED INSULATION,BONDED ROOF COVER
System Top Insulation layer Roof Cover(Note 15) (P
steNo. Deck(Note 1) Base Insulation layer MDP
Type Fasten Attach Base Ply Ply Cap
TORCH-APPUED BASE PLY: -
Dekfast Hex Plates with Dekfast 1114,
Min.inch
(Optional)One or more Min.0.25-inch Dens Deck OMG 3"Round Metal Plate with OMG 1 per 2
W-10 inch plywood layers y combination, lRoof Board HO,ROCK MG Fl p Bot or TPI t i(Ac Metal ) ft, APP-TA (Optional)APP-TA APP-TA -30.0
loose laidGypsum-Fiber
Insulation Plate with Trufast HD.
SELF-ADHERING BASE PLY:
Dekfast Hex Plates with Dekfast 1114,
Min.15/32- (Optional)One or more Min.0.25-inch Dens Deck OMG 3"Round Metal Plate with OMG 1 per 2 585-SA,APP-SA,
W-11' layers,any combination, Prime or SECUROCK HD,OMG Flat Bottom Plate(Accutrac) z SBS-SA (Optional)SBS-SA,APP-TA -30.0
inch plywood loose laid Gypsum-Fiber Roof Board with Roofgrip 1114 or Trufast 3"Metal ft APP TA
Insulation Plate with Trufast HD.
(Optional)One or more Dekfast Galvalume Steel Hex with Dekfast
W 12 in.19/32- layers,any combination, Min.1.5-inch ENRGY 3,H- 1112 DP or Mule-Hide 3"Insulation Plate 1 per SBS-SA (Optional)SBS-SA,APP-TA SBS-SA,APP SA, -82.5
I h plywood loose laid Shield,Poly ISO 1,Poly herrn with Mule-Hide Drill Point Fastener 1.33 ft APP-TA
Exterior Research and Design,LIG d/b/a Trinity)ERD Evaluation Report M10000.03.08-R6 for FL30497-R6
Certificate of Authorization 119503 6TH EDITION(2017)FBC NON-HVH2 EVALUATION Revision 6:09/08/2017
Prepared by:Robert Nieminen,PE-59166 Mule-Hide Modified Bitumen Roof Systems,(608)365-3111 Appendix 1,Page 6 of 22
PRODUCTS Y•
PRODUCT DESCRIPTION
The Mule-Hide Poly ISO I'm polyisocyanurate insulation (fiat or tapered)Is a
closed-cell polylsocyanurate foam core laminated to(non-asphaltic)glass fiber
reinforced felt'facers. The Mule-Hide Poly ISO 1 is compatible with all Mule-
Hide membranes and accessories.Available in 20 psi and 25 psi.
BASIC USES
The Mule-Hide Poly- ISO 1 TM insulation,board may be used for ballasted, mechanically attached and fully
adhered single-ply rooting systems. The Poly ISO 1 Tr" insulation board may be installed over approved decks
and substrates on new construction,tearoffs,and recover(retrofit) projects. The Poly ISO 17M insulation board
may be used in UL Ciass A and FM Class 1 assemblies.
BENEFITS&SUPPLEMENTAL STATEMENTS
• Approved for direct application to steel decks
• Mule-Hide Poly iSO 1*is manufactured with NexGen Chemistry: Contains no CFCs, HCFCs,is Zero
OQP, EPA Compliant and has virtually no GWP
• Available as 4'x 4'or 4'x 8'panels in Grade 2(20 psi)or Grade 3(25 psi) RECEIV o
• Thicknesses range from 1"to 4.5" 4 2019 JAN 1
• -
TYPiCAL PHYSICAL PROPERTIES l.ude Coun
tyr permltdng
11�111:di 14 1110i!
