Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5380-F85FB-v20.0 - Sheet - A1 - FLOOR PLAN
F F EXIT EXITEXITFFFFEXITK FWH EXIT A4 1 A42 A4.1 2 1 2 3 7 7.8 8 F 3 A6.2 3 A6.1 1 A6 1 A6.2 2 A6 2 A6.1 1 A5 2 A5 E A8.1 1 A9.1 28 A7 1 A7 3 A7 4 1 A6.1 4 A6.2 A8.1 10 A8.2 21 20 1922 A8.124 A8 4A 7 1 9 A8.2 1 2 4 3 D ASSOCIATE 19 FLOOR : TERRAZZO VESTIBULE 1 FLOOR : MAT OVER TERRAZZO NOTE: ULTRA ENTRY MAT OFFICE 5 FLOOR : TERRAZZO T2 V1 V2 R2 A7 7 23 A8.217 15 14 16 OF W5 STAGING 16 FLOOR : TERRAZZO WOMEN'S RESTROOM 23 FLOOR : EF-1 W1 V1 V1OUTSIDE OF COLUMN TO CENTERLINE OF BUILDING34' - 10"13 CENTERLINE OF BUILDING TO OUTSIDE OF COLUMN34' - 10"14 12 5 9 A8.1 13 15 2"1' - 11"69' - 8" FACE OF STUD TO FACE OF STUD93' - 1" TO LIMITS OF STONE SILL 92' - 4" FACE OF STUD TO FACE OF STUD FACE OF STUD TO FACE OF STUD56' - 8"4' - 2" CO EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 4' - 0"A88 10 22 22 2275' - 4 1/4" TO LIMITS OF STONE SILL25 A9 19 CENTERLINE OF BUILDING TO OUTSIDE OF COLUMN 46' - 2" A7 12 A7 9 30 A9 1 5 A4.1 A8 6 A8 4B A8.1 17 5 3' - 1"4' - 0"4' - 1"4' - 0"5' - 9"4"11' - 0"20' - 0"3' - 10 1/4"6' - 1 3/4"10' - 7 1/2"10' - 7 1/2"9' - 9 5/8"15' - 11 3/8"3' - 8"4" 2"16' - 2"2"10' - 8"2"4' - 7"9"9' - 4"9"9' - 4"1' - 1"1' - 1"8' - 7"9"8' - 7"9"4' - 0"EQEQEQEQ25 AP4 FOR STAMPED CONCRETE, SEE SHEET A11 FOR OUTDOOR SEATING LAYOUT, SEE SHEET EQ1 A7 22 31 A7 2111' - 0"6"4"2' - 3"A7 3 A7 6 A7 4 SIM. A7 29 A7 28 A9 23 32 34 4 A6.1 M1 M1 12 ROLLER SHADEROLLER SHADEROLLER SHADE(2) ROLLER SHADES(2) ROLLER SHADESROLLER SHADE(2) ROLLER SHADES(2) ROLLER SHADESROLLER SHADE (2) ROLLER SHADES(2) ROLLER SHADES(2) ROLLER SHADES C B A 3.5 4 5 6 V3FINISH DIM.20' - 5 3/4" HOLDGT2TILEWATER SERVICE ROOM 20 FLOOR : SEALED CONCRETE 2" 15' - 0"21' - 3"2"11' - 4"4' - 10" 2"15' - 2" 4' - 6"7' - 10"1' - 5"4' - 6"10"3' - 2"1' - 9"6' - 2"6"15' - 10"2' - 11"3' - 4"2' - 10"8' - 5"5' - 5"7' - 6"2' - 10"16' - 5"3' - 2"4' - 7"4' - 8"5' - 1"10' - 10"8' - 6"6"9' - 5"2' - 8"7' - 8"2"2"7' - 0"8' - 0"2"2"27' - 8"2' - 2"10' - 10"16' - 11"6' - 8"2' - 7"3' - 6" FACE OF STL CHANNELS 6' -4" (R.O.)3' - 7"2' - 7"5' - 0"18' - 11"14' - 10"4' - 0"2' - 8" EQ EQ11' - 4"1' - 5 1/2"10' - 11"4"21' - 11"17' - 6"17' - 6"17' - 4"3' - 8"13' - 0"4"14' - 7"1' - 7"1' - 6" 62' - 11" 31' - 4"4' - 2"4' - 4"1' - 5"W3 PROVIDE 1/2" CEMENT BOARD FOR ALL WALLS BEHIND WALK-IN REFRIG. HI-LO WATER FOUNTAINS W/ LO