Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Plans
9 1 8 7 6 1 5 4 3 2 1 A B C C E F SCOPE OF WORK: Solar electric PV system Improvement/Retrofit Q-Cell 340 DUO modules mounted on Iron Ridge or Unirac rails with Quickmount Code Compliant flashings. The scope of work is to verity that the solar electric Photovoltaic system specified in this document, meets the requirements set forth in the 2014 NEC, the 2017 FBC 6th Ed. and any other Local Utility requirements. Q CELLS a Manwhacompany NOTES: ENPHASE Quick Mount PV' RESPECT THE Roos _U N I RAC 4§cV1 r0u?MV ntiv .A� IRONRIDGE JOB SITE ADDRESS: 5207 EcD Pines Circle EAst Ft Pierce, FL 34951 PROPERTY OWNER NAME: UtZ MAJOR EQUIPMENT USED: MODULES: QCELL Q.PEAK DUO-GS 340 120 QTY MONOCRYSTALLINE HALF CELLS 340W STC RATED OUTPUT INVERTER: ENPHASE IQ7 GRIDTIED INVERTERS NO BATTERY BACK-UP 240VAC OUTPUT INCLUDES RAPID SHUTDOWN FLASHINGS: BY QUICKMOUNT INCLUDES SHINGLE, TILE AND STANDING SEAM METAL ROOF RAILS: BY UNIRAC OR IRON RIDGE GROUNDING: EXTERNAL FOR MODULES AND RAILS, #6 BARE COPPER FOR EXPOSED AREAS, UNIFIED GROUNDING ON SAME GROUND ROD AS MAIN BREAKER PANEL JUNCTION BOX: SOLADECK UL 1741 LISTED COMBINATION, TRANSITION FROM PV OR USE-2 CABLETO THWN-2 CONDUCTOR, HAS BUILT IN 18GA GALV STEEL FLASHING TO EXCEED FBC. 1. Wind load calculations based on ASCE 7-10 Components & Cladding simplified method 5. Modules must be Installed on 2 rails as shown per the module manufacturer's and uses the Asce 7-10 Pnet3O table multiplied by.6 to convert to ASD per 2017 FBC. instructions to obtain the listed wind rating. As such, the maximum elevation is 30 ft with tables for exposures B, C and D. Broward and Dade use Exposure C and D. 6. Combined module and rail dead loads are under psf. 2. Wind force estimates are area dependant and per 2017 Florida building code, the area 7. Rail attachments shall be onto minimum 20 trusses or rafters spaced no further apart used for calculations Is 1 module or 18 sq ft for the Q-Cell340 DUO mono (32mm) than 24"on center. Attachments in roof zones 1 can be alternate from top to bottom at 48"on centers but attachments in Roof zones 2 and 3 or at the ends of arrays shall be 24" 3. Installation must comply with all applicable 2017 Florida Building and 2014 NEC codes on centec'(refer to mechanical drawing # M-100). from which these plans were based. 8. These drawings are only applicable for flush mounting to a roof with an air gap between 4. Modules installed per these drawings are for Q-Cell 340 DUO (32mm) frame 2"to 10"between module and roof surface. This requirement eliminates the module and listings with a maximum uplift of 55.6 psf for side mounting. Installation in pressure zones racking from being considered as part of the building envelope. exceeding these ratings is not allowed. Refer to the Q-Cell Product Installation manual for approved mounting orientations and rail spacings. Page Title Content Rev Date Notes Cover Cover General notes, site address, system selection 00/00 1 A-100 Roof Pressures Wind pressuretablesand"A"dimensioncalculation 00/00 1 Zcr�_- E-101 Electrical Diagram Electrical diagram for Load Side Connection _ 00/00 1 E-101A Electrical Diagram Optional connection methods MIN. SEBACI REQ, 00/00 1 E-103 Placards Warning labels and where used •aOh F 00/00 1 S-101 Flashing Details FF QuickMount flashings and S-51 cut sheets h ^IpEr� 00/00 1 5-102 General Layout General rail and module layout suggestions C.NR g)pE 00/00 1 S-103 Unirac % Cut sheets and grounding notes on Unirac ) RSAR i 00/00 1 5-104 IronRidge Cut sheets and grounding notes on IronRidge rails ENG J 00/00 1 Z-101 FLASEIA Letter FLASEIA letter in lieu of FSEC certification TEG 1 00/00 1 Z-102 Module Cut Sheets for Q-Cell 340 DUO Modules 00/00 2 Z-103 Inverter Cut Sheets for Enphase Microinverters 00/00 2 APPLICABLE CODES — Florida Building Code 6th edition 2017 — National Electric Code 2014 — NFPA 101-2009 — NFPA 13-2007 NOTES 1. Drawings, calculations, tables developed requiring a PE seal and signature 2. Support documents, cut sheets, tables, reprints from publications such as ASCE 7-10, and shop drawings that do not require a PE seal and signature ENGINEER: LGER 4105 SAINT JOHN'S PARKWAY SANFORD,FL32771 PH 800-929-3919 X1411 jalger@theleveredge.com State License # 74730 A CONTRACTOR REQUIRED TO INDICATE SYSTEM SIZE BY SELECTINGTHE CORRESPONDING BOX BELOW. B PHOTOVOLTAIC SYSTEM SIZE: (3-16) QC340 DUO 1.02 to 5.44 KW STC DC 16gty ❑(17-32) QC340 DUO 5.78 to 10.88 KW STC DC DRAWN BY: JOHN ALDER, PE OF PROUDER THE LEVEREDGE 14Z Gunn Highway Odusa, FL33556 913-403-5100 Certificated AuthaduEDn 0:31930 .00 ❑(33-40) QC340 DUO 11.22 to 13.6 KW STC DC DAIEII/4A16930AM 61 LDR-MI-IQ7�C340Duo flev.03.033020 RECEIVr MAR 10 2020 ST. Lucie County, COVER Cy 793 E F ARRAY PROPERTIES ROOF MATERIAL STANDING SEAM METAL (161N) SLOPE 6112 (26.6°) CONSTRUCTION RAFTERS (4X6'S), 241N OC RAILMODEL IRONRIDGEXR100 ATTACHMENT MODEL S-51 S-5JX) FASTENING METHOD CLAMPS MAX. ALLOW. RAIL SPAN 72.01N (ZONES 1, 2, AND 3) TYP. MOUNT SPACING 48.01N ZONE 1 32.OIN ZONE 2 16.OIN ZONE 3 MAX. ALLOW. CANTILEVER 28.81N (ZONES 1, 