HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: WYNNE THE ROYALE IMPACT
Builder Name: WYNNE
Street: WYNNE DEV.
Permit Office: ST. LUCIE COUNTY
City, Stale, Zip: FT. PIERCE, FL,
Permit Number:
Owner. �s � C,-�
Jurisdiction:
Design Location: FL, Fort Pierce
County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing New (From .Plans)
9. Wall Types(1688.7 sgft.)
Insulation Area
2. Single family or multiple family Single-family
a. Concrete Block - Int Insul, Exterior
R=4.1 1448.70 ft2
b. Frame - Wood, Adjacent
R=11.0 240.00 ft2
3. Number of units, if multiple family 1
c. N/A
R= ft
4. Number of Bedrooms 3
d. WA
R= ft2
5. Is this a worst case? Yes
10. Ceiling Types. (1750.0 sqft.)
Insulation Area
a. Under Attic (Vented)
R=30.0 1720.00 ft2
6. Conditioned floor area above grade (ft2) 1720
b. Knee Wall (Vented)
R=19.0 30.00$2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft=
11. Ducts
R ft2
7. Windows(155.4 sqft.) Description Area
a: Sup: Attic, Ret: Attic, AH: Attic
6 175
a. U-Factor. Sgl, U=1.04 115.42 ft2
,
SHGC: SHGC=0.29
b. U-Factor. Sgl, U=1.11 40.00 ft2
12. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.27
a. Central Unit
34.8 SEER:15.00
c. U-Factor. WA ft2
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor. WA ft2
a. Electric Heat Pump
34.8 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 3.316 ft.
Area Weighted Average SHGC:. 0.285
14. Hot water systems
8. Floor Types (1720.0 sqft.) Insulation Area
a. Electric
Cap: 40 gallons
a. Slab -On -Grade Ede Insulation R=0.0 1720.00 ft2
9
b. Conservation features
EF: 0.970
b. N/A R= ft2
None
c. N/A R= ft2
15. Credits
Fatal
Total Proposed Modified Loads: 56.36
Glass/Floor Area: 0.090
PASS
Total Baseline Loads: 56.25
I hereby certify that the plans and specifications covered by
Review of the plans and
4 fi#>rSTe .
this calculation are in compliance with the Florida Energy
specifications covered by this
Code.
calculation indicates compliance
with the Florida Energy Code.
PREPAREp BY:
Before construction is completed
DATE: 1-9-20
this building will be inspected for
compliance with Section 553.908
)'9 - A11
hereby certify that this building, as designed, is in pliance
Florida Statutes.
with the Florida Energy Code.
OWNER/AGENT
BUILDING OFFICIAL:
DATE: ��
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed In accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402A.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
1/8/2020 4:55 PM EnergyGauge® USA 6.0.02 (Rev. t) - FlaRes2017 FBC sill Edition. (2017) Compliant Software Page 1 of 5
FORM R405-2017 INPUT SUMMARY GMECKL15T REPORT
PROJECT
Title: WYNNE THE ROYALE IMPA Bedrooms: 3
Address Type:
Street Address
Building Type: User Conditioned Area: 1720
Lot#
Owner Name: Total Stories: 1
Biock(SubdhAsion:
#of Units: 1 Worst Case: Yes
PlatBook:
Builder Name: WYNNE Rotate Angle: 90
Street:
WYNNE DEV.
Permit Office: ST. LUCIE COUNTY Cross Ventilation: No
County: .St.
