HomeMy WebLinkAboutEnergy CodeMAR 0 5 2020
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR B
Florida Department of Business and Professional Regulation - Residential Performance Method
ProjectName: DAGG ADDITION
BuilderName:
Street: 13206 HARBOR RIDGE 3A
Permit Office: ST. LUCIE COUNTY
City, Stale, Zip: PALM CITY, FL,
PennitNumber:
Owner:
Jurisdiction: 6611000
DesignLocation: FL, Fort Pierce
County: St. Lucia (Florida Climate Zone 2)
1. New construction or existing Addition
9. Wall Types (184.0 sgft.)
Insulation Area
2. Single family or multiple family Multi -family
a. Frame -Wood, Exterior
R=11.0 184.00 ft'
b. N/A
R= ft2
3. Number of units, if multiple family 1
c. WA
R= ft2
4. Number of Bedrooms(Bednns In Addition) 0(0)
d.N/A
R= ft2
10. Ceiling Types (120.0 sgft.)
Insulation Area
5. Is this a worst case? No
a. Under Neighbor (Vented)
R=19.0 120.00ft?
6. Conditioned Floor area above grade(ft') 120
b. N/A
R= ft2
Conditioned Ooorarea belowgrade(ft') 0
c. WA
R= ft2
11. Ducts
R ft2
7. Windows(93.3 sgft.) Description Area
a. Sup: Attic, Ret: Attic, AH: ADDITION
6 24
a. U-Factor: Sgl, U=0.65 93.33 ft2
SHGC: SHGC=0.25
b. U-Factor: N/A ft2
12. Cooling systems
kBtu/hr Efficiency
SHGC:
a. Central Unit
29.0 SEER:16.00
c. U-Factor: N/A ft2
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor: N/A ft2
a. Electric Strip Heat
27.0 COPA.00
SHGC:
Area Weighted Average Overhang Depth: 1.000 ft.
Area Weighted Average SHGC: 0.250
14. Hot water systems -Nonerequired
a.
Cap:N
8. Floor Types (120.0 sgft.) Insulation Area
EF: 0.00000
a. Slab -On -Grade Edge Insulation R=0.0 120.00 ft'
b. Conservation features
b. N/A R= ft'
c. NIA R= ft'
15. Credits
Pstal
Glass/Floor Area: 0.778 Total Proposed Modified Loads: 6.06
PASS
Total Baseline Loads: 6.09
1 hereby certify that the plans and specifications covered by
Review of the plans and
SpAT6
this calculation are in compliance with the Florida Energy
specifications covered by this
D4THE
�'
Code.
calculation indicates compliance
with the Florida Energy Code.
hunk ;; r r-•;m ;, �0
PREPARED BY: }N'Q J
Q2M
Before construction is completed
DATE:
this building will be inspected for
compliance with Section 553.908
�. a
. c
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
It
with the Florida Energy Code.