2, AND 3) WIND ZONE I 29.3pSf WIND ZONE 11 49.4psf WIND ZONE III ]3,8psf Module rating is-55.6pst Modules may be safely installed in Roof Zones 1 and 2 as per the layout shown Roof pressures were calculated using the components and cladding table on page 25 of the 2017 FBC 6th ed Residential ( already factored for ASD with .6 multiplier), then interpolated for affected area of 18 sq ft on a Risk II enclosed structure. Values are for Exposure B, factored up by 1.21 to Exposure C to at this site for mean roof at 15 ft. Other coefficients: Kd= .85, wind direction factor Kzt = 1.0 topographical factor, flat. Pressures then derived using roof pitch of 26 degrees, wind speed of 160 mph. The perimeter width or "a" dimension is taken from the 2017 FBC 6th Ed Residential page 37 as 4 ft in all cases. Attachment is with Code compliant Flashing and lag bolt into Truss/rafter. P-133634 I I w II III i 111 I I I C/) WLO r- IIIT--T--T--T— \Limll, C W U M II IIIT CO O Z Wof = w t l I I I I iiF - I- ii I i co LU i- _ Ifl I l'I I I I I I I I I II _.I w N O South Roof Face This area is subject to U") U- contractor validation of 0 roof top obstructions and can move the 3 modules U east as needed for Engineer of Record: improved aesthetics. John L Alger 74730 Certificate of Authorization Holder 1(_ — ILl _ I �'l I \ The LeverEdge I I I N I Certificate number 31930 This dimension represents a (' I \ I I � 24" offset from ldripedge to g CONCEPT modules as required by local l IX jurisdiction. Grey area ouline I I I is the 4 ft perimeter, Width for PROJECT ID: 133634 I I wind pressures ; DATE:3/4120 _CREATOR: J.A. I I I I I I l I I I I i i i_ .1 i l 1 i i i �. i i �%� ~, I,Y REVIEWER: I'I I I'I I !'I I i l I I'I I I I I I I I I I I I I L li I lil I Ill i hi I lil = REVISIONS East Roof Face '.;, A-100 Y'JWIESNNPKNIA QONDE0.V.DG9DDNDa1 WEfPEHdWILY TO fl^NE COPPER W RE VA UYIX IY0.40R00.WNDF➢WRI NWEVLKNEASpi U13nDCCYPWM RIWHD BRANCHGRGUITM 34BWDUOMODULES ANDMCRONNVERTES ®240VAC ENPHABE - IQT�2L5 ELECTRICAL DIAGRAM WJWW C-CELL340 DUO (32MM)DIMENSIONS: 65.T"X3g.4'X1.26- (3-16) HAMWiA O-CELL 340 DUO (32MM) can her with a 20A/2P back J PV breaker in the panel with aline tap. See 101A for line tap details e�4worgcaon°�w:.u,n OFnONAL. W1µ1 maiO LOCKABLENONFUSED, naEromrmrw°Pmem`O AC DSGW NECT, vusavauxm 3EEENOTNOTE (SW) (S M NOTE; IF UNESIOETPPSARE USED, DISCONNECT Vu1 LL BE REQUIRED ANO MUST BE FUSED. SEE MNN PANEL BREAI�H SIZE FOR FUSE RE W IREMENTS OPRONAL WPERFORMANCE METER (SEENOTEM) NEC Z %T05.12(A) THE SUM CF THE OVDNLURRENT PR01E(GnON DEVICES FRO PV SYSTEM OONNECIEDTOTFB SERVICECONDUCTORS GN NOTIXCEEDTIHE SERWCECONWCTORS RATING. WHEN USING UNE SIDEOONNECRONS THE SUM OF THE INVERTER OUTPUT RATIN W X 125% MUST BE LESS T W N SERVICE GONDUCTQRS PER NEC M14, W TEN USING BAGXF® BRENQ-R CONNEGTIONS ire IT, EXISTING AC DISTIBUTION PANEL 1202 ' 10, 3W MN100APANEL MINIO(IAMMNSREWER (SEEWBRFfJO:RTABLE) O O LOADS ENNInsE ENVOT _ PATCH CPBIETO G� O"ON NET UfER OPBONPL ELECTRICAL NOTES: 1. CONTRACTOR RESPONSIBLE FOR COMPLYING WITH ALL LOCAL OR NATIONAL CODE REQUIREMENTS AND EQUIPMENT INSTALLATION INSTRUCTIONS 2 ALL COMPONENTS MUST BE GROUNDED PER NES 6W.43 EXCEPT FOR THE PLASRC INVERTER CASING (SEE BELOW) 3 EACH MODULE MUST BE GROUNDED ACCORDING TO W MANUFACTURERS USER INSTRUCRONS 4. PER NEC 6WA(D), ALL EQUIPMENT FOR USE IN PHOTOVOLTAIC POWER SYSTEMS SHALL BE IO FLED AND LISTED FOR APPUCATION $. PER NEC 6WV, PROVIDE A WRING SIGN ATM-L LOCATIONS MERE TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION SIGN SHALL READ -WARNING- ELECTRICAL SHOCK HPSARD-DO NOT TOUGH TERMINALS -TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN OPEN POSQIOIT OR EQUIVALENT 6. PER NBCT0.5.10. PROVIDE A PERMANENT PLAQUE OR DIRECTORY SHOMNG ALL ELECTRICAL POWER SOURCES ON THE PREMISES AT SERVICEENTRANCE T. INRECONNECMON MEDIOD SHALL COMPLY WITH NEC 650.64 S. AC DISCONNECT ANDIOR W METER MAY OR MAY NOT BE REQUIRED BY THE AHJ ANDIOR UTILITY FOR INTERCONNECTION 9. WIRE SIZE ASSUMES THAT CONDUIT WILL BE RUN IN ATTIC SPACE OR LESS TUN 1D IS EXPOSED TO SUNLIGHT PER NEC 310.16(A1(2)EX, YORE GAUGE MAY NEEDTO BE INCREASED IF GREATER THAN 3 CURRENT CARRYING CONDUCTORS ARE IN ACONDUIT OR RACEWAY PER NEC 310.15(121)(3)tC) 10. ROMIX IS ACCEPTABLEAS LONG AS RRATED FOR WET CONDMONS,W RATEDAND MAY HAVE TO BE UPSIZED TO COMPENSATE FORATTCIROOF TEMPS. NOTE WIRE OAUOE WILLCHANGE FROM Of0 W MAND ON LARGER SYSTEMS ANDO6 FOR SYSTEMS W° RUNS GREATERTIHAN 1W. 11. AN OPTION FOR A SINGLE CIRCUIT BRANCH TO BE SPOT INTO TWO OR MORE SUB -CIRCUIT BRANCHES IS ACCEPTABLE 12. PLEASE SEE APPROPRIATE VOLTAGE DROP CALCULATIONS TABLE TO DETERMINE ACTUAL WIRE SIZE OF THE L1 AMID 1.2 (I -HE HOTS) 13. ALLCONDUCTORSMUSTSECOPPER 14. NEC BS0.64(B)(7) SHOULD BE FOLLOWED WHEN PLACING THE INTERCONNECTION BREAKER REGARDING LABELING REQUIREMENTS 15. WIRE CONDUIT MAY Be ANY APPROVED FOR AC CURRENT INCLUDING BUT NOT UMITED TO PVC, EMT, ENT, Mil INSIDE OR PVC, EMT, LFNC OUTSIDE 15. MEETS REQUIREMENTS FOR NEC 20146M.12 FOR RAPID SHUIDOWN 17. REFER TO THE IQ ENVOY INSTALLATION AND OPERATION MANUAL FOR INSTRUCTIONS ON WRING THE IQ ENVOY AND ITS CURRENT TRANSFORMERS 18. PER NEC BM.31, EXPOSED RACEWAYS, JUNCRON BOXES AND CONDUIT BODIES IN WHICH ANY OF AVAILABLE CONDUT OPENINGS ME USED MUST IN THE SUB COMBINER PANEL THE SUM TOTAL / 'PHOTOVOLTAIC PCME SOURCE" RATINGS ORTHEW BREANQt9 CPN NOT IXCEED 3r<"Fr.