HomeMy WebLinkAboutProduct Approval 10/30/1019 Florida Building Code Online
Business 1ProfessionalRegulation
Bas Home I U9 In User Registration I Hot Tbpia Submit Surcharge Stats&.Fads Publications.I Contac Us�� SCIS Site Map
F rich _
Producti+t}PP.ravel,,
USER:?Putilft'.UstY:
Product AROmItal Menu>Product or Aopi ton earth>ltppiication List>Application Detall
FL# FL16048-R6
Application Type Revision
Code Version 2017
Application Status Approved
Comments
Archived i
Product Manufacturer Tri-Built Materials Group,LLC
AddressJPhone/Email PO Box 70
Rutherford,NJ 07070
(800)516-1485
david.ruiz@tribuiltmg.com
Authorized Signature David Ruiz
david.ru iz@tri bu i Itmg.com
Technical Representative David Ruiz
Address/Phone/Email 250 Route 17 North
East Rutherford,NJ 07073
(201)842-2449
david.ruiz@tribuiltmaterialsgroup.com
Quality Assurance Representative
Address/Phone/Email
Category Roofing
Subcategory Undedayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida,
Professional Engineer
f; Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed the Robert Nlerninen
Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 07/18/2020
Validated By John W. Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence FL16048 R6 COI-2017-01 COI Nieminen pdf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2015
ASTM G155 2005
FM 4474 2011
FRSA/TRI April 2012(04-12) 2012
UL 1897 2012
Equivalence of Product Standards
Certified By
https:lifloridabuilding.org/pr/pr app_dti.aspx7param=wGEVXQwtDgtFPmdYINDWrwipmtAnR8jv9FYHTk4FLCxcgVtRhfvMw%3d%3d 1/2
i
10l30I2019 Florida Building Code Online
Sections from the Code
Product Approval Method Method 1 Option D
Date Submitted 09/25/2017
Date Validated 10/01/2017
Date Pending FBC Approval 10/03/2017
Date Approved 12/12/2017
Summdrir of Products
FL# Model,Number or Name Description
16048.1 TRI-BUILT Roof Underlayments Self-adhering,modified bitumen roof underiayments
Limits of Use Installation Instructions
Approved for use In HVHZ:No FLi6048 R6 n 2017 09 FINAL ER TRI-
Approved for use outside HVHZ:Yes BUILT UNDERLAYMENt�-FLi6c4Q8=R6 o—f
Impact Resistant:N/A Verified'By: Robert Nieminen PE-59166
Design Pressure:+NIA/-150 Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use of Evaluation Reports
foam-on the systems overtop the self-adhering underlayment .EI-16048 R6 AE 2017 09 FINAL ER TRI-
far one particular application.See ER Section 5.6.4 for details. . BUILT UNDERLAYMENTS FL16Q48-R6 odf
2.)Refer to ER Section 5 for other Limits of Use. Created by Independent Third Party:Yes
Sack Next
Contact Us::2601 Blair Stone Road,Tallahassee FL 32399.Phone:BSQ-487-1824
The State of Florida is an AAIEEO employer.Coo ht 2Q07-2Q13;,State of Florida:::Privacy Statement::Acossiblllty Statement::Refund$tetgmerit
Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic
mail to this entity.Instead,contact the office by phone or by traditional mail.if you have any questions,please contact 850.487.1395.-Pursuant to Section 455.275(1),
Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,FS.must provide the Department with an email address If they have one.The emalis
provided may be used for official communication with the licensee.However email addresses are public record.If you do not Wish to supply a personal address,please
provide the Department with an email address which can be made avallable to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here.
Piodycf Ji;spruvai,li2tepts:
Credik Card
Safe
I
https:flfloddabuilding.org/pr/pr app dtl.aspx?param=wGEVXQwtDgtFPmdYiNDWrwipmtAnR8jv9F[YHTk4FLCxcgVtRhfvMwa/e3d%3d 212
EXTERIOR RESEARCH&DESIGN,LLC.