CQD WE CgJ
OWNER/AGENT:
BUILDING OFFICIAL:
DATE:
DATE:
- Compliance requires certification by the air handier unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1. a d �yproject requires
an envelope leakage test report with envelope leakage no greater t� V I V E f�l` OTeh F �
REVIEWED FOR
CODE COMPLIANCE
314/20206:38 AM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC MAI66V9 LEianf5oftwareNTY Pagel of
BOCC
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title:
Building Type:
OwnerName:
#of Units:
BuilderName:
Permit Office:
Jurisdiction:
FamilyType:
New/Exisling:
Comment:
DAGG ADDITION Bedrooms: 0
User ConditionedArea: 120
Total Stodes: 1
1 Worst Case: No
RotateAngle: 0
ST. LUCIE COUNTY CrossVentilation:
6611000 Whole House Fan:
Multi -family
Addition
Address Type: StreelAddress
Lot#
Block/Subdivision:
PlatBook:
Street: 13206 HARBOR RIDGE
County: St. Lucie
City, Slate, Zip: PALM CITY,
FL,
CLIMATE
/
v DesignLocation
Design Temp
TMYSite 97.5% 2.5%
Inl Design Temp Heating Design DailyTemp
Winter Summer Degree Days Moisture Range
FL, Fort Pierce
FL VERO_BEACH_MUNI 39 90
70
75 299 62 Low
BLOCKS
Number
Name
Area Volume
1
Blockl
120 960
SPACES
Number
Name
Area Volume Kitchen Occupants
Bedrooms IntiI ID Finished Cooled Heated
1
ADDITION
120 960 No 1
1 Yes Yes Yes
FLOORS
#
FlcorType
Space Perimeter R-Value
Area
Tile Wood Carpet
1 Slab -On -Grade Edgelnsulation ADDITION 46ft 0
120 ft'
---- 0 0 1
ROOF
J#
Type
Roof Gable Roof
Materials Area Area Color
Red
Barr
Solar SA Emitt Emitt Deck Pilch
Absor. Tested Tested Insul. (deg)
_ 1
Flat
Compositionshingles 120 ft2 6ft' Medium
N
0.6 No 0.9 No 0 4.8
ATTIC
/
V #
Type
Ventilation Vent Ratio (1 in)
Area
RBS IRCC
1
No attic
Vented 300 120 ft'
N N
CEILING
#
Ceiling Type
Space R-Value Ins Type
Area Framing Frac Truss Type
1
UnderNeighbor(Vented) ADDITION 19 Blown
120 ft' 0.11 Wood
3/4/2020 6:38 AM EnergyGauge® USA 6.0.02 (Rev. 1) -FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 4
FORM RAltri-7f117 INPUT SUMMARY CHECKLIST REPORT
WALLS
Adjacent
S Pace Cavity Width Height Sheathing Framing Solar Below
_ 1 NW
_2 NE
3 SE
Exterior Frame -Wood
Exterior Frame -Wood
Exterior Frame -Wood
ADDITION 11 4 8 32.0 ft' 0.23 0.4
ADDITION 11 15 8 120.0ft 0.23 0.4
ADDITION 11 4 8 32.0 ft' 0.23 0.4
0
0
0
WINDOWS
Orientation shown isthe entered, Proposed orientation.
/
V #
Wall
Ornt ID Frame Panes
Overhang
NFRC U-Factor SHGC Imp Area Depth Separation IntShade
Screening
1
NE 2 Vinyl Low-ESingle
Yes 0.65 0.26 N 93.3 ft' 1 ft 0 in Oft 5 in Drapes/blinds
Exteriorl
INFILTRATION
# Scope
Method
SLA CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50)
.000254 80 4.39 8.26 .0881 5
HEATING SYSTEM
#
System Type
Subtype Speed Efficiency Capacity Block
Ducts
1
ElectricStripHeaUReplacemen
None COPA 27 kBtulhr 1
sys#1
COOLING SYSTEM
#
System Type
Subtype Subtype Efficiency Capacity Air Flow SHR Block
Ducts
1
Central Un'NReplacementforw
None Single SEER: 16 29 kBtulhr 870 drn 0.8 1
sys#1
SOLAR HOT WATER SYSTEM
FSEC
Cart# CompanyName
Collector Storage
System Model# CollectorModel# Area Volume
FEF
ft'
DUCTS
#
—Supply—
Location R-Value Area
— Return -- Air CFM 25 CFM26
Location Area LeakageType Handler TOT OUT ON RLF
HVAC#
Heal Cool
1
Attic 6 24 ft'
Attic 6 ft' Defaulti-eakage ADDITION (Default) c(Default) c
1 1
3/4/2020 6:38 AM EnergyGaugeO USA 6.0.02 (Rev.1)-FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 4
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
TEMPERATURES
ProgramableThermostat: Y
I
Ceiling Fans:
rr''
Heating HJan
rr''
HFeb
rr''
[X]Mar
Apr
I
I May
[ lJun
�X
r lJul
IX
[ iAug
IX
r
lSep
j j
LJ Occtt
[[X�]
Venting Ir 11 Jan
II 1) Feb
Ir�X1l Mar
Apr
May
I Jun
r Jul
r Aug
I
Sep
l><t
[X]Nov
Dec
TherrnostatSchedule:
HERS 2006 Reference
Hours
ScheduleType
1
2
3
4
5
6
7
8
9
10
11
12
Cooling(WD)
AM
78
78
78
78
78
78
78
78
80
80
80
80
PM
80
80
78
78
78
78
78
78
78
78
78
78
Cooling(WEH)
AM
78
78
78
78
78
78
78
78
78
78
78
78
PM
78
78
78
78
78
78
78
78
78
78
78
78
Healing(WD)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
Heating(WEH)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
MASS
Mass Type
Area
Thickness
FumitureFraction
Space
Default 81bsls
.ft.
