HomeMy WebLinkAboutSealed Truss BookAlpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 1:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Job Engineering Criteria:
Design Code: FBC2017RES IntelliVIEW Version: 17.02.01A
JRef #: 1WTP7610004
Wind Standard: ASCE 7-10 Wind Speed (mph): 150.000000 Roof Load (psf): 20.00- 7.00- 0.00- 5.00
Building Type: Closed Floor Load (psf): 20.00- 7.00- 0.00- 5.00
This package contains general notes pages, 380 truss drawing(s) and 8 detail(s).
Item Drawing Number Truss Item Drawing Number Truss
1 079.20.1313.35545 F1 2 079.20.1313.27308 F2
3 079.20.1313.27621 F3 4 080.20.1106.22550 F4
5 080.20.1106.29660 F5 6 080.20.1106.46360 F6
7 079.20.1313.30288 F7 8 079.20.1313.27152 F8
9 079.20.1313.42972 F9 10 079.20.1313.30959 F9A
11 079.20.1313.38603 F9B 12 080.20.1106.50040 F10
13 079.20.1313.29118 F11 14 079.20.1313.35982 F11A
15 079.20.1313.28728 F12 16 079.20.1313.32551 F14
17 079.20.1313.30367 F15 18 079.20.1313.42597 F16
19 079.20.1313.39056 F17 20 079.20.1313.41880 F17A
21 079.20.1313.42488 F18 22 079.20.1313.30804 TF1
23 079.20.1313.41895 TF2 24 079.20.1313.41709 TF3
25 079.20.1313.41161 TF4 26 079.20.1313.41240 TF5
27 079.20.1313.28556 TF6 28 079.20.1313.27061 TF7
29 079.20.1313.31068 TF8 30 080.20.1106.52503 TF10
31 080.20.1106.55380 TF11 32 079.20.1313.41896 TF12
33 079.20.1313.40428 TF13 34 079.20.1313.42020 TF14
35 079.20.1313.42675 TF15 36 079.20.1313.30117 TF16
37 079.20.1313.36873 T1 38 079.20.1313.42769 T2
39 079.20.1313.35358 T3 40 079.20.1313.28760 T4
41 079.20.1313.41084 T5 42 079.20.1313.40663 T6
43 079.20.1313.38369 T7 44 079.20.1313.41942 T8
45 079.20.1313.33299 T9 46 079.20.1313.28729 T10
47 079.20.1313.26732 T11 48 079.20.1313.40836 T12
49 079.20.1313.32847 T13 50 079.20.1313.36356 T19
51 079.20.1313.27075 T19A 52 079.20.1313.35857 T20
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 2:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Item Drawing Number Truss Item Drawing Number Truss
53 079.20.1313.26640 T21 54 079.20.1313.28650 T22
55 079.20.1313.37636 T23 56 079.20.1313.37214 T24
57 079.20.1313.41147 T25 58 079.20.1313.27979 T26
59 079.20.1313.28447 T27 60 079.20.1313.27371 T28
61 079.20.1313.34687 T29 62 079.20.1313.41897 T30
63 079.20.1313.40399 T31 64 079.20.1313.27792 T32
65 079.20.1313.37495 T33 66 079.20.1313.28993 T34
67 079.20.1313.42458 T35 68 079.20.1313.41304 T36
69 079.20.1313.42519 T37 70 079.20.1313.42035 T38
71 079.20.1313.42396 T39 72 079.20.1313.39758 T40
73 079.20.1313.37542 T41 74 079.20.1313.31942 T42
75 080.20.1106.58827 T43 76 079.20.1313.30210 T44
77 080.20.1107.09420 T45 78 079.20.1313.29867 T46
79 079.20.1313.28557 T47 80 079.20.1313.27542 T48
81 079.20.1313.41302 T49 82 079.20.1313.37885 T50
83 079.20.1313.27200 T51 84 079.20.1313.32176 T52
85 079.20.1313.27620 T53 86 079.20.1313.42940 T54
87 079.20.1313.41941 T55 88 079.20.1313.29539 T56
89 079.20.1313.42160 T57 90 079.20.1313.41396 T58
91 079.20.1313.34594 T59 92 079.20.1313.40928 T60
93 079.20.1313.39258 T61 94 080.20.1107.13990 T62
95 079.20.1313.37995 T63 96 079.20.1313.31740 T64
97 079.20.1313.36279 T65 98 079.20.1313.26654 T66
99 080.20.1107.22413 T67 100 079.20.1313.42738 T68
101 079.20.1313.27324 T69 102 079.20.1313.26887 T70
103 079.20.1313.32130 T70A 104 079.20.1313.41146 T71
105 079.20.1313.42846 T72 106 079.20.1313.41911 T73
107 079.20.1313.34313 T74 108 079.20.1313.36482 T75
109 079.20.1313.30648 T76 110 079.20.1313.42083 T77
111 079.20.1313.27294 T78 112 079.20.1313.41708 T79
113 079.20.1313.37059 T80 114 079.20.1313.42816 T81
115 079.20.1313.41115 T82 116 079.20.1313.33814 T83
117 079.20.1313.27122 T84 118 079.20.1313.36715 T85
119 079.20.1313.26762 T86 120 079.20.1313.28948 T87
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 3:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Item Drawing Number Truss Item Drawing Number Truss
121 079.20.1313.39055 T88 122 079.20.1313.27714 T89
123 079.20.1313.27060 T90 124 079.20.1313.40180 T91
125 079.20.1313.37698 T92 126 079.20.1313.35467 T93
127 079.20.1313.33580 T94 128 079.20.1313.29478 T95
129 079.20.1313.41099 T96 130 079.20.1313.42176 T97
131 079.20.1313.36419 T98 132 079.20.1313.31661 T99
133 079.20.1313.41536 T100 134 079.20.1313.40944 T101
135 079.20.1313.29524 T102 136 079.20.1313.40834 T103
137 079.20.1313.30522 T104 138 079.20.1313.41460 T106
139 079.20.1313.37090 T107 140 079.20.1313.30569 T108
141 079.20.1313.36434 T109 142 079.20.1313.38400 T110
143 079.20.1313.33892 T111 144 079.20.1313.31630 T112
145 079.20.1313.40335 T113 146 079.20.1313.35592 T114
147 079.20.1313.39554 T115 148 079.20.1313.37417 T116
149 079.20.1313.29383 T117 150 079.20.1313.36266 T118
151 079.20.1313.40835 T119 152 079.20.1313.41225 T120
153 079.20.1313.33595 T121 154 079.20.1313.42707 T122
155 079.20.1313.41365 T123 156 079.20.1313.36265 T124
157 079.20.1313.29180 T125 158 079.20.1313.28010 T126
159 079.20.1313.41427 T127 160 079.20.1313.33300 T128
161 079.20.1313.28806 T129 162 079.20.1313.28369 T130
163 079.20.1313.27839 T130A 164 079.20.1313.41693 T131
165 080.20.1107.27980 T132 166 079.20.1313.36576 T131A
167 079.20.1313.31692 T133 168 079.20.1313.26934 T134
169 079.20.1313.40664 T135 170 079.20.1313.36013 T136
171 079.20.1313.37169 T137 172 080.20.1107.35927 T138
173 079.20.1313.26952 T139 174 079.20.1313.40148 T140
175 079.20.1313.27965 T141 176 079.20.1313.38884 T142
177 079.20.1313.28759 T143 178 079.20.1313.26701 T144
179 079.20.1313.27402 T145 180 079.20.1313.31380 T146
181 079.20.1313.42987 T147 182 079.20.1313.40413 T148
183 079.20.1313.40709 T149 184 079.20.1313.39008 T150
185 080.20.1107.43987 T151 186 080.20.1107.48927 T152
187 080.20.1108.36433 T153 188 079.20.1313.27966 T154
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 4:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Item Drawing Number Truss Item Drawing Number Truss
189 079.20.1313.33128 T155 190 079.20.1313.40008 T156
191 079.20.1313.40553 T157 192 079.20.1313.38899 T158
193 079.20.1313.40243 T159 194 079.20.1313.38837 T160
195 079.20.1313.26950 T161 196 079.20.1313.27761 T162
197 079.20.1313.29087 T163 198 079.20.1313.28026 T164
199 079.20.1313.41694 T165 200 079.20.1313.41241 T166
201 079.20.1313.29213 T167 202 079.20.1313.40788 T168
203 079.20.1313.28260 T168 204 079.20.1313.39492 T169
205 079.20.1313.29336 T170 206 079.20.1313.33985 T171
207 079.20.1313.42520 T172 208 079.20.1313.40665 T173
209 079.20.1313.33658 T174 210 079.20.1313.27730 T175
211 079.20.1313.28478 T176 212 079.20.1313.42426 T177
213 079.20.1313.36310 T178 214 079.20.1313.26918 T179
215 079.20.1313.28589 T179A 216 079.20.1313.40056 T180
217 079.20.1313.41677 T181 218 079.20.1313.32395 T182
219 079.20.1313.40616 T183 220 079.20.1313.37760 T184
221 079.20.1313.30709 T185 222 079.20.1313.27231 T186
223 079.20.1313.27013 T187 224 079.20.1313.29243 T188
225 079.20.1313.42222 T189 226 079.20.1313.37901 T190
227 079.20.1313.28182 T191 228 079.20.1313.26889 T192
229 079.20.1313.27029 T193 230 079.20.1313.40085 T194
231 079.20.1313.40584 T195 232 079.20.1313.36591 T196
233 079.20.1313.41395 T197 234 079.20.1313.30335 T198
235 080.20.1108.45550 T199 236 079.20.1313.42348 T200
237 079.20.1313.36700 T201 238 079.20.1313.29960 T202
239 079.20.1313.37168 T203 240 079.20.1313.40382 T204
241 079.20.1313.29945 T205 242 079.20.1313.42629 T206
243 079.20.1313.41505 T208 244 079.20.1313.39476 T209
245 079.20.1313.29664 T210 246 079.20.1313.35654 T211
247 079.20.1313.28244 T212 248 079.20.1313.33205 T213
249 079.20.1313.32924 T214 250 079.20.1313.38150 v1
251 079.20.1313.34874 J1 252 079.20.1313.42427 J3
253 079.20.1313.42395 J4 254 079.20.1313.27870 J5
255 079.20.1313.42566 J5A 256 079.20.1313.42457 J6
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 5:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Item Drawing Number Truss Item Drawing Number Truss
257 079.20.1313.41489 J6A 258 079.20.1313.40756 J7
259 079.20.1313.27091 J7A 260 079.20.1313.41458 J8
261 079.20.1313.38166 J8A 262 079.20.1313.34360 J9
263 079.20.1313.42752 J10 264 079.20.1313.39305 J11
265 079.20.1313.31100 J11A 266 079.20.1313.40725 J12
267 079.20.1313.42628 J13 268 079.20.1313.40225 J13A
269 079.20.1313.27559 J13B 270 079.20.1313.40242 J14
271 079.20.1313.41348 J15 272 079.20.1313.40913 J16
273 079.20.1313.41520 J18 274 079.20.1313.42598 J19
275 079.20.1313.42739 J20 276 079.20.1313.36263 J21
277 079.20.1313.42551 J21A 278 079.20.1313.31240 J22
279 079.20.1313.29633 KJ1 280 079.20.1313.39759 KJ1
281 079.20.1313.35015 KJ2 282 079.20.1313.27230 KJ3
283 079.20.1313.32550 KJ4 284 079.20.1313.28229 KJ5
285 079.20.1313.38509 KJ6 286 079.20.1313.29493 KJ7
287 079.20.1313.28323 KJ8 288 079.20.1313.40101 KJ9
289 079.20.1313.26639 KJ10 290 079.20.1313.33065 KJ11
291 079.20.1313.42239 KJ12 292 079.20.1313.42066 KJ13
293 079.20.1313.30553 KJ14 294 079.20.1313.39601 KJ15
295 079.20.1313.40100 KJ16 296 079.20.1313.27544 KJ17
297 079.20.1313.28494 KJ18 298 079.20.1313.32394 KJ19
299 079.20.1313.42799 KJ20 300 079.20.1313.29058 KJ21
301 079.20.1313.31084 KJ22 302 079.20.1313.28947 KJ23
303 079.20.1313.36747 C1 304 079.20.1313.30694 C2
305 079.20.1313.27622 C2A 306 079.20.1313.31099 C3
307 079.20.1313.33425 C3A 308 079.20.1313.36575 C4
309 079.20.1313.41785 C4A 310 079.20.1313.40054 C5
311 079.20.1313.34906 C6 312 079.20.1313.29305 C7
313 079.20.1313.28651 C8 314 079.20.1313.34172 C8A
315 080.20.1108.48093 C9 316 079.20.1313.36044 C10
317 079.20.1313.42676 C10A 318 080.20.1108.55330 C11
319 080.20.1108.57143 C13 320 080.20.1109.00370 C15
321 079.20.1313.42942 C16 322 079.20.1313.42128 C17
323 079.20.1313.27418 C18 324 079.20.1313.37402 C19
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 6:
Customer: Central Florida Truss, Inc.Job Number: 20-0005
Job Description: /CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Address: 7840 SADDLEBROOK DRIVE, PORT SAINT LUCIE, FL 34986
Item Drawing Number Truss Item Drawing Number Truss
325 079.20.1313.40523 C20 326 079.20.1313.29057 C21
327 079.20.1313.27137 C22 328 079.20.1313.29961 C22A
329 079.20.1313.29244 C23 330 079.20.1313.36138 C23A
331 079.20.1313.39913 C24 332 079.20.1313.35342 C25
333 079.20.1313.34236 C25A 334 079.20.1313.29570 C26
335 079.20.1313.28151 C27 336 079.20.1313.41724 C28
337 079.20.1313.40178 C29 338 079.20.1313.41738 C30
339 079.20.1313.41116 C30A 340 079.20.1313.42349 C31
341 079.20.1313.30834 C31A 342 079.20.1313.28900 C32
343 079.20.1313.41333 C33 344 079.20.1313.31864 C34
345 080.20.1109.02410 C35 346 079.20.1313.37324 C36
347 079.20.1313.30413 C37 348 080.20.1109.09220 C38
349 079.20.1313.41271 C39 350 079.20.1313.36872 C40
351 079.20.1313.37058 C40A 352 079.20.1313.40679 C43
353 079.20.1313.42863 C43A 354 079.20.1313.34422 C44
355 079.20.1313.41583 C45 356 079.20.1313.38119 C46
357 079.20.1313.38432 C47 358 079.20.1313.40506 C48
359 079.20.1313.36389 C49 360 080.20.1109.14283 C50
361 079.20.1313.38572 C51 362 079.20.1313.34828 C52
363 079.20.1313.36871 C53 364 079.20.1313.34079 C54
365 079.20.1313.40943 C55 366 080.20.1109.18960 C56
367 079.20.1313.42004 C57 368 079.20.1313.35967 C58
369 079.20.1313.28978 C59 370 079.20.1313.42051 C60
371 079.20.1313.26779 C61 372 079.20.1313.42129 C62
373 079.20.1313.28199 C63 374 079.20.1313.40398 C64
375 079.20.1313.26716 C65 376 079.20.1313.33782 C66
377 079.20.1313.26951 C67 378 079.20.1313.28400 C68
379 079.20.1313.42191 C69 380 079.20.1313.27355 P1
381 BRCLBSUB0119 382 BRWEBLOK1014
383 CNNAILSP1014 384 CNSY42PL0118
385 DEFLCAMB1014 386 LSCSYX2A1014
387 STRBRIBR1014 388 VAL160101014
Florida Certificate of Product Approval #FL1999 Printed 3/20/2020 12:38:18 PM
03/20/2020
COA #0 278
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases.
NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non-hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1.
Page 2 of 3
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org.
2. ICC: International Code Council; www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 13723 Riverport Drive, Suite 200, Maryland Heights, MO
63043; www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com.
Page 3 of 3
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00 Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NA
Kzt: NA
BCDL: NA psf
Mean Height: NA ft
Enclosure:NA Category: NA
Wind Std:NA
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA
Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 F 999 480
VERT(CL):0.073 F 999 360
HORZ(LL):-0.010 O - -
HORZ(TL):0.019 O - -
VIEW Ver: 17.02.01A.1115.21
Creep Factor: 2.0
Max TC CSI:0.762
Max BC CSI:0.320
Max W eb CSI:0.167
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F1
Ply: 1
Qty:1
SEQN:13651 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T378
DrwNo:079.20.1313.35545
AK /DF 03/19/2020
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 620 /-/-/-/-/-
I 620 /-/-/-/-/-
A Brg Width = 4.9 Min Req =1.5
I Brg Width = 4.9 Min Req =1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 0 -703
E - F 0 -705
Chords Tens.Comp.
F - G 0 -703
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 672 0
N - M 705 0
Chords Tens.Comp.
M - L 672 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 592 0
O - D 0 -553
Webs Tens.Comp.
G - L 0 -553
L - I 592 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
9'7"6
5"7 2'6"
(TYP)
7"4 7"4 5"7
3'9"11
3'9"11
5'9"11
2'
9'7"6
3'9"11
1'8"43"1'11"413'8"4
A B C D E F G H I J
KLMNOP1X4
5X5
3X3
3X3 3X3
3X3
1X4 1X4
3X3
3X3 3X3
3X3
5X5
1X4
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00 Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Speed:NA mph
TCDL: NA psf EXP: NA
Kzt: NA
BCDL: NA psf
Mean Height: NA ft
Enclosure:NA Category: NA
Wind Std:NA
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type:
WAVE
Snow Criteria
(Pg,Pf in PSF)
Pg: NA Ct: NA
CAT: NA
Pf: NA
Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 F 999 480
VERT(CL):0.073 F 999 360
HORZ(LL):-0.010 O - -
HORZ(TL):0.019 O - -
VIEW Ver: 17.02.01A.1115.21
Creep Factor: 2.0
Max TC CSI:0.762
Max BC CSI:0.320
Max W eb CSI:0.167
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F1
Ply: 1
Qty:1
SEQN:13651 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T378
DrwNo:079.20.1313.35545
AK /DF 03/19/2020
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 620 /-/-/-/-/-
I 620 /-/-/-/-/-
A Brg Width = 4.9 Min Req =1.5
I Brg Width = 4.9 Min Req =1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 0 -703
E - F 0 -705
Chords Tens.Comp.
F - G 0 -703
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 672 0
N - M 705 0
Chords Tens.Comp.
M - L 672 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 592 0
O - D 0 -553
Webs Tens.Comp.
G - L 0 -553
L - I 592 0
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
9'7"6
5"7 2'6"
(TYP)
7"4 7"4 5"7
3'9"11
3'9"11
5'9"11
2'
9'7"6
3'9"11
1'8"43"1'11"413'8"4
A B C D E F G H I J
KLMNOP1X4
5X5
3X3
3X3 3X3
3X3
1X4 1X4
3X3
3X3 3X3
3X3
5X5
1X4
03/20/2020COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 880 /-/-/-/-/-
I 880 /-/-/-/-/-
A Brg Width = 4.9 Min Req =1.5
I Brg Width = 4.9 Min Req =1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -573
C - D 0 -542
D - E 0 -1293
E - F 0 -1494
Chords Tens.Comp.
F - G 0 -1293
G - H 0 -542
H - I 0 -573
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 1078 0
P - O 1493 0
O - N 1494 0
Chords Tens.Comp.
N - M 1493 0
M - L 1078 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 946 0
Q - D 0 -890
D - P 400 0
P - E 0 -454
Webs Tens.Comp.
F - M 0 -454
M - G 400 0
G - L 0 -890
L - I 946 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 F 999 480
VERT(CL):0.173 F 905 360
HORZ(LL):-0.020 Q - -
HORZ(TL):0.041 Q - -
Creep Factor: 2.0
Max TC CSI:0.935
Max BC CSI:0.776
Max W eb CSI:0.267
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F2
Ply: 1
Qty:1
SEQN:13656 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T370
DrwNo:079.20.1313.27308
AK /DF 03/19/2020
13'7"6
5"7 2'6"
(TYP)
2'6"2'6"5"7
5'8"7
5'8"7
7'10"15
2'2"8
13'7"6
5'8"7
1'8"43"1'11"4+
13'8"4
A B C D E F G H I J
KLMNOPQR1X4
6X6
4X4
3X3 3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3 3X3
4X4
6X6
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 880 /-/-/-/-/-
I 880 /-/-/-/-/-
A Brg Width = 4.9 Min Req =1.5
I Brg Width = 4.9 Min Req =1.5
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -573
C - D 0 -542
D - E 0 -1293
E - F 0 -1494
Chords Tens.Comp.
F - G 0 -1293
G - H 0 -542
H - I 0 -573
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 1078 0
P - O 1493 0
O - N 1494 0
Chords Tens.Comp.
N - M 1493 0
M - L 1078 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 946 0
Q - D 0 -890
D - P 400 0
P - E 0 -454
Webs Tens.Comp.
F - M 0 -454
M - G 400 0
G - L 0 -890
L - I 946 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 F 999 480
VERT(CL):0.173 F 905 360
HORZ(LL):-0.020 Q - -
HORZ(TL):0.041 Q - -
Creep Factor: 2.0
Max TC CSI:0.935
Max BC CSI:0.776
Max W eb CSI:0.267
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F2
Ply: 1
Qty:1
SEQN:13656 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T370
DrwNo:079.20.1313.27308
AK /DF 03/19/2020
13'7"6
5"7 2'6"
(TYP)
2'6"2'6"5"7
5'8"7
5'8"7
7'10"15
2'2"8
13'7"6
5'8"7
1'8"43"1'11"4+
13'8"4
A B C D E F G H I J
KLMNOPQR1X4
6X6
4X4
3X3 3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3 3X3
4X4
6X6
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1123 /-/-/-/-/-
K 1123 /-/-/-/-/-
A Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings A & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -787
C - D 0 -751
D - E 0 -1869
E - F 0 -2439
F - G 0 -2566
Chords Tens.Comp.
G - H 0 -2439
H - I 0 -1869
I - J 0 -751
J - K 0 -787
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
U - T 1487 0
T - S 2233 0
S - R 2566 0
R - Q 2566 0
Chords Tens.Comp.
Q - P 2566 0
P - O 2233 0
O - N 1487 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 1299 0
U - D 0 -1232
D - T 672 0
T - E 0 -642
E - S 459 0
S - F 0 -512
Webs Tens.Comp.
G - P 0 -512
P - H 459 0
H - O 0 -642
O - I 672 0
I - N 0 -1232
N - K 1299 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.135 Q 999 480
VERT(CL):0.226 G 900 360
HORZ(LL):-0.024 K - -
HORZ(TL):0.042 U - -
Creep Factor: 2.0
Max TC CSI:0.866
Max BC CSI:0.505
Max W eb CSI:0.367
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F3
Ply: 1
Qty:8
SEQN:13659 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T249
DrwNo:079.20.1313.27621
AK /DF 03/19/2020
T1
17'4"
4"2'6"
(TYP)
2'1"2'1"4"
7'8"
7'8"
9'8"
2'
17'4"
7'8"1'8"43"1'11"4+
13'8"4
A B C D E F G H I J K L
MNOPQRSTUV1.5X4
6X6
5X5
3X34X4
4X4
3X3
3X3
3X3
1.5X4 1.5X4
3X3
3X3
3X3
4X4
4X43X3
5X5
6X6
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2; T1 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1123 /-/-/-/-/-
K 1123 /-/-/-/-/-
A Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
Bearings A & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -787
C - D 0 -751
D - E 0 -1869
E - F 0 -2439
F - G 0 -2566
Chords Tens.Comp.
G - H 0 -2439
H - I 0 -1869
I - J 0 -751
J - K 0 -787
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
U - T 1487 0
T - S 2233 0
S - R 2566 0
R - Q 2566 0
Chords Tens.Comp.
Q - P 2566 0
P - O 2233 0
O - N 1487 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 1299 0
U - D 0 -1232
D - T 672 0
T - E 0 -642
E - S 459 0
S - F 0 -512
Webs Tens.Comp.
G - P 0 -512
P - H 459 0
H - O 0 -642
O - I 672 0
I - N 0 -1232
N - K 1299 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.135 Q 999 480
VERT(CL):0.226 G 900 360
HORZ(LL):-0.024 K - -
HORZ(TL):0.042 U - -
Creep Factor: 2.0
Max TC CSI:0.866
Max BC CSI:0.505
Max W eb CSI:0.367
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F3
Ply: 1
Qty:8
SEQN:13659 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T249
DrwNo:079.20.1313.27621
AK /DF 03/19/2020
T1
17'4"
4"2'6"
(TYP)
2'1"2'1"4"
7'8"
7'8"
9'8"
2'
17'4"
7'8"1'8"43"1'11"4+
13'8"4
A B C D E F G H I J K L
MNOPQRSTUV1.5X4
6X6
5X5
3X34X4
4X4
3X3
3X3
3X3
1.5X4 1.5X4
3X3
3X3
3X3
4X4
4X43X3
5X5
6X6
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T4 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B2 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AK 455 /-/-/-/-/-
AF 1188 /-/-/-/-/-
Z 1201 /-/-/-/-/-
S 1141 /-/-/-/-/-
AK Brg Width = 16.0 Min Req =1.5
AF Brg Width = 8.0 Min Req =1.5
Z Brg Width = 4.0 Min Req =1.5
S Brg Width = 4.5 Min Req =1.5
Bearings AK, AF, Z, & S Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -411
D - E 0 -573
E - F 0 -1165
F - G 0 -1184
G - H 0 -1184
H - I 0 -1184
I - J 0 -1597
Chords Tens.Comp.
J - K 0 -1625
K - L 0 -2625
L - M 0 -2625
M - N 0 -2842
N - O 0 -2632
O - P 0 -1935
P - Q 0 -727
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AJ-AI 408 0
AI-AH 411 0
AH-AG 412 0
AE-AD 984 0
AD-AC 1289 0
AC-AB 1289 0
AB-AA 1604 0
Chords Tens.Comp.
AA- Z 1604 0
Z - Y 1597 0
Y - X 2197 0
X - W 2848 0
W -V 2848 0
V - U 2391 0
U - T 1455 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AK 0 -414
A -AJ 425 0
AJ- B 0 -404
D -AF 0 -1023
D -AE 634 0
AE- E 0 -719
AB- I 96 -960
I - Z 0 -514
J - Y 771 0
Webs Tens.Comp.
Y - K 0 -1451
K - X 734 0
X - M 0 -389
V - O 404 0
O - U 0 -766
U - P 806 0
P - T 0 -1224
T - Q 1222 0
Q - S 0 -1063
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.236 K 783 480
VERT(CL):0.387 K 477 360
HORZ(LL):-0.019 Q - -
HORZ(TL):0.032 Q - -
Creep Factor: 2.0
Max TC CSI:0.711
Max BC CSI:0.755
Max W eb CSI:0.345
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F4
Ply: 1
Qty:1
SEQN:17512 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T137
DrwNo:080.20.1106.22550
JB /DF 03/20/2020
T2 T4
B2
3"8
7'8'15'7"4
1'11"8 2'5"12 6'3"1'5"4 13'2"12
30'7"4
2'4"
2'4"
4'4"
2'
15'
10'8"
17'
2'
30'7"4
13'7"4
1'11"41"8
+
12'
A B C D E F G H I J KL M N O P Q
STUVWXYZAAABACADAEAFAGAHAIAJAK
1X44X4
2X5 4X4
4X4
1.5X6 1.5X6
4X4
4X4
5X5
1.5X6 5X5
4X4
4X4
4X4
W=3X4
1.5X6
5X5
W=3X4
W=H0310
5X5
1.5X6
1.5X6
6X6
5X5W=3X4
5X5
4X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T4 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B2 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AK 455 /-/-/-/-/-
AF 1188 /-/-/-/-/-
Z 1201 /-/-/-/-/-
S 1141 /-/-/-/-/-
AK Brg Width = 16.0 Min Req =1.5
AF Brg Width = 8.0 Min Req =1.5
Z Brg Width = 4.0 Min Req =1.5
S Brg Width = 4.5 Min Req =1.5
Bearings AK, AF, Z, & S Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -411
D - E 0 -573
E - F 0 -1165
F - G 0 -1184
G - H 0 -1184
H - I 0 -1184
I - J 0 -1597
Chords Tens.Comp.
J - K 0 -1625
K - L 0 -2625
L - M 0 -2625
M - N 0 -2842
N - O 0 -2632
O - P 0 -1935
P - Q 0 -727
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AJ-AI 408 0
AI-AH 411 0
AH-AG 412 0
AE-AD 984 0
AD-AC 1289 0
AC-AB 1289 0
AB-AA 1604 0
Chords Tens.Comp.
AA- Z 1604 0
Z - Y 1597 0
Y - X 2197 0
X - W 2848 0
W -V 2848 0
V - U 2391 0
U - T 1455 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AK 0 -414
A -AJ 425 0
AJ- B 0 -404
D -AF 0 -1023
D -AE 634 0
AE- E 0 -719
AB- I 96 -960
I - Z 0 -514
J - Y 771 0
Webs Tens.Comp.
Y - K 0 -1451
K - X 734 0
X - M 0 -389
V - O 404 0
O - U 0 -766
U - P 806 0
P - T 0 -1224
T - Q 1222 0
Q - S 0 -1063
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.236 K 783 480
VERT(CL):0.387 K 477 360
HORZ(LL):-0.019 Q - -
HORZ(TL):0.032 Q - -
Creep Factor: 2.0
Max TC CSI:0.711
Max BC CSI:0.755
Max W eb CSI:0.345
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F4
Ply: 1
Qty:1
SEQN:17512 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T137
DrwNo:080.20.1106.22550
JB /DF 03/20/2020
T2 T4
B2
3"8
7'8'15'7"4
1'11"8 2'5"12 6'3"1'5"4 13'2"12
30'7"4
2'4"
2'4"
4'4"
2'
15'
10'8"
17'
2'
30'7"4
13'7"4
1'11"41"8
+
12'
A B C D E F G H I J KL M N O P Q
STUVWXYZAAABACADAEAFAGAHAIAJAK
1X44X4
2X5 4X4
4X4
1.5X6 1.5X6
4X4
4X4
5X5
1.5X6 5X5
4X4
4X4
4X4
W=3X4
1.5X6
5X5
W=3X4
W=H0310
5X5
1.5X6
1.5X6
6X6
5X5W=3X4
5X5
4X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP #2; T3,T4 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP #2; B4,B6,
B7 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Plating Notes
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Deflection
Max JT VERT DEFL: LL: 0.23" DL: 0.18". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AS 864 /-/-/-/-/-
AK 1206 /-/-/-/-/-
AE 1190 /-/-/-/-/-
W 1143 /-/-/-/-/-
AS Brg Width = 5.3 Min Req =1.5
AK Brg Width = 8.0 Min Req =1.5
AE Brg Width = 4.0 Min Req =1.5
W Brg Width = 5.3 Min Req =1.5
Bearing AS is a rigid surface.
Bearings AK, AE, & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 19 -478
H - I 0 -531
I - J 0 -1138
J - K 0 -1173
K - L 0 -1173
L - M 0 -1173
M - N 0 -1612
Chords Tens.Comp.
N - O 0 -1640
O - P 0 -2632
P - Q 0 -2632
Q - R 0 -2851
R - S 0 -2638
S - T 0 -1939
T - U 0 -730
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AM 478 -19
AM-AL 478 -20
AI-AH 952 0
AH-AG 1269 0
AG-AF 1619 0
AF-AE 1619 0
AE-AD 1612 0
Chords Tens.Comp.
AD-AC 2208 0
AC-AB 2208 0
AB-AA 2857 0
AA- Z 2857 0
Z - Y 2396 0
Y - X 1459 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AS- D 0 -597
AO-AN 519 -18
H -AJ 0 -1074
H -AI 699 0
AI- I 0 -743
AG- M 87 -950
M -AE 0 -505
N -AD 769 0
AD- O 0 -1443
Webs Tens.Comp.
O -AB 730 0
AB- Q 0 -392
Z - S 407 0
S - Y 0 -768
Y - T 807 0
T - X 0 -1225
X - U 1226 0
U - W 0 -1066
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.237 O 782 480
VERT(CL):0.387 O 477 360
HORZ(LL):0.019 X - -
HORZ(TL):0.033 X - -
Creep Factor: 2.0
Max TC CSI:0.713
Max BC CSI:0.753
Max W eb CSI:0.346
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F5
Ply: 1
Qty:1
SEQN:17508 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T106
DrwNo:080.20.1106.29660
JB /DF 03/20/2020
T3 T4
B4 B6 B73"8
3"8
2'6"6 7'8"8'0"12 15'7"4
5'18'10'10"6
1"8 2'3"10"82'6"10"8 6'8"14 12'12'
1'1"8 1'4"2 2'4"4 6'3"1'5"4 13'2"12
33'10"6
2'4"8
2'4"8
2'7"8
3"2'9"
1"8
3'3"
6"
4'
9"5'7"2
1'7"2
7'7"2
2'10'2"6
2'7"4
18'3"2
8'0"12
20'3"2
2'
33'10"6
13'7"4
7"4
1'4"1'11"4
1"8
+
12'7"4
12'
A B C D E F G H I J K L M N O P Q R S T U
WXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASAT
AU
AV
AW
AX
1.5X4
1.5X4
4X4
4X410X10(**)
1.5X6
4X4
1.5X4(**)
1.5X6
2X5
3X61.5X6
1.5X4(**)
4X4
10X10(**)
1.5X6
W=3X44X4
4X4
1.5X6
4X4
4X4W=3X4
5X8
2X5 5X5
4X4
4X4
4X4W=3X4
1.5X6
5X5
W=H0310
5X5
1.5X6
1.5X6
6X6
5X5
W=3X45X5
W=3X44X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP #2; T3,T4 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP #2; B4,B6,
B7 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Plating Notes
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Deflection
Max JT VERT DEFL: LL: 0.23" DL: 0.18". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AS 864 /-/-/-/-/-
AK 1206 /-/-/-/-/-
AE 1190 /-/-/-/-/-
W 1143 /-/-/-/-/-
AS Brg Width = 5.3 Min Req =1.5
AK Brg Width = 8.0 Min Req =1.5
AE Brg Width = 4.0 Min Req =1.5
W Brg Width = 5.3 Min Req =1.5
Bearing AS is a rigid surface.
Bearings AK, AE, & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 19 -478
H - I 0 -531
I - J 0 -1138
J - K 0 -1173
K - L 0 -1173
L - M 0 -1173
M - N 0 -1612
Chords Tens.Comp.
N - O 0 -1640
O - P 0 -2632
P - Q 0 -2632
Q - R 0 -2851
R - S 0 -2638
S - T 0 -1939
T - U 0 -730
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AM 478 -19
AM-AL 478 -20
AI-AH 952 0
AH-AG 1269 0
AG-AF 1619 0
AF-AE 1619 0
AE-AD 1612 0
Chords Tens.Comp.
AD-AC 2208 0
AC-AB 2208 0
AB-AA 2857 0
AA- Z 2857 0
Z - Y 2396 0
Y - X 1459 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AS- D 0 -597
AO-AN 519 -18
H -AJ 0 -1074
H -AI 699 0
AI- I 0 -743
AG- M 87 -950
M -AE 0 -505
N -AD 769 0
AD- O 0 -1443
Webs Tens.Comp.
O -AB 730 0
AB- Q 0 -392
Z - S 407 0
S - Y 0 -768
Y - T 807 0
T - X 0 -1225
X - U 1226 0
U - W 0 -1066
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.237 O 782 480
VERT(CL):0.387 O 477 360
HORZ(LL):0.019 X - -
HORZ(TL):0.033 X - -
Creep Factor: 2.0
Max TC CSI:0.713
Max BC CSI:0.753
Max W eb CSI:0.346
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F5
Ply: 1
Qty:1
SEQN:17508 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T106
DrwNo:080.20.1106.29660
JB /DF 03/20/2020
T3 T4
B4 B6 B73"8
3"8
2'6"6 7'8"8'0"12 15'7"4
5'18'10'10"6
1"8 2'3"10"82'6"10"8 6'8"14 12'12'
1'1"8 1'4"2 2'4"4 6'3"1'5"4 13'2"12
33'10"6
2'4"8
2'4"8
2'7"8
3"2'9"
1"8
3'3"
6"
4'
9"5'7"2
1'7"2
7'7"2
2'10'2"6
2'7"4
18'3"2
8'0"12
20'3"2
2'
33'10"6
13'7"4
7"4
1'4"1'11"4
1"8
+
12'7"4
12'
A B C D E F G H I J K L M N O P Q R S T U
WXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASAT
AU
AV
AW
AX
1.5X4
1.5X4
4X4
4X410X10(**)
1.5X6
4X4
1.5X4(**)
1.5X6
2X5
3X61.5X6
1.5X4(**)
4X4
10X10(**)
1.5X6
W=3X44X4
4X4
1.5X6
4X4
4X4W=3X4
5X8
2X5 5X5
4X4
4X4
4X4W=3X4
1.5X6
5X5
W=H0310
5X5
1.5X6
1.5X6
6X6
5X5
W=3X45X5
W=3X44X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E; T3,T6 4x2 SP #2;
Bot chord: 4x2 SP #2; B3,B6,
B7 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2; W8,W10 4x2 SP 2250f-1.9E;
Plating Notes
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AU 1056 /-/-/-/-/-
AL 1277 /-/-/-/-/-
AF 1124 /-/-/-/-/-
X 1138 /-/-/-/-/-
AU Brg Width = 5.3 Min Req =1.5
AL Brg Width = 8.0 Min Req =1.5
AF Brg Width = 4.0 Min Req =1.5
X Brg Width = 7.3 Min Req =1.5
Bearing AU is a rigid surface.
Bearings AL, AF, & X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 814 0
C - D 847 0
D - E 836 0
E - F 389 -295
F - G 431 -80
G - H 431 -80
I - J 0 -889
J - K 0 -889
K - L 0 -1029
L - M 0 -1029
Chords Tens.Comp.
M - N 0 -1029
N - O 0 -1571
O - P 0 -1600
P - Q 0 -2601
Q - R 0 -2827
R - S 0 -2827
S - T 0 -2621
T - U 0 -1928
U - V 0 -726
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AU-AR 0 -1732
AR-AP 0 -825
AO-AN 295 -389
AN-AM 295 -390
AM-AL 0 -496
AL-AK 0 -496
AK-AJ 0 -496
AJ-AI 654 0
AI-AH 1071 0
Chords Tens.Comp.
AH-AG 1071 0
AG-AF 1576 0
AF-AE 1571 0
AE-AD 2171 0
AD-AC 2171 0
AC-AB 2829 0
AB-AA 2835 0
AA- Z 2382 0
Z - Y 1451 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AU 0 -842
AP- E 0 -675
AP-AO 328 -390
H -AK 0 -1155
H -AJ 784 0
Webs Tens.Comp.
AE- P 0 -1462
P -AC 745 0
AC- Q 0 -403
AA- T 400 0
T - Z 0 -763
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.239 P 775 480
VERT(CL):0.388 P 476 360
HORZ(LL):-0.021 V - -
HORZ(TL):0.035 V - -
Creep Factor: 2.0
Max TC CSI:0.719
Max BC CSI:0.761
Max W eb CSI:0.344
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F6
Ply: 1
Qty:3
SEQN:17515 SY42
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T296
DrwNo:080.20.1106.46360
JB /DF 03/20/2020
T3 T6
B3 B6 B7
W8 W10
3"8
3"8
4'0"8 7'8"8'15'7"4
10'1"8 9'0"12 16'1"8
1"8 3'9"2 1'4"67"6 6'8"2 12'12'
2'6"(TYP)
10"10 1'5"2'5"6'3"1'4"8 13'2"12
35'3"12
4'9"2
4'9"2
5'3"
5"14
5'4"8
1"8
7'0"8
1'8"9'0"8
2'
11'8"8
2'8"
19'8"8
8'
21'8"8
2'
35'3"12
13'7"4
7"4
1'4"1'11"4
1"8
+
12'7"4
12'
A B C D E F G H I J K L MN O P Q R S T U V
XYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQAR
ASAT
AU
AVAWAX
1.5X4
1.5X4
4X4
1.5X6 4X4
5X5
4X4
SS0508
4X4
1.5X61.5X6
1.5X4(**)
2X5
10X10(++)
4X4
4X4 1.5X6
4X4W=3X4
4X4W=3X4
5X8
2X5 5X5
4X4
4X4
W=3X44X4
W=3X4
1.5X6
5X5
W=3X55X5
1.5X6
1.5X6
6X6
5X5
W=3X45X5
4X4W=3X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E; T3,T6 4x2 SP #2;
Bot chord: 4x2 SP #2; B3,B6,
B7 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2; W8,W10 4x2 SP 2250f-1.9E;
Plating Notes
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Additional Notes
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AU 1056 /-/-/-/-/-
AL 1277 /-/-/-/-/-
AF 1124 /-/-/-/-/-
X 1138 /-/-/-/-/-
AU Brg Width = 5.3 Min Req =1.5
AL Brg Width = 8.0 Min Req =1.5
AF Brg Width = 4.0 Min Req =1.5
X Brg Width = 7.3 Min Req =1.5
Bearing AU is a rigid surface.
Bearings AL, AF, & X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 814 0
C - D 847 0
D - E 836 0
E - F 389 -295
F - G 431 -80
G - H 431 -80
I - J 0 -889
J - K 0 -889
K - L 0 -1029
L - M 0 -1029
Chords Tens.Comp.
M - N 0 -1029
N - O 0 -1571
O - P 0 -1600
P - Q 0 -2601
Q - R 0 -2827
R - S 0 -2827
S - T 0 -2621
T - U 0 -1928
U - V 0 -726
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AU-AR 0 -1732
AR-AP 0 -825
AO-AN 295 -389
AN-AM 295 -390
AM-AL 0 -496
AL-AK 0 -496
AK-AJ 0 -496
AJ-AI 654 0
AI-AH 1071 0
Chords Tens.Comp.
AH-AG 1071 0
AG-AF 1576 0
AF-AE 1571 0
AE-AD 2171 0
AD-AC 2171 0
AC-AB 2829 0
AB-AA 2835 0
AA- Z 2382 0
Z - Y 1451 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AU 0 -842
AP- E 0 -675
AP-AO 328 -390
H -AK 0 -1155
H -AJ 784 0
Webs Tens.Comp.
AE- P 0 -1462
P -AC 745 0
AC- Q 0 -403
AA- T 400 0
T - Z 0 -763
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.239 P 775 480
VERT(CL):0.388 P 476 360
HORZ(LL):-0.021 V - -
HORZ(TL):0.035 V - -
Creep Factor: 2.0
Max TC CSI:0.719
Max BC CSI:0.761
Max W eb CSI:0.344
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F6
Ply: 1
Qty:3
SEQN:17515 SY42
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T296
DrwNo:080.20.1106.46360
JB /DF 03/20/2020
T3 T6
B3 B6 B7
W8 W10
3"8
3"8
4'0"8 7'8"8'15'7"4
10'1"8 9'0"12 16'1"8
1"8 3'9"2 1'4"67"6 6'8"2 12'12'
2'6"(TYP)
10"10 1'5"2'5"6'3"1'4"8 13'2"12
35'3"12
4'9"2
4'9"2
5'3"
5"14
5'4"8
1"8
7'0"8
1'8"9'0"8
2'
11'8"8
2'8"
19'8"8
8'
21'8"8
2'
35'3"12
13'7"4
7"4
1'4"1'11"4
1"8
+
12'7"4
12'
A B C D E F G H I J K L MN O P Q R S T U V
XYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQAR
ASAT
AU
AVAWAX
1.5X4
1.5X4
4X4
1.5X6 4X4
5X5
4X4
SS0508
4X4
1.5X61.5X6
1.5X4(**)
2X5
10X10(++)
4X4
4X4 1.5X6
4X4W=3X4
4X4W=3X4
5X8
2X5 5X5
4X4
4X4
W=3X44X4
W=3X4
1.5X6
5X5
W=3X55X5
1.5X6
1.5X6
6X6
5X5
W=3X45X5
4X4W=3X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
AJ- I 0 -817
I -AI 449 0
AG- N 34 -1019
N -AF 0 -451
O -AE 777 0
Z - U 801 0
U - Y 0 -1219
Y - V 1220 0
V - X 0 -1062
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F6
Ply: 1
Qty:3
SEQN:17515 SY42
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T296
DrwNo:080.20.1106.46360
JB /DF 03/20/2020
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
AJ- I 0 -817
I -AI 449 0
AG- N 34 -1019
N -AF 0 -451
O -AE 777 0
Z - U 801 0
U - Y 0 -1219
Y - V 1220 0
V - X 0 -1062
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F6
Ply: 1
Qty:3
SEQN:17515 SY42
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T296
DrwNo:080.20.1106.46360
JB /DF 03/20/2020
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T5 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B5 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AM 1610 /-/-/-/-/-
AD 2040 /-/-/-/-/-
V 1040 /-/-/-/-/-
AM Brg Width = 4.0 Min Req =1.5
AD Brg Width = 4.0 Min Req =1.6
V Brg Width = 7.3 Min Req =1.5
Bearings AM, AD, & V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 611 0
C - D 393 -583
D - E 393 -583
E - F 381 -605
F - G 0 -1004
G - H 0 -1025
H - I 0 -653
I - J 543 -342
J - K 543 -342
Chords Tens.Comp.
K - L 543 -342
L - M 1071 -745
M - N 1051 -778
N - O 1051 -778
O - P 317 -1956
P - Q 0 -2320
Q - R 0 -2260
R - S 0 -1711
S - T 0 -655
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AM 0 -1012
AM-AL 0 -1012
AL-AK 605 -381
AK-AJ 623 -368
AJ-AI 1177 0
AI-AH 1177 0
AH-AG 877 0
AG-AF 561 0
AF-AE 561 0
Chords Tens.Comp.
AE-AD 765 -1030
AD-AC 745 -1071
AC-AB 1434 -674
AB-AA 1434 -674
AA- Z 2253 -93
Z - Y 2401 0
Y - X 2093 0
X - W 1307 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AN 0 -651
AN- C 653 0
C -AM 0 -1760
C -AL 1652 0
AL- E 0 -671
AK- F 0 -619
F -AJ 925 0
AJ- G 0 -481
H -AG 7 -589
Webs Tens.Comp.
AE- L 718 -707
L -AD 0 -1157
M -AC 1028 0
AC- O 0 -1919
O -AA 1087 0
AA- P 0 -657
R - X 0 -642
X - S 679 0
S - W 0 -1096
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.282 O 656 480
VERT(CL):0.424 O 436 360
HORZ(LL):-0.034 T - -
HORZ(TL):0.057 T - -
Creep Factor: 2.0
Max TC CSI:0.963
Max BC CSI:0.841
Max W eb CSI:0.466
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F7
Ply: 1
Qty:2
SEQN:13753 /SY42
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T383
DrwNo:079.20.1313.30288
AK /DF 03/19/2020
T2 T5
B53"8
3"8
5'2"8 14'6"15'7"4
6'1"8 16'13'2"4
1"8 11'7"11'7"4 12'
4'11"4 1'5"12 8'9"1'6"8 13'2"12
35'3"12
5'3"12
5'3"12
7'0"8
1'8"12 9'0"8
2'
19'8"8
10'8"
21'8"8
2'
35'3"12
13'7"4
1'11"4
1"8 +
+
12'
A B C D E F G H I JK L M N O P Q R S T
VWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAP
1.5X4
1.5X4
4X4
1.5X6 4X4
4X4
5X5
6X10
2X5
W=3X5
6X6
1.5X6
1.5X6
5X5
5X5
4X4
W=3X44X4
4X4
5X5
5X5
W=3X4
1.5X6
5X5
W=3X4
5X5
2X5
2X6
6X6
W=3X8
6X6
W=3X46X6
4X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T5 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B5 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AM 1610 /-/-/-/-/-
AD 2040 /-/-/-/-/-
V 1040 /-/-/-/-/-
AM Brg Width = 4.0 Min Req =1.5
AD Brg Width = 4.0 Min Req =1.6
V Brg Width = 7.3 Min Req =1.5
Bearings AM, AD, & V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 611 0
C - D 393 -583
D - E 393 -583
E - F 381 -605
F - G 0 -1004
G - H 0 -1025
H - I 0 -653
I - J 543 -342
J - K 543 -342
Chords Tens.Comp.
K - L 543 -342
L - M 1071 -745
M - N 1051 -778
N - O 1051 -778
O - P 317 -1956
P - Q 0 -2320
Q - R 0 -2260
R - S 0 -1711
S - T 0 -655
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AM 0 -1012
AM-AL 0 -1012
AL-AK 605 -381
AK-AJ 623 -368
AJ-AI 1177 0
AI-AH 1177 0
AH-AG 877 0
AG-AF 561 0
AF-AE 561 0
Chords Tens.Comp.
AE-AD 765 -1030
AD-AC 745 -1071
AC-AB 1434 -674
AB-AA 1434 -674
AA- Z 2253 -93
Z - Y 2401 0
Y - X 2093 0
X - W 1307 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AN 0 -651
AN- C 653 0
C -AM 0 -1760
C -AL 1652 0
AL- E 0 -671
AK- F 0 -619
F -AJ 925 0
AJ- G 0 -481
H -AG 7 -589
Webs Tens.Comp.
AE- L 718 -707
L -AD 0 -1157
M -AC 1028 0
AC- O 0 -1919
O -AA 1087 0
AA- P 0 -657
R - X 0 -642
X - S 679 0
S - W 0 -1096
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.282 O 656 480
VERT(CL):0.424 O 436 360
HORZ(LL):-0.034 T - -
HORZ(TL):0.057 T - -
Creep Factor: 2.0
Max TC CSI:0.963
Max BC CSI:0.841
Max W eb CSI:0.466
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F7
Ply: 1
Qty:2
SEQN:13753 /SY42
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T383
DrwNo:079.20.1313.30288
AK /DF 03/19/2020
T2 T5
B53"8
3"8
5'2"8 14'6"15'7"4
6'1"8 16'13'2"4
1"8 11'7"11'7"4 12'
4'11"4 1'5"12 8'9"1'6"8 13'2"12
35'3"12
5'3"12
5'3"12
7'0"8
1'8"12 9'0"8
2'
19'8"8
10'8"
21'8"8
2'
35'3"12
13'7"4
1'11"4
1"8 +
+
12'
A B C D E F G H I JK L M N O P Q R S T
VWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAP
1.5X4
1.5X4
4X4
1.5X6 4X4
4X4
5X5
6X10
2X5
W=3X5
6X6
1.5X6
1.5X6
5X5
5X5
4X4
W=3X44X4
4X4
5X5
5X5
W=3X4
1.5X6
5X5
W=3X4
5X5
2X5
2X6
6X6
W=3X8
6X6
W=3X46X6
4X4
4X4
4X4
4X4
4X4
5X5
5X5
6X6
6X6
2X5
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
AG- I 672 0
I -AE 0 -1058
J -AE 399 0
W -T 1099 0
T - V 0 -975
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F7
Ply: 1
Qty:2
SEQN:13753 /SY42
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T383
DrwNo:079.20.1313.30288
AK /DF 03/19/2020
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
AG- I 672 0
I -AE 0 -1058
J -AE 399 0
W -T 1099 0
T - V 0 -975
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F7
Ply: 1
Qty:2
SEQN:13753 /SY42
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T383
DrwNo:079.20.1313.30288
AK /DF 03/19/2020
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T6 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B3,B5 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 1674 /-/-/-/-/-
Y 1529 /-/-/-/-/-
R 667 /-/-/-/-/-
AH Brg Width = 4.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =1.5
R Brg Width = 3.5 Min Req =1.5
Bearing R is a rigid surface.
Bearings AH & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 613 0
C - D 356 -665
D - E 356 -665
E - F 342 -690
F - G 322 -715
G - H 0 -1270
H - I 0 -1257
I - J 0 -1257
Chords Tens.Comp.
J - K 0 -1257
K - L 0 -905
L - M 201 -574
M - N 640 -632
N - O 631 -637
O - P 631 -637
P - Q 92 -938
Q - R 6 -428
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AI-AH 0 -1012
AH-AG 0 -1012
AG-AF 690 -342
AF-AE 979 -122
AE-AD 1390 0
AD-AC 1390 0
AC-AB 1180 0
Chords Tens.Comp.
AB-AA 1180 0
AA- Z 649 0
Z - Y 646 -603
Y - X 632 -640
X - W 946 -258
W -V 946 -258
V - U 837 -9
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AI 0 -655
AI- C 650 0
C -AH 0 -1817
C -AG 1775 0
AG- E 0 -783
F -AF 862 0
AF- G 0 -1425
G -AE 725 0
Webs Tens.Comp.
K -AA 0 -604
AA- L 675 0
L - Z 0 -932
Z - M 686 -217
M - Y 0 -995
X - P 0 -809
Q - U 5 -686
U - R 691 -9
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 G 836 480
VERT(CL):0.335 G 513 360
HORZ(LL):-0.032 R - -
HORZ(TL):0.052 R - -
Creep Factor: 2.0
Max TC CSI:0.633
Max BC CSI:0.785
Max W eb CSI:0.501
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F8
Ply: 1
Qty:3
SEQN:13733 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T377
DrwNo:079.20.1313.27152
AK /DF 03/19/2020
T2 T6
B3 B5
3"8
5'2"8 14'6"9'
6'1"8 7'2"8 8'9"8 6'7"
1"8 14'9'3"5'4"
4'11"4 1'5"12 10'5"6'5"4"
28'8"8
5'3"12
5'3"12
7'0"8
1'8"12 9'0"8
2'
19'8"8
10'8"
21'8"8
2'
28'8"8
7'1'11"41'8"43"
1"8
+
12'
13'8"4ABCDEFGHIJKLMNOPQRS
TUVWXYZAAABACADAEAFAGAHAIAJAK
1.5X4
1.5X4
4X4
1.5X6 4X4
4X4
5X5
6X10
3X5
W=3X5
6X6
1.5X6 2X5
6X6
5X5
5X5
4X4
W=3X4
W=3X4
4X4
W=3X4
W=3X4
4X4
5X5
5X5
5X5
5X5
1.5X6
1.5X6
4X4
W=3X5 4X4
W=3X4 4X4
4X4
5X5
5X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E; T2,T6 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B3,B5 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 1674 /-/-/-/-/-
Y 1529 /-/-/-/-/-
R 667 /-/-/-/-/-
AH Brg Width = 4.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =1.5
R Brg Width = 3.5 Min Req =1.5
Bearing R is a rigid surface.
Bearings AH & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 613 0
C - D 356 -665
D - E 356 -665
E - F 342 -690
F - G 322 -715
G - H 0 -1270
H - I 0 -1257
I - J 0 -1257
Chords Tens.Comp.
J - K 0 -1257
K - L 0 -905
L - M 201 -574
M - N 640 -632
N - O 631 -637
O - P 631 -637
P - Q 92 -938
Q - R 6 -428
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AI-AH 0 -1012
AH-AG 0 -1012
AG-AF 690 -342
AF-AE 979 -122
AE-AD 1390 0
AD-AC 1390 0
AC-AB 1180 0
Chords Tens.Comp.
AB-AA 1180 0
AA- Z 649 0
Z - Y 646 -603
Y - X 632 -640
X - W 946 -258
W -V 946 -258
V - U 837 -9
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AI 0 -655
AI- C 650 0
C -AH 0 -1817
C -AG 1775 0
AG- E 0 -783
F -AF 862 0
AF- G 0 -1425
G -AE 725 0
Webs Tens.Comp.
K -AA 0 -604
AA- L 675 0
L - Z 0 -932
Z - M 686 -217
M - Y 0 -995
X - P 0 -809
Q - U 5 -686
U - R 691 -9
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 G 836 480
VERT(CL):0.335 G 513 360
HORZ(LL):-0.032 R - -
HORZ(TL):0.052 R - -
Creep Factor: 2.0
Max TC CSI:0.633
Max BC CSI:0.785
Max W eb CSI:0.501
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F8
Ply: 1
Qty:3
SEQN:13733 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T377
DrwNo:079.20.1313.27152
AK /DF 03/19/2020
T2 T6
B3 B5
3"8
5'2"8 14'6"9'
6'1"8 7'2"8 8'9"8 6'7"
1"8 14'9'3"5'4"
4'11"4 1'5"12 10'5"6'5"4"
28'8"8
5'3"12
5'3"12
7'0"8
1'8"12 9'0"8
2'
19'8"8
10'8"
21'8"8
2'
28'8"8
7'1'11"41'8"43"
1"8
+
12'
13'8"4ABCDEFGHIJKLMNOPQRS
TUVWXYZAAABACADAEAFAGAHAIAJAK
1.5X4
1.5X4
4X4
1.5X6 4X4
4X4
5X5
6X10
3X5
W=3X5
6X6
1.5X6 2X5
6X6
5X5
5X5
4X4
W=3X4
W=3X4
4X4
W=3X4
W=3X4
4X4
5X5
5X5
5X5
5X5
1.5X6
1.5X6
4X4
W=3X5 4X4
W=3X4 4X4
4X4
5X5
5X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1641 /-/-/-/-/-
J 755 /-/-/-/-/-
P Brg Width = 6.0 Min Req =1.5
J Brg Width = -Min Req =-
Bearing P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 588 0
C - D 1068 0
D - E 518 -538
E - F 510 -548
Chords Tens.Comp.
F - G 21 -1144
G - H 0 -997
H - I 0 -419
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 0 -1030
P - O 517 -532
O - N 538 -518
Chords Tens.Comp.
N - M 937 -235
M - L 1174 0
L - K 829 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 0 -651
Q - C 716 0
C - P 0 -669
P - D 0 -1695
D - O 722 0
Webs Tens.Comp.
N - F 0 -1071
F - M 531 0
H - K 0 -705
K - I 725 0
I - J 0 -725
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.216 N 669 480
VERT(CL):0.354 N 408 360
HORZ(LL):-0.045 I - -
HORZ(TL):0.074 I - -
Creep Factor: 2.0
Max TC CSI:0.995
Max BC CSI:0.711
Max W eb CSI:0.264
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9
Ply: 1
Qty:2
SEQN:13850 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T389
DrwNo:079.20.1313.42972
AK /DF 03/19/2020
3"8
3"8
5'2"8 12'7"4
2'4"12 2'6"
(TYP)
1'3"4 10"12
17'9"12
5'5"8
5'5"8
7'0"8
1'7"9'0"8
2'
17'9"12
8'9"4
1"8
+
12'
A B C D E F G H I
JKLMNOPQRS
1X4
1X4
3X4
2X5 4X4
3X3
5X5
4X6
6X8
4X4
1.5X6
1.5X4
5X5
3X3
5X5
3X3
4X4
3X3
5X5
3X6
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1641 /-/-/-/-/-
J 755 /-/-/-/-/-
P Brg Width = 6.0 Min Req =1.5
J Brg Width = -Min Req =-
Bearing P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 588 0
C - D 1068 0
D - E 518 -538
E - F 510 -548
Chords Tens.Comp.
F - G 21 -1144
G - H 0 -997
H - I 0 -419
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 0 -1030
P - O 517 -532
O - N 538 -518
Chords Tens.Comp.
N - M 937 -235
M - L 1174 0
L - K 829 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 0 -651
Q - C 716 0
C - P 0 -669
P - D 0 -1695
D - O 722 0
Webs Tens.Comp.
N - F 0 -1071
F - M 531 0
H - K 0 -705
K - I 725 0
I - J 0 -725
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.216 N 669 480
VERT(CL):0.354 N 408 360
HORZ(LL):-0.045 I - -
HORZ(TL):0.074 I - -
Creep Factor: 2.0
Max TC CSI:0.995
Max BC CSI:0.711
Max W eb CSI:0.264
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9
Ply: 1
Qty:2
SEQN:13850 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T389
DrwNo:079.20.1313.42972
AK /DF 03/19/2020
3"8
3"8
5'2"8 12'7"4
2'4"12 2'6"
(TYP)
1'3"4 10"12
17'9"12
5'5"8
5'5"8
7'0"8
1'7"9'0"8
2'
17'9"12
8'9"4
1"8
+
12'
A B C D E F G H I
JKLMNOPQRS
1X4
1X4
3X4
2X5 4X4
3X3
5X5
4X6
6X8
4X4
1.5X6
1.5X4
5X5
3X3
5X5
3X3
4X4
3X3
5X5
3X6
2X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2700f-2.2E;
Bot chord: 4x2 SP 2700f-2.2E;
B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Deflection
Max JT VERT DEFL: LL: 0.27" DL: 0.18". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 974 /-/-/-/-/-
I 974 /-/-/-/-/-
P Brg Width = -Min Req =-
I Brg Width = 4.0 Min Req =1.5
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -924
B - C 0 -953
C - D 0 -965
D - E 0 -1897
Chords Tens.Comp.
E - F 0 -1869
F - G 0 -1479
G - H 0 -568
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 953 0
N - M 1609 0
M - L 1985 0
Chords Tens.Comp.
L - K 1779 0
K - J 1143 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 0 -1479
A - O 1961 0
O - B 0 -816
N - D 0 -1125
D - M 500 0
Webs Tens.Comp.
F - K 0 -517
K - G 577 0
G - J 0 -990
J - H 982 0
H - I 0 -935
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.274 N 633 480
VERT(CL):0.445 N 390 360
HORZ(LL):-0.039 H - -
HORZ(TL):0.064 H - -
Creep Factor: 2.0
Max TC CSI:0.744
Max BC CSI:0.766
Max W eb CSI:0.553
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9A
Ply: 1
Qty:2
SEQN:14062 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T11
DrwNo:079.20.1313.30959
AK /DF 03/19/2020
B2
14'11"12
11"4 1'2"2'6"
(TYP)
1'3"12
1'3"12
3'3"12
2'
3'5"4
1"8
14'11"12
11'6"8
1"8
+
12'
A B C D E F G H
IJKLMNOP
6X6
2X5 7X8
3X3 2X4
5X5
3X3
5X5
3X3
4X4
3X3
5X5
3X3
6X6
4X5
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2700f-2.2E;
Bot chord: 4x2 SP 2700f-2.2E;
B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Deflection
Max JT VERT DEFL: LL: 0.27" DL: 0.18". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 974 /-/-/-/-/-
I 974 /-/-/-/-/-
P Brg Width = -Min Req =-
I Brg Width = 4.0 Min Req =1.5
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -924
B - C 0 -953
C - D 0 -965
D - E 0 -1897
Chords Tens.Comp.
E - F 0 -1869
F - G 0 -1479
G - H 0 -568
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 953 0
N - M 1609 0
M - L 1985 0
Chords Tens.Comp.
L - K 1779 0
K - J 1143 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 0 -1479
A - O 1961 0
O - B 0 -816
N - D 0 -1125
D - M 500 0
Webs Tens.Comp.
