Loading...
HomeMy WebLinkAboutDuct Leakage TestPlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date:,?0,70 Permit #; % l�6 - O &Z Lot #: Contractor: W nn C ur �., Construction: d'Post Construction Test Address: 71i0`1/ 5., �a (�ocra R%v�f/J ', ❑ Rough -in Test �/ p t /-' /;, Test Conditions: Date: Floor Area (ft2): Time: /blot/ Indoor Temperature (F): >3 Outdoor Temperature (F): 77 Primary Location of Supply Ductwork Primary Location of Return Ductwork l`c /,5-/ '/a'r— Total Leakage Test (Outside) Duct Leakage: ❑ Default v Prop. Leak Free Test Pressure: 4 S (Pa) ❑ Proposed On = -3 la Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ePass ❑ Fail Installed Pa Total Leakage (cfm): Total Leakage per 100 sqft: 3 /o CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. -7 7, y, Testinq Company n Company Name: �1���- Address: /Ff70 2csekcVsvaw .0 f. 4 I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature:2 -� Printed Name: ��c✓a.� o r License/Certificate #: �� 7,0 Q