Lucie
' Jurisdiction: Whole House Fan: No
City, State, Zip:
Fr. PIERCE,
Family Type: Single-family
FL,
New/E)dsgdg: New (From Plans)
Comment:
CLIMATE
Design Temp
Inl Design Temp Heating
Design Daily Temp'
Design Location TMY Site 97.5 % 2.5 %
Winter
Summer Degree Days Moisture
Range
FL, Fort Pierce FL—VERO_BEACH_MUNI 39 90
70
75 299
62
LOW -
BLOCKS
Number Name `Area Volume
1 Entire House 1720 13760
SPACES
Number Name Area Volume Kitchen Occupants
Bedrooms
Infil ID Finished Cooled
Healed
1 BEDROOM 343 2744 No 0
1
1 Yes
Yes
Yes
2 WIC 63 504 No 0
1 No
Yes
Yes
3 M.BATH 56 448 No 0
1 Yes
Yes
Yes
4 KITCHEN 172 1376 Yes 0
1 No
Yes
Yes
5 BATH 45 360 No 0
1 Yes
Yes
Yes
6 BEDROOM 2 204 1632 No 0
1
1 Yes
Yes
Yes
7 ENTRY 98 784 No 0
1 Yes
Yes
Yes
8 LAUNDRY 42 336 No 0
1 Yes
Yes
Yes
9 GRFAT/DINING 528 4224 No 0
1 Yes
Yes
Yes
10 BEDROOM 3 169 1352 No 1
1
1 Yes
Yes
Yes
FLOORS
# Floor Type Space Perimeter Perimeter R-Value
Area
Joist R-Value
Tile Wood
Carpet
1 Slab -On -Grade Edge Insulatio BEDROOM 52 ft 0
343 ft'
—
0 1
0
2SIab-On-Grade Edge Insulatio WIC lit 0
63 ft'
_
0 1
0
3SIabOn-Grade Edge Insulatio M. BATH 8 ft 0
56 fN
_
0 1
0
4Siab-On-Grade Edge Insulatio KITCHEN 1 ft 0
172 ft'
_
0 1
0
SSIab=On-Grade Edge Insulatio BATH 5ft 0
45ft'
—
0 1
0
6SIab-On-Grade Edge Insulatio, BEDROOM 2 42.6.it 0
204 ft'
_
0 1
0
7SIab-On-Grade Edge Insulatio ENTRY 6.3 It 0
98 ft'
_
0 1
0
1/8/2020 4:56 PM EnergyGauge®USA 6.0.02.(Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software - Page 2 of 5
FORMR405-2017 INPUT. bUMMAKYGFIEGKI-I51 KtPUKI
FLOORS
#
Floor Type Space Perimeter Perimeter R-Value
_ Area
Joist R-Value
Tile Wood Carpet
8 Slab -On -Grade Edge Insulatio LAUNDRY Eft
0
42 ft'
0
1
0
9 SIab-On-Grade Edge Insulatio GREATIDINING 48 ft 0
528 ft'
_
0
1
0
10SIab-On-Grade Edge Insulatio BEDROOM 3 13 ft 0
169 ft2'
-
0
1
0
ROOF
Roof
Gable
Roof
Red
Solar
SA Emitt
Emitt Deck
Pitch
#
Type Materials Area
Area
Color
Barr
Absor.
Tested
Tested Insul.
(deg)
1
Gable or Shed Metal 1813 ft2
286 112
Light
N
0.6
No 0.9
No 0
18.4
ATTIC
/
V
#
Type Ventilation
Vent Ratio (1 in)
Area
RBS
IRCC
1
Full attic Vented
150
1720 112
N
N
CEILING
#
Ceiling Type Space
R-Value
Ins Type
Area
Framing Free
Truss Type
1
Under Attic (Vented) BEDROOM
30
Blown
343 ft'
0.1
Wood
_
2
Under Attic (Vented) WIC
30
Blown
63ft'
0.1
Wood
_
3
Under Attic (Vented) M. BATH
30
Blown
56 ft'
0.1
Wood
_
4
Under Attic (Vented) KITCHEN
30
Blown
172'ft'
0.1
Wood
_
5
Under Attic (Vented) BATH
30
Blown
45 ft'
0.1
Wood
_
6
Under Attic (Vented) BEDROOM
30
Blown
204 ft'
0.1
Wood
_
7
Under Attic (Vented) ENTRY
30
Blown
98 ft'
0.1
Wood
_
8
Under Attic (Vented) LAUNDRY
30
Blown
42 ft'
0.1
Wood
9
Under Attic (Vented) GREAUDINING
30
Blown
528 ft'
0.1
Wood
10
Under Attic (Vented) BEDROOM 3
30
Blown
169 ft'
0.1
Wood.