F - K 0 -517
K - G 577 0
G - J 0 -990
J - H 982 0
H - I 0 -935
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.274 N 633 480
VERT(CL):0.445 N 390 360
HORZ(LL):-0.039 H - -
HORZ(TL):0.064 H - -
Creep Factor: 2.0
Max TC CSI:0.744
Max BC CSI:0.766
Max W eb CSI:0.553
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9A
Ply: 1
Qty:2
SEQN:14062 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T11
DrwNo:079.20.1313.30959
AK /DF 03/19/2020
B2
14'11"12
11"4 1'2"2'6"
(TYP)
1'3"12
1'3"12
3'3"12
2'
3'5"4
1"8
14'11"12
11'6"8
1"8
+
12'
A B C D E F G H
IJKLMNOP
6X6
2X5 7X8
3X3 2X4
5X5
3X3
5X5
3X3
4X4
3X3
5X5
3X3
6X6
4X5
2X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 17.69
BC: From 10 plf at 0.00 to 10 plf at 17.69
TC: 760 lb Conc. Load at 1.46
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*343 /-/-/-/-/-
W*493 /-/-/-/-/-
K /-634
T Brg Width = 68.5 Min Req =-
W Brg Width = 26.8 Min Req =-
Bearings T & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -481
D - E 0 -1116
E - F 0 -1129
F - G 0 -1132
Chords Tens.Comp.
G - H 0 -1066
H - I 0 -487
I - J 531 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 392 0
R - Q 755 0
Q - P 755 0
Chords Tens.Comp.
P - O 1129 0
O - N 1207 0
N - M 877 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 0 -910
S - C 0 -486
R - D 0 -500
D - P 651 0
P - E 0 -389
Webs Tens.Comp.
H - M 0 -685
M - I 687 0
I - L 0 -1107
L - J 0 -932
J - K 636 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 O 999 480
VERT(CL):0.175 O 725 360
HORZ(LL):-0.011 I - -
HORZ(TL):0.019 I - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.900
Max W eb CSI:0.194
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9B
Ply: 1
Qty:1
SEQN:13856 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T391
DrwNo:079.20.1313.38603
AK /DF 03/19/2020
3"8
3"8
17'9"12
1'1"12 1'3"12 2'6"
(TYP)
1'1"10"12
1'7"
1'7"
5'8"8
4'1"8
7'0"8
1'4"9'0"8
2'
17'9"12
8'9"4
1'11"4+
12'
A B C D E F G H I J
K
L
MNOPQ
RS
T
W
1X4
1X4
3X3
1X4
4X4
3X8
3X3
3X3
4X6
2X4 4X4
1.5X4 1.5X4
3X3
3X3
3X3
3X3
4X4
4X4
3X3
4X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 17.69
BC: From 10 plf at 0.00 to 10 plf at 17.69
TC: 760 lb Conc. Load at 1.46
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*343 /-/-/-/-/-
W*493 /-/-/-/-/-
K /-634
T Brg Width = 68.5 Min Req =-
W Brg Width = 26.8 Min Req =-
Bearings T & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -481
D - E 0 -1116
E - F 0 -1129
F - G 0 -1132
Chords Tens.Comp.
G - H 0 -1066
H - I 0 -487
I - J 531 0
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 392 0
R - Q 755 0
Q - P 755 0
Chords Tens.Comp.
P - O 1129 0
O - N 1207 0
N - M 877 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 0 -910
S - C 0 -486
R - D 0 -500
D - P 651 0
P - E 0 -389
Webs Tens.Comp.
H - M 0 -685
M - I 687 0
I - L 0 -1107
L - J 0 -932
J - K 636 0
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 O 999 480
VERT(CL):0.175 O 725 360
HORZ(LL):-0.011 I - -
HORZ(TL):0.019 I - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.900
Max W eb CSI:0.194
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F9B
Ply: 1
Qty:1
SEQN:13856 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T391
DrwNo:079.20.1313.38603
AK /DF 03/19/2020
3"8
3"8
17'9"12
1'1"12 1'3"12 2'6"
(TYP)
1'1"10"12
1'7"
1'7"
5'8"8
4'1"8
7'0"8
1'4"9'0"8
2'
17'9"12
8'9"4
1'11"4+
12'
A B C D E F G H I J
K
L
MNOPQ
RS
T
W
1X4
1X4
3X3
1X4
4X4
3X8
3X3
3X3
4X6
2X4 4X4
1.5X4 1.5X4
3X3
3X3
3X3
3X3
4X4
4X4
3X3
4X4
3X3
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 60 plf at 0.13 to 60 plf at 5.54
BC: From 10 plf at 0.00 to 10 plf at 5.54
TC: 1728 lb Conc. Load at 0.56
TC: 974 lb Conc. Load at 1.98, 4.56
TC: 755 lb Conc. Load at 2.27
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right cantilever is exposed to wind
Additional Notes
See DWG CNSY42PL0118 for connection details of
2 ply trusses.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 2740 /-/-/-/588 /-
H 2070 /-/-/-/444 /-
Wind reactions based on MWFRS
K Brg Width = 4.0 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings K & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 240 -1118
A - J 1055 -226
L - K 250 -1165
Webs Tens.Comp.
B - J 214 -984
D - H 227 -1032
H - E 616 -132
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.077 I 671 480
VERT(CL):0.143 I 362 360
HORZ(LL):0.051 A - -
HORZ(TL):0.094 A - -
Creep Factor: 2.0
Max TC CSI:0.686
Max BC CSI:0.552
Max W eb CSI:0.439
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F10
Ply: 2
Qty:1
SEQN:14083 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T327
DrwNo:080.20.1106.50040
JB /DF 03/20/2020
2 Complete Trusses Required
3"8
3"8
4'8"1'
4"1'2"4 9"8
5'8"
8"8
8"8
2'6"4
1'9"12
4'4"8
1'10"4
5'8"
1'3"8
1'11"41"8 12'
A B C D E
GHIJK
L
6X63X3(**)
2X5
2X5
7X6
4X7
6X6
2X5
5X5
5X5
1.5X6
1X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 60 plf at 0.13 to 60 plf at 5.54
BC: From 10 plf at 0.00 to 10 plf at 5.54
TC: 1728 lb Conc. Load at 0.56
TC: 974 lb Conc. Load at 1.98, 4.56
TC: 755 lb Conc. Load at 2.27
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right cantilever is exposed to wind
Additional Notes
See DWG CNSY42PL0118 for connection details of
2 ply trusses.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 2740 /-/-/-/588 /-
H 2070 /-/-/-/444 /-
Wind reactions based on MWFRS
K Brg Width = 4.0 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings K & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 240 -1118
A - J 1055 -226
L - K 250 -1165
Webs Tens.Comp.
B - J 214 -984
D - H 227 -1032
H - E 616 -132
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.077 I 671 480
VERT(CL):0.143 I 362 360
HORZ(LL):0.051 A - -
HORZ(TL):0.094 A - -
Creep Factor: 2.0
Max TC CSI:0.686
Max BC CSI:0.552
Max W eb CSI:0.439
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F10
Ply: 2
Qty:1
SEQN:14083 SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T327
DrwNo:080.20.1106.50040
JB /DF 03/20/2020
2 Complete Trusses Required
3"8
3"8
4'8"1'
4"1'2"4 9"8
5'8"
8"8
8"8
2'6"4
1'9"12
4'4"8
1'10"4
5'8"
1'3"8
1'11"41"8 12'
A B C D E
GHIJK
L
6X63X3(**)
2X5
2X5
7X6
4X7
6X6
2X5
5X5
5X5
1.5X6
1X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2700f-2.2E;
Bot chord: 4x2 SP 2700f-2.2E;
B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Deflection
Max JT VERT DEFL: LL: 0.24" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 974 /-/-/-/-/-
J 974 /-/-/-/-/-
S Brg Width = -Min Req =-
J Brg Width = 4.0 Min Req =1.5
Bearing J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -899
B - C 0 -925
C - D 0 -1733
D - E 0 -1733
Chords Tens.Comp.
E - F 0 -1910
F - G 0 -1910
G - H 0 -1472
H - I 0 -570
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 925 0
Q - P 953 0
P - O 1910 0
O - N 1910 0
Chords Tens.Comp.
N - M 1910 0
M - L 1773 0
L - K 1145 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - S 0 -1473
A - R 1909 0
R - B 0 -734
Q - C 0 -780
C - P 1265 0
P - E 0 -487
Webs Tens.Comp.
M - G 419 0
G - L 0 -517
L - H 563 0
H - K 0 -989
K - I 985 0
I - J 0 -935
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.249 C 698 480
VERT(CL):0.403 C 431 360
HORZ(LL):-0.037 I - -
HORZ(TL):0.060 I - -
Creep Factor: 2.0
Max TC CSI:0.633
Max BC CSI:0.757
Max W eb CSI:0.539
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F11
Ply: 1
Qty:1
SEQN:14066 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T322
DrwNo:079.20.1313.29118
AK /DF 03/19/2020
B2
14'11"12
11"4 1'3"13 1'3"13 1'3"6 2'6"2'6"
1'3"12
1'3"12
3'3"12
2'
6'3"14
3'0"2
8'3"14
2'
14'11"12
6'7"14
1"8
+
12'
A B C D E F G H I
JKLMNOPQRS
6X6
2X5 7X8
3X3
1.5X6
4X5 1X4
6X8
3X3
1.5X6
1X4
1.5X64X4(**)
3X3
5X5
3X3
6X6
4X5
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2700f-2.2E;
Bot chord: 4x2 SP 2700f-2.2E;
B2 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Deflection
Max JT VERT DEFL: LL: 0.24" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 974 /-/-/-/-/-
J 974 /-/-/-/-/-
S Brg Width = -Min Req =-
J Brg Width = 4.0 Min Req =1.5
Bearing J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -899
B - C 0 -925
C - D 0 -1733
D - E 0 -1733
Chords Tens.Comp.
E - F 0 -1910
F - G 0 -1910
G - H 0 -1472
H - I 0 -570
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 925 0
Q - P 953 0
P - O 1910 0
O - N 1910 0
Chords Tens.Comp.
N - M 1910 0
M - L 1773 0
L - K 1145 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - S 0 -1473
A - R 1909 0
R - B 0 -734
Q - C 0 -780
C - P 1265 0
P - E 0 -487
Webs Tens.Comp.
M - G 419 0
G - L 0 -517
L - H 563 0
H - K 0 -989
K - I 985 0
I - J 0 -935
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.249 C 698 480
VERT(CL):0.403 C 431 360
HORZ(LL):-0.037 I - -
HORZ(TL):0.060 I - -
Creep Factor: 2.0
Max TC CSI:0.633
Max BC CSI:0.757
Max W eb CSI:0.539
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F11
Ply: 1
Qty:1
SEQN:14066 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T322
DrwNo:079.20.1313.29118
AK /DF 03/19/2020
B2
14'11"12
11"4 1'3"13 1'3"13 1'3"6 2'6"2'6"
1'3"12
1'3"12
3'3"12
2'
6'3"14
3'0"2
8'3"14
2'
14'11"12
6'7"14
1"8
+
12'
A B C D E F G H I
JKLMNOPQRS
6X6
2X5 7X8
3X3
1.5X6
4X5 1X4
6X8
3X3
1.5X6
1X4
1.5X64X4(**)
3X3
5X5
3X3
6X6
4X5
2X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 975 /-/-/-/-/-
J 975 /-/-/-/-/-
Q Brg Width = 5.3 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings Q & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -571
B - C 0 -1457
C - D 0 -1912
D - E 0 -1919
Chords Tens.Comp.
E - F 0 -1912
F - G 0 -1457
G - H 0 -571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1135 0
O - N 1760 0
N - M 1919 0
Chords Tens.Comp.
M - L 1760 0
L - K 1135 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 0 -911
A - P 1007 0
P - B 0 -992
B - O 568 0
O - C 0 -532
C - N 463 0
Webs Tens.Comp.
M - F 463 0
F - L 0 -532
L - G 568 0
G - K 0 -992
K - H 1007 0
H - J 0 -911
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 D 999 480
VERT(CL):0.184 D 962 360
HORZ(LL):0.020 B - -
HORZ(TL):0.042 B - -
Creep Factor: 2.0
Max TC CSI:0.735
Max BC CSI:0.721
Max W eb CSI:0.284
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F11A
Ply: 1
Qty:7
SEQN:13763 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T374
DrwNo:079.20.1313.35982
AK /DF 03/19/2020
3"8
15'2"12
2'6"
(TYP)
1'2"14 1'2"14
6'7"6
6'7"6
8'7"6
2'
15'2"12
6'7"6
1'11"4+
12'
A B C D E F G H
JKLMNOPQ
1X44X4
2X4 4X4
3X3
3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 975 /-/-/-/-/-
J 975 /-/-/-/-/-
Q Brg Width = 5.3 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings Q & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -571
B - C 0 -1457
C - D 0 -1912
D - E 0 -1919
Chords Tens.Comp.
E - F 0 -1912
F - G 0 -1457
G - H 0 -571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1135 0
O - N 1760 0
N - M 1919 0
Chords Tens.Comp.
M - L 1760 0
L - K 1135 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 0 -911
A - P 1007 0
P - B 0 -992
B - O 568 0
O - C 0 -532
C - N 463 0
Webs Tens.Comp.
M - F 463 0
F - L 0 -532
L - G 568 0
G - K 0 -992
K - H 1007 0
H - J 0 -911
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 D 999 480
VERT(CL):0.184 D 962 360
HORZ(LL):0.020 B - -
HORZ(TL):0.042 B - -
Creep Factor: 2.0
Max TC CSI:0.735
Max BC CSI:0.721
Max W eb CSI:0.284
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F11A
Ply: 1
Qty:7
SEQN:13763 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T374
DrwNo:079.20.1313.35982
AK /DF 03/19/2020
3"8
15'2"12
2'6"
(TYP)
1'2"14 1'2"14
6'7"6
6'7"6
8'7"6
2'
15'2"12
6'7"6
1'11"4+
12'
A B C D E F G H
JKLMNOPQ
1X44X4
2X4 4X4
3X3
3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 964 /-/-/-/-/-
J 964 /-/-/-/-/-
Q Brg Width = 3.3 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings Q & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -564
B - C 0 -1435
C - D 0 -1868
D - E 0 -1875
Chords Tens.Comp.
E - F 0 -1868
F - G 0 -1435
G - H 0 -564
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1120 0
O - N 1730 0
N - M 1875 0
Chords Tens.Comp.
M - L 1730 0
L - K 1120 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 0 -901
A - P 994 0
P - B 0 -979
B - O 555 0
O - C 0 -520
C - N 454 0
Webs Tens.Comp.
M - F 454 0
F - L 0 -520
L - G 555 0
G - K 0 -979
K - H 994 0
H - J 0 -901
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 D 999 480
VERT(CL):0.177 D 987 360
HORZ(LL):0.019 B - -
HORZ(TL):0.041 B - -
Creep Factor: 2.0
Max TC CSI:0.727
Max BC CSI:0.705
Max W eb CSI:0.281
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F12
Ply: 1
Qty:2
SEQN:13766 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T388
DrwNo:079.20.1313.28728
AK /DF 03/19/2020
3"8
15'0"12
2'6"
(TYP)
1'1"14 1'1"14
6'6"6
6'6"6
8'6"6
2'
15'0"12
6'6"6
1'11"4+
12'
A B C D E F G H
JKLMNOPQ
1X44X4
2X4 4X4
3X3
3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 964 /-/-/-/-/-
J 964 /-/-/-/-/-
Q Brg Width = 3.3 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings Q & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -564
B - C 0 -1435
C - D 0 -1868
D - E 0 -1875
Chords Tens.Comp.
E - F 0 -1868
F - G 0 -1435
G - H 0 -564
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1120 0
O - N 1730 0
N - M 1875 0
Chords Tens.Comp.
M - L 1730 0
L - K 1120 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 0 -901
A - P 994 0
P - B 0 -979
B - O 555 0
O - C 0 -520
C - N 454 0
Webs Tens.Comp.
M - F 454 0
F - L 0 -520
L - G 555 0
G - K 0 -979
K - H 994 0
H - J 0 -901
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 D 999 480
VERT(CL):0.177 D 987 360
HORZ(LL):0.019 B - -
HORZ(TL):0.041 B - -
Creep Factor: 2.0
Max TC CSI:0.727
Max BC CSI:0.705
Max W eb CSI:0.281
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F12
Ply: 1
Qty:2
SEQN:13766 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T388
DrwNo:079.20.1313.28728
AK /DF 03/19/2020
3"8
15'0"12
2'6"
(TYP)
1'1"14 1'1"14
6'6"6
6'6"6
8'6"6
2'
15'0"12
6'6"6
1'11"4+
12'
A B C D E F G H
JKLMNOPQ
1X44X4
2X4 4X4
3X3
3X3
3X3
3X3
1X4 1X4
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Additional Notes
Refer to General Notes for additional information
See detail STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AO 38 /-/-/-/-/-
AN*133 /-/-/-/-/-
BC 556 /-/-/-/-/-
BD 997 /-/-/-/-/-
V 353 /-/-/-/-/-
AO Brg Width = 8.0 Min Req =1.5
AN Brg Width = 60.0 Min Req =-
BC Brg Width = 12.0 Min Req =1.5
BD Brg Width = 12.0 Min Req =1.5
V Brg Width = 8.7 Min Req =1.5
Bearings AO, AN, BC, BD, & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - I 0 -375
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E -AJ 0 -513
E -AI 417 0
I -AD 0 -388
Webs Tens.Comp.
AD- L 442 0
L -AC 0 -538
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 K 999 480
VERT(CL):0.034 K 999 360
HORZ(LL):0.001 E - -
HORZ(TL):0.002 E - -
Creep Factor: 2.0
Max TC CSI:0.362
Max BC CSI:0.245
Max W eb CSI:0.317
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F14
Ply: 1
Qty:1
SEQN:13863 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T364
DrwNo:079.20.1313.32551
AK /DF 03/19/2020
3"8
8"5'6"7'8"6'2"12
6"14
1'4"
(TYP)
3"
1'7"4
1'2"4 2'9"2'4"2
0"14
0"10
2'5"6
2'6"12
1'0"8
2'6"
(TYP)
3"
20'0"12
7"10
7"10
3'2"
2'6"6 6'2"
3'
13'10"
7'8"
20'0"12
6'2"12
1'11"412'
A B C E G I J L N Q T
VXAA
AC
ADAFAHAI
AJAKALAMANAOBC
BD
1X43X3
2X4
1X4
3X4
3X6
2X4 3X4
3X6
2X4 3X8(++)W=3X4
5X5
5X5
3X31X4
W=3X4
3X31X4
3X4
6X6
3X31.5X6(++)
3X3
1.5X6(++)3X3
1.5X6(++)3X3
1.5X6(++)
3X3
2X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Additional Notes
Refer to General Notes for additional information
See detail STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AO 38 /-/-/-/-/-
AN*133 /-/-/-/-/-
BC 556 /-/-/-/-/-
BD 997 /-/-/-/-/-
V 353 /-/-/-/-/-
AO Brg Width = 8.0 Min Req =1.5
AN Brg Width = 60.0 Min Req =-
BC Brg Width = 12.0 Min Req =1.5
BD Brg Width = 12.0 Min Req =1.5
V Brg Width = 8.7 Min Req =1.5
Bearings AO, AN, BC, BD, & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - I 0 -375
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E -AJ 0 -513
E -AI 417 0
I -AD 0 -388
Webs Tens.Comp.
AD- L 442 0
L -AC 0 -538
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 K 999 480
VERT(CL):0.034 K 999 360
HORZ(LL):0.001 E - -
HORZ(TL):0.002 E - -
Creep Factor: 2.0
Max TC CSI:0.362
Max BC CSI:0.245
Max W eb CSI:0.317
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F14
Ply: 1
Qty:1
SEQN:13863 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T364
DrwNo:079.20.1313.32551
AK /DF 03/19/2020
3"8
8"5'6"7'8"6'2"12
6"14
1'4"
(TYP)
3"
1'7"4
1'2"4 2'9"2'4"2
0"14
0"10
2'5"6
2'6"12
1'0"8
2'6"
(TYP)
3"
20'0"12
7"10
7"10
3'2"
2'6"6 6'2"
3'
13'10"
7'8"
20'0"12
6'2"12
1'11"412'
A B C E G I J L N Q T
VXAA
AC
ADAFAHAI
AJAKALAMANAOBC
BD
1X43X3
2X4
1X4
3X4
3X6
2X4 3X4
3X6
2X4 3X8(++)W=3X4
5X5
5X5
3X31X4
W=3X4
3X31X4
3X4
6X6
3X31.5X6(++)
3X3
1.5X6(++)3X3
1.5X6(++)3X3
1.5X6(++)
3X3
2X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 1338 /-/-/-/-/-
L 1338 /-/-/-/-/-
W Brg Width = -Min Req =-
L Brg Width = 4.0 Min Req =1.5
Bearing L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -830
B - C 0 -2256
C - D 0 -3181
D - E 0 -3704
E - F 0 -3712
Chords Tens.Comp.
F - G 0 -3704
G - H 0 -3704
H - I 0 -3181
I - J 0 -2256
J - K 0 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 1663 0
U - T 2826 0
T - S 3518 0
S - R 3518 0
R - Q 3712 0
Chords Tens.Comp.
Q - P 3518 0
P - O 3518 0
O - N 2826 0
N - M 1663 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - W 0 -1319
A - V 1432 0
V - B 0 -1433
B - U 1021 0
U - C 0 -980
C - T 611 0
T - D 0 -580
D - R 587 -51
Webs Tens.Comp.
Q - H 587 -51
H - O 0 -580
O - I 611 0
I - N 0 -980
N - J 1021 0
J - M 0 -1433
M - K 1432 0
K - L 0 -1301
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.213 E 999 480
VERT(CL):0.340 E 708 360
HORZ(LL):0.036 B - -
HORZ(TL):0.060 B - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.738
Max W eb CSI:0.404
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F15
Ply: 1
Qty:11
SEQN:13868 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T195
DrwNo:079.20.1313.30367
AK /DF 03/19/2020
20'7"
2'6"
(TYP)
1'5"1'5"
9'3"8
9'3"8
11'3"8
2'
20'7"
9'3"8
1'11"41"8
+
12'
A B C D E F G H I J K
LMNOPQRSTUVW
5X6
2X5 6X6
4X4
6X6
3X4
5X5
3X3
W=3X45X5
1.5X4 1.5X4
5X5
W=3X4
W=3X4
3X3
5X5
3X4
6X6
4X4
6X6
5X6
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP #2;
Webs: 4x2 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 1338 /-/-/-/-/-
L 1338 /-/-/-/-/-
W Brg Width = -Min Req =-
L Brg Width = 4.0 Min Req =1.5
Bearing L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -830
B - C 0 -2256
C - D 0 -3181
D - E 0 -3704
E - F 0 -3712
Chords Tens.Comp.
F - G 0 -3704
G - H 0 -3704
H - I 0 -3181
I - J 0 -2256
J - K 0 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 1663 0
U - T 2826 0
T - S 3518 0
S - R 3518 0
R - Q 3712 0
Chords Tens.Comp.
Q - P 3518 0
P - O 3518 0
O - N 2826 0
N - M 1663 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - W 0 -1319
A - V 1432 0
V - B 0 -1433
B - U 1021 0
U - C 0 -980
C - T 611 0
T - D 0 -580
D - R 587 -51
Webs Tens.Comp.
Q - H 587 -51
H - O 0 -580
O - I 611 0
I - N 0 -980
N - J 1021 0
J - M 0 -1433
M - K 1432 0
K - L 0 -1301
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.213 E 999 480
VERT(CL):0.340 E 708 360
HORZ(LL):0.036 B - -
HORZ(TL):0.060 B - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.738
Max W eb CSI:0.404
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F15
Ply: 1
Qty:11
SEQN:13868 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T195
DrwNo:079.20.1313.30367
AK /DF 03/19/2020
20'7"
2'6"
(TYP)
1'5"1'5"
9'3"8
9'3"8
11'3"8
2'
20'7"
9'3"8
1'11"41"8
+
12'
A B C D E F G H I J K
LMNOPQRSTUVW
5X6
2X5 6X6
4X4
6X6
3X4
5X5
3X3
W=3X45X5
1.5X4 1.5X4
5X5
W=3X4
W=3X4
3X3
5X5
3X4
6X6
4X4
6X6
5X6
2X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E; B1 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 1300 /-/-/-/-/-
O 1391 /-/-/-/-/-
AB Brg Width = 5.3 Min Req =1.5
O Brg Width = 4.0 Min Req =1.5
Bearings AB & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -462
B - C 0 -979
C - D 0 -2305
D - E 0 -3166
E - F 0 -3557
Chords Tens.Comp.
F - G 0 -3557
G - H 0 -3510
H - I 0 -3175
I - J 0 -2279
J - K 0 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 553 0
Z - Y 1743 0
Y - X 2841 0
X - W 3482 0
W -V 3482 0
V - U 3519 0
Chords Tens.Comp.
U - T 3510 0
T - S 3498 0
S - R 3498 0
R - Q 2810 0
Q - P 1723 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 0 -1162
A -AA 1264 0
AA- B 0 -1279
B - Z 1197 0
Z - C 0 -1315
C - Y 967 0
Y - D 0 -922
D - X 559 0
X - E 0 -543
Webs Tens.Comp.
G - U 54 -427
T - H 536 -36
H - R 0 -923
R - I 689 0
I - Q 0 -915
Q - J 960 0
J - P 0 -1353
P - K 1327 0
K - O 0 -1331
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.213 G 999 480
VERT(CL):0.338 G 701 360
HORZ(LL):0.034 B - -
HORZ(TL):0.055 B - -
Creep Factor: 2.0
Max TC CSI:0.484
Max BC CSI:0.559
Max W eb CSI:0.375
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F16
Ply: 1
Qty:5
SEQN:13892 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T358
DrwNo:079.20.1313.42597
AK /DF 03/19/2020
B1
3"8
3"8
20'1"4 10"
12'9"12 8'1"8
7"8 1'10"4 2'6"
(TYP)
2'1"7"8
20'11"4
1'
1'
10'7"4
9'7"4
12'7"4
2'
19'11"4
7'4"
20'11"4
1'1'11"41"8
+12'
A B C D E F G H I J K L
NOPQRSTUVWXYZAA
AB
1X45X5
2X5 7X6
5X5
7X6
4X4
6X6
3X3
5X5
3X3
W=3X44X4
W=3X43X3
1.5X6 1.5X6
3X3
W=H03105X5
4X4
6X6
4X4
6X6
5X6
5X5
3X3
1.5X6
1X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E; B1 4x2 SP #2;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 1300 /-/-/-/-/-
O 1391 /-/-/-/-/-
AB Brg Width = 5.3 Min Req =1.5
O Brg Width = 4.0 Min Req =1.5
Bearings AB & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -462
B - C 0 -979
C - D 0 -2305
D - E 0 -3166
E - F 0 -3557
Chords Tens.Comp.
F - G 0 -3557
G - H 0 -3510
H - I 0 -3175
I - J 0 -2279
J - K 0 -937
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 553 0
Z - Y 1743 0
Y - X 2841 0
X - W 3482 0
W -V 3482 0
V - U 3519 0
Chords Tens.Comp.
U - T 3510 0
T - S 3498 0
S - R 3498 0
R - Q 2810 0
Q - P 1723 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 0 -1162
A -AA 1264 0
AA- B 0 -1279
B - Z 1197 0
Z - C 0 -1315
C - Y 967 0
Y - D 0 -922
D - X 559 0
X - E 0 -543
Webs Tens.Comp.
G - U 54 -427
T - H 536 -36
H - R 0 -923
R - I 689 0
I - Q 0 -915
Q - J 960 0
J - P 0 -1353
P - K 1327 0
K - O 0 -1331
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.213 G 999 480
VERT(CL):0.338 G 701 360
HORZ(LL):0.034 B - -
HORZ(TL):0.055 B - -
Creep Factor: 2.0
Max TC CSI:0.484
Max BC CSI:0.559
Max W eb CSI:0.375
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F16
Ply: 1
Qty:5
SEQN:13892 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T358
DrwNo:079.20.1313.42597
AK /DF 03/19/2020
B1
3"8
3"8
20'1"4 10"
12'9"12 8'1"8
7"8 1'10"4 2'6"
(TYP)
2'1"7"8
20'11"4
1'
1'
10'7"4
9'7"4
12'7"4
2'
19'11"4
7'4"
20'11"4
1'1'11"41"8
+12'
A B C D E F G H I J K L
NOPQRSTUVWXYZAA
AB
1X45X5
2X5 7X6
5X5
7X6
4X4
6X6
3X3
5X5
3X3
W=3X44X4
W=3X43X3
1.5X6 1.5X6
3X3
W=H03105X5
4X4
6X6
4X4
6X6
5X6
5X5
3X3
1.5X6
1X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B1 4x2 SP #2;
Webs: 4x2 SP #2;
Deflection
Max JT VERT DEFL: LL: 0.20" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
This truss spaced @ 24.0" oc supports additional
concentrated load at right end from 8.00' stud wall
(13.75 PSF) supporting 3-0-0 roof spans with 2-0-0
overhang. Roof load: 20.00 psf LL and 25.00 psf DL.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1262 /-/-/-/-/-
N 1991 /-/-/-/-/-
Z Brg Width = 3.5 Min Req =1.5
N Brg Width = 4.0 Min Req =1.5
Bearings Z & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -737
B - C 0 -2090
C - D 0 -2948
D - E 0 -3347
E - F 0 -3300
Chords Tens.Comp.
F - G 0 -2963
G - H 0 -2963
H - I 0 -2076
I - J 0 -735
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - X 1532 0
X - W 2621 0
W -V 3265 0
V - U 3265 0
U - T 3310 0
Chords Tens.Comp.
T - S 3300 0
S - R 3287 0
R - Q 3287 0
Q - P 2606 0
P - O 1520 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Z 0 -1172
A - Y 1330 0
Y - B 0 -1368
B - X 959 0
X - C 0 -913
C - W 563 0
W -D 0 -547
E - T 47 -467
S - F 587 -26
Webs Tens.Comp.
F - Q 0 -951
Q - H 683 0
H - P 0 -921
P - I 969 0
I - O 0 -1358
O - J 1304 0
J - N 0 -1319
N - K 35 -608
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 E 999 480
VERT(CL):0.349 E 669 360
HORZ(LL):0.034 B - -
HORZ(TL):0.061 B - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.575
Max W eb CSI:0.375
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F17
Ply: 1
Qty:1
SEQN:13895 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T373
DrwNo:079.20.1313.39056
AK /DF 03/19/2020
B1
3"8
3"8
19'9"8 10"
12'6"8'1"8
2'5"2'6"
(TYP)
2'1"7"8
20'7"8
10'3"8
10'3"8
12'3"8
2'
19'7"8
7'4"
20'7"8
1'1'11"41"8
+12'
A B C D E F G H I J K
MNOPQRSTUVWXYZ
1X45X5
2X5 6X6
4X4
6X6
3X3
5X5
3X3
W=3X44X4
3X3
1.5X6 1.5X6
3X3
W=H03105X5
W=3X44X4
6X6
4X4
6X6
5X6
5X5
3X3
1.5X6
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP #2;
Bot chord: 4x2 SP 2250f-1.9E; B1 4x2 SP #2;
Webs: 4x2 SP #2;
Deflection
Max JT VERT DEFL: LL: 0.20" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
This truss spaced @ 24.0" oc supports additional
concentrated load at right end from 8.00' stud wall
(13.75 PSF) supporting 3-0-0 roof spans with 2-0-0
overhang. Roof load: 20.00 psf LL and 25.00 psf DL.
Truss must be installed as shown with top chord up.
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1262 /-/-/-/-/-
N 1991 /-/-/-/-/-
Z Brg Width = 3.5 Min Req =1.5
N Brg Width = 4.0 Min Req =1.5
Bearings Z & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -737
B - C 0 -2090
C - D 0 -2948
D - E 0 -3347
E - F 0 -3300
Chords Tens.Comp.
F - G 0 -2963
G - H 0 -2963
H - I 0 -2076
I - J 0 -735
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - X 1532 0
X - W 2621 0
W -V 3265 0
V - U 3265 0
U - T 3310 0
Chords Tens.Comp.
T - S 3300 0
S - R 3287 0
R - Q 3287 0
Q - P 2606 0
P - O 1520 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Z 0 -1172
A - Y 1330 0
Y - B 0 -1368
B - X 959 0
X - C 0 -913
C - W 563 0
W -D 0 -547
E - T 47 -467
S - F 587 -26
Webs Tens.Comp.
F - Q 0 -951
Q - H 683 0
H - P 0 -921
P - I 969 0
I - O 0 -1358
O - J 1304 0
J - N 0 -1319
N - K 35 -608
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 E 999 480
VERT(CL):0.349 E 669 360
HORZ(LL):0.034 B - -
HORZ(TL):0.061 B - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.575
Max W eb CSI:0.375
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F17
Ply: 1
Qty:1
SEQN:13895 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T373
DrwNo:079.20.1313.39056
AK /DF 03/19/2020
B1
3"8
3"8
19'9"8 10"
12'6"8'1"8
2'5"2'6"
(TYP)
2'1"7"8
20'7"8
10'3"8
10'3"8
12'3"8
2'
19'7"8
7'4"
20'7"8
1'1'11"41"8
+12'
A B C D E F G H I J K
MNOPQRSTUVWXYZ
1X45X5
2X5 6X6
4X4
6X6
3X3
5X5
3X3
W=3X44X4
3X3
1.5X6 1.5X6
3X3
W=H03105X5
W=3X44X4
6X6
4X4
6X6
5X6
5X5
3X3
1.5X6
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E; B4 4x2 SP #2;
Webs: 4x2 SP #2;
Deflection
Max JT VERT DEFL: LL: 0.23" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1326 /-/-/-/-/-
M 1324 /-/-/-/-/-
Z Brg Width = 3.5 Min Req =1.5
M Brg Width = 6.0 Min Req =1.5
Bearings Z & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -777
B - C 0 -2223
C - D 0 -3171
D - E 0 -3659
E - F 0 -3670
Chords Tens.Comp.
F - G 0 -3670
G - H 0 -3195
H - I 0 -2264
I - J 0 -2264
J - K 0 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - X 1618 0
X - W 2798 0
W -V 3535 0
V - U 3535 0
U - T 3677 0
T - S 3670 0
Chords Tens.Comp.
S - R 3670 0
R - Q 3658 0
Q - P 3658 0
P - O 2822 0
O - N 1670 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Z 0 -1229
A - Y 1402 0
Y - B 0 -1448
B - X 1040 0
X - C 0 -990
C - W 641 0
W -D 0 -626
U - E 285 -407
E - T 118 -403
Webs Tens.Comp.
R - G 584 0
G - P 0 -948
P - H 644 0
H - O 0 -961
O - J 1022 0
J - N 0 -1445
N - K 1390 0
K - M 0 -1156
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.231 E 999 480
VERT(CL):0.388 E 621 360
HORZ(LL):0.036 B - -
HORZ(TL):0.064 B - -
Creep Factor: 2.0
Max TC CSI:0.438
Max BC CSI:0.650
Max W eb CSI:0.396
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F17A
Ply: 1
Qty:3
SEQN:13898 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T215
DrwNo:079.20.1313.41880
AK /DF 03/19/2020
B4
3"8
3"8
20'7"8
13'6"7'1"8
2'5"2'6"
(TYP)
10'3"8
10'3"8
12'3"8
2'
12'5"
1"812'9"
4"
20'7"8
7'10"8
1'11"41"8
+12'
A B C D E F G H I J K
MNOPQRSTUVWXYZ
1X45X5
2X5 6X6
4X4
6X6
3X4
5X5
3X3
W=3X44X4
3X3
1.5X6
1.5X4
1.5X61.5X6
3X3
W=3X5
5X5
3X4W=3X4
6X6
4X4
6X6
5X5
1.5X6
1X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E; B4 4x2 SP #2;
Webs: 4x2 SP #2;
Deflection
Max JT VERT DEFL: LL: 0.23" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1326 /-/-/-/-/-
M 1324 /-/-/-/-/-
Z Brg Width = 3.5 Min Req =1.5
M Brg Width = 6.0 Min Req =1.5
Bearings Z & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -777
B - C 0 -2223
C - D 0 -3171
D - E 0 -3659
E - F 0 -3670
Chords Tens.Comp.
F - G 0 -3670
G - H 0 -3195
H - I 0 -2264
I - J 0 -2264
J - K 0 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - X 1618 0
X - W 2798 0
W -V 3535 0
V - U 3535 0
U - T 3677 0
T - S 3670 0
Chords Tens.Comp.
S - R 3670 0
R - Q 3658 0
Q - P 3658 0
P - O 2822 0
O - N 1670 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Z 0 -1229
A - Y 1402 0
Y - B 0 -1448
B - X 1040 0
X - C 0 -990
C - W 641 0
W -D 0 -626
U - E 285 -407
E - T 118 -403
Webs Tens.Comp.
R - G 584 0
G - P 0 -948
P - H 644 0
H - O 0 -961
O - J 1022 0
J - N 0 -1445
N - K 1390 0
K - M 0 -1156
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.231 E 999 480
VERT(CL):0.388 E 621 360
HORZ(LL):0.036 B - -
HORZ(TL):0.064 B - -
Creep Factor: 2.0
Max TC CSI:0.438
Max BC CSI:0.650
Max W eb CSI:0.396
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F17A
Ply: 1
Qty:3
SEQN:13898 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T215
DrwNo:079.20.1313.41880
AK /DF 03/19/2020
B4
3"8
3"8
20'7"8
13'6"7'1"8
2'5"2'6"
(TYP)
10'3"8
10'3"8
12'3"8
2'
12'5"
1"812'9"
4"
20'7"8
7'10"8
1'11"41"8
+12'
A B C D E F G H I J K
MNOPQRSTUVWXYZ
1X45X5
2X5 6X6
4X4
6X6
3X4
5X5
3X3
W=3X44X4
3X3
1.5X6
1.5X4
1.5X61.5X6
3X3
W=3X5
5X5
3X4W=3X4
6X6
4X4
6X6
5X5
1.5X6
1X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 881 /-/-/-/-/-
J 899 /-/-/-/-/-
R Brg Width = 4.0 Min Req =1.5
J Brg Width = 6.0 Min Req =1.5
Bearings R & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -855
C - D 0 -1466
D - E 0 -1466
Chords Tens.Comp.
E - F 0 -1604
F - G 0 -1307
G - H 0 -516
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 1454 0
P - O 1466 0
O - N 1466 0
Chords Tens.Comp.
N - M 1477 0
M - L 1585 0
L - K 1021 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 0 -879
B - Q 847 0
Q - C 0 -1055
C - P 411 0
F - L 0 -490
Webs Tens.Comp.
L - G 504 0
G - K 0 -890
K - H 910 0
H - J 0 -840
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.214 E 758 480
VERT(CL):0.382 E 426 360
HORZ(LL):-0.039 H - -
HORZ(TL):0.071 H - -
Creep Factor: 2.0
Max TC CSI:0.730
Max BC CSI:0.911
Max W eb CSI:0.257
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F18
Ply: 1
Qty:2
SEQN:13904 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T372
DrwNo:079.20.1313.42488
AK /DF 03/19/2020
3"8
3"8
3"4 13'8"
0"4
1"4
5"12 2'6"
(TYP)
13'11"4
3'7"4
3'7"4
5'7"4
2'
5'8"12
1"8
6'0"12
4"13'11"4
7'10"8
1'11"4+
12'
A B C D E F G H
JKLMNOPQR
1X4
1X4
3X4
4X6
4X4
4X4
3X3
2X4
1X4
1X41.5X4
3X3
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 4x2 SP 2250f-1.9E;
Bot chord: 4x2 SP 2250f-1.9E;
Webs: 4x2 SP #2;
Additional Notes
Refer to General Notes for additional information
+ 2x6 continuous strongback. See detail
STRBRIBR1014 for bracing and bridging
recommendations.
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 881 /-/-/-/-/-
J 899 /-/-/-/-/-
R Brg Width = 4.0 Min Req =1.5
J Brg Width = 6.0 Min Req =1.5
Bearings R & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -855
C - D 0 -1466
D - E 0 -1466
Chords Tens.Comp.
E - F 0 -1604
F - G 0 -1307
G - H 0 -516
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 1454 0
P - O 1466 0
O - N 1466 0
Chords Tens.Comp.
N - M 1477 0
M - L 1585 0
L - K 1021 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 0 -879
B - Q 847 0
Q - C 0 -1055
C - P 411 0
F - L 0 -490
Webs Tens.Comp.
L - G 504 0
G - K 0 -890
K - H 910 0
H - J 0 -840
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:12(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.214 E 758 480
VERT(CL):0.382 E 426 360
HORZ(LL):-0.039 H - -
HORZ(TL):0.071 H - -
Creep Factor: 2.0
Max TC CSI:0.730
Max BC CSI:0.911
Max W eb CSI:0.257
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:F18
Ply: 1
Qty:2
SEQN:13904 /SY42
FROM:
Cust: R 761 JRef:1WTP7610004 T372
DrwNo:079.20.1313.42488
AK /DF 03/19/2020
3"8
3"8
3"4 13'8"
0"4
1"4
5"12 2'6"
(TYP)
13'11"4
3'7"4
3'7"4
5'7"4
2'
5'8"12
1"8
6'0"12
4"13'11"4
7'10"8
1'11"4+
12'
A B C D E F G H
JKLMNOPQR
1X4
1X4
3X4
4X6
4X4
4X4
3X3
2X4
1X4
1X41.5X4
3X3
3X3
3X3
3X3
3X3
4X4
4X4
2X4
1X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.33
TC: From 220 plf at 5.33 to 220 plf at 15.33
TC: From 120 plf at 15.33 to 120 plf at 20.17
BC: From 10 plf at 0.00 to 10 plf at 20.17
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1798 /-/-/-/-/-
Y 1823 /-/-/-/-/-
X Brg Width = 12.0 Min Req =1.6
Y Brg Width = 6.0 Min Req =1.6
Bearings X & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -869
B - C 0 -1726
D - F 0 -4039
F - G 0 -4372
Chords Tens.Comp.
G - H 0 -4398
H - I 0 -4369
I - K 0 -3918
L - M 0 -1270
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1023 0
V - U 3412 0
U - T 3507 0
T - S 4107 0
Chords Tens.Comp.
S - R 4398 0
R - Q 3997 0
Q - P 3305 0
P - O 3202 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -862
A - W 1181 0
W -B 0 -839
B - V 1003 0
V - C 378 0
V - D 0 -1994
C - D 0 -1581
D - T 606 0
Webs Tens.Comp.
F - S 577 -143
R - I 553 0
Q - K 697 0
K - L 0 -1097
K - O 0 -2117
O - M 1505 0
M - N 0 -885
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.275 G 880 480
VERT(CL):0.447 G 541 360
HORZ(LL):0.058 A - -
HORZ(TL):0.093 A - -
Creep Factor: 2.0
Max TC CSI:0.865
Max BC CSI:0.455
Max W eb CSI:0.425
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF1
Ply: 2
Qty:1
SEQN:13831 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T385
DrwNo:079.20.1313.30804
AK /DF 03/19/2020
2 Complete Trusses Required
20'2"
1'11"11
1'11"11
3'7"13
1'8"3
5'4"
1'8"3
7'4"11
2'0"11
9'3"10
1'10"15
11'4"6
2'0"11
13'3"5
1'10"15
15'4"
2'0"11
17'7"4
2'3"4
20'2"
2'6"12
1'8"3
1'8"3
3'6"1
1'9"15
5'2"4
1'8"3
7'1"3
1'10"15
9'3"10
2'2"7
11'6"2
2'2"7
13'6"13
2'0"11
15'5"12
1'10"15
17'9"
2'3"4
20'2"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWXY
3X6
2X4 3X6
3X5
5X8
4X5 5X10
3X4
3X4
H0710 3X4
3X4
3X4
5X10 3X4
4X10
3X8
2X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.33
TC: From 220 plf at 5.33 to 220 plf at 15.33
TC: From 120 plf at 15.33 to 120 plf at 20.17
BC: From 10 plf at 0.00 to 10 plf at 20.17
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1798 /-/-/-/-/-
Y 1823 /-/-/-/-/-
X Brg Width = 12.0 Min Req =1.6
Y Brg Width = 6.0 Min Req =1.6
Bearings X & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -869
B - C 0 -1726
D - F 0 -4039
F - G 0 -4372
Chords Tens.Comp.
G - H 0 -4398
H - I 0 -4369
I - K 0 -3918
L - M 0 -1270
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1023 0
V - U 3412 0
U - T 3507 0
T - S 4107 0
Chords Tens.Comp.
S - R 4398 0
R - Q 3997 0
Q - P 3305 0
P - O 3202 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -862
A - W 1181 0
W -B 0 -839
B - V 1003 0
V - C 378 0
V - D 0 -1994
C - D 0 -1581
D - T 606 0
Webs Tens.Comp.
F - S 577 -143
R - I 553 0
Q - K 697 0
K - L 0 -1097
K - O 0 -2117
O - M 1505 0
M - N 0 -885
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.275 G 880 480
VERT(CL):0.447 G 541 360
HORZ(LL):0.058 A - -
HORZ(TL):0.093 A - -
Creep Factor: 2.0
Max TC CSI:0.865
Max BC CSI:0.455
Max W eb CSI:0.425
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF1
Ply: 2
Qty:1
SEQN:13831 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T385
DrwNo:079.20.1313.30804
AK /DF 03/19/2020
2 Complete Trusses Required
20'2"
1'11"11
1'11"11
3'7"13
1'8"3
5'4"
1'8"3
7'4"11
2'0"11
9'3"10
1'10"15
11'4"6
2'0"11
13'3"5
1'10"15
15'4"
2'0"11
17'7"4
2'3"4
20'2"
2'6"12
1'8"3
1'8"3
3'6"1
1'9"15
5'2"4
1'8"3
7'1"3
1'10"15
9'3"10
2'2"7
11'6"2
2'2"7
13'6"13
2'0"11
15'5"12
1'10"15
17'9"
2'3"4
20'2"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWXY
3X6
2X4 3X6
3X5
5X8
4X5 5X10
3X4
3X4
H0710 3X4
3X4
3X4
5X10 3X4
4X10
3X8
2X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 7.67
TC: From 220 plf at 7.67 to 220 plf at 17.67
TC: From 120 plf at 17.67 to 120 plf at 22.50
BC: From 10 plf at 0.00 to 10 plf at 22.50
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1900 /-/-/-/-/-
N 2025 /-/-/-/-/-
X Brg Width = 4.0 Min Req =1.7
N Brg Width = -Min Req =-
Bearing X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -1321
B - C 0 -2510
D - F 0 -4575
F - G 0 -5223
Chords Tens.Comp.
G - H 0 -5245
H - I 0 -5211
I - K 0 -4458
L - M 0 -1420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1482 0
V - U 4438 0
U - T 5294 0
T - S 5294 0
Chords Tens.Comp.
S - R 5245 0
R - Q 4596 0
Q - P 3622 0
P - O 3518 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -911
A - W 1558 0
W -B 0 -878
B - V 1241 0
V - D 0 -2118
C - D 0 -2164
U - F 0 -831
F - S 358 -470
Webs Tens.Comp.
R - I 787 0
I - Q 0 -547
Q - K 970 0
K - L 0 -1212
K - O 0 -2313
O - M 1683 0
M - N 0 -982
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.391 G 691 480
VERT(CL):0.635 G 425 360
HORZ(LL):0.069 A - -
HORZ(TL):0.112 A - -
Creep Factor: 2.0
Max TC CSI:0.832
Max BC CSI:0.596
Max W eb CSI:0.604
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF2
Ply: 2
Qty:3
SEQN:13828 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T206
DrwNo:079.20.1313.41895
AK /DF 03/19/2020
2 Complete Trusses Required
22'6"
2'9"
2'9"
5'3"
2'6"
7'8"
2'5"
9'6"15
1'10"15
11'7"10
2'0"11
13'8"6
2'0"11
15'7"5
1'10"15
17'8"
2'0"11
19'11"4
2'3"4
22'6"
2'6"12
2'5"
2'5"
5'0"12
2'7"12
7'8"
2'7"4
9'6"15
1'10"15
11'7"10
2'0"11
13'10"2
2'2"7
15'10"13
2'0"11
17'9"12
1'10"15
20'1"
2'3"4
22'6"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWX
3X8
2X4 3X8
3X6
4X10
3X8 6X10
3X4
3X8
H0710 3X4
3X4
3X5
5X10 3X5
4X12
3X8
2X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 7.67
TC: From 220 plf at 7.67 to 220 plf at 17.67
TC: From 120 plf at 17.67 to 120 plf at 22.50
BC: From 10 plf at 0.00 to 10 plf at 22.50
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1900 /-/-/-/-/-
N 2025 /-/-/-/-/-
X Brg Width = 4.0 Min Req =1.7
N Brg Width = -Min Req =-
Bearing X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -1321
B - C 0 -2510
D - F 0 -4575
F - G 0 -5223
Chords Tens.Comp.
G - H 0 -5245
H - I 0 -5211
I - K 0 -4458
L - M 0 -1420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1482 0
V - U 4438 0
U - T 5294 0
T - S 5294 0
Chords Tens.Comp.
S - R 5245 0
R - Q 4596 0
Q - P 3622 0
P - O 3518 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -911
A - W 1558 0
W -B 0 -878
B - V 1241 0
V - D 0 -2118
C - D 0 -2164
U - F 0 -831
F - S 358 -470
Webs Tens.Comp.
R - I 787 0
I - Q 0 -547
Q - K 970 0
K - L 0 -1212
K - O 0 -2313
O - M 1683 0
M - N 0 -982
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.391 G 691 480
VERT(CL):0.635 G 425 360
HORZ(LL):0.069 A - -
HORZ(TL):0.112 A - -
Creep Factor: 2.0
Max TC CSI:0.832
Max BC CSI:0.596
Max W eb CSI:0.604
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF2
Ply: 2
Qty:3
SEQN:13828 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T206
DrwNo:079.20.1313.41895
AK /DF 03/19/2020
2 Complete Trusses Required
22'6"
2'9"
2'9"
5'3"
2'6"
7'8"
2'5"
9'6"15
1'10"15
11'7"10
2'0"11
13'8"6
2'0"11
15'7"5
1'10"15
17'8"
2'0"11
19'11"4
2'3"4
22'6"
2'6"12
2'5"
2'5"
5'0"12
2'7"12
7'8"
2'7"4
9'6"15
1'10"15
11'7"10
2'0"11
13'10"2
2'2"7
15'10"13
2'0"11
17'9"12
1'10"15
20'1"
2'3"4
22'6"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWX
3X8
2X4 3X8
3X6
4X10
3X8 6X10
3X4
3X8
H0710 3X4
3X4
3X5
5X10 3X5
4X12
3X8
2X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 7.67
TC: From 220 plf at 7.67 to 220 plf at 17.67
TC: From 120 plf at 17.67 to 120 plf at 22.50
BC: From 10 plf at 0.00 to 10 plf at 22.50
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1900 /-/-/-/-/-
Y 2025 /-/-/-/-/-
X Brg Width = 4.0 Min Req =1.7
Y Brg Width = 6.0 Min Req =1.8
Bearings X & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -1321
B - C 0 -2508
D - F 0 -4608
F - G 0 -5278
Chords Tens.Comp.
G - H 0 -5299
H - I 0 -5263
I - K 0 -4525
L - M 0 -1423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1482 0
V - U 4472 0
U - T 5282 0
T - S 5282 0
Chords Tens.Comp.
S - R 5299 0
R - Q 4635 0
Q - P 3740 0
P - O 3623 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -911
A - W 1558 0
W -B 0 -876
B - V 1238 0
V - D 0 -2157
C - D 0 -2158
U - F 0 -778
Webs Tens.Comp.
R - I 941 0
I - Q 0 -456
Q - K 896 0
K - L 0 -1223
K - O 0 -2413
O - M 1687 0
M - N 0 -984
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.341 G 792 480
VERT(CL):0.553 G 487 360
HORZ(LL):0.061 A - -
HORZ(TL):0.100 A - -
Creep Factor: 2.0
Max TC CSI:0.452
Max BC CSI:0.555
Max W eb CSI:0.606
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF3
Ply: 2
Qty:1
SEQN:13834 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T381
DrwNo:079.20.1313.41709
AK /DF 03/19/2020
2 Complete Trusses Required
T2
22'6"
2'9"
2'9"
5'3"
2'6"
7'8"
2'5"
9'6"15
1'10"15
11'7"10
2'0"11
13'8"6
2'0"11
15'7"5
1'10"15
17'8"
2'0"11
19'11"4
2'3"4
22'6"
2'6"12
2'5"
2'5"
5'0"12
2'7"12
7'8"
2'7"4
9'6"15
1'10"15
11'7"10
2'0"11
13'10"2
2'2"7
15'10"13
2'0"11
17'9"12
1'10"15
20'1"
2'3"4
22'6"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWXY
3X8
2X4 3X8
3X6
4X10
3X8 6X10
3X4
3X8
H0710 3X5
3X5
3X5
5X12 3X5
4X12
3X8
2X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 7.67
TC: From 220 plf at 7.67 to 220 plf at 17.67
TC: From 120 plf at 17.67 to 120 plf at 22.50
BC: From 10 plf at 0.00 to 10 plf at 22.50
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1900 /-/-/-/-/-
Y 2025 /-/-/-/-/-
X Brg Width = 4.0 Min Req =1.7
Y Brg Width = 6.0 Min Req =1.8
Bearings X & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -1321
B - C 0 -2508
D - F 0 -4608
F - G 0 -5278
Chords Tens.Comp.
G - H 0 -5299
H - I 0 -5263
I - K 0 -4525
L - M 0 -1423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
W -V 1482 0
V - U 4472 0
U - T 5282 0
T - S 5282 0
Chords Tens.Comp.
S - R 5299 0
R - Q 4635 0
Q - P 3740 0
P - O 3623 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - X 0 -911
A - W 1558 0
W -B 0 -876
B - V 1238 0
V - D 0 -2157
C - D 0 -2158
U - F 0 -778
Webs Tens.Comp.
R - I 941 0
I - Q 0 -456
Q - K 896 0
K - L 0 -1223
K - O 0 -2413
O - M 1687 0
M - N 0 -984
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.341 G 792 480
VERT(CL):0.553 G 487 360
HORZ(LL):0.061 A - -
HORZ(TL):0.100 A - -
Creep Factor: 2.0
Max TC CSI:0.452
Max BC CSI:0.555
Max W eb CSI:0.606
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF3
Ply: 2
Qty:1
SEQN:13834 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T381
DrwNo:079.20.1313.41709
AK /DF 03/19/2020
2 Complete Trusses Required
T2
22'6"
2'9"
2'9"
5'3"
2'6"
7'8"
2'5"
9'6"15
1'10"15
11'7"10
2'0"11
13'8"6
2'0"11
15'7"5
1'10"15
17'8"
2'0"11
19'11"4
2'3"4
22'6"
2'6"12
2'5"
2'5"
5'0"12
2'7"12
7'8"
2'7"4
9'6"15
1'10"15
11'7"10
2'0"11
13'10"2
2'2"7
15'10"13
2'0"11
17'9"12
1'10"15
20'1"
2'3"4
22'6"
2'5"1'11"412'
A B C D E
F G H I J
K L M
NOPQRSTUVWXY
3X8
2X4 3X8
3X6
4X10
3X8 6X10
3X4
3X8
H0710 3X5
3X5
3X5
5X12 3X5
4X12
3X8
2X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 2.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 60 plf at 0.00 to 60 plf at 6.27
BC: From 5 plf at 0.00 to 5 plf at 6.27
BC: 3510 lb Conc. Load at 1.77, 3.73, 5.15
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 4773 /-/-/-/-/-
K 6165 /-/-/-/-/-
J Brg Width = 8.0 Min Req =4.2
K Brg Width = 7.3 Min Req =5.5
Bearings J & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2741
B - C 0 -2763
Chords Tens.Comp.
C - D 0 -2784
D - E 0 -2061
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 2763 0
Chords Tens.Comp.
H - G 2256 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 0 -2600
A - I 3792 0
H - D 1062 0
Webs Tens.Comp.
D - G 0 -1060
G - E 3373 0
E - F 0 -2729
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 C 999 480
VERT(CL):0.073 C 999 360
HORZ(LL):-0.016 E - -
HORZ(TL):0.026 E - -
Creep Factor: 2.0
Max TC CSI:0.608
Max BC CSI:0.611
Max W eb CSI:0.952
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF4
Ply: 2
Qty:1
SEQN:13842 /FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T365
DrwNo:079.20.1313.41161
AK /DF 03/19/2020
2 Complete Trusses Required
W2
6'3"4
1'9"5
1'9"5
3'8"13
1'11"8
4'9"7
1'0"10
6'3"5
1'5"14
1'6"1
1'6"1
3'10"9
2'4"8
5'1"7
1'2"14
6'3"5
1'1"141'11"412'
A B C D E
FGHIJK
6X8
3X8 10X10
1.5X4 1.5X4
5X6
4X4
7X8
7X8
4X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 2.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 60 plf at 0.00 to 60 plf at 6.27
BC: From 5 plf at 0.00 to 5 plf at 6.27
BC: 3510 lb Conc. Load at 1.77, 3.73, 5.15
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 4773 /-/-/-/-/-
K 6165 /-/-/-/-/-
J Brg Width = 8.0 Min Req =4.2
K Brg Width = 7.3 Min Req =5.5
Bearings J & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2741
B - C 0 -2763
Chords Tens.Comp.
C - D 0 -2784
D - E 0 -2061
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 2763 0
Chords Tens.Comp.
H - G 2256 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 0 -2600
A - I 3792 0
H - D 1062 0
Webs Tens.Comp.
D - G 0 -1060
G - E 3373 0
E - F 0 -2729
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.045 C 999 480
VERT(CL):0.073 C 999 360
HORZ(LL):-0.016 E - -
HORZ(TL):0.026 E - -
Creep Factor: 2.0
Max TC CSI:0.608
Max BC CSI:0.611
Max W eb CSI:0.952
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF4
Ply: 2
Qty:1
SEQN:13842 /FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T365
DrwNo:079.20.1313.41161
AK /DF 03/19/2020
2 Complete Trusses Required
W2
6'3"4
1'9"5
1'9"5
3'8"13
1'11"8
4'9"7
1'0"10
6'3"5
1'5"14
1'6"1
1'6"1
3'10"9
2'4"8
5'1"7
1'2"14
6'3"5
1'1"141'11"412'
A B C D E
FGHIJK
6X8
3X8 10X10
1.5X4 1.5X4
5X6
4X4
7X8
7X8
4X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.54
BC: From 10 plf at 0.00 to 10 plf at 17.54
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*581 /-/-/-/-/-
U 1149 /-/-/-/-/-
T /-1308
T Brg Width = 42.5 Min Req =-
U Brg Width = 12.0 Min Req =1.5
Bearings T & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1130 0
E - F 0 -1580
F - G 0 -1614
Chords Tens.Comp.
G - H 0 -1596
H - J 0 -1593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 936 0
Q - P 936 0
P - O 1614 0
Chords Tens.Comp.
O - N 1630 0
N - M 1194 0
M - L 1158 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 586 0
A - S 0 -1298
S - B 0 -418
S - C 0 -1189
B - C 1059 0
Webs Tens.Comp.
C - R 497 0
R - E 0 -1104
E - P 783 0
N - J 463 0
J - L 0 -1229
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.067 G 999 480
VERT(CL):0.108 G 999 360
HORZ(LL):-0.012 K - -
HORZ(TL):0.020 K - -
Creep Factor: 2.0
Max TC CSI:0.557
Max BC CSI:0.239
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF5
Ply: 2
Qty:1
SEQN:13814 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T194
DrwNo:079.20.1313.41240
AK /DF 03/19/2020
2 Complete Trusses Required
17'6"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
11'0"14
1'10"15
12'10"1
1'9"3
14'9"
1'10"15
17'6"8
2'9"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'0"2
1'9"3
11'2"10
2'2"7
13'1"9
1'10"15
14'10"12
1'9"3
17'6"8
2'7"121'11"412'
A B CD
E F G H I
J K
LMNOPQR
S
T U
3X5
3X10 4X7
3X5 4X7
3X4
3X8
7X6 3X4
3X4
3X4
5X8 3X3
3X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.54
BC: From 10 plf at 0.00 to 10 plf at 17.54
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*581 /-/-/-/-/-
U 1149 /-/-/-/-/-
T /-1308
T Brg Width = 42.5 Min Req =-
U Brg Width = 12.0 Min Req =1.5
Bearings T & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1130 0
E - F 0 -1580
F - G 0 -1614
Chords Tens.Comp.
G - H 0 -1596
H - J 0 -1593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 936 0
Q - P 936 0
P - O 1614 0
Chords Tens.Comp.
O - N 1630 0
N - M 1194 0
M - L 1158 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 586 0
A - S 0 -1298
S - B 0 -418
S - C 0 -1189
B - C 1059 0
Webs Tens.Comp.
C - R 497 0
R - E 0 -1104
E - P 783 0
N - J 463 0
J - L 0 -1229
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.067 G 999 480
VERT(CL):0.108 G 999 360
HORZ(LL):-0.012 K - -
HORZ(TL):0.020 K - -
Creep Factor: 2.0
Max TC CSI:0.557
Max BC CSI:0.239
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF5
Ply: 2
Qty:1
SEQN:13814 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T194
DrwNo:079.20.1313.41240
AK /DF 03/19/2020
2 Complete Trusses Required
17'6"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
11'0"14
1'10"15
12'10"1
1'9"3
14'9"
1'10"15
17'6"8
2'9"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'0"2
1'9"3
11'2"10
2'2"7
13'1"9
1'10"15
14'10"12
1'9"3
17'6"8
2'7"121'11"412'
A B CD
E F G H I
J K
LMNOPQR
S
T U
3X5
3X10 4X7
3X5 4X7
3X4
3X8
7X6 3X4
3X4
3X4
5X8 3X3
3X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.04
BC: From 10 plf at 0.00 to 10 plf at 17.04
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1485 /-/-/-/-/-
U 1658 /-/-/-/-/-
T Brg Width = -Min Req =-
U Brg Width = 6.0 Min Req =2.6
Bearing U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2270
B - D 0 -405
C - E 0 -5294
E - F 0 -6418
Chords Tens.Comp.
F - G 0 -6418
G - H 0 -5890
H - J 0 -4675
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 5139 0
R - Q 6304 0
Q - P 6304 0
P - O 6059 0
Chords Tens.Comp.
O - N 4913 0
N - M 3069 0
M - L 2985 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 0 -1438
A - S 2599 0
S - C 0 -3086
B - C 0 -1899
C - R 480 0
R - E 0 -1192
Webs Tens.Comp.
P - G 423 0
G - O 0 -662
O - H 1182 0
H - N 0 -972
N - J 1877 0
J - L 0 -3274
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.252 F 812 480
VERT(CL):0.409 F 499 360
HORZ(LL):0.056 A - -
HORZ(TL):0.092 A - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.619
Max W eb CSI:0.733
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF6
Ply: 1
Qty:3
SEQN:13808 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T276
DrwNo:079.20.1313.28556
AK /DF 03/19/2020
T2
17'0"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
10'11"2
1'9"3
12'10"1
1'10"15
14'9"
1'10"15
17'0"8
2'3"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'1"14
1'10"15
11'2"10
2'0"11
13'1"9
1'10"15
14'10"12
1'9"3
16'7"8
1'8"12
17'0"8
5"1'11"412'
A B CD
E F G H I
J K
LMNOPQRST U
4X8
3X4 5X12
4X5 6X12
3X5
4X7
H0710
3X4
3X6
3X6
4X7
5X12 3X3
3X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.04
BC: From 10 plf at 0.00 to 10 plf at 17.04
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1485 /-/-/-/-/-
U 1658 /-/-/-/-/-
T Brg Width = -Min Req =-
U Brg Width = 6.0 Min Req =2.6
Bearing U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2270
B - D 0 -405
C - E 0 -5294
E - F 0 -6418
Chords Tens.Comp.