^QR 0�� BY MEANS OF PERMANENRY AFFD(ED LABELS MERATINGOFTHEWBACI<FEDBREWERINTHE a0MaHF2 GONG GTORS #; THVM-2GRWND 1P PANEL CONNECT.(BUS RATED 100A MIN) PANEL ORTHEFUSES ONTiE DISCONNECT, (SEENOTEM2ANDM3) EXI STING we PVC 3M EMTORAPPROVEDEOUIV L YMICHEVERISAPPUGBLE ROM1'EXMAYBEUSEDIN —_ NllLTHVYCU (2)01D CONDUCTORS NEC M14 T05.12rN THE SUM OF THE OVERLURRENT PROTECTION UNEXPOSED AREAS UIO: WALLSANDATnCS GEC (1) M THW41-2 GROUND OPTIONAL LOCKABLE NONFUSED 3OA RATED 2 POLE AC DISCONNECT DEWCES FROM THE W SYSTEM CONNECTED TO THE SERVICE °ID WRE IUYBE 2 GROUND ROD56APART LINE HIGHER) ONDUCTORS (SERVICE RATING CONDUCTORS CAN NOT IXCEFD THE SERVICE CONDUCTORS u .D OP°BExBEE0.s CVA (2)N ROVED (2) @8 CONDUCTORS IN 31d' EMTORAPPROVED EQUIVALENT RATING, WHEN USING UNE SIDE CONNECTIONS 1Y REE VOLTAGE DROP (1) PD GROUND TO COMMON GROUND ROD AT PANEL T/ m REQUIRED LOCKABLE FUSED 60A RATED 2 POLE AG DISCONNECT. SIZE FUSES PER BREAKERTABLE IMPORTANT: MAKE SURE TO MEASURE THE LINE TO LINE AND THE LINE TO NEUTRAL VOLTAGE OF ALL SERVICE ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR EQUIPMENT, THE VOLTAGE FOR THE MICRO -INVERTERS SHOULD BE WITHIN THE FOLLOWING RANGES: 240VAC: LINE -TO -LINE: 211 TO 264 VAC LINE -TO -GROUND: 106 TO 132 VAC THE IQ MICRO -INVERTER HAS INTEGRATED GROUND AND DOUBLE INSULATION SO NO GEC OR EGC IS REQUIRED FRO THE INVERTER. THE DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND AND MEETS THE REQUIREMENTS OF NEC 690.35 TABLE A Breaker size per No. modules NUMBER OF MODULES FUSE SIZE UP TO 12 16A UP TO 16 20A ENPHASE INVERTERS MEET THE REQUIREMENTS OF 2014 NEC FOR RAPID SHUTDOWN WITH NO ADDITIONAL EQUIPMENT. IN ADDITION, THE OUTPUT FROM THE INVERTER IS AC, SO ROMEX WITHOUT CONDUIT MAY BE USED IN THE ATTIC AND NON EXPOSED AREAS. NoncEs: Enphase IQ7 Micro Inverter REVISIONS ENGINEER Field Wiring Diagram REV DATE BY DESCRIPTION 1423 Gunn Highway herewiOlin ere NB eXMsbs Odessa, FL W558 �ce9 CERTIFIED 5.44 KW STC DC 813 035100 afMne natelulswAM1BNNe Hanwha Q-Cell 340 DUO Modules GERTIFICATEOF AUTHORIZATIONS 3183D ENGINEER OF RECORD JOHN L ALGER PROFESSIONALENGINEER FL LICENSE NO. 74730 DRAIYING INFORMATION DATE DRAWN BV - SCALE BNEETNE-1 O 1 Main Main Requlrcd lockable Main Breake Brooke fused eoa rated teaks disconnect. Fuse size determined Optional lockable Hausa Hausa by 125%of Mtrrvortar non rased soA Circuits 240 V Circuits mled disconnected as output Circuits may be roquuod by from local utally Inverter 40 240r7, Existing AC sting AC t distribution panel Op��yA Not used 'button panel 4distribution from Existing AC Inverter g panel 240 V 1201240 V 1 PH can fused 30A 1240 V 1 Pit 120/240 V 1 PN from rated dacom,ecod ea may be required by Inverter lowl utdity Unified Unified FV Breaker Ground PV Breaker between Ground main and bottom of Ground wire to connoct opposite main breaker dWdy to Ground rod and buss not to disconnect or panel gmunds to ovold paroRol PV Breaker +Main breaker PV Breaker+ Main breaker Grounding eau neutral w1m Line side connection required when PV over current must be 5120% of buss rating must be 5100% of buss rating device + Main panel breaker > 100% of buss rating Line tap may be used with a 20A fuse PANEL CONNECT OPPOSITE MAIN PANEL CONNECT BETWEEN in a 60A lockable AC disconnect LINE SIDE TAPS HOUSE CIRCUITS May be panel connected. 20A/ running #6 wires from disconnect to 1- Wire sized per voltage drop table, line tap. back fed breaker in a 200A busss usually #10 or #8 based on 125% of 2- Wire from disconnect to connection point to be #6 with a 200 amp main meets NEC maximum continuous inverter output amps. THWN - 2. Distance from connection point to Criteria for 120% overbuss panel Upsizing of wire from #10 to #8 is permitted disconnect panel not to exceed 10' and must comply connect, to reduce voltage drop. with NEC 2014 240.21 (B)(1). 3- Line side taps may be made with double lugs in the box or meter can or with polaris taps. Rating of the connections must be rated at least 125% of maximum inverter output current. 4- NEC 2014 705.12 (A). The sum of the overcurrent protection devices from the PV system connected to the service conductors, cannot exceed the service conductor's rating, when using line side connections. CERTIFICATE OF I I AUTHORIZATIONe 31930 �- ENGNEERCPRECORD JORN L ILLGER -_\ PROFESS,D:cLL ENGwEER ,•.' , E1.ltCR,SF N0.7RJ0 `, • ,n.d...p....e,ae..r.....d REVISIONS OPTIONAL CONNECTION DETAILS auwaowroflwnoN HEV a4TF. BY aESGflIP,IDN MiE: 7rr,2017 MnatiN e.