HomeMy WebLinkAboutEngineering Report #7 M L Engineering Inc. Project No.20-104 Report No. 7 Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt. Threshold Inspector Building Official: St.Lucie County Bldg.Dept. 2030 379'Avenue Contractor: Mr.Robert Stark—Structure-Con Vero Beach,Florida 32960 Mr.Khris McConnell—Structure-Con Phone: (772)569-1257 File Fax: (772)569-4041 www.mlenaineeringinc.com THRESHOLD INSPECTION REPORT OCEAN HARBOR NORTH CONDOMINIUMS—BLDG.D CONCRETE REPAIRS 5163 N.HWY.AIA,FT.PIERCE,FL 34949 SLC BUILDING PERMIT NUMBER:2002-0526 PROJECT NAME: Ocean Harbor N.Condos—Bldg.D DATE: April 9,2020 Concrete Repairs CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL CONTRACT-OR:----Structure-Con _ _- - PROJECT MGR: Mr.Khris McConnell INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Units 216/316,416/516,,516,616 and 616/716—Continued demo of edge spalls. OBSERVATIONS: Unif 216/31.6 :: •;: Chipping of 5palled concrete is complete and all corrosion in existing reinforcing bars has been exposed. • °A total of 2'-6'-linear feet of edge&4 square feet of full depth to be repaired. Uriit 416/516(North enol) • 6ipping along the•balcony edge is in progress. • Contractor'is chasing the corrosion in the bars and has stopped due to the location of a post tension anchor. Unit 516/616 • Repaired areas have been poured and the form boards have been removed. • Cable ends have been cut and grease caps placed.(Typ x3) • Contractor is to grout pockets with a non-shrink,high strength grout. Unit 616/716 • Chipping of spalled concrete is complete and all corrosion in existing reinforcing has been bars exposed. • A total of 2'-6"linear feet of edge to be repaired. All work to date complies with the design and permit documents. RECOMMENDATIONS: Unit 416/516 Contractor to lock-off(1)PT cable prior to any further chipping. Unit 616-716 Two existing#4 bursting bars to be replaced.Cut corroded bars&dowel in new 94 bars w/6"epoxy embed. P MTodd Rhoten Page 1 of 3 M L Engineering Inc. Project No. 20-104 Report No. 7 Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt. Threshold Inspector Building Official: St.Lucie County Bldg.Dept. 2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con Vero Beach,Florida 32960 Mr.Khris McConnell—Structure-Con Phone: (772)569-1257 File Fax: (772)569-4041 www.mlenginceringinc.com Pic 1 216-716 stack North facing balconies. i a Pic 2 Unit 216/316 Existing PT cable locked off. ` Edge spall demo around cable. Reinforcing bars to be power tool cleaned&coated. r 1M1 � r Pic 3 Unit 416/516 Corrosion in reinforcing continues to adjacent PT cable. Work stopped until cable is locked off. Page 2 of 3 M L Engineering Inc. Project No.20-104 Report No.7 Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt. Threshold Inspector Building Official: St.Lucie County Bldg.Dept. 2030.37'Avenue Contractor: Mr.Robert Stark—Structure-Con Vero Beach,Florida 32960 Mr.Khris McConnell—Structure-Con Phone: (772)569-1257 File Fax: (772)569-4041 www.mlengineeringinc.com ;Ta Pic 4 V�* Unit 5.16/616 Cable ends have been cut back and grease caps placed. Pic 5 Unit 616/716 Bursting bars to be replaced. r Page 3 of 3