F - G 0 -6418
G - H 0 -5890
H - J 0 -4675
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 5139 0
R - Q 6304 0
Q - P 6304 0
P - O 6059 0
Chords Tens.Comp.
O - N 4913 0
N - M 3069 0
M - L 2985 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 0 -1438
A - S 2599 0
S - C 0 -3086
B - C 0 -1899
C - R 480 0
R - E 0 -1192
Webs Tens.Comp.
P - G 423 0
G - O 0 -662
O - H 1182 0
H - N 0 -972
N - J 1877 0
J - L 0 -3274
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.252 F 812 480
VERT(CL):0.409 F 499 360
HORZ(LL):0.056 A - -
HORZ(TL):0.092 A - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.619
Max W eb CSI:0.733
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF6
Ply: 1
Qty:3
SEQN:13808 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T276
DrwNo:079.20.1313.28556
AK /DF 03/19/2020
T2
17'0"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
10'11"2
1'9"3
12'10"1
1'10"15
14'9"
1'10"15
17'0"8
2'3"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'1"14
1'10"15
11'2"10
2'0"11
13'1"9
1'10"15
14'10"12
1'9"3
16'7"8
1'8"12
17'0"8
5"1'11"412'
A B CD
E F G H I
J K
LMNOPQRST U
4X8
3X4 5X12
4X5 6X12
3X5
4X7
H0710
3X4
3X6
3X6
4X7
5X12 3X3
3X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.04
BC: From 10 plf at 0.00 to 10 plf at 17.04
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*564 /-/-/-/-/-
U 1145 /-/-/-/-/-
T /-1192
T Brg Width = 42.5 Min Req =-
U Brg Width = 6.0 Min Req =1.5
Bearings T & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1037 0
E - F 0 -1525
F - G 0 -1558
Chords Tens.Comp.
G - H 0 -1538
H - J 0 -1452
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 954 0
Q - P 954 0
P - O 1558 0
Chords Tens.Comp.
O - N 1503 0
N - M 1011 0
M - L 983 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 533 0
A - S 0 -1192
S - B 0 -401
S - C 0 -1159
B - C 974 0
Webs Tens.Comp.
C - R 470 0
R - E 0 -1048
E - P 673 0
N - J 514 0
J - L 0 -1078
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.058 G 999 480
VERT(CL):0.094 G 999 360
HORZ(LL):-0.012 K - -
HORZ(TL):0.019 K - -
Creep Factor: 2.0
Max TC CSI:0.524
Max BC CSI:0.202
Max W eb CSI:0.275
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF7
Ply: 2
Qty:1
SEQN:13821 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T355
DrwNo:079.20.1313.27061
AK /DF 03/19/2020
2 Complete Trusses Required
17'0"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
11'0"14
1'10"15
12'10"1
1'9"3
14'9"
1'10"15
17'0"8
2'3"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'0"2
1'9"3
11'2"10
2'2"7
13'1"9
1'10"15
14'10"12
1'9"3
17'0"8
2'1"121'11"412'
A B CD
E F G H I
J K
LMNOPQR
S
T U
3X5
3X10 3X8
3X5 4X7
3X4
3X8
7X6 3X4
3X4
3X4
5X8 3X3
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @11.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 120 plf at 0.00 to 120 plf at 5.48
TC: From 220 plf at 5.48 to 220 plf at 14.75
TC: From 120 plf at 14.75 to 120 plf at 17.04
BC: From 10 plf at 0.00 to 10 plf at 17.04
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T*564 /-/-/-/-/-
U 1145 /-/-/-/-/-
T /-1192
T Brg Width = 42.5 Min Req =-
U Brg Width = 6.0 Min Req =1.5
Bearings T & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1037 0
E - F 0 -1525
F - G 0 -1558
Chords Tens.Comp.
G - H 0 -1538
H - J 0 -1452
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 954 0
Q - P 954 0
P - O 1558 0
Chords Tens.Comp.
O - N 1503 0
N - M 1011 0
M - L 983 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 533 0
A - S 0 -1192
S - B 0 -401
S - C 0 -1159
B - C 974 0
Webs Tens.Comp.
C - R 470 0
R - E 0 -1048
E - P 673 0
N - J 514 0
J - L 0 -1078
Loading Criteria (psf)
TCLL:40.00
TCDL:20.00
BCLL:0.00
BCDL:5.00
Des Ld:65.00
NCBCLL:10.00
Soffit:0.00
Load Duration: 1.00
Spacing: 24.0 "
Wind Criteria
Wind Std:NA
Speed:NA mph
Enclosure: NA
Category: NA
EXP: NA Kzt: NA
Mean Height: NA ft
TCDL: NA psf
BCDL: NA psf
MW FRS Parallel Dist: NA
C&C Dist a: NA ft
Loc. from endwall: NA
I: NA GCpi: NA
Wind Duration: NA
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.058 G 999 480
VERT(CL):0.094 G 999 360
HORZ(LL):-0.012 K - -
HORZ(TL):0.019 K - -
Creep Factor: 2.0
Max TC CSI:0.524
Max BC CSI:0.202
Max W eb CSI:0.275
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF7
Ply: 2
Qty:1
SEQN:13821 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T355
DrwNo:079.20.1313.27061
AK /DF 03/19/2020
2 Complete Trusses Required
17'0"8
2'10"10
2'10"10
5'5"12
2'7"2
7'2"15
1'9"3
9'1"14
1'10"15
11'0"14
1'10"15
12'10"1
1'9"3
14'9"
1'10"15
17'0"8
2'3"8
2'8"14
2'8"14
5'5"12
2'8"14
7'2"15
1'9"3
9'0"2
1'9"3
11'2"10
2'2"7
13'1"9
1'10"15
14'10"12
1'9"3
17'0"8
2'1"121'11"412'
A B CD
E F G H I
J K
LMNOPQR
S
T U
3X5
3X10 3X8
3X5 4X7
3X4
3X8
7X6 3X4
3X4
3X4
5X8 3X3
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2; T1 2x6 SP M-26;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W1 2x6 SP #2; W2,
W10 2x4 SP 2250f-1.9E; W 9 2x10 SP #1;
W11 2x8 SP 2400f-2.0E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.25" o.c.
Bot Chord: 3 Rows @ 3.75" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 438 plf at 0.00 to 438 plf at 26.67
BC: From 20 plf at 0.00 to 20 plf at 26.67
BC: 1338 lb Conc. Load at 1.10, 2.48, 4.19, 6.19
8.19,10.19,12.19,14.19,16.19,18.19,20.19
BC: 9149 lb Conc. Load at 22.44
BC: 941 lb Conc. Load at 24.33,25.94
Plating Notes
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 1 21" 36 SPf(S) Standard
2 25.667' 1 12" 17 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
The maximum concentrated load is 9149#
++ 18-(0.131"x3.0") nails opposite face of hanger
after the third ply is attached. 9-(0.131"x3.0")
nails after the fourth ply is attached.
++
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 16694 /-/-/-/7412 /-
M 21258 /-/-/-/9443 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req =-
M Brg Width = 12.0 Min Req =-
Bearings L & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2969 -6679
B - C 2865 -6440
C - D 1940 -4355
Chords Tens.Comp.
D - E 1367 -3077
E - F 1366 -3077
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 6243 -2773
J - I 5913 -2626
Chords Tens.Comp.
I - H 3983 -1769
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 2164 -4839
A - K 6548 -2905
K - B 485 -708
J - C 1741 -734
C - I 1248 -2809
Webs Tens.Comp.
D - I 3100 -1347
D - H 1179 -2657
E - H 250 -510
H - F 7122 -3163
F - G 2988 -6703
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.16 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
18SS, WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 J 999 480
VERT(CL):0.336 J 951 360
HORZ(LL):0.037 B - -
HORZ(TL):0.084 B - -
Creep Factor: 2.0
Max TC CSI:0.733
Max BC CSI:0.556
Max W eb CSI:0.994
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF8
Ply: 3
Qty:1
SEQN:14289 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T189
DrwNo:079.20.1313.31068
AK /DF 03/19/2020
3 Complete Trusses Required
T1
W1 W2
W9
W10
W11
BL1 BL2
26'8"
7"8
7"8
6'6"1
5'10"9
12'11"10
6'5"9
19'2"13
6'3"3
22'5"4
3'2"7
25'10"6
3'5"2
26'8"
9"10
6'1"11
6'1"11
12'8"2
6'6"7
19'2"5
6'6"3
22'5"4
3'2"15
26'8"
4'2"122'11"69'4"512'
A
B
C
D E F
GHIJKL
M
4 12
SS1012
8X14 7X10
7X6
10X10
6X6
8X8
7X8
3X3
SS1319(I)
SS1319(I)
8X14
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2; T1 2x6 SP M-26;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W1 2x6 SP #2; W2,
W10 2x4 SP 2250f-1.9E; W 9 2x10 SP #1;
W11 2x8 SP 2400f-2.0E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.25" o.c.
Bot Chord: 3 Rows @ 3.75" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 438 plf at 0.00 to 438 plf at 26.67
BC: From 20 plf at 0.00 to 20 plf at 26.67
BC: 1338 lb Conc. Load at 1.10, 2.48, 4.19, 6.19
8.19,10.19,12.19,14.19,16.19,18.19,20.19
BC: 9149 lb Conc. Load at 22.44
BC: 941 lb Conc. Load at 24.33,25.94
Plating Notes
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 1 21" 36 SPf(S) Standard
2 25.667' 1 12" 17 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
The maximum concentrated load is 9149#
++ 18-(0.131"x3.0") nails opposite face of hanger
after the third ply is attached. 9-(0.131"x3.0")
nails after the fourth ply is attached.
++
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 16694 /-/-/-/7412 /-
M 21258 /-/-/-/9443 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req =-
M Brg Width = 12.0 Min Req =-
Bearings L & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2969 -6679
B - C 2865 -6440
C - D 1940 -4355
Chords Tens.Comp.
D - E 1367 -3077
E - F 1366 -3077
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 6243 -2773
J - I 5913 -2626
Chords Tens.Comp.
I - H 3983 -1769
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 2164 -4839
A - K 6548 -2905
K - B 485 -708
J - C 1741 -734
C - I 1248 -2809
Webs Tens.Comp.
D - I 3100 -1347
D - H 1179 -2657
E - H 250 -510
H - F 7122 -3163
F - G 2988 -6703
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.16 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
18SS, WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 J 999 480
VERT(CL):0.336 J 951 360
HORZ(LL):0.037 B - -
HORZ(TL):0.084 B - -
Creep Factor: 2.0
Max TC CSI:0.733
Max BC CSI:0.556
Max W eb CSI:0.994
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF8
Ply: 3
Qty:1
SEQN:14289 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T189
DrwNo:079.20.1313.31068
AK /DF 03/19/2020
3 Complete Trusses Required
T1
W1 W2
W9
W10
W11
BL1 BL2
26'8"
7"8
7"8
6'6"1
5'10"9
12'11"10
6'5"9
19'2"13
6'3"3
22'5"4
3'2"7
25'10"6
3'5"2
26'8"
9"10
6'1"11
6'1"11
12'8"2
6'6"7
19'2"5
6'6"3
22'5"4
3'2"15
26'8"
4'2"122'11"69'4"512'
A
B
C
D E F
GHIJKL
M
4 12
SS1012
8X14 7X10
7X6
10X10
6X6
8X8
7X8
3X3
SS1319(I)
SS1319(I)
8X14
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 3.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 373 plf at 0.00 to 373 plf at 3.00
BC: From 20 plf at 0.00 to 20 plf at 3.00
TC: 757 lb Conc. Load at 2.83
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D 632 /-/-/52 /131 /-
C 1304 /-/-/52 /193 /-
Wind reactions based on MWFRS
D Brg Width = 7.6 Min Req =1.5
C Brg Width = -Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 103 -637
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 B 999 480
VERT(CL):0.002 B 999 360
HORZ(LL):-0.000 B - -
HORZ(TL):0.000 B - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.022
Max W eb CSI:0.021
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF10
Ply: 2
Qty:1
SEQN:14262 FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T255
DrwNo:080.20.1106.52503
JB /DF 03/20/2020
2 Complete Trusses Required
3'
3'
3'1'11"412'
A B
CD
4X4
1.5X6
1.5X6
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 3.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 373 plf at 0.00 to 373 plf at 3.00
BC: From 20 plf at 0.00 to 20 plf at 3.00
TC: 757 lb Conc. Load at 2.83
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D 632 /-/-/52 /131 /-
C 1304 /-/-/52 /193 /-
Wind reactions based on MWFRS
D Brg Width = 7.6 Min Req =1.5
C Brg Width = -Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 103 -637
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 B 999 480
VERT(CL):0.002 B 999 360
HORZ(LL):-0.000 B - -
HORZ(TL):0.000 B - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.022
Max W eb CSI:0.021
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF10
Ply: 2
Qty:1
SEQN:14262 FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T255
DrwNo:080.20.1106.52503
JB /DF 03/20/2020
2 Complete Trusses Required
3'
3'
3'1'11"412'
A B
CD
4X4
1.5X6
1.5X6
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W7 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 2 Rows @ 4.00" o.c. (Each Row)
Bot Chord: 1 Row @ 5.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 87 plf at 0.00 to 87 plf at 0.67
TC: From 414 plf at 0.67 to 414 plf at 6.00
TC: From 87 plf at 6.00 to 87 plf at 7.29
BC: From 10 plf at 0.00 to 10 plf at 7.29
TC: 2338 lb Conc. Load at 6.67
TC: 626 lb Conc. Load at 7.00
BC: 1304 lb Conc. Load at 0.42
BC: 99 lb Conc. Load at 1.23, 3.10, 5.10
BC: 142 lb Conc. Load at 6.27
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 2944 /-/-/-/415 /-
E 4214 /-/-/-/554 /-
Wind reactions based on MWFRS
H Brg Width = 3.5 Min Req =2.6
E Brg Width = 4.0 Min Req =3.7
Bearings H & E Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 200 -1246
B - C 200 -1246
Chords Tens.Comp.
C - D 206 -1296
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 1442 -224
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - H 145 -882
A - G 1403 -225
C - F 97 -754
Webs Tens.Comp.
F - D 1461 -234
D - E 255 -2017
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.013 C 999 480
VERT(CL):0.029 C 999 360
HORZ(LL):0.003 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.790
Max BC CSI:0.414
Max W eb CSI:0.412
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF11
Ply: 2
Qty:1
SEQN:14265 FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T258
DrwNo:080.20.1106.55380
JB /DF 03/20/2020
2 Complete Trusses Required
W1
W7
7'3"8
2'6"7
2'6"7
4'7"5
2'0"15
7'3"8
2'8"3
2'6"7
2'6"7
4'11"5
2'4"15
7'3"8
2'4"31'11"412'
A B C D
EFGH
4X5
2X5
1.5X4
3X12
3X4
3X8
5X5
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W7 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 2 Rows @ 4.00" o.c. (Each Row)
Bot Chord: 1 Row @ 5.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 87 plf at 0.00 to 87 plf at 0.67
TC: From 414 plf at 0.67 to 414 plf at 6.00
TC: From 87 plf at 6.00 to 87 plf at 7.29
BC: From 10 plf at 0.00 to 10 plf at 7.29
TC: 2338 lb Conc. Load at 6.67
TC: 626 lb Conc. Load at 7.00
BC: 1304 lb Conc. Load at 0.42
BC: 99 lb Conc. Load at 1.23, 3.10, 5.10
BC: 142 lb Conc. Load at 6.27
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 2944 /-/-/-/415 /-
E 4214 /-/-/-/554 /-
Wind reactions based on MWFRS
H Brg Width = 3.5 Min Req =2.6
E Brg Width = 4.0 Min Req =3.7
Bearings H & E Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 200 -1246
B - C 200 -1246
Chords Tens.Comp.
C - D 206 -1296
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 1442 -224
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - H 145 -882
A - G 1403 -225
C - F 97 -754
Webs Tens.Comp.
F - D 1461 -234
D - E 255 -2017
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:150 mph
Enclosure: Closed
Risk Category: II
EXP: B Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.013 C 999 480
VERT(CL):0.029 C 999 360
HORZ(LL):0.003 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.790
Max BC CSI:0.414
Max W eb CSI:0.412
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF11
Ply: 2
Qty:1
SEQN:14265 FLAT
FROM:
Cust: R 761 JRef:1WTP7610004 T258
DrwNo:080.20.1106.55380
JB /DF 03/20/2020
2 Complete Trusses Required
W1
W7
7'3"8
2'6"7
2'6"7
4'7"5
2'0"15
7'3"8
2'8"3
2'6"7
2'6"7
4'11"5
2'4"15
7'3"8
2'4"31'11"412'
A B C D
EFGH
4X5
2X5
1.5X4
3X12
3X4
3X8
5X5
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 467 plf at 0.00 to 467 plf at 16.44
BC: From 18 plf at 0.00 to 18 plf at 16.44
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Wall girder loading on this truss.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 3342 /-/-/404 /225 /46
J 4632 /-/-/566 /398 /-
Wind reactions based on MWFRS
A Brg Width = 4.0 Min Req =2.0
J Brg Width = 6.0 Min Req =2.8
Bearings A & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 223 -1656
B - C 209 -1535
C - D 289 -2230
Chords Tens.Comp.
D - E 286 -2275
E - F 286 -2275
F - G 175 -1352
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 1376 -204
N - M 1355 -201
Chords Tens.Comp.
M - L 2322 -298
L - K 1520 -195
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 979 -98
M - D 47 -450
E - L 45 -377
L - F 856 -103
Webs Tens.Comp.
F - K 96 -814
K - G 1564 -185
G - J 155 -1312
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 E 999 480
VERT(CL):0.118 E 999 360
HORZ(LL):0.008 C - -
HORZ(TL):0.024 C - -
Creep Factor: 2.0
Max TC CSI:0.522
Max BC CSI:0.591
Max W eb CSI:0.441
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF12
Ply: 3
Qty:1
SEQN:14259 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T366
DrwNo:079.20.1313.41896
AK /DF 03/19/2020
3 Complete Trusses Required
3"4 13'8"2'6"
2'7"4
2'7"4
5'7"9
3'0"5
8'2"10
2'7"1
10'9"11
2'7"1
13'6"
2'8"5
16'5"4
2'11"4
2'9"
2'9"
5'4"1
2'7"1
8'2"10
2'10"9
11'1"11
2'11"1
13'10"
2'8"5
16'5"4
2'7"4
8"1 1'9"112'
A
B
C D E F G H
IJKLMN
5
12
2X5(C3)3X4(C3)
3X4
4X7
1.5X4 3X5
3X4 1.5X4
3X8
3X4
3X8
3X8
3X5
3X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 467 plf at 0.00 to 467 plf at 16.44
BC: From 18 plf at 0.00 to 18 plf at 16.44
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Wall girder loading on this truss.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 3342 /-/-/404 /225 /46
J 4632 /-/-/566 /398 /-
Wind reactions based on MWFRS
A Brg Width = 4.0 Min Req =2.0
J Brg Width = 6.0 Min Req =2.8
Bearings A & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 223 -1656
B - C 209 -1535
C - D 289 -2230
Chords Tens.Comp.
D - E 286 -2275
E - F 286 -2275
F - G 175 -1352
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 1376 -204
N - M 1355 -201
Chords Tens.Comp.
M - L 2322 -298
L - K 1520 -195
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 979 -98
M - D 47 -450
E - L 45 -377
L - F 856 -103
Webs Tens.Comp.
F - K 96 -814
K - G 1564 -185
G - J 155 -1312
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 E 999 480
VERT(CL):0.118 E 999 360
HORZ(LL):0.008 C - -
HORZ(TL):0.024 C - -
Creep Factor: 2.0
Max TC CSI:0.522
Max BC CSI:0.591
Max W eb CSI:0.441
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF12
Ply: 3
Qty:1
SEQN:14259 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T366
DrwNo:079.20.1313.41896
AK /DF 03/19/2020
3 Complete Trusses Required
3"4 13'8"2'6"
2'7"4
2'7"4
5'7"9
3'0"5
8'2"10
2'7"1
10'9"11
2'7"1
13'6"
2'8"5
16'5"4
2'11"4
2'9"
2'9"
5'4"1
2'7"1
8'2"10
2'10"9
11'1"11
2'11"1
13'10"
2'8"5
16'5"4
2'7"4
8"1 1'9"112'
A
B
C D E F G H
IJKLMN
5
12
2X5(C3)3X4(C3)
3X4
4X7
1.5X4 3X5
3X4 1.5X4
3X8
3X4
3X8
3X8
3X5
3X3
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2; T2 2x6 SP M-26;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
W7 2x4 SP 2700f-2.2E; W 22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
In addition apply (1) 1/2" bolt, or 0.22"-0.25" min/max dia. X 4.5"
length wood screw from each outside face, at each joint location.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 12.56
TC: From 120 plf at 12.56 to 120 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
TC: 5855 lb Conc. Load at 13.08
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 4776 /-/-/996 /1817 /317
AA 4536 /-/-/767 /1886 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.9
AA Brg Width = 6.0 Min Req =1.8
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 708 -1842
C - D 797 -2065
D - E 812 -2092
E - G 430 -40
F - H 2575 -6563
H - I 2557 -6515
Chords Tens.Comp.
I - J 2137 -5363
J - K 2121 -5324
K - L 1531 -3784
L - M 1081 -2647
M - N 570 -1386
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1678 -645
Y - X 1686 -648
X - W 1905 -735
W -V 6858 -2671
V - U 6908 -2690
Chords Tens.Comp.
U - T 5420 -2159
T - S 5363 -2137
S - R 3970 -1605
R - Q 2806 -1146
Q - P 1558 -643
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 2261 -867
W -F 2087 -5347
E - F 942 -2433
F - G 32 -1169
F - V 179 -506
F - U 167 -1003
U - I 1407 -511
I - T 215 -579
J - S 158 -379
Webs Tens.Comp.
S - K 1663 -633
K - R 365 -915
R - L 1202 -473
L - Q 322 -781
Q - M 1339 -538
M - P 358 -846
P - N 1581 -650
N - O 353 -841
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.253 H 999 480
VERT(CL):0.549 H 605 360
HORZ(LL):0.096 G - -
HORZ(TL):0.208 G - -
Creep Factor: 2.0
Max TC CSI:0.297
Max BC CSI:0.570
Max W eb CSI:0.658
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF13
Ply: 5
Qty:1
SEQN:14139 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T8
DrwNo:079.20.1313.40428
AK /DF 03/19/2020
5 Complete Trusses Required
T2
W5 W7
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
12'6"11
3'1"11
14'3"10
1'8"14
16'0"8
1'8"14
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
12'6"11
3'3"7
14'3"10
1'8"14
16'2"4
1'10"10
18'8"
2'5"12
20'10"10
2'2"10
23'1"12
2'3"2
25'5"6
2'3"10
27'10"
2'4"101'8"
7"12 1'11"45'10"96'5"112'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X5(A1)
3X4
10X10
3X4
8X14
6X8
8X143X4 H1010
4X5
3X8
7X8
3X6
3X6
4X5
4X5
3X8
3X8
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2; T2 2x6 SP M-26;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
W7 2x4 SP 2700f-2.2E; W 22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 4.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
In addition apply (1) 1/2" bolt, or 0.22"-0.25" min/max dia. X 4.5"
length wood screw from each outside face, at each joint location.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 12.56
TC: From 120 plf at 12.56 to 120 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
TC: 5855 lb Conc. Load at 13.08
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 4776 /-/-/996 /1817 /317
AA 4536 /-/-/767 /1886 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.9
AA Brg Width = 6.0 Min Req =1.8
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 708 -1842
C - D 797 -2065
D - E 812 -2092
E - G 430 -40
F - H 2575 -6563
H - I 2557 -6515
Chords Tens.Comp.
I - J 2137 -5363
J - K 2121 -5324
K - L 1531 -3784
L - M 1081 -2647
M - N 570 -1386
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1678 -645
Y - X 1686 -648
X - W 1905 -735
W -V 6858 -2671
V - U 6908 -2690
Chords Tens.Comp.
U - T 5420 -2159
T - S 5363 -2137
S - R 3970 -1605
R - Q 2806 -1146
Q - P 1558 -643
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 2261 -867
W -F 2087 -5347
E - F 942 -2433
F - G 32 -1169
F - V 179 -506
F - U 167 -1003
U - I 1407 -511
I - T 215 -579
J - S 158 -379
Webs Tens.Comp.
S - K 1663 -633
K - R 365 -915
R - L 1202 -473
L - Q 322 -781
Q - M 1339 -538
M - P 358 -846
P - N 1581 -650
N - O 353 -841
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.253 H 999 480
VERT(CL):0.549 H 605 360
HORZ(LL):0.096 G - -
HORZ(TL):0.208 G - -
Creep Factor: 2.0
Max TC CSI:0.297
Max BC CSI:0.570
Max W eb CSI:0.658
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF13
Ply: 5
Qty:1
SEQN:14139 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T8
DrwNo:079.20.1313.40428
AK /DF 03/19/2020
5 Complete Trusses Required
T2
W5 W7
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
12'6"11
3'1"11
14'3"10
1'8"14
16'0"8
1'8"14
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
12'6"11
3'3"7
14'3"10
1'8"14
16'2"4
1'10"10
18'8"
2'5"12
20'10"10
2'2"10
23'1"12
2'3"2
25'5"6
2'3"10
27'10"
2'4"101'8"
7"12 1'11"45'10"96'5"112'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X5(A1)
3X4
10X10
3X4
8X14
6X8
8X143X4 H1010
4X5
3X8
7X8
3X6
3X6
4X5
4X5
3X8
3X8
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @10.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 13.27
TC: From 120 plf at 13.27 to 120 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
TC: 1088 lb Conc. Load at 13.27
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 2211 /-/-/1001 /853 /338
AA 2301 /-/-/774 /1047 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.5
AA Brg Width = 6.0 Min Req =1.5
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 514 -1296
C - D 560 -1398
D - E 559 -1374
F - H 1695 -4020
H - I 1682 -3989
Chords Tens.Comp.
I - J 1568 -3637
J - K 1557 -3615
K - L 1243 -2819
L - M 920 -2063
M - N 505 -1124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1176 -560
Y - X 1181 -563
X - W 1281 -572
W -V 4416 -1830
V - U 4451 -1844
Chords Tens.Comp.
U - T 3664 -1579
T - S 3637 -1568
S - R 2930 -1291
R - Q 2178 -972
Q - P 1262 -571
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 1248 -490
W -F 1388 -3322
E - F 629 -1498
F - G 153 -391
F - U 223 -630
U - I 526 -159
S - K 843 -328
Webs Tens.Comp.
K - R 238 -544
R - L 789 -332
L - Q 259 -563
Q - M 984 -429
M - P 324 -683
P - N 1281 -575
N - O 328 -706
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.200 G 999 480
VERT(CL):0.418 G 795 360
HORZ(LL):0.077 G - -
HORZ(TL):0.162 G - -
Creep Factor: 2.0
Max TC CSI:0.272
Max BC CSI:0.375
Max W eb CSI:0.561
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF14
Ply: 3
Qty:5
SEQN:14136 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T332
DrwNo:079.20.1313.42020
AK /DF 03/19/2020
3 Complete Trusses Required
W6
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'3"4
3'10"4
14'7"14
1'4"10
16'0"8
1'4"10
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
13'3"4
4'
14'7"14
1'4"10
16'2"4
1'6"6
18'7"8
2'5"4
20'10"10
2'3"2
23'1"12
2'3"2
25'4"14
2'3"2
27'10"
2'5"21'8"
7"12 1'11"46'2"26'8"1012'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X4(A1)1.5X4 7X10
4X6
8X14
1.5X6
H1010
2X4
3X8 1.5X4
1.5X4
3X5
3X5
4X5
4X5
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @10.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 13.27
TC: From 120 plf at 13.27 to 120 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
TC: 1088 lb Conc. Load at 13.27
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 2211 /-/-/1001 /853 /338
AA 2301 /-/-/774 /1047 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.5
AA Brg Width = 6.0 Min Req =1.5
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 514 -1296
C - D 560 -1398
D - E 559 -1374
F - H 1695 -4020
H - I 1682 -3989
Chords Tens.Comp.
I - J 1568 -3637
J - K 1557 -3615
K - L 1243 -2819
L - M 920 -2063
M - N 505 -1124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1176 -560
Y - X 1181 -563
X - W 1281 -572
W -V 4416 -1830
V - U 4451 -1844
Chords Tens.Comp.
U - T 3664 -1579
T - S 3637 -1568
S - R 2930 -1291
R - Q 2178 -972
Q - P 1262 -571
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 1248 -490
W -F 1388 -3322
E - F 629 -1498
F - G 153 -391
F - U 223 -630
U - I 526 -159
S - K 843 -328
Webs Tens.Comp.
K - R 238 -544
R - L 789 -332
L - Q 259 -563
Q - M 984 -429
M - P 324 -683
P - N 1281 -575
N - O 328 -706
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.200 G 999 480
VERT(CL):0.418 G 795 360
HORZ(LL):0.077 G - -
HORZ(TL):0.162 G - -
Creep Factor: 2.0
Max TC CSI:0.272
Max BC CSI:0.375
Max W eb CSI:0.561
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF14
Ply: 3
Qty:5
SEQN:14136 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T332
DrwNo:079.20.1313.42020
AK /DF 03/19/2020
3 Complete Trusses Required
W6
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'3"4
3'10"4
14'7"14
1'4"10
16'0"8
1'4"10
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
13'3"4
4'
14'7"14
1'4"10
16'2"4
1'6"6
18'7"8
2'5"4
20'10"10
2'3"2
23'1"12
2'3"2
25'4"14
2'3"2
27'10"
2'5"21'8"
7"12 1'11"46'2"26'8"1012'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X4(A1)1.5X4 7X10
4X6
8X14
1.5X6
H1010
2X4
3X8 1.5X4
1.5X4
3X5
3X5
4X5
4X5
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 70 plf at 0.00 to 70 plf at 13.33
TC: From 120 plf at 13.33 to 120 plf at 16.75
TC: From 70 plf at 16.75 to 70 plf at 23.83
TC: From 35 plf at 23.83 to 35 plf at 27.83
BC: From 20 plf at 0.00 to 20 plf at 13.33
BC: From 10 plf at 13.33 to 10 plf at 16.75
BC: From 20 plf at 16.75 to 20 plf at 23.83
BC: From 75 plf at 23.83 to 75 plf at 27.83
TC: 560 lb Conc. Load at 13.50
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Special loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 30 plf at 0.00 to 30 plf at 13.33
TC: From 15 plf at 13.33 to 15 plf at 16.75
TC: From 30 plf at 16.75 to 30 plf at 23.83
TC: From 15 plf at 23.83 to 15 plf at 27.83
BC: From 20 plf at 0.00 to 20 plf at 13.33
BC: From 10 plf at 13.33 to 10 plf at 16.75
BC: From 20 plf at 16.75 to 20 plf at 23.83
BC: From 75 plf at 23.83 to 75 plf at 27.83
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1618 /-/-/1001 /631 /338
AA 1664 /-/-/774 /729 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.5
AA Brg Width = 6.0 Min Req =1.5
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 477 -1035
C - D 511 -1079
D - E 497 -1037
F - H 1441 -2898
H - I 1431 -2863
Chords Tens.Comp.
I - J 1318 -2614
J - K 1310 -2600
K - L 1028 -2012
L - M 754 -1474
M - N 411 -810
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 941 -560
Y - X 944 -563
X - W 985 -571
W -V 3101 -1567
V - U 3131 -1582
Chords Tens.Comp.
U - T 2636 -1329
T - S 2614 -1318
S - R 2091 -1068
R - Q 1553 -796
Q - P 900 -463
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 916 -448
W -F 1090 -2266
E - F 634 -1127
S - K 625 -297
K - R 200 -389
R - L 564 -284
Webs Tens.Comp.
L - Q 210 -389
Q - M 705 -357
M - P 256 -442
P - N 924 -469
N - O 262 -489
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 G 999 480
VERT(CL):0.315 G 999 360
HORZ(LL):0.058 G - -
HORZ(TL):0.122 G - -
Creep Factor: 2.0
Max TC CSI:0.179
Max BC CSI:0.227
Max W eb CSI:0.423
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF15
Ply: 3
Qty:1
SEQN:14145 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T369
DrwNo:079.20.1313.42675
AK /DF 03/19/2020
3 Complete Trusses Required
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'3"4
3'10"4
14'9"10
1'6"6
16'0"8
1'2"14
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
13'1"8
3'10"4
14'9"10
1'8"2
16'2"4
1'4"10
18'7"8
2'5"4
20'10"10
2'3"2
23'1"12
2'3"2
25'4"14
2'3"2
27'10"
2'5"21'8"
7"12 1'11"46'2"26'8"1012'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X4(A1)1.5X4 5X8
3X5
8X14
1.5X4
10X10
1.5X4
3X8 1.5X4
1.5X4
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W22 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 70 plf at 0.00 to 70 plf at 13.33
TC: From 120 plf at 13.33 to 120 plf at 16.75
TC: From 70 plf at 16.75 to 70 plf at 23.83
TC: From 35 plf at 23.83 to 35 plf at 27.83
BC: From 20 plf at 0.00 to 20 plf at 13.33
BC: From 10 plf at 13.33 to 10 plf at 16.75
BC: From 20 plf at 16.75 to 20 plf at 23.83
BC: From 75 plf at 23.83 to 75 plf at 27.83
TC: 560 lb Conc. Load at 13.50
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Special loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 30 plf at 0.00 to 30 plf at 13.33
TC: From 15 plf at 13.33 to 15 plf at 16.75
TC: From 30 plf at 16.75 to 30 plf at 23.83
TC: From 15 plf at 23.83 to 15 plf at 27.83
BC: From 20 plf at 0.00 to 20 plf at 13.33
BC: From 10 plf at 13.33 to 10 plf at 16.75
BC: From 20 plf at 16.75 to 20 plf at 23.83
BC: From 75 plf at 23.83 to 75 plf at 27.83
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Z 1618 /-/-/1001 /631 /338
AA 1664 /-/-/774 /729 /-
Wind reactions based on MWFRS
Z Brg Width = 8.0 Min Req =1.5
AA Brg Width = 6.0 Min Req =1.5
Bearings Z & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 477 -1035
C - D 511 -1079
D - E 497 -1037
F - H 1441 -2898
H - I 1431 -2863
Chords Tens.Comp.
I - J 1318 -2614
J - K 1310 -2600
K - L 1028 -2012
L - M 754 -1474
M - N 411 -810
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 941 -560
Y - X 944 -563
X - W 985 -571
W -V 3101 -1567
V - U 3131 -1582
Chords Tens.Comp.
U - T 2636 -1329
T - S 2614 -1318
S - R 2091 -1068
R - Q 1553 -796
Q - P 900 -463
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -E 916 -448
W -F 1090 -2266
E - F 634 -1127
S - K 625 -297
K - R 200 -389
R - L 564 -284
Webs Tens.Comp.
L - Q 210 -389
Q - M 705 -357
M - P 256 -442
P - N 924 -469
N - O 262 -489
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 G 999 480
VERT(CL):0.315 G 999 360
HORZ(LL):0.058 G - -
HORZ(TL):0.122 G - -
Creep Factor: 2.0
Max TC CSI:0.179
Max BC CSI:0.227
Max W eb CSI:0.423
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF15
Ply: 3
Qty:1
SEQN:14145 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T369
DrwNo:079.20.1313.42675
AK /DF 03/19/2020
3 Complete Trusses Required
W22
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'3"4
3'10"4
14'9"10
1'6"6
16'0"8
1'2"14
18'5"12
2'5"4
20'7"2
2'1"6
22'10"4
2'3"2
25'1"6
2'3"2
27'10"
2'8"10
2'11"15
2'11"15
5'11"14
2'11"15
9'3"4
3'3"7
13'1"8
3'10"4
14'9"10
1'8"2
16'2"4
1'4"10
18'7"8
2'5"4
20'10"10
2'3"2
23'1"12
2'3"2
25'4"14
2'3"2
27'10"
2'5"21'8"
7"12 1'11"46'2"26'8"1012'A
B
C
D
E
F
G
H I J K L M N
OPQRSTUVWXYZAA
5 12
3X4(A1)1.5X4 5X8
3X5
8X14
1.5X4
10X10
1.5X4
3X8 1.5X4
1.5X4
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 7.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 16.77
TC: From 344 plf at 16.77 to 344 plf at 23.83
TC: From 73 plf at 23.83 to 73 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Y 1963 /-/-/977 /645 /320
N 2682 /-/-/743 /828 /-
Wind reactions based on MWFRS
Y Brg Width = 8.0 Min Req =1.7
N Brg Width = 6.0 Min Req =2.4
Bearings Y & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 753 -1684
C - D 817 -1817
D - E 764 -1699
E - F 670 -1560
F - G 660 -1429
Chords Tens.Comp.
H - J 2049 -5102
J - K 2014 -5508
K - L 1711 -4968
L - M 1313 -3862
M - N 928 -2636
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1525 -859
X - W 1531 -862
W -V 1662 -888
V - U 1545 -793
U - T 1326 -566
T - S 5015 -1937
Chords Tens.Comp.
S - R 5548 -1978
R - Q 5110 -1698
Q - P 4078 -1311
P - O 2383 -803
O - N 2393 -806
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - U 464 -166
G - T 2482 -928
G - H 1368 -3096
T - H 1776 -4780
S - J 192 -594
Webs Tens.Comp.
R - K 511 -320
K - Q 265 -699
Q - L 1143 -429
L - P 365 -1066
P - M 1794 -586
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.202 S 999 480
VERT(CL):0.482 S 685 360
HORZ(LL):0.060 F - -
HORZ(TL):0.143 F - -
Creep Factor: 2.0
Max TC CSI:0.457
Max BC CSI:0.540
Max W eb CSI:0.813
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF16
Ply: 2
Qty:1
SEQN:14159 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T368
DrwNo:079.20.1313.30117
AK /DF 03/19/2020
2 Complete Trusses Required
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'0"12
3'7"12
14'11"4
1'10"8
16'9"4
1'10"
18'6"2
1'8"14
20'6"8
2'0"6
22'6"15
2'0"6
24'10"13
2'3"14
27'10"
2'11"3
2'11"15
2'11"15
5'11"14
2'11"15
9'1"8
3'1"11
13'2"8
4'1"
14'11"12
1'9"4
16'9"4
1'9"8
18'9"10
2'0"6
20'10"
2'0"6
22'10"7
2'0"6
24'9"1
1'10"10
27'10"
3'0"151'8"
7"12 8"9 1'11"46'1"16'7"1012'A
B
C
D
E
F G
H
I
J K L M
N
OPQRSTUVWXY
5 12
3X5(A1)1.5X4
5X5
10X10
8X12
7X8 8X12
1.5X4
4X4
4X4
4X7 1.5X4
5X10
3X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 7.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)
TC: From 73 plf at -1.67 to 73 plf at 16.77
TC: From 344 plf at 16.77 to 344 plf at 23.83
TC: From 73 plf at 23.83 to 73 plf at 27.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 27.83
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
It is the responsibility of the building designer
and truss fabricator to review this dwg prior
to cutting lumber to verify that all data, including
dimensions and loads, conform to the architectural
plans, specifications and fabricator's truss layout.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Y 1963 /-/-/977 /645 /320
N 2682 /-/-/743 /828 /-
Wind reactions based on MWFRS
Y Brg Width = 8.0 Min Req =1.7
N Brg Width = 6.0 Min Req =2.4
Bearings Y & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 753 -1684
C - D 817 -1817
D - E 764 -1699
E - F 670 -1560
F - G 660 -1429
Chords Tens.Comp.
H - J 2049 -5102
J - K 2014 -5508
K - L 1711 -4968
L - M 1313 -3862
M - N 928 -2636
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1525 -859
X - W 1531 -862
W -V 1662 -888
V - U 1545 -793
U - T 1326 -566
T - S 5015 -1937
Chords Tens.Comp.
S - R 5548 -1978
R - Q 5110 -1698
Q - P 4078 -1311
P - O 2383 -803
O - N 2393 -806
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - U 464 -166
G - T 2482 -928
G - H 1368 -3096
T - H 1776 -4780
S - J 192 -594
Webs Tens.Comp.
R - K 511 -320
K - Q 265 -699
Q - L 1143 -429
L - P 365 -1066
P - M 1794 -586
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.202 S 999 480
VERT(CL):0.482 S 685 360
HORZ(LL):0.060 F - -
HORZ(TL):0.143 F - -
Creep Factor: 2.0
Max TC CSI:0.457
Max BC CSI:0.540
Max W eb CSI:0.813
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:TF16
Ply: 2
Qty:1
SEQN:14159 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T368
DrwNo:079.20.1313.30117
AK /DF 03/19/2020
2 Complete Trusses Required
27'10"
3'1"11
3'1"11
6'3"6
3'1"11
9'5"
3'1"11
13'0"12
3'7"12
14'11"4
1'10"8
16'9"4
1'10"
18'6"2
1'8"14
20'6"8
2'0"6
22'6"15
2'0"6
24'10"13
2'3"14
27'10"
2'11"3
2'11"15
2'11"15
5'11"14
2'11"15
9'1"8
3'1"11
13'2"8
4'1"
14'11"12
1'9"4
16'9"4
1'9"8
18'9"10
2'0"6
20'10"
2'0"6
22'10"7
2'0"6
24'9"1
1'10"10
27'10"
3'0"151'8"
7"12 8"9 1'11"46'1"16'7"1012'A
B
C
D
E
F G
H
I
J K L M
N
OPQRSTUVWXY
5 12
3X5(A1)1.5X4
5X5
10X10
8X12
7X8 8X12
1.5X4
4X4
4X4
4X7 1.5X4
5X10
3X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.925'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 7.00
TC: From 36 plf at 7.00 to 36 plf at 16.42
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.03
BC: From 10 plf at 7.03 to 10 plf at 16.42
TC: 444 lb Conc. Load at 7.03
TC: 101 lb Conc. Load at 7.06
TC: 226 lb Conc. Load at 9.06,11.06,13.06,15.06
BC: 507 lb Conc. Load at 7.03
BC: 131 lb Conc. Load at 9.06,11.06,13.06,15.06
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1781 /-/-/-/944 /-
G 1942 /-/-/-/1030 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.8
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1689 -3166
C - D 1646 -3112
Chords Tens.Comp.
D - E 1190 -2245
E - F 1190 -2244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2796 -1464
Chords Tens.Comp.
I - H 2822 -1468
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 642 -68
D - H 340 -706
E - H 612 -782
Webs Tens.Comp.
H - F 2717 -1440
F - G 1021 -1812
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.088 C 999 360
VERT(CL):0.144 I 999 240
HORZ(LL):-0.038 C - -
HORZ(TL):0.054 C - -
Creep Factor: 2.0
Max TC CSI:0.803
Max BC CSI:0.436
Max W eb CSI:0.760
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T1
Ply: 1
Qty:4
SEQN:11509 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T10
DrwNo:079.20.1313.36873
AK /DF 03/19/2020
16'5"1
7'
7'
11'8"8
4'8"8
16'5"1
4'8"8
7'1"12
7'1"12
11'8"8
4'6"12
16'5"1
4'8"81'8"
8"3 3'7"33'11"220'A
B
C
D E F
GHI
5 12
6X6(E1)
3X4
5X8
2X4
2X4
5X10
5X8
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.925'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 7.00
TC: From 36 plf at 7.00 to 36 plf at 16.42
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.03
BC: From 10 plf at 7.03 to 10 plf at 16.42
TC: 444 lb Conc. Load at 7.03
TC: 101 lb Conc. Load at 7.06
TC: 226 lb Conc. Load at 9.06,11.06,13.06,15.06
BC: 507 lb Conc. Load at 7.03
BC: 131 lb Conc. Load at 9.06,11.06,13.06,15.06
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1781 /-/-/-/944 /-
G 1942 /-/-/-/1030 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.8
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1689 -3166
C - D 1646 -3112
Chords Tens.Comp.
D - E 1190 -2245
E - F 1190 -2244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2796 -1464
Chords Tens.Comp.
I - H 2822 -1468
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 642 -68
D - H 340 -706
E - H 612 -782
Webs Tens.Comp.
H - F 2717 -1440
F - G 1021 -1812
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.088 C 999 360
VERT(CL):0.144 I 999 240
HORZ(LL):-0.038 C - -
HORZ(TL):0.054 C - -
Creep Factor: 2.0
Max TC CSI:0.803
Max BC CSI:0.436
Max W eb CSI:0.760
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T1
Ply: 1
Qty:4
SEQN:11509 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T10
DrwNo:079.20.1313.36873
AK /DF 03/19/2020
16'5"1
7'
7'
11'8"8
4'8"8
16'5"1
4'8"8
7'1"12
7'1"12
11'8"8
4'6"12
16'5"1
4'8"81'8"
8"3 3'7"33'11"220'A
B
C
D E F
GHI
5 12
6X6(E1)
3X4
5X8
2X4
2X4
5X10
5X8
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1024 /-/-/643 /448 /253
F 852 /-/-/443 /412 /-
Wind reactions based on MWFRS
H Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 971 -1433
C - D 685 -1118
Chords Tens.Comp.
D - E 740 -987
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1263 -1154
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 442 -298
G - E 1105 -828
Webs Tens.Comp.
E - F 595 -771
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 D 999 360
VERT(CL):0.055 D 999 240
HORZ(LL):-0.004 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.122
Max W eb CSI:0.491
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T2
Ply: 1
Qty:4
SEQN:13913 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T160
DrwNo:079.20.1313.42769
AK /DF 03/19/2020
T2
W3
16'5"1
4'6"
4'6"
9'
4'6"
16'5"1
7'5"1
9'1"12
9'1"12
16'5"1
7'3"51'8"
8"3 4'5"34'9"220'A
B
C
D E
FGH
5
12
4X4(A1)
1.5X4
5X5
10X10
4X4
3X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1024 /-/-/643 /448 /253
F 852 /-/-/443 /412 /-
Wind reactions based on MWFRS
H Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 971 -1433
C - D 685 -1118
Chords Tens.Comp.
D - E 740 -987
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1263 -1154
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 442 -298
G - E 1105 -828
Webs Tens.Comp.
E - F 595 -771
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 D 999 360
VERT(CL):0.055 D 999 240
HORZ(LL):-0.004 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.122
Max W eb CSI:0.491
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T2
Ply: 1
Qty:4
SEQN:13913 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T160
DrwNo:079.20.1313.42769
AK /DF 03/19/2020
T2
W3
16'5"1
4'6"
4'6"
9'
4'6"
16'5"1
7'5"1
9'1"12
9'1"12
16'5"1
7'3"51'8"
8"3 4'5"34'9"220'A
B
C
D E
FGH
5
12
4X4(A1)
1.5X4
5X5
10X10
4X4
3X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1024 /-/-/648 /443 /305
F 852 /-/-/456 /430 /-
Wind reactions based on MWFRS
I Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 815 -1423
Chords Tens.Comp.
C - D 492 -848
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1252 -1066
H - G 1250 -1069
Chords Tens.Comp.
G - F 700 -555
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 568 -608
D - G 557 -274
Webs Tens.Comp.
D - F 742 -936
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 H 999 360
VERT(CL):0.054 H 999 240
HORZ(LL):-0.004 F - -
HORZ(TL):0.009 F - -
Creep Factor: 2.0
Max TC CSI:0.737
Max BC CSI:0.131
Max W eb CSI:0.762
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T3
Ply: 1
Qty:4
SEQN:13917 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T159
DrwNo:079.20.1313.35358
AK /DF 03/19/2020
16'5"1
5'7"12
5'7"12
11'
5'4"4
16'5"1
5'5"1
5'6"
5'6"
11'
5'6"
16'0"1
5'0"1
16'5"1
5"
1'8"
8"3 5'3"35'7"220'A
B
C
D E
FGHI
5 12
4X4(A1)
10X10
3X4
4X7
3X4
1.5X4
10X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1024 /-/-/648 /443 /305
F 852 /-/-/456 /430 /-
Wind reactions based on MWFRS
I Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 815 -1423
Chords Tens.Comp.
C - D 492 -848
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1252 -1066
H - G 1250 -1069
Chords Tens.Comp.
G - F 700 -555
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 568 -608
D - G 557 -274
Webs Tens.Comp.
D - F 742 -936
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 H 999 360
VERT(CL):0.054 H 999 240
HORZ(LL):-0.004 F - -
HORZ(TL):0.009 F - -
Creep Factor: 2.0
Max TC CSI:0.737
Max BC CSI:0.131
Max W eb CSI:0.762
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T3
Ply: 1
Qty:4
SEQN:13917 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T159
DrwNo:079.20.1313.35358
AK /DF 03/19/2020
16'5"1
5'7"12
5'7"12
11'
5'4"4
16'5"1
5'5"1
5'6"
5'6"
11'
5'6"
16'0"1
5'0"1
16'5"1
5"
1'8"
8"3 5'3"35'7"220'A
B
C
D E
FGHI
5 12
4X4(A1)
10X10
3X4
4X7
3X4
1.5X4
10X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1024 /-/-/655 /435 /359
F 852 /-/-/474 /452 /-
Wind reactions based on MWFRS
I Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 718 -1419
Chords Tens.Comp.
C - D 274 -589
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1238 -1026
H - G 1233 -1027
Chords Tens.Comp.
G - F 445 -367
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 727 -868
D - G 609 -328
Webs Tens.Comp.
D - F 709 -858
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.04 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 H 999 360
VERT(CL):0.058 H 999 240
HORZ(LL):-0.005 E - -
HORZ(TL):0.013 E - -
Creep Factor: 2.0
Max TC CSI:0.766
Max BC CSI:0.134
Max W eb CSI:0.776
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T4
Ply: 1
Qty:4
SEQN:13921 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T154
DrwNo:079.20.1313.28760
AK /DF 03/19/2020
16'5"1
6'7"12
6'7"12
13'
6'4"4
16'5"1
3'5"1
6'6"
6'6"
13'
6'6"
16'0"1
3'0"1
16'5"1
5"
1'8"
8"3 6'1"36'5"220'A
B
C
D E
FGHI
5
12
4X4(A1)
10X10
3X4
4X7
3X4
1.5X4
10X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 1024 /-/-/655 /435 /359
F 852 /-/-/474 /452 /-
Wind reactions based on MWFRS
I Brg Width = 8.0 Min Req =1.6
F Brg Width = -Min Req =-
Bearing I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 718 -1419
Chords Tens.Comp.
C - D 274 -589
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1238 -1026
H - G 1233 -1027
Chords Tens.Comp.
G - F 445 -367
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 727 -868
D - G 609 -328
Webs Tens.Comp.
D - F 709 -858
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.04 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 H 999 360
VERT(CL):0.058 H 999 240
HORZ(LL):-0.005 E - -
HORZ(TL):0.013 E - -
Creep Factor: 2.0
Max TC CSI:0.766
Max BC CSI:0.134
Max W eb CSI:0.776
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T4
Ply: 1
Qty:4
SEQN:13921 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T154
DrwNo:079.20.1313.28760
AK /DF 03/19/2020
16'5"1
6'7"12
6'7"12
13'
6'4"4
16'5"1
3'5"1
6'6"
6'6"
13'
6'6"
16'0"1
3'0"1
16'5"1
5"
1'8"
8"3 6'1"36'5"220'A
B
C
D E
FGHI
5
12
4X4(A1)
10X10
3X4
4X7
3X4
1.5X4
10X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W2 2x4 SP 2700f-2.2E;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1045 /-/-/659 /424 /413
F 961 /-/-/494 /476 /-
Wind reactions based on MWFRS
H Brg Width = 8.0 Min Req =1.7
F Brg Width = -Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 599 -1478
Chords Tens.Comp.
C - D 860 -1477
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1283 -968
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 702 -587
G - D 1453 -1026
Webs Tens.Comp.
D - F 726 -732
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.46 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 C 999 360
VERT(CL):0.071 C 999 240
HORZ(LL):-0.010 E - -
HORZ(TL):0.023 E - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.141
Max W eb CSI:0.811
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T5
Ply: 1
Qty:4
SEQN:13925 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T161
DrwNo:079.20.1313.41084
AK /DF 03/19/2020
T3
W2
16'5"1
7'5"10
7'5"10
15'
7'6"6
16'5"1
1'5"1
7'7"12
7'7"12
15'10"1
8'2"5
16'5"1
7"
1'8"
8"3 6'11"37'3"220'A
B
C
D E
FGH
5 12
4X4(A1)
5X5
10X10
5X5 1.5X4
12X14
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W2 2x4 SP 2700f-2.2E;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Truss supports 400# mech unit; unit centered at
9-0-0; supported by BC; unit width 2-0-0; supported by
4 trusses.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1045 /-/-/659 /424 /413
F 961 /-/-/494 /476 /-
Wind reactions based on MWFRS
H Brg Width = 8.0 Min Req =1.7
F Brg Width = -Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 599 -1478
Chords Tens.Comp.
C - D 860 -1477
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1283 -968
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 702 -587
G - D 1453 -1026
Webs Tens.Comp.
D - F 726 -732
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.46 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 C 999 360
VERT(CL):0.071 C 999 240
HORZ(LL):-0.010 E - -
HORZ(TL):0.023 E - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.141
Max W eb CSI:0.811
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T5
Ply: 1
Qty:4
SEQN:13925 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T161
DrwNo:079.20.1313.41084
AK /DF 03/19/2020
T3
W2
16'5"1
7'5"10
7'5"10
15'
7'6"6
16'5"1
1'5"1
7'7"12
7'7"12
15'10"1
8'2"5
16'5"1
7"
1'8"
8"3 6'11"37'3"220'A
B
C
D E
FGH
5 12
4X4(A1)
5X5
10X10
5X5 1.5X4
12X14
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 924 /-/-/655 /408 /453
G 752 /-/-/517 /504 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 679 -1336
C - D 586 -1229
Chords Tens.Comp.
D - E 317 -754
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1082 -1013
I - H 1078 -1013
Chords Tens.Comp.
H - G 615 -591
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 462 -500
H - E 429 -215
Webs Tens.Comp.
E - G 791 -823
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.037 C 999 360
VERT(CL):0.057 I 999 240
HORZ(LL):-0.018 C - -
HORZ(TL):0.023 G - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.507
Max W eb CSI:0.759
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T6
Ply: 1
Qty:24
SEQN:11536 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T153
DrwNo:079.20.1313.40663
AK /DF 03/19/2020
16'5"1
5'5"5
5'5"5
10'11"6
5'6"1
16'5"1
5'5"11
5'3"15
5'3"15
10'7"14
5'3"15
16'5"1
5'9"31'8"
8"3 7'6"57'10"420'A
B
C
D
E
F
GHI
5 12
3X6(E5)
3X4
1.5X4
5X5
3X4
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 924 /-/-/655 /408 /453
G 752 /-/-/517 /504 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 679 -1336
C - D 586 -1229
Chords Tens.Comp.
D - E 317 -754
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1082 -1013
I - H 1078 -1013
Chords Tens.Comp.
H - G 615 -591
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 462 -500
H - E 429 -215
Webs Tens.Comp.
E - G 791 -823
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.037 C 999 360
VERT(CL):0.057 I 999 240
HORZ(LL):-0.018 C - -
HORZ(TL):0.023 G - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.507
Max W eb CSI:0.759
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T6
Ply: 1
Qty:24
SEQN:11536 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T153
DrwNo:079.20.1313.40663
AK /DF 03/19/2020
16'5"1
5'5"5
5'5"5
10'11"6
5'6"1
16'5"1
5'5"11
5'3"15
5'3"15
10'7"14
5'3"15
16'5"1
5'9"31'8"
8"3 7'6"57'10"420'A
B
C
D
E
F
GHI
5 12
3X6(E5)
3X4
1.5X4
5X5
3X4
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.75" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
In addition apply (1) 1/2" bolt or 0.22"-0.25" min/max dia. X 6.0"
length wood screw at each joint location.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 58 plf at -1.67 to 58 plf at 57.00
BC: From 17 plf at -1.67 to 17 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 16.84
BC: From 48 plf at 16.84 to 48 plf at 19.67
BC: From 16 plf at 19.67 to 16 plf at 24.09
BC: From 48 plf at 24.09 to 48 plf at 27.09
BC: From 16 plf at 27.09 to 16 plf at 35.70
BC: From 48 plf at 35.70 to 48 plf at 38.62
BC: From 16 plf at 38.62 to 16 plf at 55.33
BC: From 17 plf at 55.33 to 17 plf at 57.00
BC: 1942 lb Conc. Load at 7.06,48.27
BC: 852 lb Conc. Load at 9.06,11.06,13.06,42.27
44.27,46.27
BC: 961 lb Conc. Load at 15.06,40.27
BC: 752 lb Conc. Load at 17.06,19.06,21.06,23.06
25.06,27.06,29.06,31.06,33.06,35.06,37.06,38.27
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DW G to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
++ 4-(0.128"x3.0") nails opposite face of hanger
after the third ply is attached. 2-(0.128"x3.0")
nails after the fourth ply is attached.
++
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 12229 /-/-/-/6714 /-
K 12331 /-/-/-/6787 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =6.1
K Brg Width = 8.0 Min Req =6.1
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3922 -7115
C - D 3839 -6909
D - E 3454 -6112
E - F 3756 -6558
F - G 3780 -6588
Chords Tens.Comp.
G - H 3780 -6588
H - I 3505 -6185
I - J 3883 -6971
J - K 3966 -7177
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 6504 -3584
T - S 6501 -3583
S - R 6354 -3532
R - Q 5637 -3184
Q - P 6562 -3759
Chords Tens.Comp.
P - O 5704 -3231
O - N 6411 -3572
N - M 6557 -3622
M - K 6560 -3624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 814 -378
D - R 459 -946
E - R 1338 -697
E - Q 1260 -783
Webs Tens.Comp.
P - H 1198 -745
H - O 1416 -747
O - I 451 -933
I - N 802 -370
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.309 G 999 360
VERT(CL):0.579 G 999 240
HORZ(LL):-0.099 M - -
HORZ(TL):0.188 M - -
Creep Factor: 2.0
Max TC CSI:0.153
Max BC CSI:0.460
Max W eb CSI:0.320
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T7
Ply: 4
Qty:2
SEQN:13928 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T200
DrwNo:079.20.1313.38369
AK /DF 03/19/2020
4 Complete Trusses Required
55'4"
5'6"
5'6"
11'1"11
5'7"12
16'5"1
5'3"6
24'1"6
7'8"5
31'4"6
7'3"1
38'10"15
7'6"9
44'2"5
5'3"6
49'10"
5'7"12
55'4"
5'6"
5'5"2
5'5"2
10'10"3
5'5"2
16'5"1
5'6"14
23'9"14
7'4"13
31'4"6
7'6"9
38'10"15
7'6"9
44'5"13
5'6"14
49'10"14
5'5"2
55'4"
5'5"21'8"
1'8"
8"37'6"58'2"520'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU
5
12
5X12(A1)1.5X4
10X10
10X10
3X4
8X8
10X10 4X5
10X10 1.5X4
10X10
8X8
10X10
3X4
10X10
10X10
1.5X4 5X12(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.75" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
In addition apply (1) 1/2" bolt or 0.22"-0.25" min/max dia. X 6.0"
length wood screw at each joint location.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 58 plf at -1.67 to 58 plf at 57.00
BC: From 17 plf at -1.67 to 17 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 16.84
BC: From 48 plf at 16.84 to 48 plf at 19.67
BC: From 16 plf at 19.67 to 16 plf at 24.09
BC: From 48 plf at 24.09 to 48 plf at 27.09
BC: From 16 plf at 27.09 to 16 plf at 35.70
BC: From 48 plf at 35.70 to 48 plf at 38.62
BC: From 16 plf at 38.62 to 16 plf at 55.33
BC: From 17 plf at 55.33 to 17 plf at 57.00
BC: 1942 lb Conc. Load at 7.06,48.27
BC: 852 lb Conc. Load at 9.06,11.06,13.06,42.27
44.27,46.27
BC: 961 lb Conc. Load at 15.06,40.27
BC: 752 lb Conc. Load at 17.06,19.06,21.06,23.06
25.06,27.06,29.06,31.06,33.06,35.06,37.06,38.27
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DW G to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
++ 4-(0.128"x3.0") nails opposite face of hanger
after the third ply is attached. 2-(0.128"x3.0")
nails after the fourth ply is attached.
++
Note: Truss not designed to be installed in reverse
orientation. Truss must be installed as shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 12229 /-/-/-/6714 /-
K 12331 /-/-/-/6787 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =6.1
K Brg Width = 8.0 Min Req =6.1
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3922 -7115
C - D 3839 -6909
D - E 3454 -6112
E - F 3756 -6558
F - G 3780 -6588
Chords Tens.Comp.
G - H 3780 -6588
H - I 3505 -6185
I - J 3883 -6971
J - K 3966 -7177
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 6504 -3584
T - S 6501 -3583
S - R 6354 -3532
R - Q 5637 -3184
Q - P 6562 -3759
Chords Tens.Comp.
P - O 5704 -3231
O - N 6411 -3572
N - M 6557 -3622
M - K 6560 -3624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 814 -378
D - R 459 -946
E - R 1338 -697
E - Q 1260 -783
Webs Tens.Comp.
P - H 1198 -745
H - O 1416 -747
O - I 451 -933
I - N 802 -370
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.309 G 999 360
VERT(CL):0.579 G 999 240
HORZ(LL):-0.099 M - -
HORZ(TL):0.188 M - -
Creep Factor: 2.0
Max TC CSI:0.153
Max BC CSI:0.460
Max W eb CSI:0.320
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T7
Ply: 4
Qty:2
SEQN:13928 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T200
DrwNo:079.20.1313.38369
AK /DF 03/19/2020
4 Complete Trusses Required
55'4"
5'6"
5'6"
11'1"11
5'7"12
16'5"1
5'3"6
24'1"6
7'8"5
31'4"6
7'3"1
38'10"15
7'6"9
44'2"5
5'3"6
49'10"
5'7"12
55'4"
5'6"
5'5"2
5'5"2
10'10"3
5'5"2
16'5"1
5'6"14
23'9"14
7'4"13
31'4"6
7'6"9
38'10"15
7'6"9
44'5"13
5'6"14
49'10"14
5'5"2
55'4"
5'5"21'8"
1'8"
8"37'6"58'2"520'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU
5
12
5X12(A1)1.5X4
10X10
10X10
3X4
8X8
10X10 4X5
10X10 1.5X4
10X10
8X8
10X10
3X4
10X10
10X10
1.5X4 5X12(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E; T6 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 2309 /-/-/1430 /899 /282
V 2303 /-/-/1430 /900 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =3.7
V Brg Width = 8.0 Min Req =3.7
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3379 -4731
C - D 3257 -4460
D - E 2919 -3953
E - F 2984 -4028
F - G 2984 -4015
Chords Tens.Comp.
G - H 2985 -4016
H - I 2920 -3938
I - J 3258 -4441
J - K 3295 -4599
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 4301 -2951
T - S 4301 -2952
S - R 4060 -2723
R - Q 3590 -2208
Q - P 4040 -2390
Chords Tens.Comp.