SIDE ON THE RETAIL SIDE. RE: SHEET AC1 FOR ACCESSIBILITY REQUIREMENTS FILLER PANEL BY REF. CO. WATER SOFTENER. RE: PLUMBING RE: DETAIL 13/A9 FILLER PANEL BY REF. CO. SEAL GAP AT FREEZER/SLAB WITH NON-SHRINK GROUT FILLER PANEL BY REF. CO. PORTABLE GENERATOR CONNECTION BOX. RE: ELECTRICAL NOTE: INSTALL PRE-PAINTED PLYWOOD FROM FLOOR TO CEILING IN ELECTRICAL ROOM, ALL WALLS, COLOR:P2 DS DSDSDSDS DS DS DS DS DS DS 6" PVC TUBE W/ THREADED CAP FOR AS-BUILT DRAWINGS LINE OF PORCH OVERHANG ABOVE G.C. TO PROVIDE AND INSTALL SHADES AT ALL STOREFRONT GLAZING BELOW 11'-0" AS PER SPECS. MOUNT ON INSIDE OF OPENING. RE: DETAIL 9/A3.1 (TYP.) NOTE: ROLLER SHADE FASCIA COLOR TO MATCH STORE FRONT (TYP.) FOR CONTROL JOINT LOCATION, RE: STRUCTURAL FOR EQUIPMENT LAYOUT RE: SHEET EQ1 FOR ROOM FINISH SCHEDULE RE: SHEET A8 DIMENSION BASE POINT. CENTERLINE OF BUILDING.6"RETAIL AREA 35 FLOOR : TERRAZZO FOOD SERVICE 32 FLOOR : TERRAZZO CONTINUOUS BEAD OF CAULK IN GAP BETWEEN DOOR FRAME AND STONE/WALL SOFFIT. RE: SHEET A2 EDGE OF STONE ABOVE G.C. TO PROVIDE AND INSTALL SHADES AT ALL STOREFRONT GLAZING BELOW 11'-0" AS PER SPECS. MOUNT ON INSIDE OF OPENING. RE: DETAIL 9/A3.1 (TYP.) NOTE: ROLLER SHADE FASCIA COLOR TO MATCH STORE FRONT (TYP.)RE: DETAIL 6/A9 FOR CORNER SHELFICE MERCHANDISERPROVIDE 1/2" CEMENT BOARD FOR ALL WALLS BEHIND WALK-IN REFRIG. WASH ROOM 31 FLOOR : TERRAZZO WALK-IN FREEZER 28 FLOOR : INS MTL PNLS BY REF CO. WALK-IN REFRIG. 29 FLOOR : TERRAZZO COFFEE 33 FLOOR : TERRAZZO REAR VESTIBULE 34 FLOOR : MAT OVER TERRAZZO MEN'S RESTROOM 24 FLOOR : EF-1 ELECTRICAL ROOM 39 FLOOR : SEALED CONCRETE 10 5 5 5 5 1 2CO2 4' - 0"11"1' - 1"4' - 0"3' - 7"1' - 6"11 1/2"22 22 22 SELF SERVICE WALK-IN REFRIG. 38 FLOOR : VF1 OVER TERRAZZO VINYL FLOOR PROVIDED BY WAWA, INSTALLED BY G.C. RETAIL WALK-IN REFRIG. 37 FLOOR : TERRAZZO DELIVERY VESTIBULE 36 FLOOR : TERRAZZO 22 18 17 34 A83 19 18 5 R1 36 WATER HEATER ON 30"x30"x4"H PRE-FAB CONCRETE PAD EL R PT PT D1 W6 V2 7' - 5"2 A3.1 15 BELOW WATERTABLE ABOVE WATERTABLE S.S. FINISH 4' - 3" WHITE FINISH 10' - 6" 22 GWBACRCGWBACRCSTAINLESS STEEL END CAP TYP. PROVIDED BY CABINETRY MFR. STAINLESS STEEL END CAP TYP. PROVIDED BY CABINETRY MFR. A9 19 ACRCGWBACRC GWB A9 26 CT1TILEGWB A9 26ACRCGWBGWB CT1TILEGWB SS PNLS A9 15 FRPC A9 18 A9 18ACRCGWBGWB TILE CT1 CT1TILEFRPC TILECT1ACRCGWBGWB GT2 WALL FINISH ABOVE SOFFIT A9 26 A9 14 TYP CORNER @ FRP A9 