HomeMy WebLinkAboutCALCSFORM R405-2017
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2077 Florida Building Code, Energy Conservation via the residential
Simulated Performance method shall include:
❑ This Checklist
❑ A FORM 405 report that documents that the Proposed Design complies with Section R405.3 of the Florida
Energy Code. This form shall include a summary page indicating home address, e-ratio and the pass or fail
status along with summary areas and types of components, whether the home was simulated as a worst -case
orientation, name and version of the compliance software tool, name of individual completing the compliance
report (one page).
❑ An input summary checklist that can be used for field verification (usually 4 pages/may be greater).
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO for the Performance method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table 402.4.1.1 - one page)
❑ A completed Form 2017 Envelope Leakage Test Report (usually one page). Section R402.4 or R402.4.1.2
exceptions may apply.
❑ If FORM R405 duct leakage type indicates anything other than "default leakage", then a completed FORM R405
Duct Leakage Test Report (usually one page).
2020-Feb-13 09:22:17
lh/Plightso t' Right-Suite(D Universal 2019 19.0.15 RSU27054 Right -Energy RO Florida 2017 Section 405.4.1 Compliant Software Page 1
N... ... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: Gardner Residence
Builder Name: Groza Builders, Inc
Street: TBD Dunn Rd
Permit Office:
City, State, Zip: Port St Lucie, FL 34983
Permit Number:
Owner: Gardner Residence
Jurisdiction: St Lucie
Design Location: FL, St Lucie Co Intl
County: St Lucie (Florida Climate Zone 2)
1. New construction or existing New (From Plans)
9. Wall types (2016 ft2)
Insulation (R) Area (ft2)
2. Single family or multiple family Single -Family
a. Blk Wall, Stucco Ext, 8" Thk, R-
9.0 1877.75
b. Frm Wall, 112" DW Ext, R-11 Cav
11.0 138.00
3. Number of units, if multiple family 1
c. N/A
4. Number of bedrooms 4
d. N/A
10. Ceiling types (2104 ft2)
Insulation (R) Area (ft2)
5. Is this a worst case? No
a. Attic, Shingle Roof, R-30 Ceil 1
30.0 2103.50
6. Conditioned floor area above grade (ft2) 2103.50
b. N/A
Conditioned floor area below grade (ft2) 0
c. N/A
7. Windows 362 ft2 Description Area ft2
( ) p ( )
11. Ducts R Area (ft2)
a.Sup: House Attic, Ret: House Attic, AH: House Attic 6.0 461.33
a. U-Factor: Dbl Impact, 0.310 54.17
b,
SHGC: 0.19
b. U-Factor: Dbl Impact, 0.300 255.70
12. Cooling systems
kBtu/hr Efficiency
SHGC: 0.21
a.Split air conditioner
39.5 SEER: 16.0
c. U-Factor: Dbl Impact, 0.300 52.00
b•
SHGC: 0.28
13. Heating systems
kBtu/hr Efficiency
d. U-Factor:
a.Electric furnace
0.0 AFUE: 80.0
SHGC:
b.
Area Weighted Average Overhang Depth: 3.225 ft
14. Hot water systems
Area Weighted Average SHGC: 0.217
a.Electric conventional (40 gal)
Cap: 40 gal
EF: 0.96
8. Floor types (2103.50 ft2) Insulation (R) Area (ft2)
b.Conservation features
a. On grade depth, Tile fir fnsh 0.0 2103.50
(None)
b. N/A
c. N/A
15. Credits None
Glass/Floor area: 0.172 Total Proposed Modified Loads: 56.69
PASS
Total Baseline
Loads: 63.67
I hereby certify that the plans and specifications covered by
Review of the plans and specificationst1E
STD r
this calculation are in compliance with the Florida Energy
covered by this calculation indicates
4�� r•u�
w= dt
Code.
compliance with the Florida Energy
Code. Before is
`
y'<, r 7rv",
l /
PREPARED BY:
construction completed,
this building will be inspected for
1-0 "qr'.y
[�
compliance with Section 553.908
DATE: 02/13/2020
Florida Statutes.
t7� lyAk •
I hereby certify that this building s designe , is in
r.�
the Florid
c00 WE
compliance with gy
OWNER/AGENT:
BUILDING OFFICIAL:
DATE: S-'45-
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50 (R402.4.1.2).