Certificate of Authorization#9503
UNIT#13
TT�INITYJERD 353 CHRISTIANSTREET
6478
(203)262-9245
EVALUATION REPORT ------
TRI-BUILT Materials Group,CCC Evaluation Report A42960.10.12-R6
PO Box 70 FL16048-R6
Rutherford,NJ 07070 Date of Issuance:10/25/2012
(800)516-1485 Revision 6: 09/25/2017
SCOPE:
This Evaluation Report is issued under Rule 61620-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the a Edition {2017} Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LA13EUNG: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUEDCOMPuANCE: This Evaluation Report is valid until such time as the named product(s)changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
changes or the referenced Quality Assurance documentation changes. Trinity ERD requires a complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle,
ADVERTISEMENT:The Evaluation Report number preceded by the words "Trinity)ERD Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION:Upon request,a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building Official.
This Evaluation Report consists of pages 1 through 6.
Prepared by: 'Ak
�. �...
Robert J.M.Nieminen,P.E.
•„�1z�i��tThefacsimileseal appearing was authorized byRobert Nieminen,
Florida Registration No.59166,Florida DCAANEI983 PA on 09/25/2017.This does not serve as an electronically signed
document
CERTIFicATION OF INDEPENDENCE:
1. Trinity[ERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity!ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
A. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity ERD nor Robert Nieminen, P.E.are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
T'PJNI1Y I ERD
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof UndeTlayments, as produced by TRI-BUILT Materials Group, LLC, have
demonstrated compliance with the following sections of the 6th Edition(2017)Florida Building Code through testing
in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/
Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1504.3.1 Wind Resistance FM 4474 2011
1504.3.1 Wind Uplift UL 1897 2012
1504.6 Accelerated Weathering ASTM G155 2005
1507.2.4/1507.1.1,1507.2.9.2 Physical Properties ASTM D1970 2015
1507.3.3 Physical Properties FRSA/TRI April 2012(04-12) 2012
3. REFERENCES:
Entity Examination Reference. Date
ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.13 11/19/2013
ERD(TST6049) Physical Properties S40540.03.14 03/26/2014
ERD(TST6049) Physical Properties S44870.04.14-2 04/02/2014
ERD(TST6049) Physical Properties S44870.04.14-3 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties 544870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014
ERD(TST6049) Physical Properties 543530.05.14 05/28/2014
ERD(TST6049) Physical Properties S40540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04,15 05/27/2015
ERD(TST6049) Wind Resistance SC14045.05.17-R3 06/07/2017
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 12/10/2015
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.07/18/2020
4. PRODUCT DESCRIPTION:
4.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
modified bitumen roof underlayment,with a 36-inch sheet width;meets ASTM D1970.
4.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified
bitumen roof Underlayment;meets ASTM D1970 and FRSA/TRI April 2012.
4.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering, glass-mat reinforced, film-surfaced, SBS
modified bitumen roof underlayment;meets ASTM D1970.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,LLC. Evaluation Report A429W.10.12-R6
Certiffcate of Authorization#9503 6t"EDITION(2017)FRC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017
Page 2 of 6
QOTRRINITYIERD
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product Is
specifically referenced within FBC approval documents. If not listed, a request may be made to the
Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the
prepared roof covering.
5.5 Allowable-Roof Covers:
�xg
ni
_ TABLE V ROOF GoVER OPTIONNS
Asphalt
gw . Wood Shakes
Underlayment Shingles Nall-On Tile Foam-On Tile Metal &Shingles Slate
Tri-Built 52nd-R 5A Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes Yes Yes Yes Yes Yes
Underlayment See 5.5.1 i
Tri-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-On Tile"is limited to use of the following Approved tile adhesives/underlayment combinations.