18 A9 20 TYP CORNER @ FOOD SERVICE TILE PROVIDE 1/2" DUROCK AT BASE OF WALL TO A HEIGHT OF 48" AND 1/2" PLYWOOD ABOVE DUROCK BEHIND WALL MTD SHELVES. FINISH TO BE FRP. RE: ELEVATIONS SS HAND SINK. RE: DETAIL 12/A9 FASCIA ABOVE WALK-IN BOXES TO UNDERSIDE OF CEILING. RE: 10/A2 PROVIDE 5/8" PLYWOOD FLOOR TO CEILING ON THIS WALL. FINISH TO BE FRP ALL JOINTS, GAPS OR SPACES LEADING FROM BUILDING/VESTIBULE INTERIOR TO THE ROOFTOP TOWER SHALL BE SEALED BELOW WATERTABLE ABOVE WATERTABLE FOOD SERVICE SOFFIT RE: SHEET A2 PROVIDE 1/2" CEMENT BOARD FOR ALL WALLS BEHIND WALK-IN REFRIG.1' - 4"KNOX-BOX 3273 RECESSED MOUNT SERIES. CONFIRM LOCATION AND REQUIREMENTS WITH LOCAL JURISDICTION. FILLER PANEL BY REF. CO.5' - 0"5' - 0"2' - 4" 9' - 3" 9"9' - 3"9" 8' - 10"6"2' - 7"6"15' - 9"6"2' - 7" 4' - 6" 9' - 4 1/2" IMG1 GWB SOFFIT. RE: SHEET A2 30 A9.1 29 A9.1 2"12' - 7"2"4" DIA. BOLLARD @ GEN. BOX, SUPPLIED BY WAWA, INSTALLED BY G.C. RE: DTL 7/A6.2 PROVIDE 1/2" CEMENT BOARD FOR ALL WALLS BEHIND WALK-IN FREEZER4"4"3' - 7"3' - 1"3' - 8"11' - 4"2' - 2"1' - 11"10' - 2" OUTSIDE OF COLUMN TO CENTERLINE OF BUILDING 46' - 2" SOFFIT. RE: SHEET A2 4' - 10"2"20 2' - 6"2' - 1"1' - 3"EQ EQ 3' - 4" 16 14 11 15 SURGE TANK ON SHELF. RE: 8/A9 21 4"3 3 6 10 33 4 10 7 33 3 4 11 10 10 7 11 10 R3 1' - 2" GWB SS PNLS FRPC FINISH 2B 4' - 0" G 9' - 11"4' - 4"13' - 3 1/4"9' - 1"7' - 9"12' - 4 1/2"7' - 0 1/4" 3' - 4"7' - 5"3' - 11 3/4"5' - 11 1/4"7' - 5 1/2"14' - 5 3/4"11' - 4 1/2"8' - 2" 3' - 8 1/2"2' - 0 1/2"29' - 10"A7 12 41' - 0 1/2" A B C D EA 13' - 6"3' - 6"10" MIN.10" MIN.10"3' - 6"10"3' - 6"V1 DOOR IDENTIFICATION. RE: DOOR SCHEDULE BLOCKING IDENTIFICATION. RE: EQUIPMENT BLOCKING NOTES 1 WATER HEATER 8" MTL. STUDS W/ R-30 BATT INSUL. AND EXT. VENEER INSUL. MTL. PANELS BY REF. CO. 3-5/8" MTL. STUDS @ 16" O.C. W/ FINISH AS SCHEDULED 3-5/8" MTL. STUDS @ 16" O.C. W/ 5/8" PLYWOOD ON ELECTRICAL SIDE CONCRETE BLOCK (CMU) 6" MTL. STUDS @ 16" O.C. W/ FINISH AS SCHEDULED F FIRE EXTINGUISHER. RE: DETAIL 4/A9. PROVIDE BLOCKING AS REQUIRED & COORDINATE FINAL LOCATION W/ FIRE MARSHALL NOTE: ALL WALLS TO GO TO UNDERSIDE OF ROOF DECK, UNLESS OTHERWISE NOTED. PROVIDE SLOTTED TRACK AT CEILING. NOTE:BOTTOM 48" OF PLYWOOD IS PRESSURE TREATED, TYP EXT. WALLS TACTILE BRAILLE SIGN, STATING "EXIT" COMPLYING WITH FAC. RE: DETAIL 18/AC1 ALUM PANIC TYPE B ALUM SADDLE TYPE (SET IN BED OF CAULK) C MAX.1/2"ALUM SADDLE