[M.vLOM1. rNAWN BF orweryate.l[n+[ap.n.w / ddMed�i.r�.w�V� SGLE NTS. , tsxa Gum Rgmrway J,EETNO Odessa. FL J3558 ••a.eeon.m.a,m.len[Rd. a,aJoas,ee ""°'E""d E-101A PROJECT INFORMATION PROJECT SITE 5207 ECHO PINES CIR E, FORT PIERCE, FL 34951 UTILITY COMPANY FLORIDA POWER & LIGHT CO ELECTRICAL SERVICE 120/240V 1Q ASHRAE EXTREME LOW 0°C (32°F) ASHRAE2%HIGH 1330C(91°F) CLIMATE DATA SOURCE VERO BEACH MUNICIPAL AIRPORT (KVRB) ELECTRICAL PROPERTIES ELECTRICAL CODE 2014NEC (NFPA70) MODULE Q-CELLS Q.PEAK DUO BLK-G6 340 INVERTERS 16 X ENPHASE 1Q7-60-2-US ARRAY WIRING (2 BRANCH OF 8 M CROINVERTERS ELECTRICAL PANEL MAIN SERVICE PANEL W/200A BUSBAR 200A MCB POINT OF CONNECTION LOAD SIDE CONNECTION AT MSP DC POWER RATING 5,44OW DC MAX. AC OUTPUT 16.OA EST. FIRST YEAR PROD. 8,296 KWH Utility to have 24-hr unrestricted access to any and all PV equipment installed at the service entrance Working clearances around all existing and new electrical equipment ( except for micro - inverters designed to install under modules), shall be maintained as per NEC 110.26 Conductors exposed to sunlight shall be listed as sunlight resistant as per NEC 300.6 (C)(1) and 310.8(D) Conductors located in wet areas, shall be suitable for use in a wet environment as per NEC 310.8(C) All electrical equipment shall be listed by a nationally recognized testing laboratory such as but not limited to NRTL, UL or others as per NEC 110.2 Module frames, rails racks, and posts, shall be bonded and grounded as per the module and rail manufacturer's installation instruction manuals. Automatic rapid shutdown is built into each inverter and requires no added components 0 0 0 0 0 O 0 AC COMBINER MAIN SERVICE PANEL TRANSITION BOX B(N) PROPOSED BACKSROOF-MOUNTED PHOTOVOLTAIC ARRAY. 6:12 (27°) SLOPED ROOF, 8 PV MODULES (BLACK FRAME, TRANSITION BOX (N) PROPOSED ROOF -MOUNTED PHOTOVOLTAIC ARRAY. 6:12 (27°) SLOPED ROOF, 8 PV MODULES (BLACK FRAME, BLACK BACKSHEET),180° AZIMUTH P-133634 W ofM U co co CO _l W LL z Lu n- U O W W ti CD U-) Q leer of Record: L Alger 74730 icate of Irization Holder he LeverEdge ertificate number 1930 -102 D. E REFLECTORI This illustration is for the placement of labels and not to be used in the sizing of / D. E REFLECTORRED wire, fuses, breakers or other wiring details. Refer to E-101 for wiring details mm A and notes. B. F 1 D, E ° REFLECTORI7.ED K M B.O. H. J.1 operating AC Voltage: 240V LOCATION A LOCATION E MAx Operating AC current: 16A PNO*GVCLTAIC ACCRDJiVERIER9 IOGIED IA�OER FKN PV NCOIAF OH R001iORAFMYNEC 69031( Service Panel PHOTOVOLTAIC • • LOCATIONN F LOCATION•• POWER SOURCE �' ' 9' ' N K PHOTOVOLTAIC SYSTEM ' ' • • C PHOTOVOLTAIC 1 m AC DISCONNECT m THIS ELECTRIC SYSTEA{ _© WARNING L POWER SOURCE ISALSO SERVED BYA 0 WARN ING aPBw-waTHIS SERVICE METEI PHOTOVOLTAIC SYSTEM DUAL POWER SUPPLY aFTRAnYGDsa�rR ADP$ IS ALSO SERVED BY. + WARNINGS PHOTOVOLTAIC soNRCEsumlTrcwDAND POWER SOURCE �' . - - wsa vTEiECTuc eYSTEA PHOTOVOLTAIC SYSTE ELECTRIC SHOCK HAZAfiD - .. — LOCATION C LOCATION D •NEC 690.31(G)(3)' • • • •-•21111111111111111 NEC 690A(F), 640.31(EH4). IFO'605.,11.1:1•- IFC 605.11.1.2 10' and T hcm ;6or LOCATION G LOCATION I LOCATION H INSIDE PANEL I. FhOT NING O PUT COILSECTQ4 LOCATE 7H75FNT DEVICE NING© w DWSCM: RELOCATF RCURRENT VICE �1 J� ENCwMOFRECORD JOHNLASGER •• r , . '�f- 31930 . - i0FES510MALEWWMER EL LICEME NO. 74M p` xoncca REVISIONS alAvm�olro;ow.umR �•1'i + REV DATE RY I DESCRIPTIDN DAIS 6rYR�ta �� ll = RrcP.eranrvmFopem.w PLACARDS FOR TYPICAL SCALE NTS. , , MICROINVERTER PV SYSTEM ODeu•. FL J7550 y,�,y E-104 eTs+OsaT00 E-104 S- and Barrel Tile (QOaso Unhwwl Tito MOunMMUTM Shmvn) Standing Seam Clamp Composition Shingle Flat Tile (Elnowt/QMSESDown) (QBaso Universal Tile Mount MMUTM Shom) ROOF MOUNTING DETAIL S[:Ar_F- NTS W eu.0 rgwwl�daM[eermw.mana.Ua6Mt,bA atad0}S1a0 t>r S-51.1 and Mini STANDING SEAM M1 asr Protea TRAPEZOIDAL 0- CFxSTPION Gir. 1 CAPxa6W. HEX HHAD.511C10%3ICMCV, GME a 1 ] OWE 1•IPf 41CII 6116'IUBDWASL NC0.I CASIn D MG SCMW. Ii% 16A0. S/IC%S.]MC ] 6 S6•bf 0*0a CCNE rxrxjwf=. 0005 AL Mal I S ILASNNO, CONE. 1671n=.=ALML 1 6 CoW.COWn(e INS1DIG, 1•IPfoEPam 1 ] Post 12VOax6S 600TS160646. 1R I a WA R.$Lmm. 6/ICo%I•VCOD.(IGM00N M= I I wmHm foommeo x roo. m ss 1 ID wAS1S11.SPID4oCL.6P16-o.16ass 1 II CAP xe[w,le%NGp. a/16•la%1'eNC]A.16853 1 otes on Flashings and Attachments: 1 Contractor is responsible for compliance with any and all local and National codes and equipment installation instructions. 2 PV modules are mounted to aluminum racking components and rails and attached to the roof using Quick Mount PV flashings or other flashings and attachments approved by racking manufacturer as appropriate to the installation. 3 Maximum span between attachments to be 48" or less. For the attachments on the ends of the rails each side, the span can not exceed manufacturer's recommendations. 