P - O 3578 -2229
O - N 4049 -2745
N - M 4188 -2905
M - K 4184 -2901
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - R 679 -620
E - R 583 -457
E - Q 682 -458
Webs Tens.Comp.
P - H 673 -456
H - O 585 -458
O - I 680 -621
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.09 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 G 999 360
VERT(CL):0.377 G 999 240
HORZ(LL):0.056 M - -
HORZ(TL):0.119 M - -
Creep Factor: 2.0
Max TC CSI:0.343
Max BC CSI:0.254
Max W eb CSI:0.735
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T8
Ply: 1
Qty:2
SEQN:13938 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T13
DrwNo:079.20.1313.41942
AK /DF 03/19/2020
T6
55'4"
6'1"1
6'1"1
12'2"8
6'1"7
18'0"4
5'9"12
24'7"12
6'7"8
30'10"
6'2"4
37'3"12
6'5"12
43'1"8
5'9"12
49'2"15
6'1"7
55'4"
6'1"1
5'11"8
5'11"8
11'11"
5'11"8
18'0"4
6'1"4
24'2"
6'1"12
30'10"
6'8"
37'3"12
6'5"12
43'5"
6'1"4
49'4"8
5'11"8
55'4"
5'11"81'8"
1'8"
8"38'2"58'10"5(W B1)
20'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU V
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
3X4 10X10
10X10 1.5X4
4X8
8X8
10X10
3X4
10X10
10X10
1.5X4 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E; T6 2x6 SP #2;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 2309 /-/-/1430 /899 /282
V 2303 /-/-/1430 /900 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =3.7
V Brg Width = 8.0 Min Req =3.7
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3379 -4731
C - D 3257 -4460
D - E 2919 -3953
E - F 2984 -4028
F - G 2984 -4015
Chords Tens.Comp.
G - H 2985 -4016
H - I 2920 -3938
I - J 3258 -4441
J - K 3295 -4599
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 4301 -2951
T - S 4301 -2952
S - R 4060 -2723
R - Q 3590 -2208
Q - P 4040 -2390
Chords Tens.Comp.
P - O 3578 -2229
O - N 4049 -2745
N - M 4188 -2905
M - K 4184 -2901
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - R 679 -620
E - R 583 -457
E - Q 682 -458
Webs Tens.Comp.
P - H 673 -456
H - O 585 -458
O - I 680 -621
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.09 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 G 999 360
VERT(CL):0.377 G 999 240
HORZ(LL):0.056 M - -
HORZ(TL):0.119 M - -
Creep Factor: 2.0
Max TC CSI:0.343
Max BC CSI:0.254
Max W eb CSI:0.735
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T8
Ply: 1
Qty:2
SEQN:13938 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T13
DrwNo:079.20.1313.41942
AK /DF 03/19/2020
T6
55'4"
6'1"1
6'1"1
12'2"8
6'1"7
18'0"4
5'9"12
24'7"12
6'7"8
30'10"
6'2"4
37'3"12
6'5"12
43'1"8
5'9"12
49'2"15
6'1"7
55'4"
6'1"1
5'11"8
5'11"8
11'11"
5'11"8
18'0"4
6'1"4
24'2"
6'1"12
30'10"
6'8"
37'3"12
6'5"12
43'5"
6'1"4
49'4"8
5'11"8
55'4"
5'11"81'8"
1'8"
8"38'2"58'10"5(W B1)
20'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU V
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
3X4 10X10
10X10 1.5X4
4X8
8X8
10X10
3X4
10X10
10X10
1.5X4 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 2287 /-/-/1433 /903 /303
K 2291 /-/-/1433 /903 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =3.6
K Brg Width = 8.0 Min Req =3.6
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3404 -4692
C - D 3224 -4333
D - E 2848 -3754
E - F 2834 -3670
F - G 2834 -3669
Chords Tens.Comp.
G - H 2838 -3678
H - I 2848 -3764
I - J 3225 -4343
J - K 3404 -4701
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 4263 -2970
T - S 4263 -2971
S - R 3935 -2669
R - Q 3398 -2107
Q - P 3687 -2219
Chords Tens.Comp.
P - O 3406 -2127
O - N 3945 -2691
N - M 4272 -2991
M - K 4272 -2990
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 416 -347
D - R 740 -707
E - R 624 -497
E - Q 494 -350
Webs Tens.Comp.
P - H 505 -354
H - O 619 -492
O - I 742 -709
N - J 416 -346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.42 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.154 F 999 360
VERT(CL):0.334 F 999 240
HORZ(LL):0.055 M - -
HORZ(TL):0.118 M - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.211
Max W eb CSI:0.555
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T9
Ply: 1
Qty:2
SEQN:13948 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T148
DrwNo:079.20.1313.33299
AK /DF 03/19/2020
55'4"
6'6"12
6'6"12
13'3"5
6'8"8
19'7"7
6'4"2
25'0"6
5'4"15
30'1"14
5'1"7
35'8"9
5'6"11
42'0"11
6'4"2
48'9"4
6'8"8
55'4"
6'6"12
6'5"14
6'5"14
12'11"13
6'5"14
19'7"7
6'7"10
25'0"6
5'4"15
30'7"7
5'7"1
35'8"9
5'1"2
42'4"3
6'7"10
48'10"2
6'5"14
55'4"
6'5"141'8"1'8"
8"38'10"59'6"5(W B1)
(W B2)
(WB1)
20'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
10X10
10X10
4X8
3X4
10X10
8X8
3X4
3X4
10X10
10X10
1.5X4 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
U 2287 /-/-/1433 /903 /303
K 2291 /-/-/1433 /903 /-
Wind reactions based on MWFRS
U Brg Width = 8.0 Min Req =3.6
K Brg Width = 8.0 Min Req =3.6
Bearings U & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3404 -4692
C - D 3224 -4333
D - E 2848 -3754
E - F 2834 -3670
F - G 2834 -3669
Chords Tens.Comp.
G - H 2838 -3678
H - I 2848 -3764
I - J 3225 -4343
J - K 3404 -4701
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 4263 -2970
T - S 4263 -2971
S - R 3935 -2669
R - Q 3398 -2107
Q - P 3687 -2219
Chords Tens.Comp.
P - O 3406 -2127
O - N 3945 -2691
N - M 4272 -2991
M - K 4272 -2990
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 416 -347
D - R 740 -707
E - R 624 -497
E - Q 494 -350
Webs Tens.Comp.
P - H 505 -354
H - O 619 -492
O - I 742 -709
N - J 416 -346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.42 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.154 F 999 360
VERT(CL):0.334 F 999 240
HORZ(LL):0.055 M - -
HORZ(TL):0.118 M - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.211
Max W eb CSI:0.555
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T9
Ply: 1
Qty:2
SEQN:13948 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T148
DrwNo:079.20.1313.33299
AK /DF 03/19/2020
55'4"
6'6"12
6'6"12
13'3"5
6'8"8
19'7"7
6'4"2
25'0"6
5'4"15
30'1"14
5'1"7
35'8"9
5'6"11
42'0"11
6'4"2
48'9"4
6'8"8
55'4"
6'6"12
6'5"14
6'5"14
12'11"13
6'5"14
19'7"7
6'7"10
25'0"6
5'4"15
30'7"7
5'7"1
35'8"9
5'1"2
42'4"3
6'7"10
48'10"2
6'5"14
55'4"
6'5"141'8"1'8"
8"38'10"59'6"5(W B1)
(W B2)
(WB1)
20'A
B
C
D
E F G H
I
J
K
L
MNOPQRSTU
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
10X10
10X10
4X8
3X4
10X10
8X8
3X4
3X4
10X10
10X10
1.5X4 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W4,W10 2x4 SP 2700f-2.2E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2341 /-/-/1434 /904 /323
J 2341 /-/-/1434 /904 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req =3.7
J Brg Width = 8.0 Min Req =3.7
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3409 -4825
C - D 3184 -4400
D - E 2770 -3711
E - F 2713 -3530
Chords Tens.Comp.
F - G 2713 -3530
G - H 2770 -3710
H - I 3184 -4400
I - J 3408 -4825
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4384 -2970
R - Q 4384 -2970
Q - P 3989 -2612
P - O 3351 -2003
Chords Tens.Comp.
O - N 3351 -2023
N - M 3989 -2632
M - L 4384 -2989
L - J 4384 -2989
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 474 -417
Q - D 394 -215
D - P 801 -839
E - P 741 -524
Webs Tens.Comp.
G - N 740 -524
N - H 801 -840
H - M 394 -215
M - I 474 -417
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.157 F 999 360
VERT(CL):0.331 F 999 240
HORZ(LL):0.057 L - -
HORZ(TL):0.121 L - -
Creep Factor: 2.0
Max TC CSI:0.094
Max BC CSI:0.212
Max W eb CSI:0.683
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T10
Ply: 1
Qty:2
SEQN:13958 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T140
DrwNo:079.20.1313.28729
AK /DF 03/19/2020
W4
W10
55'4"
7'1"14
7'1"14
14'4"1
7'2"4
21'2"10
6'10"9
27'8"
6'5"6
34'1"6
6'5"6
40'11"15
6'10"9
48'2"2
7'2"4
55'4"
7'1"14
7'0"5
7'0"5
14'0"9
7'0"5
21'2"10
7'2"1
27'8"
6'5"6
34'1"6
6'5"6
41'3"7
7'2"1
48'3"11
7'0"5
55'4"
7'0"51'8"1'8"
8"39'6"410'2"4(WB1)
(W B2)
(W B1)
20'A
B
C
D
E F G
H
I
J
K
LMNOPQRS
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
3X4
1.5X4
10X10
8X8
3X4
3X4
10X10
10X10
1.5X4 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W4,W10 2x4 SP 2700f-2.2E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2341 /-/-/1434 /904 /323
J 2341 /-/-/1434 /904 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req =3.7
J Brg Width = 8.0 Min Req =3.7
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3409 -4825
C - D 3184 -4400
D - E 2770 -3711
E - F 2713 -3530
Chords Tens.Comp.
F - G 2713 -3530
G - H 2770 -3710
H - I 3184 -4400
I - J 3408 -4825
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4384 -2970
R - Q 4384 -2970
Q - P 3989 -2612
P - O 3351 -2003
Chords Tens.Comp.
O - N 3351 -2023
N - M 3989 -2632
M - L 4384 -2989
L - J 4384 -2989
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 474 -417
Q - D 394 -215
D - P 801 -839
E - P 741 -524
Webs Tens.Comp.
G - N 740 -524
N - H 801 -840
H - M 394 -215
M - I 474 -417
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.76 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.157 F 999 360
VERT(CL):0.331 F 999 240
HORZ(LL):0.057 L - -
HORZ(TL):0.121 L - -
Creep Factor: 2.0
Max TC CSI:0.094
Max BC CSI:0.212
Max W eb CSI:0.683
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T10
Ply: 1
Qty:2
SEQN:13958 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T140
DrwNo:079.20.1313.28729
AK /DF 03/19/2020
W4
W10
55'4"
7'1"14
7'1"14
14'4"1
7'2"4
21'2"10
6'10"9
27'8"
6'5"6
34'1"6
6'5"6
40'11"15
6'10"9
48'2"2
7'2"4
55'4"
7'1"14
7'0"5
7'0"5
14'0"9
7'0"5
21'2"10
7'2"1
27'8"
6'5"6
34'1"6
6'5"6
41'3"7
7'2"1
48'3"11
7'0"5
55'4"
7'0"51'8"1'8"
8"39'6"410'2"4(WB1)
(W B2)
(W B1)
20'A
B
C
D
E F G
H
I
J
K
LMNOPQRS
5
12
5X8(A1)1.5X4
10X10
10X10
3X4
8X8
3X4
1.5X4
10X10
8X8
3X4
3X4
10X10
10X10
1.5X4 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W2,W10,W12 2x4 SP 2700f-2.2E;
W4 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2171 /-/-/1433 /909 /344
J 2171 /-/-/1433 /909 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req =3.5
J Brg Width = 8.0 Min Req =3.5
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3432 -4420
C - D 3145 -3886
D - E 2695 -3174
E - F 2607 -2916
Chords Tens.Comp.
F - G 2607 -2916
G - H 2695 -3173
H - I 3146 -3887
I - J 3431 -4420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4010 -2986
R - Q 4010 -2986
Q - P 3508 -2550
P - O 2848 -1899
Chords Tens.Comp.
O - N 2847 -1918
N - M 3509 -2570
M - L 4009 -3005
L - J 4010 -3005
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 554 -535
Q - D 440 -242
D - P 856 -867
E - P 655 -548
Webs Tens.Comp.
G - N 655 -548
N - H 858 -870
H - M 440 -243
M - I 553 -534
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.09 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.125 P 999 360
VERT(CL):0.290 P 999 240
HORZ(LL):0.047 L - -
HORZ(TL):0.110 L - -
Creep Factor: 2.0
Max TC CSI:0.088
Max BC CSI:0.189
Max W eb CSI:0.832
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T11
Ply: 1
Qty:2
SEQN:13962 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T298
DrwNo:079.20.1313.26732
AK /DF 03/19/2020
W2
W4
W10
W12
55'4"
7'7"9
7'7"9
15'4"
7'8"7
22'9"13
7'5"13
27'8"
4'10"3
32'6"3
4'10"3
40'
7'5"13
47'8"7
7'8"7
55'4"
7'7"9
7'6"11
7'6"11
15'1"6
7'6"11
22'9"13
7'8"7
27'8"
4'10"3
32'6"3
4'10"3
40'2"10
7'8"7
47'9"5
7'6"11
55'4"
7'6"111'8"1'8"
8"310'2"410'10"4(WB1)
(WB2)
(W B4)
(W B3)
(W B1)
20'A
B
C
D
E F G
H
I
J
K
LMNOPQRS
5
12
5X8(A1)1.5X4
10X10
10X10
10X10
8X8
3X4
1.5X4
10X10
8X8
3X4
10X10
10X10
10X10
1.5X4 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W2,W10,W12 2x4 SP 2700f-2.2E;
W4 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 2171 /-/-/1433 /909 /344
J 2171 /-/-/1433 /909 /-
Wind reactions based on MWFRS
S Brg Width = 8.0 Min Req =3.5
J Brg Width = 8.0 Min Req =3.5
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3432 -4420
C - D 3145 -3886
D - E 2695 -3174
E - F 2607 -2916
Chords Tens.Comp.
F - G 2607 -2916
G - H 2695 -3173
H - I 3146 -3887
I - J 3431 -4420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4010 -2986
R - Q 4010 -2986
Q - P 3508 -2550
P - O 2848 -1899
Chords Tens.Comp.
O - N 2847 -1918
N - M 3509 -2570
M - L 4009 -3005
L - J 4010 -3005
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 554 -535
Q - D 440 -242
D - P 856 -867
E - P 655 -548
Webs Tens.Comp.
G - N 655 -548
N - H 858 -870
H - M 440 -243
M - I 553 -534
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.09 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.125 P 999 360
VERT(CL):0.290 P 999 240
HORZ(LL):0.047 L - -
HORZ(TL):0.110 L - -
Creep Factor: 2.0
Max TC CSI:0.088
Max BC CSI:0.189
Max W eb CSI:0.832
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T11
Ply: 1
Qty:2
SEQN:13962 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T298
DrwNo:079.20.1313.26732
AK /DF 03/19/2020
W2
W4
W10
W12
55'4"
7'7"9
7'7"9
15'4"
7'8"7
22'9"13
7'5"13
27'8"
4'10"3
32'6"3
4'10"3
40'
7'5"13
47'8"7
7'8"7
55'4"
7'7"9
7'6"11
7'6"11
15'1"6
7'6"11
22'9"13
7'8"7
27'8"
4'10"3
32'6"3
4'10"3
40'2"10
7'8"7
47'9"5
7'6"11
55'4"
7'6"111'8"1'8"
8"310'2"410'10"4(WB1)
(WB2)
(W B4)
(W B3)
(W B1)
20'A
B
C
D
E F G
H
I
J
K
LMNOPQRS
5
12
5X8(A1)1.5X4
10X10
10X10
10X10
8X8
3X4
1.5X4
10X10
8X8
3X4
10X10
10X10
10X10
1.5X4 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
W6 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 2334 /-/-/1430 /912 /364
I 2329 /-/-/1430 /912 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req =3.7
I Brg Width = 8.0 Min Req =3.7
Bearings Q & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3457 -4806
C - D 3100 -4224
D - E 2618 -3388
E - F 2564 -3036
Chords Tens.Comp.
F - G 2612 -3370
G - H 3098 -4209
H - I 3458 -4793
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4361 -2982
P - O 4361 -2982
O - N 3812 -2486
N - M 3038 -1791
Chords Tens.Comp.
M - L 3798 -2504
L - K 4349 -3002
K - I 4350 -3002
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 611 -583
O - D 474 -260
D - N 913 -1017
E - N 870 -596
Webs Tens.Comp.
M - F 842 -663
M - G 909 -1009
G - L 472 -257
L - H 614 -587
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.42 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.152 N 999 360
VERT(CL):0.323 N 999 240
HORZ(LL):0.057 K - -
HORZ(TL):0.121 K - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.203
Max W eb CSI:0.996
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T12
Ply: 1
Qty:23
SEQN:13995 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T335
DrwNo:079.20.1313.40836
AK /DF 03/19/2020
W5 W6
W7
55'4"
8'1"15
8'1"15
16'4"13
8'2"13
24'5"
8'0"3
30'11"
6'6"
38'11"3
8'0"3
47'2"1
8'2"13
55'4"
8'1"15
8'1"1
8'1"1
16'2"3
8'1"1
24'5"
8'2"13
30'9"4
6'4"4
39'1"13
8'4"9
47'2"15
8'1"1
55'4"
8'1"11'8"1'8"
8"310'10"411'6"4(W B1)
(W B2)
(a)
(WB2)
(WB1)
20'A
B
C
D
E F
G
H
I
J
KLMNOPQ
5 12
5X8(A1)10X10
10X10
10X10
10X10
8X8
3X4 10X10
8X8
10X10
10X10
10X10
10X10 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
W6 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 2334 /-/-/1430 /912 /364
I 2329 /-/-/1430 /912 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req =3.7
I Brg Width = 8.0 Min Req =3.7
Bearings Q & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3457 -4806
C - D 3100 -4224
D - E 2618 -3388
E - F 2564 -3036
Chords Tens.Comp.
F - G 2612 -3370
G - H 3098 -4209
H - I 3458 -4793
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4361 -2982
P - O 4361 -2982
O - N 3812 -2486
N - M 3038 -1791
Chords Tens.Comp.
M - L 3798 -2504
L - K 4349 -3002
K - I 4350 -3002
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 611 -583
O - D 474 -260
D - N 913 -1017
E - N 870 -596
Webs Tens.Comp.
M - F 842 -663
M - G 909 -1009
G - L 472 -257
L - H 614 -587
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.42 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.152 N 999 360
VERT(CL):0.323 N 999 240
HORZ(LL):0.057 K - -
HORZ(TL):0.121 K - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.203
Max W eb CSI:0.996
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T12
Ply: 1
Qty:23
SEQN:13995 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T335
DrwNo:079.20.1313.40836
AK /DF 03/19/2020
W5 W6
W7
55'4"
8'1"15
8'1"15
16'4"13
8'2"13
24'5"
8'0"3
30'11"
6'6"
38'11"3
8'0"3
47'2"1
8'2"13
55'4"
8'1"15
8'1"1
8'1"1
16'2"3
8'1"1
24'5"
8'2"13
30'9"4
6'4"4
39'1"13
8'4"9
47'2"15
8'1"1
55'4"
8'1"11'8"1'8"
8"310'10"411'6"4(W B1)
(W B2)
(a)
(WB2)
(WB1)
20'A
B
C
D
E F
G
H
I
J
KLMNOPQ
5 12
5X8(A1)10X10
10X10
10X10
10X10
8X8
3X4 10X10
8X8
10X10
10X10
10X10
10X10 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W4,W5,W7,W8 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 2171 /-/-/1425 /915 /384
I 2171 /-/-/1425 /915 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req =3.5
I Brg Width = 8.0 Min Req =3.5
Bearings Q & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3491 -4397
C - D 3057 -3725
D - E 2558 -2889
E - F 2500 -2582
Chords Tens.Comp.
F - G 2558 -2889
G - H 3054 -3721
H - I 3493 -4399
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3983 -2977
P - O 3982 -2977
O - N 3347 -2424
N - M 2568 -1678
Chords Tens.Comp.
M - L 3343 -2441
L - K 3984 -2998
K - I 3984 -2998
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 669 -679
O - D 519 -285
D - N 979 -1022
E - N 725 -608
Webs Tens.Comp.
M - F 725 -719
M - G 965 -1005
G - L 511 -277
L - H 675 -685
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.127 N 999 360
VERT(CL):0.293 N 999 240
HORZ(LL):0.048 K - -
HORZ(TL):0.111 K - -
Creep Factor: 2.0
Max TC CSI:0.109
Max BC CSI:0.185
Max W eb CSI:0.758
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T13
Ply: 1
Qty:2
SEQN:13966 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T334
DrwNo:079.20.1313.32847
AK /DF 03/19/2020
W4
W5
W7
W8
55'4"
8'8"6
8'8"6
17'5"9
8'9"4
26'0"3
8'6"10
29'3"13
3'3"10
37'10"7
8'6"10
46'7"10
8'9"4
55'4"
8'8"6
8'7"8
8'7"8
17'2"15
8'7"8
26'0"3
8'9"4
29'2"1
3'1"14
38'1"1
8'11"
46'8"8
8'7"8
55'4"
8'7"81'8"1'8"
8"311'6"412'2"4(WB1)
(W B2)(WB2)
(W B1)
20'A
B
C
D
E F
G
H
I
J
KLMNOPQ
5 12
5X8(A1)10X10
10X10
10X10
10X10
8X8
3X4 10X10
8X8
10X10
10X10
10X10
10X10 5X8(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x8 SP 2400f-2.0E;
Bot chord: 2x8 SP 2400f-2.0E;
Webs: 2x4 SP #2; W4,W5,W7,W8 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 2171 /-/-/1425 /915 /384
I 2171 /-/-/1425 /915 /-
Wind reactions based on MWFRS
Q Brg Width = 8.0 Min Req =3.5
I Brg Width = 8.0 Min Req =3.5
Bearings Q & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 3491 -4397
C - D 3057 -3725
D - E 2558 -2889
E - F 2500 -2582
Chords Tens.Comp.
F - G 2558 -2889
G - H 3054 -3721
H - I 3493 -4399
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3983 -2977
P - O 3982 -2977
O - N 3347 -2424
N - M 2568 -1678
Chords Tens.Comp.
M - L 3343 -2441
L - K 3984 -2998
K - I 3984 -2998
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 669 -679
O - D 519 -285
D - N 979 -1022
E - N 725 -608
Webs Tens.Comp.
M - F 725 -719
M - G 965 -1005
G - L 511 -277
L - H 675 -685
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 5.53 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.127 N 999 360
VERT(CL):0.293 N 999 240
HORZ(LL):0.048 K - -
HORZ(TL):0.111 K - -
Creep Factor: 2.0
Max TC CSI:0.109
Max BC CSI:0.185
Max W eb CSI:0.758
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T13
Ply: 1
Qty:2
SEQN:13966 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T334
DrwNo:079.20.1313.32847
AK /DF 03/19/2020
W4
W5
W7
W8
55'4"
8'8"6
8'8"6
17'5"9
8'9"4
26'0"3
8'6"10
29'3"13
3'3"10
37'10"7
8'6"10
46'7"10
8'9"4
55'4"
8'8"6
8'7"8
8'7"8
17'2"15
8'7"8
26'0"3
8'9"4
29'2"1
3'1"14
38'1"1
8'11"
46'8"8
8'7"8
55'4"
8'7"81'8"1'8"
8"311'6"412'2"4(WB1)
(W B2)(WB2)
(W B1)
20'A
B
C
D
E F
G
H
I
J
KLMNOPQ
5 12
5X8(A1)10X10
10X10
10X10
10X10
8X8
3X4 10X10
8X8
10X10
10X10
10X10
10X10 5X8(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 664 /-/-/523 /203 /163
F 385 /-/-/274 /162 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.3 Min Req =1.5
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1166 -1582
Chords Tens.Comp.
C - D 331 -563
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 503 -543
Chords Tens.Comp.
G - F 498 -545
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - F 566 -520
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.014 G 999 360
VERT(CL):0.033 G 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.467
Max BC CSI:0.436
Max W eb CSI:0.246
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T19
Ply: 1
Qty:17
SEQN:13037 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T307
DrwNo:079.20.1313.36356
AK /DF 03/19/2020
8"8'11"5
4'9"10
4'9"10
9'7"5
4'9"10
4'7"14
4'7"14
9'7"5
4'11"61'8"
6"1 3'8"84'0"1312'A
B
C
D
E
FG
4 12
2X5(C3)3X4(C3)
3X4
1.5X4
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 664 /-/-/523 /203 /163
F 385 /-/-/274 /162 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.3 Min Req =1.5
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1166 -1582
Chords Tens.Comp.
C - D 331 -563
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 503 -543
Chords Tens.Comp.
G - F 498 -545
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - F 566 -520
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.014 G 999 360
VERT(CL):0.033 G 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.467
Max BC CSI:0.436
Max W eb CSI:0.246
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T19
Ply: 1
Qty:17
SEQN:13037 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T307
DrwNo:079.20.1313.36356
AK /DF 03/19/2020
8"8'11"5
4'9"10
4'9"10
9'7"5
4'9"10
4'7"14
4'7"14
9'7"5
4'11"61'8"
6"1 3'8"84'0"1312'A
B
C
D
E
FG
4 12
2X5(C3)3X4(C3)
3X4
1.5X4
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.381'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 481 /-/-/372 /137 /138
E 401 /-/-/298 /172 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
E Brg Width = 3.3 Min Req =1.5
Bearings A & E Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 864 -1125
Chords Tens.Comp.
B - C 429 -614
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - F 572 -635
Chords Tens.Comp.
F - E 567 -636
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 665 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 B 999 360
VERT(CL):0.023 F 999 240
HORZ(LL):-0.005 B - -
HORZ(TL):0.008 E - -
Creep Factor: 2.0
Max TC CSI:0.436
Max BC CSI:0.299
Max W eb CSI:0.266
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T19A
Ply: 1
Qty:1
SEQN:13040 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T313
DrwNo:079.20.1313.27075
AK /DF 03/19/2020
8"8'11"5
4'9"10
4'9"10
9'7"5
4'9"10
4'7"14
4'7"14
9'7"5
4'11"6
6"1 3'8"812'
A
B
C
D
EF
4 12
2X5(C3)3X4(C3)
3X4
1.5X4
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.381'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 481 /-/-/372 /137 /138
E 401 /-/-/298 /172 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
E Brg Width = 3.3 Min Req =1.5
Bearings A & E Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 864 -1125
Chords Tens.Comp.
B - C 429 -614
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - F 572 -635
Chords Tens.Comp.
F - E 567 -636
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 665 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 B 999 360
VERT(CL):0.023 F 999 240
HORZ(LL):-0.005 B - -
HORZ(TL):0.008 E - -
Creep Factor: 2.0
Max TC CSI:0.436
Max BC CSI:0.299
Max W eb CSI:0.266
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T19A
Ply: 1
Qty:1
SEQN:13040 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T313
DrwNo:079.20.1313.27075
AK /DF 03/19/2020
8"8'11"5
4'9"10
4'9"10
9'7"5
4'9"10
4'7"14
4'7"14
9'7"5
4'11"6
6"1 3'8"812'
A
B
C
D
EF
4 12
2X5(C3)3X4(C3)
3X4
1.5X4
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 5.02
BC: From 10 plf at 0.00 to 10 plf at 5.02
BC: 268 lb Conc. Load at 1.25
BC: 604 lb Conc. Load at 3.25
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D 739 /-/-/-/270 /-
C 546 /-/-/-/205 /-
Wind reactions based on MWFRS
D Brg Width = 3.5 Min Req =1.5
C Brg Width = -Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.012 C 803 360
VERT(CL):-0.028 C 999 240
HORZ(LL):0.006 B - -
HORZ(TL):0.013 B - -
Creep Factor: 2.0
Max TC CSI:0.503
Max BC CSI:0.792
Max W eb CSI:0.076
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:13005 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T299
DrwNo:079.20.1313.35857
AK /DF 03/19/2020
8"4'4"4
5'0"4
5'0"4
6"1 2'2"212'
A
B
CD
4 12
2X4(A1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 5.02
BC: From 10 plf at 0.00 to 10 plf at 5.02
BC: 268 lb Conc. Load at 1.25
BC: 604 lb Conc. Load at 3.25
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D 739 /-/-/-/270 /-
C 546 /-/-/-/205 /-
Wind reactions based on MWFRS
D Brg Width = 3.5 Min Req =1.5
C Brg Width = -Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.012 C 803 360
VERT(CL):-0.028 C 999 240
HORZ(LL):0.006 B - -
HORZ(TL):0.013 B - -
Creep Factor: 2.0
Max TC CSI:0.503
Max BC CSI:0.792
Max W eb CSI:0.076
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:13005 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T299
DrwNo:079.20.1313.35857
AK /DF 03/19/2020
8"4'4"4
5'0"4
5'0"4
6"1 2'2"212'
A
B
CD
4 12
2X4(A1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 5.02
TC: From 36 plf at 5.02 to 36 plf at 10.60
TC: From 72 plf at 10.60 to 72 plf at 30.28
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.05
BC: From 10 plf at 5.05 to 10 plf at 10.60
BC: From 20 plf at 10.60 to 20 plf at 30.28
TC: 280 lb Conc. Load at 5.05
TC: 115 lb Conc. Load at 7.08
TC: 136 lb Conc. Load at 9.08
BC: 119 lb Conc. Load at 5.05
BC: 66 lb Conc. Load at 7.08
BC: 80 lb Conc. Load at 9.08
BC: 546 lb Conc. Load at 10.60
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2386 /-/-/-/913 /-
H 1633 /-/-/-/613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =2.1
H Brg Width = 3.3 Min Req =1.5
Bearings B & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 956 -2573
C - D 1521 -4064
Chords Tens.Comp.
D - E 1502 -4023
E - F 509 -1338
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 2397 -885
L - K 2398 -880
K - J 4096 -1540
Chords Tens.Comp.
J - I 4011 -1507
I - H 1201 -452
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 1766 -675
E - I 1072 -2848
Webs Tens.Comp.
I - F 775 -216
F - H 522 -1386
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.245 J 999 360
VERT(CL):0.560 J 633 240
HORZ(LL):-0.070 G - -
HORZ(TL):0.160 G - -
Creep Factor: 2.0
Max TC CSI:0.330
Max BC CSI:0.862
Max W eb CSI:0.734
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T21
Ply: 2
Qty:1
SEQN:13457 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T353
DrwNo:079.20.1313.26640
AK /DF 03/19/2020
2 Complete Trusses Required
W6
W9
8"29'7"5
5'0"4
5'0"4
10'6"
5'5"12
15'8"4
5'2"4
23'1"8
7'5"4
30'3"5
7'1"12
5'2"
5'2"
10'2"8
5'0"8
15'4"12
5'2"4
22'10"
7'5"4
30'3"5
7'5"41'8"
6"1 7'0"82'2"27'6"1412'A
B
C D E
F
G
HIJKL
4 12
3X5(A1)
5X8
1.5X4 4X5
3X4
7X6
7X6
5X5
3X4
1.5X4
7X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x6 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 5.02
TC: From 36 plf at 5.02 to 36 plf at 10.60
TC: From 72 plf at 10.60 to 72 plf at 30.28
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.05
BC: From 10 plf at 5.05 to 10 plf at 10.60
BC: From 20 plf at 10.60 to 20 plf at 30.28
TC: 280 lb Conc. Load at 5.05
TC: 115 lb Conc. Load at 7.08
TC: 136 lb Conc. Load at 9.08
BC: 119 lb Conc. Load at 5.05
BC: 66 lb Conc. Load at 7.08
BC: 80 lb Conc. Load at 9.08
BC: 546 lb Conc. Load at 10.60
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2386 /-/-/-/913 /-
H 1633 /-/-/-/613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =2.1
H Brg Width = 3.3 Min Req =1.5
Bearings B & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 956 -2573
C - D 1521 -4064
Chords Tens.Comp.
D - E 1502 -4023
E - F 509 -1338
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 2397 -885
L - K 2398 -880
K - J 4096 -1540
Chords Tens.Comp.
J - I 4011 -1507
I - H 1201 -452
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 1766 -675
E - I 1072 -2848
Webs Tens.Comp.
I - F 775 -216
F - H 522 -1386
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.245 J 999 360
VERT(CL):0.560 J 633 240
HORZ(LL):-0.070 G - -
HORZ(TL):0.160 G - -
Creep Factor: 2.0
Max TC CSI:0.330
Max BC CSI:0.862
Max W eb CSI:0.734
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T21
Ply: 2
Qty:1
SEQN:13457 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T353
DrwNo:079.20.1313.26640
AK /DF 03/19/2020
2 Complete Trusses Required
W6
W9
8"29'7"5
5'0"4
5'0"4
10'6"
5'5"12
15'8"4
5'2"4
23'1"8
7'5"4
30'3"5
7'1"12
5'2"
5'2"
10'2"8
5'0"8
15'4"12
5'2"4
22'10"
7'5"4
30'3"5
7'5"41'8"
6"1 7'0"82'2"27'6"1412'A
B
C D E
F
G
HIJKL
4 12
3X5(A1)
5X8
1.5X4 4X5
3X4
7X6
7X6
5X5
3X4
1.5X4
7X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x6 SP #2;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1588 /-/-/1011 /548 /312
L 1344 /-/-/828 /530 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 276 -498
C - D 765 -1210
D - E 1792 -2514
E - F 1876 -2554
F - G 1849 -2938
Chords Tens.Comp.
G - H 1916 -3001
H - I 881 -1429
I - J 303 -535
J - K 348 -529
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1118 -949
T - R 2267 -1784
R - Q 2975 -2035
Chords Tens.Comp.
Q - P 2996 -2085
P - M 1285 -928
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 528 -773
D - V 409 -465
D - T 1285 -974
V - T 1054 -901
T - F 446 -438
F - R 713 -388
Webs Tens.Comp.
H - P 1203 -1777
P - I 647 -403
I - M 697 -962
M - K 899 -649
K - L 519 -651
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 G 999 360
VERT(CL):0.474 G 746 240
HORZ(LL):0.068 L - -
HORZ(TL):0.158 L - -
Creep Factor: 2.0
Max TC CSI:0.215
Max BC CSI:0.345
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T22
Ply: 2
Qty:1
SEQN:13023 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T345
DrwNo:079.20.1313.28650
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B1 B4
W10
W16
8"29'7"5
3'4"4
3'4"4
7'2"4
3'10"
12'8"
5'5"12
17'10"4
5'2"4
22'4"10
4'6"6
26'9"4
4'4"10
30'3"5
3'6"1
3'4"4
3'4"4
7'
3'7"12
12'4"8
5'4"8
17'8"8
5'4"
22'1"2
4'4"10
26'7"8
4'6"6
30'3"5
3'7"131'8"
6"1 7'0"82'10"131'7'4"1312'A
B
C D
E F G H
I
J
K
L
M NOPQR
STUV
4 12
3X4(C6)
3X6(C6)
3X5
3X5
1.5X4
5X81.5X6
4X4
5X8
5X5
3X5
1.5X4
5X81.5X4 6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x6 SP #2;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1588 /-/-/1011 /548 /312
L 1344 /-/-/828 /530 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 276 -498
C - D 765 -1210
D - E 1792 -2514
E - F 1876 -2554
F - G 1849 -2938
Chords Tens.Comp.
G - H 1916 -3001
H - I 881 -1429
I - J 303 -535
J - K 348 -529
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1118 -949
T - R 2267 -1784
R - Q 2975 -2035
Chords Tens.Comp.
Q - P 2996 -2085
P - M 1285 -928
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 528 -773
D - V 409 -465
D - T 1285 -974
V - T 1054 -901
T - F 446 -438
F - R 713 -388
Webs Tens.Comp.
H - P 1203 -1777
P - I 647 -403
I - M 697 -962
M - K 899 -649
K - L 519 -651
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 G 999 360
VERT(CL):0.474 G 746 240
HORZ(LL):0.068 L - -
HORZ(TL):0.158 L - -
Creep Factor: 2.0
Max TC CSI:0.215
Max BC CSI:0.345
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T22
Ply: 2
Qty:1
SEQN:13023 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T345
DrwNo:079.20.1313.28650
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B1 B4
W10
W16
8"29'7"5
3'4"4
3'4"4
7'2"4
3'10"
12'8"
5'5"12
17'10"4
5'2"4
22'4"10
4'6"6
26'9"4
4'4"10
30'3"5
3'6"1
3'4"4
3'4"4
7'
3'7"12
12'4"8
5'4"8
17'8"8
5'4"
22'1"2
4'4"10
26'7"8
4'6"6
30'3"5
3'7"131'8"
6"1 7'0"82'10"131'7'4"1312'A
B
C D
E F G H
I
J
K
L
M NOPQR
STUV
4 12
3X4(C6)
3X6(C6)
3X5
3X5
1.5X4
5X81.5X6
4X4
5X8
5X5
3X5
1.5X4
5X81.5X4 6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W16 2x4 SP 2250f-1.9E;
W17 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1088 /-/-/765 /372 /225
L 936 /-/-/661 /371 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 585 -912
C - D 522 -827
D - E 1306 -1783
E - F 1018 -1449
F - G 1185 -1849
Chords Tens.Comp.
G - H 1246 -1927
H - I 724 -1142
I - J 392 -633
J - K 440 -651
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 746 -652
U - S 1725 -1431
S - R 1377 -1099
Chords Tens.Comp.
R - Q 1870 -1322
Q - P 1926 -1370
P - M 1037 -763
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 957 -757
W -U 707 -625
E - S 436 -457
F - R 508 -303
H - P 664 -970
Webs Tens.Comp.
P - I 450 -288
I - M 417 -569
M - K 826 -609
K - L 369 -445
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 15.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.168 G 999 360
VERT(CL):0.387 G 999 240
HORZ(LL):0.056 L - -
HORZ(TL):0.129 L - -
Creep Factor: 2.0
Max TC CSI:0.262
Max BC CSI:0.453
Max W eb CSI:0.270
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T23
Ply: 2
Qty:1
SEQN:13454 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T326
DrwNo:079.20.1313.37636
AK /DF 03/19/2020
2 Complete Trusses Required
W16
W17
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
8'3"4
1'6"12
13'9"
5'5"12
18'11"4
5'2"4
22'11"2
3'11"14
26'9"4
3'10"2
33'7"5
6'10"1
3'4"4
3'4"4
7'
3'7"12
8'3"4
1'3"4
13'5"8
5'2"4
18'9"8
5'4"
22'7"10
3'10"2
26'7"8
3'11"14
33'7"5
6'11"131'8"
6"1 8'1"133'3"21'8'6"212'A
B
C D
E
F G H
I
J
K
L
M NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)5X81.5X4
5X8
5X8
5X5
1.5X4
5X81.5X4 6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W16 2x4 SP 2250f-1.9E;
W17 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1088 /-/-/765 /372 /225
L 936 /-/-/661 /371 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 585 -912
C - D 522 -827
D - E 1306 -1783
E - F 1018 -1449
F - G 1185 -1849
Chords Tens.Comp.
G - H 1246 -1927
H - I 724 -1142
I - J 392 -633
J - K 440 -651
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 746 -652
U - S 1725 -1431
S - R 1377 -1099
Chords Tens.Comp.
R - Q 1870 -1322
Q - P 1926 -1370
P - M 1037 -763
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 957 -757
W -U 707 -625
E - S 436 -457
F - R 508 -303
H - P 664 -970
Webs Tens.Comp.
P - I 450 -288
I - M 417 -569
M - K 826 -609
K - L 369 -445
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 15.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.168 G 999 360
VERT(CL):0.387 G 999 240
HORZ(LL):0.056 L - -
HORZ(TL):0.129 L - -
Creep Factor: 2.0
Max TC CSI:0.262
Max BC CSI:0.453
Max W eb CSI:0.270
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T23
Ply: 2
Qty:1
SEQN:13454 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T326
DrwNo:079.20.1313.37636
AK /DF 03/19/2020
2 Complete Trusses Required
W16
W17
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
8'3"4
1'6"12
13'9"
5'5"12
18'11"4
5'2"4
22'11"2
3'11"14
26'9"4
3'10"2
33'7"5
6'10"1
3'4"4
3'4"4
7'
3'7"12
8'3"4
1'3"4
13'5"8
5'2"4
18'9"8
5'4"
22'7"10
3'10"2
26'7"8
3'11"14
33'7"5
6'11"131'8"
6"1 8'1"133'3"21'8'6"212'A
B
C D
E
F G H
I
J
K
L
M NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)5X81.5X4
5X8
5X8
5X5
1.5X4
5X81.5X4 6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x4 SP 2700f-2.2E;
W14 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1235 /595 /360
K 1498 /-/-/1046 /594 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 926 -1464
C - D 823 -1322
D - E 2108 -2857
E - F 1416 -2046
Chords Tens.Comp.
F - G 1499 -2313
G - H 1431 -2238
H - I 627 -1033
I - J 721 -1047
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1193 -1030
S - Q 2762 -2309
Q - P 1927 -1549
Chords Tens.Comp.
P - O 2330 -1677
O - L 2233 -1604
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 420 -467
D - S 1538 -1246
U - S 1129 -985
S - E 462 -377
E - Q 815 -895
Webs Tens.Comp.
F - P 437 -242
H - L 965 -1388
L - J 1328 -995
J - K 594 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 G 999 360
VERT(CL):0.460 G 856 240
HORZ(LL):0.078 K - -
HORZ(TL):0.180 K - -
Creep Factor: 2.0
Max TC CSI:0.435
Max BC CSI:0.612
Max W eb CSI:0.402
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T24
Ply: 2
Qty:1
SEQN:13297 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T325
DrwNo:079.20.1313.37214
AK /DF 03/19/2020
2 Complete Trusses Required
W11
W14
W15
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
10'3"4
3'6"12
15'9"
5'5"12
20'11"4
5'2"4
26'9"4
5'10"
33'7"5
6'10"1
3'4"4
3'4"4
7'
3'7"12
10'3"4
3'3"4
15'5"8
5'2"4
20'7"12
5'2"4
26'7"8
5'11"12
33'7"5
6'11"131'8"
6"1 8'1"133'11"21'8'6"212'A
B C D
E
F G H
I
J
K
LMNOPQ
RSTU
4 12
3X5(C3)3X4(C3)
3X4
4X4
4X4 6X81.5X4
3X4
5X8
3X4 5X5
3X4
3X4
5X5
1.5X4
6X81.5X4
3X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x4 SP 2700f-2.2E;
W14 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1235 /595 /360
K 1498 /-/-/1046 /594 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 926 -1464
C - D 823 -1322
D - E 2108 -2857
E - F 1416 -2046
Chords Tens.Comp.
F - G 1499 -2313
G - H 1431 -2238
H - I 627 -1033
I - J 721 -1047
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1193 -1030
S - Q 2762 -2309
Q - P 1927 -1549
Chords Tens.Comp.
P - O 2330 -1677
O - L 2233 -1604
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 420 -467
D - S 1538 -1246
U - S 1129 -985
S - E 462 -377
E - Q 815 -895
Webs Tens.Comp.
F - P 437 -242
H - L 965 -1388
L - J 1328 -995
J - K 594 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 G 999 360
VERT(CL):0.460 G 856 240
HORZ(LL):0.078 K - -
HORZ(TL):0.180 K - -
Creep Factor: 2.0
Max TC CSI:0.435
Max BC CSI:0.612
Max W eb CSI:0.402
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T24
Ply: 2
Qty:1
SEQN:13297 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T325
DrwNo:079.20.1313.37214
AK /DF 03/19/2020
2 Complete Trusses Required
W11
W14
W15
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
10'3"4
3'6"12
15'9"
5'5"12
20'11"4
5'2"4
26'9"4
5'10"
33'7"5
6'10"1
3'4"4
3'4"4
7'
3'7"12
10'3"4
3'3"4
15'5"8
5'2"4
20'7"12
5'2"4
26'7"8
5'11"12
33'7"5
6'11"131'8"
6"1 8'1"133'11"21'8'6"212'A
B C D
E
F G H
I
J
K
LMNOPQ
RSTU
4 12
3X5(C3)3X4(C3)
3X4
4X4
4X4 6X81.5X4
3X4
5X8
3X4 5X5
3X4
3X4
5X5
1.5X4
6X81.5X4
3X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B3,B5,
B6 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
W20 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1246 /594 /360
K 1498 /-/-/1033 /593 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 886 -1400
C - D 805 -1310
D - E 2133 -2896
E - F 1255 -1838
Chords Tens.Comp.
F - G 1225 -1873
G - H 1031 -1648
H - I 1236 -1842
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1185 -1016
Y - W 2805 -2338
W -V 1716 -1386
V - U 1878 -1372
Chords Tens.Comp.
S - Q 1732 -1296
Q - P 1740 -1305
P - M 1735 -1301
M - L 1648 -1213
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AA 422 -479
D - Y 1588 -1290
AA- Y 1118 -966
Y - E 434 -340
E - W 982 -1122
Webs Tens.Comp.
U - H 537 -699
U - S 1861 -1328
S - I 922 -592
I - L 1417 -1874
L - K 685 -824
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 V 999 360
VERT(CL):0.404 V 973 240
HORZ(LL):0.105 R - -
HORZ(TL):0.242 R - -
Creep Factor: 2.0
Max TC CSI:0.382
Max BC CSI:0.449
Max W eb CSI:0.999
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T25
Ply: 2
Qty:1
SEQN:13307 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T329
DrwNo:079.20.1313.41147
AK /DF 03/19/2020
2 Complete Trusses Required
T3
B3
B5 B6
W5
W20
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
12'3"4
5'6"12
17'9"
5'5"12
22'11"4
5'2"4
25'8"
2'8"12
33'7"5
7'11"5
3'4"4
3'4"4
7'
3'7"12
12'3"4
5'3"4
17'5"8
5'2"4
22'9"8
5'4"
25'8"
2'10"8
27'1"12
1'5"12
27'3"8
1"12
29'4"8
2'1"
29'6"4
1"12
31'1"12
1'7"8
31'3"8
1"12
33'1"13
1'10"5
33'7"5
5"8
1'8"
6"1 8'1"134'7"21'2'4"8'6"212'A
B C D
E
F G H
I
J
K
LM
NO
PQ
R
STUVW
XYZAA
4 12
3X5(C3)3X4(C3)
4X4
6X81.5X4
5X8
5X5 3X12
5X5
5X81.5X4
3X5
3X31.5X4 1.5X4 1.5X4 5X5
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B3,B5,
B6 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
W20 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1246 /594 /360
K 1498 /-/-/1033 /593 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 886 -1400
C - D 805 -1310
D - E 2133 -2896
E - F 1255 -1838
Chords Tens.Comp.
F - G 1225 -1873
G - H 1031 -1648
H - I 1236 -1842
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1185 -1016
Y - W 2805 -2338
W -V 1716 -1386
V - U 1878 -1372
Chords Tens.Comp.
S - Q 1732 -1296
Q - P 1740 -1305
P - M 1735 -1301
M - L 1648 -1213
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AA 422 -479
D - Y 1588 -1290
AA- Y 1118 -966
Y - E 434 -340
E - W 982 -1122
Webs Tens.Comp.
U - H 537 -699
U - S 1861 -1328
S - I 922 -592
I - L 1417 -1874
L - K 685 -824
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 V 999 360
VERT(CL):0.404 V 973 240
HORZ(LL):0.105 R - -
HORZ(TL):0.242 R - -
Creep Factor: 2.0
Max TC CSI:0.382
Max BC CSI:0.449
Max W eb CSI:0.999
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T25
Ply: 2
Qty:1
SEQN:13307 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T329
DrwNo:079.20.1313.41147
AK /DF 03/19/2020
2 Complete Trusses Required
T3
B3
B5 B6
W5
W20
8"32'11"5
3'4"4
3'4"4
6'8"8
3'4"4
12'3"4
5'6"12
17'9"
5'5"12
22'11"4
5'2"4
25'8"
2'8"12
33'7"5
7'11"5
3'4"4
3'4"4
7'
3'7"12
12'3"4
5'3"4
17'5"8
5'2"4
22'9"8
5'4"
25'8"
2'10"8
27'1"12
1'5"12
27'3"8
1"12
29'4"8
2'1"
29'6"4
1"12
31'1"12
1'7"8
31'3"8
1"12
33'1"13
1'10"5
33'7"5
5"8
1'8"
6"1 8'1"134'7"21'2'4"8'6"212'A
B C D
E
F G H
I
J
K
LM
NO
PQ
R
STUVW
XYZAA
4 12
3X5(C3)3X4(C3)
4X4
6X81.5X4
5X8
5X5 3X12
5X5
5X81.5X4
3X5
3X31.5X4 1.5X4 1.5X4 5X5
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2700f-2.2E;
Webs: 2x4 SP #2; W13 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1258 /595 /360
K 1498 /-/-/1023 /595 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 957 -1457
C - D 673 -1136
D - E 1656 -2364
E - F 1110 -1619
Chords Tens.Comp.
F - G 1017 -1543
G - H 1017 -1543
H - I 618 -994
I - J 720 -1044
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 997 -881
D - S 2129 -1754
U - T 974 -857
S - Q 2214 -1822
Chords Tens.Comp.
Q - P 2202 -1814
P - O 1504 -1218
O - L 1239 -897
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - T 812 -914
E - P 642 -752
O - H 380 -320
Webs Tens.Comp.
H - L 424 -661
L - J 1325 -996
J - K 601 -713
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 R 999 360
VERT(CL):0.373 R 999 240
HORZ(LL):0.062 K - -
HORZ(TL):0.145 K - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.468
Max W eb CSI:0.351
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T26
Ply: 2
Qty:1
SEQN:13314 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T324
DrwNo:079.20.1313.27979
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B2
W13
W14
8"32'11"5
8'11"1
8'11"1
14'3"4
5'4"3
19'7"4
5'4"
24'11"4
5'4"
26'9"4
1'10"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'9"5
1'9"5
14'3"4
5'5"15
19'7"4
5'4"
26'7"8
7'0"4
33'7"5
6'11"131'8"
6"1 8'1"135'3"21'8'6"212'A
B C D
E
F G H
I
J
K
LMNOPQ
RSTU
4 12
3X5(C3)3X4(C3)
3X46X12
3X4
3X4
5X8
5X5 3X8
5X5
6X8
3X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2700f-2.2E;
Webs: 2x4 SP #2; W13 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1258 /595 /360
K 1498 /-/-/1023 /595 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 957 -1457
C - D 673 -1136
D - E 1656 -2364
E - F 1110 -1619
Chords Tens.Comp.
F - G 1017 -1543
G - H 1017 -1543
H - I 618 -994
I - J 720 -1044
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 997 -881
D - S 2129 -1754
U - T 974 -857
S - Q 2214 -1822
Chords Tens.Comp.
Q - P 2202 -1814
P - O 1504 -1218
O - L 1239 -897
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - T 812 -914
E - P 642 -752
O - H 380 -320
Webs Tens.Comp.
H - L 424 -661
L - J 1325 -996
J - K 601 -713
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 R 999 360
VERT(CL):0.373 R 999 240
HORZ(LL):0.062 K - -
HORZ(TL):0.145 K - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.468
Max W eb CSI:0.351
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T26
Ply: 2
Qty:1
SEQN:13314 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T324
DrwNo:079.20.1313.27979
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B2
W13
W14
8"32'11"5
8'11"1
8'11"1
14'3"4
5'4"3
19'7"4
5'4"
24'11"4
5'4"
26'9"4
1'10"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'9"5
1'9"5
14'3"4
5'5"15
19'7"4
5'4"
26'7"8
7'0"4
33'7"5
6'11"131'8"
6"1 8'1"135'3"21'8'6"212'A
B C D
E
F G H
I
J
K
LMNOPQ
RSTU
4 12
3X5(C3)3X4(C3)
3X46X12
3X4
3X4
5X8
5X5 3X8
5X5
6X8
3X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1737 /-/-/1269 /594 /360
K 1497 /-/-/1012 /595 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 927 -1456
C - D 677 -1138
D - E 1769 -2528
E - F 1330 -1907
Chords Tens.Comp.
F - G 993 -1431
G - H 835 -1248
H - I 576 -920
I - J 681 -1023
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1003 -889
D - T 2298 -1873
V - U 978 -864
T - R 2374 -1934
Chords Tens.Comp.
R - Q 2358 -1922
Q - P 1765 -1451
P - O 1333 -1083
O - L 1243 -931
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 827 -929
E - Q 497 -620
F - P 440 -517
H - L 338 -430
Webs Tens.Comp.
L - I 471 -545
L - J 1307 -964
J - K 605 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.130 Q 999 360
VERT(CL):0.301 Q 999 240
HORZ(LL):0.058 K - -
HORZ(TL):0.135 K - -
Creep Factor: 2.0
Max TC CSI:0.348
Max BC CSI:0.441
Max W eb CSI:0.339
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T27
Ply: 2
Qty:1
SEQN:13326 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T323
DrwNo:079.20.1313.28447
AK /DF 03/19/2020
2 Complete Trusses Required
T4
B2
W14
W15
8"32'11"5
7'5"3
7'5"3
11'7"10
4'2"7
16'3"4
4'7"10
21'9"
5'5"12
26'11"4
5'2"4
33'7"5
6'8"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
11'4"2
4'4"2
16'3"4
4'11"2
21'5"8
5'2"4
26'7"12
5'2"4
33'7"5
6'11"91'8"
6"1 8'1"135'11"21'8'6"212'A
B
C D
E
F
G H I
J
K
LMNOPQ
RSTUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4 4X4
1.5X4
1.5X4
5X5
5X8
5X5
6X81.5X4
5X5
3X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1737 /-/-/1269 /594 /360
K 1497 /-/-/1012 /595 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 927 -1456
C - D 677 -1138
D - E 1769 -2528
E - F 1330 -1907
Chords Tens.Comp.
F - G 993 -1431
G - H 835 -1248
H - I 576 -920
I - J 681 -1023
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1003 -889
D - T 2298 -1873
V - U 978 -864
T - R 2374 -1934
Chords Tens.Comp.
R - Q 2358 -1922
Q - P 1765 -1451
P - O 1333 -1083
O - L 1243 -931
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 827 -929
E - Q 497 -620
F - P 440 -517
H - L 338 -430
Webs Tens.Comp.
L - I 471 -545
L - J 1307 -964
J - K 605 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.130 Q 999 360
VERT(CL):0.301 Q 999 240
HORZ(LL):0.058 K - -
HORZ(TL):0.135 K - -
Creep Factor: 2.0
Max TC CSI:0.348
Max BC CSI:0.441
Max W eb CSI:0.339
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T27
Ply: 2
Qty:1
SEQN:13326 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T323
DrwNo:079.20.1313.28447
AK /DF 03/19/2020
2 Complete Trusses Required
T4
B2
W14
W15
8"32'11"5
7'5"3
7'5"3
11'7"10
4'2"7
16'3"4
4'7"10
21'9"
5'5"12
26'11"4
5'2"4
33'7"5
6'8"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
11'4"2
4'4"2
16'3"4
4'11"2
21'5"8
5'2"4
26'7"12
5'2"4
33'7"5
6'11"91'8"
6"1 8'1"135'11"21'8'6"212'A
B
C D
E
F
G H I
J
K
LMNOPQ
RSTUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4 4X4
1.5X4
1.5X4
5X5
5X8
5X5
6X81.5X4
5X5
3X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1882 /-/-/1385 /644 /390
K 1622 /-/-/1086 /644 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.7
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 996 -1563
C - D 734 -1238
D - E 1820 -2637
E - F 1299 -1883
Chords Tens.Comp.
F - G 970 -1391
G - H 762 -1121
H - I 431 -698
I - J 513 -778
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1091 -964
D - V 2380 -1926
X - W 1064 -937
V - T 2472 -2000
T - S 2457 -1989
Chords Tens.Comp.
S - R 1735 -1422
R - Q 1292 -1052
Q - N 1110 -841
N - L 1091 -825
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - W 889 -1001
E - S 599 -758
F - R 465 -556
G - R 408 -295
Webs Tens.Comp.
H - L 454 -582
L - I 388 -444
L - J 1164 -869
J - K 648 -774
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 26.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.162 U 999 360
VERT(CL):0.381 U 999 240
HORZ(LL):0.069 K - -
HORZ(TL):0.161 K - -
Creep Factor: 2.0
Max TC CSI:0.641
Max BC CSI:0.582
Max W eb CSI:0.444
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T28
Ply: 2
Qty:1
SEQN:13411 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T86
DrwNo:079.20.1313.27371
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'2"15
8'2"15
13'3"2
5'0"3
17'11"8
4'8"6
23'5"4
5'5"12
28'7"8
5'2"4
33'7"5
4'11"13
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'1"8
1'1"8
12'11"10
4'10"2
17'11"8
4'11"14
23'1"12
5'2"4
26'9"4
3'7"8
28'4"
1'6"12
33'7"5
5'3"51'8"
6"1 8'1"136'5"141'8'6"212'A
B C D
E
F
G H I
J
K
LMNOPQRST
UVWX
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4 1.5X4
5X5
5X5
5X8
1.5X41.5X4 6X8
1.5X4
5X5
3X5
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1882 /-/-/1385 /644 /390
K 1622 /-/-/1086 /644 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.7
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 996 -1563
C - D 734 -1238
D - E 1820 -2637
E - F 1299 -1883
Chords Tens.Comp.
F - G 970 -1391
G - H 762 -1121
H - I 431 -698
I - J 513 -778
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1091 -964
D - V 2380 -1926
X - W 1064 -937
V - T 2472 -2000
T - S 2457 -1989
Chords Tens.Comp.
S - R 1735 -1422
R - Q 1292 -1052
Q - N 1110 -841
N - L 1091 -825
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - W 889 -1001
E - S 599 -758
F - R 465 -556
G - R 408 -295
Webs Tens.Comp.
H - L 454 -582
L - I 388 -444
L - J 1164 -869
J - K 648 -774
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 26.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.162 U 999 360
VERT(CL):0.381 U 999 240
HORZ(LL):0.069 K - -
HORZ(TL):0.161 K - -
Creep Factor: 2.0
Max TC CSI:0.641
Max BC CSI:0.582
Max W eb CSI:0.444
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T28
Ply: 2
Qty:1
SEQN:13411 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T86
DrwNo:079.20.1313.27371
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'2"15
8'2"15
13'3"2
5'0"3
17'11"8
4'8"6
23'5"4
5'5"12
28'7"8
5'2"4
33'7"5
4'11"13
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'1"8
1'1"8
12'11"10
4'10"2
17'11"8
4'11"14
23'1"12
5'2"4
26'9"4
3'7"8
28'4"
1'6"12
33'7"5
5'3"51'8"
6"1 8'1"136'5"141'8'6"212'A
B C D
E
F
G H I
J
K
LMNOPQRST
UVWX
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4 1.5X4
5X5
5X5
5X8
1.5X41.5X4 6X8
1.5X4
5X5
3X5
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1882 /-/-/1399 /643 /390
K 1622 /-/-/1072 /645 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.7
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 991 -1557
C - D 732 -1241
D - E 1775 -2608
E - F 1264 -1856
Chords Tens.Comp.
F - G 823 -1204
G - H 529 -772
H - I 527 -770
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1095 -958
D - T 2348 -1874
V - U 1068 -930
T - R 2443 -1949
Chords Tens.Comp.
R - Q 2428 -1939
Q - P 1711 -1383
P - M 1105 -893
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 881 -1002
E - Q 587 -752
F - P 561 -696
G - P 410 -260
Webs Tens.Comp.
G - M 416 -445
M - I 828 -626
I - K 615 -810
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 26.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.170 S 999 360
VERT(CL):0.400 S 984 240
HORZ(LL):0.067 K - -
HORZ(TL):0.157 K - -
Creep Factor: 2.0
Max TC CSI:0.678
Max BC CSI:0.614
Max W eb CSI:0.351
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T29
Ply: 2
Qty:1
SEQN:13414 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T304
DrwNo:079.20.1313.34687
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"3
8'5"3
13'7"10
5'2"7
20'3"4
6'7"10
26'9"4
6'6"
30'11"4
4'2"
33'7"5
2'8"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
30'7"12
4'0"4
33'7"5
2'11"91'8"
6"1 8'1"137'3"21'8'6"212'A
B C D
E
F
G H I
J
KL
M NOPQR
STUV
4 12
3X5(C3)3X4(C3)
3X46X12
4X4
5X5
5X5
3X4
5X8
3X4
5X8 3X4
5X10(SRS)
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1882 /-/-/1399 /643 /390
K 1622 /-/-/1072 /645 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.7
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 991 -1557
C - D 732 -1241
D - E 1775 -2608
E - F 1264 -1856
Chords Tens.Comp.
F - G 823 -1204
G - H 529 -772
H - I 527 -770
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1095 -958
D - T 2348 -1874
V - U 1068 -930
T - R 2443 -1949
Chords Tens.Comp.
R - Q 2428 -1939
Q - P 1711 -1383
P - M 1105 -893
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 881 -1002
E - Q 587 -752
F - P 561 -696
G - P 410 -260
Webs Tens.Comp.
G - M 416 -445
M - I 828 -626
I - K 615 -810
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 26.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.170 S 999 360
VERT(CL):0.400 S 984 240
HORZ(LL):0.067 K - -
HORZ(TL):0.157 K - -
Creep Factor: 2.0
Max TC CSI:0.678
Max BC CSI:0.614
Max W eb CSI:0.351
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T29
Ply: 2
Qty:1
SEQN:13414 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T304
DrwNo:079.20.1313.34687
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"3
8'5"3
13'7"10
5'2"7
20'3"4
6'7"10
26'9"4
6'6"
30'11"4
4'2"
33'7"5
2'8"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
30'7"12
4'0"4
33'7"5
2'11"91'8"
6"1 8'1"137'3"21'8'6"212'A
B C D
E
F
G H I
J
KL
M NOPQR
STUV
4 12
3X5(C3)3X4(C3)
3X46X12
4X4
5X5
5X5
3X4
5X8
3X4
5X8 3X4
5X10(SRS)
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1737 /-/-/1323 /643 /368
L 1464 /-/-/965 /625 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 970 -1495
C - D 624 -1091
D - E 1926 -2774
E - F 1483 -2207
Chords Tens.Comp.
F - G 1002 -1486
G - H 655 -934
H - I 478 -643
I - J 479 -644
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 948 -802
D - V 2549 -2017
W -U 926 -779
V - T 2530 -2002
Chords Tens.Comp.
T - R 2606 -2060
R - Q 2047 -1594
Q - P 1360 -1076
P - M 850 -673
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 743 -875
E - R 454 -538
F - Q 546 -720
G - P 502 -635
Webs Tens.Comp.