2020-Feb-13 09:22:17
wrightsofk` Rig ht-Suite@Universal201919.0.15 RSU27054 Rig ht-Energy® Florid a2017 Section405.4.1 Compliant Software Page
... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
Building Input Summary Report
PROJECT
Title:
Gardner Residence
Bedrooms: 4
Address type:
Street address
Building Type: FLAsBuilt
Bathrooms: 3
Lot#:
Owner:
Gardner Residence
Conditioned Area: 2104
Block/Subdivision:
# of Units: 1
Total Stories: 1
Platbook:
Builder
Name: Groza Builders, Inc
Worst Case: No
Street:
TBD Dunn Rd
Permit Office:
Rotate An le: 0
County:
St Lucie
Jurisdiction:
St Lucie
Cross Ventilation: No
City, State, Zip:
Port St
Lucie,
FL
34983
Family
Type: Single -Family
Whole House Fan: No
New/ New (From Plans)
Terrain: Ocean/Lake
Year Construct:
Shielding: Suburban
Comment:
CLIMATE
IECC Design Temp Int Design Temp
Heating
Design
Daily Temp
f
Design Location
TMY Site Zone 97.5 % 2.5 % Winter
Summer
Degree Days
Moisture
Range
FL, St Lucie Co Intl
FL_Fort_Pierce 2 41 90 70 75
486
57
Low
BLOCKS
#
Name
Area Volume
1
House
2103.50 ft2 17966.13 ft3
SPACES
#
Area
Volume Kitchen Occupants Bedrooms InfilID
Finished
Cooled
Heated
1
Guest House 197.50 ft2
1580.00 ft3 No 0
1 1
Yes
Yes
Yes
2
Master Suite 288.00 ft2
2304.00 f? No 0
1 1
Yes
Yes
Yes
3
WIC 51.75 ft2
414.00 ft3 No 0
0 1
Yes
Yes
Yes
4
Bed 2 159.75 ft2
1278.00 ft3 No 0
1 1
Yes
Yes
Yes
5
Laundry 42.25 ft2
338.00 ft3 No 0
0 1
Yes
Yes
Yes
6
Bath 2 55.25 ft2
442.00 ft3 No 0
0 1
Yes
Yes
Yes
7
Bed 3 186.00 ft2
1488.00 f? No 0
1 1
Yes
Yes
Yes
8
Master Bath 97.50 ft2
780.00 ft3 No 0
0 1
Yes
Yes
Yes
9
Hallway 139.50 ft2
1116.00 f? No 0
0 1
Yes
Yes
Yes
10
Linen 8.75 ft2
70.00 ft3 No 0
0 1
Yes
Yes
Yes
11
Pantry 38.50 ft2
308.00 ft3 No 0
0 1
Yes
Yes
Yes
12
Wtr Htr 14.00 ft2
112.00 ft3 No 0
0 1
Yes
Yes
Yes
13
Kitchen/Nook 330.00 W
3135.00 ft3 Yes 2
0 1
Yes
Yes
Yes
14
Great Room 428.75 ft2
4073.13 ft3 No 2
0 1
Yes
Yes
Yes
15
Guest Bath 48.00 ft2
384.00 ft3 No 0
0 1
Yes
Yes
Yes
16
G Clst 18.00 ft2
144.00 ft3 No 0
0 1
Yes
Yes
Yes
FLOORS
(Total Exposed Area = 2104 sq.ft.)
#
Floor Type
Space Perimeter R-Value Area
Ll-Factor
Tile Wood
Carpet
1
On grade depth, Tile fir fnsh
Guest House 37 ft 0
197.50 ft2
0.989
1.0
0
0
2
On grade depth, Tile flr fnsh
Master Suite 34 ft 0
288.00 ft2
0.989
1.0
0
0
3
On grade depth, Tile flr fnsh
WIC 5 ft 0
51.75 ft2
0.989
1.0
0
0
4
On grade depth, Tile fir fnsh
Bed 2 11 ft 0
159.75 ft2
0.989
1.0
0
0
5
On grade depth, Tile flr fnsh
Laundry 0 ft 0
42.25 ft2
0.989
1.0
0
0
6
On grade depth, Tile fir fnsh
Bath Z 0 ft 0
55.25 ft2
0.989
1.0
0
0
7
On grade depth, Tile flr fnsh
Bed 3 31 ft 0
186.00 ft2
0.989
1.0
0
0
8
On grade depth, Tile fir fnsh
Master Bath 7 ft 0
97.50 ft2
0.989
1.0
0
0
9
On grade depth, Tile flr fnsh
Hallway 5 ft 0
139.50 ft2
0.989
1.0
0
0
10
On grade depth, Tile flr fnsh
Linen 0 ft 0
8.75 ft2
0.989
1.0
0
0
11
On grade depth, Tile flr fnsh
Pantry 0 ft 0
38.50 ft2
0.989
1.0
0
0
12
On grade depth, Tile flr fnsh
Wtr Htr 4 ft 0
14.00 ft2
0.989
1.0
0
0
13
On grade depth, Tile flr fnsh
Kitchen/Nook 37 ft 0
330.00 ft2
0.989
1.0
0
0
14
On grade depth, Tile flr fnsh
Great Room 42 ft 0
428.75 ft2
0.989
1.0
0
0
15
On grade depth, Tile flr fnsh
Guest Bath 8 ft 0
48.00 ft2
0.989
1.0
0
0
16
On grade depth, Tile flr fnsh
G Clst 3 ft 0
18.00 ft2
0.989
1.0
0
0
ROOF
Roof Gable Roof
Solar SA
Emitt
Emitt
Deck Pitch
/ #
Type Materials Area Area Color
Absor. Tested
Tested
Insul. (deg)
1
Hip RoofAsph
2279 ft2 Medium
0.75 No
0.90
No
0
23
2
Hip RoofAsph 557 ft2 Medium
0.75 No
0.90
No
0
23
2020-Feb-13 09:22:17
wrightsaft" Right -Suite® Universal201919.0.15 RSU27054 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page
HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MA Front Door faces: N
FORM R405-2017
ATTIC
✓
#
Type Ventilation
Vent Ratio (1 in)
Area RBS
IRCC
1
Full attic
Vented
300
2103.50ft2 N
N
2
Full attic
Vented
300
514.50 ft2 N
N
CEILING
(Total Exposed Area = 2104 sq.ft.)
