REPORT OF FOUNDATION PAD COMPACTION
Client:
Drawdy Brothers
2945 West Midway Road
Fort Pierce, FL 34982
2959, 2961, 2963 West Midway Road
Fort Pierce, St. Lucie County, Florida
Foundation Pad
Report Date:
Project No:
Lab No:
Permit No:
June 15, 2007
1314
1
0703-0417
Site:
Density tests and Hand Cone Penetrometer (HCP) readings were made at a minimum of three locations in
the building pad. Density tests were performed in the upper one foot of fill. HCP readings were taken in
hand auger boreholes at one foot intervals from slab grade through the depth of fill. The density tests were
performed in general compliance with ASTM D 2922. The HCP test, in conjunction with information about
the soil type, is empirically correlated to the relative density of subsurface soils.
Density Date Elevation Dry Density (pst) Percent
Test No. Tested Location (feet) In Place Proctor Compaction
1 6/15/07 Northwest Comer 0-1 116.4 117.2 99.3
2 Center Area 0-1 115.5 117.2 98.5
3 Southeast Comer 0-1 115.8 117.2 98.8
*. All elevations are below bottom of slab.
The depth of the fill was approximately one foot. The fill should extend at least five feet beyond the
building perimeter. At the time of our testing no information was available regarding the foundation pad
setbacks.
In the locations and depths that were tested, the fill has been compacted to a minimum of 95 percent of the
modified Proctor maximum dry density (ASTM D 1557). No soil borings were performed below the
recently placed fill.
Distribution:
Client - 3
Submitted by:
A. M. NGINEERlNG AND TESTING, INc.
t:.µo/D 7
Paul C. Martin, P.E.
Florida Registration No. 65051
PCMlah
\\Server-ame\company\AM Data\Drawdy Brothers - Various - 1314\1 - 2959, 2961, 2963 West Midway Rd., Fort Pierce _ Pad w.
Fill. doc
0<1(1
103" 1)1
ø tp~~
RECE!VED
8t Lucie County Inspections JUN 2 O· 2007
2300 Virginia A venue
· FL 34982 Pub'ic Vlorks
Ft PIerce, , St. Lucie County, FL
(772) 462-2172
I. CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREA TMENT
PERMIT # O/éi, - OL{ (7 JOB ADDRESS 215~ - 2 '1 ¿, JvJ ¡tv1._!~ w+r vi ~
BmLDER
<í5-os
PEST CONTROL CONTRACTOR '\ \ \ S e.tJ\ ENV \HJ~ /Vle;d\/V'\ ~-&-V CL-{
~ß- 9Yl\~S
PEST CONTROL LICENSE #
We, the undersigned, hereby certify that we have pretreated the above..described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 4Zoò Chemicals used: &, M 7C-
Percentage of solution:
i::<S 10
Total gallons used:
"~ll)
Date of treatment: ~ -- / 9 - 0 ')
Time of Treatment:
QFooting
r:J 1st Treatment
AI. 0 Re~treat
~Slab
, ~st Treatment
aRe-treat
o Driveway
o 1st Treatment
ORe-treat
Q Pools
CJ 1st Treatment
ORe-treat
LJ Other
o 1st Treatment
I:J Re-treat
LJ Perimeter for Final Inspectîon
FBCI04.2.6 Certificått òf Protective Treattne11J. for prevention Qftermites,
A. weather resistant jobsitt! posting board shall be provided to receive
duplicO,te Treåtment Cert~ate$ a.~ each required protective treatment is
completed., providing a copy for the person the permit is issued to and
another copy for the buildin.g permit files. The Treatment Certificate shall
pravíde the product u.sed, identity of the applicaror, time and date of the
treatment, site location. area treated. chemica.l u$ed. þètCe11t concentration
and number of gallons used, to establish a verifiable record of protective
treatment. if the soil chemical barrier method för tennite preven.tion is used,
final exterior treatment .'ìltall be completed prior to final building approval.
St Lucie County requires for the final inspection foJ:' CO, a Permanent
SUcker to be placed on the electrical pane) box cover, listing QI) the
treatments and dates of applications..
NOTE:
There must be a cQmpleted form for each required treatmen..t or re-treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or lhé scheduled inspection will
fail and a l'e.in.~pe(;ti()n fee charged.
Rt"isf:d 6/13102 dmg