11
Knee Walt (Vented) GREAT/DINING
19
Blown
30 ft2
0.11
Wood
WALLS
Adjacent
Space Cavity Width
Height
Solar, Below,
Sheathing FramiPALA..
nmf
Pf In
Ft
In
Area
PAW-
�tjng
1
N=>E
Exterior Concrete Block- Int lnsuBEDROOM
4.1 9
0 8
0
72.0 ft2
0
0
0.4
0
2
S=>W
Exterior Concrete Block -Int lnsuBEDROOM
4.1 29
0 8
0
232.0 ft2
0
0
0.4
0
_ 3
W=>N
Exterior Concrete Block- Int InsuBEDROOM
4.1 14
0 8
0
112.0 ft'
0
0
0.4
0
_ 4
S=>W
Exterior Concrete Block- Int Insul M. BATH
4.1 8
0 8
0
64.0 ft'
0
0
0.4
0
_ 5
N=>E
Exterior Concrete Block- Int Insul BATH
4.1 5
0 8
0
40.0 ft'
0
0
0.4
0
_ 6
N=>E
Exterior Concrete Block- Int Ins®EDROOM 2
4.1 14
0 8
0
112.0 ft'
0
0
0.4
0
_ 7
NE=>SE Exterior Concrete Block - Int Ins6EDR00M2
4.1 2
10 8
0
22.7 ft2
0.
0
0.4
0
8
E=>S
Exterior Concrete Block - Int InsHEDROOM 2
4.1 9
0 8
0
72.0 ft'
0
0
0.4
0
_ 9
SE=>SW Exterior Concrete Block- Int InsE1EDR00M 2
4.1 2
10 8
0
22.7 ft2
0
0
0.4
0
_ 10
S=>W
Exterior Concrete Block- Int Ins(KEDROOM 2
4.1 14
0 8
0
112.0 ft2
0
0-
0.4
0
11
NE=>SE
Exterior Concrete Block- Int Insul ENTRY
4.1 1
5 8
0
11.3 112
0
0
0.4
0
1/812020 4:56 PM EnergyGaugeb USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5
FORM R405-2017 INPUT. SUMMARY. CHECKLIST REPORT
WALLS
Adjacent Space Cavity Width Height
Sheathing Framing Solar
Below
_ 12
E=>S Exterior Concrete Block- Int Insul ENTRY 4.1 5 0 8
0 40.0 ft2
0 0.4
0
_ 13
S=>W Exterior Concrete Block - Int InsuLAUNDRY 4.1 6 0 8
0 48.0 ft'
0 0 0.4
0
14
N=>E Exterior Concrete Block - Int Inst6REAT/DINI 4.1 28 0 8
0 224.0 ft2
0 0 0.4
0
_ 15
W=>N Exterior Concrete Block - Int Insd6REAT/DINI 4.1 20 0 8
0 160.0 ft'
0 0 0.4
0
16
N=>E Exterior Concrete Block - Int InsBEDROOM 3 4.1 13 0 8
0 104.0 ft2
0 0 0.4
0
17
N=>E Garage Frame -Wood BEDROOM 11 30 8
240.0 ft2
0.23 0.4
0
DOORS
# Omt Door Type Space Storrs
U-Value
Width Height -
Area
Ft In Ft In
1 E=>S Insulated ENTRY None
.32 3
6 8
20 ft
WINDOWS
Orientation shown is the entered orientation => changed to Worst Case.