4 Contractor is responsible for ensuring watertight penetrations and for sealing, trimming, cutting roof shingles and membranes in a neat, professional, and workmanlike manner. Note: Protea is limited to 40psf when used with an equal number of PV clips in a 24 ga steel roof. See LeverEdge Engineering for higher uplift loads. Metal roofs are made by several manufacturers using several different styles from standing seam to 5V and others. S-51 makes clips for each particular roof style. It is the contractors; responsibility to determine the particular brand and model of roof and select the proper S-5 clip for their particular installation. Check the S-51 web site at www.s-5.com. installers can access the tools and procedures for proper installation of the clips at www.s-S.com/tools. Proper installation is critical to achieve the rated pull and slide off values listed. FLASHING CUT SHEETS Quick Mount Flashings The LeverEdge 1423 Gunn Highway Certificate of Authorizat;onC— Odessa, FL33556 3193D 813403-5100 REVISIONS ue.6cw NOR6ATSN Nf/I DATE I er i MM tnY ff arA� NTs S-101 .1 1 1 1 'NI The Right Way! S-5-U Clamp The S-S-U clamp is by far our most popular and most versatile clamp. It fits about 85% of the standing seam profiles manufactured in North America —including most structural and architectural profiles. It can be used on vertically oriented seams and, by rotating the, clamp 90 degrees, it can also be used on most horizontal 2" seam profiles. Its simple'design, generous dimensioning, and multiple hole orientations are what make the S-S-U clamp so versatile foruse with the S-5!® snow retention products, such as ColorGard*, as well as with other' heavy-duty applications. Installation is as simple as setting the specially patented round -point setscrews into the clamp, placing the clamp on the seam, and tightening them to the specified tensiomThen, affix ancillary items using the bolt provided with the product. Go to www.S-5.com/tools for information and tools available for properly attaching and tensioning 5-5! clamps. S-S-U Mini Clamp The S-S-U Mini is a bit shorter than the S-S-U and has one setscrew rather than two. The mini is the choice for attaching all kinds of rooftop accessories:, signs, walkways, satellite dishes, antennas, rooftop lighting, lightning protection systems, solar arrays, exhaust stack bracing, conduit, condensate lines, mechanical equipment —just about anything!* 1i-51 uiini dmnps are rutcon,p4ible with; and should i,ot be used with SSrSnoRai1-6noFence"or ColoiGard'snow retenfl& syste us.: +r c ■ The. S-S-U clamp is our most popular and versatile clamp, fitting about 85% of the standing seam profiles t in North America. e Ln CO Cl D E O V Ln CO I N M M N CO CO CO CO SM50V The Right Way! The strength of the S-S-U clamp is in its simple design. The patented setscrews will slightly dimple the metal seam material but not pierce it — leaving the roof manufacturer's warranty intact. vro rv> •�. ern cr inanee Mee r, Wrtr: n rut r: Idmp usage ps. =_ THIS LAYOUT USES (2) ADDITIONAL SPLICES OPTIONAL LAYOUT 1 CONTRACTOR RESPUNSIBL 2 ROOF MEMBER STRUCTUR 3 ROOF CAN BE COMPOSITIC 4 MODULES MOUNTED TO At 5 DISTANCE BETWEEN ATTAC 6 RAIL OVERHANG FROM AP 7 CONTRACTOR SHAM. TAKE B ADJUSTMENTS MAY BE RD RAIL OVERHANG AND MOO 11Ywyn W... � M..iNA..memr.. rw.Yan.t.+eenr.w rm.._n+rvAr.mw .m.m."rmle.ex4 ra 102" (2, 19L) UG -- #6 BARE CU GROUND FOR MODULE GROUNDING (SEE NOTE 9) EXAMPLE OF RACKING LAYOUT ACTUAL RACKING LAYOUT DETERMINED BY CONTRACTOR / PV TRANSITION BOX 17 - I U-D/ 10 s" MAX.) 2' —nP 7 PV MODULE zQ . v'u1� Oi co \ � I_ 1 1 n T i_ __ _._ --_ -� - ..-�._.•. -. .N� .•_ _. — MODULE GROUNDING LUG (SEE NOTE 9) , RAIL L-BRACKET & QUICK MOUNT ROOF PENETRATION SPLICE CONNECTOR IG WITH ALL LOCH. OR NATIONAL CODE REQUIREMENTS AND EQUIPMENT INSTALLATION INSTRUCTIONS. RAFTERS AT 24' OH CENTER. ILE WFTHA PITCH BETWEEN RAND 45 DEGREES. ALLOTHER ROOFTYPES PLEASE REFER TO SUPPLEMENTAL ALTERNATE ATTACHMENT/FLASHING STRATEGIES. III SYSTEM AND ATTACHED WITH OUICNMOUNT PV MOUNTING SYSTEM OR OTHER FLASHINGIATTACHMENT SYSTEM APPROVED BY THE RACKING MANUFACTURER 1423 O,I. F HtjXM al3+osstw IN NOTE ISARE MET GENERAL RACKING LAYOUT REVISIONS rrw'AlnawanuU i1E11 GAIT I AY I In=I VTR anae nrA MCA 5-102 31930 ARRAY DETAILS Scale: 1/4" =1' 5-102 BONDED SPLICE DETAIL A.100 CSOMSnICE SHEATHING H�ING \"• -) (UUFASTENM[INGL GROUNDING LUG (SEE NOTE 9) MICROINVERTER KIT rd Notes on Racking: L-FOOT 1 Only approved racking components shall be used to meet wind load ratings. 2 Contractor is responsible for compliance with any and all local and National codes and equipment installation instructions. 3 PV modules are mounted to aluminum racking components and rails and attached to the roof using Quick Mount PV flashings or other attachment and flashings approved by the racking manufacturer as appropriate to the installation. 4 Maximum span between attachments to be 48". 5 Please refer to manufacturer's Installation instructions for rail cantilever distance from roof attachment. 6 Contractor Is responsible for ensuring watertight attachments and for sealing, trimming, cutting roof shingles and membranes in a neat, professional and workmanlike manner. 7 Different rows and columns are permissable as long as the attachment requirements listed in i14, maximum rail overhang, and maximum module overhang from ends, does not exceed manufacturer's recommendations. 610DULE RAIL (TYP.) ROOFING (TYP.) image shows shingles but thl al roof is standing seam. Use only for the accessories and (TYP•) NUT IRON RIDGE RAIL DETAILS i� 8 Modules are not permitted to be installed in roof pressure zones with an estimated uplift that exceed the limitations specified by the module manufacturer (please refer to the module specification sheet and installation manual for more details). 