✓
#
Ceiling Type
Space
R-Value U-Factor
Area
Framing Fraction Truss Type
1
Attic, Shingle Roof, R-30 Ceil Ins,
Guest House
30
0.034
197.50 ft2
0.10
Wood
2
Attic, Shingle Roof, R-30 Ceil Ins,
Master Suite
30
0.034
288.00 ft2
0.10
Wood
3
Attic, Shingle Roof, R-30 Ceil Ins,
WIC
30
0.034
51.75 ft2
0.10
Wood
4
Attic, Shingle Roof, R-30 Ceil Ins,
Bed 2
30
0.034
159.75 ft2
0.10
Wood
5
Attic, Shingle Roof, R-30 Ceil Ins,
Laundry
30
0.034
42.25 ft2
0.10
Wood
6
Attic, Shingle Roof, R-30 Ceil Ins,
Bath 2
30
0.034
55.25 ft2
0.10
Wood
7
Attic, Shingle Roof, R-30 Ceil Ins,
Bed 3
30
0.034
186.00 ft2
0.10
Wood
8
Attic, Shingle Roof, R-30 Ceil Ins,
Master Bath
30
0.034
97.50 ft2
0.10
Wood
9
Attic, Shingle Roof, R-30 Ceil Ins,
Hallway
30
0.034
139.50 ft2
0.10
Wood
10
Attic, Shingle Roof, R-30 Ceil Ins,
Linen
30
0.034
8.75 ft2
0.10
Wood
11
Attic, Shingle Roof, R-30 Ceil Ins,
Pant
30
0.034
38.50 ft2
0.10
Wood
12
Attic, Shingle Roof, R-30 Ceil Ins,
Wtr H�r
30
0.034
14.00 ft2
0.10
Wood
13
Attic, Shingle Roof, R-30 Ceil Ins,
Kitchen/Nook
30
0.034
330.00 ft2
0.10
Wood
14
Attic, Shingle Roof, R-30 Ceil Ins,
Great Room
30
0.034
428.75 ft2
0.10
Wood
15
Attic, Shingle Roof, R-30 Ceil Ins,
Guest Bath
30
0.034
48.00 ft2
0.10
Wood
16
Attic, Shingle Roof, R-30 Ceil Ins,
G Clst
30
0.034
18.00 W
0.10
Wood
WALLS
(Total Exposed Area = 2016 sq.ft.)
Adjacent
Cavity
Width
Height
Sheathing
U- Frm. Solar
Below
✓
#
Ornt
To Wall Type
Space
R-Value
Ft In
Ft In
Area R-Value
Factor Frac. Absor.