H - P 415 -281
M - J 855 -642
J - L 527 -701
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.165 S 999 360
VERT(CL):0.388 S 999 240
HORZ(LL):0.062 L - -
HORZ(TL):0.145 L - -
Creep Factor: 2.0
Max TC CSI:0.312
Max BC CSI:0.554
Max W eb CSI:0.415
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T30
Ply: 2
Qty:1
SEQN:13420 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T220
DrwNo:079.20.1313.41897
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
4'8"7
4'8"7
9'8"3
4'11"12
16'1"10
6'5"7
22'3"4
6'1"10
26'9"4
4'6"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
4'6"11
2'0"1
6'6"12
2'0"1
7'
5"4
9'5"
2'5"
15'10"2
6'5"2
22'3"4
6'5"2
26'7"8
4'4"4
33'7"5
6'11"131'8"
6"1 7'11"21'8'6"212'A
B C D
E
F
G
H I J
L
M NOPQR
STUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4
5X5
5X5
5X8 1.5X4
5X81.5X4
5X5
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1737 /-/-/1323 /643 /368
L 1464 /-/-/965 /625 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 970 -1495
C - D 624 -1091
D - E 1926 -2774
E - F 1483 -2207
Chords Tens.Comp.
F - G 1002 -1486
G - H 655 -934
H - I 478 -643
I - J 479 -644
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 948 -802
D - V 2549 -2017
W -U 926 -779
V - T 2530 -2002
Chords Tens.Comp.
T - R 2606 -2060
R - Q 2047 -1594
Q - P 1360 -1076
P - M 850 -673
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 743 -875
E - R 454 -538
F - Q 546 -720
G - P 502 -635
Webs Tens.Comp.
H - P 415 -281
M - J 855 -642
J - L 527 -701
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.165 S 999 360
VERT(CL):0.388 S 999 240
HORZ(LL):0.062 L - -
HORZ(TL):0.145 L - -
Creep Factor: 2.0
Max TC CSI:0.312
Max BC CSI:0.554
Max W eb CSI:0.415
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T30
Ply: 2
Qty:1
SEQN:13420 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T220
DrwNo:079.20.1313.41897
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
4'8"7
4'8"7
9'8"3
4'11"12
16'1"10
6'5"7
22'3"4
6'1"10
26'9"4
4'6"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
4'6"11
2'0"1
6'6"12
2'0"1
7'
5"4
9'5"
2'5"
15'10"2
6'5"2
22'3"4
6'5"2
26'7"8
4'4"4
33'7"5
6'11"131'8"
6"1 7'11"21'8'6"212'A
B C D
E
F
G
H I J
L
M NOPQR
STUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4
5X5
5X5
5X8 1.5X4
5X81.5X4
5X5
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1310 /591 /381
K 1498 /-/-/989 /605 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 920 -1439
C - D 663 -1148
D - E 1609 -2411
E - F 1134 -1719
Chords Tens.Comp.
F - G 745 -1106
G - H 553 -752
H - I 457 -587
I - J 456 -586
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1013 -869
D - T 2171 -1701
V - U 988 -845
T - R 2258 -1769
Chords Tens.Comp.
R - Q 2245 -1759
Q - P 1585 -1240
P - O 997 -801
O - L 685 -550
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 800 -927
E - Q 548 -691
F - P 491 -656
P - G 389 -247
Webs Tens.Comp.
G - O 479 -594
H - O 487 -371
L - J 849 -660
J - K 552 -714
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 S 999 360
VERT(CL):0.372 S 999 240
HORZ(LL):0.060 K - -
HORZ(TL):0.141 K - -
Creep Factor: 2.0
Max TC CSI:0.464
Max BC CSI:0.517
Max W eb CSI:0.472
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T31
Ply: 2
Qty:1
SEQN:13425 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T300
DrwNo:079.20.1313.40399
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"3
8'5"3
13'7"10
5'2"7
20'6"12
6'11"2
24'3"4
3'8"8
26'9"4
2'6"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
24'3"4
4'
26'7"8
2'4"4
33'7"5
6'11"131'8"
6"1 8'7"21'8'11"712'A
B C D
E
F
G
H I J
K
LMNOPQR
STUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4
5X5
5X5
5X8 1.5X4
5X81.5X4 6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1740 /-/-/1310 /591 /381
K 1498 /-/-/989 /605 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 920 -1439
C - D 663 -1148
D - E 1609 -2411
E - F 1134 -1719
Chords Tens.Comp.
F - G 745 -1106
G - H 553 -752
H - I 457 -587
I - J 456 -586
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1013 -869
D - T 2171 -1701
V - U 988 -845
T - R 2258 -1769
Chords Tens.Comp.
R - Q 2245 -1759
Q - P 1585 -1240
P - O 997 -801
O - L 685 -550
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 800 -927
E - Q 548 -691
F - P 491 -656
P - G 389 -247
Webs Tens.Comp.
G - O 479 -594
H - O 487 -371
L - J 849 -660
J - K 552 -714
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 S 999 360
VERT(CL):0.372 S 999 240
HORZ(LL):0.060 K - -
HORZ(TL):0.141 K - -
Creep Factor: 2.0
Max TC CSI:0.464
Max BC CSI:0.517
Max W eb CSI:0.472
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T31
Ply: 2
Qty:1
SEQN:13425 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T300
DrwNo:079.20.1313.40399
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"3
8'5"3
13'7"10
5'2"7
20'6"12
6'11"2
24'3"4
3'8"8
26'9"4
2'6"
33'7"5
6'10"1
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
24'3"4
4'
26'7"8
2'4"4
33'7"5
6'11"131'8"
6"1 8'7"21'8'11"712'A
B C D
E
F
G
H I J
K
LMNOPQR
STUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4
5X5
5X5
5X8 1.5X4
5X81.5X4 6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1306 /594 /385
L 1496 /-/-/986 /605 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 935 -1438
C - D 669 -1145
D - E 1617 -2409
E - F 1138 -1713
Chords Tens.Comp.
F - G 753 -1109
G - H 440 -586
H - I 458 -526
I - J 456 -525
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1010 -863
D - U 2170 -1698
W -V 985 -838
U - S 2257 -1765
Chords Tens.Comp.
S - R 2244 -1756
R - Q 1579 -1231
Q - N 1002 -799
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - V 793 -924
E - R 554 -697
F - Q 485 -644
G - N 513 -660
Webs Tens.Comp.
N - J 694 -565
M - J 552 -667
M - K 694 -538
K - L 605 -744
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.61 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 T 999 360
VERT(CL):0.372 T 999 240
HORZ(LL):0.062 M - -
HORZ(TL):0.144 M - -
Creep Factor: 2.0
Max TC CSI:0.460
Max BC CSI:0.516
Max W eb CSI:0.420
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T32
Ply: 2
Qty:1
SEQN:13433 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T318
DrwNo:079.20.1313.27792
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'3"4
5'8"8
31'8"12
5'5"8
33'7"5
1'10"9
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
31'7"
4'11"8
33'7"5
2'0"51'8"
6"1 8'7"101'9'3"29'7"712'A
B C D
E
F
G
H I J
K
LM
NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
5X51.5X4
5X141.5X4 3X8
5X8
3X3
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1306 /594 /385
L 1496 /-/-/986 /605 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 935 -1438
C - D 669 -1145
D - E 1617 -2409
E - F 1138 -1713
Chords Tens.Comp.
F - G 753 -1109
G - H 440 -586
H - I 458 -526
I - J 456 -525
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1010 -863
D - U 2170 -1698
W -V 985 -838
U - S 2257 -1765
Chords Tens.Comp.
S - R 2244 -1756
R - Q 1579 -1231
Q - N 1002 -799
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - V 793 -924
E - R 554 -697
F - Q 485 -644
G - N 513 -660
Webs Tens.Comp.
N - J 694 -565
M - J 552 -667
M - K 694 -538
K - L 605 -744
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.61 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.158 T 999 360
VERT(CL):0.372 T 999 240
HORZ(LL):0.062 M - -
HORZ(TL):0.144 M - -
Creep Factor: 2.0
Max TC CSI:0.460
Max BC CSI:0.516
Max W eb CSI:0.420
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T32
Ply: 2
Qty:1
SEQN:13433 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T318
DrwNo:079.20.1313.27792
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'3"4
5'8"8
31'8"12
5'5"8
33'7"5
1'10"9
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
31'7"
4'11"8
33'7"5
2'0"51'8"
6"1 8'7"101'9'3"29'7"712'A
B C D
E
F
G
H I J
K
LM
NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
5X51.5X4
5X141.5X4 3X8
5X8
3X3
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1147 /601 /388
L 1496 /-/-/870 /610 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 953 -1436
C - D 678 -1145
D - E 1629 -2410
E - F 1150 -1712
Chords Tens.Comp.
F - G 763 -1110
G - H 456 -585
H - I 530 -567
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1010 -860
D - U 2170 -1698
W -V 985 -836
U - S 2258 -1766
Chords Tens.Comp.
S - R 2244 -1757
R - Q 1578 -1232
Q - N 1004 -797
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - V 791 -924
E - R 554 -699
F - Q 488 -641
G - N 501 -667
N - I 919 -796
Webs Tens.Comp.
N - M 408 -328
I - M 616 -726
M - J 560 -442
J - L 587 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.160 T 999 360
VERT(CL):0.376 T 999 240
HORZ(LL):0.068 L - -
HORZ(TL):0.159 L - -
Creep Factor: 2.0
Max TC CSI:0.459
Max BC CSI:0.516
Max W eb CSI:0.576
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T33
Ply: 2
Qty:1
SEQN:13437 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T317
DrwNo:079.20.1313.37495
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'9"4
6'2"8
28'3"4
1'6"
29'8"12
1'5"8
33'7"5
3'10"9
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
28'5"
1'9"8
33'7"5
5'2"51'8"
6"1 8'7"101'9'11"210'3"712'A
B C D
E
F
G
H
I J
K
LM
NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
1.5X4
6X81.5X4
5X5
3X8
5X5
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1147 /601 /388
L 1496 /-/-/870 /610 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.3 Min Req =1.5
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 953 -1436
C - D 678 -1145
D - E 1629 -2410
E - F 1150 -1712
Chords Tens.Comp.
F - G 763 -1110
G - H 456 -585
H - I 530 -567
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1010 -860
D - U 2170 -1698
W -V 985 -836
U - S 2258 -1766
Chords Tens.Comp.
S - R 2244 -1757
R - Q 1578 -1232
Q - N 1004 -797
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - V 791 -924
E - R 554 -699
F - Q 488 -641
G - N 501 -667
N - I 919 -796
Webs Tens.Comp.
N - M 408 -328
I - M 616 -726
M - J 560 -442
J - L 587 -712
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.160 T 999 360
VERT(CL):0.376 T 999 240
HORZ(LL):0.068 L - -
HORZ(TL):0.159 L - -
Creep Factor: 2.0
Max TC CSI:0.459
Max BC CSI:0.516
Max W eb CSI:0.576
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T33
Ply: 2
Qty:1
SEQN:13437 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T317
DrwNo:079.20.1313.37495
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W16
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'9"4
6'2"8
28'3"4
1'6"
29'8"12
1'5"8
33'7"5
3'10"9
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
28'5"
1'9"8
33'7"5
5'2"51'8"
6"1 8'7"101'9'11"210'3"712'A
B C D
E
F
G
H
I J
K
LM
NOPQRS
TUVW
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
1.5X4
6X81.5X4
5X5
3X8
5X5
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1144 /605 /390
K 1496 /-/-/865 /613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 958 -1436
C - D 677 -1145
D - E 1627 -2410
E - F 1148 -1712
Chords Tens.Comp.
F - G 759 -1110
G - H 452 -584
H - I 510 -556
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1010 -860
D - T 2170 -1697
V - U 985 -835
T - R 2258 -1764
Chords Tens.Comp.
R - Q 2244 -1755
Q - P 1578 -1229
P - M 1004 -793
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 791 -924
E - Q 554 -699
F - P 489 -641
G - M 500 -669
Webs Tens.Comp.
M - I 828 -684
I - L 581 -656
L - J 636 -529
J - K 662 -731
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.159 S 999 360
VERT(CL):0.374 S 999 240
HORZ(LL):0.065 L - -
HORZ(TL):0.151 L - -
Creep Factor: 2.0
Max TC CSI:0.459
Max BC CSI:0.516
Max W eb CSI:0.495
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T34
Ply: 2
Qty:1
SEQN:13441 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T320
DrwNo:079.20.1313.28993
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'9"4
6'2"8
29'
2'2"12
33'7"5
4'7"5
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
29'
2'4"8
33'7"5
4'7"51'8"
6"1 8'7"101'10'2"110'6"612'A
B C D
E
F
G
H
I
J
KL
M NOPQR
STUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
1.5X4
6X81.5X4
5X8
3X8
3X3
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1738 /-/-/1144 /605 /390
K 1496 /-/-/865 /613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
K Brg Width = 3.3 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 958 -1436
C - D 677 -1145
D - E 1627 -2410
E - F 1148 -1712
Chords Tens.Comp.
F - G 759 -1110
G - H 452 -584
H - I 510 -556
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1010 -860
D - T 2170 -1697
V - U 985 -835
T - R 2258 -1764
Chords Tens.Comp.
R - Q 2244 -1755
Q - P 1578 -1229
P - M 1004 -793
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - U 791 -924
E - Q 554 -699
F - P 489 -641
G - M 500 -669
Webs Tens.Comp.
M - I 828 -684
I - L 581 -656
L - J 636 -529
J - K 662 -731
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.159 S 999 360
VERT(CL):0.374 S 999 240
HORZ(LL):0.065 L - -
HORZ(TL):0.151 L - -
Creep Factor: 2.0
Max TC CSI:0.459
Max BC CSI:0.516
Max W eb CSI:0.495
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T34
Ply: 2
Qty:1
SEQN:13441 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T320
DrwNo:079.20.1313.28993
AK /DF 03/19/2020
2 Complete Trusses Required
B2
W15
8"32'11"5
8'5"8
8'5"8
13'7"5
5'1"13
20'6"12
6'11"7
26'9"4
6'2"8
29'
2'2"12
33'7"5
4'7"5
2'4"14
2'4"14
2'6"10
1"12
6'6"12
4'0"2
7'
5"4
8'3"12
1'3"12
13'4"2
5'0"6
20'3"4
6'11"2
26'7"8
6'4"4
29'
2'4"8
33'7"5
4'7"51'8"
6"1 8'7"101'10'2"110'6"612'A
B C D
E
F
G
H
I
J
KL
M NOPQR
STUV
4 12
3X5(C3)3X4(C3)
6X12
1.5X4
1.5X4
1.5X4 5X5
5X5
1.5X4
6X81.5X4
5X8
3X8
3X3
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.854'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1783 /-/-/1144 /605 /390
I 1665 /-/-/865 /613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =2.8
I Brg Width = 3.3 Min Req =2.7
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2196 -3465
C - D 1951 -3289
D - E 1665 -2753
Chords Tens.Comp.
E - F 1177 -1874
F - G 606 -812
G - H 631 -765
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 3036 -2292
M - L 3033 -2294
Chords Tens.Comp.
L - K 2527 -1873
K - J 1673 -1234
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 443 -526
L - E 448 -181
E - K 775 -1027
K - F 856 -462
Webs Tens.Comp.
F - J 1033 -1433
J - H 1426 -1087
H - I 1320 -1597
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.160 L 999 360
VERT(CL):0.340 L 999 240
HORZ(LL):0.044 J - -
HORZ(TL):0.096 J - -
Creep Factor: 2.0
Max TC CSI:0.677
Max BC CSI:0.875
Max W eb CSI:0.898
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T35
Ply: 1
Qty:2
SEQN:13447 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T328
DrwNo:079.20.1313.42458
AK /DF 03/19/2020
T1
B1
W6
W8
W9
8"32'11"5
7'7"5
7'7"5
14'9"2
7'1"13
21'11"10
7'2"8
29'
7'0"6
33'7"5
4'7"5
7'5"9
7'5"9
14'5"15
7'0"6
21'8"2
7'2"2
29'
7'3"14
33'7"5
4'7"51'8"
6"1 8'7"1010'2"110'6"6(WB1)
(WB2)
(WB1)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X8(C4)3X4(C4)
3X4
1.5X4
3X4
5X5
5X5
5X5
3X5
5X5
5X8
5X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.854'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1783 /-/-/1144 /605 /390
I 1665 /-/-/865 /613 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =2.8
I Brg Width = 3.3 Min Req =2.7
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2196 -3465
C - D 1951 -3289
D - E 1665 -2753
Chords Tens.Comp.
E - F 1177 -1874
F - G 606 -812
G - H 631 -765
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 3036 -2292
M - L 3033 -2294
Chords Tens.Comp.
L - K 2527 -1873
K - J 1673 -1234
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 443 -526
L - E 448 -181
E - K 775 -1027
K - F 856 -462
Webs Tens.Comp.
F - J 1033 -1433
J - H 1426 -1087
H - I 1320 -1597
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.160 L 999 360
VERT(CL):0.340 L 999 240
HORZ(LL):0.044 J - -
HORZ(TL):0.096 J - -
Creep Factor: 2.0
Max TC CSI:0.677
Max BC CSI:0.875
Max W eb CSI:0.898
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T35
Ply: 1
Qty:2
SEQN:13447 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T328
DrwNo:079.20.1313.42458
AK /DF 03/19/2020
T1
B1
W6
W8
W9
8"32'11"5
7'7"5
7'7"5
14'9"2
7'1"13
21'11"10
7'2"8
29'
7'0"6
33'7"5
4'7"5
7'5"9
7'5"9
14'5"15
7'0"6
21'8"2
7'2"2
29'
7'3"14
33'7"5
4'7"51'8"
6"1 8'7"1010'2"110'6"6(WB1)
(WB2)
(WB1)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X8(C4)3X4(C4)
3X4
1.5X4
3X4
5X5
5X5
5X5
3X5
5X5
5X8
5X5
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.854'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 590 /-/-/382 /185 /390
M*101 /-/-/62 /39 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
M Brg Width = 315 Min Req =-
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1520 -1998
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 291 -490
Chords Tens.Comp.
M - L 305 -501
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 434 -440
L - E 375 -447
Webs Tens.Comp.
K - F 395 -451
G - J 440 -387
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):0.051 C 999 240
HORZ(LL):-0.016 C - -
HORZ(TL):0.028 C - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.460
Max W eb CSI:0.449
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:13451 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T336
DrwNo:079.20.1313.41304
AK /DF 03/19/2020
W9
8"32'11"5
7'7"5
7'7"5
14'9"2
7'1"13
21'11"10
7'2"8
29'
7'0"6
33'7"5
4'7"5
7'5"9
7'5"9
14'5"15
7'0"6
21'8"2
7'2"2
29'
7'3"14
33'7"5
4'7"51'8"
6"1 8'7"1010'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
(WB4)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X5(C3)3X4(C3)
3X4
1.5X4
3X4
5X5
5X5
5X5
3X4
5X5
3X8
4X4
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.854'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 590 /-/-/382 /185 /390
M*101 /-/-/62 /39 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
M Brg Width = 315 Min Req =-
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1520 -1998
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 291 -490
Chords Tens.Comp.
M - L 305 -501
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 434 -440
L - E 375 -447
Webs Tens.Comp.
K - F 395 -451
G - J 440 -387
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.36 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):0.051 C 999 240
HORZ(LL):-0.016 C - -
HORZ(TL):0.028 C - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.460
Max W eb CSI:0.449
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:13451 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T336
DrwNo:079.20.1313.41304
AK /DF 03/19/2020
W9
8"32'11"5
7'7"5
7'7"5
14'9"2
7'1"13
21'11"10
7'2"8
29'
7'0"6
33'7"5
4'7"5
7'5"9
7'5"9
14'5"15
7'0"6
21'8"2
7'2"2
29'
7'3"14
33'7"5
4'7"51'8"
6"1 8'7"1010'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
(WB4)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X5(C3)3X4(C3)
3X4
1.5X4
3X4
5X5
5X5
5X5
3X4
5X5
3X8
4X4
2X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.908'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 547 /-/-/308 /126 /382
M 1594 /-/-/1037 /616 /-
I 1190 /-/-/682 /488 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
M Brg Width = 8.0 Min Req =2.5
I Brg Width = 4.0 Min Req =1.9
Bearings B, M, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1509 -1953
D - E 779 -1349
E - F 827 -1223
Chords Tens.Comp.
F - G 535 -630
G - H 558 -587
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1218 -1036
Chords Tens.Comp.
K - J 1078 -907
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 1090 -1417
D - L 1362 -800
L - E 341 -394
Webs Tens.Comp.
F - J 667 -818
J - H 993 -863
H - I 1101 -1155
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.075 C 999 360
VERT(CL):0.191 C 463 240
HORZ(LL):-0.031 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.720
Max BC CSI:0.656
Max W eb CSI:0.778
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:13461 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T301
DrwNo:079.20.1313.42519
AK /DF 03/19/2020
W8
7'8"26'4"
7'9"12
7'9"12
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
34'
5'
7'8"
7'8"
14'5"15
6'9"15
21'8"2
7'2"2
29'
7'3"14
34'
5'1'8"
6"1 8'6"110'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X5(C3)
3X4(C3)3X4
2X6
3X5
5X5
5X5
5X5
3X4
5X5
4X7
3X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.908'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 547 /-/-/308 /126 /382
M 1594 /-/-/1037 /616 /-
I 1190 /-/-/682 /488 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
M Brg Width = 8.0 Min Req =2.5
I Brg Width = 4.0 Min Req =1.9
Bearings B, M, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1509 -1953
D - E 779 -1349
E - F 827 -1223
Chords Tens.Comp.
F - G 535 -630
G - H 558 -587
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1218 -1036
Chords Tens.Comp.
K - J 1078 -907
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 1090 -1417
D - L 1362 -800
L - E 341 -394
Webs Tens.Comp.
F - J 667 -818
J - H 993 -863
H - I 1101 -1155
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.075 C 999 360
VERT(CL):0.191 C 463 240
HORZ(LL):-0.031 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.720
Max BC CSI:0.656
Max W eb CSI:0.778
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:13461 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T301
DrwNo:079.20.1313.42519
AK /DF 03/19/2020
W8
7'8"26'4"
7'9"12
7'9"12
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
34'
5'
7'8"
7'8"
14'5"15
6'9"15
21'8"2
7'2"2
29'
7'3"14
34'
5'1'8"
6"1 8'6"110'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
12'A
B
C
D
E
F
G
H
IJKLM
4 12
3X5(C3)
3X4(C3)3X4
2X6
3X5
5X5
5X5
5X5
3X4
5X5
4X7
3X5
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
W10 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 568 /-/-/338 /135 /403
M 1553 /-/-/998 /595 /-
I 1201 /-/-/692 /500 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
M Brg Width = 8.0 Min Req =2.5
I Brg Width = 4.0 Min Req =1.9
Bearings B, M, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 803 -1395
D - E 835 -1243
Chords Tens.Comp.
E - F 533 -634
F - G 558 -571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1259 -1090
Chords Tens.Comp.
K - J 1097 -948
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - C 1068 -1377
C - L 1297 -759
K - E 386 -119
Webs Tens.Comp.
E - J 687 -842
J - G 884 -792
G - I 1092 -1133
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.038 K 999 360
VERT(CL):0.087 K 999 240
HORZ(LL):-0.012 I - -
HORZ(TL):0.026 I - -
Creep Factor: 2.0
Max TC CSI:0.728
Max BC CSI:0.669
Max W eb CSI:0.802
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:13509 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T279
DrwNo:079.20.1313.42035
AK /DF 03/19/2020
W8
W10
7'8"26'4"
7'9"12
7'9"12
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
32'7"5
3'7"5
34'
1'4"11
7'8"
7'8"
14'5"15
6'9"15
21'8"2
7'2"2
29'
7'3"14
34'
5'1'8"
6"1 8'11"1010'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
(WB4)
12'A
B
C
D
E
F
G H
IJKLM
4 12
3X4(B1)
2X6
3X5
5X5
5X5
5X5
3X4
5X5
3X8
5X5 2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
W10 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 568 /-/-/338 /135 /403
M 1553 /-/-/998 /595 /-
I 1201 /-/-/692 /500 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
M Brg Width = 8.0 Min Req =2.5
I Brg Width = 4.0 Min Req =1.9
Bearings B, M, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 803 -1395
D - E 835 -1243
Chords Tens.Comp.
E - F 533 -634
F - G 558 -571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1259 -1090
Chords Tens.Comp.
K - J 1097 -948
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - C 1068 -1377
C - L 1297 -759
K - E 386 -119
Webs Tens.Comp.
E - J 687 -842
J - G 884 -792
G - I 1092 -1133
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.06 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.038 K 999 360
VERT(CL):0.087 K 999 240
HORZ(LL):-0.012 I - -
HORZ(TL):0.026 I - -
Creep Factor: 2.0
Max TC CSI:0.728
Max BC CSI:0.669
Max W eb CSI:0.802
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:13509 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T279
DrwNo:079.20.1313.42035
AK /DF 03/19/2020
W8
W10
7'8"26'4"
7'9"12
7'9"12
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
32'7"5
3'7"5
34'
1'4"11
7'8"
7'8"
14'5"15
6'9"15
21'8"2
7'2"2
29'
7'3"14
34'
5'1'8"
6"1 8'11"1010'2"110'6"6(WB1)
(WB2)
(WB3)
(WB1)
(WB4)
12'A
B
C
D
E
F
G H
IJKLM
4 12
3X4(B1)
2X6
3X5
5X5
5X5
5X5
3X4
5X5
3X8
5X5 2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W21 2x4 SP 2250f-1.9E;
W22 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 315 /-/-/201 /-/420
AB 1661 /-/-/1061 /736 /-
J 1185 /-/-/715 /495 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
AB Brg Width = 8.0 Min Req =2.6
J Brg Width = 4.0 Min Req =1.9
Bearings A, AB, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 428 -941
B - C 46 -488
C - D 244 -709
D - E 917 -1759
Chords Tens.Comp.
E - F 879 -1456
F - G 480 -699
G - H 512 -590
H - I 397 -455
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 1592 -1298
U - R 1613 -1305
R - Q 1269 -1072
Chords Tens.Comp.
Q - O 1292 -1081
O - M 489 -427
M - L 492 -429
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 473 -355
AB-AA 1145 -1414
AA- D 1145 -1389
D - V 1705 -1315
R - F 423 -146
F - O 743 -944
Webs Tens.Comp.
O - H 682 -700
H - L 854 -958
L - I 1118 -977
K - I 985 -1145
K - J 984 -1142
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.34 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.069 T 999 360
VERT(CL):0.196 Z 999 240
HORZ(LL):-0.021 N - -
HORZ(TL):0.049 N - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.674
Max W eb CSI:0.844
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T39
Ply: 1
Qty:1
SEQN:13513 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T311
DrwNo:079.20.1313.42396
AK /DF 03/19/2020
W4
W21
W22
8"7'26'4"
3'10"14
3'10"14
7'9"12
3'10"14
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
30'1"5
1'1"5
34'
3'10"11
3'9"2
3'9"2
7'6"4
3'9"2
7'9"12
3"8
11'5"
3'7"4
12'10"12
1'5"12
13'0"8
1"12
14'5"15
1'5"7
19'8"8
5'2"9
19'10"4
1"12
21'7"8
1'9"4
28'7"
6'11"8
29'
5"
30'0"12
1'0"12
30'2"8
1"12
30'4"13
2"5
33'6"8
3'1"11
34'
5"8
6"1 9'9"101'4"10'2"1(WB1)
(WB2)
(a)
12'
A
B
C
D
E
F
G H I
J
KLM
NOPQ
R
ST
UVW
XYZAAABAC
4 12
3X5(C3)3X4(C3)
3X4
3X4
4X53X3
3X6
1.5X63X4 4X5
5X5
5X5 1.5X67X6
3X4
5X5
5X5
3X8
4X4
5X5
4X4 5X5
4X4
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W21 2x4 SP 2250f-1.9E;
W22 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 315 /-/-/201 /-/420
AB 1661 /-/-/1061 /736 /-
J 1185 /-/-/715 /495 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
AB Brg Width = 8.0 Min Req =2.6
J Brg Width = 4.0 Min Req =1.9
Bearings A, AB, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 428 -941
B - C 46 -488
C - D 244 -709
D - E 917 -1759
Chords Tens.Comp.
E - F 879 -1456
F - G 480 -699
G - H 512 -590
H - I 397 -455
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 1592 -1298
U - R 1613 -1305
R - Q 1269 -1072
Chords Tens.Comp.
Q - O 1292 -1081
O - M 489 -427
M - L 492 -429
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 473 -355
AB-AA 1145 -1414
AA- D 1145 -1389
D - V 1705 -1315
R - F 423 -146
F - O 743 -944
Webs Tens.Comp.
O - H 682 -700
H - L 854 -958
L - I 1118 -977
K - I 985 -1145
K - J 984 -1142
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.34 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.40 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.069 T 999 360
VERT(CL):0.196 Z 999 240
HORZ(LL):-0.021 N - -
HORZ(TL):0.049 N - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.674
Max W eb CSI:0.844
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T39
Ply: 1
Qty:1
SEQN:13513 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T311
DrwNo:079.20.1313.42396
AK /DF 03/19/2020
W4
W21
W22
8"7'26'4"
3'10"14
3'10"14
7'9"12
3'10"14
14'9"2
6'11"6
21'11"10
7'2"8
29'
7'0"6
30'1"5
1'1"5
34'
3'10"11
3'9"2
3'9"2
7'6"4
3'9"2
7'9"12
3"8
11'5"
3'7"4
12'10"12
1'5"12
13'0"8
1"12
14'5"15
1'5"7
19'8"8
5'2"9
19'10"4
1"12
21'7"8
1'9"4
28'7"
6'11"8
29'
5"
30'0"12
1'0"12
30'2"8
1"12
30'4"13
2"5
33'6"8
3'1"11
34'
5"8
6"1 9'9"101'4"10'2"1(WB1)
(WB2)
(a)
12'
A
B
C
D
E
F
G H I
J
KLM
NOPQ
R
ST
UVW
XYZAAABAC
4 12
3X5(C3)3X4(C3)
3X4
3X4
4X53X3
3X6
1.5X63X4 4X5
5X5
5X5 1.5X67X6
3X4
5X5
5X5
3X8
4X4
5X5
4X4 5X5
4X4
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W9,W11 2x4 SP 2250f-1.9E;
W12 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 188 /-/-/203 /-/457
N 1708 /-/-/1092 /802 /-
I 1182 /-/-/724 /509 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
N Brg Width = 8.0 Min Req =2.7
I Brg Width = 4.0 Min Req =1.9
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -750
B - C 0 -736
C - D 394 -1037
Chords Tens.Comp.
D - E 425 -1358
E - F 525 -1157
F - G 215 -482
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - R 403 -333
L - K 1224 -901
Chords Tens.Comp.
K - J 1009 -806
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - N 1334 -1526
M - D 1312 -1514
D - L 1390 -1082
L - E 437 -353
Webs Tens.Comp.
K - F 409 -82
F - J 739 -948
G - J 818 -540
G - I 911 -1097
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 Q 999 360
VERT(CL):0.129 Q 651 240
HORZ(LL):-0.025 S - -
HORZ(TL):0.049 S - -
Creep Factor: 2.0
Max TC CSI:0.932
Max BC CSI:0.702
Max W eb CSI:0.951
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:13519 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T310
DrwNo:079.20.1313.39758
AK /DF 03/19/2020
W5
W9
W11
W12
7'26'4"
7'1"12
7'1"12
14'8"15
7'7"3
22'4"11
7'7"13
29'8"11
7'4"
33'4"
3'7"5
1'8"14
1'8"14
1'10"10
1"12
3'4"
1'5"6
4'9"12
1'5"12
6'10"4
2'0"8
14'5"12
7'7"8
22'1"3
7'7"8
29'8"11
7'7"8
33'4"
3'7"5
8"12 10'7"101'(WB1)
(WB2)
(WB4)
(WB3)
(a)
12'
A BC
D
E
F
G H
IJKL
M NOP
QRS
4 12
3X4(E3)3X6(E3)
3X43X8
3X32X6
4X4
4X4
5X5
5X5
3X4
5X8
3X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W9,W11 2x4 SP 2250f-1.9E;
W12 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 188 /-/-/203 /-/457
N 1708 /-/-/1092 /802 /-
I 1182 /-/-/724 /509 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
N Brg Width = 8.0 Min Req =2.7
I Brg Width = 4.0 Min Req =1.9
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -750
B - C 0 -736
C - D 394 -1037
Chords Tens.Comp.
D - E 425 -1358
E - F 525 -1157
F - G 215 -482
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - R 403 -333
L - K 1224 -901
Chords Tens.Comp.
K - J 1009 -806
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - N 1334 -1526
M - D 1312 -1514
D - L 1390 -1082
L - E 437 -353
Webs Tens.Comp.
K - F 409 -82
F - J 739 -948
G - J 818 -540
G - I 911 -1097
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 Q 999 360
VERT(CL):0.129 Q 651 240
HORZ(LL):-0.025 S - -
HORZ(TL):0.049 S - -
Creep Factor: 2.0
Max TC CSI:0.932
Max BC CSI:0.702
Max W eb CSI:0.951
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:13519 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T310
DrwNo:079.20.1313.39758
AK /DF 03/19/2020
W5
W9
W11
W12
7'26'4"
7'1"12
7'1"12
14'8"15
7'7"3
22'4"11
7'7"13
29'8"11
7'4"
33'4"
3'7"5
1'8"14
1'8"14
1'10"10
1"12
3'4"
1'5"6
4'9"12
1'5"12
6'10"4
2'0"8
14'5"12
7'7"8
22'1"3
7'7"8
29'8"11
7'7"8
33'4"
3'7"5
8"12 10'7"101'(WB1)
(WB2)
(WB4)
(WB3)
(a)
12'
A BC
D
E
F
G H
IJKL
M NOP
QRS
4 12
3X4(E3)3X6(E3)
3X43X8
3X32X6
4X4
4X4
5X5
5X5
3X4
5X8
3X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W12,W13 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 163 /-31 /-/126 /-/469
M 1813 /-/-/1164 /774 /-
I 1159 /-/-/725 /559 /-
Wind reactions based on MWFRS
O Brg Width = -Min Req =-
M Brg Width = 8.0 Min Req =2.9
I Brg Width = 4.0 Min Req =1.8
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 547 -786
C - D 472 -1275
D - E 486 -1118
Chords Tens.Comp.
E - F 162 -474
F - G 327 -442
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 5 -755
N - M 82 -482
Chords Tens.Comp.
L - K 1149 -1001
K - J 970 -811
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 427 -190
B - M 499 -404
M - C 1221 -1558
C - L 1525 -962
L - D 370 -391
Webs Tens.Comp.
K - E 397 -141
E - J 705 -875
F - J 541 -441
J - G 1229 -1074
G - I 1019 -1110
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.54 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 K 999 360
VERT(CL):0.090 K 999 240
HORZ(LL):-0.014 I - -
HORZ(TL):0.026 H - -
Creep Factor: 2.0
Max TC CSI:0.836
Max BC CSI:0.697
Max W eb CSI:0.930
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:13523 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T305
DrwNo:079.20.1313.37542
AK /DF 03/19/2020
W6
W12
W13
W14
7'26'4"
2'7"12
2'7"12
7'1"12
4'6"
14'8"15
7'7"3
22'4"6
7'7"8
29'10"7
7'6"1
32'2"11
2'4"4
33'4"
1'1"5
2'4"4
2'4"4
6'10"4
4'6"
14'5"12
7'7"8
22'1"3
7'7"8
29'10"7
7'9"4
33'4"
3'5"9
1'7"5 11'5"10(WB1)
(W B2)
(W B2)
(WB4)
(WB3)
(a)
12'
A B
C
D
E
F
G H
IJKLMNO
4 12
3X3
1.5X4 3X4
5X5
4X5
3X6
5X6
5X5
5X5
5X5
1.5X4
3X10
5X52X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W12,W13 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 163 /-31 /-/126 /-/469
M 1813 /-/-/1164 /774 /-
I 1159 /-/-/725 /559 /-
Wind reactions based on MWFRS
O Brg Width = -Min Req =-
M Brg Width = 8.0 Min Req =2.9
I Brg Width = 4.0 Min Req =1.8
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 547 -786
C - D 472 -1275
D - E 486 -1118
Chords Tens.Comp.
E - F 162 -474
F - G 327 -442
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 5 -755
N - M 82 -482
Chords Tens.Comp.
L - K 1149 -1001
K - J 970 -811
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 427 -190
B - M 499 -404
M - C 1221 -1558
C - L 1525 -962
L - D 370 -391
Webs Tens.Comp.
K - E 397 -141
E - J 705 -875
F - J 541 -441
J - G 1229 -1074
G - I 1019 -1110
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.54 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.039 K 999 360
VERT(CL):0.090 K 999 240
HORZ(LL):-0.014 I - -
HORZ(TL):0.026 H - -
Creep Factor: 2.0
Max TC CSI:0.836
Max BC CSI:0.697
Max W eb CSI:0.930
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:13523 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T305
DrwNo:079.20.1313.37542
AK /DF 03/19/2020
W6
W12
W13
W14
7'26'4"
2'7"12
2'7"12
7'1"12
4'6"
14'8"15
7'7"3
22'4"6
7'7"8
29'10"7
7'6"1
32'2"11
2'4"4
33'4"
1'1"5
2'4"4
2'4"4
6'10"4
4'6"
14'5"12
7'7"8
22'1"3
7'7"8
29'10"7
7'9"4
33'4"
3'5"9
1'7"5 11'5"10(WB1)
(W B2)
(W B2)
(WB4)
(WB3)
(a)
12'
A B
C
D
E
F
G H
IJKLMNO
4 12
3X3
1.5X4 3X4
5X5
4X5
3X6
5X6
5X5
5X5
5X5
1.5X4
3X10
5X52X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W21 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 149 /-70 /-/129 /6 /457
V 1852 /-/-/1189 /818 /-
I 1157 /-/-/711 /553 /-
Wind reactions based on MWFRS
X Brg Width = -Min Req =-
V Brg Width = 8.0 Min Req =2.9
I Brg Width = 4.0 Min Req =1.8
Bearings V & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 375 -631
B - C 663 -929
C - D 678 -1442
Chords Tens.Comp.
D - E 794 -1428
E - F 445 -1018
F - G 337 -716
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - W 13 -734
W -V 1 -412
V - S 96 -459
U - T 78 -488
Chords Tens.Comp.
T - Q 81 -493
P - O 1107 -933
M - K 625 -535
K - J 620 -540
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - W 700 -420
B - V 364 -399
V - U 1207 -1521
U - C 1181 -1372
U - S 486 -101
C - Q 1835 -1334
Q - P 1112 -943
Webs Tens.Comp.
Q - E 269 -384
O - M 928 -766
F - M 367 -455
M - G 729 -511
G - J 983 -1134
J - I 1038 -1106
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.99 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 E 999 360
VERT(CL):0.101 E 999 240
HORZ(LL):-0.022 I - -
HORZ(TL):0.047 L - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.448
Max W eb CSI:0.981
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:13527 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T314
DrwNo:079.20.1313.31942
AK /DF 03/19/2020
W21
7'26'4"
4'7"12
4'7"12
7'1"12
2'6"
12'2"12
5'1"
17'4"
5'1"4
22'9"7
5'5"6
27'11"
5'1"9
33'4"
5'5"
4'4"4
4'4"4
6'10"4
2'6"
7'1"12
3"8
10'9"
3'7"4
12'1"
1'4"
17'2"9
5'1"9
22'7"11
5'5"1
27'11"
5'3"5
29'4"12
1'5"12
29'6"8
1"12
32'10"8
3'4"
33'4"
5"82'3"511'10"11'4"11'8"9(WB1)
(WB2)(a)
12'
A B
C
D
E
F
G
H
I
JK
LMNOP
Q
RSTUVWX
4 12
4X4
3X4
5X5
4X55X5
4X5
4X4 5X10 3X5
5X8
4X7
3X4
5X82X4
3X4
4X4 7X8
2X4
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W21 2x6 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 149 /-70 /-/129 /6 /457
V 1852 /-/-/1189 /818 /-
I 1157 /-/-/711 /553 /-
Wind reactions based on MWFRS
X Brg Width = -Min Req =-
V Brg Width = 8.0 Min Req =2.9
I Brg Width = 4.0 Min Req =1.8
Bearings V & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 375 -631
B - C 663 -929
C - D 678 -1442
Chords Tens.Comp.
D - E 794 -1428
E - F 445 -1018
F - G 337 -716
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - W 13 -734
W -V 1 -412
V - S 96 -459
U - T 78 -488
Chords Tens.Comp.
T - Q 81 -493
P - O 1107 -933
M - K 625 -535
K - J 620 -540
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - W 700 -420
B - V 364 -399
V - U 1207 -1521
U - C 1181 -1372
U - S 486 -101
C - Q 1835 -1334
Q - P 1112 -943
Webs Tens.Comp.
Q - E 269 -384
O - M 928 -766
F - M 367 -455
M - G 729 -511
G - J 983 -1134
J - I 1038 -1106
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.99 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 E 999 360
VERT(CL):0.101 E 999 240
HORZ(LL):-0.022 I - -
HORZ(TL):0.047 L - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.448
Max W eb CSI:0.981
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:13527 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T314
DrwNo:079.20.1313.31942
AK /DF 03/19/2020
W21
7'26'4"
4'7"12
4'7"12
7'1"12
2'6"
12'2"12
5'1"
17'4"
5'1"4
22'9"7
5'5"6
27'11"
5'1"9
33'4"
5'5"
4'4"4
4'4"4
6'10"4
2'6"
7'1"12
3"8
10'9"
3'7"4
12'1"
1'4"
17'2"9
5'1"9
22'7"11
5'5"1
27'11"
5'3"5
29'4"12
1'5"12
29'6"8
1"12
32'10"8
3'4"
33'4"
5"82'3"511'10"11'4"11'8"9(WB1)
(WB2)(a)
12'
A B
C
D
E
F
G
H
I
JK
LMNOP
Q
RSTUVWX
4 12
4X4
3X4
5X5
4X55X5
4X5
4X4 5X10 3X5
5X8
4X7
3X4
5X82X4
3X4
4X4 7X8
2X4
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 7.94
TC: From 72 plf at 7.94 to 72 plf at 41.33
BC: From 10 plf at 0.00 to 10 plf at 7.94
BC: From 20 plf at 7.94 to 20 plf at 41.33
BC: 273 lb Conc. Load at 1.94, 3.94
BC: 295 lb Conc. Load at 5.94
BC: 359 lb Conc. Load at 7.94
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1129 /-/-/-/437 /-
L 2332 /-/0 /-/878 /0
H 1169 /-/-/-/465 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
L Brg Width = 8.0 Min Req =2.1
H Brg Width = 4.0 Min Req =1.5
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 359 -983
C - D 268 -642
Chords Tens.Comp.
D - E 241 -577
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 957 -356
K - J 581 -234
Chords Tens.Comp.
J - I 501 -202
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 158 -394
A - M 1024 -372
B - L 428 -1179
L - C 330 -670
Webs Tens.Comp.
C - K 673 -246
E - I 206 -496
F - I 405 -108
F - H 203 -541
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.038 M 999 360
VERT(CL):0.083 M 999 240
HORZ(LL):-0.009 G - -
HORZ(TL):0.020 G - -
Creep Factor: 2.0
Max TC CSI:0.539
Max BC CSI:0.554
Max W eb CSI:0.520
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T43
Ply: 2
Qty:1
SEQN:16322 COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T2
DrwNo:080.20.1106.58827
JB /DF 03/20/2020
2 Complete Trusses Required
15'26'4"
7'7"6
7'7"6
14'7"12
7'0"6
22'7"
7'11"4
30'6"15
7'11"14
38'3"
7'8"1
41'4"
3'1"
7'3"14
7'3"14
14'4"4
7'0"6
22'3"13
7'11"9
30'3"7
7'11"9
38'3"
7'11"9
41'4"
3'1"2'11"510'9"1212'
A B C
D
E
F G
HIJKLMN
4 12
3X4
1.5X6 3X4
3X4
7X6
5X5
3X4
5X5
7X6
3X4
5X8
3X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 7.94
TC: From 72 plf at 7.94 to 72 plf at 41.33
BC: From 10 plf at 0.00 to 10 plf at 7.94
BC: From 20 plf at 7.94 to 20 plf at 41.33
BC: 273 lb Conc. Load at 1.94, 3.94
BC: 295 lb Conc. Load at 5.94
BC: 359 lb Conc. Load at 7.94
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1129 /-/-/-/437 /-
L 2332 /-/0 /-/878 /0
H 1169 /-/-/-/465 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
L Brg Width = 8.0 Min Req =2.1
H Brg Width = 4.0 Min Req =1.5
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 359 -983
C - D 268 -642
Chords Tens.Comp.
D - E 241 -577
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 957 -356
K - J 581 -234
Chords Tens.Comp.
J - I 501 -202
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 158 -394
A - M 1024 -372
B - L 428 -1179
L - C 330 -670
Webs Tens.Comp.
C - K 673 -246
E - I 206 -496
F - I 405 -108
F - H 203 -541
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.038 M 999 360
VERT(CL):0.083 M 999 240
HORZ(LL):-0.009 G - -
HORZ(TL):0.020 G - -
Creep Factor: 2.0
Max TC CSI:0.539
Max BC CSI:0.554
Max W eb CSI:0.520
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T43
Ply: 2
Qty:1
SEQN:16322 COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T2
DrwNo:080.20.1106.58827
JB /DF 03/20/2020
2 Complete Trusses Required
15'26'4"
7'7"6
7'7"6
14'7"12
7'0"6
22'7"
7'11"4
30'6"15
7'11"14
38'3"
7'8"1
41'4"
3'1"
7'3"14
7'3"14
14'4"4
7'0"6
22'3"13
7'11"9
30'3"7
7'11"9
38'3"
7'11"9
41'4"
3'1"2'11"510'9"1212'
A B C
D
E
F G
HIJKLMN
4 12
3X4
1.5X6 3X4
3X4
7X6
5X5
3X4
5X5
7X6
3X4
5X8
3X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W15,W16 2x4 SP 2250f-1.9E;
W17 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 546 /-/-/316 /208 /292
O 2207 /-/-/1496 /844 /-
J 1108 /-/-/764 /482 /-
Wind reactions based on MWFRS
R Brg Width = -Min Req =-
O Brg Width = 8.0 Min Req =2.6
J Brg Width = 4.0 Min Req =1.8
Bearings O & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 192 -521
C - D 949 -970
D - E 255 -734
Chords Tens.Comp.
E - F 584 -1110
F - G 528 -906
G - H 409 -568
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 58 -531
Q - P 542 -682
P - O 309 -384
N - M 705 -736
Chords Tens.Comp.
M - L 1010 -899
L - K 779 -724
K - J 480 -440
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 222 -503
A - Q 613 -225
C - O 985 -1324
O - D 1121 -1487
D - N 1222 -901
Webs Tens.Comp.
N - E 627 -758
E - M 451 -293
G - K 682 -718
H - K 755 -624
H - J 911 -994
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.031 F 999 360
VERT(CL):0.073 F 999 240
HORZ(LL):-0.015 J - -
HORZ(TL):0.028 J - -
Creep Factor: 2.0
Max TC CSI:0.846
Max BC CSI:0.478
Max W eb CSI:0.804
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:13552 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T319
DrwNo:079.20.1313.30210
AK /DF 03/19/2020
W15
W16
W17
15'26'4"
5'3"8
5'3"8
10'3"8
5'
16'7"12
6'4"4
20'4"8
3'8"12
25'5"12
5'1"4
32'1"9
6'7"12
35'11"8
3'9"15
41'4"
5'4"8
5'
5'
10'
5'
15'
5'
20'1"
5'1"
25'2"9
5'1"9
31'10"1
6'7"7
35'11"8
4'1"7
41'4"
5'4"83'7"510'0"9(WB1)
(WB1)
(WB2)
(WB3)
12'
A B C D
E
F
G
H I
JKLMNOPQR
4 12
4X4
1.5X6 5X5
5X5
3X5 5X5
5X5
5X8 2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W15,W16 2x4 SP 2250f-1.9E;
W17 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 546 /-/-/316 /208 /292
O 2207 /-/-/1496 /844 /-
J 1108 /-/-/764 /482 /-
Wind reactions based on MWFRS
R Brg Width = -Min Req =-
O Brg Width = 8.0 Min Req =2.6
J Brg Width = 4.0 Min Req =1.8
Bearings O & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 192 -521
C - D 949 -970
D - E 255 -734
Chords Tens.Comp.
E - F 584 -1110
F - G 528 -906
G - H 409 -568
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 58 -531
Q - P 542 -682
P - O 309 -384
N - M 705 -736
Chords Tens.Comp.
M - L 1010 -899
L - K 779 -724
K - J 480 -440
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 222 -503
A - Q 613 -225
C - O 985 -1324
O - D 1121 -1487
D - N 1222 -901
Webs Tens.Comp.
N - E 627 -758
E - M 451 -293
G - K 682 -718
H - K 755 -624
H - J 911 -994
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.031 F 999 360
VERT(CL):0.073 F 999 240
HORZ(LL):-0.015 J - -
HORZ(TL):0.028 J - -
Creep Factor: 2.0
Max TC CSI:0.846
Max BC CSI:0.478
Max W eb CSI:0.804
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T44
Ply: 1
Qty:1
SEQN:13552 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T319
DrwNo:079.20.1313.30210
AK /DF 03/19/2020
W15
W16
W17
15'26'4"
5'3"8
5'3"8
10'3"8
5'
16'7"12
6'4"4
20'4"8
3'8"12
25'5"12
5'1"4
32'1"9
6'7"12
35'11"8
3'9"15
41'4"
5'4"8
5'
5'
10'
5'
15'
5'
20'1"
5'1"
25'2"9
5'1"9
31'10"1
6'7"7
35'11"8
4'1"7
41'4"
5'4"83'7"510'0"9(WB1)
(WB1)
(WB2)
(WB3)
12'
A B C D
E
F
G
H I
JKLMNOPQR
4 12
4X4
1.5X6 5X5
5X5
3X5 5X5
5X5
5X8 2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 7.38
TC: From 36 plf at 7.38 to 36 plf at 10.67
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.38
BC: From 10 plf at 7.38 to 10 plf at 10.21
BC: 1129 lb Conc. Load at 7.46
BC: 546 lb Conc. Load at 9.38
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1093 /-/-/-/428 /-
E 1570 /-/-/-/596 /-
Wind reactions based on MWFRS
H Brg Width = 3.5 Min Req =1.7
E Brg Width = 3.5 Min Req =3.5
Bearing E is a rigid surface.
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 567 -1478
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 2584 -939
Chords Tens.Comp.
G - F 1286 -476
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - C 1153 -324
C - F 622 -1669
Webs Tens.Comp.
E - F 1667 -646
D - E 2172 -2060
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.029 G 999 360
VERT(CL):0.065 G 999 240
HORZ(LL):-0.017 D - -
HORZ(TL):0.039 D - -
Creep Factor: 2.0
Max TC CSI:0.836
Max BC CSI:0.379
Max W eb CSI:0.485
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:16327 SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T5
DrwNo:080.20.1107.09420
JB /DF 03/20/2020
8"10'
7'7"4
7'7"4
10'2"8
2'7"4
10'8"
5"8
7'5"8
7'5"8
10'2"8
2'9"
10'8"
5"8
1'8"
7"46"1 3'5"84'0"124'5"12'
12'7"4
A
B
C
D
EFGH
4 12
2X5(A1)
3X8
4X5
4X6
2X6(**)8X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 7.38
TC: From 36 plf at 7.38 to 36 plf at 10.67
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.38
BC: From 10 plf at 7.38 to 10 plf at 10.21
BC: 1129 lb Conc. Load at 7.46
BC: 546 lb Conc. Load at 9.38
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 1093 /-/-/-/428 /-
E 1570 /-/-/-/596 /-
Wind reactions based on MWFRS
H Brg Width = 3.5 Min Req =1.7
E Brg Width = 3.5 Min Req =3.5
Bearing E is a rigid surface.
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 567 -1478
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 2584 -939
Chords Tens.Comp.
G - F 1286 -476
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - C 1153 -324
C - F 622 -1669
Webs Tens.Comp.
E - F 1667 -646
D - E 2172 -2060
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.029 G 999 360
VERT(CL):0.065 G 999 240
HORZ(LL):-0.017 D - -
HORZ(TL):0.039 D - -
Creep Factor: 2.0
Max TC CSI:0.836
Max BC CSI:0.379
Max W eb CSI:0.485
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T45
Ply: 1
Qty:1
SEQN:16327 SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T5
DrwNo:080.20.1107.09420
JB /DF 03/20/2020
8"10'
7'7"4
7'7"4
10'2"8
2'7"4
10'8"
5"8
7'5"8
7'5"8
10'2"8
2'9"
10'8"
5"8
1'8"
7"46"1 3'5"84'0"124'5"12'
12'7"4
A
B
C
D
EFGH
4 12
2X5(A1)
3X8
4X5
4X6
2X6(**)8X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.776'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 571 /-/-/456 /174 /129
E 273 /-/-/186 /114 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2203 -2354
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 C 999 360
VERT(CL):0.110 C 707 240
HORZ(LL):-0.024 C - -
HORZ(TL):0.067 C - -
Creep Factor: 2.0
Max TC CSI:0.805
Max BC CSI:0.488
Max W eb CSI:0.406
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T46
Ply: 1
Qty:2
SEQN:13536 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T315
DrwNo:079.20.1313.29867
AK /DF 03/19/2020
8"6'7"12
7'3"12
7'3"121'8"
6"1 2'11"53'3"1012'A
B
C
D
E
4 12
2X5(C3)3X4(C3)
3X4
3X3
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.776'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 571 /-/-/456 /174 /129
E 273 /-/-/186 /114 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2203 -2354
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 C 999 360
VERT(CL):0.110 C 707 240
HORZ(LL):-0.024 C - -
HORZ(TL):0.067 C - -
Creep Factor: 2.0
Max TC CSI:0.805
Max BC CSI:0.488
Max W eb CSI:0.406
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T46
Ply: 1
Qty:2
SEQN:13536 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T315
DrwNo:079.20.1313.29867
AK /DF 03/19/2020
8"6'7"12
7'3"12
7'3"121'8"
6"1 2'11"53'3"1012'A
B
C
D
E
4 12
2X5(C3)3X4(C3)
3X4
3X3
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.776'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 377 /-/-/296 /105 /105
D 295 /-/-/219 /128 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1901 -2044
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 377 -207
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.064 B 999 360
VERT(CL):0.148 B 526 240
HORZ(LL):0.039 B - -
HORZ(TL):0.091 B - -
Creep Factor: 2.0
Max TC CSI:0.890
Max BC CSI:0.759
Max W eb CSI:0.400
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:13533 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T309
DrwNo:079.20.1313.28557
AK /DF 03/19/2020
8"6'7"12
7'3"12
7'3"12
6"1 2'11"512'
A
B
C
D
4 12
2X5(C3)
3X4(C3)
3X4
3X3
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.776'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 377 /-/-/296 /105 /105
D 295 /-/-/219 /128 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1901 -2044
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - D 377 -207
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.064 B 999 360
VERT(CL):0.148 B 526 240
HORZ(LL):0.039 B - -
HORZ(TL):0.091 B - -
Creep Factor: 2.0
Max TC CSI:0.890
Max BC CSI:0.759
Max W eb CSI:0.400
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T47
Ply: 1
Qty:1
SEQN:13533 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T309
DrwNo:079.20.1313.28557
AK /DF 03/19/2020
8"6'7"12
7'3"12
7'3"12
6"1 2'11"512'
A
B
C
D
4 12
2X5(C3)
3X4(C3)
3X4
3X3
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 2.71
TC: From 36 plf at 2.71 to 36 plf at 6.65
BC: From 10 plf at 0.00 to 10 plf at 6.65
BC: 188 lb Conc. Load at 0.71
BC: 163 lb Conc. Load at 2.71
BC: 149 lb Conc. Load at 4.71
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 542 /-/-/-/80 /-
D 359 /-/-/-/67 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 117 -622
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 552 -91
Chords Tens.Comp.
E - D 534 -94
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 101 -577
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.008 E 999 360
VERT(CL):0.018 E 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.170
Max BC CSI:0.247
Max W eb CSI:0.130
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:13530 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T316
DrwNo:079.20.1313.27542
AK /DF 03/19/2020
6'7"12
3'3"14
3'3"14
6'7"12
3'3"14
3'2"2
3'2"2
6'7"12
3'5"10
8"12 2'11"512'
A
B
C
DE
4 12
3X4(B2)
1.5X4
3X4
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 2.71
TC: From 36 plf at 2.71 to 36 plf at 6.65
BC: From 10 plf at 0.00 to 10 plf at 6.65
BC: 188 lb Conc. Load at 0.71
BC: 163 lb Conc. Load at 2.71
BC: 149 lb Conc. Load at 4.71
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 542 /-/-/-/80 /-
D 359 /-/-/-/67 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 117 -622
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 552 -91
Chords Tens.Comp.
E - D 534 -94
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 101 -577
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.008 E 999 360
VERT(CL):0.018 E 999 240
HORZ(LL):-0.002 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.170
Max BC CSI:0.247
Max W eb CSI:0.130
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T48
Ply: 1
Qty:1
SEQN:13530 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T316
DrwNo:079.20.1313.27542
AK /DF 03/19/2020
6'7"12
3'3"14
3'3"14
6'7"12
3'3"14
3'2"2
3'2"2
6'7"12
3'5"10
8"12 2'11"512'
A
B
C
DE
4 12
3X4(B2)
1.5X4
3X4
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W6 2x4 SP 2250f-1.9E;
W5 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 818 /-/-/635 /279 /373
N 3076 /-/-/2031 /1105 /-
J 1156 /-/-/836 /364 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
N Brg Width = 8.0 Min Req =4.9
J Brg Width = 4.2 Min Req =1.8
Bearings B, N, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 619 -1064
D - E 1124 -604
E - F 528 -580
Chords Tens.Comp.
F - G 530 -583
G - H 830 -1170
H - I 766 -1056
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 932 -644
P - O 926 -644
N - M 746 -920
Chords Tens.Comp.
M - L 1032 -527
L - K 980 -648
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 809 -1021
O - D 558 -297
D - N 855 -1132
N - E 1608 -2131
E - M 1681 -1116
Webs Tens.Comp.
M - G 670 -838
H - K 414 -531
K - I 1126 -717
I - J 887 -1109
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.036 P 999 360
VERT(CL):0.085 P 999 240
HORZ(LL):0.013 J - -
HORZ(TL):0.027 J - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.713
Max W eb CSI:0.982
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T49
Ply: 1
Qty:3
SEQN:12891 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T302
DrwNo:079.20.1313.41302
AK /DF 03/19/2020
T2
W2
W5
W6
W13
21'8"27'4"3
7'8"5
7'8"5
14'11"2
7'2"13
21'9"12
6'10"10
29'4"
7'6"4
36'10"9
7'6"9
43'8"9
6'10"
49'0"3
5'3"10
7'6"9
7'6"9
14'7"15
7'1"6
21'6"4
6'10"5
29'4"
7'9"12
37'1"12
7'9"12
44'0"1
6'10"5
49'0"3
5'0"21'8"
6"1 3'8"1110'3"610'7"11(WB1)
(WB4)(WB2)
(WB3)
(WB1)
12'A B
C
D
E
F
G
H
I
JKLMNOP
4 12
3X5(B1)1.5X4
3X4
5X6
5X6
5X5
4X6
6X6
6X8
5X6
5X6
3X4
3X5
4X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W6 2x4 SP 2250f-1.9E;
W5 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 818 /-/-/635 /279 /373
N 3076 /-/-/2031 /1105 /-
J 1156 /-/-/836 /364 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
N Brg Width = 8.0 Min Req =4.9
J Brg Width = 4.2 Min Req =1.8
Bearings B, N, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 619 -1064
D - E 1124 -604
E - F 528 -580
Chords Tens.Comp.
F - G 530 -583
G - H 830 -1170
H - I 766 -1056
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 932 -644
P - O 926 -644
N - M 746 -920
Chords Tens.Comp.
M - L 1032 -527
L - K 980 -648
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 809 -1021
O - D 558 -297
D - N 855 -1132
N - E 1608 -2131
E - M 1681 -1116
Webs Tens.Comp.
M - G 670 -838
H - K 414 -531
K - I 1126 -717
I - J 887 -1109
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.036 P 999 360
VERT(CL):0.085 P 999 240
HORZ(LL):0.013 J - -
HORZ(TL):0.027 J - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.713
Max W eb CSI:0.982
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T49
Ply: 1
Qty:3
SEQN:12891 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T302
DrwNo:079.20.1313.41302
AK /DF 03/19/2020
T2
W2
W5
W6
W13
21'8"27'4"3
7'8"5
7'8"5
14'11"2
7'2"13
21'9"12
6'10"10
29'4"
7'6"4
36'10"9
7'6"9
43'8"9
6'10"
49'0"3
5'3"10
7'6"9
7'6"9
14'7"15
7'1"6
21'6"4
6'10"5
29'4"
7'9"12
37'1"12
7'9"12
44'0"1
6'10"5
49'0"3
5'0"21'8"
6"1 3'8"1110'3"610'7"11(WB1)
(WB4)(WB2)
(WB3)
(WB1)
12'A B
C
D
E
F
G
H
I
JKLMNOP
4 12
3X5(B1)1.5X4
3X4
5X6
5X6
5X5
4X6
6X6
6X8
5X6
5X6
3X4
3X5
4X6
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W6,W9 2x4 SP 2250f-1.9E;
W5 2x4 SP 2700f-2.2E; W 19 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 823 /-/-/635 /272 /373
V 2892 /-/-/2030 /1117 /-
K 1066 /-/-/824 /356 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
V Brg Width = 8.0 Min Req =3.4
K Brg Width = 4.2 Min Req =1.7
Bearings B, V, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 575 -1076
D - E 1162 -655
E - F 502 -469
F - G 1040 -1161
Chords Tens.Comp.
G - H 1116 -1278
H - I 1007 -1290
I - J 867 -1075
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 942 -603
X - W 937 -603
V - U 789 -959
S - Q 1050 -597
Chords Tens.Comp.
Q - P 1033 -595
P - O 999 -780
O - L 1016 -782
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 813 -1018
W -D 560 -298
D - V 855 -1147
V - E 1637 -2051
E - U 1595 -1141
F - U 802 -990
Webs Tens.Comp.
F - S 1036 -869
S - G 637 -602
I - L 437 -477
L - J 1163 -897
J - K 871 -1029
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.041 G 999 360
VERT(CL):0.103 G 999 240
HORZ(LL):0.022 K - -
HORZ(TL):0.050 K - -
Creep Factor: 2.0
Max TC CSI:0.832
Max BC CSI:0.609
Max W eb CSI:0.982
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T50
Ply: 1
Qty:1
SEQN:12895 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T303
DrwNo:079.20.1313.37885
AK /DF 03/19/2020
T2
W2
W5
W6
W9
W19
21'8"27'4"3
7'8"5
7'8"5
14'11"2
7'2"13
21'9"12
6'10"10
29'4"
7'6"4
36'6"5
7'2"5
41'2"
4'7"11
45'10"
4'8"
49'0"3
3'2"3
7'6"9
7'6"9
14'7"15
7'1"6
21'6"4
6'10"5
29'4"
7'9"12
36'6"
7'2"
37'11"12
1'5"12
41'2"
3'2"4
44'4"4
3'2"4
45'10"
1'5"12
49'0"3
3'2"31'8"
6"1 3'8"111'4"10'3"610'7"11(WB1)
(WB3)(WB2)
12'A B
C
D
E
F
G
H
I
J
K
L
MN
OPQ
RSTUVWX
4 12
3X5(B1)
3X4
5X6
5X6
5X6
4X6
6X8
5X8 5X8
5X6
3X8
3X4
5X8
3X5
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W6,W9 2x4 SP 2250f-1.9E;
W5 2x4 SP 2700f-2.2E; W 19 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 823 /-/-/635 /272 /373
V 2892 /-/-/2030 /1117 /-
K 1066 /-/-/824 /356 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
V Brg Width = 8.0 Min Req =3.4
K Brg Width = 4.2 Min Req =1.7
Bearings B, V, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 575 -1076
D - E 1162 -655
E - F 502 -469
F - G 1040 -1161
Chords Tens.Comp.