9 Grounding lugs are only needed on one rail per row of modules. Grounding lugs can be installed anywhere along the rail and in either orientation. 10 IronRidge systems using approved Enphase microinverters eliminate the need for lay -In lugs and field installed equipment gounding. This solution meets the requirements of UL 2703 for bonding and grounding and is Included in this listing. Specifically, the Enphase IQ6 and IQ6+ inverters have a nonconductive base and do not require grounding. The Q-Cable, however, does not contain a ground, so modules and rails must be grounded externally and grounded at the breaker panel ground rod in unified grounding. 1423 Gum 10plrray Odessa. FL 03550 a,3ail}St00 NOTI L [A REVISIONS oRAHTe0 rt60N iarr�WxWH,nxrlywrd Mn�Mrnne mNnln popery MTMteMef'TrnuY ~O'��'�� .,�.°abw,eeP>ofe. REV GlE NT WP DE[OSfON GTE: V11=L11RDfe LOaxN 6Y: 6GIE N.T.S. S-104.1 LErinEIGVEOF AIIr11Ci0WIONI 31000 e,r r„wu stbm /6N1.N01:, rworpsmwnap.,casw R,ID2NO.f1e0 IRONRIDGE XR100 SPAN TABLE 72' Spans are permitted only under the following oxrdl,ionL Aa othef s are I imxed to 41' spans. Foe EaposurofiandConly. Exposure0iequ1cy"1n"dn9ava,wVcm Wmd Speed Corditfons f30mph Zone l and 2 allmfpllcfe Sto4S deg,Zme 3 p'Nhm 30to4Sdeg I40mph Zone l a1lroof0tthes(S lo4S dcgL Zcnestand3J0tc45de9 Isomph Zone1Z11=fp1tch0(St045degl, Zenn2and3.30104Sdeg momph Zone 1only,a11r00PiId SSlo4Sdegtees Csmlle rwltedto40%ofsp3nandrfosplicestocm0lmr. Shtrglcand We roofs only. Metal roofsragrdreerlginettirsgevalwibn forpu0 oK S-104 /lr IRON RIDGE Built for solar's toughest roofs. Datasheet Flush Mount System IronRfdge builds the strongest mounting system for pitched roofs in solar. Every component has been tested to the limit and proven in extreme environments. Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings, and is also why our products are fully certified, code compliant and backed by a 25-year warranty. Strength Tested All components evaluated for superior structural performance. Class A Fire Rating Certified to maintain the fire resistance rating of the existing roof. UL 2703 Listed System Entire system and components meet newest effective UL 2703 standard. PE Certified Pre -stamped engineering letters available in most states. Design Assistant Online software makes it simple to create, share, and price projects. 25-Year Warranty Products guaranteed to be free of impairing defects. — XR Rails e XR10 Rail A low -profile mounting rail for regions with light snow. • 6'spanningcapability • Moderate load capability • Clear and black finish — Clamps & Grounding O UFOs Universal Fastening Objects bond modules to rails. • Fully assembled & lubed • Single, universal size • Clear and black finish — Attachments O FlashFoot2 Flash and mount XR Rails with superior waterproofing. • Twist -on Cap eases install • Wind -driven rain tested • Mill and black finish — Resources Datasheet XR100 Rail XR1000 Rail Bonded Splices The ultimate residential solar mounting rail. • B'spanningcapability • Heavy load capability • Clear and black finish A heavyweight mounting rail for commercial projects. • 12'spanningcapability • Extreme load capability • Clear anodized finish Stopper Sleeves CAMO Snap onto the UFO to turn into a bonded end clamp. • Bonds modules to rails • Sized to match modules • Clear and black finish Bond modules to rails while staying completely hidden. • Universal end -cam clamp • Tool -less installation • Fully assembled All rails use internal splices for seamless connections. • Self -drilling screws • Varying versions for rails • Forms secure bonding Grounding Lugs Connect arrays to equipment ground. • Low profile • Single tool installation • Mounts in any direction Conduit Mount Slotted L-Feet Bonding Hardware Flash and mount conduit, strut, or junction boxes. • Twist -on Cap eases install • Wind -driven rain tested • Secures 3/a" or 1" conduit _ Design Assistant • — Go from rough layout to fully engineered system. For free. Go to IronRidge.com/design Drop -in design for rapid rail attachment. • Secure rail connections • Slot for vertical adjusting • Clear and black finish Bond and attach XR Rails to roof attachments. • T & Square Bolt options • Nut uses 7/16" socket • Assembled and lubricated NABCEP Certified Training NABCEP i Earn free continuing education credits, while learning more about our systems. Go to IronRidge.cam/training ® 2019 InonRidge, Inc. All rights reserved. U.S., Patents; 118,695,290: 119,819,303; 99,865,938; Others Pending. Version 1.70 RaSEIA Fln,ids Solar tneW lnduurirs Aiwciai ion June 28, 2017 Dear building official, On June 231 of 2017 Governor Rick Scott signed HB 1021 amending 377.705 of Florida Statute authorizing solar energy systems manufactured or sold in the state to be certified by professional engineers. In effect a Florida Solar Energy Center, (FSEC,) certification is no longer required by state statute for materials or systems to be sold or installed in the state of Florida. On page 6, lines 138-144 read; All solar energy systems sold in the state must meet the