Grade%
1
SE
Exterior Blk Wall, Stucco
Guest House
9
15 6
8 0
124.0 ft2 0
0.089 0.22 0.75
0
2
SW
Exterior Blk Wall, Stucco
Guest House
9
17 0
8 0
136.0 ft2 0
0.089 0.22 0.75
0
3
NW
Exterior Blk Wall, Stucco
Guest House
9
4 6
8 0
36.0 ft2 0
0.089 0.22 0.75
0
4
-
Partition Frm Wall, 1/2" DW
Guest House
11
11 3
8 0
90.0 ft2 0
0.101 0.25 0.75
0
5
NE
Exterior Blk Wall, Stucco
Master Suite
9
15 0
8 0
120.0 ft2 0
0.089 0.22 0.75
0
6
SE
Exterior Blk Wall, Stucco
Master Suite
9
18 6
8 0
148.0 ft2 0
0.089 0.22 0.75
0
7
SE
Exterior Blk Wall, Stucco
WIC
9
4 6
8 0
36.0 ft2 0
0.089 0.22 0.75
0
8
SE
Exterior Blk Wall, Stucco
Bed 2
9
10 6
8 0
84.0 ft2 0
0.089 0.22 0.75
0
9
SE
Exterior Blk Wall, Stucco
Bed 3
9
12 6
8 0
100.0 ft2 0
0.089 0.22 0.75
0
10
SW
Exterior Blk Wall, Stucco
Bed 3
9
18 0
8 0
144.0 ft2 0
0.089 0.22 0.75
0
11
NE
Exterior Blk Wall, Stucco
Master Bath
9
6 6
8 0
52.0 ft2 0
0.089 0.22 0.75
0
12
SW
Exterior Blk Wall, Stucco
Hallway
9
4 6
8 0
36.0 ft2 0
0.089 0.22 0.75
0
13
NE
Exterior Blk Wall, Stucco
Wtr Htr
9
3 6
8 0
28.0 ft2 0
0.089 0.22 0.75
0
14
NE
Exterior Blk Wall, Stucco
Kitchen/Nook
9
15 0
9 6
142.5 ft2 0
0.089 0.22 0.75
0
15
NW
Exterior Blk Wall, Stucco
Kitchen/Nook
9
22 0
9 6
209.0 ft2 0
0.089 0.22 0.75
0
16
SW
Exterior Blk Wall, Stucco
Great Room
9
17 6
9 6
166.3 ft2 0
0.089 0.22 0.75
0
17
NW
Exterior Blk Wall, Stucco
Great Room
9
24 0
9 6
228.0 ft2 0
0.089 0.22 0.75
0
18
NW
Exterior Blk Wall, Stucco
Guest Bath
9
8 0
8 0
64.0 ft2 0
0.089 0.22 0.75
0
19
-
Partition Frm Wall, 1/2" DW
Guest Bath
11
6 0
8 0
48.0 ft2 0
0.101 0.25 0.75
0
20
NW
Exterior Blk Wall, Stucco
G Clst
9
3 0
8 0
24.0 ft2 0
0.089 0.22 0.75
0
DOORS
(Total Exposed Area = 37 sq.ft.)
Width
Height
#
Ornt Door Type
Space
Storms
U-Value Ft In
Ft In Area
1
NW Door, Mtl Fbrgl Type
Guest House
None
0.127 2 7
6 7
17.0 ft2
2
NE Door, Mt l Fbrgl Type
Kitchen/Nook
None
0.127 3 0
6 7
19.8 ft2
WINDOWS
(Total Exposed Area = 362 sq.ft.)
Wall
Overhang Interior
✓
#
Ornt ID Frame Panes
NFRC
U-Factor
SHGC Impact Area Depth
Separation Shade
Screening
1
SE 1 Vinyl Low-E Double
Yes
0.310
0.19
Yes
15.6ft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
2
SW 2 Vinyl Low-E Double
Yes
0.310
0.19
Yes
15.6ft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
3
NE 5 Vinyl Low-E Double
Yes
0.310
0.19
Yes
23.Oft2 5 ft 0 in
1 ft 0 in Blinds 45°
outdoor
4
SE 6 Vinyl Low-E Double
Yes
0.300
0.21
Yes
23.Oft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
5
SE 8 Vinyl Low-E Double
Yes
0.300
0.21
Yes
15.6ft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
6
SE 9 Vinyl Low-E Double
Yes
0.300
0.21
Yes
23.Oft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
7
SW 10 Vinyl Low-E Double
Yes
0.300
0.21
Yes
23.Oft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
8
NE 14 Vinyl Low-E Double
Yes
0.300
0.21
Yes
18.Oft2 2 ft 0 in
1 ft 0 in Blinds 45°
outdoor
9
NW 15 Vinyl Low-E Double
Yes
0.300
0.21
Yes
18.Oft2 2 ft 0 in
1 ft 0 in Blinds 45'
outdoor
10
NW 15 Vinyl Low-E Double
Yes
0.300
0.21
Yes
31.2ft2 2 ft 0 in
1 ft 0 in Blinds 45'
outdoor
11
SW 16 Vinyl Low-E Double
Yes
0.300
0.21
Yes
52.Oft2 8 ft 0 in
1 ft 0 in None
None
12
SW 16 Vinyl Low-E Double
Yes
0.300
0.21
Yes
10.4ft2 8 ft 0 in
1 ft 0 in Blinds 45'
outdoor
13
NW 17 Vinyl Low-E Double
Yes
0.300
0.28
Yes
13.Oft2 2 ft 0 in
1 ft 0 in None
None
14
NW 17 Vinyl Low-E Double
Yes
0.300
0.21
Yes
41.6ft2 2 ft 0 in
2
1 ft 0 in Blinds 45°
outdoor
GARAGE
✓
