HomeMy WebLinkAboutBlower Door7 F.1�L'�+p.tiRvl,a D.
Planning & Development Services; Building & Code Regulation Division
2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE R402.4.1.2
House Infiltration Test (Blower Door) Certification
Prescriptive and Performance Method
Date: Permit M
Contractor: '\a/oALj tin r -,IMS
Job Address: 2 i o i -Sanfn C_la_rn Rl ,e4 (74Pierce FL Lk!1 ,1
Construction: (X ) New Construction — Complete ( ) Existing —After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) = 1,0L4_7 Test Date:
Volume =
ACH (50) = CFM (50) x 60 / Volume = 6, S _ Mechanical Ventilation required less than 3 ACH
Passing results must be & ACH (50) or less (X) Pass ( ) Fail
FBC, Energy
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not
exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting
shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105
(3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party
conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
FBC, Residential
R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when
tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section -R402.4.1.2 of the Florida
Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in
accordance with Section M1507.3.
Testing Company
Company Name: Si!,rc—TPr Address: c�5-7oRcSer),-.,5„ri,,,�_'Ar 4io Jgj<snnurllF F -1-
32.
L32. Us
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements in accordam% with Section R402.4.1.2 Climate Zone 2.
Signature:
Printed N�� l rcl v - San
License/Certification #: F 3SFRr,-
N
Planning & Development Services I �] /' ,
Building & Code Regulation Division ` I �
2300 Virginia Ave, Rm 201
,,.,., NA, Fort Pierce, FL 34982
:.•I 772-462-2165 Fax 772-462-W3
"!.1
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: _N/L&i/-202„0 Permit#: Lot#:
Contractor: wo,dE,, urney-i- ome5- -- — — Address: $_(Q+LSca}q C(ar�Q.�y!t. P:, �epi- 34951
Construction: o Post Construction Test n Rough4n Test
Test Conditions:
Date: H/ It 4110 Z n Fluor Area (ft2): /!2,00
Time: Primary Location of Supply Ductwork
Indoor Temperature (F): 75 Primary Location of Return Ductwork 111'1
Outdoor Temperature (F): 7$
Total Leakacie Test Outside
Duct Leakage: o Default ❑ Prop. Leak Free /Proposed On = -012
Test Pressure: 25 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: o Pass ❑ Fail
Installed Pa
Total Leakage (cfm): c{
Total Leakage per 1Do soft 3.4 %
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testing Company
Company Name: Address: 1L2z5
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: :3rtoy noe LicenselCertificate#: W-SSF8..