Wall
Overhang
# Omt ID Frame Panes NFRC U-Factor. SHGC Imp
Area Depth
Separation Int Shade
Screening
_
1 W=>N 3 Metal Low-E Single Yes 1.04 0.29 N
32.4 ft' 1 ft 0 In
1 ft 5 in Drapeslblinds
Exterior 5
_
2 S=>W 4 Metal Low-E Single Yes 1.04 0.29 N
6.9 ft' 1 ft 0 in
1 ft 5 in None
None
_
3 E=>S 8 Metal Low-E Single Yes 1.04 0.29 N
23.2 ft2 1 ft 0 in
1 ft 5 in None
None
_
4 N=>E 14 Metal Low-E Single Yes 1.64 0.29 N
36.6 ft2 1 ft 0 in
1 ft 5 in None
None
_
5 W=>N 15 Metal Low-E Single Yes 1.11 0.27 N
40.0112 10 ft 0 in
1 ft 5 in None
None
6 N=>E 16 Metal Low-E Single Yes 1.04 0.29 N
16.2 112 1 ft 0 in
1 ft 5 in None
None
GARAGE
# Floor Area Ceiling Area Exposed Wall Perimeter
Avg. Wall Height
Exposed Wag insulation
1 300 ft2 300 ft2 30 ft
8 ft
11
INFILTRATION
# Scope Method SLA CFM 50. ELA EgLA ACH
ACH 50
1 Wholehouse Proposed ACH(50) .000356 1605.3 88.13 165.74 .1233
7
HEATING SYSTEM
# System Type Subtype Speed Efficiency
Capacity
Block
Ducts
1 Electric Heat Pump/ Split Singl - HSPF:8.5
34.8 kBtu/hr
1
sys#1
COOLING SYSTEM
# System Type Subtype Subtype Efficiency
Capacity Air Flow SHR Block
Ducts
1 Central Unill Split Singi SEER: 15 34.8kBlu/hr
cfm 0.85 1
sys#1
1/82020 4:56 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5.
1=nRM RA05-2017 - INPUT. SUMMARY. CHECKLIST REPORT
HOT WATER SYSTEM
# System Type
subType
Location
EF
Cap
Use
SetPnt
Conservation
1 Electric
None
Garage
.0.97
40 gal
60.9 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cart # Company Name
System Model # Collector Model
# Area Volume
FEF
None None
ft'
DUCTS
/ —Supply—
—Return
Air
CFM 25
CFM25
HVAC#
V # Location R-Value Area
Location
Area
Leakage Type
Handler
TOT
OUT GIN ,
RLF
Heat Cool
1 Attic
6 175 ft'
Attic
65 ft2
Default Leakage
Attic
(Default) (Default)
1 1
TEMPERATURES
Progmmabl[re ThermostatJan:
Ceiling Fans:Cooling
,Y
Mar
[FebrX']
Apr
MJul
lrX rr
rtDec
Aug(t
Aug
Se
Sep
r r0('I
Nov
Nov
rIX,]
Dec
Venting [ ]Jan [ ] Feb
(X] Mar
Apr
May.
(� Jun [ Jul
[X�
[X�
Oct [X]
[ ]
Thermostat Schedule: HERS 2006 Reference
Hours,
Schedule Type
1
2 3
4
5 6
7
8
9 10
11
12
Cooling (WD) AM
78
78 78
78
78 78
78
78
80 80
80
80
PM
80
80 78
78
78 78
78
78
78 .78
78
78
Cooling (WEH) AM
78
78 78
78
78 78
78
78
78 78
78
78
PM
78 -78
78
78
78 78
78
78
78 78
78
78
Heating (WD)
68
68
68
68 68
68
68
68 68
66
66
PM
68
Heating (WEH) AM
66
66 66
66
66 68
68
68
68 68
68
68
PM
68
68 68
68
68 68
68,
68
68 68
66
66
MASS
Mass Type
Area
Thickness
Furniture Fraction
Space
Default(8lbslsq.fL
0 it,
0 ft
0:3
BEDROOM
Defaull(8lbs/sq.fL
ft'
It
0.3
WIC
Defaull(B Ibs/sq.ft.
ft'
it
0.3.
