Loading...
HomeMy WebLinkAboutProduct Approval 1 Florida Building Code Online Page 1 of 3 D �M n D a BCIS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts Publications Contact Us BCIS Site Map i Links Search Or * _-Product Approval l.�c-USER:Public p r "'•' �� Product Approval Menu>Product or Application Search>Application List>Application Detail MAR 0 2 2020 i •aA FL# FL13192-RS Application Type Revision ST. Lucie County, Permitting Code Version 2017 Application Status Approved Comments Archived ❑ Product Manufacturer James Hardie Building Products,Inc. Address/Phone/Email 26300 La Alameda Ste.250 / 0 " Mission Viejo,CA 92691 di1;.b (909)545-8359 ® may, chad.diercks@jameshardie.com Authorized Signature Chad Diercks chad.diercks@jameshardie.com > Technical Representative Pingsheng Zhu 40 40 ®� 0. Address/Phone/Email 10901 Elm Ave. �V1 ODS Fontana,CA 92337 0 � ` m (909)349-29240V pingsheng.zhu@jameshardie.com Quality Assurance Representative Pingsheng Zhu ♦ rj� Address/Phone/Email 10901 Elm Ave. yes vJ Fontana,CA 92337 (909)349-2927 pingsheng.zhu@jameshardie.com Category Panel Walls Subcategory Siding Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer ❑ Evaluation Report-Hardcopy Received Florida Engineer or Architect Name who developed Ronald I.Ogawa the Evaluation Report Florida License PE-24121 Quality Assurance Entity Intertek Testing Services NA,Inc.-QA Entity Quality Assurance Contract Expiration Date 12/31/2020 Validated By John Southard,P.E. 21 Validation Checklist-Hardcopy Received Certificate of Independence FL13192 R5 COI RIO-Certificate of Independence odf Referenced Standard and Year(of Standard) Standard Year ASTM C1186 2007 ASTM E330 2002 Equivalence of Product Standards Certified By Florida Licensed Professional Engineer or Architect FL13192 R5 Eauiv RI0-26928-17 ASTM C1186 eouivalencv odf Sections from the Code FILE COPY https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgtsk%2bGnUu... 10/28/2019 Florida Building Code Online Page 2 of 3 Product Approval Method Method 1 Option D Date Submitted 08/09/2017 Date Validated 08/25/2017 Date Pending FBC Approval 08/28/2017 Date Approved 10/10/2017 Summary of Products FL# Model,Number or Name Description 13192.1 Cemplank Lap Siding fiber-cement lap siding Limits of Use Installation Instructions Approved for use in HVHZ:Yes FL13192 R5 II CemPlank-Installation.odf Approved for use outside HVHZ:Yes FL13192 R5 II ER RIO-2683-17 Plank Wood Metal Impact Resistant:N/A Frame.pdf Design Pressure:N/A FL13192 R5 II ER RIO-2687-17 Plank Shingle to CMU.pdf Other:For use in HVHZ install in accordance with NOA 17- FL13192 R5 II ER RIO-2688-17 Plank WSP Sheathing.pdf 0406.06 FL13192 R5 II NOA 17-0406.06.pdf Verified By: Ronald I.Ogawa 24121 Created by Independent Third Party: No Evaluation Reports FL13192 R5 AE ER RIO-2683-17 Plank Wood Metal Frame.pdf FL13192 R5 AE ER RIO-2687-17 Plank Shingle to CMU.odf FL13192 R5 AE ER RIO-2668-17 Plank WSP Sheathing.oddf FL13192 R5 AE NOA 17-0406.06.pdf Created by Independent Third Party:Yes 13192.2 HardiePlank Lap Siding fiber-cement lap siding Limits of Use Installation Instructions Approved for use in HVHZ:Yes FL13192 R5 II ER RIO-2683-17 Plank Wood Metal Approved for use outside HVHZ:Yes Frame.pdf Impact Resistant:N/A FL13192 R5 II ER RIO-2687-17 Plank Shingle to CMU.pdf Design Pressure:N/A FL13192 R5 II ER RIO-2688-17 Plank WSP Sheathing.odf Other:For use in HVHZ install in accordance with NOA 17- FL13192 R5 II HardiePlank-Installation.pdf 0406.06 FL13192 R5 II NOA 17-0406.06.odf Verified By: Ronald I.Ogawa 24121 Created by Independent Third Party: No Evaluation Reports FL13192 R5 AE ER RIO-2683-17 Plank Wood Metal Frame.pdf FL13192 R5 AE ER RIO-2687-17 Plank Shingle to CMU.pdf FL13192 R5 AE ER RIO-2688-17 Plank WSP Sheathing.pdF FL13192 R5 AE NOA 17-0406.06.pdf Created by Independent Third Party:Yes 13192.3 HardieShingle Individual Shingles fiber-cement individual cladding shingles Limits of Use Installation Instructions Approved for use in HVHZ:No FL13192 R5 II ER RIO-2685-17 Shingle Wood Metal Approved for use outside HVHZ:Yes Frame.pdf Impact Resistant:N/A FL13192 R5 II HardieShingle-Installation.odf Design Pressure:N/A Verified By: Ronald I.Ogawa 24121 Other: Created by Independent Third Party: No Evaluation Reports FL13192 R5 AE ER