Loading...
HomeMy WebLinkAboutEnergy CodeMAR 0 5 2020 FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR B Florida Department of Business and Professional Regulation - Residential Performance Method ProjectName: DAGG ADDITION BuilderName: Street: 13206 HARBOR RIDGE 3A Permit Office: ST. LUCIE COUNTY City, Stale, Zip: PALM CITY, FL, PennitNumber: Owner: Jurisdiction: 6611000 DesignLocation: FL, Fort Pierce County: St. Lucia (Florida Climate Zone 2) 1. New construction or existing Addition 9. Wall Types (184.0 sgft.) Insulation Area 2. Single family or multiple family Multi -family a. Frame -Wood, Exterior R=11.0 184.00 ft' b. N/A R= ft2 3. Number of units, if multiple family 1 c. WA R= ft2 4. Number of Bedrooms(Bednns In Addition) 0(0) d.N/A R= ft2 10. Ceiling Types (120.0 sgft.) Insulation Area 5. Is this a worst case? No a. Under Neighbor (Vented) R=19.0 120.00ft? 6. Conditioned Floor area above grade(ft') 120 b. N/A R= ft2 Conditioned Ooorarea belowgrade(ft') 0 c. WA R= ft2 11. Ducts R ft2 7. Windows(93.3 sgft.) Description Area a. Sup: Attic, Ret: Attic, AH: ADDITION 6 24 a. U-Factor: Sgl, U=0.65 93.33 ft2 SHGC: SHGC=0.25 b. U-Factor: N/A ft2 12. Cooling systems kBtu/hr Efficiency SHGC: a. Central Unit 29.0 SEER:16.00 c. U-Factor: N/A ft2 SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a. Electric Strip Heat 27.0 COPA.00 SHGC: Area Weighted Average Overhang Depth: 1.000 ft. Area Weighted Average SHGC: 0.250 14. Hot water systems -Nonerequired a. Cap:N 8. Floor Types (120.0 sgft.) Insulation Area EF: 0.00000 a. Slab -On -Grade Edge Insulation R=0.0 120.00 ft' b. Conservation features b. N/A R= ft' c. NIA R= ft' 15. Credits Pstal Glass/Floor Area: 0.778 Total Proposed Modified Loads: 6.06 PASS Total Baseline Loads: 6.09 1 hereby certify that the plans and specifications covered by Review of the plans and SpAT6 this calculation are in compliance with the Florida Energy specifications covered by this D4THE �' Code. calculation indicates compliance with the Florida Energy Code. hunk ;; r r-•;m ;, �0 PREPARED BY: }N'Q J Q2M Before construction is completed DATE: this building will be inspected for compliance with Section 553.908 �. a . c I hereby certify that this building, as designed, is in compliance Florida Statutes. It with the Florida Energy Code. CQD WE CgJ OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handier unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1. a d �yproject requires an envelope leakage test report with envelope leakage no greater t� V I V E f�l` OTeh F � REVIEWED FOR CODE COMPLIANCE 314/20206:38 AM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC MAI66V9 LEianf5oftwareNTY Pagel of BOCC FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: Building Type: OwnerName: #of Units: BuilderName: Permit Office: Jurisdiction: FamilyType: New/Exisling: Comment: DAGG ADDITION Bedrooms: 0 User ConditionedArea: 120 Total Stodes: 1 1 Worst Case: No RotateAngle: 0 ST. LUCIE COUNTY CrossVentilation: 6611000 Whole House Fan: Multi -family Addition Address Type: StreelAddress Lot# Block/Subdivision: PlatBook: Street: 13206 HARBOR RIDGE County: St. Lucie City, Slate, Zip: PALM CITY, FL, CLIMATE / v DesignLocation Design Temp TMYSite 97.5% 2.5% Inl Design Temp Heating Design DailyTemp Winter Summer Degree Days Moisture Range FL, Fort Pierce FL VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Blockl 120 960 SPACES Number Name Area Volume Kitchen Occupants Bedrooms IntiI ID Finished Cooled Heated 1 ADDITION 120 960 No 1 1 Yes Yes Yes FLOORS # FlcorType Space Perimeter R-Value Area Tile Wood Carpet 1 Slab -On -Grade Edgelnsulation ADDITION 46ft 0 120 ft' ---- 0 0 1 ROOF J# Type Roof Gable Roof Materials Area Area Color Red Barr Solar SA Emitt Emitt Deck Pilch Absor. Tested Tested Insul. (deg) _ 1 Flat Compositionshingles 120 ft2 6ft' Medium N 0.6 No 0.9 No 0 4.8 ATTIC / V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 No attic Vented 300 120 ft' N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 UnderNeighbor(Vented) ADDITION 19 Blown 120 ft' 0.11 Wood 3/4/2020 6:38 AM EnergyGauge® USA 6.0.02 (Rev. 1) -FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 4 FORM RAltri-7f117 INPUT SUMMARY CHECKLIST REPORT WALLS Adjacent S Pace Cavity Width Height Sheathing Framing Solar Below _ 1 NW _2 NE 3 SE Exterior Frame -Wood Exterior Frame -Wood Exterior Frame -Wood ADDITION 11 4 8 32.0 ft' 0.23 0.4 ADDITION 11 15 8 120.0ft 0.23 0.4 ADDITION 11 4 8 32.0 ft' 0.23 0.4 0 0 0 WINDOWS Orientation shown isthe entered, Proposed