#
Floor Area Ceiling Area Exposed Wall Perimeter
Avg. Wall Height
Exposed Wall Insulation
2020-Feb-13 09:22:17
wrightsof#° Right -Suite® Universal 2019 19.0.15 RSU27054 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page
,_ ,,..,,., ,.,L .- -,,,., ... HVAC\TBD Dunn Rd PSL Gardner Residence GBLrup Calc = MJ8 Front Door faces: N
lZ:nDr%A DAOr,-')017
INFILTRATION
Scope
Method
SLA CFM 50 ELA
E LA
ACH
ACH 50
1 Wholehouse Simplified
0.000381 2096 115.3
216.5
0.53
7.00
HEATING SYSTEM
✓ #
System Type
Subtype Efficiency
Capacity
Block
Ducts
1
Electric furnace
AFUE: 80.0
0.0 kBtu/hr
1
s s#1
COOLING SYSTEM
✓ #
System Type
Subtype Efficiency
Capacity Air Flow
SHR Block
Ducts
1
Split air conditioner
SEER: 16.0 39.5 kBtu/hr 1317 cfm
0.70 1
s s#1
HOT WATER SYSTEM
✓ #
System Type Subtype Location EF Cap
Use
SetPnt
Conservation
1 Electric conventional
0.96 40 gal
70 gal
120 °F
None
DUCTS
--------- Supply ---------
✓ # Location R-Value Area
--------- Return ---------
Location Area Leakage Type
Air
Handier
CFM 25 Percent
Out Leakage
HVAC #
QN RLF Heat Cool
1 House Attic 6.0 461 ft2
House Attic 234 ft2 Default Leakage
House Attic
(Default) 6.00
1 1
TEMPERATURES
Programmable Thermostat: Y
Cooling [ X ]Jan [ X] Feb [X] Mar
Heating [ X ]Jan [ X] Feb [X] Mar
Venting X ]Jan [ X] Feb X Mar
Ceiling Fans:
[ X] Apr [ X] May [ X] Jun [ X] Jul
[ X] Apr [ X] May [ X] Jun [ X] Jul
[X]Apr [X]May [ X Jun X Jul
[ X] Aug
[ X] Aug
X Aug
[ X] Sep [ X] Oct [ X] Nov
[ X] Sep [ X] Oct [ X] Nov
[ X Sep X Oct X] Nov
[ X] Dec
[ X] Dec
X] Dec
Thermostat Schedule: Florida Building Code, 6th Edition Hours
Schedule Type (2017) 1 2 3 4 5 6 7
8 9
10 11
12
Cooling (WD)
Cooling (WEH)
Heating (WD)
Heating (WEH)
AM 75
PM 75
AM 75
PM 75
AM 72
PM 72
AM 72
PM 72
75 75 75 75 75
75 75 75 75 75
75 75 75 75 75
75 75 75 75 75
72 72 72 72 72
72 72 72 72 72
72 72 72 72 72
72 72 72 72 72
75
75
75
75
72
72
72
72
75 75
75 75
75 75
75 75
72 72
72 72
72 72
72 72
75 75
75 75
75 75
75 75
72 72
72 72
72 72
72 72
75
75
75
75
72
72
72
72
2020-Feb-13 09:22:17
wrl htsofk' Right-Suite@)Uni,ersal20l9l9.0.15 RSU27054 Right -Energy® Florida2017 Section405.4.1 Compliant Software Pages
, , —,: „ ... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX = 89
The lower the EnergyPerformance Index, the more efficient the home.
1. New home or addition
2. Single-family or multiple -family
3. Number of units, if multiple -family
4. Number of bedrooms
5. Is this a worst case? (yes/no)
6. Conditioned floor area (ft2)
7. Windows, type and area*
a. U-Factor:
b. Solar Heat Gain Coefficient (SHGC)
c. Area (ft2)
8. Skylights
a. U-Factor:
b. Solar Heat Gain Coefficient (SHGC)
9. Floor type, insulation level
a. Slab -on -grade (R-value):
b. Wood, raised (R-value):
c. Concrete, raised (R-value)
10 Wall type and insulation:
a. Exterior:
1. Wood frame (Insulation R-value)
2. Masonry (Insulation R-value):
b. Adjacent:
1. Wood frame (Insulation R-value)
2. Masonry (Insulation R-value):
11. Ceiling type and insulation level
a. Under attic (R-value):
b. Single assembly (R-value):
c. Knee walls/skylight walls (R-value)
d. Radiant barrier installed
1. New (From Plans) 12. Ducts, location & insulation level
a. Supply ducts:
R
6.0
2. Single
-Family
b. Return ducts:
R
6.0
c. AHU location:
House
Attic
3.
1
13. Cooling systems
Capacity
39.5
4.
4
a. Split system:
SEER
16.00
b. Single package:
SEER
5.
No
c. Ground/water source: SEER/COP
d. Room unit/PTAC:
EER
6.