RIO-2685-17 Shingle Wood Metal Frame.pdf . Created by Independent Third Party:Yes 13192.4 HardieShingle Panel fiber-cement notched shingle panels(straight edge, staggered edge,half round edge) Limits of Use Installation Instructions Approved for use in HVHZ:No FL13192 R5 II ER RIO-2685-17 Shingle Wood Metal Approved for use outside HVHZ:Yes Frame.pdf Impact Resistant:N/A FL13192 R5 II ER RIO-2687-17 Plank Shingle to CMU.pdf Design Pressure:N/A FL13192 R5 II HardieShingle-Installation.pdf Other: Verified By: Ronald I.Ogawa 24121 Created by Independent Third Party: No Evaluation Reports FL13192 R5 AE ER RIO-2685-17 Shingle Wood Metal Frame.pdf FL13192 R5 AE ER RIO-2687-17 Plank Shingle to CMU.pdf Created by Independent Third Party:Yes 13192.5 Prevail Lap Siding fiber-cement lap siding https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgtsk°/`2bGnUu... 10/28/2019 Florida Building Code Online Page 3 of."') • Limits of Use Installation Instructions Approved for use in HVHZ:Yes FL13192 R5 II ER RIO-2683-17 Plank Wood Metal Approved for use outside HVHZ:Yes Frame.odf Impact Resistant:N/A FL13192 R5 II ER RIO-2687-17 Plank Shingle to CMU.Ddf Design Pressure:N/A FL13192 R5 II ER RIO-2688-17 Plank WSP Sheathing.ocif Other:For use in HVHZ install in accordance with NOA 17- FL13192 R5 II NOA 17-0406.06.odf 0406.06 FL13192 R5 II Prevail-Lao-Siding--Installation.Ddf Verified By: Ronald I.Ogawa 24121 Created by Independent Third Party: No Evaluation Reports FL13192 RS AE ER RIO-2683-17 Plank Wood Metal Frame.Ddf FL13192 R5 AE ER RIO-2687-17 Plank Shingle to CMU.Ddf FL13192 R5 AE ER RI0-2688-17 Plank WSP Sheathing.Ddf FL13192 R5 AE NOA 17-0406.06.Ddf Created by Independent Third Party:Yes Back Next Contact Us::2601 Blair Stone Road.Tallahassee FL 32399 Phone:850-487-1824 The State of Florida is an AA/EEO employer.Coovriaht 2007-2013 State of Florida.::Privacy Statement::Accessibility Statement::Refund Statement under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.*Pursuant to Section 455.275 (1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under Chapter 455,F.S.,please click here. Product Approval Accepts: ® ® ® RRec Credit Cart! Safe https://www.floridabuilding.org/pr/pr app_dtl.aspx?param=wGEVXQWtDgtsk%2bGnUu... 10/28/2019 Florida Product Approval Cemplank° Lap Siding • For use inside HVHZ: o Cemplank Lap Siding fastener types, fastening schedule, and installation shall be in accordance with the Miami-Dade County Florida NOA 17- 0406.06. Consult the Cemplank product installation instructions on the follow pages for all other installation requirements. • For use outside of HVHZ, o Cemplank Lap Siding fastener types, fastening schedule, and installation shall be in accordance with Engineering Evaluation Reports RIO-2683-17, RIO-2687-17, or RIO-2688-17. Consult the Cemplank product installation instructions on the follow pages for all other installation requirements. � y Cemplank® t_ Lap Skiing INSTALLATION REQUIREMENTS-PRIMED AND FACTORY BUILT COLOR TREATED PRODUCTS NOVEMBER 2016 CEDAR ■ BEADED CEDAR • BEADED SMOOTH IMPORTANT.FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING CODES AND THE MANUFACTURER'S WRITTEN APPLICATION INSTRUCTIONS MAY LEAD TO PERSONAL INJURY,AFFECT SYSTEM PERFORMANCE,VIOLATE LOCAL BUILDING CODES,AND VOID THE PRODUCT ONLY WARRANTY. STORAGE& HANDLING: A CUTTING INSTRUCTIONS' Store flat and keep dry and covered prior OUTDOORS equipped with a HardieBlade®saw INDOORS to installation.Installing product wet or 1.Position cutting station so that wind blade and vacuum dust extraction 1.NEVER cut with power saws indoors saturated may result in shrinkage at butt will blow dust away from user and c.Good: Circular saw with a 2.Cut only using score and snap,or shears(manual, joints.Car others in working area. HardieBlade saw blade Carry product on edge. Protect p,Use one of the following methods: moderate cutting volume)r low to electric or pneumatic). edges and corners from breakage. 