G - H 1116 -1278
H - I 1007 -1290
I - J 867 -1075
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 942 -603
X - W 937 -603
V - U 789 -959
S - Q 1050 -597
Chords Tens.Comp.
Q - P 1033 -595
P - O 999 -780
O - L 1016 -782
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 813 -1018
W -D 560 -298
D - V 855 -1147
V - E 1637 -2051
E - U 1595 -1141
F - U 802 -990
Webs Tens.Comp.
F - S 1036 -869
S - G 637 -602
I - L 437 -477
L - J 1163 -897
J - K 871 -1029
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.041 G 999 360
VERT(CL):0.103 G 999 240
HORZ(LL):0.022 K - -
HORZ(TL):0.050 K - -
Creep Factor: 2.0
Max TC CSI:0.832
Max BC CSI:0.609
Max W eb CSI:0.982
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T50
Ply: 1
Qty:1
SEQN:12895 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T303
DrwNo:079.20.1313.37885
AK /DF 03/19/2020
T2
W2
W5
W6
W9
W19
21'8"27'4"3
7'8"5
7'8"5
14'11"2
7'2"13
21'9"12
6'10"10
29'4"
7'6"4
36'6"5
7'2"5
41'2"
4'7"11
45'10"
4'8"
49'0"3
3'2"3
7'6"9
7'6"9
14'7"15
7'1"6
21'6"4
6'10"5
29'4"
7'9"12
36'6"
7'2"
37'11"12
1'5"12
41'2"
3'2"4
44'4"4
3'2"4
45'10"
1'5"12
49'0"3
3'2"31'8"
6"1 3'8"111'4"10'3"610'7"11(WB1)
(WB3)(WB2)
12'A B
C
D
E
F
G
H
I
J
K
L
MN
OPQ
RSTUVWX
4 12
3X5(B1)
3X4
5X6
5X6
5X6
4X6
6X8
5X8 5X8
5X6
3X8
3X4
5X8
3X5
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W6,W7,W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 661 /-/-/503 /208 /373
P 2984 /-/-/1967 /1068 /-
K 1406 /-/-/977 /471 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
P Brg Width = 4.0 Min Req =-
K Brg Width = 4.2 Min Req =2.2
Bearings B, P, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 346 -741
D - E 1076 -656
E - F 478 -689
F - G 946 -1095
Chords Tens.Comp.
G - H 970 -1092
H - I 1172 -1514
I - J 1134 -1574
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 671 -409
R - Q 664 -410
P - O 706 -866
Chords Tens.Comp.
O - N 625 -224
N - M 1355 -774
M - L 1432 -939
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 631 -759
Q - D 445 -228
D - P 713 -946
P - E 1608 -2254
E - O 1877 -1262
O - F 923 -1151
Webs Tens.Comp.
F - N 711 -487
N - H 593 -672
I - L 405 -456
L - J 1458 -903
J - K 1097 -1330
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.053 M 999 360
VERT(CL):0.117 M 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.031 K - -
Creep Factor: 2.0
Max TC CSI:0.879
Max BC CSI:0.680
Max W eb CSI:0.841
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T51
Ply: 1
Qty:3
SEQN:12899 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T308
DrwNo:079.20.1313.27200
AK /DF 03/19/2020
W5 W6
W7
W14
W15
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"9
5'10"12
23'6"12
5'11"3
29'4"
5'9"4
35'1"9
5'9"9
41'0"4
5'10"11
49'0"3
7'11"15
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
23'3"4
5'11"
29'4"
6'0"12
35'4"12
6'0"12
41'3"12
5'11"
49'0"3
7'8"71'8"
6"1 3'8"1110'3"610'7"11(WB1)
(WB2)
12'A B
C
D
E
F
G
H
I
J
KLMNOPQR
4 12
3X5(B1)1.5X4
3X4
3X4
5X6
5X6
6X6
4X6
3X4
5X6
5X8
5X6
5X6
3X4
4X4
4X10
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W6,W7,W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 661 /-/-/503 /208 /373
P 2984 /-/-/1967 /1068 /-
K 1406 /-/-/977 /471 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
P Brg Width = 4.0 Min Req =-
K Brg Width = 4.2 Min Req =2.2
Bearings B, P, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 346 -741
D - E 1076 -656
E - F 478 -689
F - G 946 -1095
Chords Tens.Comp.
G - H 970 -1092
H - I 1172 -1514
I - J 1134 -1574
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 671 -409
R - Q 664 -410
P - O 706 -866
Chords Tens.Comp.
O - N 625 -224
N - M 1355 -774
M - L 1432 -939
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 631 -759
Q - D 445 -228
D - P 713 -946
P - E 1608 -2254
E - O 1877 -1262
O - F 923 -1151
Webs Tens.Comp.
F - N 711 -487
N - H 593 -672
I - L 405 -456
L - J 1458 -903
J - K 1097 -1330
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.053 M 999 360
VERT(CL):0.117 M 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.031 K - -
Creep Factor: 2.0
Max TC CSI:0.879
Max BC CSI:0.680
Max W eb CSI:0.841
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T51
Ply: 1
Qty:3
SEQN:12899 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T308
DrwNo:079.20.1313.27200
AK /DF 03/19/2020
W5 W6
W7
W14
W15
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"9
5'10"12
23'6"12
5'11"3
29'4"
5'9"4
35'1"9
5'9"9
41'0"4
5'10"11
49'0"3
7'11"15
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
23'3"4
5'11"
29'4"
6'0"12
35'4"12
6'0"12
41'3"12
5'11"
49'0"3
7'8"71'8"
6"1 3'8"1110'3"610'7"11(WB1)
(WB2)
12'A B
C
D
E
F
G
H
I
J
KLMNOPQR
4 12
3X5(B1)1.5X4
3X4
3X4
5X6
5X6
6X6
4X6
3X4
5X6
5X8
5X6
5X6
3X4
4X4
4X10
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W6,W7,W11,
W15 2x4 SP 2250f-1.9E; W 16 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 5X6 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 675 /-/-/506 /211 /364
Q 2741 /-/-/1965 /1062 /-
L 1326 /-/-/980 /472 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, Q, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 358 -780
D - E 1029 -641
E - F 457 -557
F - G 912 -958
Chords Tens.Comp.
G - H 956 -846
H - I 1282 -1362
I - J 1165 -1371
J - K 1123 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 677 -420
S - R 673 -421
Q - P 693 -829
Chords Tens.Comp.
P - O 503 -207
O - N 896 -467
N - M 1325 -927
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 628 -751
R - D 445 -227
D - Q 713 -951
Q - E 1599 -2068
E - P 1677 -1246
P - F 931 -1144
F - O 713 -483
Webs Tens.Comp.
O - H 575 -485
H - N 706 -656
N - I 472 -373
J - M 395 -402
M - K 1342 -888
K - L 1090 -1251
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.01 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.047 I 999 360
VERT(CL):0.112 I 999 240
HORZ(LL):0.012 L - -
HORZ(TL):0.026 L - -
Creep Factor: 2.0
Max TC CSI:0.878
Max BC CSI:0.665
Max W eb CSI:0.834
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T52
Ply: 1
Qty:1
SEQN:12940 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T297
DrwNo:079.20.1313.32176
AK /DF 03/19/2020
W5 W6
W7
W11
W15
W16
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
23'3"12
5'8"
28'8"4
5'4"8
29'11"12
1'3"8
35'6"
5'6"4
41'0"9
5'6"9
49'0"3
7'11"10
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
23'0"4
5'8"
28'10"
5'9"12
35'6"
6'8"
41'3"12
5'9"12
49'0"3
7'8"71'8"
6"1 3'8"1110'0"1310'5"2(WB1)
(WB1)
(WB2)
12'A B
C
D
E
F
G H
I
J
K
LMNOPQRS
4 12
3X5(B1)1.5X4
3X4
3X4
4X6
4X5
3X4
5X8 5X8
1.5X4
3X5
4X10
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W6,W7,W11,
W15 2x4 SP 2250f-1.9E; W 16 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 5X6 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 675 /-/-/506 /211 /364
Q 2741 /-/-/1965 /1062 /-
L 1326 /-/-/980 /472 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, Q, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 358 -780
D - E 1029 -641
E - F 457 -557
F - G 912 -958
Chords Tens.Comp.
G - H 956 -846
H - I 1282 -1362
I - J 1165 -1371
J - K 1123 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 677 -420
S - R 673 -421
Q - P 693 -829
Chords Tens.Comp.
P - O 503 -207
O - N 896 -467
N - M 1325 -927
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 628 -751
R - D 445 -227
D - Q 713 -951
Q - E 1599 -2068
E - P 1677 -1246
P - F 931 -1144
F - O 713 -483
Webs Tens.Comp.
O - H 575 -485
H - N 706 -656
N - I 472 -373
J - M 395 -402
M - K 1342 -888
K - L 1090 -1251
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.01 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.047 I 999 360
VERT(CL):0.112 I 999 240
HORZ(LL):0.012 L - -
HORZ(TL):0.026 L - -
Creep Factor: 2.0
Max TC CSI:0.878
Max BC CSI:0.665
Max W eb CSI:0.834
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T52
Ply: 1
Qty:1
SEQN:12940 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T297
DrwNo:079.20.1313.32176
AK /DF 03/19/2020
W5 W6
W7
W11
W15
W16
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
23'3"12
5'8"
28'8"4
5'4"8
29'11"12
1'3"8
35'6"
5'6"4
41'0"9
5'6"9
49'0"3
7'11"10
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
23'0"4
5'8"
28'10"
5'9"12
35'6"
6'8"
41'3"12
5'9"12
49'0"3
7'8"71'8"
6"1 3'8"1110'0"1310'5"2(WB1)
(WB1)
(WB2)
12'A B
C
D
E
F
G H
I
J
K
LMNOPQRS
4 12
3X5(B1)1.5X4
3X4
3X4
4X6
4X5
3X4
5X8 5X8
1.5X4
3X5
4X10
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W9,W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 674 /-/-/510 /207 /338
P 2758 /-/-/1970 /1065 /-
L 1314 /-/-/973 /463 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
P Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, P, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 343 -777
D - E 1039 -659
E - F 1027 -536
F - G 757 -830
Chords Tens.Comp.
G - H 1017 -1016
H - I 987 -1120
I - J 1279 -1454
J - K 1082 -1473
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 675 -406
R - Q 671 -406
Chords Tens.Comp.
O - N 738 -327
N - M 1219 -802
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 627 -758
Q - D 420 -227
D - P 716 -939
E - P 354 -381
P - F 1495 -1954
F - O 986 -624
Webs Tens.Comp.
G - O 532 -703
G - N 631 -573
N - I 479 -409
M - J 586 -508
M - K 1354 -884
K - L 1050 -1247
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 I 999 360
VERT(CL):0.096 I 999 240
HORZ(LL):0.015 L - -
HORZ(TL):0.034 L - -
Creep Factor: 2.0
Max TC CSI:0.866
Max BC CSI:0.936
Max W eb CSI:0.865
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T53
Ply: 1
Qty:1
SEQN:12910 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T289
DrwNo:079.20.1313.27620
AK /DF 03/19/2020
W6
W9
W14
W15
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'6"
5'9"2
22'2"
4'8"
26'8"4
4'6"4
31'11"12
5'3"8
36'6"
4'6"4
41'2"5
4'8"5
49'0"3
7'9"14
5'8"13
5'8"13
11'5"11
5'8"13
17'6"
6'0"5
26'8"4
9'2"4
31'10"
5'1"12
41'2"
9'4"
49'0"3
7'10"31'8"
6"1 3'8"119'4"139'9"2(WB1)
(WB2)(WB2)
(WB2)
12'A B
C
D
E
F
G H
I
J
K
LMNOPQR
4 12
3X5(B1)1.5X4
3X4
3X4
5X6
1.5X4
6X8
4X5
5X8
3X4 5X8
5X6
3X4
3X10
5X6
4X10
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W9,W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 674 /-/-/510 /207 /338
P 2758 /-/-/1970 /1065 /-
L 1314 /-/-/973 /463 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
P Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, P, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 343 -777
D - E 1039 -659
E - F 1027 -536
F - G 757 -830
Chords Tens.Comp.
G - H 1017 -1016
H - I 987 -1120
I - J 1279 -1454
J - K 1082 -1473
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 675 -406
R - Q 671 -406
Chords Tens.Comp.
O - N 738 -327
N - M 1219 -802
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 627 -758
Q - D 420 -227
D - P 716 -939
E - P 354 -381
P - F 1495 -1954
F - O 986 -624
Webs Tens.Comp.
G - O 532 -703
G - N 631 -573
N - I 479 -409
M - J 586 -508
M - K 1354 -884
K - L 1050 -1247
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 I 999 360
VERT(CL):0.096 I 999 240
HORZ(LL):0.015 L - -
HORZ(TL):0.034 L - -
Creep Factor: 2.0
Max TC CSI:0.866
Max BC CSI:0.936
Max W eb CSI:0.865
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T53
Ply: 1
Qty:1
SEQN:12910 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T289
DrwNo:079.20.1313.27620
AK /DF 03/19/2020
W6
W9
W14
W15
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'6"
5'9"2
22'2"
4'8"
26'8"4
4'6"4
31'11"12
5'3"8
36'6"
4'6"4
41'2"5
4'8"5
49'0"3
7'9"14
5'8"13
5'8"13
11'5"11
5'8"13
17'6"
6'0"5
26'8"4
9'2"4
31'10"
5'1"12
41'2"
9'4"
49'0"3
7'10"31'8"
6"1 3'8"119'4"139'9"2(WB1)
(WB2)(WB2)
(WB2)
12'A B
C
D
E
F
G H
I
J
K
LMNOPQR
4 12
3X5(B1)1.5X4
3X4
3X4
5X6
1.5X4
6X8
4X5
5X8
3X4 5X8
5X6
3X4
3X10
5X6
4X10
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W7 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 726 /-/-/561 /225 /310
X 2680 /-/-/1888 /1029 /-
L 1329 /-/-/981 /472 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, X, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 441 -917
D - E 1062 -659
E - F 656 -863
F - G 985 -1144
Chords Tens.Comp.
G - H 985 -1144
H - I 1169 -1472
I - J 1271 -1732
J - K 754 -940
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 806 -498
Z - Y 802 -498
W -U 749 -874
U - S 768 -906
Chords Tens.Comp.
S - R 741 -317
R - Q 1322 -792
Q - P 1585 -1093
P - M 932 -742
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 626 -758
Y - D 418 -224
D - W 782 -1019
W -X 1949 -2541
W -E 1638 -2080
E - S 1842 -1244
F - S 707 -925
F - R 816 -628
Webs Tens.Comp.
R - H 433 -390
H - Q 408 -257
Q - I 395 -365
P - J 718 -488
J - M 804 -931
M - K 1364 -1089
K - L 1033 -1301
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.34 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.057 T 999 360
VERT(CL):0.175 T 999 240
HORZ(LL):0.022 L - -
HORZ(TL):0.052 L - -
Creep Factor: 2.0
Max TC CSI:0.959
Max BC CSI:0.690
Max W eb CSI:0.902
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T54
Ply: 1
Qty:1
SEQN:12914 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T312
DrwNo:079.20.1313.42940
AK /DF 03/19/2020
W6
W7
W20
BL1
17'6"31'6"3
5'10"8
5'10"8
11'8"11
5'10"3
17'7"12
5'11"1
24'8"4
7'0"8
29'4"
4'7"12
33'11"12
4'7"12
40'3"14
6'4"2
46'11"8
6'7"10
49'0"3
2'0"11
5'8"12
5'8"12
11'7"4
5'10"8
17'6"
5'10"12
21'2"12
3'8"12
21'8"
5"4
24'7"12
2'11"12
29'4"
4'8"4
33'11"12
4'7"12
40'7"6
6'7"10
46'11"8
6'4"2
49'0"3
2'0"111'8"
6"1 3'8"111'8'8"139'1"2(WB1)(WB1)
12'A B
C
D
E
F G H
I
J K
L
M
N
OPQRS
TU VWXYZ
4 12
3X5(B1)
3X4
5X8
5X6
5X83X6
4X6
5X8
3X8 3X8
5X8
5X6
3X4
3X4
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W6,W7 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 726 /-/-/561 /225 /310
X 2680 /-/-/1888 /1029 /-
L 1329 /-/-/981 /472 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 4.0 Min Req =-
L Brg Width = 4.2 Min Req =2.1
Bearings B, X, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 441 -917
D - E 1062 -659
E - F 656 -863
F - G 985 -1144
Chords Tens.Comp.
G - H 985 -1144
H - I 1169 -1472
I - J 1271 -1732
J - K 754 -940
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 806 -498
Z - Y 802 -498
W -U 749 -874
U - S 768 -906
Chords Tens.Comp.
S - R 741 -317
R - Q 1322 -792
Q - P 1585 -1093
P - M 932 -742
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 626 -758
Y - D 418 -224
D - W 782 -1019
W -X 1949 -2541
W -E 1638 -2080
E - S 1842 -1244
F - S 707 -925
F - R 816 -628
Webs Tens.Comp.
R - H 433 -390
H - Q 408 -257
Q - I 395 -365
P - J 718 -488
J - M 804 -931
M - K 1364 -1089
K - L 1033 -1301
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.34 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.057 T 999 360
VERT(CL):0.175 T 999 240
HORZ(LL):0.022 L - -
HORZ(TL):0.052 L - -
Creep Factor: 2.0
Max TC CSI:0.959
Max BC CSI:0.690
Max W eb CSI:0.902
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T54
Ply: 1
Qty:1
SEQN:12914 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T312
DrwNo:079.20.1313.42940
AK /DF 03/19/2020
W6
W7
W20
BL1
17'6"31'6"3
5'10"8
5'10"8
11'8"11
5'10"3
17'7"12
5'11"1
24'8"4
7'0"8
29'4"
4'7"12
33'11"12
4'7"12
40'3"14
6'4"2
46'11"8
6'7"10
49'0"3
2'0"11
5'8"12
5'8"12
11'7"4
5'10"8
17'6"
5'10"12
21'2"12
3'8"12
21'8"
5"4
24'7"12
2'11"12
29'4"
4'8"4
33'11"12
4'7"12
40'7"6
6'7"10
46'11"8
6'4"2
49'0"3
2'0"111'8"
6"1 3'8"111'8'8"139'1"2(WB1)(WB1)
12'A B
C
D
E
F G H
I
J K
L
M
N
OPQRS
TU VWXYZ
4 12
3X5(B1)
3X4
5X8
5X6
5X83X6
4X6
5X8
3X8 3X8
5X8
5X6
3X4
3X4
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W9 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 857 /-/-/650 /292 /296
Y 2437 /-/-/1728 /917 /-
M 1394 /-/-/1018 /510 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =3.9
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 779 -1266
C - D 365 -587
D - E 435 -181
E - F 728 -855
F - G 1226 -1402
Chords Tens.Comp.
G - H 1226 -1402
H - I 1483 -1661
I - J 1626 -1838
J - K 1441 -1832
K - L 799 -978
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1135 -828
AA- Z 1131 -829
Z - Y 476 -284
T - S 756 -413
Chords Tens.Comp.
S - R 1587 -1083
R - Q 1507 -1052
Q - N 962 -778
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 570 -692
Z - D 429 -207
D - Y 688 -929
Y - X 1395 -1772
X - E 1386 -1757
E - T 1419 -912
F - T 657 -914
F - S 1034 -769
Webs Tens.Comp.
G - S 328 -446
H - R 393 -450
R - I 583 -401
Q - J 539 -457
Q - K 808 -615
K - N 840 -965
N - L 1406 -1140
L - M 1108 -1365
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.063 H 999 360
VERT(CL):0.148 H 999 240
HORZ(LL):-0.020 J - -
HORZ(TL):0.045 J - -
Creep Factor: 2.0
Max TC CSI:0.609
Max BC CSI:0.670
Max W eb CSI:0.837
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T55
Ply: 1
Qty:1
SEQN:12918 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T287
DrwNo:079.20.1313.41941
AK /DF 03/19/2020
W5
W9
W20
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
22'8"4
5'0"8
28'4"4
5'8"
34'0"4
5'8"
35'
11"12
40'11"12
5'11"12
46'11"8
5'11"12
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
22'8"4
1'0"4
28'4"4
5'8"
34'0"4
5'8"
40'11"12
6'11"8
46'11"8
5'11"12
49'0"3
2'0"111'8"
6"1 3'8"118'0"131'8'4"128'9"(WB1)
12'A B
C
D
E
F G H I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X6
5X53X4
4X5
5X8
4X4
3X10
5X10(SRS)
5X6
5X6
3X8
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W9 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 857 /-/-/650 /292 /296
Y 2437 /-/-/1728 /917 /-
M 1394 /-/-/1018 /510 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =3.9
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 779 -1266
C - D 365 -587
D - E 435 -181
E - F 728 -855
F - G 1226 -1402
Chords Tens.Comp.
G - H 1226 -1402
H - I 1483 -1661
I - J 1626 -1838
J - K 1441 -1832
K - L 799 -978
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1135 -828
AA- Z 1131 -829
Z - Y 476 -284
T - S 756 -413
Chords Tens.Comp.
S - R 1587 -1083
R - Q 1507 -1052
Q - N 962 -778
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 570 -692
Z - D 429 -207
D - Y 688 -929
Y - X 1395 -1772
X - E 1386 -1757
E - T 1419 -912
F - T 657 -914
F - S 1034 -769
Webs Tens.Comp.
G - S 328 -446
H - R 393 -450
R - I 583 -401
Q - J 539 -457
Q - K 808 -615
K - N 840 -965
N - L 1406 -1140
L - M 1108 -1365
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.063 H 999 360
VERT(CL):0.148 H 999 240
HORZ(LL):-0.020 J - -
HORZ(TL):0.045 J - -
Creep Factor: 2.0
Max TC CSI:0.609
Max BC CSI:0.670
Max W eb CSI:0.837
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T55
Ply: 1
Qty:1
SEQN:12918 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T287
DrwNo:079.20.1313.41941
AK /DF 03/19/2020
W5
W9
W20
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
22'8"4
5'0"8
28'4"4
5'8"
34'0"4
5'8"
35'
11"12
40'11"12
5'11"12
46'11"8
5'11"12
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
22'8"4
1'0"4
28'4"4
5'8"
34'0"4
5'8"
40'11"12
6'11"8
46'11"8
5'11"12
49'0"3
2'0"111'8"
6"1 3'8"118'0"131'8'4"128'9"(WB1)
12'A B
C
D
E
F G H I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X6
5X53X4
4X5
5X8
4X4
3X10
5X10(SRS)
5X6
5X6
3X8
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W8,W9 2x4 SP 2250f-1.9E;
W21 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 638 /-/-/481 /177 /296
X 2879 /-/-/1981 /1099 /-
M 1265 /-/-/914 /443 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 4.0 Min Req =-
M Brg Width = 4.2 Min Req =2.0
Bearings B, X, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -679
C - D 506 -366
D - E 1299 -849
E - F 480 -145
F - G 708 -889
Chords Tens.Comp.
G - H 708 -889
H - I 1282 -1350
I - J 1251 -1393
J - K 1295 -1606
K - L 742 -889
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 582 -330
Z - Y 578 -330
Y - X 350 -470
V - T 413 -474
Chords Tens.Comp.
T - S 1373 -933
S - R 1371 -933
R - Q 1471 -1125
Q - N 875 -724
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 639 -773
Y - D 455 -227
D - X 724 -962
X - E 1463 -1810
X - V 968 -1199
E - V 1438 -968
F - V 1145 -1551
F - T 1591 -1230
Webs Tens.Comp.
G - T 340 -457
T - H 748 -782
I - R 528 -397
Q - K 665 -520
K - N 781 -872
N - L 1280 -1061
L - M 1025 -1238
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 S 999 360
VERT(CL):0.136 S 999 240
HORZ(LL):0.026 M - -
HORZ(TL):0.061 M - -
Creep Factor: 2.0
Max TC CSI:0.781
Max BC CSI:0.608
Max W eb CSI:0.844
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T56
Ply: 1
Qty:1
SEQN:12922 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T281
DrwNo:079.20.1313.29539
AK /DF 03/19/2020
W5
W8
W9
W21
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
20'8"4
3'0"8
26'4"4
5'8"
32'0"4
5'8"
35'
2'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'6"
6'0"5
21'8"
4'2"
26'4"4
4'8"4
31'10"8
5'6"4
35'
3'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"117'4"131'8'4"128'9"(WB1)
12'A B
C
D
E
F G H
I
J
K L
M
N
O
PQRST
UVWXYZ
4 12
3X5(B1)
3X4
5X6
5X6
5X8
4X5
5X8
6X8
5X8
5X10(SRS)
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W8,W9 2x4 SP 2250f-1.9E;
W21 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 638 /-/-/481 /177 /296
X 2879 /-/-/1981 /1099 /-
M 1265 /-/-/914 /443 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 4.0 Min Req =-
M Brg Width = 4.2 Min Req =2.0
Bearings B, X, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -679
C - D 506 -366
D - E 1299 -849
E - F 480 -145
F - G 708 -889
Chords Tens.Comp.
G - H 708 -889
H - I 1282 -1350
I - J 1251 -1393
J - K 1295 -1606
K - L 742 -889
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 582 -330
Z - Y 578 -330
Y - X 350 -470
V - T 413 -474
Chords Tens.Comp.
T - S 1373 -933
S - R 1371 -933
R - Q 1471 -1125
Q - N 875 -724
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 639 -773
Y - D 455 -227
D - X 724 -962
X - E 1463 -1810
X - V 968 -1199
E - V 1438 -968
F - V 1145 -1551
F - T 1591 -1230
Webs Tens.Comp.
G - T 340 -457
T - H 748 -782
I - R 528 -397
Q - K 665 -520
K - N 781 -872
N - L 1280 -1061
L - M 1025 -1238
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 S 999 360
VERT(CL):0.136 S 999 240
HORZ(LL):0.026 M - -
HORZ(TL):0.061 M - -
Creep Factor: 2.0
Max TC CSI:0.781
Max BC CSI:0.608
Max W eb CSI:0.844
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T56
Ply: 1
Qty:1
SEQN:12922 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T281
DrwNo:079.20.1313.29539
AK /DF 03/19/2020
W5
W8
W9
W21
BL1
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'7"12
5'10"14
20'8"4
3'0"8
26'4"4
5'8"
32'0"4
5'8"
35'
2'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'6"
6'0"5
21'8"
4'2"
26'4"4
4'8"4
31'10"8
5'6"4
35'
3'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"117'4"131'8'4"128'9"(WB1)
12'A B
C
D
E
F G H
I
J
K L
M
N
O
PQRST
UVWXYZ
4 12
3X5(B1)
3X4
5X6
5X6
5X8
4X5
5X8
6X8
5X8
5X10(SRS)
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 861 /-/-/654 /294 /296
Y 2430 /-/-/1689 /913 /-
M 1394 /-/-/992 /511 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =3.9
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 719 -1280
C - D 300 -597
D - E 418 -219
E - F 381 -112
F - G 1095 -1250
Chords Tens.Comp.
G - H 1095 -1250
H - I 1627 -1651
I - J 1620 -1668
J - K 1581 -1817
K - L 853 -981
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1148 -832
AA- Z 1144 -833
Z - Y 484 -337
T - S 1861 -1512
Chords Tens.Comp.
S - R 1858 -1512
R - Q 1674 -1399
Q - N 967 -834
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 576 -694
Z - D 422 -208
D - Y 733 -911
Y - X 1452 -1755
E - X 554 -326
X - F 1057 -1499
F - T 1663 -1299
G - T 317 -444
Webs Tens.Comp.
T - H 867 -870
H - R 436 -509
I - R 628 -479
J - Q 390 -268
Q - K 787 -685
K - N 900 -970
N - L 1414 -1222
L - M 1178 -1366
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.070 S 999 360
VERT(CL):0.165 S 999 240
HORZ(LL):-0.028 T - -
HORZ(TL):0.063 T - -
Creep Factor: 2.0
Max TC CSI:0.581
Max BC CSI:0.630
Max W eb CSI:0.892
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T57
Ply: 1
Qty:1
SEQN:12926 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T292
DrwNo:079.20.1313.42160
AK /DF 03/19/2020
W5
W7
W20
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'6"
5'9"2
18'8"4
1'2"4
24'4"4
5'8"
30'0"4
5'8"
35'
4'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
24'4"4
2'8"4
29'10"8
5'6"4
35'
5'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"116'8"131'8'4"128'9"12'A B
C
D
E F G H
I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X6
5X55X5
5X6
5X8 5X6
5X10(SRS)
5X6
3X8
3X4
3X4
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 861 /-/-/654 /294 /296
Y 2430 /-/-/1689 /913 /-
M 1394 /-/-/992 /511 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =3.9
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 719 -1280
C - D 300 -597
D - E 418 -219
E - F 381 -112
F - G 1095 -1250
Chords Tens.Comp.
G - H 1095 -1250
H - I 1627 -1651
I - J 1620 -1668
J - K 1581 -1817
K - L 853 -981
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1148 -832
AA- Z 1144 -833
Z - Y 484 -337
T - S 1861 -1512
Chords Tens.Comp.
S - R 1858 -1512
R - Q 1674 -1399
Q - N 967 -834
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 576 -694
Z - D 422 -208
D - Y 733 -911
Y - X 1452 -1755
E - X 554 -326
X - F 1057 -1499
F - T 1663 -1299
G - T 317 -444
Webs Tens.Comp.
T - H 867 -870
H - R 436 -509
I - R 628 -479
J - Q 390 -268
Q - K 787 -685
K - N 900 -970
N - L 1414 -1222
L - M 1178 -1366
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.070 S 999 360
VERT(CL):0.165 S 999 240
HORZ(LL):-0.028 T - -
HORZ(TL):0.063 T - -
Creep Factor: 2.0
Max TC CSI:0.581
Max BC CSI:0.630
Max W eb CSI:0.892
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T57
Ply: 1
Qty:1
SEQN:12926 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T292
DrwNo:079.20.1313.42160
AK /DF 03/19/2020
W5
W7
W20
17'6"31'6"3
5'10"9
5'10"9
11'8"14
5'10"4
17'6"
5'9"2
18'8"4
1'2"4
24'4"4
5'8"
30'0"4
5'8"
35'
4'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'8"13
5'8"13
11'5"11
5'8"13
17'4"4
5'10"9
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
24'4"4
2'8"4
29'10"8
5'6"4
35'
5'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"116'8"131'8'4"128'9"12'A B
C
D
E F G H
I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X6
5X55X5
5X6
5X8 5X6
5X10(SRS)
5X6
3X8
3X4
3X4
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W6,W7,W10 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 843 /-/-/635 /279 /296
Y 2486 /-/-/1700 /936 /-
M 1374 /-/-/967 /503 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =4.0
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 641 -1233
C - D 319 -598
D - E 509 -613
E - F 463 -219
F - G 835 -960
Chords Tens.Comp.
G - H 835 -960
H - I 1578 -1647
I - J 1570 -1635
J - K 1531 -1779
K - L 848 -968
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1104 -825
AA- Z 1101 -826
Z - Y 322 -382
V - T 363 -438
Chords Tens.Comp.
T - S 1872 -1543
S - R 1868 -1543
R - Q 1636 -1349
Q - N 955 -831
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 539 -642
D - Z 563 -453
Z - E 1100 -992
E - Y 687 -726
Y - X 1311 -1662
X - F 1293 -1636
F - T 1818 -1427
Webs Tens.Comp.
T - H 1166 -1245
H - R 414 -458
I - R 554 -368
Q - K 758 -648
K - N 897 -957
N - L 1397 -1218
L - M 1168 -1346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 S 999 360
VERT(CL):0.161 S 999 240
HORZ(LL):-0.033 T - -
HORZ(TL):0.075 T - -
Creep Factor: 2.0
Max TC CSI:0.729
Max BC CSI:0.674
Max W eb CSI:0.659
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T58
Ply: 1
Qty:1
SEQN:12931 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T286
DrwNo:079.20.1313.41396
AK /DF 03/19/2020
W4
W6
W7
W10
W20
17'6"31'6"3
5'7"15
5'7"15
11'1"12
5'5"14
16'8"4
5'6"8
17'7"12
11"8
22'8"4
5'0"8
28'0"4
5'4"
35'
6'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'6"3
5'6"3
11'2"1
5'7"15
17'4"4
6'2"3
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
22'8"4
1'0"4
27'10"8
5'2"4
35'
7'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"116'0"131'8'4"128'9"(WB1)
12'A B
C
D
E F G H
I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X8
5X6
5X53X4
4X6
5X8
5X12
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W6,W7,W10 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 843 /-/-/635 /279 /296
Y 2486 /-/-/1700 /936 /-
M 1374 /-/-/967 /503 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =4.0
M Brg Width = 4.2 Min Req =2.2
Bearings B, Y, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 641 -1233
C - D 319 -598
D - E 509 -613
E - F 463 -219
F - G 835 -960
Chords Tens.Comp.
G - H 835 -960
H - I 1578 -1647
I - J 1570 -1635
J - K 1531 -1779
K - L 848 -968
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AA 1104 -825
AA- Z 1101 -826
Z - Y 322 -382
V - T 363 -438
Chords Tens.Comp.
T - S 1872 -1543
S - R 1868 -1543
R - Q 1636 -1349
Q - N 955 -831
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 539 -642
D - Z 563 -453
Z - E 1100 -992
E - Y 687 -726
Y - X 1311 -1662
X - F 1293 -1636
F - T 1818 -1427
Webs Tens.Comp.
T - H 1166 -1245
H - R 414 -458
I - R 554 -368
Q - K 758 -648
K - N 897 -957
N - L 1397 -1218
L - M 1168 -1346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 S 999 360
VERT(CL):0.161 S 999 240
HORZ(LL):-0.033 T - -
HORZ(TL):0.075 T - -
Creep Factor: 2.0
Max TC CSI:0.729
Max BC CSI:0.674
Max W eb CSI:0.659
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T58
Ply: 1
Qty:1
SEQN:12931 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T286
DrwNo:079.20.1313.41396
AK /DF 03/19/2020
W4
W6
W7
W10
W20
17'6"31'6"3
5'7"15
5'7"15
11'1"12
5'5"14
16'8"4
5'6"8
17'7"12
11"8
22'8"4
5'0"8
28'0"4
5'4"
35'
6'11"12
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
5'6"3
5'6"3
11'2"1
5'7"15
17'4"4
6'2"3
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
22'8"4
1'0"4
27'10"8
5'2"4
35'
7'1"8
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"116'0"131'8'4"128'9"(WB1)
12'A B
C
D
E F G H
I
J
K L
M
N
O
PQRST
UVWXYZAA
4 12
3X5(B1)
3X4
5X6
5X8
5X6
5X53X4
4X6
5X8
5X12
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W14 2x4 SP 2250f-1.9E;
W25 2x6 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 736 /-/-/541 /220 /296
Y 2716 /-/-/1846 /1038 /-
O 1300 /-/-/908 /461 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =-
O Brg Width = 4.2 Min Req =2.1
Bearings B, Y, & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 567 -1174
D - E 200 -389
E - F 647 -494
F - G 604 -428
I - J 1314 -1556
Chords Tens.Comp.
J - K 1405 -1456
K - L 1355 -1478
L - M 1378 -1659
M - N 787 -914
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AH 991 -677
AH-AF 1068 -754
AF-AE 1059 -750
AD-AA 903 -1083
AA- Z 689 -825
Chords Tens.Comp.
W -U 1431 -1042
U - T 1498 -1178
T - S 1523 -1205
S - P 901 -768
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AE 643 -805
AE- E 409 -243
E -AD 756 -787
F -AD 412 -406
AD- G 1009 -927
G - Z 1733 -2210
G - W 1554 -1188
Z - Y 1756 -2236
Webs Tens.Comp.
Y - W 925 -1119
W -I 1439 -1638
I - U 379 -245
K - T 527 -434
S - M 692 -570
M - P 829 -896
P - N 1318 -1127
N - O 1086 -1273
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.073 AG 999 360
VERT(CL):0.192 AG 999 240
HORZ(LL):0.027 O - -
HORZ(TL):0.062 O - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.793
Max W eb CSI:0.812
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T59
Ply: 1
Qty:1
SEQN:12937 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T288
DrwNo:079.20.1313.34594
AK /DF 03/19/2020
W10
W14
W25
BL1
17'6"31'6"3
6'2"3
6'2"3
10'6"15
4'4"13
14'8"4
4'1"5
17'6"
2'9"12
21'2"12
3'8"12
26'0"4
4'9"8
30'6"2
4'5"14
35'
4'5"14
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
6'0"7
3'4"7
10'3"7
4'3"1
14'10"
4'6"9
15'9"4
11"4
17'4"4
1'7"
21'11"8
4'7"4
26'0"4
4'0"12
35'
8'11"12
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"115'4"131'8'4"128'9"12'A B C
D
E
F G H I
J
K
L
M
N
O
P
Q
RSTU
VWXYZAAABACAD
AEAFAGAH
AIAJ
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6(++)
1.5X4
5X6
4X81.5X6(++)
5X8
5X5
1.5X4
6X81.5X4
5X12
5X6
5X8
6X8
1.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W14 2x4 SP 2250f-1.9E;
W25 2x6 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 736 /-/-/541 /220 /296
Y 2716 /-/-/1846 /1038 /-
O 1300 /-/-/908 /461 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 4.0 Min Req =-
O Brg Width = 4.2 Min Req =2.1
Bearings B, Y, & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 567 -1174
D - E 200 -389
E - F 647 -494
F - G 604 -428
I - J 1314 -1556
Chords Tens.Comp.
J - K 1405 -1456
K - L 1355 -1478
L - M 1378 -1659
M - N 787 -914
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AH 991 -677
AH-AF 1068 -754
AF-AE 1059 -750
AD-AA 903 -1083
AA- Z 689 -825
Chords Tens.Comp.
W -U 1431 -1042
U - T 1498 -1178
T - S 1523 -1205
S - P 901 -768
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AE 643 -805
AE- E 409 -243
E -AD 756 -787
F -AD 412 -406
AD- G 1009 -927
G - Z 1733 -2210
G - W 1554 -1188
Z - Y 1756 -2236
Webs Tens.Comp.
Y - W 925 -1119
W -I 1439 -1638
I - U 379 -245
K - T 527 -434
S - M 692 -570
M - P 829 -896
P - N 1318 -1127
N - O 1086 -1273
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.073 AG 999 360
VERT(CL):0.192 AG 999 240
HORZ(LL):0.027 O - -
HORZ(TL):0.062 O - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.793
Max W eb CSI:0.812
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T59
Ply: 1
Qty:1
SEQN:12937 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T288
DrwNo:079.20.1313.34594
AK /DF 03/19/2020
W10
W14
W25
BL1
17'6"31'6"3
6'2"3
6'2"3
10'6"15
4'4"13
14'8"4
4'1"5
17'6"
2'9"12
21'2"12
3'8"12
26'0"4
4'9"8
30'6"2
4'5"14
35'
4'5"14
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
6'0"7
3'4"7
10'3"7
4'3"1
14'10"
4'6"9
15'9"4
11"4
17'4"4
1'7"
21'11"8
4'7"4
26'0"4
4'0"12
35'
8'11"12
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"115'4"131'8'4"128'9"12'A B C
D
E
F G H I
J
K
L
M
N
O
P
Q
RSTU
VWXYZAAABACAD
AEAFAGAH
AIAJ
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6(++)
1.5X4
5X6
4X81.5X6(++)
5X8
5X5
1.5X4
6X81.5X4
5X12
5X6
5X8
6X8
1.5X4
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x6 SP M-26;
T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W18 2x4 SP 2250f-1.9E;
W31 2x6 SP #2;
Bracing
(a) Continuous lateral restraint equally spaced on
member.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 525 /-/-/359 /151 /296
AD 2942 /-/-/2042 /1135 /-
P 1294 /-/-/909 /428 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AD Brg Width = 4.0 Min Req =-
P Brg Width = 4.2 Min Req =2.1
Bearings B, AD, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 1144 -976
G - H 1359 -1170
H - I 2825 -2546
I - J 2813 -2533
J - K 1224 -1654
Chords Tens.Comp.
K - L 1281 -1462
L - M 1239 -1464
M - N 1283 -1649
N - O 728 -909
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AO-AN 873 -1032
AN-AL 1194 -1297
AL-AH 1162 -1267
AH-AA 551 -599
AB- Y 793 -917
Chords Tens.Comp.
Y - W 840 -967
W -V 1133 -541
V - U 1526 -1008
U - T 1513 -1115
T - Q 896 -711
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F -AO 865 -1019
G -AN 585 -458
H -AA 1569 -1691
AH-AC 673 -770
I -AA 398 -520
AB-AC 2050 -2546
AC-AD 2269 -2785
AA-AB 2052 -2536
AA- W 1588 -1137
Webs Tens.Comp.
AA- J 2797 -3368
J - V 923 -906
V - K 534 -424
L - U 462 -318
T - N 690 -517
N - Q 768 -894
Q - O 1310 -1043
O - P 1005 -1267
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.115 AR 999 360
VERT(CL):0.319 AR 651 240
HORZ(LL):0.057 P - -
HORZ(TL):0.155 AA - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.572
Max W eb CSI:0.815
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T60
Ply: 1
Qty:1
SEQN:12951 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T67
DrwNo:079.20.1313.40928
AK /DF 03/19/2020
T1
T2
W18
W31
BL1
17'6"31'6"3
4'2"12
4'2"12
5'2"4
11"8
6'11"8
1'9"4
11'4"
4'4"8
12'8"4
1'4"4
17'6"
4'9"12
24'0"4
6'6"4
29'1"2
5'0"14
35'
5'10"14
40'10"14
5'10"14
46'11"8
6'0"10
49'0"3
2'0"11
1'5"3
1'5"3
1'7"3
2"
2'8"
1'0"13
4'8"
2'
6'11"8
2'3"8
11'4"
4'4"8
12'8"4
1'4"4
12'10"
1"12
13'7"8
9"8
15'9"3
2'1"11
17'4"4
1'7"1
21'2"12
3'10"8
21'8"
5"4
23'8"12
2'0"12
28'9"10
5'0"14
35'
6'2"6
41'2"6
6'2"6
46'11"8
5'9"2
49'0"3
2'0"111'8"
6"1 3'8"114'8"131'2'8'4"128'11"2(a)(WB1)
12'A
B C
D E F
G H I J
K
L
M
N O
P
Q
R
STUVW
XY Z
AA
AB
ACADAE
AFAG
AH
AIAJ
AK
AL
AM
AN
AO
AP
AQARASAT
AUAVAW
AXAY
4 12
4X5(A2)
3X8
1.5X4(**)1.5X6(++)3X4
4X4
3X4
5X8
3X4
6X8
3X4
3X43X4
1.5X6(++)
7X83X45X54X6
4X5
5X14(SRS)
3X4
3X4
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x6 SP M-26;
T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W18 2x4 SP 2250f-1.9E;
W31 2x6 SP #2;
Bracing
(a) Continuous lateral restraint equally spaced on
member.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 525 /-/-/359 /151 /296
AD 2942 /-/-/2042 /1135 /-
P 1294 /-/-/909 /428 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AD Brg Width = 4.0 Min Req =-
P Brg Width = 4.2 Min Req =2.1
Bearings B, AD, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 1144 -976
G - H 1359 -1170
H - I 2825 -2546
I - J 2813 -2533
J - K 1224 -1654
Chords Tens.Comp.
K - L 1281 -1462
L - M 1239 -1464
M - N 1283 -1649
N - O 728 -909
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AO-AN 873 -1032
AN-AL 1194 -1297
AL-AH 1162 -1267
AH-AA 551 -599
AB- Y 793 -917
Chords Tens.Comp.
Y - W 840 -967
W -V 1133 -541
V - U 1526 -1008
U - T 1513 -1115
T - Q 896 -711
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F -AO 865 -1019
G -AN 585 -458
H -AA 1569 -1691
AH-AC 673 -770
I -AA 398 -520
AB-AC 2050 -2546
AC-AD 2269 -2785
AA-AB 2052 -2536
AA- W 1588 -1137
Webs Tens.Comp.
AA- J 2797 -3368
J - V 923 -906
V - K 534 -424
L - U 462 -318
T - N 690 -517
N - Q 768 -894
Q - O 1310 -1043
O - P 1005 -1267
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.115 AR 999 360
VERT(CL):0.319 AR 651 240
HORZ(LL):0.057 P - -
HORZ(TL):0.155 AA - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.572
Max W eb CSI:0.815
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T60
Ply: 1
Qty:1
SEQN:12951 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T67
DrwNo:079.20.1313.40928
AK /DF 03/19/2020
T1
T2
W18
W31
BL1
17'6"31'6"3
4'2"12
4'2"12
5'2"4
11"8
6'11"8
1'9"4
11'4"
4'4"8
12'8"4
1'4"4
17'6"
4'9"12
24'0"4
6'6"4
29'1"2
5'0"14
35'
5'10"14
40'10"14
5'10"14
46'11"8
6'0"10
49'0"3
2'0"11
1'5"3
1'5"3
1'7"3
2"
2'8"
1'0"13
4'8"
2'
6'11"8
2'3"8
11'4"
4'4"8
12'8"4
1'4"4
12'10"
1"12
13'7"8
9"8
15'9"3
2'1"11
17'4"4
1'7"1
21'2"12
3'10"8
21'8"
5"4
23'8"12
2'0"12
28'9"10
5'0"14
35'
6'2"6
41'2"6
6'2"6
46'11"8
5'9"2
49'0"3
2'0"111'8"
6"1 3'8"114'8"131'2'8'4"128'11"2(a)(WB1)
12'A
B C
D E F
G H I J
K
L
M
N O
P
Q
R
STUVW
XY Z
AA
AB
ACADAE
AFAG
AH
AIAJ
AK
AL
AM
AN
AO
AP
AQARASAT
AUAVAW
AXAY
4 12
4X5(A2)
3X8
1.5X4(**)1.5X6(++)3X4
4X4
3X4
5X8
3X4
6X8
3X4
3X43X4
1.5X6(++)
7X83X45X54X6
4X5
5X14(SRS)
3X4
3X4
5X6
5X8
3X4
3X4
3X4
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2,B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x4 SP 2250f-1.9E;
W29 2x6 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 804 /-/-/588 /261 /296
AB 2530 /-/-/1723 /965 /-
P 1373 /-/-/934 /492 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AB Brg Width = 4.0 Min Req =-
P Brg Width = 4.2 Min Req =2.2
Bearings B, AB, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 212 -545
D - E 1316 -1660
E - F 417 -619
H - I 628 -513
I - J 939 -1263
Chords Tens.Comp.
J - K 1654 -2034
K - L 1484 -1636
L - M 1442 -1627
M - N 1445 -1780
N - O 834 -967
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AP-AO 456 -424
D -AL 1299 -1224
AL-AJ 1558 -1459
AJ-AI 1538 -1446
AI-AF 536 -421
AA- Y 696 -793
Chords Tens.Comp.
Y - W 826 -943
W -V 1390 -1037
V - U 1869 -1427
U - T 1638 -1269
T - Q 953 -816
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AO 521 -547
E -AI 1119 -1094
F -AI 424 -378
F -AF 737 -727
AF- H 758 -648
AF-AC 529 -601
H -AC 521 -655
AC-AB 750 -871
AC- I 494 -332
AB-AA 1543 -1999
Webs Tens.Comp.
I -AA 1510 -1964
I - W 2312 -2006
W -J 1160 -1231
J - V 687 -647
K - U 453 -495
L - U 569 -457
T - N 763 -608
N - Q 881 -954
Q - O 1394 -1197
O - P 1150 -1345
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.194 AK 999 360
VERT(CL):0.477 AK 433 240
HORZ(LL):0.078 AE - -
HORZ(TL):0.195 AE - -
Creep Factor: 2.0
Max TC CSI:0.691
Max BC CSI:0.681
Max W eb CSI:0.891
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T61
Ply: 1
Qty:1
SEQN:12956 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T277
DrwNo:079.20.1313.39258
AK /DF 03/19/2020
T1
B2
B3
W15
W29
BL1
17'6"31'6"3
7'1"9
7'1"9
10'8"4
3'6"11
13'9"4
3'1"
15'7"8
1'10"4
17'6"
1'10"8
22'0"4
4'6"4
28'7"14
6'7"10
35'
6'4"2
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'11"13
2'3"13
10'8"4
3'8"7
13'7"8
2'11"4
15'7"8
2'
17'4"4
1'8"12
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
28'4"6
6'8"6
35'
6'7"10
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"114'0"131'8'4"128'9"12'A B C D
E
F G H I J
K
L
M
N O
P
Q
R
STUV
W XYZAAABAC
ADAE
AFAG
AH
AIAJAKAL
AMANAO
APAQAR
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6(++)
3X10(++)
3X8(++)
1.5X4
5X8 1.5X4
5X81.5X4 5X8
1.5X4 5X5
4X12
2X44X7
5X6
5X6
5X8
6X8
1.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2,B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W15 2x4 SP 2250f-1.9E;
W29 2x6 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 17.333' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 804 /-/-/588 /261 /296
AB 2530 /-/-/1723 /965 /-
P 1373 /-/-/934 /492 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AB Brg Width = 4.0 Min Req =-
P Brg Width = 4.2 Min Req =2.2
Bearings B, AB, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 212 -545
D - E 1316 -1660
E - F 417 -619
H - I 628 -513
I - J 939 -1263
Chords Tens.Comp.
J - K 1654 -2034
K - L 1484 -1636
L - M 1442 -1627
M - N 1445 -1780
N - O 834 -967
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AP-AO 456 -424
D -AL 1299 -1224
AL-AJ 1558 -1459
AJ-AI 1538 -1446
AI-AF 536 -421
AA- Y 696 -793
Chords Tens.Comp.
Y - W 826 -943
W -V 1390 -1037
V - U 1869 -1427
U - T 1638 -1269
T - Q 953 -816
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AO 521 -547
E -AI 1119 -1094
F -AI 424 -378
F -AF 737 -727
AF- H 758 -648
AF-AC 529 -601
H -AC 521 -655
AC-AB 750 -871
AC- I 494 -332
AB-AA 1543 -1999
Webs Tens.Comp.
I -AA 1510 -1964
I - W 2312 -2006
W -J 1160 -1231
J - V 687 -647
K - U 453 -495
L - U 569 -457
T - N 763 -608
N - Q 881 -954
Q - O 1394 -1197
O - P 1150 -1345
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.194 AK 999 360
VERT(CL):0.477 AK 433 240
HORZ(LL):0.078 AE - -
HORZ(TL):0.195 AE - -
Creep Factor: 2.0
Max TC CSI:0.691
Max BC CSI:0.681
Max W eb CSI:0.891
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T61
Ply: 1
Qty:1
SEQN:12956 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T277
DrwNo:079.20.1313.39258
AK /DF 03/19/2020
T1
B2
B3
W15
W29
BL1
17'6"31'6"3
7'1"9
7'1"9
10'8"4
3'6"11
13'9"4
3'1"
15'7"8
1'10"4
17'6"
1'10"8
22'0"4
4'6"4
28'7"14
6'7"10
35'
6'4"2
40'10"
5'10"
46'11"8
6'1"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'11"13
2'3"13
10'8"4
3'8"7
13'7"8
2'11"4
15'7"8
2'
17'4"4
1'8"12
17'7"12
3"8
21'2"12
3'7"
21'8"
5"4
28'4"6
6'8"6
35'
6'7"10
41'1"8
6'1"8
46'11"8
5'10"
49'0"3
2'0"111'8"
6"1 3'8"114'0"131'8'4"128'9"12'A B C D
E
F G H I J
K
L
M
N O
P
Q
R
STUV
W XYZAAABAC
ADAE
AFAG
AH
AIAJAKAL
AMANAO
APAQAR
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6(++)
3X10(++)
3X8(++)
1.5X4
5X8 1.5X4
5X81.5X4 5X8
1.5X4 5X5
4X12
2X44X7
5X6
5X6
5X8
6X8
1.5X4
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
B3 2x6 SP #2;
Webs: 2x4 SP #2; W31 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 49.02
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 49.02
BC: 1109 lb Conc. Load at 11.19
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1172 /-/-/-/449 /-
AC 3271 /-/-/-/1218 /-
Q 1356 /-/-/-/504 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 4.0 Min Req =2.9
Q Brg Width = 4.2 Min Req =1.5
Bearings B, AC, & Q Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 175 -456
D - E 703 -1926
E - F 487 -1339
F - G 469 -1313
G - H 213 -634
H - I 209 -622
Chords Tens.Comp.
K - L 366 -993
L - M 311 -817
M - N 310 -815
N - O 312 -834
O - P 176 -465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AR-AQ 395 -152
D -AN 1635 -592
AN-AL 1829 -662
AL-AK 1808 -657
AK-AJ 1248 -450
Chords Tens.Comp.
AJ-AG 1275 -457
AB-AA 208 -549
W -V 912 -331
V - U 785 -293
U - R 447 -168
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AQ 232 -576
E -AK 234 -632
AJ- G 384 -112
G -AG 293 -800
AG- I 997 -365
I -AD 263 -676
AD-AC 219 -586
AD- J 583 -220
AC-AB 517 -1280
Webs Tens.Comp.
J -AB 493 -1252
J -AA 971 -368
AA- K 298 -663
K - W 754 -270
U - O 405 -146
O - R 189 -450
R - P 652 -244
P - Q 255 -664
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.157 AP 999 360
VERT(CL):0.368 AP 560 240
HORZ(LL):0.079 AC - -
HORZ(TL):0.186 AC - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.879
Max W eb CSI:0.986
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T62
Ply: 2
Qty:1
SEQN:16303 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T282
DrwNo:080.20.1107.13990
JB /DF 03/20/2020
2 Complete Trusses Required
T4
B2
B3
W31
17'6"31'6"3
6'4"9
6'4"9
8'8"4
2'3"11
11'4"
2'7"12
13'9"4
2'5"4
15'7"8
1'10"4
17'6"
1'10"8
20'0"4
2'6"4
27'7"
7'6"12
35'
7'5"
42'5"
7'5"
46'11"8
4'6"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'2"13
1'6"13
8'8"4
2'5"7
11'0"8
2'4"4
13'7"8
2'7"
15'7"8
2'
17'4"4
1'8"12
17'7"12
3"8
19'8"12
2'1"
21'2"12
1'6"
21'8"
5"4
27'3"8
5'7"8
35'
7'8"8
42'8"8
7'8"8
46'11"8
4'3"
49'0"3
2'0"111'8"
6"1 3'8"113'4"131'8'4"128'9"12'A B C D
E
F G H I J K
L
M
N
O P
Q
R
S
TUVW
XY ZAAABACAD
AEAF
AGAHAI
AJAKALAMAN
AOAPAQ
ARASAT
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6 (++)
3X8 (++)
3X8 (++)
1.5X4
5X8 1.5X4
10X10
1.5X4 5X8
1.5X4
4X8 5X6
1.5X41.5X4
5X6
5X8
5X8
1.5X4
3X3
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
B3 2x6 SP #2;
Webs: 2x4 SP #2; W31 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 49.02
BC: From 21 plf at -1.67 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 49.02
BC: 1109 lb Conc. Load at 11.19
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1172 /-/-/-/449 /-
AC 3271 /-/-/-/1218 /-
Q 1356 /-/-/-/504 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 4.0 Min Req =2.9
Q Brg Width = 4.2 Min Req =1.5
Bearings B, AC, & Q Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 175 -456
D - E 703 -1926
E - F 487 -1339
F - G 469 -1313
G - H 213 -634
H - I 209 -622
Chords Tens.Comp.
K - L 366 -993
L - M 311 -817
M - N 310 -815
N - O 312 -834
O - P 176 -465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AR-AQ 395 -152
D -AN 1635 -592
AN-AL 1829 -662
AL-AK 1808 -657
AK-AJ 1248 -450
Chords Tens.Comp.
AJ-AG 1275 -457
AB-AA 208 -549
W -V 912 -331
V - U 785 -293
U - R 447 -168
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AQ 232 -576
E -AK 234 -632
AJ- G 384 -112
G -AG 293 -800
AG- I 997 -365
I -AD 263 -676
AD-AC 219 -586
AD- J 583 -220
AC-AB 517 -1280
Webs Tens.Comp.
J -AB 493 -1252
J -AA 971 -368
AA- K 298 -663
K - W 754 -270
U - O 405 -146
O - R 189 -450
R - P 652 -244
P - Q 255 -664
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.90 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.157 AP 999 360
VERT(CL):0.368 AP 560 240
HORZ(LL):0.079 AC - -
HORZ(TL):0.186 AC - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.879
Max W eb CSI:0.986
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T62
Ply: 2
Qty:1
SEQN:16303 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T282
DrwNo:080.20.1107.13990
JB /DF 03/20/2020
2 Complete Trusses Required
T4
B2
B3
W31
17'6"31'6"3
6'4"9
6'4"9
8'8"4
2'3"11
11'4"
2'7"12
13'9"4
2'5"4
15'7"8
1'10"4
17'6"
1'10"8
20'0"4
2'6"4
27'7"
7'6"12
35'
7'5"
42'5"
7'5"
46'11"8
4'6"8
49'0"3
2'0"11
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'2"13
1'6"13
8'8"4
2'5"7
11'0"8
2'4"4
13'7"8
2'7"
15'7"8
2'
17'4"4
1'8"12
17'7"12
3"8
19'8"12
2'1"
21'2"12
1'6"
21'8"
5"4
27'3"8
5'7"8
35'
7'8"8
42'8"8
7'8"8
46'11"8
4'3"
49'0"3
2'0"111'8"
6"1 3'8"113'4"131'8'4"128'9"12'A B C D
E
F G H I J K
L
M
N
O P
Q
R
S
TUVW
XY ZAAABACAD
AEAF
AGAHAI
AJAKALAMAN
AOAPAQ
ARASAT
4 12
3X5(B1)
3X8
1.5X4(**)1.5X6 (++)
3X8 (++)
3X8 (++)
1.5X4
5X8 1.5X4
10X10
1.5X4 5X8
1.5X4
4X8 5X6
1.5X41.5X4
5X6
5X8
5X8
1.5X4
3X3
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1774 /-/-/1282 /621 /287
W 2174 /-/-/1473 /801 /-
J 268 /-/-/198 /75 /-
Wind reactions based on MWFRS
Q Brg Width = 4.0 Min Req =2.8
W Brg Width = 8.0 Min Req =3.5
J Brg Width = -Min Req =-
Bearings Q & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 1032 -1198
D - E 1486 -1789
E - F 1325 -1412
Chords Tens.Comp.
F - G 1291 -1411
G - H 1050 -1284
H - I 683 -400
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1183 -837
O - N 1630 -1032
Chords Tens.Comp.
N - M 1174 -711
M - L 453 -461
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 291 -418
R - Q 362 -567
Q - C 1032 -1223
C - P 1466 -1128
P - D 736 -859
D - O 559 -365
Webs Tens.Comp.
E - N 460 -491
F - N 433 -271
G - M 578 -664
M - H 1761 -1265
H - L 1373 -1811
L - I 686 -682
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 E 999 360
VERT(CL):0.127 E 999 240
HORZ(LL):0.019 M - -
HORZ(TL):0.046 M - -
Creep Factor: 2.0
Max TC CSI:0.733
Max BC CSI:0.693
Max W eb CSI:0.699
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T63
Ply: 1
Qty:1
SEQN:12993 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T354
DrwNo:079.20.1313.37995
AK /DF 03/19/2020
W14
3'8"8 31'8"9'8"
4'4"12
4'4"12
7'6"4
3'1"8
14'6"4
7'
21'4"8
6'10"4
28'3"1
6'10"9
35'2"12
6'11"11
40'1"10
4'10"14
45'0"8
4'10"14
2'1"12
2'1"12
3'8"8
1'6"12
7'2"12
3'6"4
14'2"12
7'
21'4"8
7'1"12
28'6"4
7'1"12
35'6"4
7'
40'3"6
4'9"2
45'0"8
4'9"22'8"136"18'4"12(WB1)
12'
A B C
D
E
F
G
H
I
J
KLMNOPQRSTUVW
4 12
3X3
1.5X6(++)5X5
4X5
5X5
3X6
3X4
5X6
3X4
5X6
3X8
5X6
5X8
4X5
4X6
3X4
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1774 /-/-/1282 /621 /287
W 2174 /-/-/1473 /801 /-
J 268 /-/-/198 /75 /-
Wind reactions based on MWFRS
Q Brg Width = 4.0 Min Req =2.8
W Brg Width = 8.0 Min Req =3.5
J Brg Width = -Min Req =-
Bearings Q & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 1032 -1198
D - E 1486 -1789
E - F 1325 -1412
Chords Tens.Comp.
F - G 1291 -1411
G - H 1050 -1284
H - I 683 -400
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1183 -837
O - N 1630 -1032
Chords Tens.Comp.
N - M 1174 -711
M - L 453 -461
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 291 -418
R - Q 362 -567
Q - C 1032 -1223
C - P 1466 -1128
P - D 736 -859
D - O 559 -365
Webs Tens.Comp.
E - N 460 -491
F - N 433 -271
G - M 578 -664
M - H 1761 -1265
H - L 1373 -1811
L - I 686 -682
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 E 999 360
VERT(CL):0.127 E 999 240
HORZ(LL):0.019 M - -
HORZ(TL):0.046 M - -
Creep Factor: 2.0
Max TC CSI:0.733
Max BC CSI:0.693
Max W eb CSI:0.699
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T63
Ply: 1
Qty:1
SEQN:12993 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T354
DrwNo:079.20.1313.37995
AK /DF 03/19/2020
W14
3'8"8 31'8"9'8"
4'4"12
4'4"12
7'6"4
3'1"8
14'6"4
7'
21'4"8
6'10"4
28'3"1
6'10"9
35'2"12
6'11"11
40'1"10
4'10"14
45'0"8
4'10"14
2'1"12
2'1"12
3'8"8
1'6"12
7'2"12
3'6"4
14'2"12
7'
21'4"8
7'1"12
28'6"4
7'1"12
35'6"4
7'
40'3"6
4'9"2
45'0"8
4'9"22'8"136"18'4"12(WB1)
12'
A B C
D
E
F
G
H
I
J
KLMNOPQRSTUVW
4 12
3X3
1.5X6(++)5X5
4X5
5X5
3X6
3X4
5X6
3X4
5X6
3X8
5X6
5X8
4X5
4X6
3X4
3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13,W14 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1181 /-/-/952 /357 /263
Y 2482 /-/-/1590 /951 /-
L 604 /-/-/425 /206 /-
Wind reactions based on MWFRS
T Brg Width = 4.0 Min Req =1.9
Y Brg Width = 8.0 Min Req =4.0
L Brg Width = -Min Req =-
Bearings T & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 580 -753
D - E 492 -654
E - F 376 -90
Chords Tens.Comp.