standards established by the center and shall display accepted results or approved performance tests Ina manner prescribed by the center, unless otherwise certified by an engineer licensed pursuant to chapter471 using the standards contained in the most recent version of the Florida Building Code. Please find HB 1021 attached for your convenience. This modification to 377.705 will go into effect July 1, 2017 If you have any questions, please feel free to contact FIaSEIA at (407) 339-2010 or (800) 426-5899 Regards, The Board of Directors of FlaSEIA Florida Solar Energy Industries Association (FIaSEIA) 2555 Porter Lake Dr., Suite 106 Sarasota, FL 34240 System Certification by'kElorida Licensed Engineer System Size (STC DC) 1.02 to 5.44kW 15.78 to 10.88kW 11.22 to 13.6kW PV MODULES AND ARRAY Module Brand Hanwha Hanwha Hanwha Module Size & model Q-Cell G6 340 DUO Q-Cell G6 340 DUO Q-Cell G6 340 DUO Module FSEC # 401259 401259 401259 Total Number of PV Modules 3 to 16 17 to 26 27 to 40 Series Strings/Branch Circuits 1 string 1 string I 1 string Shortest String 1 string of 3 11 string of 3 1 string of 3 Longest String 1 string of 16 1 string of 16 1 string of 16 Array Nameplate Power Rating 1020 to 5440W 5780 to 1088OW 11220 to 1360OW POWER CONDITIONING (Inverter) Inverter Brand Enphase Enphase Enphase Inverter model number IQ7-60-2-US IQ7-60-2-US IQ7-60-2-US Listing to UL 1741 Verified Yes yes Yes Inverter DC Voltage Window 16VDC to 48VDC 16VDC to 48VDC 16VDC to 48VDC AC Power Rating 250VA 250VA 250VA AC Nominal Voltage Output 240V 240V 240V Max PV array Power per inverter 240VA 240VA 240VA Number of inverters used 3 to 16 17 to 26 27 to 40 CHARGE CONTROLLER AND BATTERIES Charge Controller Manufacturer N/A N/A N/A Charge Controller Model Number N/A N/A N/A Listing to UL 1741 N/A N/A N/A BATTERY BANK CONFIGURATION Number in Each Series String N/A N/A N/A Battery Manufacturer N/A N/A N/A Battery Model number N/A N/A N/A Battery Type N/A N/A N/A Battery Capacity (C20 rate) N/A N/A N/A Total Number of batteries N/A N/A N/A Number of Series Strings N/A N/A N/A I, John LAlger, PE # 74730, an engineer pursuant to chapter 471 of the Florida Statutes, have reviewed and the attached solar Electric PV system with it's related components, and certify that it meets the minmum requirements of: 2017 Florida Building Code 6th ed 2017 Florida Building Code 6th ed Residential 2014 NEC NOilte/: REVISIONS(wma(�oaoQulro TN Poi�waWwnP�}M NEV DA}L PY DE�fJ®110Y CAie: 141LJn nn,+WnwN}}<4n1n pe�yNTM L,wIEap•TY It] Z-101 Z-101 powaetl M . 1 NE DUo THE IDEAL SOLUTION FOR: RRo [erodayeon (1�L1�J mmtwlbwdmea Engineered In Germany 07Q-1 GICCUS O.ollq•.Toetetl mmm 10. 00032687 O.ANTUM TECHNOLOGY: LOW LEVELISED COST OF ELECTRICITY Higher yield persurtace area, lower BOS costs, higher power classes, and an efficiency rate of up m 20.1%. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-Ilght and temperature behaviour �� ENDURING HIGH PERFORMANCE ty) Long -tern yield securitywith Anti UD Technology, Anil PID Technology', Hot -Spot Protect and Traceable Duality Tra.pTM- EXTREME WEATHER RATING (y2/J`J High-tech aluminlum alloy frame, certified for high snow, (540OPe) and wild loads (4000 Pe). _o_ A RELIABLE INVESTMENT Inclusive 12-year product warranty and 26-year linear performance weranty2, STATE OF THE ART MODULE TECHNOLOGY ( % Q.ANTUM DUO combines cutting edge cell separation and Innovative wiring with O.ANTUM Technology. e APT rest lend t,... aavrdln9 to IEC/IS 62804=016, method B (-ZW V, 1581) e see date Meet on rear for haver Infermetlon. i»Rop trn 400rtzp a ran.1/hatebiel Ix4tlidee Q,.CIELLS MECHANICAL SPECIFICATION Haoa COVOr CempeAle lilm Frame BleeLenodieedeluminWm Call ax 20 mpreerystelllne QANTUM solar had cells Janatlon be. lil-101 mm x gS60 mm x 16-IB mm Prolectlon class IP87 wM bypass diodes Cable 4mml Soler eabla(e) 21150 mm,(-)ill Omm Cno... I., Sit, bli MC4. Ampherml UTX Renhe 05-6, Ton9Mg TL-CableolS, JMTHY JM601; Ina ar Friends PV2e; IP67 ELECTRICAL CHARACTERISTICS POWERCLASS 340 345 350 366 MINIMUM PERFORMANCEAT STANDARD TEST CONDITIONS, STCt(POWER TC LERANC8.5 /-OW) Power at MPPr Pura I'm 340 345 360 355 F Soon Chmllt CurronP ye [A] 10.68 10.]3 30.79 10.84. F Open Cirenit VOIt4F.' V. IVI 40.24 40AS 40.73 40.98 ? Ccrre at at MPP I_ [A] 10.16 10.22 10.27 10.33 Voltage at MPP V,w rvl 33.46 3376 34.07 34.38 EffitAl y' q 1%I e1B.0 ana .19.5 a18.8 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT' - POW¢ratMPP P. Im 254.E 2582 20LS 265.7 F. Short Clicult Cement lso [A] see 8.96 8.69 8.74 2 Open C.irealt Voltage Vea M 3794 381] 9d41 38.86 F Currant at MPP I- [A] 8.00' 8.04- 8.09 8.13 VollnRo Et MPP V. M 3L81 3210 32.40 32.69 `Mesa datWe..Pwt3%:I.:VaaS5% at fsm. SOOOWAn', MttVC. AM LSG ea 04J••BOOW/M. NMOT,spectrum AM lbG O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE AlleaW96%ofnemloalpo.mldur- r____T_____'_____' a_._ei8_._.._._______. InBfsetyear. Tldemefter mm.O.fi4% ^ _ tlepretlnlon rrer year. AtleeA B3.1% - � ' �. - "�-"""' ofroMml powsupto]Oyeem. At ' �-~ ' E d e lee olrmml�ul powerupto .. - 26 Ymdl.m p C _____ , ' A1dere.dvIn meesuremem tour- ; ^ amen Fua wermmim vsccoNanca ^ wMthewerres.n.ma sva m w m scree $ ^ lone Gq,le mo,, aBaroeeuon olyour 'vemrexcvwr^n ^ resp¢e8.eoounay. e�wr�.r.v.r.v..