3.Position cutting station in well-ventilated area Cemboard"is not responsible for damage a.Best: i.Score and snap ii:Shears caused by improper storage and (manual,electric or pneumatic)' Shears and score/snap methods may not —NEVER dry sweep—Use wet suppression or Vacuum handling of b.Better: Dust reducing circular saw be suitable for products thicker than 1/2 in. the product. NIOSH-approved respirators can be used in conjunction with above cutting practices to further reduce dust exposures.Additional exposure information is available F!Tqp at www.jameshardie.com to help you determine the most appropriate cutting method for your job requirements.If corxxm still exists about exposure levels or you do not comply with the above practices,you should always consult a qualified industrial hygienist or contact the manufacturer for further information. SDM105 GENERAL REQUIREMENTS: • Cemplank'lap siding can be installed over braced wood or steel studs spaced a maximum of 24 in.o.c.or directly to minimum 7/16 in.thick OSB sheathing.See general fastening requirements.Irregularities in framing and sheathing can mirror through the finished application. It, Information on installing Cemboard products over foam can be located in JH Tech Bulletin 19 at www.jamehardie.com It, A water-resistive barrier is required in accordance with local building code requirements.The water-resistive barrier must be appropriately installed with penetration and junction flashing in accordance with local building code requirements.Cemboard will assume no responsibility for water infiltration.James Hardie does manufacture HardieWrap®Weather Barrier,a non-woven non-perforated housewrap',which complies with building code requirements. • When installing Cemboard products all clearance details in figs.3-14 must be followed. • Adjacent finished grade must slope away from the building in accordance with local building codes-typically a minimum of 6 in.in the first 10 ft.. • Do not use Cemplank lap siding in fascia or trim applications. • Do not install Cemboard products,such that they may remain in contact with standing water. Figure 1 Double Wall Single Wall • Cemplank lap siding may be installed on flat vertical wall applications only. g construction construction • For larger projects,including commercial and multi-family projects,where the span of the water-resistive barrier let-in bracing wall is significant in length,the designer and/or architect should take into consideration the plywood or 24 in.o.c.max. coefficient of thermal expansion and moisture movement of the product in their design. OSB sheathing These values can be found in the Technical Bulletin"Expansion Characteristics of Cemboard"Siding Products"at www.JamesHardie.com. • DO NOT use stain,oil/alkyd base paint,or powder coating on Cemboard®Products. INSTALLATION: JOINTTREATMENT Figure 2 Place fastener One or more of the following joint treatment between 3/4 Ioptions are required by code(as referenced stud in.&1"from 2009 IRC R703.10.2) top of plank A.Joint Flashing(Cemboard recommended) - B.Caulking*(Caulking Is not recommended water- g ( g resistive Nail 3/8 in.from for Factory Built Color for aesthetic barrier edge of plank reasons as the Caulking and Factory -- 00° Built Color will weather noshing tng differently.For the same reason, ° HardieZone"' do not caulk nail heads on Cemplank'siding _water-resistive Factory Built Color products.) (_ ° °° e barrier C."H" jointer cover install planks in Y� °°0 0 0° fastener moderate contact at butt joints ° o 00 0 0 Install a 1 1/4 in.starter strip to 00 1150 ensure a consistent plank angle `Refer to Caulking section in these instructions. ° ° 'For additional information on HardieWrap°Weather Barrier,consult Cemboard at 1-866-4Hardie or www.hardiewrap.com leave appropriate gap between planks and trim,then caulk."' *DANGER:Do not breathe dust Fiber cement Is but a health hazard when handed or stored in its original,rauattered condition.The hazard associated with fiber cement arises from crystalline silica present in the dust generated by activities such as culling,rebating,drilling, from this product Respirable roubng.savdng,crushing,or othronvise abooding fbi cement,ad when cleaning up.disposing of or moving the dust When cleng any of these activities in a Interim that generates dot(1)follovi James Hardie instructions and best practices to reduce or limit the release of duct:(2)wam others in the area to avoid the dust:CJl when using mechanical saw or high speed cuffing teals,Work outrloas and use dust count=eguipmenC and(4)if no other dust controls are avaiable,rear a Crystalline Silica Dust causes MOSH-approveddust