TYPE (SET IN BED OF CAULK) A 2 1 D EXTENDED WIDTH THRESHOLD 3"5"1/2"SHEET TITLECLIENT NAMEPROJECT NAMECHECKEDDRAWNDATEPROJECT NO.COPYRIGHT © - All reports, plans, specifications, computer files, field data, notes and other documents are instruments of service prepared by: Cuhaci & Peterson, (C & P) as instruments of service remain the property of C & P. C & P shall retain all common law, statutory and other reserved rights, including the copyright thereto. Any use or reproduction of this document without written permission from C & P is a violation of Federal copyright laws.4/17/2020 11:19:47 AMA1218071904-17-2020S.G.A.D.M.FLOOR PLANORANGE AVE. & KINGS HWY, FT. PIERCE, FLWAWA260 WEST BALTIMORE PIKEWAWA, PENNSYLVANIA 19063WAWA F85FB 2020.00 STORE #5380-ORN04/17/2020 1/4" = 1'-0"A1 1 FLOOR PLAN EQUIPMENT BLOCKING NOTES # ITEM BLK MAT'L LOCATION AND REMARKS 1 SHELVING @ 3 COMP. SINK 1/2" PLYWOOD IN LIEU OF GWB, SEE ELEVATION 2 MOP HOLDER 2" X 6" 5'-8" 3 HAND DRYER 2" X 6" 3'-3" AND 4'-0" 4 FUTURE ACCESSORY -- -- 5 HAND WASH SINK 2" X 6" 3'-5" 6 URINAL AS PER MANUF. - 7 GRAB BARS 2" X 6" 2'-10 1/2" & VERTICAL 9 TRASH BAG HOLDER 2" X 6" 2'-0" AND 4'-0" 10 TOILET PARTIONS AS PER MANUF. - 11 COAT HOOKS 2" X 12" 3'-10" 12 OFFICE SECURITY SHELF 2" X 10" 4'-9" SEE DETAIL ON 6/A9 13 LOCKERS 2" X 10" 5'-6" 14 FUEL TANK MONITOR 2" X 12" 5'-5" 15 SURGE TANK SHELF 2" X 6" 7'-8" 17 WATER FOUNTAIN LOW 2" X 6" 2'-6" 18 WATER FOUNTAIN HIGH 2" X 6" 3'-0" 19 BEER COOLER SIGN 2" X 8" 10'-5" SEE 3/A9.1 & 2/G1 22 FIRE EXTINGUISHER 2" X 6" 3'-6" SEE DETAIL 4/A9 25 CSR UNIT 5/8" PLYWD IN LIEU OF GWB. FLR TO CLG 31 GOOSE LOGO SIGN 2" X 6" 9'-0" & 10'-9" SEE ELEVATION 32 3 COMPARTMENT SINK 2" X 12" 2'-11" SEE ELEVATION 33 TRASH RECEPTACLE 2" X 6" 3'-3" 34 AIR CURTAIN 2" X 12" ABOVE DOOR. SEE 10/M3 36 ICE MACHINE SHELF 8" METAL STUDS RE: DETAIL 27/A9 1. PROVIDE ADDITIONAL BLOCKING AT OTHER LOCATIONS AS REQUIRED 2. ALL HEIGHTS CENTERED UNLESS NOTED OTHERWISE 3. PROVIDE BLOCKING FOR ALL CABINETS: 2X12, CENTERED ON CABINET TOP DOOR SCHEDULE #DOOR FRM TYPE THR'D HW SET COMMENTS PUSH HW KICK PLATE W H TH TYPE MAT'L PUSH PULL AP4 2' - 6" 2' - 0" - --- --- - HW 21 BABCOCK DAVIS HSM 3024 - - - AP5 3' - 0" 4' - 0" 0' - 0" - --- --- - HW 19 BABCOCK DAVIS XTI INSULATED TOWER ACCESS PANEL/DOOR - - - CO 3' - 0" 7' - 0" 0' - 1 3/4" B HM HM D HW 9 SEE DETAIL 25 & 26/A7 AND 30/A9.1 LOCKSET - - D1 4' - 0" 7' - 0" 0' - 1 3/4" C HM HM A HW 10 4" X 25" STORM PRO HURRICANE LITE WITH 1/2" CLEAR LAMINATED GLASS. SEE DETAIL 25 & 26/A7 AND 27/A7 PANIC BAR 35" X 46" - EL 3' - 0" 6' - 8" 0' - 1 3/4" C HM HM C HW 13 4" X 25" SAFETY GLASS VISION PANEL. SEE DETAILS 22/A9 AND 29/A9.1 PANIC BAR - - OF 3' - 0" 6' - 8" 0' - 1 3/4" C HM HM - HW 12.1 4" X 25" ONE-WAY SAFETY GLASS VISION PANEL. SEE DETAIL 22/A9 LOCKSET 16" X 34" 16" X 35" PT 3' - 0" 6' - 8" 0' - 1 3/4" B WD HM - HW 7 UNDERCUT DOOR 1". SEE DETAIL 22/A9 24" X 24" 16" X 34" 16" X 35" R 3' - 0" 6' - 9" 0' - 2" REF - - - - BY REFRIGERATION COMPANY - - - R1 3' - 0" 6' - 9" 0' - 4" REF - - - - BY REFRIGERATION COMPANY - - - R2 4' - 0" 6' - 9" 0' - 2" REF - - - - BY REFRIGERATION COMPANY (DOUBLE DOORS) W/ 8" X 14" LITE. - - - R3 3' - 0" 6' - 9" 0' - 2" REF - - - - BY REFRIGERATION COMPANY (GLAZED) - - - T2 4' - 0" 7' - 0" 0' - 1 3/4" C HM HM A HW 5.5 4" X 25" STORM PRO HURRICANE LITE WITH 1/2" CLEAR LAMINATED GLASS. SEE DETAILS 25 & 26/A7 LOCKSET 35" X 46" - V1 (2) 3' - 0" 7' - 0" 0' - 1 3/4" A ALUM ALUM C HW 20 NO HOLD OPENS. HARDWARE SET 20 BY G.C. BALANCE OF HARDWARE BY DOOR SUPPLIER PUSH BAR - - V2 (2) 3' - 0" 7' - 0" 0' - 1 3/4" A ALUM ALUM C - NO HOLD OPENS. HARDWARE BY DOOR SUPPLIER. PUSH BAR - - V3 3' - 0" 7' - 0" 0' - 1 3/4" A1 ALUM ALUM C - NO HOLD OPENS, PUSH ONLY. HARDWARE BY DOOR SUPPLIER PUSH BAR - - W1 3' - 0" 6' - 8" 0' - 1 3/4" C WD HM - HW 3.1 DOUBLE ACTING W/ 4" X 25" SAFETY GLASS VISION PANEL. SEE DETAIL 22/A9 (2) 8" X 16"39" X 34" 39" X 34" W3 3' - 0" 6' - 8" 0' - 1 3/4" C WD HM - HW 3.6 4" X 25" SAFETY GLASS VISION PANEL. SEE DETAIL 22/A9 LOCKSET 36" X 34" 36" X 35" W5 3' - 0" 6' - 8" 0' - 1 3/4" C WD HM - HW 3.5 4" X 25" ONE-WAY SAFETY GLASS VISION PANEL. PROVIDE 8" JAMBS W/ EXTENSIONS ON RETAIL SIDE. SEE DETAIL 23/A9 8" X 16"16" X 34" 16" X 35" W6 3' - 0" 6' - 8" 0' - 1 3/4" C WD HM - HW 3.6 4" X 25" SAFETY GLASS VISION PANEL. SEE DETAIL 22/A9 LOCKSET 36" X 34" 36" X 35" 1. DOOR #'S SHOWN IN DOOR SCHEDULE ARE TYPICAL FOR WAWA STORES. VERIFY QUANTITIES AND WHICH DOORS ARE REQUIRED AS INDICATED IN FLOOR PLAN. 2. SEE STOREFRONT MANUFACTURER SPECIFICATIONS FOR VESTIBULE DOORS AND HARDWARE. DOORS ARE TO BE KEYED ALIKE WITH THUMB LATCH AND CLOSER AT ALL DOORS. 3. ALL EXTERIOR HOLLOW METAL DOORS SHALL BE INSULATED DOORS. 4. RUN CONTINUOUS BEAD OF CLEAR SILICONE CAULK AROUND ALL DOOR FRAMES. 