Loading...
HomeMy WebLinkAboutBowers EngineeringCONTRACTOR: Master Craft Aluminum DESIGN CRITERIA: Applicable Codes, Regulations, and Standards 1. The 6th Edition (2017) Florida Building Code, specifically Chapter 16 Structural Design, Chapter 20 Aluminum, and Chapter 23 Wood. 2. AA ASM 35 and AA ADMI Specifications for Aluminum Structures, Part 1-A of the Aluminum Design Manual prepared by The Aluminum Association. and the AAF Guide to Aluminum Construction in High Wind Areas. 3. ASCE 7-10. Loading Criteria 1. Live Load: 10 PSF per 6th Edition (2017) Florida Building Code, Appendix I Section 105.1 2. Dead Load: 2 PSF 3. Wind Load: 3.1. Building Occupancy Category, Section 1604.5 and Table 1604.5: Risk Category 1. 3.2. Ultimate Design Wind Speed: Vvr,T = 150 MPH Nominal Design Wind Speed: Vasa = 116 MPH 3.3. Exposure Category, Section 1609.4.3: Exposure C 3.4. Screen Enclosure Section 2002.4 4. Building Category for Aluminum Structures, Section 2002.6: Category Type 1 - Wood Shed: Non -Habitable Unconditioned Scope of Work: Does not include analysis of existing structure. Roof Type 1. Roof Type: MONOSLOPE 2. Roof Material: 3" x 48" x 0.024" Elite 2000 Composite Panel, 1.0 # density foam, Florida Product Approval Number FL 7561-R4. Foundation Design New 4" conc. slab w/ fibermesh filled w/ 2,500 PSI concrete. The foundations are based on a minimum soil bearing pressure of 1,500 psf. Specirications The following specifications are applicable to this project: 1. All work shall be in accordance with the 6th Edition (2017) Florida Building Code, and any other applicable local codes and regulations. 2. Aluminum extrusions shall be 6005 T5 Alloy. Due to quality control issues, no manufacturer substitution is acceptable without the specific written, signed and sealed authorization of Florida Aluminum Engineering, Inc. 3. Fasteners are required to be corrosion resistant, minimum SAE Grade 2 or better zinc plated to ASTM B633, or coated stainless steel series "300", or uncoated stainless steel series "400". 4. Approved concrete screw anchors to be Simpson Titen-HD or equivalent 5. All Self Mating Beam Sections are to be stitched with either #14 screws 6" from ends and 24" center to center or #12 screws 6" from ends and 12" center to center. 6. Door location shall be determined by contractor in the field. 7. Where concrete specifications are required, whether in the screen enclosure scope or not, by one or more regulatory agency, the following specifications are applicable: a. Concrete shall conform to ASTM C94 for the following components: i. Portland Cement Type 1,- ASTM C 150 ii. Aggregates - Large Aggregate 3/4" max - ASTM C 33 iii. Air entraining +/- 1%- ASTM C 260 iv. Water reducing agent - ASTM C 494 v. Clean Potable water vi. Other admixtures not permitted b. Metal accessories shall conform to: i. Reinforcing Bars - ASTM A615, grade 60 ii. Welded wire fabric - ASTM A185 c. Concrete slump at discharge chute not less than 3" or more than 5". Water added after batching is not permitted. d. Prepare and place concrete per American Concrete Institute Manual of Standard Practice, Parts 1, 2, and 3 including hot weather recommendations. e. Moist cure or polyethylene curing permitted. f. Prior to placing concrete, treat the entire subsurface area for termites in compliance with the FBC. g. Concrete shall be placed over a polyethylene vapor barrier. h. All aluminum components embedded within concrete shall be coated with a bituminous paint or epoxy. 