mask or respirator(e.g,ftN95dust now. damage to lungs and respiratory Peter to the product Safety Data Sheet before use.Do not handleprodutlunilallsaferyprecautionshe"beenreadandunderstood.Washhandsandlacetheroughlyallerhanding.Ifegpsedtodustacanigetc iiladvice.ltshortness system through prolonged of breathorotherhealth=amdevelopafterexposuretodusthamtheprodct.seekmedicalattention.DsposeofproductInaccordanceWithloW,stateandnagmalregulations.Ifthemamnoapplicableregulatom.daposeofinasecure landfill,or In a way that wig not expose others to dual. Or repeated inhalation. WARNING:This product contains a chemical knmm to the State of California to rause cancer,For more information go tuwww.inmarelogsca.gov/product. For more information contact:James Hardie Building Products,Inc.,231 S.LaSalle St.,Suite 2000,Chicago,IL 60604 USA 1-888 JHARDIE www.jameshardie.com www.jhsafesite.com CEM1610-P1/4 11/16 s r` South CLEARANCE AND FLASHING REQUIREMENTS Figure 3 Figure 4 Figure 5 Figure 6 Roof to Wall Horizontal Flashing Kickout Flashing Slabs,Path,Steps to Siding w Z-Flashing ' As re ulred code r 4*A' /'1 nfn4li x4in ., Min.''/a in. i } .,. 1 Do not caulk �a 1 in. Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Deck to Wall Ground to Siding Gutter to Siding Sheltered Areas Mortar/Masonry Jem - -F4ing Z Fla hmg Z-FI sh Min •� '� 6m j �1 - - f� I '#° �✓/ r Min.1z1n. m a Figure 12 Figure 13 Figure 14 Drip Edge Block Penetration Valley/Shingle Extension Recommended in NZ10 _ Mitt;1/a r � D FASTENER REQUIREMENTS**(Please refer to the applicable ESR report online to determine which fastener meets your wind load design criteria) Blind Nailing is the preferred method of installation for Cemplanke lap siding products.Face nailing should only be used where required by code for high wind areas and must not be used in conjunction with Blind nailing(Please see JH Tech bulletin 17 for exemption when doing a repair).Pin-backed corners may be done for aesthetic purposes Only.Pin-backs shall be done with finish nails only,and are not a substitute for blind or face nailing. BLIND NAILING FACE NAILING Nails-Wood Framing Nails-Wood Framing •Siding nail(0.09 in,shank x 0.221 in.HD x 2 in.long) •6d(0.113 in.shank x 0.267 in.HD x 2 in.long) •11 ga.roofing nail(0.121 in.shank x 0.371 in.HD x 1.25 in.long) •Siding nail(0.09 in.shank x 0.221 in.HD x 2 in.long) Screws-Steel Framing Screws-Steel Framing •Ribbed Wafer-head or equivalent(No.8 x 1 1/4 in.long x 0.375 in.HD)Screws •Ribbed Bugle-head or equivalent(No.8-18 x 1-5/8 in.long x must penetrate 3 threads into metal framing. 0.323 in.HD)Screws must penetrate 3 threads into metal framing. Nails-Steel Framing Nails-Steel Framing •ET&F Panelfast®nails or equivalent(0.10 in.shank x 0.313 in.HD x 1-1/2 in. •ET&F pin or equivalent(0,10 in.shank x 0.25 in.HD x 1-1/2 in.long) long)Nails must penetrate minimum 1/4 in,into metal framing. Nails must penetrate minimum 1/4 in.into metal framing. OSB minimum 7/16 in. OSB minimum 7/16 in. •11 ga.roofing nail(0.121 in.shank x 0.371 in.HD x 1.75 in,long) •Siding nail(0.09 in.shank x 0.221 in.HD x 1-1/2 in,long)" •Ribbed Wafer-head or equivalent(No.8 x 15/8 in.long x 0.375 in.HD). 241n.—­`stud O.C.max. Stud O.C.24"max � Figure 15 Figure 16 11/4 in.min. overlap I Minimum overlap for Both Face I I and Blind Nailing I _ - ° 3/4In:1 ink _ Blind Nall y— face nail min.1 1/4 in. overlap water-resistive Water Resistive I barrier 1114 in. Barrer over '" Laminate sheet to be removed immediately after installation of each course for ColorPlus®products. When face nailing to OSB,planks must be no greater than 91/4 in.wide and fasteners must be 12 in.o.c.or less. Also see General Fastening Requirements;and when considering alternative fastening options refer to Technical Bulletin USTB 17-Fastening Tips for Cemplane Lap Siding, CEM1610-P2/4 11/16 South GENERAL FASTENING REQUIREMENTS PNEUMATIC FASTENING Fasteners must be corrosion resistant,galvanized,or stainless steel. Cemboard products can be hand nailed or fastened with a pneumatic tool. Electro-galvanized are acceptable but may exhibit premature corrosion. Pneumatic fastening is highly recommended. Set air pressure so that the Cemboard recommends the use of quality,hot-dipped galvanized nails. fastener is driven snug with the surface of the siding.A