Loading...
HomeMy WebLinkAboutRogers, Gary Signed ContractALWAYS READY Sam Crane Electrical, LLC 2618 SE Market Place Stuart, FL 34997-8859 11. (772) 223-8865 RAWred by Sam cane EtecCrcw www.alwaysreadygen.com March 2, 2020 Dear Gary Rogers: Thank you for the opportunity to conduct an in-home survey and review your standby power needs in detail. At Sam Crane Electrical, LLC, we strive to provide our customers with the best automatic standby solution, and offering Generac automatic standby generators allows us to offer the generator and transfer switch option that meets your unique requirements. As a result, we are pleased to offer you this personalized proposal. Sam Crane Electrical, LLC D/B/A ALWAYS READY GENERATORS Generac Certified Dealer and Installer over 20 years. We are a family owned and operated company that is proud to be a part of the community and strive to provide superior service. Each generator is installed and serviced by our expert installer team. Our focus is on providing the "best in class" generators with excellence in installation, service and maintenance. Our technicians go through rigorous training and each installation is backed by our service guarantee and the manufacturer's warranty. Gary Rogers 9137 One Putt Place PSL, FL 34986 H: (772) 672-4580 M: (772) 672-4580 Grogers4222@gmail.com 22kW Air -Cooled Standby Generator with Wi-Fi, Aluminum Enclosure, 200 SE (Model 7043-2) Proposal ... .... ........... ............ QTY NOTES Terms and Legal - New Generator Payment Terms: Quote good for 30 Days " 25% Down for Permitting & Mobilization (Subject to non-refundable service fee if cancelled) 50% To order Generator 15% Upon Electrical Completion 10% Due Upon Start -Up (once gas is connected) Final Inspection will be scheduled after final payment. "A service fee of 2% will be charged on all credit card transactions over $ 3000.00 CARD MUST BE PRESENT TO SWIPE HOA/POAApproval (If applicable): We will provide the documents required by the association to the owner to submit for approval. It is the sole responsibility of the owner to obtain final approval. Please be advised, Sam Crane Electrical will not be responsible for delays due to electric service provider for shutdowns or for any delays caused by product shortage, back -ordered materials or weather. Terms accepted by:. lease Initial Date:% h J��^ �L, ^7 2�� 2 All material is guaranteed to be as specified unless changed or substituted by owner or owner's representative. All work shall be executed in a workmanlike manner in accordance with accepted standard practices. Any alterations or deviations from the contract plans and specifications involving additional or extra costs will be executed only upon written authorization from the owner or owner's representative and will become an extra charge to the original contract proposal. We will not be held responsible for materials or labor subject to strikes, accidents, delays, or acts or God. In any litigation, arbitration or any other disputes relating to the proposal, inclusive of any or all change orders or other modifications to plans and specifications of the above project, or the parties obligations or performance hereafter, the prevailing party shall recover its attorney fees and any and all related costs, both taxable and non-taxable, from the non -prevailing party. Sub -Total: $10,419.98 Sales Tax: $0.00 Total: $10,419.98 Down Payment: $0.00 Balance Due: $10,419.98