orientation. / V # Wall Ornt ID Frame Panes Overhang NFRC U-Factor SHGC Imp Area Depth Separation IntShade Screening 1 NE 2 Vinyl Low-ESingle Yes 0.65 0.26 N 93.3 ft' 1 ft 0 in Oft 5 in Drapes/blinds Exteriorl INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000254 80 4.39 8.26 .0881 5 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 ElectricStripHeaUReplacemen None COPA 27 kBtulhr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Un'NReplacementforw None Single SEER: 16 29 kBtulhr 870 drn 0.8 1 sys#1 SOLAR HOT WATER SYSTEM FSEC Cart# CompanyName Collector Storage System Model# CollectorModel# Area Volume FEF ft' DUCTS # —Supply— Location R-Value Area — Return -- Air CFM 25 CFM26 Location Area LeakageType Handler TOT OUT ON RLF HVAC# Heal Cool 1 Attic 6 24 ft' Attic 6 ft' Defaulti-eakage ADDITION (Default) c(Default) c 1 1 3/4/2020 6:38 AM EnergyGaugeO USA 6.0.02 (Rev.1)-FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT TEMPERATURES ProgramableThermostat: Y I Ceiling Fans: rr'' Heating HJan rr'' HFeb rr'' [X]Mar Apr I I May [ lJun �X r lJul IX [ iAug IX r lSep j j LJ Occtt [[X�] Venting Ir 11 Jan II 1) Feb Ir�X1l Mar Apr May I Jun r Jul r Aug I Sep l><t [X]Nov Dec TherrnostatSchedule: HERS 2006 Reference Hours ScheduleType 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Healing(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness FumitureFraction Space Default 81bsls .ft. 0 ft' 0 it 0.3 ADDITION 3/4120206:38 AM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 4of4 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: DAGG ADDITION Builder Name: Street: 13206 HARBOR RIDGE 3A Permit Office: ST. LUCIE COUNTY City, Stale, Zip: PALM CITY, FL, Permit Number: U Owner: Jurisdiction: 6611000 w x Design Location: FL, Fort Pierce COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceilinglat is The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity Insulation shall be installed to QnGuding insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered - shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on Narrow cavities installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Wring Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electricallphone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids a. In addition, inspection of log walls shall be in accordance win the provisions or Icc-auu. 3/412020 6:36 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 100 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. Addition 12. Ducts, location & insulation level a) Supply ducts R 6.0 2. Single-family or multiple -family 2. Multi -family b) Return ducts R 6.0 c) AHU location ADDITION 3. No. of units (if multiple -family) 3. 1 4. Number of bedrooms 4. 0 13. Cooling system: Capacity 29.0 a) Split system SEER 5. Is this a worst case? (yes/no) 5. No b) Single package SEER c) Ground/water source SEER/COP 6. Conditioned Floor area (sq. ft.) 6. 120 d) Room unit/PTAC EER e) Other 16.0 7. Windows, type and area a) U-factor.(weighted average) 7a. 0.650 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.250 14. Heating system: Capacity 27.0 c) Area 7c. 93.3 a) Split system heat pump HSPF b) Single package heat pump HSPF 8. Skylights c) Electric resistance COP 1.0 a) U-factor:(weighted average) 88. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG AFUE 0 Other 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF b) Gas fired, natural gas EF 10. Wall type and insulation: c) Gas fired, LPG EF A. Exterior. d) Solar system with tank EF 1. Wood frame (Insulation R-value) 10A1. 11.0 e) Dedicated heat pump with tank EF_ 2. Masonry (Insulation R-value) 10A2. 0 Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 1061. 2. Masonry (Insulation R-value) 10132. 16. HVAC credits claimed (Performance Method) 11. Ceiling type and insulation level a) Ceiling fans a) Under attic 11a. b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11c. d) Multizone cooling credit d) Radiant barrier installed 11d. No e) Multizone heating credit f) Programmable thermostat Yes 'Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Date: Address of New Home: 13206 HARBOR RIDGE 3A City/FL Zip: PALM CITY, FL 3/4/2020 6:38:42 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 Job M Performed for: DAGG RESIDENCE 13206 HARBOR RIDGE 3A PALM CITY FL QUICK CALCS, INC. 317 ST. LUCIE LANE FORT PIERCE, FL 34946 Phone: 772-46SV99 QUICKCALCSQAOLCOM Scale: 1 :155 Page 1 RigMSE&O UrMmI 2019 19.0.07 RSUOB101 2020-Mar-040 A0.26 ...iits ft HUACIDAGG RESIEDN(