G - H 1016 -610
I - J 531 -766
J - K 916 -1116
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 721 -418
R - Q 578 -345
Q - P 913 -845
Chords Tens.Comp.
O - N 654 -385
N - M 1211 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - C 797 -985
C - S 940 -462
E - Q 721 -806
F - Q 397 -473
Q - G 1301 -1031
G - P 1369 -1701
P - H 833 -1001
Webs Tens.Comp.
H - O 548 -418
O - I 831 -839
N - J 632 -562
J - M 428 -423
M - K 1210 -996
K - L 438 -575
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.98 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 J 999 360
VERT(CL):0.073 N 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.464
Max W eb CSI:0.941
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T64
Ply: 1
Qty:1
SEQN:12997 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T231
DrwNo:079.20.1313.31740
AK /DF 03/19/2020
W13
W14
3'8"8 21'8"19'8"
2'4"12
2'4"12
3'10"8
1'5"12
8'10"7
4'11"15
15'2"
6'3"10
21'4"8
6'2"8
25'2"12
3'10"4
30'9"9
5'6"13
36'3"12
5'6"3
41'10"4
5'6"8
45'0"8
3'2"4
2'1"4
2'1"4
3'8"12
1'7"8
8'6"15
4'10"3
14'10"13
6'3"15
21'4"8
6'5"11
25'6"4
4'1"12
31'0"12
5'6"8
36'7"4
5'6"8
42'1"12
5'6"8
45'0"8
2'10"12
2'0"13 1'6"13
6"8'4"12(W B1)
12'
A B C
D
E
F
G
H
I
J K
LMNOPQRSTUVWXY
4 12
3X3
1.5X4 5X81.5X4
5X5 3X8
5X6
5X6
5X6
4X8
4X5
5X5
5X6
5X6
5X5
3X5
3X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13,W14 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1181 /-/-/952 /357 /263
Y 2482 /-/-/1590 /951 /-
L 604 /-/-/425 /206 /-
Wind reactions based on MWFRS
T Brg Width = 4.0 Min Req =1.9
Y Brg Width = 8.0 Min Req =4.0
L Brg Width = -Min Req =-
Bearings T & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 580 -753
D - E 492 -654
E - F 376 -90
Chords Tens.Comp.
G - H 1016 -610
I - J 531 -766
J - K 916 -1116
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - R 721 -418
R - Q 578 -345
Q - P 913 -845
Chords Tens.Comp.
O - N 654 -385
N - M 1211 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - C 797 -985
C - S 940 -462
E - Q 721 -806
F - Q 397 -473
Q - G 1301 -1031
G - P 1369 -1701
P - H 833 -1001
Webs Tens.Comp.
H - O 548 -418
O - I 831 -839
N - J 632 -562
J - M 428 -423
M - K 1210 -996
K - L 438 -575
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.98 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 J 999 360
VERT(CL):0.073 N 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.464
Max W eb CSI:0.941
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T64
Ply: 1
Qty:1
SEQN:12997 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T231
DrwNo:079.20.1313.31740
AK /DF 03/19/2020
W13
W14
3'8"8 21'8"19'8"
2'4"12
2'4"12
3'10"8
1'5"12
8'10"7
4'11"15
15'2"
6'3"10
21'4"8
6'2"8
25'2"12
3'10"4
30'9"9
5'6"13
36'3"12
5'6"3
41'10"4
5'6"8
45'0"8
3'2"4
2'1"4
2'1"4
3'8"12
1'7"8
8'6"15
4'10"3
14'10"13
6'3"15
21'4"8
6'5"11
25'6"4
4'1"12
31'0"12
5'6"8
36'7"4
5'6"8
42'1"12
5'6"8
45'0"8
2'10"12
2'0"13 1'6"13
6"8'4"12(W B1)
12'
A B C
D
E
F
G
H
I
J K
LMNOPQRSTUVWXY
4 12
3X3
1.5X4 5X81.5X4
5X5 3X8
5X6
5X6
5X6
4X8
4X5
5X5
5X6
5X6
5X5
3X5
3X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1373 /-/-/978 /458 /271
H 968 /-/-/548 /434 /-
Wind reactions based on MWFRS
M Brg Width = 4.0 Min Req =2.2
H Brg Width = 4.2 Min Req =1.5
Bearings M & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 377 -517
B - C 356 -502
C - D 656 -990
Chords Tens.Comp.
D - E 721 -1034
E - F 443 -515
F - G 465 -471
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 526 -280
N - L 400 -213
M - K 0 -395
Chords Tens.Comp.
K - J 922 -895
J - I 909 -807
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - M 1000 -1248
L - C 989 -1243
C - K 1125 -682
K - D 368 -431
Webs Tens.Comp.
E - I 588 -677
I - G 814 -740
G - H 930 -941
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.025 J 999 360
VERT(CL):0.065 B 462 240
HORZ(LL):0.011 B - -
HORZ(TL):0.024 B - -
Creep Factor: 2.0
Max TC CSI:0.545
Max BC CSI:0.528
Max W eb CSI:0.775
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T65
Ply: 1
Qty:1
SEQN:13002 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T283
DrwNo:079.20.1313.36279
AK /DF 03/19/2020
W10
3'8"8 21'8"3
4'0"4
4'0"4
8'7"4
4'7"
15'0"7
6'5"3
21'4"8
6'4"1
25'4"11
4'0"3
5"
5"
2'1"12
1'8"12
3'8"12
1'7"
8'3"12
4'7"
14'9"4
6'5"8
21'4"8
6'7"4
25'4"11
4'0"31'10"17'0"116"8'4"12(WB1)
12'
A
B
C
D
E
F
G
HIJK
LM
N O
P
4 12
3X4(E3)3X8(E3)
1.5X6(++)3X31.5X6
3X5
3X5 5X5
5X5
4X4
3X8 1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1373 /-/-/978 /458 /271
H 968 /-/-/548 /434 /-
Wind reactions based on MWFRS
M Brg Width = 4.0 Min Req =2.2
H Brg Width = 4.2 Min Req =1.5
Bearings M & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 377 -517
B - C 356 -502
C - D 656 -990
Chords Tens.Comp.
D - E 721 -1034
E - F 443 -515
F - G 465 -471
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 526 -280
N - L 400 -213
M - K 0 -395
Chords Tens.Comp.
K - J 922 -895
J - I 909 -807
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - M 1000 -1248
L - C 989 -1243
C - K 1125 -682
K - D 368 -431
Webs Tens.Comp.
E - I 588 -677
I - G 814 -740
G - H 930 -941
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.025 J 999 360
VERT(CL):0.065 B 462 240
HORZ(LL):0.011 B - -
HORZ(TL):0.024 B - -
Creep Factor: 2.0
Max TC CSI:0.545
Max BC CSI:0.528
Max W eb CSI:0.775
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T65
Ply: 1
Qty:1
SEQN:13002 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T283
DrwNo:079.20.1313.36279
AK /DF 03/19/2020
W10
3'8"8 21'8"3
4'0"4
4'0"4
8'7"4
4'7"
15'0"7
6'5"3
21'4"8
6'4"1
25'4"11
4'0"3
5"
5"
2'1"12
1'8"12
3'8"12
1'7"
8'3"12
4'7"
14'9"4
6'5"8
21'4"8
6'7"4
25'4"11
4'0"31'10"17'0"116"8'4"12(WB1)
12'
A
B
C
D
E
F
G
HIJK
LM
N O
P
4 12
3X4(E3)3X8(E3)
1.5X6(++)3X31.5X6
3X5
3X5 5X5
5X5
4X4
3X8 1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 1363 /-/-/971 /455 /271
G 976 /-/-/554 /437 /-
Wind reactions based on MWFRS
K Brg Width = 4.0 Min Req =2.2
G Brg Width = 4.2 Min Req =1.6
Bearings K & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 731 -1121
C - D 714 -996
Chords Tens.Comp.
D - E 448 -507
E - F 466 -473
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 35 -425
J - I 1020 -941
Chords Tens.Comp.
I - H 873 -774
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 426 -247
K - B 924 -1203
B - J 1105 -649
Webs Tens.Comp.
D - H 582 -672
H - F 815 -740
F - G 935 -948
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.025 I 999 360
VERT(CL):0.059 I 999 240
HORZ(LL):-0.009 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.448
Max W eb CSI:0.774
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T66
Ply: 1
Qty:1
SEQN:13013 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T284
DrwNo:079.20.1313.26654
AK /DF 03/19/2020
W11
3'8"8 21'8"3
4'0"4
4'0"4
9'10"4
5'10"
15'7"15
5'9"11
21'4"8
5'8"9
25'4"11
4'0"3
3'8"12
3'8"12
9'6"12
5'10"
15'4"12
5'10"
21'4"8
5'11"12
25'4"11
4'0"3
1'3"4 7'0"118'4"12(WB1)
12'
A
B
C
D
E
F
GHIJKL
4 12
3X3
1.5X4 4X4
3X5
3X4
3X4
5X5
5X5
4X4
3X8
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 1363 /-/-/971 /455 /271
G 976 /-/-/554 /437 /-
Wind reactions based on MWFRS
K Brg Width = 4.0 Min Req =2.2
G Brg Width = 4.2 Min Req =1.6
Bearings K & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 731 -1121
C - D 714 -996
Chords Tens.Comp.
D - E 448 -507
E - F 466 -473
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 35 -425
J - I 1020 -941
Chords Tens.Comp.
I - H 873 -774
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 426 -247
K - B 924 -1203
B - J 1105 -649
Webs Tens.Comp.
D - H 582 -672
H - F 815 -740
F - G 935 -948
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.025 I 999 360
VERT(CL):0.059 I 999 240
HORZ(LL):-0.009 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.448
Max W eb CSI:0.774
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T66
Ply: 1
Qty:1
SEQN:13013 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T284
DrwNo:079.20.1313.26654
AK /DF 03/19/2020
W11
3'8"8 21'8"3
4'0"4
4'0"4
9'10"4
5'10"
15'7"15
5'9"11
21'4"8
5'8"9
25'4"11
4'0"3
3'8"12
3'8"12
9'6"12
5'10"
15'4"12
5'10"
21'4"8
5'11"12
25'4"11
4'0"3
1'3"4 7'0"118'4"12(WB1)
12'
A
B
C
D
E
F
GHIJKL
4 12
3X3
1.5X4 4X4
3X5
3X4
3X4
5X5
5X5
4X4
3X8
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
B3 2x6 SP #2;
Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 9.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 4.75
TC: From 36 plf at 4.75 to 36 plf at 8.69
BC: From 20 plf at 0.00 to 20 plf at 4.67
BC: From 10 plf at 4.67 to 10 plf at 8.69
BC: 892 lb Conc. Load at 4.75
BC: 485 lb Conc. Load at 6.75
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 884 /-/-/-/320 /-
F 1109 /-/-/-/407 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 147 -390
B - C 173 -459
Chords Tens.Comp.
C - D 396 -1070
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 549 -208
C - I 774 -282
Chords Tens.Comp.
I - G 1020 -372
G - F 959 -351
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 581 -207
C - L 339 -872
Webs Tens.Comp.
G - D 863 -295
D - F 442 -1207
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 K 687 360
VERT(CL):0.335 K 305 240
HORZ(LL):0.050 F - -
HORZ(TL):0.113 F - -
Creep Factor: 2.0
Max TC CSI:0.507
Max BC CSI:0.975
Max W eb CSI:0.357
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T67
Ply: 2
Qty:1
SEQN:16300 MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T290
DrwNo:080.20.1107.22413
JB /DF 03/20/2020
2 Complete Trusses Required
B2
B3W3
8'8"4
1'10"8
1'10"8
6'10"12
5'0"4
8'8"4
1'9"8
2'8"
2'8"
4'8"
2'
6'9"
2'1"
8'8"4
1'11"4
6"1 1'2'4"133'4"1312'
13'
A
B C
D
E
FG
HIJ
KLMN
4 12
2X5(B1)
2X4(**)
3X3
3X8
1.5X4(**)
3X6 (++)
3X6
3X5
7X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
B3 2x6 SP #2;
Webs: 2x4 SP #2; W3 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 9.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 72 plf at 4.75
TC: From 36 plf at 4.75 to 36 plf at 8.69
BC: From 20 plf at 0.00 to 20 plf at 4.67
BC: From 10 plf at 4.67 to 10 plf at 8.69
BC: 892 lb Conc. Load at 4.75
BC: 485 lb Conc. Load at 6.75
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 884 /-/-/-/320 /-
F 1109 /-/-/-/407 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 147 -390
B - C 173 -459
Chords Tens.Comp.
C - D 396 -1070
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 549 -208
C - I 774 -282
Chords Tens.Comp.
I - G 1020 -372
G - F 959 -351
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 581 -207
C - L 339 -872
Webs Tens.Comp.
G - D 863 -295
D - F 442 -1207
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 K 687 360
VERT(CL):0.335 K 305 240
HORZ(LL):0.050 F - -
HORZ(TL):0.113 F - -
Creep Factor: 2.0
Max TC CSI:0.507
Max BC CSI:0.975
Max W eb CSI:0.357
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T67
Ply: 2
Qty:1
SEQN:16300 MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T290
DrwNo:080.20.1107.22413
JB /DF 03/20/2020
2 Complete Trusses Required
B2
B3W3
8'8"4
1'10"8
1'10"8
6'10"12
5'0"4
8'8"4
1'9"8
2'8"
2'8"
4'8"
2'
6'9"
2'1"
8'8"4
1'11"4
6"1 1'2'4"133'4"1312'
13'
A
B C
D
E
FG
HIJ
KLMN
4 12
2X5(B1)
2X4(**)
3X3
3X8
1.5X4(**)
3X6 (++)
3X6
3X5
7X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x4 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 681 /-/-/502 /231 /122
G 485 /-/-/304 /188 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 399 -511
Chords Tens.Comp.
D - E 963 -999
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - N 392 -475
N - M 455 -559
D - J 626 -666
Chords Tens.Comp.
J - H 909 -1004
H - G 938 -1026
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - M 612 -474
Webs Tens.Comp.
E - G 1069 -976
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.145 I 904 360
VERT(CL):0.332 I 394 240
HORZ(LL):0.051 G - -
HORZ(TL):0.118 G - -
Creep Factor: 2.0
Max TC CSI:0.683
Max BC CSI:0.519
Max W eb CSI:0.296
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T68
Ply: 1
Qty:1
SEQN:12966 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T280
DrwNo:079.20.1313.42738
AK /DF 03/19/2020
B1
W4
11'0"8
6'9"12
6'9"12
11'0"8
4'2"12
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'11"8
2'3"8
11'0"8
4'1"1'8"
6"1 1'1'9"52'9"53'1"1012'
13'
A
B C
D
E F
GH
IJK
LMNOP
4 12
2X5(B1)
3X8
1.5X4(**)1.5X6(++)
3X10(++)
3X6(++)
4X7
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x4 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 681 /-/-/502 /231 /122
G 485 /-/-/304 /188 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 399 -511
Chords Tens.Comp.
D - E 963 -999
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - N 392 -475
N - M 455 -559
D - J 626 -666
Chords Tens.Comp.
J - H 909 -1004
H - G 938 -1026
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - M 612 -474
Webs Tens.Comp.
E - G 1069 -976
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.145 I 904 360
VERT(CL):0.332 I 394 240
HORZ(LL):0.051 G - -
HORZ(TL):0.118 G - -
Creep Factor: 2.0
Max TC CSI:0.683
Max BC CSI:0.519
Max W eb CSI:0.296
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T68
Ply: 1
Qty:1
SEQN:12966 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T280
DrwNo:079.20.1313.42738
AK /DF 03/19/2020
B1
W4
11'0"8
6'9"12
6'9"12
11'0"8
4'2"12
10"14
10"14
1'0"14
2"
2'8"
1'7"2
4'8"
2'
6'11"8
2'3"8
11'0"8
4'1"1'8"
6"1 1'1'9"52'9"53'1"1012'
13'
A
B C
D
E F
GH
IJK
LMNOP
4 12
2X5(B1)
3X8
1.5X4(**)1.5X6(++)
3X10(++)
3X6(++)
4X7
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W3 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Hipjack supports 7-9-11 setback jacks. Jacks up to 7'
have no webs. Longer jacks supported to BC.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 558 /-/-/-/182 /-
H 892 /-/-/-/313 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 153 -418
C - D 233 -652
D - E 375 -1058
Chords Tens.Comp.
E - F 369 -1048
F - G 369 -1048
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - M 748 -275
L - J 1063 -377
Chords Tens.Comp.
J - I 1074 -377
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - G 1059 -373
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 K 999 360
VERT(CL):0.159 K 823 240
HORZ(LL):0.024 H - -
HORZ(TL):0.056 H - -
Creep Factor: 2.0
Max TC CSI:0.305
Max BC CSI:0.302
Max W eb CSI:0.417
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T69
Ply: 2
Qty:1
SEQN:12098 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T330
DrwNo:079.20.1313.27324
AK /DF 03/19/2020
2 Complete Trusses Required
W1
W3
11'0"8
2'4"8
2'4"8
4'9"12
2'5"4
7'11"2
3'1"6
11'0"8
3'1"6
2'8"
2'8"
4'8"
2'
7'11"2
3'3"2
11'0"8
3'1"61'8"
6"1 1'1'1"52'1"52'5"1012'
13'
A
B
C
D E F G
HI
JKLM
NOP
4 12
2X5(B1)3X41.5X4
3X4
3X4
1.5X4
3X5
4X7
1.5X4
1.5X4
4X7
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W3 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Hipjack supports 7-9-11 setback jacks. Jacks up to 7'
have no webs. Longer jacks supported to BC.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 558 /-/-/-/182 /-
H 892 /-/-/-/313 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 153 -418
C - D 233 -652
D - E 375 -1058
Chords Tens.Comp.
E - F 369 -1048
F - G 369 -1048
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - M 748 -275
L - J 1063 -377
Chords Tens.Comp.
J - I 1074 -377
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - G 1059 -373
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 K 999 360
VERT(CL):0.159 K 823 240
HORZ(LL):0.024 H - -
HORZ(TL):0.056 H - -
Creep Factor: 2.0
Max TC CSI:0.305
Max BC CSI:0.302
Max W eb CSI:0.417
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T69
Ply: 2
Qty:1
SEQN:12098 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T330
DrwNo:079.20.1313.27324
AK /DF 03/19/2020
2 Complete Trusses Required
W1
W3
11'0"8
2'4"8
2'4"8
4'9"12
2'5"4
7'11"2
3'1"6
11'0"8
3'1"6
2'8"
2'8"
4'8"
2'
7'11"2
3'3"2
11'0"8
3'1"61'8"
6"1 1'1'1"52'1"52'5"1012'
13'
A
B
C
D E F G
HI
JKLM
NOP
4 12
2X5(B1)3X41.5X4
3X4
3X4
1.5X4
3X5
4X7
1.5X4
1.5X4
4X7
3X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
W5 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1149 /-/-/718 /379 /354
F 1175 /-/-/692 /491 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.8
F Brg Width = 3.7 Min Req =1.9
Bearings A & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1329 -2456
Chords Tens.Comp.
B - C 726 -1500
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2245 -1689
H - G 2242 -1689
Chords Tens.Comp.
G - F 1318 -959
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 808 -954
G - C 645 -287
Webs Tens.Comp.
C - F 1141 -1569
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.085 B 999 360
VERT(CL):0.185 B 999 240
HORZ(LL):-0.040 E - -
HORZ(TL):0.061 E - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.506
Max W eb CSI:0.727
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T70
Ply: 1
Qty:2
SEQN:13070 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T273
DrwNo:079.20.1313.26887
AK /DF 03/19/2020
T3
W4
W5
24'3"11
7'11"4
7'11"4
15'10"8
7'11"4
23'8"
7'9"8
24'3"11
7"11
7'9"8
7'9"8
15'7"
7'9"8
24'3"11
8'8"11
6"1 8'2"38'4"12(WB1)
(WB2)
12'
A
B
C
D E
FGH
4 12
3X5(B1)1.5X4
3X4
5X5
7X6
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
W5 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1149 /-/-/718 /379 /354
F 1175 /-/-/692 /491 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.8
F Brg Width = 3.7 Min Req =1.9
Bearings A & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1329 -2456
Chords Tens.Comp.
B - C 726 -1500
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2245 -1689
H - G 2242 -1689
Chords Tens.Comp.
G - F 1318 -959
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 808 -954
G - C 645 -287
Webs Tens.Comp.
C - F 1141 -1569
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.085 B 999 360
VERT(CL):0.185 B 999 240
HORZ(LL):-0.040 E - -
HORZ(TL):0.061 E - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.506
Max W eb CSI:0.727
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T70
Ply: 1
Qty:2
SEQN:13070 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T273
DrwNo:079.20.1313.26887
AK /DF 03/19/2020
T3
W4
W5
24'3"11
7'11"4
7'11"4
15'10"8
7'11"4
23'8"
7'9"8
24'3"11
7"11
7'9"8
7'9"8
15'7"
7'9"8
24'3"11
8'8"11
6"1 8'2"38'4"12(WB1)
(WB2)
12'
A
B
C
D E
FGH
4 12
3X5(B1)1.5X4
3X4
5X5
7X6
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
W5 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1306 /-/-/837 /434 /376
G 1162 /-/-/689 /481 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.1
G Brg Width = 3.7 Min Req =1.8
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1207 -2395
Chords Tens.Comp.
C - D 705 -1481
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2183 -1605
I - H 2179 -1605
Chords Tens.Comp.
H - G 1303 -952
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 685 -905
H - D 640 -248
Webs Tens.Comp.
D - G 1133 -1552
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 I 999 360
VERT(CL):0.192 I 999 240
HORZ(LL):-0.038 F - -
HORZ(TL):0.058 G - -
Creep Factor: 2.0
Max TC CSI:0.684
Max BC CSI:0.506
Max W eb CSI:0.718
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T70A
Ply: 1
Qty:5
SEQN:13062 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T270
DrwNo:079.20.1313.32130
AK /DF 03/19/2020
T3
W4
W5
24'3"11
7'10"15
7'10"15
15'10"8
7'11"9
23'8"
7'9"8
24'3"11
7"11
7'9"8
7'9"8
15'8"12
7'11"4
24'3"11
8'6"151'8"
6"1 8'2"38'4"128'9"(WB1)
(WB2)
12'A
B
C
D
E F
GHI
4 12
3X5(B1)1.5X4
5X5
5X8
3X4
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
W5 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1306 /-/-/837 /434 /376
G 1162 /-/-/689 /481 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.1
G Brg Width = 3.7 Min Req =1.8
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1207 -2395
Chords Tens.Comp.
C - D 705 -1481
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2183 -1605
I - H 2179 -1605
Chords Tens.Comp.
H - G 1303 -952
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 685 -905
H - D 640 -248
Webs Tens.Comp.
D - G 1133 -1552
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 I 999 360
VERT(CL):0.192 I 999 240
HORZ(LL):-0.038 F - -
HORZ(TL):0.058 G - -
Creep Factor: 2.0
Max TC CSI:0.684
Max BC CSI:0.506
Max W eb CSI:0.718
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T70A
Ply: 1
Qty:5
SEQN:13062 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T270
DrwNo:079.20.1313.32130
AK /DF 03/19/2020
T3
W4
W5
24'3"11
7'10"15
7'10"15
15'10"8
7'11"9
23'8"
7'9"8
24'3"11
7"11
7'9"8
7'9"8
15'8"12
7'11"4
24'3"11
8'6"151'8"
6"1 8'2"38'4"128'9"(WB1)
(WB2)
12'A
B
C
D
E F
GHI
4 12
3X5(B1)1.5X4
5X5
5X8
3X4
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x4 SP 2250f-1.9E;
W13 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: 0.11" DL: 0.15". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1114 /-/-/693 /392 /311
H 1114 /-/-/691 /507 /-
Wind reactions based on MWFRS
Q Brg Width = -Min Req =-
H Brg Width = 3.7 Min Req =1.8
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1533 -2259
B - C 1359 -2229
C - D 814 -1432
Chords Tens.Comp.
D - E 390 -708
E - F 588 -773
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 14 -504
P - O 2465 -2187
Chords Tens.Comp.
O - N 2043 -1674
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 715 -1076
A - P 2451 -1667
P - B 710 -938
B - O 517 -416
C - N 765 -860
N - D 393 -184
Webs Tens.Comp.
N - L 1267 -992
D - L 642 -822
E - L 656 -621
L - F 1513 -1253
I - H 941 -1054
I - G 943 -1044
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.99 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.113 C 999 360
VERT(CL):0.260 C 999 240
HORZ(LL):0.032 K - -
HORZ(TL):0.074 K - -
Creep Factor: 2.0
Max TC CSI:0.609
Max BC CSI:0.685
Max W eb CSI:0.726
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T71
Ply: 1
Qty:1
SEQN:13093 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T146
DrwNo:079.20.1313.41146
AK /DF 03/19/2020
T3
T4
W11
W13
24'3"11
3'3"1
3'3"1
9'1"6
5'10"5
14'11"6
5'10"
20'8"4
5'8"14
23'8"
2'11"12
24'3"11
7"11
2'11"9
2'11"9
8'9"14
5'10"5
14'9"15
6'0"1
20'10"
6'0"1
22'3"12
1'5"12
23'10"3
1'6"7
24'3"11
5"81'7"18'2"31'8'4"1212'
A B
C
D
E
F G
HIJK
LMNOPQ
4 12
3X8
1.5X6 4X7
5X5
5X5
3X4
3X10
5X5
6X8
SS0508
3X3
1.5X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x4 SP 2250f-1.9E;
W13 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: 0.11" DL: 0.15". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
Q 1114 /-/-/693 /392 /311
H 1114 /-/-/691 /507 /-
Wind reactions based on MWFRS
Q Brg Width = -Min Req =-
H Brg Width = 3.7 Min Req =1.8
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1533 -2259
B - C 1359 -2229
C - D 814 -1432
Chords Tens.Comp.
D - E 390 -708
E - F 588 -773
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - P 14 -504
P - O 2465 -2187
Chords Tens.Comp.
O - N 2043 -1674
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - Q 715 -1076
A - P 2451 -1667
P - B 710 -938
B - O 517 -416
C - N 765 -860
N - D 393 -184
Webs Tens.Comp.
N - L 1267 -992
D - L 642 -822
E - L 656 -621
L - F 1513 -1253
I - H 941 -1054
I - G 943 -1044
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.99 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.113 C 999 360
VERT(CL):0.260 C 999 240
HORZ(LL):0.032 K - -
HORZ(TL):0.074 K - -
Creep Factor: 2.0
Max TC CSI:0.609
Max BC CSI:0.685
Max W eb CSI:0.726
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T71
Ply: 1
Qty:1
SEQN:13093 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T146
DrwNo:079.20.1313.41146
AK /DF 03/19/2020
T3
T4
W11
W13
24'3"11
3'3"1
3'3"1
9'1"6
5'10"5
14'11"6
5'10"
20'8"4
5'8"14
23'8"
2'11"12
24'3"11
7"11
2'11"9
2'11"9
8'9"14
5'10"5
14'9"15
6'0"1
20'10"
6'0"1
22'3"12
1'5"12
23'10"3
1'6"7
24'3"11
5"81'7"18'2"31'8'4"1212'
A B
C
D
E
F G
HIJK
LMNOPQ
4 12
3X8
1.5X6 4X7
5X5
5X5
3X4
3X10
5X5
6X8
SS0508
3X3
1.5X6
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2700f-2.2E;
T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2700f-2.2E; B3 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W4,W5,W10,W12,
W14 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 4.27
TC: From 36 plf at 4.27 to 36 plf at 5.94
TC: From 72 plf at 5.94 to 72 plf at 30.31
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.27
BC: From 10 plf at 4.27 to 10 plf at 5.94
BC: From 20 plf at 5.94 to 20 plf at 30.31
TC: 173 lb Conc. Load at 4.27
TC: 146 lb Conc. Load at 5.06
BC: 39 lb Conc. Load at 4.27
BC: 83 lb Conc. Load at 5.06
BC: 781 lb Conc. Load at 5.94
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2490 /-/-/-/967 /-
K 1590 /-/-/-/619 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.2
K Brg Width = 3.7 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 662 -1728
C - D 647 -1705
D - E 1869 -4891
E - F 1662 -4366
Chords Tens.Comp.
F - G 1263 -3304
G - H 661 -1679
H - I 309 -777
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1441 -549
D - S 4644 -1770
T - R 1387 -525
S - P 4579 -1744
Chords Tens.Comp.
O - N 3173 -1212
N - M 3318 -1276
M - L 1572 -611
L - K 679 -265
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - R 694 -1835
S - R 1118 -419
E - P 1587 -564
P - O 2988 -1140
P - F 1275 -484
O - F 250 -563
Webs Tens.Comp.
G - M 705 -1851
H - M 665 -203
H - L 413 -1058
L - I 669 -197
I - K 375 -960
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.195 N 999 360
VERT(CL):0.445 N 816 240
HORZ(LL):0.076 K - -
HORZ(TL):0.172 K - -
Creep Factor: 2.0
Max TC CSI:0.392
Max BC CSI:0.898
Max W eb CSI:0.500
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T72
Ply: 2
Qty:1
SEQN:13114 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T186
DrwNo:079.20.1313.42846
AK /DF 03/19/2020
2 Complete Trusses Required
T1
T2
B3 B4
W4
W5 W10
W12
W14
W15
8"89"11
9"11
30'3"11
4'3"3
4'3"3
8'0"2
3'8"15
11'9"1
3'8"15
17'11"4
6'2"3
24'1"3
6'1"14
30'3"11
6'2"8
1'7"8
1'7"8
1'9"1
1"9
4'3"3
2'6"2
7'8"14
3'5"11
11'5"9
3'8"11
17'11"4
6'5"11
23'10"
5'10"11
30'3"11
6'5"111'8"
7"12 8'7"51'10"13 9"11 27'7"32'5"11'8'11"1112'A
B
CD
E F G
H
I
J
KLMNO
PQ
RST
5
12
4 12
5X5(E1)
8X16(++)
1.5X4
2X6
4X4
6X6H0514
3X8 3X10
3X10 5X5
8X12
5X5
2X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2700f-2.2E;
T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2700f-2.2E; B3 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W4,W5,W10,W12,
W14 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 4.27
TC: From 36 plf at 4.27 to 36 plf at 5.94
TC: From 72 plf at 5.94 to 72 plf at 30.31
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.27
BC: From 10 plf at 4.27 to 10 plf at 5.94
BC: From 20 plf at 5.94 to 20 plf at 30.31
TC: 173 lb Conc. Load at 4.27
TC: 146 lb Conc. Load at 5.06
BC: 39 lb Conc. Load at 4.27
BC: 83 lb Conc. Load at 5.06
BC: 781 lb Conc. Load at 5.94
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2490 /-/-/-/967 /-
K 1590 /-/-/-/619 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.2
K Brg Width = 3.7 Min Req =1.5
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 662 -1728
C - D 647 -1705
D - E 1869 -4891
E - F 1662 -4366
Chords Tens.Comp.
F - G 1263 -3304
G - H 661 -1679
H - I 309 -777
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1441 -549
D - S 4644 -1770
T - R 1387 -525
S - P 4579 -1744
Chords Tens.Comp.
O - N 3173 -1212
N - M 3318 -1276
M - L 1572 -611
L - K 679 -265
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - R 694 -1835
S - R 1118 -419
E - P 1587 -564
P - O 2988 -1140
P - F 1275 -484
O - F 250 -563
Webs Tens.Comp.
G - M 705 -1851
H - M 665 -203
H - L 413 -1058
L - I 669 -197
I - K 375 -960
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.195 N 999 360
VERT(CL):0.445 N 816 240
HORZ(LL):0.076 K - -
HORZ(TL):0.172 K - -
Creep Factor: 2.0
Max TC CSI:0.392
Max BC CSI:0.898
Max W eb CSI:0.500
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T72
Ply: 2
Qty:1
SEQN:13114 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T186
DrwNo:079.20.1313.42846
AK /DF 03/19/2020
2 Complete Trusses Required
T1
T2
B3 B4
W4
W5 W10
W12
W14
W15
8"89"11
9"11
30'3"11
4'3"3
4'3"3
8'0"2
3'8"15
11'9"1
3'8"15
17'11"4
6'2"3
24'1"3
6'1"14
30'3"11
6'2"8
1'7"8
1'7"8
1'9"1
1"9
4'3"3
2'6"2
7'8"14
3'5"11
11'5"9
3'8"11
17'11"4
6'5"11
23'10"
5'10"11
30'3"11
6'5"111'8"
7"12 8'7"51'10"13 9"11 27'7"32'5"11'8'11"1112'A
B
CD
E F G
H
I
J
KLMNO
PQ
RST
5
12
4 12
5X5(E1)
8X16(++)
1.5X4
2X6
4X4
6X6H0514
3X8 3X10
3X10 5X5
8X12
5X5
2X4
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.712'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1555 /-/-/1034 /545 /393
J 1385 /-/-/871 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1805 -2715
C - D 1620 -2653
D - E 1630 -2444
Chords Tens.Comp.
E - F 2199 -3541
F - G 1351 -2289
G - H 617 -1139
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2379 -2025
N - M 3150 -2376
M - L 3559 -2634
Chords Tens.Comp.
L - K 2070 -1568
K - J 984 -734
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 679 -318
N - E 548 -904
E - M 501 -306
F - L 1199 -1669
Webs Tens.Comp.
L - G 945 -612
G - K 1098 -1424
K - H 1094 -748
H - J 1149 -1540
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.176 F 999 360
VERT(CL):0.404 F 900 240
HORZ(LL):0.050 J - -
HORZ(TL):0.116 J - -
Creep Factor: 2.0
Max TC CSI:0.572
Max BC CSI:0.975
Max W eb CSI:0.962
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T73
Ply: 1
Qty:1
SEQN:13121 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T267
DrwNo:079.20.1313.41911
AK /DF 03/19/2020
W5
W7
30'3"11
6'3"3
6'3"3
10'3"2
3'11"15
14'3"1
3'11"15
19'7"3
5'4"2
24'11"6
5'4"2
30'3"11
5'4"5
6'6"11
6'6"11
13'11"9
7'4"14
19'3"11
5'4"2
24'7"14
5'4"2
30'3"11
5'7"131'8"
7"12 8'7"53'3"18'11"11(WB1)
(WB2)
12'A
B
C
D E F
G
H
I
JKLMN
5
12
4 12
5X6(E1)
3X4
4X5
3X4
3X4
5X5
5X5
3X5
3X5
3X5
4X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.712'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1555 /-/-/1034 /545 /393
J 1385 /-/-/871 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1805 -2715
C - D 1620 -2653
D - E 1630 -2444
Chords Tens.Comp.
E - F 2199 -3541
F - G 1351 -2289
G - H 617 -1139
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2379 -2025
N - M 3150 -2376
M - L 3559 -2634
Chords Tens.Comp.
L - K 2070 -1568
K - J 984 -734
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 679 -318
N - E 548 -904
E - M 501 -306
F - L 1199 -1669
Webs Tens.Comp.
L - G 945 -612
G - K 1098 -1424
K - H 1094 -748
H - J 1149 -1540
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.176 F 999 360
VERT(CL):0.404 F 900 240
HORZ(LL):0.050 J - -
HORZ(TL):0.116 J - -
Creep Factor: 2.0
Max TC CSI:0.572
Max BC CSI:0.975
Max W eb CSI:0.962
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T73
Ply: 1
Qty:1
SEQN:13121 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T267
DrwNo:079.20.1313.41911
AK /DF 03/19/2020
W5
W7
30'3"11
6'3"3
6'3"3
10'3"2
3'11"15
14'3"1
3'11"15
19'7"3
5'4"2
24'11"6
5'4"2
30'3"11
5'4"5
6'6"11
6'6"11
13'11"9
7'4"14
19'3"11
5'4"2
24'7"14
5'4"2
30'3"11
5'7"131'8"
7"12 8'7"53'3"18'11"11(WB1)
(WB2)
12'A
B
C
D E F
G
H
I
JKLMN
5
12
4 12
5X6(E1)
3X4
4X5
3X4
3X4
5X5
5X5
3X5
3X5
3X5
4X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2; W6,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1556 /-/-/1049 /545 /393
J 1385 /-/-/870 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1773 -2736
C - D 1749 -2695
D - E 1538 -2475
Chords Tens.Comp.
E - F 1519 -2256
F - G 1716 -2782
G - H 782 -1436
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2424 -2179
M - L 2673 -2020
Chords Tens.Comp.
L - K 2779 -2078
K - J 1258 -957
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - M 614 -304
M - F 336 -569
G - K 1262 -1707
Webs Tens.Comp.
K - H 1006 -632
H - J 1295 -1701
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.124 L 999 360
VERT(CL):0.286 L 999 240
HORZ(LL):0.040 J - -
HORZ(TL):0.092 J - -
Creep Factor: 2.0
Max TC CSI:0.929
Max BC CSI:0.955
Max W eb CSI:0.968
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T74
Ply: 1
Qty:1
SEQN:13118 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T271
DrwNo:079.20.1313.34313
AK /DF 03/19/2020
B2
W6
W8
W9
30'3"11
4'1"10
4'1"10
8'3"3
4'1"10
12'6"2
4'2"15
16'9"1
4'2"15
23'8"2
6'11"1
30'3"11
6'7"9
8'4"15
8'4"15
16'5"9
8'0"10
23'4"10
6'11"1
30'3"11
6'11"11'8"
7"12 8'7"54'1"18'11"11(WB1)(WB2)
12'A
B
C
D
E F G
H
I
JKLM
5 12
4 12
6X6(E1)
3X4
1.5X4
4X5
3X8
3X4
5X5
5X5
3X5
4X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2; W6,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1556 /-/-/1049 /545 /393
J 1385 /-/-/870 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1773 -2736
C - D 1749 -2695
D - E 1538 -2475
Chords Tens.Comp.
E - F 1519 -2256
F - G 1716 -2782
G - H 782 -1436
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2424 -2179
M - L 2673 -2020
Chords Tens.Comp.
L - K 2779 -2078
K - J 1258 -957
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - M 614 -304
M - F 336 -569
G - K 1262 -1707
Webs Tens.Comp.
K - H 1006 -632
H - J 1295 -1701
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.124 L 999 360
VERT(CL):0.286 L 999 240
HORZ(LL):0.040 J - -
HORZ(TL):0.092 J - -
Creep Factor: 2.0
Max TC CSI:0.929
Max BC CSI:0.955
Max W eb CSI:0.968
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T74
Ply: 1
Qty:1
SEQN:13118 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T271
DrwNo:079.20.1313.34313
AK /DF 03/19/2020
B2
W6
W8
W9
30'3"11
4'1"10
4'1"10
8'3"3
4'1"10
12'6"2
4'2"15
16'9"1
4'2"15
23'8"2
6'11"1
30'3"11
6'7"9
8'4"15
8'4"15
16'5"9
8'0"10
23'4"10
6'11"1
30'3"11
6'11"11'8"
7"12 8'7"54'1"18'11"11(WB1)(WB2)
12'A
B
C
D
E F G
H
I
JKLM
5 12
4 12
6X6(E1)
3X4
1.5X4
4X5
3X8
3X4
5X5
5X5
3X5
4X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
W10 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1557 /-/-/1062 /545 /393
J 1386 /-/-/870 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1649 -2716
C - D 1657 -2675
D - E 1448 -2309
Chords Tens.Comp.
E - F 1443 -2082
F - G 1302 -2156
G - H 620 -1144
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2404 -2089
N - M 2401 -2090
M - L 2264 -1739
Chords Tens.Comp.
L - K 2139 -1596
K - J 991 -762
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - M 392 -373
E - M 523 -243
G - K 1065 -1460
Webs Tens.Comp.
K - H 1069 -697
H - J 1189 -1547
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.110 F 999 360
VERT(CL):0.252 F 999 240
HORZ(LL):0.042 J - -
HORZ(TL):0.096 J - -
Creep Factor: 2.0
Max TC CSI:0.584
Max BC CSI:0.898
Max W eb CSI:0.944
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T75
Ply: 1
Qty:1
SEQN:13125 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T274
DrwNo:079.20.1313.36482
AK /DF 03/19/2020
W7
W10
30'3"11
5'3"6
5'3"6
10'3"3
4'11"14
14'9"2
4'5"15
19'3"1
4'5"15
24'11"2
5'8"1
30'3"11
5'4"9
5'1"10
5'1"10
10'4"15
5'3"6
18'11"9
8'6"10
24'7"10
5'8"1
30'3"11
5'8"11'8"
7"12 8'7"54'11"18'11"11(WB1)
(WB2)
12'A
B
C
D
E F G
H
I
JKLMN
5
12
4 12
5X6(E1)
3X4
1.5X4
3X4
4X5
5X8
3X4
5X5
5X5
3X5
4X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
W10 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1557 /-/-/1062 /545 /393
J 1386 /-/-/870 /586 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1649 -2716
C - D 1657 -2675
D - E 1448 -2309
Chords Tens.Comp.
E - F 1443 -2082
F - G 1302 -2156
G - H 620 -1144
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2404 -2089
N - M 2401 -2090
M - L 2264 -1739
Chords Tens.Comp.
L - K 2139 -1596
K - J 991 -762
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - M 392 -373
E - M 523 -243
G - K 1065 -1460
Webs Tens.Comp.
K - H 1069 -697
H - J 1189 -1547
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.110 F 999 360
VERT(CL):0.252 F 999 240
HORZ(LL):0.042 J - -
HORZ(TL):0.096 J - -
Creep Factor: 2.0
Max TC CSI:0.584
Max BC CSI:0.898
Max W eb CSI:0.944
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T75
Ply: 1
Qty:1
SEQN:13125 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T274
DrwNo:079.20.1313.36482
AK /DF 03/19/2020
W7
W10
30'3"11
5'3"6
5'3"6
10'3"3
4'11"14
14'9"2
4'5"15
19'3"1
4'5"15
24'11"2
5'8"1
30'3"11
5'4"9
5'1"10
5'1"10
10'4"15
5'3"6
18'11"9
8'6"10
24'7"10
5'8"1
30'3"11
5'8"11'8"
7"12 8'7"54'11"18'11"11(WB1)
(WB2)
12'A
B
C
D
E F G
H
I
JKLMN
5
12
4 12
5X6(E1)
3X4
1.5X4
3X4
4X5
5X8
3X4
5X5
5X5
3X5
4X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.636'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1558 /-/-/1075 /544 /393
J 1386 /-/-/870 /587 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1629 -2723
C - D 1641 -2679
D - E 1336 -2133
Chords Tens.Comp.
E - F 1350 -1898
F - G 940 -1613
G - H 1092 -1766
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2407 -2063
M - L 2404 -2064
Chords Tens.Comp.
L - K 1901 -1473
K - J 754 -596
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 525 -572
E - L 448 -166
F - K 489 -447
Webs Tens.Comp.
K - G 666 -836
K - H 1641 -1124
H - J 1119 -1415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 L 999 360
VERT(CL):0.211 L 999 240
HORZ(LL):0.032 J - -
HORZ(TL):0.073 J - -
Creep Factor: 2.0
Max TC CSI:0.535
Max BC CSI:0.872
Max W eb CSI:0.827
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T76
Ply: 1
Qty:1
SEQN:13129 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T269
DrwNo:079.20.1313.30648
AK /DF 03/19/2020
B2
W7
W8
W9
30'3"11
6'3"6
6'3"6
12'3"3
5'11"14
17'0"2
4'8"15
21'9"1
4'8"15
26'0"6
4'3"5
30'3"11
4'3"5
6'1"10
6'1"10
12'4"15
6'3"6
21'7"5
9'2"6
30'3"11
8'8"61'8"
7"12 8'7"55'9"18'11"11(WB1)
12'A
B
C
D
E F G
H
I
JKLM
5
12
4 12
5X6(E1)
3X4
1.5X4
3X4
4X5
5X8
3X4
5X8
5X5
4X6
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
W9 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.636'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1558 /-/-/1075 /544 /393
J 1386 /-/-/870 /587 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.5
J Brg Width = 3.7 Min Req =2.2
Bearings B & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1629 -2723
C - D 1641 -2679
D - E 1336 -2133
Chords Tens.Comp.
E - F 1350 -1898
F - G 940 -1613
G - H 1092 -1766
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2407 -2063
M - L 2404 -2064
Chords Tens.Comp.
L - K 1901 -1473
K - J 754 -596
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 525 -572
E - L 448 -166
F - K 489 -447
Webs Tens.Comp.
K - G 666 -836
K - H 1641 -1124
H - J 1119 -1415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 L 999 360
VERT(CL):0.211 L 999 240
HORZ(LL):0.032 J - -
HORZ(TL):0.073 J - -
Creep Factor: 2.0
Max TC CSI:0.535
Max BC CSI:0.872
Max W eb CSI:0.827
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T76
Ply: 1
Qty:1
SEQN:13129 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T269
DrwNo:079.20.1313.30648
AK /DF 03/19/2020
B2
W7
W8
W9
30'3"11
6'3"6
6'3"6
12'3"3
5'11"14
17'0"2
4'8"15
21'9"1
4'8"15
26'0"6
4'3"5
30'3"11
4'3"5
6'1"10
6'1"10
12'4"15
6'3"6
21'7"5
9'2"6
30'3"11
8'8"61'8"
7"12 8'7"55'9"18'11"11(WB1)
12'A
B
C
D
E F G
H
I
JKLM
5
12
4 12
5X6(E1)
3X4
1.5X4
3X4
4X5
5X8
3X4
5X8
5X5
4X6
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.907'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1398 /-/-/954 /493 /367
I 1391 /-/-/872 /597 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.2
I Brg Width = 3.7 Min Req =2.2
Bearings A & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1880 -2822
B - C 1640 -2693
C - D 1225 -1952
D - E 1474 -2111
Chords Tens.Comp.
E - F 843 -1372
F - G 959 -1501
G - H 594 -846
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 2430 -2059
T - S 2425 -2060
Q - O 2112 -1653
Chords Tens.Comp.
O - N 2102 -1654
N - M 792 -625
M - J 807 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 716 -800
D - Q 628 -407
S - Q 1770 -1497
E - N 845 -990
N - F 576 -760
Webs Tens.Comp.
N - G 1454 -1025
G - J 1101 -1338
J - H 1676 -1312
H - I 1146 -1352
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 Q 999 360
VERT(CL):0.234 Q 999 240
HORZ(LL):0.057 I - -
HORZ(TL):0.132 I - -
Creep Factor: 2.0
Max TC CSI:0.499
Max BC CSI:0.875
Max W eb CSI:0.938
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T77
Ply: 1
Qty:1
SEQN:13133 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T272
DrwNo:079.20.1313.42083
AK /DF 03/19/2020
T1
W14
W15
30'3"11
7'3"6
7'3"6
14'3"3
6'11"14
18'7"
4'3"13
24'3"1
5'8"1
26'9"
2'5"15
30'3"11
3'6"11
7'1"10
7'1"10
14'4"15
7'3"6
18'7"
4'2"1
20'0"12
1'5"12
24'1"5
4'0"9
25'3"4
1'1"15
26'9"
1'5"12
30'3"11
3'6"11
7"12 8'7"56'7"11'4"(WB1)
12'
A
B
C
D E F
G
H
I
J
KL
MNO
PQRST
5 12
4 12
5X6(E1)
3X4
5X5
3X4
4X7
3X12 5X8
3X4
5X8
5X5
4X5
6X8
4X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W14 2x4 SP 2250f-1.9E;
W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.907'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1398 /-/-/954 /493 /367
I 1391 /-/-/872 /597 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.2
I Brg Width = 3.7 Min Req =2.2
Bearings A & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1880 -2822
B - C 1640 -2693
C - D 1225 -1952
D - E 1474 -2111
Chords Tens.Comp.
E - F 843 -1372
F - G 959 -1501
G - H 594 -846
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 2430 -2059
T - S 2425 -2060
Q - O 2112 -1653
Chords Tens.Comp.
O - N 2102 -1654
N - M 792 -625
M - J 807 -631
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 716 -800
D - Q 628 -407
S - Q 1770 -1497
E - N 845 -990
N - F 576 -760
Webs Tens.Comp.
N - G 1454 -1025
G - J 1101 -1338
J - H 1676 -1312
H - I 1146 -1352
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 Q 999 360
VERT(CL):0.234 Q 999 240
HORZ(LL):0.057 I - -
HORZ(TL):0.132 I - -
Creep Factor: 2.0
Max TC CSI:0.499
Max BC CSI:0.875
Max W eb CSI:0.938
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T77
Ply: 1
Qty:1
SEQN:13133 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T272
DrwNo:079.20.1313.42083
AK /DF 03/19/2020
T1
W14
W15
30'3"11
7'3"6
7'3"6
14'3"3
6'11"14
18'7"
4'3"13
24'3"1
5'8"1
26'9"
2'5"15
30'3"11
3'6"11
7'1"10
7'1"10
14'4"15
7'3"6
18'7"
4'2"1
20'0"12
1'5"12
24'1"5
4'0"9
25'3"4
1'1"15
26'9"
1'5"12
30'3"11
3'6"11
7"12 8'7"56'7"11'4"(WB1)
12'
A
B
C
D E F
G
H
I
J
KL
MNO
PQRST
5 12
4 12
5X6(E1)
3X4
5X5
3X4
4X7
3X12 5X8
3X4
5X8
5X5
4X5
6X8
4X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W12 2x4 SP 2250f-1.9E;
W13 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1397 /-/-/930 /508 /329
H 1392 /-/-/873 /616 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 3.7 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1421 -2088
B - C 1532 -2514
C - D 1124 -1742
Chords Tens.Comp.
D - E 867 -1256
E - F 377 -656
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 22 -595
M - L 2377 -2232
L - K 2230 -1902
Chords Tens.Comp.
K - J 1510 -1291
J - I 1238 -978
I - H 616 -477
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 888 -1380
A - M 2490 -1699
M - B 987 -1317
B - L 406 -138
C - K 771 -845
D - K 587 -405
Webs Tens.Comp.
D - J 509 -437
J - E 476 -417
E - I 845 -1041
I - F 964 -703
F - H 1068 -1381
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 C 999 360
VERT(CL):0.211 C 999 240
HORZ(LL):0.035 H - -
HORZ(TL):0.081 H - -
Creep Factor: 2.0
Max TC CSI:0.751
Max BC CSI:0.871
Max W eb CSI:0.784
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T78
Ply: 1
Qty:1
SEQN:13137 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T275
DrwNo:079.20.1313.27294
AK /DF 03/19/2020
W12
W13
30'3"11
2'3"4
2'3"4
9'5"
7'1"12
16'3"3
6'10"4
21'7"14
5'4"11
26'9"1
5'1"3
30'3"11
3'6"10
1'11"12
1'11"12
9'1"8
7'1"12
16'3"3
7'1"12
21'4"6
5'1"3
26'5"9
5'1"3
30'3"11
3'10"21'7"28'7"57'5"1(WB1)(WB1)(WB1)
(WB2)
12'
A B
C
D E F
G
HIJKLMN
5 12
4 12
4X7
2X6 5X6
5X5(SRS)
3X4
3X4
4X8
5X5 3X4
3X4
3X5
6X6
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W12 2x4 SP 2250f-1.9E;
W13 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1397 /-/-/930 /508 /329
H 1392 /-/-/873 /616 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 3.7 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1421 -2088
B - C 1532 -2514
C - D 1124 -1742
Chords Tens.Comp.
D - E 867 -1256
E - F 377 -656
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 22 -595
M - L 2377 -2232
L - K 2230 -1902
Chords Tens.Comp.
K - J 1510 -1291
J - I 1238 -978
I - H 616 -477
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 888 -1380
A - M 2490 -1699
M - B 987 -1317
B - L 406 -138
C - K 771 -845
D - K 587 -405
Webs Tens.Comp.
D - J 509 -437
J - E 476 -417
E - I 845 -1041
I - F 964 -703
F - H 1068 -1381
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 C 999 360
VERT(CL):0.211 C 999 240
HORZ(LL):0.035 H - -
HORZ(TL):0.081 H - -
Creep Factor: 2.0
Max TC CSI:0.751
Max BC CSI:0.871
Max W eb CSI:0.784
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T78
Ply: 1
Qty:1
SEQN:13137 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T275
DrwNo:079.20.1313.27294
AK /DF 03/19/2020
W12
W13
30'3"11
2'3"4
2'3"4
9'5"
7'1"12
16'3"3
6'10"4
21'7"14
5'4"11
26'9"1
5'1"3
30'3"11
3'6"10
1'11"12
1'11"12
9'1"8
7'1"12
16'3"3
7'1"12
21'4"6
5'1"3
26'5"9
5'1"3
30'3"11
3'10"21'7"28'7"57'5"1(WB1)(WB1)(WB1)
(WB2)
12'
A B
C
D E F
G
HIJKLMN
5 12
4 12
4X7
2X6 5X6
5X5(SRS)
3X4
3X4
4X8
5X5 3X4
3X4
3X5
6X6
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W11 2x4 SP 2250f-1.9E;
W12 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1397 /-/-/913 /523 /295
H 1394 /-/-/872 /627 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
H Brg Width = 4.0 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1567 -2339
B - C 1419 -2314
C - D 1001 -1521
Chords Tens.Comp.
D - E 666 -921
E - F 666 -921
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 26 -513
L - K 2496 -2191
Chords Tens.Comp.
K - J 2040 -1698
J - I 1308 -1091
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 897 -1362
A - L 2641 -1773
L - B 856 -1153
B - K 553 -463
K - C 412 -173
C - J 823 -909
Webs Tens.Comp.
D - J 658 -489
D - I 666 -669
E - I 307 -411
I - F 1316 -1003
F - H 1092 -1395
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.097 K 999 360
VERT(CL):0.222 K 999 240
HORZ(LL):0.029 H - -
HORZ(TL):0.067 H - -
Creep Factor: 2.0
Max TC CSI:0.752
Max BC CSI:0.877
Max W eb CSI:0.857
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T79
Ply: 1
Qty:1
SEQN:13141 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T181
DrwNo:079.20.1313.41708
AK /DF 03/19/2020
W10
W11
W12
30'4"
4'3"4
4'3"4
11'5"
7'1"12
18'3"3
6'10"4
23'10"14
5'7"11
29'3"1
5'4"3
30'4"
1'0"15
3'10"4
3'10"4
11'1"8
7'3"4
18'3"3
7'1"12
23'10"14
5'7"11
30'4"
6'5"22'5"28'7"68'3"1(WB1)
(WB2)
12'
A B
C
D E F G
HIJKLM
5 12
4 12
4X7
2X6 3X10
5X5
5X5
3X4
4X8
5X5
1.5X4
4X8
5X5(SRS)
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W11 2x4 SP 2250f-1.9E;
W12 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1397 /-/-/913 /523 /295
H 1394 /-/-/872 /627 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
H Brg Width = 4.0 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1567 -2339
B - C 1419 -2314
C - D 1001 -1521
Chords Tens.Comp.
D - E 666 -921
E - F 666 -921
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 26 -513
L - K 2496 -2191
Chords Tens.Comp.
K - J 2040 -1698
J - I 1308 -1091
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 897 -1362
A - L 2641 -1773
L - B 856 -1153
B - K 553 -463
K - C 412 -173
C - J 823 -909
Webs Tens.Comp.
D - J 658 -489
D - I 666 -669
E - I 307 -411
I - F 1316 -1003
F - H 1092 -1395
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.097 K 999 360
VERT(CL):0.222 K 999 240
HORZ(LL):0.029 H - -
HORZ(TL):0.067 H - -
Creep Factor: 2.0
Max TC CSI:0.752
Max BC CSI:0.877
Max W eb CSI:0.857
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T79
Ply: 1
Qty:1
SEQN:13141 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T181
DrwNo:079.20.1313.41708
AK /DF 03/19/2020
W10
W11
W12
30'4"
4'3"4
4'3"4
11'5"
7'1"12
18'3"3
6'10"4
23'10"14
5'7"11
29'3"1
5'4"3
30'4"
1'0"15
3'10"4
3'10"4
11'1"8
7'3"4
18'3"3
7'1"12
23'10"14
5'7"11
30'4"
6'5"22'5"28'7"68'3"1(WB1)
(WB2)
12'
A B
C
D E F G
HIJKLM
5 12
4 12
4X7
2X6 3X10
5X5
5X5
3X4
4X8
5X5
1.5X4
4X8
5X5(SRS)
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3,T4 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x6 SP M-26;
B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.10
TC: From 36 plf at 6.10 to 36 plf at 9.94
TC: From 73 plf at 9.94 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.15
BC: From 10 plf at 6.15 to 10 plf at 9.94
BC: From 20 plf at 9.94 to 20 plf at 40.33
TC: 247 lb Conc. Load at 6.15
TC: 190 lb Conc. Load at 7.06
TC: 211 lb Conc. Load at 9.06
BC: 266 lb Conc. Load at 6.15
BC: 116 lb Conc. Load at 7.06, 9.06
BC: 1651 lb Conc. Load at 9.94
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 4085 /-/-/-/1542 /-
K 2425 /-/-/-/908 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.6
K Brg Width = 4.0 Min Req =2.1
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1558 -4153
C - D 2108 -5652
D - E 2066 -5538
E - F 1093 -2901
Chords Tens.Comp.
F - G 721 -1890
G - H 553 -1471
H - I 210 -551
I - J 209 -550
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 3770 -1406
W -V 3779 -1405
V - U 5670 -2120
U - T 5532 -2068
Chords Tens.Comp.
R - P 1696 -638
P - O 1364 -513
O - L 1362 -508
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 2164 -813
E - T 1191 -3183
T - F 757 -220
T - R 2669 -1000
F - R 416 -1123
R - G 1452 -523
Webs Tens.Comp.
G - P 543 -1430
H - P 1238 -423
H - L 439 -1184
L - J 1282 -488
J - K 458 -1187
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.49 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.341 E 999 360
VERT(CL):0.779 E 618 240
HORZ(LL):0.077 K - -
HORZ(TL):0.176 K - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.595
Max W eb CSI:0.885
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T80
Ply: 2
Qty:1
SEQN:13149 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T244
DrwNo:079.20.1313.37059
AK /DF 03/19/2020
2 Complete Trusses Required
T3
T4
B1 B2
W6
W19
40'4"
6'1"4
6'1"4
11'3"
5'1"12
16'1"4
4'10"4
22'5"14
6'4"10
28'6"10
6'0"12
30'1"3
1'6"9
36'10"12
6'9"9
40'4"
3'5"4
6'3"
6'3"
10'11"8
4'8"8
15'9"12
4'10"4
22'4"2
6'6"6
28'7"
6'2"14
30'0"12
1'5"12
30'1"3
0"7
35'3"4
5'2"1
36'9"
1'5"12
40'4"
3'7"
1'8"
7"12 9'0"43'2"41'4"9'4"1012'A
B
C D E
F
G
H I J
K
L
MN
OP
QRSTUVW
5 12
4X8(B2)
6X8
4X6
3X4
H0710
7X6
5X10
3X4
5X8
3X8
5X8
4X7 6X82X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3,T4 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x6 SP M-26;
B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.10
TC: From 36 plf at 6.10 to 36 plf at 9.94
TC: From 73 plf at 9.94 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.15
BC: From 10 plf at 6.15 to 10 plf at 9.94
BC: From 20 plf at 9.94 to 20 plf at 40.33
TC: 247 lb Conc. Load at 6.15
TC: 190 lb Conc. Load at 7.06
TC: 211 lb Conc. Load at 9.06
BC: 266 lb Conc. Load at 6.15
BC: 116 lb Conc. Load at 7.06, 9.06
BC: 1651 lb Conc. Load at 9.94
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 4085 /-/-/-/1542 /-
K 2425 /-/-/-/908 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.6
K Brg Width = 4.0 Min Req =2.1
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1558 -4153
C - D 2108 -5652
D - E 2066 -5538
E - F 1093 -2901
Chords Tens.Comp.
F - G 721 -1890
G - H 553 -1471
H - I 210 -551
I - J 209 -550
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 3770 -1406
W -V 3779 -1405
V - U 5670 -2120
U - T 5532 -2068
Chords Tens.Comp.
R - P 1696 -638
P - O 1364 -513
O - L 1362 -508
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 2164 -813
E - T 1191 -3183
T - F 757 -220
T - R 2669 -1000
F - R 416 -1123
R - G 1452 -523
Webs Tens.Comp.
G - P 543 -1430
H - P 1238 -423
H - L 439 -1184
L - J 1282 -488
J - K 458 -1187
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.49 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.341 E 999 360
VERT(CL):0.779 E 618 240
HORZ(LL):0.077 K - -
HORZ(TL):0.176 K - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.595
Max W eb CSI:0.885
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T80
Ply: 2
Qty:1
SEQN:13149 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T244
DrwNo:079.20.1313.37059
AK /DF 03/19/2020
2 Complete Trusses Required
T3
T4
B1 B2
W6
W19
40'4"
6'1"4
6'1"4
11'3"
5'1"12
16'1"4
4'10"4
22'5"14
6'4"10
28'6"10
6'0"12
30'1"3
1'6"9
36'10"12
6'9"9
40'4"
3'5"4
6'3"
6'3"
10'11"8
4'8"8
15'9"12
4'10"4
22'4"2
6'6"6
28'7"
6'2"14
30'0"12
1'5"12
30'1"3
0"7
35'3"4
5'2"1
36'9"
1'5"12
40'4"
3'7"
1'8"
7"12 9'0"43'2"41'4"9'4"1012'A
B
C D E
F
G
H I J
K
L
MN
OP
QRSTUVW
5 12
4X8(B2)
6X8
4X6
3X4
H0710
7X6
5X10
3X4
5X8
3X8
5X8
4X7 6X82X4
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W9,W11,
W12 2x4 SP 2250f-1.9E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1407 /700 /442
L 1862 /-/-/1227 /745 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
L Brg Width = 4.0 Min Req =3.0
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2588 -3791
C - D 2592 -3749
D - E 2384 -3583
E - F 2853 -4344
Chords Tens.Comp.
F - G 3208 -4918
G - H 1897 -3020
H - I 949 -1468
I - J 1008 -1259
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3378 -3090
Q - P 3260 -2780
P - O 4403 -3369
Chords Tens.Comp.
O - N 4942 -3716
N - M 2659 -2070
M - L 716 -560
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - P 1376 -850
P - F 519 -776
F - O 670 -476
G - N 1877 -2554
Webs Tens.Comp.
