HomeMy WebLinkAboutHribar (SS) Sheet 07 dated 24 Mar 20 (7)FLAT CONCRETE TILE ROOF ON
PEEL 4 STICK MEMBRANE ON
5/8" CDX, PLYWOOD ON
PRE-ENG'D WOOD TRUSSES 6 2 4" 0/C
COPPER DRIP EDGE ON
I" X 3" P.T. WOOD DRIP ON
2" X 8" SMOOTH SAWN GEGAR
FASCIA ON 2" X 4" SUB -FASCIA
SIMPSON HETA20 TYPICAL
EACH TRUSS END
6" X 6" P.T. EAVE
BRACKETS W/
3/4" BEVELED END°
V v G�nrl\l..i
3 6" HT, E.S.P. BRONZE
ALUMINUM RAILING
FORMED 4 POURED
CONCRETE SLAB
SEE DETAIL SHEET # 10
COACH LIGHT FIXTURE
VERIFY SELECTION BY
OWNER INSTALLED BY
CONTRACTOR
SMOOTH STUCCO
WATER -MARK BAND
3 6" SQUARE X 14"D THICKENED -
COLUMN FTG. W/ #5 BARS
aQ 8" 0/C EACH WAY
Z(`3
2,-b
OVERHANG
FLASH 4 COUNTER -
FLASH 0 ROOF ! WALL
JUNCTION
12
5
n
0 01
1" X 6" T 4 G STAINED
WOOD CEILING
2 4" W X i b"D FORMED
r1a POURED CONCRETE
BEAM W/ 6 - #5 BARS
4 #3 HOOPS aQ 16" O/C
5/8" SMOOTH STUCCO
SLOPE
E
NON-SKID TRAVERTINE
FLOOR MATERIAL
4" STEP DOWN
I" X 6" T 4 G STAINED
WOOD CEILING
5/8" SMOOTH STUCCO
SLOPE
NON-SKID TRAVERTINE
FLOOR MATERIAL
4" STEP DOWN
o- -o- o o- a
" I" ICYNENE FOAM INSUL, R-20
5/8" DRYWALL CEILING
8" X 14" CONC. BEAM W/
II 4 - #5 BARS CONTINUOUS
1/2" DRYWALL WALLS ON
I" X 2" P.T. FURRING ON 3/4"
RIGID FOAM FOIL FACED
INSULATION R - 5.4
WOOD BASE
3/4" T.G. PLYWOOD GLUE 4
NAIL ON 3 1/2" WIDE X 2 4"DEEP
FLOOR TRUSSES 0 1132" O/C
5/8" DRYWALL CEILING
8" X 14" CONIC, BEAM W/
4 - #5 BARS CONTINUOUS
1/2" DRYWALL WALLS ON
I" X 2" P.T. FURRING ON 3/4"
RIGID FOAM FOIL FACED
INSULATION R - 5.4
8" X 1160" C.M U. W/ POURED
BLOCK CELLS aQ 4'-0" MAX.
SPACING 4 aQ EACH SIDE OF
DOORS OR WINDOWS 4 ALL
CORNERS
WOOD BASE
3/4" TG, PLYWOOD GLUE 4
NAIL ON 3 1/2" WIDE X 2 4"DEEP
FLOOR TRUSSES Q 192" 0/C
5/8" DRYWALL CEILING
2" X 4" P.T. NAILER W/ 1/4"
X 4" TAP CON aQ 32" O/C
1/2" DRYWALL WALLS ON
I" X 2" P.T. FURRING ON 3/4"
RIGID FOAM FOIL FACED
INSULATION R - 5.4
4" CONCRETE SLAB W/
6 X 6 10/10 WWF, ON
6 MIL VAPOR BARRIER
ON TERMOTE TREATED SOIL
3000 P.S,I. CONCRETE
2500 PS F. SOIL BEARINr
0 '
0 0
2 4" X 14" THICKENED EDGE
W/ 3 45 BARS CONTINUOUS
3 it -411
THR.FLR
22'-0"
THR. FLR. '
0
r 20'-O""
SEC. FLR, G�
0
n
10' -
BEG,
JL 34 V.TIR.
i
i WASHER J L3" V.T.R.
1 1TUB 2" 1 I 1 1
I
SHR, I LAY. 2" , - i' � .L
TOIL 3" 3" 2" -
LAY. z"
OWNERS BATH 3"LAY.i I 2'1SHR .I , LAV. ILAV. I
BATH # TWO 43" " I i SHR. t TOIL{
i I
IWASHER I
SINK '
2"
LAUNDRY
LOOP VENT
9 KIT. ISL
q SINK
2" "
KITCHEN
TOIL 3;, v 2"
3"
BATH # THREE _ THIRD FLOOR
SECOND FLOOR
SINK
4"
'I
TOIL. LAV,
Y'
3"
PDR, RM. SECOND FLOOR
FIRST FLOOR
4"
I
LAV.
2"
TOIL tf 3" 4" CA.
CABANA BATH
PI UMBING WASTE RISER DIAGRAM
NO SCALE
4" SANITARY WASTE LINE
TO COMMUNITY SEWER SYSTEM
IN ROAD RIGHT-OF-WAY
BEGIN 9 RAIL WALL CENTERLINE W/
IST 2" X 6" STUD 4 WORK OUT FROM
THERE b" O.C. BOTH DIRECTIONS, STUDS
TO BE IN-LINE BOTTOM TO TOP OF WALL/
USE PLUMB BOB OR LASER FOR ALIGNMENT
3/4" PLYWOOD DIRECTLY ON
WOOD STUDS FROM BOTTOM TO TOP
OF RAIL WALL ONLY/ NAILED OR
SCREWED EVERY b" TO 8" O.G.
3/4" PLYWOOD FULL WIDTH
OF RAIL WALL
OPTIONAL
ELEVATOR RAIL WALL
FRAMING DETAIL
1/2" = 110"
VERIFY ALL ELEVATOR INSTALLATION
DETAILS 4 CONDITIONS W/ SOUTHEAST
ELEVATOR, INC.
z
18150
24 MAR 20
OF NINETEEN
RM SW