M. BATH
Default(8 lbs/sq.ft.
ft'
It
0.3
KITCHEN
Default(8 lbs/sq.ft.
ft'
ft
0.3
BATH
Default(8lbs/sq:ft.
ft'
ft
0.3
BEDROOM 2
Defautt(81bs/sq.R
ft'
It
0.3
ENTRY
Default(8 Ibs/sq.fL
ft'
It
0.3
LAUNDRY
Default(8 lbsts.ft.
ft'
It
0.3
GREAT/DINING
1/8/2020 4:56 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: WYNNE THE ROYALE IMPACT Builder Name: WYNNE
Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
Owner. Jurisdiction:
m
Design Location: FL, Fort Pierce
LL))
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barter shall be installed In the building envelope.
'Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceilinglattic
The air barrier in any dropped ceilinglsoffit shall be aligned with
The insulation in an dropped callin /soffit
y pp 9
the insulation and any gaps in the air barrier shag be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame wags
The junction of the lop plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity .
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
'
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between Wndowldoor jambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity Insulation shall be installed to
(including
Insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be In contact with the top side
floors)
'of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered vdth
Where provided Instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures Installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind ninino and Wring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exteriorwalls. adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be Insulated.
Electdcal/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover nlates and wall or ceilinas.
I
f
a. in aeonion, mspecmn or iog Walls snail oe in accoroance vam me provisions or luu-4uu.
1/8/2020 4:57 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* =100
The lower the Energy
Performance Index,
the more efficient the home.
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
a) Supply ducts R
6.0
2. Single-family or multiple -family
2. Single-family
b) Return ducts R
6.0
c) AHU location
Attic
3. No. of units (if multiple -family)
3.
1
4. Number of bedrooms
4.
3
13. Cooling system: Capacity
34.8
a) Split system SEER
15.0
5. Is this a worst case? (yes/no)
5.
Yes
b) Single'package SEER
c)Ground/water source SEER/COP
6. Conditioned floor area (sq. ft.)
6.
1720
d) Room unit/PTAC EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average)
7a.
1.058
b) Solar Heat Gain Coefficient(SHGC)
7b.
0.285
14. Heating system: Capacity
34.8
c) Area
7c.
155.4
a) Split system heat pump HSPF
8.5
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance COP
a) U-factor:(weighted average)
8a.
NA
d) Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b.
NA
e) Gas furnace, LPG AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a.
0.0
b) Wood, raised (R-value)
9b.
16. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance EF
0.97
b) Gas fired, natural gas EF
10. Wall type and insulation:
c) Gas fired, LPG EF
A. Exterior.
d) Solar system with tank EF
1. Wood frame (Insulation R-value)
10A1.
e) Dedicated heat pump with tank EF_
2. Masonry (Insulation R-value)
10A2.
4.1
f) Heat recovery unit HeatRec%
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
10131.
11.0
2. Masonry (Insulation R-value)
10B2.
16. HVAC credits claimed (Performance Method)
11. Ceiling type and insulation level
a) Ceiling fans
a) Under attic
11 a.
30.0
b) Cross ventilation
No
b) Single assembly
11b.
c) Whole house fan
No
c) Knee walls/skylight walls
11c.
19.0
d) Multizone cooling credit
d) Radiant barrier installed
11d.
No
e) Multizone heating credit
f) Programmable thermostat
Yes
*Label requited by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving -features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installed code compliant features.
Builder Signature: Date:
Address of New Home: WYNNE DEV. -Q 4z-� City/FL Zip: FT. PIERCE. FL
1/812020 4:66:68 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software- Page 1 of 1