8. All lumber and plywood shall have grade marks and treatment identification and Shall conform to the following: a. Framing lumber shall be minimum no. 2 southern yellow pine and have a maximum moisture content of 15%. b. Pressure treatments shall be osmosalts, osmose k-33, womansalts or celcure, as recommended for the use condition. Pressure treated lumber shall be impregnated with a cca salt treatment in accordance with f.s. tt-w-571 and bear the American Wood Preservatives Institute quality mark 1p-2. c. Wall Sheathing: APA rated Sheathing, thickness as indicated, Exposure 1. d. Aluminum members that are uncoated shall be separated from PT lumber by 30# felt paper, 10 mil polyethylene sheet or equivalent material. 9. Contractor shall provide Florida Product Approval information as to the exact window being utilized for this project, including manufacturers specifications, and installation methods for anchoring the submitted windows to Aluminum members and specific sizes as indicated on A-1. 10. Contractor shall provide any additional backing (aluminum, wood etc..) and anchors as required by the window manufacturers recommended procedures. 11. All glass panels within 24" of a door opening shall be of tempered glass per FBC-R308.4 12. All flashing and weatherproofing shall be provided by the contractor. 13. Use of these plans acknowledges and accepts a limit of liability not to exceed design and engineering fee. WIND SPEED AND EXPOSURE HAVE BEEN DETERMINED USING THE ADVANCED TECHNOLOGY COUNCIL'S WEBSITE AND GOOGLE EARTH. 3X3XO.093 POST O 0 3X3XO.093 POST I I 8'-0' 8'- 5- -- f A-2 S-1 A-2 11'-0" 2X8SMB A-2 A-3 4TH WALL 2X5SMB 4TH WALL 2X4PTC� BEAM 16"O.C. _/' m 3"X48"X0.024" O 1.0# DENSITY FOAM :U COMPOSITE PANEL �y•:�0 m 2X5SMB EDGE S) BEAM M. -1 A A 2X3KB_,,-' (TYP) O I 00 3X3XO.093 POST f 1'-0" 3X48X0.024" 1.0# DENSITY FOAM COMPOSITE PANEL (2) 20 TOP PLATE VINYL SIDING TO MATCH TY -VEX VAPOR BARRIER 1/2" PLY CDX 2X4PT BOTTOM PLATE 00 I t0 424-,- 71' B S -S A-2 A-3 8'-0" 11'-0" UJ U W J W (1. Z `m C7 Z Z Z Q Z O CL UJ N Z N w WU O 0 J C CL G V Z Z 5 Z_ a UJ wa�� Q W =2�� Z d�F cr_ U OZLEA J W LL W w UJQ D w Q of Lu WU J W W W:D-- Wt7F-to M L to v d m(�OOLLLL TP DATE DRAWN 03/26/20 REVISION SHEET NO: A-1 d Z U t� Z W 0 a 9 LL o O :U �y•:�0 UJ U W J W (1. Z `m C7 Z Z Z Q Z O CL UJ N Z N w WU O 0 J C CL G V Z Z 5 Z_ a UJ wa�� Q W =2�� Z d�F cr_ U OZLEA J W LL W w UJQ D w Q of Lu WU J W W W:D-- Wt7F-to M L to v d m(�OOLLLL TP DATE DRAWN 03/26/20 REVISION SHEET NO: A-1 d Z U t� Z W 0 a 9 LL ALUMINUM MEMBERS DUVIENSIONS HOLLOW SECTIONS �4 ���Ci'r��i 2x2: 2"x2"x0.046" •••'• '•• 2 x 3: 2" x 3" x 0.050" •••.• 2 x 4: 2" x 4" x 0.050" `��,`.��� : !