5. EXIT DOOR LOCKS, IF PROVIDED ON EGREES DOORS, SHALL NOT REQUIRE THE USE OF A KEY, TOOL, SPECIAL KNOWLEDGE OR EFFORT FOR OPERATION FROM THE EGRESS SIDE IN ACCORDANCE WITH SECTION 14.5.2.3 OF FFPC AND SECTION 1010.1.9 OF FBC UNLESS SPECIFICALLY ALLOWED BY CODE. 6. A LATCH OR OTHER FASTENING DEVICE ON A EGRESS DOOR SHALL BE PROVIDED WITH A KNOB, HANDLE, PANIC BAR, OR OTHER SIMPLE TYPE OF RELEASING DEVICE HAVING AN OBVIOUS METHOD OF OPERATION UNDER ALL LIGHTING CONDITIONS, DOORS SHALL BE OPERABLE WITH NO MORE THAN ONE RELEASING OPERATION PER FFPC 14.5.2.10 7. ALL DOORS SERVING SPACES REQUIRED TO BE ACCESSIBLE SHALL BE PROVIDED WITH OPERABLE PARTS THAT SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS MAXIMUM (FBCA 309.4). 8. OPERABLE PARTS OF HARDWARE SHALL BE 34 INCHES MINIMUM AND 48 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND (FBCA 404.2.7). 9. REFER TO HARDWARE SCHEDULE IN THE SPECIFICATION MANUAL. 10. THRESHOLD 'A' NOT TO EXCEED 1/2" HIGH. 11. DOOR TC REQUIRES HOLE IN SLAB FOR BOLT. 12. VISION PANEL DIMENSIONS CORRESPOND TO VISIBLE LIGHT DIMENSIONS. CONTRACTOR TO COORDINATE REQUIRED GLASS SIZE AND ROUGH OPENING WITH DOOR MANUFACTURER. 13. ACROVYN DOORS SHALL BE INSTALLED IN H.M. FRAMES PER SPECIFICATIONS. THE DOORS SHALL HAVE ACROVYN COVERING FACTORY APPLIED. 1. BUILDING SHALL HAVE PRE-CONSTRUCTION TREATMENT PROTECTION AGAINST SUBTERRANEAN TERMITES IN ACCORDANCE WITH THE RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES. A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED TO THE BUILDING DEPARTMENT BY THE LICENSED PEST CONTROL COMPANY PERFORMING THE TREATMENT IN ACCORDANCE WITH FBC 1816.1. 2. SOIL TREATMENT FOR TERMITE CONTROL SHALL BE PER SPECIFICATION SECTION 02282 SOIL TREATMENT. 3. REFER TO FLORIDA PRODUCT APPROVAL SCHEDULE ON COVER SHEET FOR APPLICABLE STOREFRONT SPEC. IMPACT GLASS MAY BE REQUIRED. 4. RE: DETAILS 20 AND 21/A9 FOR CORNER CONDITIONS AT WALL TILE IN THE FOOD SERVICE AREA AND RESTROOMS. 5. ALL INTERIOR WALLS SHALL BE 1/2" GWB U.N.O. 6. ALL INTERIOR GWB CEILINGS TO BE 5/8" U.N.O. GENERAL NOTES DOOR NOTES LEGEND DOOR TYPES THRESHOLDS DOOR FRAMES: ALL DOOR FRAMES, INTERIOR AND EXTERIOR TO BE FULLY WELDED. NO KNOCK-DOWN FRAMES. WOOD BLOCKING AT JAMBS AND HEAD OF ALL INTERIOR DOORS AS REQUIRED. REFER TO SHEET A10 FOR TRASH COMPOUND DOOR Revision ScheduleNo.DescriptionDatePERMIT SET04/17/2020