2103.50
e. Other:
14. Heating systems
Capacity
0.0
7aDbl Impact,
0.310
a. Split system heat pump:
HSPF
7b.
0.19
b. Single package heat pump:
HSPF
7c.
54.17
c. Electric resistance:
COP
80.00
d. Gas furnace, natural gas:
AFUE
e. Gas furnace, LPG:
AFUE
8a.
f. Other:
8b.
15. Water heating systems
a. Electric resistance:
EF
0.960
9a.
0.0
b. Gas fired, natrual gas:
EF
9b.
c. Gas fired, LPG:
EF
9c.
d. Solar system with tank:
EF
e. Dedicated heat pump with tank:
EF
f. Heat recovery unit:
HeatRec%
g. Other:
10a1.
10a2.
9
16. HVAC credits claimed (Performance
Method)
a. Ceiling fans:
10b1.
11
b. Cross ventilation:
10b2.
c. Whole house fan:
d. Multizone cooling credit:
e. Multizone heating credit:
11 a.
30.0
f. Programmable thermostat:
Yes
11 b.
11 c.
11d.
*Label required by Section 303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation,th rough the above energy saving features
which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature: Date:-25-2,�
Address of New Home: TBD Dunn Rd
City/FL Zip: Port St Lucie, FL 34983
2020-Feb-13 09:22:17
wrightSOfk' Rig ht-Suite®Universal201919.0.15 RSU27054 Right-Energyn0 Florida2017 Section405.4.1 Compliant Software Page
I-0 - ... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
Florida Building Code, Energy Conservation, 6th Edition (2017)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: TBD Dunn Rd PERMIT #:
Port St Lucie, FL 34983
MANDATORY REQUIREMENTS - See individual code sections for full details.
SECTION R401 GENERAL
I/
R401.3 Energy Performance Level (EPL) display card (Mandatory). The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the plans
and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD.
R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comp ry with Section C402.5.
R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing
methods between dissimilar materials shall allow for differential expansion and contraction.
El R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
w ith the manufacturer's instructions and the criteria listed in Table 402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended
weatherstripping or other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond
intended infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeledin accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight-figging doors on masonry fireplaces,the doors shall be listed and labeled in accordance with UL 907.
ElR402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per
square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or
AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
2020-Feb-13 09:22:17
weightsoft" Right -Suite® Universal 2019 19.0.15 RSU27054 Right -Energy® Florida 2017 Section 405.4.1 Compliant Software Page 7
,u10•;.,,,,e.,4r„ter, , ., ... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Cale = MJ8 Front Door faces: N
FORM R405-2017
MANDATORY REQUIREMENTS -(Continued)
rl R402.4.4 Rooms containing fuel -burning appliances In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent apliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
rl R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
rl R403.1 Controls
R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
R403.3.2 Sealing (Mandatory). All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7),
Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design air flow rate when tested in accordance with ASHRAE 193.
❑ R403.3.3 Duct testing. Ducts shall be pressure tested to determine air leakage by one of the following methods:
Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
❑ R403.3.5 Building Cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C)
or below 55°F (13°C) shall be insulated to a minimum of R-3.
❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). Heated water circulation systems shall be in
accordance with Section R403.5.1.1. Heat trace termperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
ElR403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe
shall be dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for how water within the
occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there is no demand for hot water.
❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems
shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance
with the times when heated water is used in the occupancy.
2020-Feb-13 09:22:17
wrightspft" Right -Suite® Universal 2019 19.0.15 RSU27054 Right -Energy® Florida 2017 Section 405.4.1 Compliant Software Page 8
4104".1, 0.. „y h,,,,., ... HVAC\TBD Dunn Rd PSL Gardner Residence GBLrup Calc = MJ8 Front Door faces: N
FORM R405-2017
MANDATORY REQUIREMENTS -(Continued)
R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat
traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 1/2 inches (89 mm) in the hot water distribution line and cold water line located as close as
possible to the storage tank.
❑ R403.5.6 Water heater efficiencies (Mandatory).
❑ R403.5.6.1 Storage water heater temperature controls.
❑ R403.5.6.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be from 100°F to 140°F (38°C to 60°C).
❑ R403.5.6.1.2 shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied
to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s)
of combustion types of service water heating systems to be turned off.
R403.5.6.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment
installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the
appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1.
rl R403.5.6.2.1 Solar water heating system. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
❑ R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida
Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including:
Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the
ventilation system is not operating.
❑ R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by
an electronically commutated motor.
❑ R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure of for mechanical
ventilation shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum or R-19, space permitting, or R-10 otherwise.
❑ R403.7 Heating and cooling equipment (Mandatory).
❑ R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, heating and cooling calculation
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
CFM
MINIMUM EFFICACY (a)
CFM/WATT
AIRFLOW RATE MAXIMUM
CFM
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
< 90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm - 28.3 L/min.