' TABLE,a."ALLgWABLETILEADHESIVE f UNDiR1AYMENTCOMBINATIONS,
Adhesive Florida Product Approval Underlayments,
ICP Adhesives Polyset°AH-160 FL6332 Tri-Built S/A HT TU Underlayment
Dow TileBond' FL22525 Tri-Built S/A HT TU Underlayment
5.6 Allowable Substrates:
5.6.1 -Direct-Bond to Deck:
Tri-Built Sand-11 SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
Plywood;ASTM D41 primed plywood;OSB;ASTM D41 primed OSB;Southern Yellow Pine;ASTM D41
primed Southern Yellow Pine;ASTM D41 primed structural concrete.
While not required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT Materials Group,LLC
recommends priming the deck if the final roof cover is not slated for installation within 24 hours. Note:
TRI-BUILT Materials Group, LLC requires tongue-and-groove board decking be covered with plywood or
OSB prior to installation of the self-adhering underlayment.
5.6.2 -Bond-to-insulation:
Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
➢ Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam-on tile systems (Tri-Built S/A HT TU Underlayment only), insulation attachment shall be
designed by a qualified design professional and installed based on testing of the insulation/underlayment
system in accordance with FM 4474,Appendix D or TAS 114,Appendix J.
1 Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval far Overturning Moment Resistance Performance.
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R6
Certificate of Authorization#9503 6TH EDITION(2017)FBC NON-HVH2 EVALUATION F1.16048-116
TRI-BUILT Roof Underlayments;(900)516-1485 Revision 6:09/2S/2017
Page 3 of 6
. ^
QTRRINITYIERD
B*3 Bond to cled Base W"
Trl-Bullt Sand-R SA Shingle Uwderlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Mndemlayment applied to:
> ASTM Q226,Type|or||felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
�
minim um codified requirements, For under foam-on tile systems �U
ems |� '�uA HT TU
|
Underlayment only), base layer shall be attached per minimum requirements of FRSA/TRI April 2012(04-
12).
� 5.6.4 FRSWUTN0April 2012 (04'12)
! does not address wind uplift resistance nfall undoM/ mentsysiemobeneathfomm-ond(esystems where
i
the undedaymentforms part ofthe |oad'path. The following wind uplift U �
limitations apply �
yt� dire �eoh
' undedaymentsystems that are not addressed inF0SA/TRIApril 2012(04-12)and are used infoam-on fi|e
�
applications. Maximum Design Pnsxwve is the result of testing for wind load resistance based on
'
allowable wind loads,and reflects the ultimate passing pressure divided hy%(the 2to1margin ofsafety
per FBC1504.9has already been appke6). Refer tmFRSA/TRI April 2012(04-12)'Appendix A~Table 1A or
FBC 1G09for determination ofdesign wind pressures.
#1 Maximum Design Pressure=-45.0 psf:
Deck: Min. 15/32-inch —plywood to meet project requirements to satisfaction of Authority
Having Jurisdiction.
Primer: (Opdone|)ASTM D41mrRES|S[DEXTERIOR PRIMER
Un6edayment: Tri-Built S/A0T T0Umderlmymnent,se\f-adhened.
#2
Deck: Structural concrete to meet project requirements to satisfaction ofAuthnrity Having
Jurisdiction.
�
Primer: SopremaBast000l 608c
�
| Underlayment: Tri-Built m/AHT TUUndadoyoent,seU-adhered.
� N3 Maximum Pressure=-150.0 visf:
beck: ' Min. 15/32'inchAPA'rote6 BCX plywood (may beinstalled Csideup) tomeet project
requirements tnsatisfaction ofAuthority Having Jurisdiction.
Deck Preparation:Plywood yhe|| be thoroughly cleaned to remove dust and debris that may inhibit
adhesion. All sheathing fasteners shall be driven flush with the surface. All sharp
splinters and wood projections shall beremoved/sanded.
Primen (Opt|ona|)R[S|S[OEXTERIOR PRIMER
Uoder|ayment: Tr\'BwUt 5/A HT TU NmderlaVmemt, self-adhered, shall be thoroughly roll using hand
roller and/or weighted roller to ensure there are no voids, and ensure there are no
voids/bridging atside and end'/aps'
#4 Maximum Design Pressure=-60.0 psf:
Deck: Min. 19/3I-inch plywood to meet project requirements to satisfaction of Authority
Having Jurisdiction.