(j LL 2� 2x5: 2"x5"x0.050" `. e( co o OPEN BACK SECTIONS S 0- W UJ Q 1x2: 1"x2"x0.040" N ;•V Q Z 1x3: 1"x3"x0.045" ;� Z • �v;•\: SNAP SECTIONS (5) 1!4" x 4" LAGS W/ ,�i�0 ••�• •' •!��/ ,, I NEOPRENE Xy • • ,'wkp..' • • • FACED WASHER PER PANEL �/ Q�O\\\\`,, 2 x 4 Snap: 2" x 4" x 0.045" 3" x 3" x 0.093" POST SELF MATING (SMB) 2 x 4 SMB : 2" x 4" x 0.044" x 0.100"cc 2 x 5 SMB: 2" x 5" x 0.050" x 0.100" r( W W 2 x 6 SMB: 2" x 6" x 0.050" x 0.120" "" W 2 x 7 SMB: 2" x 7" x 0.057" x 0.120" 2" x 2" x 3" x 1/8" ALUM ANGLE Z m 2 x 8 SMB: 2" x 8" x 0.072" x 0.124" EACH SIDE OF UPRIGHT{{-- 3" COMPOSITE F- O 2 x 9 SMB: 2" x 9" x 0.072" x 0.124" W/ (1) 3/8" DIA. x 3" CONCRETE ANCHORS (2 1/4" EMBEDMENT)3 " ROOF PANEL Z W lG W Z d 2 x 10 SMB: 2" x 10" x 0,092"x 0.398" � � INTO CONCRETE & (2) 3/8" DIA. x 4" x G CH ALUM RECEIVING CHANNEL � J � THRU BOLTS THROUGH POST W/ #10 x 3!4" TOP AND (3) 3/8" DIA. Z Q Z MINIMUM FASTENER EDGE DISTANCE: 1/2" BOTTOM AS END CAP THRU BOLTS p: MINIMUM FASTENER SPACING: 3/4" 1 O N N Z CONCRETE SCREW ANCHOR 2" x 5" SMB W V SIMPSON TITEN HD OR EQUIVALENTW r J m SHEET METAL SCREWS (SKIS): 3" x 3" x 0.093" POST cc ITW / BUILDEX OR EQUIVALENT 2 B 3" x 3" POST TO DECK CONNECTION DETAILS Z Z g SCALE: NTS A-2 S COMPOSITE ROOF TO POST CONNECTION ? n C ! g A-2 G SCALE: NTS 5 Z w m a - t, 6 Q WolQ W zw�-- �, Z 5~~ a � FD o_ oz g JJ uj U- 3" COMP ROOF PANEL SELF -MATING BEAM NOTE: HEADER ATTACHMENT TO 4 FASCIA W/ 1/4" LAGS @ 24" O.C. E DX W/ 1 3/4" EMBEDMENT 2 PT (5) 1/4" x 4" LAGS W/ FLASHING 1 1/4" DIA. NEOPRENE FACED WASHER PER PANEL 3" COMPOSITE i ,•; UU ROOF PANEL 12" 2 x 5 SMB .. z _..I uj EXISTING ./ i • i .. __... ij; J HOST a f/ QIt W LU 0 J W " W w (3) 318" DIA. THRU BOLT i .. A 12" _, _. _ if; O H MO w 2" x 3" x 0.050., ` KNEE BRACE UPRIGHT ; _(3)1/4" DIA. x 3" LAG SCREWS CIcT c+') O tC) O J d m (o LL \ 1 1!2" x 2118" x 1 1!2" x 5" x 0.062" INTO WALL STAGGERED V- r I ' I ALUM RECEIVING CHANNEL ` ' 'DRAW N BY 1 /' • I W1(4) #14 x 3/4" SMS EACH SIDE INTO BEAM '. TP 1 112° x 2 118" x 1 x DATE DRAWN 2"x5"SMB f� ,/ ,�'` 0.062" x 3" LONG ALUM I LU ;j i I / F'I RECEIVING CHANNEL W/ (3) 03/26/20 3" x 3" x 0.093" F'i #12 x 3/4" SMS EA. FACE & REVISION POST = (3) #12 x 3/4" INTO POST ; - - _ - S-3 BEAM TO HOST STRUCTURE ATTACHMENT DETAIL S-1 S-2 KNEE BRACE CONNECTION DETAIL A_2 SCALE: NTS 4 _ COMP. ROOF TO CORNER POST 4TH WALL DETAIL A-2 SCALE: NTS SHEET NO: SCALE: NTS A-2 A-2 fi \_(6) 114" DIA. x 3" LAG SCREWS 1 1/2" x 21/8" x 1 1/2" x 8" x 0.062" r INTO WALL STAGGERED ALUM RECEIVING CHANNEL W/ (6) #14 x 3/4" SMS EACH SIDE INTO BEAM ' S-4 BEAM TO HOST STRUCTURE ATTACHMENT DETAIL 1/2`:12` MINA_'3 SCALE: NTS NEW 1/4" DIA. x 5 7!8" LAG COMPOSITE ///'''SCREWS W/ 1 1/2" DIA. / ROOF / NEOPRENE FACED / / WASHER @ 8" O.C. (2) 2X4 TOP HEADER SCHEDULE OPENING HEADER SIZE 1 � C (2)2"x8" T-5" TO 64" (2) 2" x 8" 5'-5" TO 8'-8" (2) 2" x ta' 8'-7 TO 12-8" (2) 2" x 12' EACH HEADER SHEATHING SPLICE O DOUBLE HEADER PER SCHEDULE (2) 16d TOE NAILS =a iw (o * w .� Q O: Q 2x4'T (2) LSTA24 EA END V < EACH END 8d @ 24" OC STAGGERED �/ ty Z /// 2"x8"SMB ,, 2X4PT STUDS @ 16" O.C. O'•• •••••.' !!