(a) When tested in accordance HVI Standard 916
2020-Feb-13 09:22:17
VVrightSQft" Right -Suite® Universal 2019 19.0.15 RSU27054 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page
0 1, ,- ., ,,i,-,,,., HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
MANDATORY REQUIREMENTS -(Continued)
R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is
less than the calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the
capacity of equipment may be sized in accordance with good design practice.
El R403.7.1.2 Heating equipment capacity.
R403.7.1.2.1 Heat pumps Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
El R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1
R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
C403 and C404 of the IECC—Commercial Provisions in lieu of Section R403.
❑ R403.9 Snow melt and ice system controls (Mandatory). Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the systemw hen the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that w ill allow shutoff when the outdoor temperature is above 40oF (4.8°C).
R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
❑ R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operations.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant cover on or at
the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
Ri ht-Suite@ Universal RSU27054 Ri ht-Ener ® Florida017 Section Compliant
tAIFIIS�t1tS��" 9 9 9Y P � Page 10
HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
MANDATORY REQUIREMENTS - (Continued)
❑ R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
rl R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be
high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps.
Exception: Low -voltage lighting.
0 R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
2020-Feb-13 09:22:17
wrllsgh#oRight-SuiteOO Universal 2019 19.0.15 RSU27054 Right -Energy® Florida 2017 Section 405.4.1 Compliant Software Page 11
, HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Gardner Residence Builder Name Groza Builders, Inc
Street: TBD Dunn Rd Permit Office:
City, State, Zip: Port St Lucie, FL 34983 Permit Number:
Owner: Gardner Residence Jurisdiction: St Lucie
Design Location: FL, St Lucie Co Intl
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
v%
General
A continuous air barrier shall be installed in the
requirements
q
building envelope. The exterior thermal envelope
Air-permeableinsulation shall not be used as a
p
g
❑
contains a continuous barrier. Breaks or joints in the
air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit
The insulation in any dropped ceiling/soffit
shall be aligned with the insulation and any
shall be aligned with the air barrier.
gaps in the air barrier shall be sealed.
❑
Access openings, drop down stairs or knee wall doors
to unconditioned attics paces shall be sealed.
Walls
The junction of the foundation and sill plate
Cavities with corners and headers of frame walls
shall be sealed.The junction of the top plate
shall be insulated by completely filling the cavity
and the top of exterior walls shall be sealed.
with a material having a thermal resistance of R-3
El
walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier
Windows, skylights
doors
The space between window/door jambs and framing,
and skylights and framing shall be sealed.
❑
and
Rim joists are insulated and include an air
Rim joists shall be insulated.
El
joists
barrier.
Floors (including
The air barrier shall be installed at any exposed
Floor framing cavity Insulation shall be installed
above -garage and
edge of insulation.
to maintain permanent contact with the underside
cantilevered floors)
of subfloor decking, or floor framing cavity
insulation shall be permitted to be in contact
❑
with the top sideof sheathing, or continuous
insulation installed on the underside of floor
framing and extends from the bottom to the top of
all perimeter floor framing members.
Crawl space
Exposed earth in unvented crawl spaces shall be
Where provided in lieu of floor insulation,
walls
covered with a Class I vapor retarder with
insulation shall be permanently attached
❑
overlapping joints taped.
to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shaft
openings to exterior or unconditioned space shall
❑
be sealed.
Narrow cavities
Batts in narrow cavities shall be cut to fit, or
narrow cavities shall be filled by insulation that
❑
on installation readily conforms to the available
cavity spaces.
Garage
Air sealing shall be provided between the garage
❑
separation
and conditioned spaces.
Recessed
Recessed light fixtures installed in the building
Recessed light fixtures installed in the
lighting
thermal envelope shall be sealed to the drywall.
building thermal envelope shall be airtight
❑
and IC rated.
Plumbing and
Batt insulation shall be cut neatly to fit around
wiring
wiring and plumbing in exterior walls, or
insulation that on installation readily conforms
❑
to available space shall extend behind piping
and wiring.
Shower/tub on
The air barrier shall be installed behind
Exterior walls adjacent to showers and tubs
exterior wall
electrical or communication boxes or air -sealed
shall be insulated.
❑
boxes shall be installed.
Electrical/phone
The air barrier shall be installed behind
box on exterior
electrical or communication boxes or air -sealed
❑
walls
boxes shall be installed.
HVAC register
HVAC register boots that penetrate building
boots
thermal envelope shall be sealed to the subfloor
❑
or drywall.
Concealed
When required to be sealed, concealed fire
sprinklers
sprinklers shall only be sealed in a manner that
is recommended by the manufacturer.