0 ft'
0 it
0.3
ADDITION
3/4120206:38 AM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4of4
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: DAGG ADDITION Builder Name:
Street: 13206 HARBOR RIDGE 3A Permit Office: ST. LUCIE COUNTY
City, Stale, Zip: PALM CITY, FL, Permit Number:
U
Owner: Jurisdiction: 6611000
w
x
Design Location: FL, Fort Pierce
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
Ceilinglat is
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity Insulation shall be installed to
QnGuding
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
-
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
Narrow cavities
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Wring
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electricallphone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
a. In addition, inspection of log walls shall be in accordance win the provisions or Icc-auu.
3/412020 6:36 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 100
The lower the Energy Performance Index, the more efficient the home.
1. New home or, addition
1. Addition
12. Ducts, location & insulation level
a) Supply ducts
R
6.0
2. Single-family or multiple -family
2. Multi -family
b) Return ducts
R
6.0
c) AHU location
ADDITION
3. No. of units (if multiple -family)
3.
1
4. Number of bedrooms
4.
0
13. Cooling system:
Capacity
29.0
a) Split system
SEER
5. Is this a worst case? (yes/no)
5.
No
b) Single package
SEER
c) Ground/water source SEER/COP
6. Conditioned Floor area (sq. ft.)
6.
120
d) Room unit/PTAC
EER
e) Other
16.0
7. Windows, type and area
a) U-factor.(weighted average)
7a.
0.650
b) Solar Heat Gain Coefficient (SHGC)
7b.
0.250
14. Heating system:
Capacity
27.0
c) Area
7c.
93.3
a) Split system heat pump
HSPF
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance
COP
1.0
a) U-factor:(weighted average)
88.
NA
d) Gas furnace, natural gas
AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b.
NA
e) Gas furnace, LPG
AFUE
0 Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a.
0.0
b) Wood, raised (R-value)
9b.
15. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance
EF
b) Gas fired, natural gas
EF
10. Wall type and insulation:
c) Gas fired, LPG
EF
A. Exterior.
d) Solar system with tank
EF
1. Wood frame (Insulation R-value)
10A1.
11.0
e) Dedicated heat pump with tank EF_
2. Masonry (Insulation R-value)
10A2.
0 Heat recovery unit HeatRec%
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
1061.
2. Masonry (Insulation R-value)
10132.
16. HVAC credits claimed (Performance Method)
11. Ceiling type and insulation level a) Ceiling fans
a) Under attic 11a. b) Cross ventilation No
b) Single assembly 11b. c) Whole house fan No
c) Knee walls/skylight walls 11c. d) Multizone cooling credit
d) Radiant barrier installed 11d. No e) Multizone heating credit
f) Programmable thermostat Yes
'Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installed code compliant features.
Builder
Date:
Address of New Home: 13206 HARBOR RIDGE 3A City/FL Zip: PALM CITY, FL
3/4/2020 6:38:42 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
Job M
Performed for:
DAGG RESIDENCE
13206 HARBOR RIDGE 3A
PALM CITY FL
QUICK CALCS, INC.
317 ST. LUCIE LANE
FORT PIERCE, FL 34946
Phone: 772-46SV99
QUICKCALCSQAOLCOM
Scale: 1 :155
Page 1
RigMSE&O UrMmI 2019
19.0.07 RSUOB101
2020-Mar-040 A0.26
...iits ft HUACIDAGG RESIEDN(