Dimensional Stabil' ASTM D-2126 2%Linear Chane 7 da
Compressive Strength ASTM D-1621 20 PSI Grade 2 25 PSI Grade3
Water Absorption ASTM D-209 Less than 1%By Volume
Moisture Vapor Transmission ASTM E-96 Less than One 1 Perm
Service Temperature --- -100°F to 250°F Max
Flame Spread foam core ASTM E 84 <75"
Smoke Development ASTM E 84 <450**
j *The physical properties above are presented as typical average'velues as determined by accepted ASTM test methods and
i are subject to change. All Information can be confirmed by contacting Mule-Hide Products.
"The numerical ratings are determined by ASTM Test Method E-84 are not intended to reflect hazards presented by this or
any other material under actual fire conditions. A flame spread index of 75 or less and smoke development of 450 or less meet
code requirements regarding flame spread and smoke development for foam plastic roof insulation.However,the codes
exempt foam plastic insulation when used In roof deck constructions that comply as an assembly with FM 4450 or UL 1256(see
IBC,NBC, UBC and SBS Sections on Foam Plastic insulation(Chapter 26). Smoke development does not apply to roofing
PolylSO TM Recycle Content
20 2 layers of 1.8"Poly iSO Between 16%and 43%by weight,depending upon
25 '2 layers of 2.2"Poly ISO thickness(55%post consumer and 45%post industrial).
30 2 layers of 2.6"Poly ISO Refer to Mule-Hide LEED memo.
35 21a ers of-3.1"Po 1S0
40 2 layers of 3.5"Poly ISO
Revised:March-2017 PDS 09-6210 Page 1 of 3
Product Data Sheet
MULE-HIDE POLY IS01 TM ROOF INSULATION
mig, um
TYPICAL PHYSICAL PROPERTIES(Continued)
E 'r
1.0 25 1 5.7 .175 2%
1.5 38 8.6 .116 4%
1.8 46 10.3 .097 4%
2.0 51 11.4 •088 4 sf
2.5 64 14.4 .069 4%
2.6 66 15.0 .067 41
3.0 76 17.4 .057 4%
3.5 89 20.5 .049 4%
3.8 97 22,3 .045 4%
4.0 102 23.6 .042 4%
4.3 109 25.5 .039 4'f
4.5 114 26.8 1
.037 4'%/.,
.Long Term Thermal Resistance Values are based on ASTM 01289(revised Jan-2014)and CAN11.11_C S770 which provides for a
15•yeartime weighted average.
*Other thicknesses available upon special request.
SUPPLIMENTAL INFORMATION
._.__ o-_-::_• stf»MYeYr9if.YYr�aY�osw�rss.SlsY.lM.r Yrsn�srY?•RYrrMMYY}R�y...Y��rYrfrr•roYRr.Yf,
7.
.. ...::.... .._'_„u.rte;-_.•:-`:..'-:.”. _
r
_ A- n•:.:. ..... ::.... .!'...':,::'':}_.is
' :a. :,:5 .... .•:-:..: _g. rte. ._.: ..Vii»
:.p;[g :a.:S.w - �O'-'S:,_ :1•d5,'• - 2iiY5f';>
;TAAi t:' ��• - X::r :Y:c.' j':-%.1:F -,Y.1`.` >t
- - - - r
r
r
4 !
✓.c
e ^•
t -
_ J
:._..:. • .i.•ate• .. ..
C _ r
.v
•5:
i
4..
_ _ r
• r:•.:. ....,. „ :�,...-. cSCic_'.,. ... .:. .... .... .:....t; •�L= _ .•:_2.0'•';'I�O�' '� — '�Y.i.: 2.�p�: iS0 •.
ME
!JJ AJi IYYLJ Y�►I.YYY�.Y.11.r.AA'�J:[OiYiJ`il.YIY Yl11LCY1YY.JY itY►iJ i•YY IY.AJi:lliYl�llYril Y\414.•Iiil\ 1.i i YM.LY 11Y Yi}Y.i.YlY1YJ.aYYY i Y11►i 11111•tlr
PACKAGING
Factory applied packaging is only intended for protection during transit.When stored outside or at the job site,
the Insulation must be stored at least 4"above ground level and completely covered with a weatherproof
covering such as a tarpaulin. Waming-Do Not Leave Exposed:This product will bum if exposed to an
ignition source of sufficient heat and intensity,or an open flame.
