Loading...
HomeMy WebLinkAboutGoedeke- ContractMASTER POOLS GUILD MEMBER ONCRETE p GWWW.MASTERPOOLSGUkZLD.COM POOLS' INC. 8880 GLADES CUT OFF RD PORT SAINT LUCIE, FL 34986 (772)878-7752 DELUXE POOL FOR GOEDEKE: Member Building the world's finest pools FEBRUARY 11TH, 2020 STANDARD STRUCTUAL ENGINEERING PLANS & SPECIFICATIONS ALL CONSTRUCTION PERMITS AS REQUIRED BY LOCAL MUNICIPALITY POOL PERMIT QUALIFIED BY OWNERS ART ALLEN AND TRAVIS LEONARD SPOOL DIMENSIONS: 15'X30' EXCAVATE & HAUL EXCESS SOIL ON DAY OF EXCAVATION (Min. 9' access for excavation) GRAVEL ROCK BASE FOUNDATION FOR ENTIRE POOL SHELL, STEEL REINFORCING THROUGHOUT STRUCTURE GUNITE CONCRETE SHELL TO EXCEED LOCAL BUILDING CODES 6" GUNITE WALLS & 8" GUNITE FLOORS 3' SHALLOW END DEPTH TO 6' DEEP END DEPTH LIFETIME STRUCTURAL WARRANTY ONE SET OF ENLARGED GUNITE STEPS WITH TILED EDGE AS PER PLAN GUNITE CONCRETE SWIMOUT LEDGE WITH CAP TILE TRIM SCHEDULE 40 NON -CORROSIVE PVC PLUMBING THROUGHOUT BACKFILL OF CONCRETE SHELL AND PLUMBING LINES SEPARATE INDEPENDENT CERTIFIED COMPACTION REPORT (2) 2" MAIN DRAINS WITH 3" TRUNK LINES, AND APPROVED MAIN DRAIN FRAMES AND GRATES PER V.G.B. ASME/ANSI 112.19.8-2007 HYDROSTATIC UPLIFT VALVE WITH UNDER -DRAIN STUB OUT FOR FUTURE DRAINAGE AUTOMATIC WIDE MOUTH SKIMMER ENCASED IN GUNITE BEAM THREE 2" PLUMBING RETURN LINES COMPLETE HOOK-UP OF PLUMBING LINES FROM FILTER TO POOL PRESSURE TEST ALL PLUMBING LINES (1) MULTI COLOR L.E.D UNDERWATER POOL LIGHTS IN POOL 6" BAND OF GLASS OR CERAMIC WATERLINE TILE (Wide Standard selection) DELUXE JANDY BRAND CARTRIDGE FILTER CS200 40,000 GALLON FILTRATION MEDIA WITH 3 YEAR PARTS AND LABOR WARRANTY DELUXE JANDY BRAND 2.7HP VARIABLE SPEED PUMP WITH 3 YEAR PARTS AND LABOR WARRANTY FOR FILTRATION IN LINE CHLORINATOR CONCRETE PAD FOR POOL EQUIPMENT ALL ELECTRIC HOOK-UP INCLUDING TIMER, JUNCTION BOX AND SUB PANEL "GEM " DELUXE AGGREGATE POOL PLASTER FINISH (standard Colors) DELUXE MAINTENANCE KIT INCLUDING: VACUUM HEAD, HOSE & TELE -POLE, BRUSH, LEAF SKIMMER AND TEST KIT PRE -FILTER SYSTEM TO PURIFY INITIAL START-UP WATER COMPLETE INITIAL CHEMICAL START-UP SERVICE, OPERATING INSTRUCTIONS AND MAINTENANCE MANUAL DECO DRAIN ALL NECESSARY INSPECTIONS REQUIRED BY MUNICIPALITY STATE SALES AND FEDERAL TAXES GENERAL LIABILITY AND WORKMAN'S COMPENSATION INSURANCE CONSTRUCTION PROPERTY DAMAGE & NEGLIGENCE INSURANCE UP TO 3 PALLETS OF SOD REPLACED • TOTAL .... $40,120.00 • INCLUDES ALL PERMIT FEES AND SALES TAX • 8-12 WEEKS FOR PERMITISCHEDULING • 6-10 WEEKS CONSTRUCTION REGARDS,