` ``� 1'-9 314" HEADER PER SCHEDULE fi \_(6) 114" DIA. x 3" LAG SCREWS 1 1/2" x 21/8" x 1 1/2" x 8" x 0.062" r INTO WALL STAGGERED ALUM RECEIVING CHANNEL W/ (6) #14 x 3/4" SMS EACH SIDE INTO BEAM ' S-4 BEAM TO HOST STRUCTURE ATTACHMENT DETAIL 1/2`:12` MINA_'3 SCALE: NTS NEW 1/4" DIA. x 5 7!8" LAG COMPOSITE ///'''SCREWS W/ 1 1/2" DIA. / ROOF / NEOPRENE FACED / / WASHER @ 8" O.C. (2) 2X4 TOP HEADER SCHEDULE OPENING HEADER SIZE UP TO 3'W (2)2"x8" T-5" TO 64" (2) 2" x 8" 5'-5" TO 8'-8" (2) 2" x ta' 8'-7 TO 12-8" (2) 2" x 12' 1. THE FOUNDATIONS SHOWN ARE BASED ON A MIN SOIL BEARING PRESSURE OF 1,500 PSF BEARING CAPACITY OF SOIL SHALL BE VERIFIED BY LICENSED CONTRACTOR PRIOR TO POURING CONCRETE. 2. THE SLAB/FOUNDATION AREA SHALL BE CLEARED OF DEBRIS AND ROOTS AND SHALL BE COMPACTED PRIOR TO PLACEMENT OF CONCRETE. 3. CONCRETE SHALL BE PER SPECIFICATIONS IN THE DESIGN SUMMARY. 12" OVERHANG MAX HEADER SCHEDULE VINYL SIDING ON TY -VEX VAPOR BARRIER PAPER OR HOUSE WRAP ON 1/2" APA RATED SHEATHING 2X4 S.Y.P. @ 16" O.C. NOTES FOR WALL SHEATHING: 1. 1/2" APA RATED SHEATHING CONTINUOUS FROM BOTTOM OF BOTTOM PLATE TO TOP OF TOP PLATE. SHEATHING IS PART OF LOAD PATH TO GROUND. 2. IF SHEATHING HAS HORIZONTAL BREAK, IT CANNOT BE USED AS PART OF LOAD PATH - USE H2.5AT BOTTOM AND H.2 AT TOP OF EACH STUD. NAIL PATTERN: 8d 4" O.C. @ EDGES 8d 6" O.C. INFILL 2X4PT STUD (a; 16" O.C. (1) 2" x 4" PT BOTTOM PLATE W/ 3/8" x 4" DIA, SCREW ANCHOR @ 2' O.C. S-, TYPICAL WOOD FRAME WALL SECTION A_3 SCALE: NTS H2.5ATALL HEADER SCHEDULE OPENING HEADER SIZE UP TO 3'W (2)2"x6" T-5" TO 5'4" (2) 2" x 8" 5'-5" TO 8'-8" (2) 2" x 19 87-7 75 -1 2__'-6" (2) 2"x 12' TOP PLATE DOUBLE 2X 2X4 HORIZONTAL BOTTOM PLATE HEADERSIZE SINGLE 2X PT SIMPSON STRONG TIE 3 - 16d x 5 EACH SIDE IN BLOCKING AT LTT20B A -A TYPICAL WOOD FRAME WALL @ DOOR SECTION A-3 SCALE: NTS EACH HEADER SHEATHING SPLICE HEADER PER SCHEDULE (2) 16d TOE NAILS 2 - 2X4PT STUDS MIN. (2) LSTA24 EA END EACH SIDE OF OPENING EACH END 8d @ 24" OC STAGGERED 2X4PT STUDS @ 16" O.C. 1'-9 314" HEADER PER SCHEDULE (2) LSTA24 EA END (2) - 2X4PT STUDS MIN. EACH SIDE OF OPENING 1 5/8" 16d @ 24" O.C. STAGGERED 16d NAILS @ 6" O.C. AT CORNER STUDS 2X4PT STUDS @ 16" O.C. H 2.5 AT ALL STUDS-/ BOTTOM PLATE HEADERSIZE SINGLE 2X PT SIMPSON STRONG TIE SIMPSON STRONG TIE LTT20B LTT20B A -A TYPICAL WOOD FRAME WALL @ DOOR SECTION A-3 SCALE: NTS H2.5ATALL HEADER SCHEDULE OPENING HEADERSIZE UPT03'4" (2)2"x8" 3'-5" TO 5'-4" (2) 2" x 8" 5'-5" TO (2) 2" x 10" 8'-7 TO 17-8" (2) 2" x 12' TOP PLATE DOUBLE 2X 2X4 HORIZONTAL 1 3 - 16d x 5 EACH SIDE IN BLOCKING AT EACH HEADER SHEATHING SPLICE (2) 16d TOE NAILS EACH END HEADER PER SCHEDULE 2 - 2X4PT STUDS MIN. (2) LSTA24 EA END EACH SIDE OF OPENING 8d @ 24" OC STAGGERED 2X4PT STUDS @ 16" O.C. BOTTOM PLATE SINGLE 2X PT SIM PSO N STRONG TIE SI M PSON STRONG TIE LTT20B LTT20B B B' TYPICAL WOOD FRAME WALL WINDOW SECTION A-3 SCALE: NTS W W W p: Z M W Z J zd z° O 11 n N QC w W C J O O w = a � W Z) Z N j W Q Q W Q Of W ui J W Lu f?' _ (L I" >W >: 0 0- mC(Ou-L.L DRAWN BY TP DATE DRAWN 03/26/20 REVISION AT _ SHEET NO: A-3