CODE APPROVALS/COMPLIANCE
Poly ISO 1 Tm complies with the requirements of the following specifications,test and code requirements when
properly installed.
*Federal Specification HH-1-19721GEN and HH-1-197212,Class 1
*ASTM C 1289-05a,Type ll,Class 1,Grade 2(20 psi),Grade 3(25 psi)
*FM Standard 4450/4470 Approval,Class 1
*UL Standard 1256 Classification
Page 2 of 3 PDS 09-6210 Revised March-2017
Product Data Sheet
MULE-HIDE POLY 1801 TM ROOF INSULATION
CODE APPROVALSICOMPLIANCE(continued)
*UL Standard 790 Classification
•UL Standard 263 Fire Resistance Classification
INSTALLATION INSTRUCTIONS
Ballasted Single-Ply Membrane Systems-Mule-Hide Poly ISO 17m does not require attachment to the deck in
this system.All boards must be tightly fitted together to prevent movement,separation or damage during the
Instal lation of the membrane system.All gaps greater than 1/4"must be filled.After the membrane is Installed,
sufficient amounts of ballast must be applied to prevent membrane and Insulation movement.Refer to the Mule-
Hide Manual and FMLoss Prevention Data Sheet 1-29 for information regarding ballasting guidelines.
Mechanically Attached Single-Ply Membrane Systems—Mule-Hide.Poly ISO 1 TM should be attached with
Mule-Hide fasteners and insulation plates(or FM Approved fasteners)using a minimum of 4 fasteners per 4'x 4'
! board (1 fastener per 4 square feet)and a minimum of 6 fasteners per 4'x 8'board(1 fastener per 5.33 square
i feet). Refer to the Mule-Hide Manual for proper fastener placement.
i
Fully Adhered Single•Ply Membrane Systems-Mule-Hide Poly ISO IM should be installed with the
perforated side down:Insulation attachment will vary depending upon insulation thickness and job requirements.
If the top layer is less than 2"thick,install a minimum of 8 fasteners per 4'x4'board(1 fastener per 2 square
feet)and a minimum of 16 fasteners per 4'x 8'board(1 fastener per 2 square feet). if the top layer is 2'thick or
E thicker,install 4 fasteners per 4'x 4'or 8 fasteners per 4'x 8'insulation board. Refer to the Mule-Hide Manual .
j for proper fastener density and placement. Additional fastening may be required for certain job conditions. In
some instances hot steep asphalt or insulation adhesive may be used to attach the Mule-Hide Poly ISO❑Oto
approved concrete decks.Only 4'x 4'boards may be used.Contact Mule-Hlde's Technical Department for
specific requirements and procedures.
PROTECTION&SAFETY
Mule-Hide maintains Safety Data Sheets on all of its products. Safety Data Sheets contain health and safety -
information for your development of appropriate product handling procedures to protect your employees and
customers. Mule-Hide's Safety Data.Sheets should be read and understood by all of your supervisory personnel
and employees before using Mule-Hide products in your facilities.
ADDITIONAL INFORMATION
The information given on this PDS is subject-to change without notice. Always check the Mule-Hide-website of
www.mulehide.com for the latest information,changes and updates or contact Mule-Hide Products Company at
800-786-1492.
DISCLAIMER
The statements provided concerning the material shown are Intended as a guide for material usage and are believed to be true and accurate
at the time of printing. No statement made by anyone may supersede this information,except when done In writing by Mule-Hide Products
Co.,Inc. Since the manner of use Is beyond our control,Mule-Hide does not authorize anyone to make any warranty of merchantability or
fitness for any particular purpose or any other warranty,guarantee or representation,expressed or Implied,concerning this material. Buyer
and user accept the product under these conditions and assume the risk of any failure,any Injury person or property Including that of the
user),loss or liability resulting from the handling,storage or use of the product whether or not it is handled,stored or used in accordance with
the directions or specifications. Mule-Hide must be notified In writing of any claims and be given the
Revised:March-2017 PDS 69-6210 Page 3 of 3