��n rraaa TypvalmodulaperfwmaroeuMala. Inedbnce mrdibneN ' cmrpmiean m STC toMNons r26'C.1000 W/m�. PROPERTIES FOR SYSTEM DESIGN Max. Ulift. Lead. Push/Pull [Pal 3800/2667 Pormittod Module lempooduro-40-C-s85•C Max. Toed Load, Push/Pull (Pal 000/4000 en Cantle.... Duty QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION VDEOueliryTarted, IEC 61215:2019; IEC 81730:2016,Appacatlon Clem lL Numbare Modulaapor Pellett 32 Thladete stundcanpllmwith DIN EN 50380. Number of Pellets pm Trallo/(24e) 28 C / Number of Feliciaper 40'HC-Contalnor(28t) VI OVE C Pellet Dim.oll.r s (L. W x H) 1815.1150 a 11B0mm Not.: Installation ImWagena awet Ire fcill.d. See the Ir atabdan andopaddle, manual or eomam our taJml®I mrvdw tlepedmantfor Nrvcr vMrnutb... epprwad notaloved and Iba Of611apre ll ut. N.mMAOCaLL80mbH Samedteaeo l]•2L OW66 BMerleld-Woden. Getmem/ ITEL K9(0)349466 B&234441 FIs%MB (OAT4B668 BB-230001 EMAILmke®gcalb.com I WEB www.q-cellecom Engineered In Germany 'CEW 12 Z-102 Data Sheet Enphase Microinverters Region: AMERICAS Enphase IQ 7 and IQ 7+ Microinverters To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 Micro' and Enphase IQ 7+ Micro' dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy', Enphase IQ Battery'", and the Enphase Enlighten'" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install • Lightweight and simple • Faster installation with improved, lighter two -wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable • Optimized for high powered 60-cell and 72-cell* modules • More than a million hours of testing • Class II double -insulated enclosure • UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) *The IQ 7+ Micro is requlred to support 72-cell modules. ENPHASE. Enphase IQ 7 and IQ 7+ Microinverters USE ONLY DATA FOR IQ7 INPUT DATA (DC) IQ7-60-2-US/IQ7-60-8-US IQ7PLUS-72-2-US / IQ7PLUS-72-B-US I Commonly used module pairings' _i - _2_35W-350W+ 235W-440W+ Module compatibility mo_ _ __ _ 60-cell PV dules only^ 60-ce11 and 72ell P -cV modules __._ Maximum input DC voltage__V_ __ 60V _ � --�- - --- ---- - - --- _VV-45_V - ---- - Peak power tracking voltage 27V-TV i Operating range - ..W_ --- �� -- - .__._._-___._ - 16 V-48 V -- - -_-_ ----_ -�-------- 16 V_-60 V_-_ - --- Mln/Max start voltage _-__._.___. 22V/4B V_ _-_-__- 22V/60V I Max DC short circuit current (module Isc) --- -- — ---- 15 A- _^____ __ -- 15 A _-_-____-_ _-- --- - --_ - � - -� -- -- J { Overvoltage class DC port II II If Dpo C rt backfeeilcurrent J' -. ___ratio___._.__-.-..,_-_ 0A _ PV array-c-onfiguration - _ 1 x 1 ungrounded_ array; No ad -di -tic al DC side protection required; AC side protection requires max 2 8, per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter I Peak output power __ 250 VA_ 295 VA Maximum continuous output power 240 VA_ J _ _ 290 VA Nominal (L-L) voltage/range' 240 V // 2Di1 V / 240 V_/-% 208 V/ _� ^_-_ _-____- - V 183-229 V_ 211-264 V_ V__ Maximum continuous output current _211-264 __ _ 1.0 A (240 V) 1.15 A (208 V) _ ___183.229 1.21 A (240 V) 1.39 A (2D8 V) LNominal frequency_ Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms _6.8 Arms - Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) -- III Overveltageclass ACport ^- ��-__ AC port backfeed current _III 00 A -- --__ 0 A Power factor setting __ _7.0 1.0 Power factor (adjustable) _ _�_��,_ 0.71eading...0.71agging 0.7 leading... 0.7 lagging - EFFICIENCY (_a1240 V @208 V @240 V @208 V I Peak CEC efficiency _ _-_ 97.6 % % % %_ CEC weighted efficiency _ - _97.6 _ - _ 970 % 97.0 % _97.5 _ _97.3 97.0 %_ ` 9_. % A u. MECHANICAL DATA Ambient temperature range -40°C to+65°C I _ Relative humidity range o con ensing Connectortype(IQ7--60-2-US&IQ7PLUS-72-2-US) MC4(orAmphenol H4 UTX with additional 4_DCPSadapter) _ �----� -� Connector type (IQ7-60-B-US & IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). Adaptors for modules with MC4 or UTX connectors: - PV2 to MC4: order ECA-S20-S22 -PV2 to UTX: order ECA-S20-S25 i Dimensions (WxHxD) Y 212 mm x 1_75 mm x 3_0.2 mm (without bracket)T� -38 Weight 1.08 kg Ibs) I Cooling Natural convection - No fans _ Approved for wet locations Yes - - ----_--PD3 _--- rpio-i tion degree - -- - -- - -- --- — __ — Enclosure Class II double -insulated, corrosion resistant polymeric enclosure rEnvironmentalnafegory/ UVexposurerating NEMAType6%outdoor --"'-1 FEATURES Communication L �_—_-- Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. ' Disconnecting mmeans The AC and DC connectors have been evaluated and approved by-UL for use as the load -break j disconnect required by NEC 690. Compliance- CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and 022.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at hftc<,// nnha= om/ n- =r= onorymod - tihllity. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirements to define the number of microlnverters per branch in your area. To learn more about Enphase offerings, visit enphase.com /�ENPHASE n MICROINVERTER SPECIFICATIONS SCALENIS Z-103