Loading...
HomeMy WebLinkAboutBlower Door TestPlanning & Development Services; Building & Code Regulation Division • 2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE R402.4.1.2 House Infiltration Test (Blower Door) Certification Prescriptive and Performance Method Date: 4 /ly jon2n Permit #: Contractor: Job Address: :1In5 Brookline Ave F4- Piprce FL_Rggsl Construction: ()� ) New Construction —Complete ( ) Existing —After Addition House Infiltration Test Results SLC Climate Zone 2 CFM (50) _ -1',2-73 Volume = r (,10rj ACH (50) = CFM (50) x 60 / Volume = 6 S 2 Passing results must be & ACH (50) or less Test Date: Mechanical Ventilation required less than 3 ACH (X) Pass ( ) Fail FBC, Energy R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company Fl. Company Name: Address: 32225 I hereby certify that the above House I requirements in accordance with S -,t*- Signature: Printed Name: License/Certification #: jE3SETCr results demonstrate compliance with FBC Energy Conservation .4.1.2 Climate Zone 2. Date: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Permit #. Lot #:.. s.._. _• - - Contractor. Wad Ju.eney Har4es Address: 'troS Qrookltna Awa Ff Pier« EL 34gS( Construction: o Post Construction Test ❑ Rough -in Test Test Conditions: Date: L4 I H J0,2n Floor Area (ft2): 1944) Time: _ I I: If Primary Location of Supply Ductwork Alfj r - Indoor Temperature (F): G9 Primary Location of Return Ductwork _Is4 flenr Outdoor Temperature (F): S 6 Total Leakage Test (Outside) / Duct Leakage: ❑ Default Prop. Leak Free 1( Proposed On Test Pressure: 25 (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pass ❑ Fail Installed Pa O 359. Total Leakage (ch): . 03T Total Leakage per 100 sgft 3.4% CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. Testing Company Company Name: St %le±t c. Address: g!5,76 Ren,. Sq-lvj V e 010 J, #hereby certify that the above Sealing Leakage results demonstrate compliance with 51h Edition FBC Energy Conservation Section R403.2.2. Signature: Printed Name: 1 rpTLicense/Certificate #: C 3 S Fg1,-