HomeMy WebLinkAboutBlower DoorPlanning & Development Services; Building & Code Regulation Division
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982-
772-4152-2165
4982772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE R402.4.1.2
House Infiltration Test (Blower Door) Certification
Prescriptive and Performance Method
Date:
}/13/2c)2o Permit#: � 044 [
Contractor: Aln1-_ 1A
Job Address: � � - 6
Construction: (X)
New Construction — Complete ( )Existing —After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) = Test Date:
Volume = G Lan__
G , S I MN
echanical Ventilation req Faed less than 3 ACH
ACH (50) =CFM (50) x 60 /Volume =
ll
Passing results must be & ACH (50) or less Pass
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section -R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company gs�nrZeg�nc�.[ Sa Q��d- Sir 41D
Company Name: �I�.rP�rr Address: _�n�ra.gnn..r7/e F4 ���� K
I hereby certify that the above se Infiltration results demonstrate compliance with FBC Energy Conservation
requirements in accordan ith ection R402.4.1.2 Climate Zone 2.
Signature:
Printed
License/Certification #: F 3 5 F S Cr
Planning & Development Services L -1 O G " 0 `t 4
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: 14.12 02 Permit #:
Lot #:
Contractor.
Address: 'I -L4.0 -.So -r fg�i jc ca � I.� d F 1 Q esr e F �-3 �� 51
Construction: o Post Construction Test
o RoughAn Test
Test Conditions:
Date: 4/ry/2020
Time: t 12:00A
Indoor Temperature (F): _ -7r,
Floor Area (ft2): I2(10
Primary Location of Supply Ductwork ,A -H i c,
Primary Location of Return Ductwork 14:000 -
Outdoor Temperature (F): _ 91 n
Total Leakage Test (Outside)
Duct Leakage: ❑ Default ❑ Prop. Leak Free
VProposed On = O n:90
Test Pressure: (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press
Flow (cfm)
Results: Ass o Fail
Installed Pa
Total Leakage (ch).- acl , 4
Total Leakage per 100 sgf., 14.1
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
3
Testing Company
Company Name: Address:9 '70(Ze en�Ivd Sig 410 Inrk tr nv; fle
FL 2222
I hereby certify that the above ct Sealing Leakage results demonstrate compliance with 5"' Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature-
Printed'
ignature:
Printe a :7 y So ng LicenselCertiFirate #: E 9 SF8 G
i