Base Sheet: Soprema Sopra-G or Modified Sopra-G mechanically attached with nails (FBC 1517.5.1)
and tin caps(F8[1S17'5'2)spaced 6-inchu.c.stthe 4'|nmhlaps and 6'iocho.c.inthree,
equally spaced rows inthe center vfthe sheet.
Under/ayment: Tri-Built S/AHTTuUnder|m9mmentse|f-adhered.
Exterior Research and Design,u� Evaluation Report w��10.12-Rfi
Certificate nyAvumuzamm»95ao s'EDITION(2oz7)FOC wom'xv*oEVALUATION Fu6048-n6
TRI-BUILT Roof unumwuxme"ts/(umN51a-1*m5 Revision 6:09/25/2017
Page*mrs
R Ni-ry ERD
I
5.6.4.1 For mechanically attached Base Sheet,the maximum design pressure for the selected assembly shall meet
or exceed that required under FRSA/TRI April 2012(04-12),Appendix A,Table IA.
Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1
design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an
attachment density designed by a qualified design professional to resist the elevated pressure criteria.
Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing
Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in
Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(January 2016)for Zone 2/3 enhancements.
5.7 Exposure Limitations:
Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth KT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
5.8 Tile Slio0age Limitations(TAS 103'Oer FRSA/TRI April 2012,,'(04-12)):
When loading roof tiles on the underlayment in direct-deck tile assemblies,the maximum roof slope shall
be as follows. These slope limitations can only be exceeded by using battens during loading of the roof
tiles.
6E&tiCt,fINSTAi
TAOLE 2: tit' PAG MITATIQWFOR 614ECr- Ni
ix,im U m
Underlayment Tile Profile Staging Method -Slope"
Flat .-Max.10-tile stack 6:12
Lugged Max.10-tile Aack 5:12
(bottom
Max.10-tile - -C 2-tile sta&
shall be inverted,followed by 8 files high 6:12
on slope,..as shown below)
K
Tri-BuiltS/AHTTU .4
Underlayment
Lugged
Exterior Research and Design,LLC_ Evaluation Report A42960.10.12-116
Certificate of Authorization#-9503 6"'EDITION(2017)PEC NON-HVHZ EVALUATION F1.16048-116
TRI-BUILT Roof Underlayments,(800)516-148S Revision 5:09/25/2017
Page 5 of 6
'\4
TRINITY 1 ERD
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed In accordance with TRi-BUILT Materials Group, LLC
published installation requirements subject to the Limitations set forth in Section 5 herein and the
specifics noted below.
6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-R SA Shinkle Underlai ment..Tri-Built SIA HT TU-Underlayment_or Tri-Built-Smooth HT 5!A
U_n_derlaYment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile aiMications:.
While priming is optional,TRI-BUILT Materials Group,LLC recommends priming the deck if the final roof
cover is not slated for installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll,broom or hand-press the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below,sealed in accordance with
TRi-BUILT Materials Group,LLC requirements.
When installing at slopes above 8:12, TRI-BUILT Materials Group, LLC recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile A06lications`(Tri-Built S/A HT TU Underlavment onlay:
Reference is made to FRSA/TRI April 2012 (04-12) installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
For foam-on tile applications, reference is made to Section 5.6.4 herein for wind resistance limitations that
fall outside the scope of FRSA/TRl April 2012(04-12).
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment. See Table 2 herein, and TRI-BUILT Materials Group, LLC published requirements for tile
staging.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Gulfport,MS
9. QUALiTYASSURANCE ENTITY:
UL,LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com
-END OF EVALUATION REPORT-
Exterior Research and Design,U.C. Evaluation Report A42960.10.12-1116
certificate of Authorization#9503 6i"EDITION(2017)FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments;(800)516-1485 Revision 6:09/25/2017
Page 6 of 6