❑
Caulking or other adhesive sealants shall not be
used to fill voids between fire sprinkler cover
plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
2020-Feb-13 09:22:17
M/CightSoft` Right -Suite@ Universal2019 19.0.15 RSU27054 Right -Energy® Florida 2017 Section405.4.1 Compliant Software Page 12
... HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: St Lucie
Permit Number:
Job Information
Builder: Groza Builders, Inc Community: Lot:
Address: TBD Dunn Rd Unit:
City: Port St Lucie State: FL Zip: 34983
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method.
❑ PRESCRIPTIVE METHOD The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not
El
PERFORMANCE or ERI METHOD exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or
R406-2017 (ERI), section labeled as Infiltration, sub -section ACH50.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): 7,000
x60 = 17966 - Method for calculating building volume:
CFM(50) Building Volume ACH(50) ❑ Retrieved from architectural plans
❑ PASS ❑✓ Code software calculated
El Field measured and calculated
ElWhen ACH(50) is less than 3, Mechanical Ventilation installation
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.
(50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals
licensed as set forth in Section 489.105(3)(f), (g), or (i) or and approved third party. A written report of the results of the test shall be
signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
2020-Feb-13 09:22:17
Wrightsoflt` Rig ht-SuiteDUniversal 201919.0.15RSU27054 Rig ht-Energya@Florida 2017 Section 405.4.1 Compliant Software Page13
., .. . HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
FORM R405-2017
Duct Leakage Test Report
Residential Perscriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: St Lucie
Permit Number:
Job Information
Builder: Groza Builders, Inc Community: Lot:
Address: TBD Dunn Rd Unit:
City: Port St Lucie State: FL Zip: 34983
Duct Leakage Test Results I
System 1
cfm25
System 2
cfm25
System 3
cfm25
Sum of any
additional systems
cfm25
Total of all
systems
cfm25
2104 _ Qn
Total of all Total Conditioned
systems Square Footage
❑ PASS ❑ FAIL
❑ Prescriptive Method cfm25 (Total)
To qualify as "substantially leak free" Qn Total must be less
than or equal to 0.04 if air handler unit is installed. If air handler
unit is not installed, Qn Total must be less than or equal to
0.03. This testing method meets the requirements in
accordance with Section R403.3.3.
Is the air handler unit installed ❑ YES (<= 0.04 on)
during testing? ❑ NO (<=0.03on)
❑ Performance / ERI Method cfm25 (Out or Total)
To qualify using this method, Qn must be not greater than the
proposed duct leakage Qn specified on Form R405-2017 or
R406-2017.
Leakage Type selected on Form Qn specified on Form R405-2017
R405-2017 (Energy Calc) or R406-2017 (Energy Calc) or R406-2017
Default Leakage
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set
forth in Section 489.105(3)(f), (g) or (i), Florida Statues.
Testing Company
Company Name:
Phone:
I hereby verify that the above duct leakage test results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #:
Issuing Authority:
2020-Feb-13 09:22:17
writghtsoft' Rig ht-Suitea0 Universal 2019 19.0.15 RSU27054 Rig ht-Energy® Florida 2017 Section 405.4.1 Compliant Software Page 14
,---„,,.,.,., HVAC\TBD Dunn Rd PSL Gardner Residence GBI.rup Calc = MJ8 Front Door faces: N
Reference Home Characteristics
Gardner Residence Title: TBD Dunn Rd PSL Gardner Residence GBI
TBD Dunn Rd
Port St Lucie, FL 34983 FLBase2017
Above -grade Walls (Uo)
0.084
Above -grade Wall Solar Absorptance
0.75
Above -grade Wall Infared Emittance
0.90
Basement Walls (Uo)
n/a
Above -grade Floors (Uo)
n/a
Slab Insulation R-Value
0.0
Ceilings (Uo)
0.030
Roof Solar Absorptance
0.75
Roof Infared Emittance
0.90
Attic Vent Area (ft2)
7.01
Crawls pace Vent Area (ft2)
n/a
Exposed Mason ry FI oor Area (ft2)
523.60
Carpet & Pad R-Value
2.0
Door Area (ft2)
0.00
Door U-Factor
n/a
North Window Area (ft2)
0.00
South Window Area (ft2)
78.88
East WindowArea (ft2)
78.88
West Window Area (ft2)
78.88
Window U-Factor
0.400
Window SHGC (Heating)
0.2169
Window SHGC (Cooling)
0.2169
ACH50
7.00
Internal Gains * (Btu/day)
84379
Water heater gallons per day
70.00
Water Heater set point temperature
120.00
Water heater efficiency rating
0.95
Labeled Heating System Rating and Efficiency
HSPF = 8.2
Labeled Cooling System Rating and Efficiency
SEER = 14.0
Air Distribution System Efficiency
0.88
Thermostat Type
Manual
Heating Thermostat Settings
72.0 (All hours)
TMY City: FL -Fort -Pierce