flush mount Cemboard is not responsible for the corrosion resistance of fasteners, attachment on the pneumatic tool is recommended, This will help control the Stainless steel fasteners are recommended when installing Cemboard" depth the nail is driven.If setting the nail depth proves difficult,choose a products near the ocean,large bodies of water,or in very humid climates. setting that under drives the nail, (Drive under driven nails snug with a smooth faced hammer-Does not apply for installation to steel framing). Manufacturers of ACQ and CA preservative-treated wood recommend spacer materials or other physical barriers to prevent direct contact of ACQ or CA preservative-treated wood and aluminum products.Fasteners used to attach countersunk, 0 HardieTrim Tabs to preservative-treated wood shall be of hot dipped fill&add nail zinc-coated galvanized steel or stainless steel and in accordance to 2009 IRC snug flush DO NOT DO NOT 8317.3 or 2009 IBC 2304.9.5. under drive nails staple Figure A Figure B p • Consult applicable product evaluation or listing for correct fasteners type and placement to achieve specified design wind loads. PAINTING • NOTE:Published wind loads may not be applicable to all areas where Local DO NOT use stain,oil/alkyd base paint,or powder coating on cem"Ira"Products. Building Codes have specific jurisdiction,Consult Cemboard Technical Cemboard products must be painted within 180 days for primed product and 90 Services if you are unsure of applicable compliance documentation, days for unprimed.100%acrylic topcoats are recommended. • Drive fasteners perpendicular to siding and framing. Do not paint when wet.For application rates refer to paint manufacturers • Fastener heads should fit snug against siding(no air space).(fig,A) specifications.Back-rolling is recommended if the siding is sprayed. • Do not over-drive nail heads or drive nails at an angle. CUT EDGE TREATMENT • If nail is countersunk,fill nail hole and add a nail.(fig.B) • For wood framing,under driven nails should be hit flush to the plank with a Caulk,paint or prime all field cut edges. hammer(For steel framing,remove and replace nail). • Do not use aluminum fasteners,staples,or clipped head nails. CAULKING For best results use an Elastomeric Joint Sealant complying with ASTM C920 Grade NS,Class 25 or higher or a Latex Joint Sealant complying with ASTM C834.Caulking/Sealant must be applied in accordance with the caulking/sealant manufacturer's written instructions.Note:Some caulking manufacturers do not allow tooling. FACTORY BUILT COLOR CAULKING,TOUCH-UP& LAMINATE •Care should be taken when handling and cutting Cemboard"Factory Built Color products.During installation use a wet soft cloth or soft brush to gently wipe off any residue or construction dust left on the product,then rinse with a garden hose. •Touch up nicks,scrapes and nail heads using the Factory Built Color touch-up applicator.Touch-up should be used sparingly. If large areas require touch-up,replace the damaged area with new Cemplank,lap siding with Factory Built Color. •Laminate sheet must be removed immediately after installation of each course. •Terminate non-factory cut edges into trim where possible,and caulk.Color matched caulks are available from your Factory Built Color product dealer. •Treat all other non-factory cut edges using the Factory Built Color edge coaters,available from your Factory Built Color product dealer. Note:Cemboard does not warrant the usage of third parry touch-up or paints used as touch-up on Cemboard Factory Built Color products. Problems with appearance or performance arising from use of third parry touch-up paints or paints used as touch-up that are not Cemboard touch-up will not be covered under the Cemboard Factory Built Color Limited Finish Warranty, RE-PAINTING CEMBOARD"SIDING AND TRIM PRODUCTS WITH FACTORY BUILT COLOR When repainting Factory Built Color products,Cemboard recommends the following regarding surface preparation and topcoat application: •Ensure the surface is clean,dry,and free of any dust,dirt,or mildew •Repriming is normally not necessary •100%acrylic topcoats are recommended •Apply finish coat in accordance with paint manufacturers written instructions regarding coverage,application methods,and application temperature CEM1610-P3/4 11/16