Loading...
HomeMy WebLinkAbout1 - Eng Cert - Phase 2ENGINEERS 0 SURVEYORS 0 ENVIRONMENTAL April 16, 2020 File # 16-129 Grant Chambers, P.E. St. Lucie County Water Quality Division 2300 Virginia Avenue, Room 229 Fort Pierce, FL 34982 Subject: Final Certification of Site Improvements / Phase 2— Missionary Flights International Recreational Vehicle Park Dear Mr. Chambers, This letter is to certify that the site development work, including the paving, grading, drainage, and associated items, for the second phase of the above -referenced project have been completed in substantial conformance with the approved design plans and specifications and in accordance with the regulations set forth in the Land Development Regulations. The second lift of asphalt has not yet been fully completed and will be constructed and certified as part of a future phase as previously approved by St. Lucie County. Determination to certify is based upon review of the as -built surveys and site inspections. On-site observation of construction has been conducted by myself or my representative, for the purposes of determining if the work proceeded in compliance with the plans and specifications. Please note this does not include certification for any structural, building, electrical, or landscape components of the project. Should you have any questions or require additional information, please feel free to contact me at 772- 462-2455 or by e-mail at iaysonharrison aQedc-inc.com at your convenience. Sincerely, ENGINEERING DESIGN & CONSTRUCTION, INC. HARR�SO 82270 STATE OF :/ � Son, ,iarrisn,• �� Date tORIO," ONA w/enc(Aumd 111 cc: project file 10250 SW Village Parkway, Suite 201 Port St. Lucie, FL 34987 772-462-2455