N - H 1381 -916
H - M 1544 -1940
M - J 1478 -1221
J - L 1424 -1821
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.282 G 999 360
VERT(CL):0.653 G 741 240
HORZ(LL):-0.066 J - -
HORZ(TL):0.152 J - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.499
Max W eb CSI:0.930
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T81
Ply: 1
Qty:1
SEQN:13153 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T242
DrwNo:079.20.1313.42816
AK /DF 03/19/2020
W7
W9
W11
W12
W13
40'4"
4'1"10
4'1"10
8'3"4
4'1"10
13'5"
5'1"12
18'3"4
4'10"4
25'5"
7'1"12
32'3"3
6'10"4
36'2"10
3'11"6
40'4"
4'1"6
8'3"4
8'3"4
13'1"8
4'10"4
17'11"12
4'10"4
25'1"8
7'1"12
32'4"15
7'3"8
40'4"
7'11"11'8"
7"12 9'11"14'1"210'3"7(WB1)
(WB2)(WB2)(WB3)
(WB4)
12'A
B C
D
E F G
H
I J K
LMNOPQ
5 12
7X6(E5)
3X4
1.5X4
5X8
3X4 5X6
3X4
3X4
6X6
5X8
4X6
5X5
5X8
5X5 2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W9,W11,
W12 2x4 SP 2250f-1.9E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1407 /700 /442
L 1862 /-/-/1227 /745 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
L Brg Width = 4.0 Min Req =3.0
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2588 -3791
C - D 2592 -3749
D - E 2384 -3583
E - F 2853 -4344
Chords Tens.Comp.
F - G 3208 -4918
G - H 1897 -3020
H - I 949 -1468
I - J 1008 -1259
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3378 -3090
Q - P 3260 -2780
P - O 4403 -3369
Chords Tens.Comp.
O - N 4942 -3716
N - M 2659 -2070
M - L 716 -560
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - P 1376 -850
P - F 519 -776
F - O 670 -476
G - N 1877 -2554
Webs Tens.Comp.
N - H 1381 -916
H - M 1544 -1940
M - J 1478 -1221
J - L 1424 -1821
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.282 G 999 360
VERT(CL):0.653 G 741 240
HORZ(LL):-0.066 J - -
HORZ(TL):0.152 J - -
Creep Factor: 2.0
Max TC CSI:0.823
Max BC CSI:0.499
Max W eb CSI:0.930
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T81
Ply: 1
Qty:1
SEQN:13153 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T242
DrwNo:079.20.1313.42816
AK /DF 03/19/2020
W7
W9
W11
W12
W13
40'4"
4'1"10
4'1"10
8'3"4
4'1"10
13'5"
5'1"12
18'3"4
4'10"4
25'5"
7'1"12
32'3"3
6'10"4
36'2"10
3'11"6
40'4"
4'1"6
8'3"4
8'3"4
13'1"8
4'10"4
17'11"12
4'10"4
25'1"8
7'1"12
32'4"15
7'3"8
40'4"
7'11"11'8"
7"12 9'11"14'1"210'3"7(WB1)
(WB2)(WB2)(WB3)
(WB4)
12'A
B C
D
E F G
H
I J K
LMNOPQ
5 12
7X6(E5)
3X4
1.5X4
5X8
3X4 5X6
3X4
3X4
6X6
5X8
4X6
5X5
5X8
5X5 2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W8,W10,W11 2x4 SP 2250f-1.9E;
W12 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1419 /696 /482
K 1862 /-/-/1248 /759 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
K Brg Width = 4.0 Min Req =3.0
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2465 -3773
C - D 2456 -3731
D - E 2279 -3433
E - F 2502 -3809
Chords Tens.Comp.
F - G 2631 -4086
G - H 1556 -2535
H - I 680 -1108
I - J 762 -928
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3364 -3027
Q - P 3362 -3029
P - O 3105 -2699
Chords Tens.Comp.
O - N 3846 -3005
N - M 4094 -3128
M - L 2214 -1752
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - O 972 -553
O - F 379 -585
G - M 1652 -2216
M - H 1391 -931
Webs Tens.Comp.
H - L 1511 -1885
L - J 1885 -1547
J - K 1461 -1817
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.241 N 999 360
VERT(CL):0.557 N 869 240
HORZ(LL):0.067 L - -
HORZ(TL):0.156 L - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.828
Max W eb CSI:0.958
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T82
Ply: 1
Qty:1
SEQN:13162 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T241
DrwNo:079.20.1313.41115
AK /DF 03/19/2020
B2
W8
W10
W11
W12
W13
40'4"
5'3"6
5'3"6
10'3"4
4'11"14
15'5"
5'1"12
20'3"4
4'10"4
27'5"
7'1"12
34'3"3
6'10"4
40'4"
6'0"13
5'1"10
5'1"10
10'3"4
5'1"10
15'1"8
4'10"4
19'11"12
4'10"4
27'1"8
7'1"12
34'4"15
7'3"8
40'4"
5'11"11'8"
7"12 10'9"14'11"211'1"7(WB1)
(WB2)
(WB2)
(WB3)
(a)
12'A
B C
D
E F G
H
I J
KLMNOPQ
5
12
7X6(E5)
3X4
1.5X4
3X4
5X8
3X4 5X6
3X4
3X4
5X8(SRS)
5X8
4X6
5X5
6X8
5X5
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W8,W10,W11 2x4 SP 2250f-1.9E;
W12 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1419 /696 /482
K 1862 /-/-/1248 /759 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
K Brg Width = 4.0 Min Req =3.0
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2465 -3773
C - D 2456 -3731
D - E 2279 -3433
E - F 2502 -3809
Chords Tens.Comp.
F - G 2631 -4086
G - H 1556 -2535
H - I 680 -1108
I - J 762 -928
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3364 -3027
Q - P 3362 -3029
P - O 3105 -2699
Chords Tens.Comp.
O - N 3846 -3005
N - M 4094 -3128
M - L 2214 -1752
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - O 972 -553
O - F 379 -585
G - M 1652 -2216
M - H 1391 -931
Webs Tens.Comp.
H - L 1511 -1885
L - J 1885 -1547
J - K 1461 -1817
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.241 N 999 360
VERT(CL):0.557 N 869 240
HORZ(LL):0.067 L - -
HORZ(TL):0.156 L - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.828
Max W eb CSI:0.958
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T82
Ply: 1
Qty:1
SEQN:13162 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T241
DrwNo:079.20.1313.41115
AK /DF 03/19/2020
B2
W8
W10
W11
W12
W13
40'4"
5'3"6
5'3"6
10'3"4
4'11"14
15'5"
5'1"12
20'3"4
4'10"4
27'5"
7'1"12
34'3"3
6'10"4
40'4"
6'0"13
5'1"10
5'1"10
10'3"4
5'1"10
15'1"8
4'10"4
19'11"12
4'10"4
27'1"8
7'1"12
34'4"15
7'3"8
40'4"
5'11"11'8"
7"12 10'9"14'11"211'1"7(WB1)
(WB2)
(WB2)
(WB3)
(a)
12'A
B C
D
E F G
H
I J
KLMNOPQ
5
12
7X6(E5)
3X4
1.5X4
3X4
5X8
3X4 5X6
3X4
3X4
5X8(SRS)
5X8
4X6
5X5
6X8
5X5
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W8,W9 2x4 SP 2250f-1.9E; W10,
W12 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1428 /692 /522
K 1862 /-/-/1270 /774 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
K Brg Width = 4.0 Min Req =3.0
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2449 -3799
C - D 2415 -3754
D - E 2135 -3273
E - F 2195 -3366
Chords Tens.Comp.
F - G 2169 -3438
G - H 1241 -2102
H - I 423 -761
I - J 509 -603
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3388 -3044
Q - P 3385 -3045
P - O 2941 -2584
Chords Tens.Comp.
O - N 3387 -2689
N - M 3434 -2660
M - L 1818 -1453
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - P 512 -493
E - P 398 -233
E - O 639 -314
O - F 232 -394
G - M 1521 -2016
Webs Tens.Comp.
M - H 1412 -955
H - L 1523 -1888
I - L 404 -167
L - J 1838 -1553
J - K 1511 -1838
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.203 F 999 360
VERT(CL):0.470 F 999 240
HORZ(LL):0.064 L - -
HORZ(TL):0.148 L - -
Creep Factor: 2.0
Max TC CSI:0.826
Max BC CSI:0.881
Max W eb CSI:0.954
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T83
Ply: 1
Qty:1
SEQN:13166 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T240
DrwNo:079.20.1313.33814
AK /DF 03/19/2020
B2
W8
W9
W10
W12
W13
40'4"
6'3"6
6'3"6
12'3"4
5'11"14
17'5"
5'1"12
22'3"4
4'10"4
29'5"
7'1"12
36'3"3
6'10"4
40'4"
4'0"13
6'1"10
6'1"10
12'3"4
6'1"10
17'1"8
4'10"4
21'11"12
4'10"4
29'1"8
7'1"12
36'4"15
7'3"8
40'4"
3'11"11'8"
7"12 11'7"15'9"211'11"7(WB1)
(WB2)
(WB3)
(WB2)
(a)
12'A
B
C
D
E F G
H
I J
KLMNOPQ
5 12
7X6(E5)
3X4
1.5X4
3X4
5X8
5X5 3X4
3X4
3X4
5X8(SRS)
5X6
4X6
5X5
6X8
6X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W8,W9 2x4 SP 2250f-1.9E; W10,
W12 2x4 SP 2700f-2.2E; W 13 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1428 /692 /522
K 1862 /-/-/1270 /774 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
K Brg Width = 4.0 Min Req =3.0
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2449 -3799
C - D 2415 -3754
D - E 2135 -3273
E - F 2195 -3366
Chords Tens.Comp.
F - G 2169 -3438
G - H 1241 -2102
H - I 423 -761
I - J 509 -603
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3388 -3044
Q - P 3385 -3045
P - O 2941 -2584
Chords Tens.Comp.
O - N 3387 -2689
N - M 3434 -2660
M - L 1818 -1453
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - P 512 -493
E - P 398 -233
E - O 639 -314
O - F 232 -394
G - M 1521 -2016
Webs Tens.Comp.
M - H 1412 -955
H - L 1523 -1888
I - L 404 -167
L - J 1838 -1553
J - K 1511 -1838
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.203 F 999 360
VERT(CL):0.470 F 999 240
HORZ(LL):0.064 L - -
HORZ(TL):0.148 L - -
Creep Factor: 2.0
Max TC CSI:0.826
Max BC CSI:0.881
Max W eb CSI:0.954
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T83
Ply: 1
Qty:1
SEQN:13166 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T240
DrwNo:079.20.1313.33814
AK /DF 03/19/2020
B2
W8
W9
W10
W12
W13
40'4"
6'3"6
6'3"6
12'3"4
5'11"14
17'5"
5'1"12
22'3"4
4'10"4
29'5"
7'1"12
36'3"3
6'10"4
40'4"
4'0"13
6'1"10
6'1"10
12'3"4
6'1"10
17'1"8
4'10"4
21'11"12
4'10"4
29'1"8
7'1"12
36'4"15
7'3"8
40'4"
3'11"11'8"
7"12 11'7"15'9"211'11"7(WB1)
(WB2)
(WB3)
(WB2)
(a)
12'A
B
C
D
E F G
H
I J
KLMNOPQ
5 12
7X6(E5)
3X4
1.5X4
3X4
5X8
5X5 3X4
3X4
3X4
5X8(SRS)
5X6
4X6
5X5
6X8
6X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
Webs: 2x4 SP #2; W9,W10 2x4 SP 2250f-1.9E;
W13 2x4 SP 2700f-2.2E; W 14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.908'
Bracing
(b) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
(a) 2 SCAB reinforcing members. 80% length of web
member. Same size, species & grade or better. Attach
one to each face w/10d Box or Gun (0.128"x3",min.)
nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.06
BC: From 20 plf at 20.06 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2511 /-/-/1438 /954 /522
L 2156 /-/-/1261 /815 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
L Brg Width = 4.0 Min Req =3.4
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2344 -4824
C - D 2350 -4771
D - E 2297 -4740
E - F 2495 -4737
F - G 1984 -4018
Chords Tens.Comp.
G - H 1990 -4027
H - I 1119 -2243
I - J 434 -848
J - K 506 -699
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4323 -2988
R - Q 4327 -2991
Q - P 3619 -2431
Chords Tens.Comp.
P - O 3618 -2244
O - N 3617 -2244
N - M 1950 -1314
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - E 445 -344
Q - F 1260 -690
F - P 736 -167
P - H 888 -366
H - N 1361 -2374
Webs Tens.Comp.
N - I 1886 -1000
I - M 1463 -2210
M - K 2134 -1546
K - L 1520 -2127
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.210 G 999 360
VERT(CL):0.484 G 999 240
HORZ(LL):-0.057 K - -
HORZ(TL):0.130 K - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.858
Max W eb CSI:0.925
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T84
Ply: 1
Qty:1
SEQN:13278 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T239
DrwNo:079.20.1313.27122
AK /DF 03/19/2020
T2
B2
W9
W10
W13
W14
40'4"
5'1"11
5'1"11
9'11"14
4'10"3
14'3"4
4'3"6
20'5"
6'1"12
24'3"4
3'10"4
30'5"
6'1"12
36'3"4
5'10"4
40'4"
4'0"12
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
23'11"12
3'8"8
30'1"8
6'1"12
36'5"
6'3"8
40'4"
3'11"1'8"
7"12 11'7"26'7"211'11"8(WB1)
(a)
(WB2)
(WB3)
(b)
12'A
B
C
D
E
F G H
I
J K
LMNOPQR
5 12
7X8(E4)
3X4
1.5X4
3X4
H0715
1.5X4
5X8
H0710
1.5X4
5X6
6X10(SRS)
5X5
5X6
5X5
7X8
6X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
Webs: 2x4 SP #2; W9,W10 2x4 SP 2250f-1.9E;
W13 2x4 SP 2700f-2.2E; W 14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.908'
Bracing
(b) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
(a) 2 SCAB reinforcing members. 80% length of web
member. Same size, species & grade or better. Attach
one to each face w/10d Box or Gun (0.128"x3",min.)
nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.06
BC: From 20 plf at 20.06 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2511 /-/-/1438 /954 /522
L 2156 /-/-/1261 /815 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
L Brg Width = 4.0 Min Req =3.4
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2344 -4824
C - D 2350 -4771
D - E 2297 -4740
E - F 2495 -4737
F - G 1984 -4018
Chords Tens.Comp.
G - H 1990 -4027
H - I 1119 -2243
I - J 434 -848
J - K 506 -699
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4323 -2988
R - Q 4327 -2991
Q - P 3619 -2431
Chords Tens.Comp.
P - O 3618 -2244
O - N 3617 -2244
N - M 1950 -1314
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - E 445 -344
Q - F 1260 -690
F - P 736 -167
P - H 888 -366
H - N 1361 -2374
Webs Tens.Comp.
N - I 1886 -1000
I - M 1463 -2210
M - K 2134 -1546
K - L 1520 -2127
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.210 G 999 360
VERT(CL):0.484 G 999 240
HORZ(LL):-0.057 K - -
HORZ(TL):0.130 K - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.858
Max W eb CSI:0.925
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T84
Ply: 1
Qty:1
SEQN:13278 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T239
DrwNo:079.20.1313.27122
AK /DF 03/19/2020
T2
B2
W9
W10
W13
W14
40'4"
5'1"11
5'1"11
9'11"14
4'10"3
14'3"4
4'3"6
20'5"
6'1"12
24'3"4
3'10"4
30'5"
6'1"12
36'3"4
5'10"4
40'4"
4'0"12
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
23'11"12
3'8"8
30'1"8
6'1"12
36'5"
6'3"8
40'4"
3'11"1'8"
7"12 11'7"26'7"211'11"8(WB1)
(a)
(WB2)
(WB3)
(b)
12'A
B
C
D
E
F G H
I
J K
LMNOPQR
5 12
7X8(E4)
3X4
1.5X4
3X4
H0715
1.5X4
5X8
H0710
1.5X4
5X6
6X10(SRS)
5X5
5X6
5X5
7X8
6X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W10,W14 2x4 SP 2700f-2.2E; W11,
W12 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1447 /947 /482
M 2156 /-/-/1220 /809 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
M Brg Width = 4.0 Min Req =3.4
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2367 -4820
C - D 2374 -4777
D - E 2327 -4749
E - F 2518 -4768
F - G 1693 -3176
Chords Tens.Comp.
G - H 1570 -2967
H - I 1907 -3550
I - J 1812 -3299
J - K 726 -1227
K - L 764 -1091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4318 -2945
R - Q 4322 -2948
Q - P 3490 -2368
Chords Tens.Comp.
P - O 2992 -1923
O - N 1946 -1343
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - E 420 -383
Q - F 1370 -683
F - S 896 -1028
G - S 1196 -694
S - H 383 -662
P - I 936 -455
Webs Tens.Comp.
I - O 1300 -2266
O - J 2548 -1414
J - N 1333 -1979
N - L 2217 -1553
L - M 1485 -2116
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 G 999 360
VERT(CL):0.473 G 999 240
HORZ(LL):0.054 E - -
HORZ(TL):0.123 E - -
Creep Factor: 2.0
Max TC CSI:0.808
Max BC CSI:0.859
Max W eb CSI:0.953
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T85
Ply: 1
Qty:1
SEQN:13275 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T238
DrwNo:079.20.1313.36715
AK /DF 03/19/2020
B2 B4
W10
W11
W12
W14
W15
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
16'3"4
11"15
20'3"4
4'
26'3"4
6'
30'3"4
4'
34'3"4
4'
40'4"
6'0"12
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
26'3"4
6'
34'5"
8'1"12
40'4"
5'11"1'8"
7"12 10'9"27'5"211'1"8(a)(WB1)(WB1)
(WB2)
(WB3)
(a)
12'A
B C
D
E
F G H I
J
K L
MNOPQR
S512
7X8(E4)
3X4
1.5X4
5X5
H0715
1.5X4
3X65X6
3X8 3X6
7X10
5X10(SRS)
6X6
5X8
5X5
7X8
6X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W10,W14 2x4 SP 2700f-2.2E; W11,
W12 2x4 SP 2250f-1.9E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1447 /947 /482
M 2156 /-/-/1220 /809 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
M Brg Width = 4.0 Min Req =3.4
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2367 -4820
C - D 2374 -4777
D - E 2327 -4749
E - F 2518 -4768
F - G 1693 -3176
Chords Tens.Comp.
G - H 1570 -2967
H - I 1907 -3550
I - J 1812 -3299
J - K 726 -1227
K - L 764 -1091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4318 -2945
R - Q 4322 -2948
Q - P 3490 -2368
Chords Tens.Comp.
P - O 2992 -1923
O - N 1946 -1343
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - E 420 -383
Q - F 1370 -683
F - S 896 -1028
G - S 1196 -694
S - H 383 -662
P - I 936 -455
Webs Tens.Comp.
I - O 1300 -2266
O - J 2548 -1414
J - N 1333 -1979
N - L 2217 -1553
L - M 1485 -2116
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 G 999 360
VERT(CL):0.473 G 999 240
HORZ(LL):0.054 E - -
HORZ(TL):0.123 E - -
Creep Factor: 2.0
Max TC CSI:0.808
Max BC CSI:0.859
Max W eb CSI:0.953
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T85
Ply: 1
Qty:1
SEQN:13275 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T238
DrwNo:079.20.1313.36715
AK /DF 03/19/2020
B2 B4
W10
W11
W12
W14
W15
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
16'3"4
11"15
20'3"4
4'
26'3"4
6'
30'3"4
4'
34'3"4
4'
40'4"
6'0"12
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
26'3"4
6'
34'5"
8'1"12
40'4"
5'11"1'8"
7"12 10'9"27'5"211'1"8(a)(WB1)(WB1)
(WB2)
(WB3)
(a)
12'A
B C
D
E
F G H I
J
K L
MNOPQR
S512
7X8(E4)
3X4
1.5X4
5X5
H0715
1.5X4
3X65X6
3X8 3X6
7X10
5X10(SRS)
6X6
5X8
5X5
7X8
6X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W9,W11,W13 2x4 SP 2250f-1.9E;
W14 2x4 SP 2700f-2.2E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.623'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1454 /939 /442
N 2156 /-/-/1180 /803 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
N Brg Width = 4.0 Min Req =3.4
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2389 -4815
C - D 2397 -4770
D - E 2329 -4756
E - F 2345 -4727
F - G 2518 -4778
Chords Tens.Comp.
G - H 1763 -3147
H - I 1703 -2899
I - J 1839 -3179
J - K 1022 -1678
K - L 1023 -1488
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4314 -2904
S - R 4318 -2907
R - Q 3481 -2352
Chords Tens.Comp.
Q - P 2447 -1654
P - O 2446 -1654
O - N 843 -580
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - F 375 -392
R - G 1399 -649
G - T 769 -1012
H - T 1209 -607
T - I 428 -852
T - Q 514 -631
Webs Tens.Comp.
I - Q 390 -65
Q - J 1064 -539
J - O 1371 -2089
K - O 394 -100
O - L 1754 -1205
L - N 1477 -2147
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 F 999 360
VERT(CL):0.402 F 999 240
HORZ(LL):0.053 N - -
HORZ(TL):0.122 N - -
Creep Factor: 2.0
Max TC CSI:0.584
Max BC CSI:0.902
Max W eb CSI:0.969
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T86
Ply: 1
Qty:1
SEQN:13271 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T237
DrwNo:079.20.1313.26762
AK /DF 03/19/2020
T2
T3
B2 B4
W9
W11
W13
W14
W15
40'4"
5'1"11
5'1"11
6'1"9
11"14
9'11"14
3'10"5
15'3"5
5'3"7
18'3"4
2'11"15
20'3"4
2'
28'3"4
8'
32'3"4
4'
36'2"10
3'11"6
40'4"
4'1"6
4'11"15
4'11"15
9'10"2
4'10"3
20'6"12
10'8"10
27'11"12
7'5"
32'5"
4'5"4
40'4"
7'11"1'8"
7"12 9'11"28'3"210'3"8(a)
(WB1)
(WB4)(WB2)
(WB3)
12'A
B
C
D E
F
G
H I J
K L M
NOPQRS
T
5 12
7X8(E4)
3X4
1.5X4
3X43X5
H0715
1.5X4
3X6
5X6
3X8
3X4
7X10 5X5
6X10(SRS)
5X5
6X8
5X5 2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26;
B4 2x4 SP #2;
Webs: 2x4 SP #2; W9,W11,W13 2x4 SP 2250f-1.9E;
W14 2x4 SP 2700f-2.2E; W 15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.623'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1454 /939 /442
N 2156 /-/-/1180 /803 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
N Brg Width = 4.0 Min Req =3.4
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2389 -4815
C - D 2397 -4770
D - E 2329 -4756
E - F 2345 -4727
F - G 2518 -4778
Chords Tens.Comp.
G - H 1763 -3147
H - I 1703 -2899
I - J 1839 -3179
J - K 1022 -1678
K - L 1023 -1488
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4314 -2904
S - R 4318 -2907
R - Q 3481 -2352
Chords Tens.Comp.
Q - P 2447 -1654
P - O 2446 -1654
O - N 843 -580
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - F 375 -392
R - G 1399 -649
G - T 769 -1012
H - T 1209 -607
T - I 428 -852
T - Q 514 -631
Webs Tens.Comp.
I - Q 390 -65
Q - J 1064 -539
J - O 1371 -2089
K - O 394 -100
O - L 1754 -1205
L - N 1477 -2147
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.175 F 999 360
VERT(CL):0.402 F 999 240
HORZ(LL):0.053 N - -
HORZ(TL):0.122 N - -
Creep Factor: 2.0
Max TC CSI:0.584
Max BC CSI:0.902
Max W eb CSI:0.969
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T86
Ply: 1
Qty:1
SEQN:13271 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T237
DrwNo:079.20.1313.26762
AK /DF 03/19/2020
T2
T3
B2 B4
W9
W11
W13
W14
W15
40'4"
5'1"11
5'1"11
6'1"9
11"14
9'11"14
3'10"5
15'3"5
5'3"7
18'3"4
2'11"15
20'3"4
2'
28'3"4
8'
32'3"4
4'
36'2"10
3'11"6
40'4"
4'1"6
4'11"15
4'11"15
9'10"2
4'10"3
20'6"12
10'8"10
27'11"12
7'5"
32'5"
4'5"4
40'4"
7'11"1'8"
7"12 9'11"28'3"210'3"8(a)
(WB1)
(WB4)(WB2)
(WB3)
12'A
B
C
D E
F
G
H I J
K L M
NOPQRS
T
5 12
7X8(E4)
3X4
1.5X4
3X43X5
H0715
1.5X4
3X6
5X6
3X8
3X4
7X10 5X5
6X10(SRS)
5X5
6X8
5X5 2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26; B4,
B5 2x4 SP #2;
Webs: 2x4 SP #2; W7,W10,W12 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.805'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1459 /931 /404
K 2156 /-/-/1142 /796 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
K Brg Width = 4.0 Min Req =3.4
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2327 -4821
C - D 2334 -4771
D - E 2266 -4747
E - F 2428 -4766
Chords Tens.Comp.
F - G 1732 -3185
G - H 1521 -2551
H - I 932 -1571
I - J 932 -1571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 4320 -2711
V - U 4324 -2714
Chords Tens.Comp.
U - T 3490 -2159
R - P 2545 -1517
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - E 362 -392
U - F 1380 -637
F - T 747 -1039
G - T 1239 -448
G - R 295 -646
T - R 2806 -1647
Webs Tens.Comp.
R - H 821 -416
H - P 957 -1591
I - P 398 -532
P - J 2454 -1459
L - J 1275 -2095
L - K 1274 -2117
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.195 E 999 360
VERT(CL):0.449 E 999 240
HORZ(LL):0.056 O - -
HORZ(TL):0.129 O - -
Creep Factor: 2.0
Max TC CSI:0.731
Max BC CSI:0.853
Max W eb CSI:0.932
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T87
Ply: 1
Qty:1
SEQN:13263 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T211
DrwNo:079.20.1313.28948
AK /DF 03/19/2020
T4
B2 B4 B5
W7
W10
W12
W14
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
20'3"4
4'11"15
27'0"8
6'9"4
33'5"8
6'5"
40'4"
6'10"8
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
27'4"
7'0"12
33'5"8
6'1"8
38'5"4
4'11"12
39'10"8
1'5"4
40'4"
5"8
1'8"
7"12 9'1"26"9'5"8(WB1)
(WB2)
(WB3)(WB1)
(WB3)(a)
12'A
B
C
D
E
F
G H I J
KLMNOPQRSTUV
5 12
7X8(E4)
3X4
5X5
H0715
3X6
5X8
8X12 5X8
3X5 5X5
7X8
1.5X6 (++)3X3
5X8
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26; B4,
B5 2x4 SP #2;
Webs: 2x4 SP #2; W7,W10,W12 2x4 SP 2250f-1.9E;
W14 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.805'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2512 /-/-/1459 /931 /404
K 2156 /-/-/1142 /796 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
K Brg Width = 4.0 Min Req =3.4
Bearings B & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2327 -4821
C - D 2334 -4771
D - E 2266 -4747
E - F 2428 -4766
Chords Tens.Comp.
F - G 1732 -3185
G - H 1521 -2551
H - I 932 -1571
I - J 932 -1571
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 4320 -2711
V - U 4324 -2714
Chords Tens.Comp.
U - T 3490 -2159
R - P 2545 -1517
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - E 362 -392
U - F 1380 -637
F - T 747 -1039
G - T 1239 -448
G - R 295 -646
T - R 2806 -1647
Webs Tens.Comp.
R - H 821 -416
H - P 957 -1591
I - P 398 -532
P - J 2454 -1459
L - J 1275 -2095
L - K 1274 -2117
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.195 E 999 360
VERT(CL):0.449 E 999 240
HORZ(LL):0.056 O - -
HORZ(TL):0.129 O - -
Creep Factor: 2.0
Max TC CSI:0.731
Max BC CSI:0.853
Max W eb CSI:0.932
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T87
Ply: 1
Qty:1
SEQN:13263 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T211
DrwNo:079.20.1313.28948
AK /DF 03/19/2020
T4
B2 B4 B5
W7
W10
W12
W14
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
20'3"4
4'11"15
27'0"8
6'9"4
33'5"8
6'5"
40'4"
6'10"8
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
27'4"
7'0"12
33'5"8
6'1"8
38'5"4
4'11"12
39'10"8
1'5"4
40'4"
5"8
1'8"
7"12 9'1"26"9'5"8(WB1)
(WB2)
(WB3)(WB1)
(WB3)(a)
12'A
B
C
D
E
F
G H I J
KLMNOPQRSTUV
5 12
7X8(E4)
3X4
5X5
H0715
3X6
5X8
8X12 5X8
3X5 5X5
7X8
1.5X6 (++)3X3
5X8
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26; B4,
B6,B7 2x4 SP #2;
Webs: 2x4 SP #2; W9,W12,W15 2x4 SP 2250f-1.9E;
W18 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.623'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.27
BC: From 20 plf at 20.27 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2520 /-/-/1443 /926 /365
L 2164 /-/-/1123 /792 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
L Brg Width = 4.0 Min Req =3.4
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2351 -4837
C - D 2358 -4791
D - E 2296 -4766
E - F 2467 -4788
F - G 1741 -3209
Chords Tens.Comp.
G - H 1669 -2929
H - I 1741 -3044
I - J 1071 -1871
J - K 1071 -1871
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AE 4334 -2672
AE-AD 4338 -2674
AD-AC 3504 -2115
Chords Tens.Comp.
Z - W 2883 -1635
W -U 3034 -1737
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AD- E 370 -391
AD- F 1375 -642
F -AF 754 -995
G -AF 1143 -541
AF-AC 518 -606
AF- H 376 -794
AC- H 701 -133
AC- Z 3097 -1725
Webs Tens.Comp.
H - Z 99 -412
Z - I 830 -380
I - U 982 -1717
J - U 401 -544
U - K 2650 -1520
M - K 1230 -2088
M - L 1232 -2114
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.198 E 999 360
VERT(CL):0.456 E 999 240
HORZ(LL):0.063 Q - -
HORZ(TL):0.146 Q - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.855
Max W eb CSI:0.813
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T88
Ply: 1
Qty:1
SEQN:13281 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T233
DrwNo:079.20.1313.39055
AK /DF 03/19/2020
T4
B2 B4 B6 B7
W9
W12
W15
W18
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
18'3"4
2'11"15
20'5"
2'1"12
27'0"8
6'7"8
33'5"8
6'5"
40'4"
6'10"8
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
27'4"
7'0"12
29'4"
2'
33'5"8
4'1"8
36'5"9
3'0"1
38'3"8
1'9"15
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 8'3"26"1'8'7"8(a)
(WB1)(WB2)(WB2)
12'A
B
C
D
E
F
G H I J K
LMNO
P
QRSTUVWXYZAA
AB
ACADAE
AF
5
12
7X8(E4)
3X4
5X5
H0715
3X6
5X6
3X8 8X12
3X8
5X83X3
5X5
1.5X6(++)
7X8
1.5X6(++)3X3 3X3
5X8
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x6 SP M-26; B4,
B6,B7 2x4 SP #2;
Webs: 2x4 SP #2; W9,W12,W15 2x4 SP 2250f-1.9E;
W18 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.623'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.32
BC: From 100 plf at 10.32 to 100 plf at 20.27
BC: From 20 plf at 20.27 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2520 /-/-/1443 /926 /365
L 2164 /-/-/1123 /792 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
L Brg Width = 4.0 Min Req =3.4
Bearings B & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2351 -4837
C - D 2358 -4791
D - E 2296 -4766
E - F 2467 -4788
F - G 1741 -3209
Chords Tens.Comp.
G - H 1669 -2929
H - I 1741 -3044
I - J 1071 -1871
J - K 1071 -1871
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AE 4334 -2672
AE-AD 4338 -2674
AD-AC 3504 -2115
Chords Tens.Comp.
Z - W 2883 -1635
W -U 3034 -1737
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AD- E 370 -391
AD- F 1375 -642
F -AF 754 -995
G -AF 1143 -541
AF-AC 518 -606
AF- H 376 -794
AC- H 701 -133
AC- Z 3097 -1725
Webs Tens.Comp.
H - Z 99 -412
Z - I 830 -380
I - U 982 -1717
J - U 401 -544
U - K 2650 -1520
M - K 1230 -2088
M - L 1232 -2114
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.198 E 999 360
VERT(CL):0.456 E 999 240
HORZ(LL):0.063 Q - -
HORZ(TL):0.146 Q - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.855
Max W eb CSI:0.813
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T88
Ply: 1
Qty:1
SEQN:13281 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T233
DrwNo:079.20.1313.39055
AK /DF 03/19/2020
T4
B2 B4 B6 B7
W9
W12
W15
W18
40'4"
5'1"5
5'1"5
9'11"14
4'10"9
15'3"5
5'3"7
18'3"4
2'11"15
20'5"
2'1"12
27'0"8
6'7"8
33'5"8
6'5"
40'4"
6'10"8
4'11"15
4'11"15
9'10"2
4'10"3
20'3"4
10'5"2
27'4"
7'0"12
29'4"
2'
33'5"8
4'1"8
36'5"9
3'0"1
38'3"8
1'9"15
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 8'3"26"1'8'7"8(a)
(WB1)(WB2)(WB2)
12'A
B
C
D
E
F
G H I J K
LMNO
P
QRSTUVWXYZAA
AB
ACADAE
AF
5
12
7X8(E4)
3X4
5X5
H0715
3X6
5X6
3X8 8X12
3X8
5X83X3
5X5
1.5X6(++)
7X8
1.5X6(++)3X3 3X3
5X8
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1,B3 2x4 SP 2250f-1.9E;
B2 2x6 SP M-26;
Webs: 2x4 SP #2; W9,W13,W15,W17,W18,W19,
W20 2x4 SP 2250f-1.9E; W 23 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 72 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.14
BC: From 100 plf at 10.14 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2523 /-/-/1419 /928 /329
N 2160 /-/-/1112 /791 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
N Brg Width = 4.0 Min Req =3.4
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2521 -4844
C - D 2529 -4802
D - E 2481 -4780
E - F 2667 -4798
F - G 1840 -3148
G - H 1727 -2966
Chords Tens.Comp.
H - I 2062 -3274
I - J 2004 -3089
J - K 1999 -3083
K - L 1725 -2700
L - M 995 -1576
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 4341 -2769
AI-AH 4345 -2772
AH-AG 3500 -2208
Chords Tens.Comp.
Z - X 2777 -1777
X - W 1665 -1054
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AH- E 407 -378
AH- F 1402 -660
F -AJ 888 -1040
G -AJ 1180 -749
AJ- H 420 -663
H -AG 442 -109
H -AE 151 -554
AG-AE 3405 -1994
AE- Z 3260 -2060
Webs Tens.Comp.
I - Z 848 -1451
J - Z 2201 -1316
K - X 1035 -1527
X - L 1763 -1143
L - W 1244 -1864
W -M 2515 -1589
O - M 1350 -2112
O - N 1350 -2126
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 E 999 360
VERT(CL):0.474 E 999 240
HORZ(LL):0.066 S - -
HORZ(TL):0.152 S - -
Creep Factor: 2.0
Max TC CSI:0.709
Max BC CSI:0.891
Max W eb CSI:0.860
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T89
Ply: 1
Qty:1
SEQN:13285 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T243
DrwNo:079.20.1313.27714
AK /DF 03/19/2020
B1 B2 B3
W9
W13
W15
W17 W18
W19
W20
W23
40'4"
5'1"11
5'1"11
9'11"8
4'9"13
15'3"5
5'3"13
16'3"4
11"15
20'5"
4'1"12
26'3"4
5'10"4
28'4"
2'0"12
30'4"12
2'0"12
35'1"10
4'8"14
40'4"
5'2"6
4'11"15
4'11"15
9'10"2
4'10"3
20'6"12
10'8"10
26'1"8
5'6"12
27'4"
1'2"8
28'4"
1'
29'4"
1'
30'8"4
1'4"4
35'5"10
4'9"6
36'5"9
11"15
38'3"8
1'9"15
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 7'5"26"1'8'3"78'7"13(a)(WB1)
12'A
B C
D
E
F G H I
J
K L M
NOPQ
R
STUVWXYZAAABACAD
AE
AF
AGAHAI
AJ512
7X8(E4)
3X4
3X4
H0715
5X5
3X6 5X6
3X8 3X8
H0710
7X10
6X6
1.5X6(++)
5X5
6X10
5X5(SRS)
4X6
4X6
5X8
1.5X6(++)3X3 3X3
5X8
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1,B3 2x4 SP 2250f-1.9E;
B2 2x6 SP M-26;
Webs: 2x4 SP #2; W9,W13,W15,W17,W18,W19,
W20 2x4 SP 2250f-1.9E; W 23 2x6 SP M-26;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 72 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 10.14
BC: From 100 plf at 10.14 to 100 plf at 20.08
BC: From 20 plf at 20.08 to 20 plf at 40.33
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2523 /-/-/1419 /928 /329
N 2160 /-/-/1112 /791 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.0
N Brg Width = 4.0 Min Req =3.4
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2521 -4844
C - D 2529 -4802
D - E 2481 -4780
E - F 2667 -4798
F - G 1840 -3148
G - H 1727 -2966
Chords Tens.Comp.
H - I 2062 -3274
I - J 2004 -3089
J - K 1999 -3083
K - L 1725 -2700
L - M 995 -1576
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 4341 -2769
AI-AH 4345 -2772
AH-AG 3500 -2208
Chords Tens.Comp.
Z - X 2777 -1777
X - W 1665 -1054
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AH- E 407 -378
AH- F 1402 -660
F -AJ 888 -1040
G -AJ 1180 -749
AJ- H 420 -663
H -AG 442 -109
H -AE 151 -554
AG-AE 3405 -1994
AE- Z 3260 -2060
Webs Tens.Comp.
I - Z 848 -1451
J - Z 2201 -1316
K - X 1035 -1527
X - L 1763 -1143
L - W 1244 -1864
W -M 2515 -1589
O - M 1350 -2112
O - N 1350 -2126
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 E 999 360
VERT(CL):0.474 E 999 240
HORZ(LL):0.066 S - -
HORZ(TL):0.152 S - -
Creep Factor: 2.0
Max TC CSI:0.709
Max BC CSI:0.891
Max W eb CSI:0.860
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T89
Ply: 1
Qty:1
SEQN:13285 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T243
DrwNo:079.20.1313.27714
AK /DF 03/19/2020
B1 B2 B3
W9
W13
W15
W17 W18
W19
W20
W23
40'4"
5'1"11
5'1"11
9'11"8
4'9"13
15'3"5
5'3"13
16'3"4
11"15
20'5"
4'1"12
26'3"4
5'10"4
28'4"
2'0"12
30'4"12
2'0"12
35'1"10
4'8"14
40'4"
5'2"6
4'11"15
4'11"15
9'10"2
4'10"3
20'6"12
10'8"10
26'1"8
5'6"12
27'4"
1'2"8
28'4"
1'
29'4"
1'
30'8"4
1'4"4
35'5"10
4'9"6
36'5"9
11"15
38'3"8
1'9"15
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 7'5"26"1'8'3"78'7"13(a)(WB1)
12'A
B C
D
E
F G H I
J
K L M
NOPQ
R
STUVWXYZAAABACAD
AE
AF
AGAHAI
AJ512
7X8(E4)
3X4
3X4
H0715
5X5
3X6 5X6
3X8 3X8
H0710
7X10
6X6
1.5X6(++)
5X5
6X10
5X5(SRS)
4X6
4X6
5X8
1.5X6(++)3X3 3X3
5X8
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W11,W18 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.908'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1398 /716 /292
M 1862 /-/-/1097 /704 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
M Brg Width = 4.0 Min Req =3.0
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2762 -3801
C - D 2755 -3749
D - E 2399 -3096
E - F 2462 -2987
F - G 2412 -2878
Chords Tens.Comp.
G - H 2513 -2919
H - I 2574 -2865
I - J 2154 -2485
J - K 1860 -2213
K - L 1039 -1282
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AF 3386 -2904
AF-AE 3382 -2905
AE-AD 2761 -2350
AD-AC 2996 -2467
Chords Tens.Comp.
Z - W 2177 -1830
W -U 2275 -1933
U - R 1327 -1077
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AE 615 -687
E -AE 471 -269
AC- G 881 -905
AC- Z 3023 -2517
G - Z 406 -550
Z - I 1835 -1533
Webs Tens.Comp.
J - U 1124 -1196
U - K 1536 -1358
K - R 1337 -1587
R - L 2124 -1725
N - L 1466 -1814
N - M 1468 -1833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.192 F 999 360
VERT(CL):0.444 F 999 240
HORZ(LL):0.074 Q - -
HORZ(TL):0.172 Q - -
Creep Factor: 2.0
Max TC CSI:0.770
Max BC CSI:0.736
Max W eb CSI:0.987
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T90
Ply: 1
Qty:1
SEQN:13206 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T226
DrwNo:079.20.1313.27060
AK /DF 03/19/2020
B1
W11
W18
W20
40'4"
7'3"6
7'3"6
14'3"4
6'11"14
19'5"
5'1"12
24'3"4
4'10"4
26'10"12
2'7"8
28'4"
1'5"4
32'4"12
4'0"12
36'3"8
3'10"12
40'4"
4'0"8
7'1"10
7'1"10
14'3"4
7'1"10
19'1"8
4'10"4
24'1"8
5'
27'4"
3'2"8
29'4"
2'
32'6"8
3'2"8
36'3"8
3'9"
38'5"11
2'2"3
39'10"8
1'4"13
40'4"
5"8
1'8"
7"12 6'7"26"1'8'3"78'7"1312'A
B
C
D
E F G
H
I
J K L
MNOPQRSTUVWXYZAA
AB
ACADAEAF
5 12
7X6(E5)1.5X4
5X8
5X5 5X12
5X5
1.5X4
6X103X3
1.5X4
5X8
1.5X6 (++)
5X5
5X8
4X5
6X81.5X4
1.5X6 (++)6X6
5X5
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W11,W18 2x4 SP 2250f-1.9E;
W20 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.908'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2026 /-/-/1398 /716 /292
M 1862 /-/-/1097 /704 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =3.2
M Brg Width = 4.0 Min Req =3.0
Bearings B & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2762 -3801
C - D 2755 -3749
D - E 2399 -3096
E - F 2462 -2987
F - G 2412 -2878
Chords Tens.Comp.
G - H 2513 -2919
H - I 2574 -2865
I - J 2154 -2485
J - K 1860 -2213
K - L 1039 -1282
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AF 3386 -2904
AF-AE 3382 -2905
AE-AD 2761 -2350
AD-AC 2996 -2467
Chords Tens.Comp.
Z - W 2177 -1830
W -U 2275 -1933
U - R 1327 -1077
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AE 615 -687
E -AE 471 -269
AC- G 881 -905
AC- Z 3023 -2517
G - Z 406 -550
Z - I 1835 -1533
Webs Tens.Comp.
J - U 1124 -1196
U - K 1536 -1358
K - R 1337 -1587
R - L 2124 -1725
N - L 1466 -1814
N - M 1468 -1833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.192 F 999 360
VERT(CL):0.444 F 999 240
HORZ(LL):0.074 Q - -
HORZ(TL):0.172 Q - -
Creep Factor: 2.0
Max TC CSI:0.770
Max BC CSI:0.736
Max W eb CSI:0.987
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T90
Ply: 1
Qty:1
SEQN:13206 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T226
DrwNo:079.20.1313.27060
AK /DF 03/19/2020
B1
W11
W18
W20
40'4"
7'3"6
7'3"6
14'3"4
6'11"14
19'5"
5'1"12
24'3"4
4'10"4
26'10"12
2'7"8
28'4"
1'5"4
32'4"12
4'0"12
36'3"8
3'10"12
40'4"
4'0"8
7'1"10
7'1"10
14'3"4
7'1"10
19'1"8
4'10"4
24'1"8
5'
27'4"
3'2"8
29'4"
2'
32'6"8
3'2"8
36'3"8
3'9"
38'5"11
2'2"3
39'10"8
1'4"13
40'4"
5"8
1'8"
7"12 6'7"26"1'8'3"78'7"1312'A
B
C
D
E F G
H
I
J K L
MNOPQRSTUVWXYZAA
AB
ACADAEAF
5 12
7X6(E5)1.5X4
5X8
5X5 5X12
5X5
1.5X4
6X103X3
1.5X4
5X8
1.5X6 (++)
5X5
5X8
4X5
6X81.5X4
1.5X6 (++)6X6
5X5
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11,W12,W16 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1250 /-/-/889 /425 /264
AE 2033 /-/-/1274 /770 /-
L 646 /-/-/383 /222 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.2
L Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -2049
C - D 1313 -1974
D - E 961 -1384
Chords Tens.Comp.
E - F 701 -947
J - K 433 -540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 1765 -1542
AI-AH 1760 -1542
AH-AG 1196 -1008
Chords Tens.Comp.
AG-AF 927 -681
Y - W 627 -530
W -U 559 -456
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 594 -629
E -AH 433 -262
E -AG 464 -381
AG- F 423 -351
F -AF 775 -991
AF- G 818 -576
G -AE 802 -1106
AE-AD 877 -932
Webs Tens.Comp.
AD- H 874 -928
H - Y 685 -544
Y - J 441 -483
J - U 396 -295
U - K 683 -551
M - K 454 -598
M - L 454 -616
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 D 999 360
VERT(CL):0.127 D 999 240
HORZ(LL):0.021 AE - -
HORZ(TL):0.050 AE - -
Creep Factor: 2.0
Max TC CSI:0.600
Max BC CSI:0.633
Max W eb CSI:0.901
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T91
Ply: 1
Qty:1
SEQN:13231 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T234
DrwNo:079.20.1313.40180
AK /DF 03/19/2020
W11
W12
W16
W19
25'15'4"
6'3"6
6'3"6
12'3"4
5'11"14
17'5"
5'1"12
22'3"4
4'10"4
25'1"12
2'10"8
28'4"
3'2"4
34'4"12
6'0"12
40'4"
5'11"4
6'1"10
6'1"10
12'3"4
6'1"10
17'1"8
4'10"4
21'11"12
4'10"4
24'10"4
2'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"14
6"14
34'8"4
5'9"6
36'5"10
1'9"5
38'3"8
1'9"14
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 5'9"21'6"8'3"78'7"1312'A
B
C
D
E F G
H
I
J K
LMNO
P
QRSTUVWXY
ZAA
AB AC
ADAEAFAGAHAI
5 12
5X5(E1)1.5X4
5X8
5X5
5X6
4X63X3
1.5X4
3X3
1.5X4
5X5
3X8
1.5X6(++)
5X5
1.5X6(++)
1.5X43X3
1.5X4
3X3
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11,W12,W16 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1250 /-/-/889 /425 /264
AE 2033 /-/-/1274 /770 /-
L 646 /-/-/383 /222 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.2
L Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -2049
C - D 1313 -1974
D - E 961 -1384
Chords Tens.Comp.
E - F 701 -947
J - K 433 -540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 1765 -1542
AI-AH 1760 -1542
AH-AG 1196 -1008
Chords Tens.Comp.
AG-AF 927 -681
Y - W 627 -530
W -U 559 -456
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 594 -629
E -AH 433 -262
E -AG 464 -381
AG- F 423 -351
F -AF 775 -991
AF- G 818 -576
G -AE 802 -1106
AE-AD 877 -932
Webs Tens.Comp.
AD- H 874 -928
H - Y 685 -544
Y - J 441 -483
J - U 396 -295
U - K 683 -551
M - K 454 -598
M - L 454 -616
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 D 999 360
VERT(CL):0.127 D 999 240
HORZ(LL):0.021 AE - -
HORZ(TL):0.050 AE - -
Creep Factor: 2.0
Max TC CSI:0.600
Max BC CSI:0.633
Max W eb CSI:0.901
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T91
Ply: 1
Qty:1
SEQN:13231 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T234
DrwNo:079.20.1313.40180
AK /DF 03/19/2020
W11
W12
W16
W19
25'15'4"
6'3"6
6'3"6
12'3"4
5'11"14
17'5"
5'1"12
22'3"4
4'10"4
25'1"12
2'10"8
28'4"
3'2"4
34'4"12
6'0"12
40'4"
5'11"4
6'1"10
6'1"10
12'3"4
6'1"10
17'1"8
4'10"4
21'11"12
4'10"4
24'10"4
2'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"14
6"14
34'8"4
5'9"6
36'5"10
1'9"5
38'3"8
1'9"14
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 5'9"21'6"8'3"78'7"1312'A
B
C
D
E F G
H
I
J K
LMNO
P
QRSTUVWXY
ZAA
AB AC
ADAEAFAGAHAI
5 12
5X5(E1)1.5X4
5X8
5X5
5X6
4X63X3
1.5X4
3X3
1.5X4
5X5
3X8
1.5X6(++)
5X5
1.5X6(++)
1.5X43X3
1.5X4
3X3
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W11,W12 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1238 /-/-/860 /431 /270
AE 2060 /-/-/1306 /767 /-
L 638 /-/-/398 /217 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.3
L Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1376 -2004
C - D 1371 -1963
D - E 1105 -1538
Chords Tens.Comp.
E - F 917 -1246
F - G 506 -673
J - K 472 -556
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 1756 -1547
AI-AH 1752 -1548
AH-AG 1354 -1125
AG-AF 1234 -903
Chords Tens.Comp.
AF-AE 631 -486
Y - W 673 -596
W -T 588 -511
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 473 -445
F -AF 630 -804
AF- G 663 -440
G -AE 971 -1267
AE-AD 922 -1039
AD- H 917 -1044
Webs Tens.Comp.
H - Y 743 -535
Y - J 482 -463
J - T 516 -412
T - K 777 -673
M - K 480 -622
M - L 483 -619
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 AH 999 360
VERT(CL):0.129 AH 999 240
HORZ(LL):0.022 AE - -
HORZ(TL):0.052 AE - -
Creep Factor: 2.0
Max TC CSI:0.717
Max BC CSI:0.491
Max W eb CSI:0.965
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T92
Ply: 1
Qty:1
SEQN:13236 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T245
DrwNo:079.20.1313.37698
AK /DF 03/19/2020
T4
B3W11
W12
W19
25'15'4"
5'3"6
5'3"6
10'3"4
4'11"14
15'5"
5'1"12
20'3"4
4'10"4
25'1"12
4'10"8
28'4"
3'2"4
36'4"12
8'0"12
40'4"
3'11"4
5'1"10
5'1"10
10'3"4
5'1"10
15'1"8
4'10"4
19'11"12
4'10"4
24'10"4
4'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"15
6"15
36'8"4
7'9"5
36'9"
0"12
36'10"12
1"12
38'3"8
1'4"12
39'10"8
1'7"
40'4"
5"81'8"
7"12 4'11"21'6"8'3"78'7"13(WB1)
12'A
B C
D
E F G
H
I
J K
LMNO
P
QRS
T
UVWXY
ZAA
AB AC
ADAEAFAGAHAI
5 12
7X6(E5)1.5X4
5X8
5X6
5X6
4X63X3
1.5X4
3X3
1.5X4
6X6
5X8
1.5X6 (++)
5X6(SRS)
5X6(**)
1.5X4(**)
1.5X4(**)
1.5X4
3X3
1.5X4
3X3
5X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W11,W12 2x4 SP 2250f-1.9E;
W19 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 3 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1238 /-/-/860 /431 /270
AE 2060 /-/-/1306 /767 /-
L 638 /-/-/398 /217 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.3
L Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1376 -2004
C - D 1371 -1963
D - E 1105 -1538
Chords Tens.Comp.
E - F 917 -1246
F - G 506 -673
J - K 472 -556
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AI 1756 -1547
AI-AH 1752 -1548
AH-AG 1354 -1125
AG-AF 1234 -903
Chords Tens.Comp.
AF-AE 631 -486
Y - W 673 -596
W -T 588 -511
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 473 -445
F -AF 630 -804
AF- G 663 -440
G -AE 971 -1267
AE-AD 922 -1039
AD- H 917 -1044
Webs Tens.Comp.
H - Y 743 -535
Y - J 482 -463
J - T 516 -412
T - K 777 -673
M - K 480 -622
M - L 483 -619
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 AH 999 360
VERT(CL):0.129 AH 999 240
HORZ(LL):0.022 AE - -
HORZ(TL):0.052 AE - -
Creep Factor: 2.0
Max TC CSI:0.717
Max BC CSI:0.491
Max W eb CSI:0.965
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T92
Ply: 1
Qty:1
SEQN:13236 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T245
DrwNo:079.20.1313.37698
AK /DF 03/19/2020
T4
B3W11
W12
W19
25'15'4"
5'3"6
5'3"6
10'3"4
4'11"14
15'5"
5'1"12
20'3"4
4'10"4
25'1"12
4'10"8
28'4"
3'2"4
36'4"12
8'0"12
40'4"
3'11"4
5'1"10
5'1"10
10'3"4
5'1"10
15'1"8
4'10"4
19'11"12
4'10"4
24'10"4
4'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"15
6"15
36'8"4
7'9"5
36'9"
0"12
36'10"12
1"12
38'3"8
1'4"12
39'10"8
1'7"
40'4"
5"81'8"
7"12 4'11"21'6"8'3"78'7"13(WB1)
12'A
B C
D
E F G
H
I
J K
LMNO
P
QRS
T
UVWXY
ZAA
AB AC
ADAEAFAGAHAI
5 12
7X6(E5)1.5X4
5X8
5X6
5X6
4X63X3
1.5X4
3X3
1.5X4
6X6
5X8
1.5X6 (++)
5X6(SRS)
5X6(**)
1.5X4(**)
1.5X4(**)
1.5X4
3X3
1.5X4
3X3
5X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
W21 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1230 /-/-/838 /432 /277
AE 2101 /-/-/1323 /776 /-
M 616 /-/-/423 /207 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.3
M Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1626 -2096
C - D 1450 -1951
D - E 1197 -1708
E - F 1113 -1601
Chords Tens.Comp.
F - G 856 -1164
G - H 432 -201
J - K 924 -1040
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AH 1751 -1570
AH-AG 1527 -1198
AG-AF 1600 -1106
Chords Tens.Comp.
AF-AE 1127 -843
Y - W 1004 -877
W -S 1017 -887
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 413 -249
F -AF 478 -585
AF- G 529 -298
G -AE 1271 -1611
AE-AD 995 -1144
AD- H 852 -1011
H - Y 622 -382
Y - Z 414 -48
Webs Tens.Comp.
Y - J 970 -883
S - K 807 -721
S - O 420 -346
K - O 666 -758
O - L 562 -471
N - L 492 -592
N - M 496 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.062 AG 999 360
VERT(CL):0.147 AG 999 240
HORZ(LL):0.025 AE - -
HORZ(TL):0.059 AE - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.785
Max W eb CSI:0.903
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T93
Ply: 1
Qty:1
SEQN:13240 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T212
DrwNo:079.20.1313.35467
AK /DF 03/19/2020
W7
W8
W21
25'15'4"
4'1"10
4'1"10
8'3"4
4'1"10
13'5"
5'1"12
18'3"4
4'10"4
25'1"12
6'10"8
28'4"
3'2"4
36'3"8
7'11"8
38'4"12
2'1"4
40'4"
1'11"4
8'3"4
8'3"4
13'1"8
4'10"4
17'11"12
4'10"4
24'10"4
6'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"12
6"12
29'4"
5"4
36'3"8
6'11"8
38'5"9
2'2"1
38'6"8
0"15
39'10"8
1'4"
40'4"
5"8
1'8"
7"12 4'1"21'2'4"6"8'3"78'7"13(WB1)
12'A
B C
D
E F G
H
I
J
K L
MNOPQR
S
TUVWXY
ZAAAB
AC
AD AEAFAGAH
5 12
5X5(E1)
3X4
5X8
3X4 5X5
3X4
3X4
5X6
4X65X5
3X4
6X6
5X8
3X4
6X8
5X5
1.5X6(++)
3X8 3X3
3X3
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
W21 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1230 /-/-/838 /432 /277
AE 2101 /-/-/1323 /776 /-
M 616 /-/-/423 /207 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =3.3
M Brg Width = 4.0 Min Req =1.5
Bearings B, AE, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1626 -2096
C - D 1450 -1951
D - E 1197 -1708
E - F 1113 -1601
Chords Tens.Comp.
F - G 856 -1164
G - H 432 -201
J - K 924 -1040
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AH 1751 -1570
AH-AG 1527 -1198
AG-AF 1600 -1106
Chords Tens.Comp.
AF-AE 1127 -843
Y - W 1004 -877
W -S 1017 -887
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AH 413 -249
F -AF 478 -585
AF- G 529 -298
G -AE 1271 -1611
AE-AD 995 -1144
AD- H 852 -1011
H - Y 622 -382
Y - Z 414 -48
Webs Tens.Comp.
Y - J 970 -883
S - K 807 -721
S - O 420 -346
K - O 666 -758
O - L 562 -471
N - L 492 -592
N - M 496 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.062 AG 999 360
VERT(CL):0.147 AG 999 240
HORZ(LL):0.025 AE - -
HORZ(TL):0.059 AE - -
Creep Factor: 2.0
Max TC CSI:0.873
Max BC CSI:0.785
Max W eb CSI:0.903
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T93
Ply: 1
Qty:1
SEQN:13240 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T212
DrwNo:079.20.1313.35467
AK /DF 03/19/2020
W7
W8
W21
25'15'4"
4'1"10
4'1"10
8'3"4
4'1"10
13'5"
5'1"12
18'3"4
4'10"4
25'1"12
6'10"8
28'4"
3'2"4
36'3"8
7'11"8
38'4"12
2'1"4
40'4"
1'11"4
8'3"4
8'3"4
13'1"8
4'10"4
17'11"12
4'10"4
24'10"4
6'10"8
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"12
6"12
29'4"
5"4
36'3"8
6'11"8
38'5"9
2'2"1
38'6"8
0"15
39'10"8
1'4"
40'4"
5"8
1'8"
7"12 4'1"21'2'4"6"8'3"78'7"13(WB1)
12'A
B C
D
E F G
H
I
J
K L
MNOPQR
S
TUVWXY
ZAAAB
AC
AD AEAFAGAH
5 12
5X5(E1)
3X4
5X8
3X4 5X5
3X4
3X4
5X6
4X65X5
3X4
6X6
5X8
3X4
6X8
5X5
1.5X6(++)
3X8 3X3
3X3
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x6 SP M-26;
Webs: 2x4 SP #2; W19 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.27
TC: From 36 plf at 6.27 to 36 plf at 9.94
TC: From 72 plf at 9.94 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.32
BC: From 10 plf at 6.32 to 10 plf at 11.42
BC: From 20 plf at 11.42 to 20 plf at 40.33
TC: 259 lb Conc. Load at 6.32
TC: 200 lb Conc. Load at 7.06
TC: 217 lb Conc. Load at 9.06
BC: 285 lb Conc. Load at 6.32
BC: 117 lb Conc. Load at 7.06
BC: 120 lb Conc. Load at 9.06
BC: 1620 lb Conc. Load at 9.94
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2768 /-/-/-/1070 /-
AD 3463 /-/-/-/1311 /-
K 359 /-7 /-/-/108 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.4
AD Brg Width = 8.0 Min Req =3.1
K Brg Width = 4.0 Min Req =1.5
Bearings B, AD, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1044 -2710
C - D 1111 -2880
Chords Tens.Comp.
D - E 682 -1794
F - G 538 -208
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AH 2450 -935
AH-AG 2473 -939
Chords Tens.Comp.
AG-AF 2880 -1111
AF-AE 1724 -659
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AH 425 -58
C -AG 471 -198
D -AG 508 -133
D -AF 511 -1299
AF- E 714 -233
E -AE 718 -1870
Webs Tens.Comp.
AE- F 948 -321
F -AD 393 -1028
AD-AC 297 -741
AC- G 291 -723
G - X 568 -211
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.121 AG 999 360
VERT(CL):0.277 AG 999 240
HORZ(LL):-0.032 G - -
HORZ(TL):0.074 G - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.890
Max W eb CSI:0.713
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T94
Ply: 2
Qty:1
SEQN:13254 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T169
DrwNo:079.20.1313.33580
AK /DF 03/19/2020
2 Complete Trusses Required
B1
W19
25'15'4"
6'3"4
6'3"4
11'5"
5'1"12
16'3"4
4'10"4
21'9"10
5'6"6
25'1"12
3'4"2
28'4"
3'2"4
33'10"15
5'6"15
40'4"
6'5"1
6'5"
6'5"
11'5"
5'
15'11"12
4'6"12
21'6"2
5'6"6
24'10"4
3'4"2
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"14
6"14
34'2"7
5'3"9
36'5"7
2'3"
38'3"8
1'10"1
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 3'3"73'3"21'6"8'3"78'7"1312'A
B
C D E
F
G
H
I
J
KLMN
O
PQRSTUVWX
YZAA
AB
ACADAEAFAGAH
5 12
4X5(B1)
5X8
2X4 7X10
5X6
4X4
3X5
3X3 1.5X43X3
1.5X4
5X5
3X8
1.5X6(++)
1.5X6(++)
1.5X43X3
1.5X4
3X3
3X5
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x6 SP M-26;
Webs: 2x4 SP #2; W19 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.27
TC: From 36 plf at 6.27 to 36 plf at 9.94
TC: From 72 plf at 9.94 to 73 plf at 40.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.32
BC: From 10 plf at 6.32 to 10 plf at 11.42
BC: From 20 plf at 11.42 to 20 plf at 40.33
TC: 259 lb Conc. Load at 6.32
TC: 200 lb Conc. Load at 7.06
TC: 217 lb Conc. Load at 9.06
BC: 285 lb Conc. Load at 6.32
BC: 117 lb Conc. Load at 7.06
BC: 120 lb Conc. Load at 9.06
BC: 1620 lb Conc. Load at 9.94
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2768 /-/-/-/1070 /-
AD 3463 /-/-/-/1311 /-
K 359 /-7 /-/-/108 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.4
AD Brg Width = 8.0 Min Req =3.1
K Brg Width = 4.0 Min Req =1.5
Bearings B, AD, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1044 -2710
C - D 1111 -2880
Chords Tens.Comp.
D - E 682 -1794
F - G 538 -208
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AH 2450 -935
AH-AG 2473 -939
Chords Tens.Comp.
AG-AF 2880 -1111
AF-AE 1724 -659
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AH 425 -58
C -AG 471 -198
D -AG 508 -133
D -AF 511 -1299
AF- E 714 -233
E -AE 718 -1870
Webs Tens.Comp.
AE- F 948 -321
F -AD 393 -1028
AD-AC 297 -741
AC- G 291 -723
G - X 568 -211
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.12 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.121 AG 999 360
VERT(CL):0.277 AG 999 240
HORZ(LL):-0.032 G - -
HORZ(TL):0.074 G - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.890
Max W eb CSI:0.713
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T94
Ply: 2
Qty:1
SEQN:13254 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T169
DrwNo:079.20.1313.33580
AK /DF 03/19/2020
2 Complete Trusses Required
B1
W19
25'15'4"
6'3"4
6'3"4
11'5"
5'1"12
16'3"4
4'10"4
21'9"10
5'6"6
25'1"12
3'4"2
28'4"
3'2"4
33'10"15
5'6"15
40'4"
6'5"1
6'5"
6'5"
11'5"
5'
15'11"12
4'6"12
21'6"2
5'6"6
24'10"4
3'4"2
25'1"12
3"8
26'10"12
1'9"
27'4"
5"4
28'4"
1'
28'10"14
6"14
34'2"7
5'3"9
36'5"7
2'3"
38'3"8
1'10"1
39'10"8
1'7"
40'4"
5"8
1'8"
7"12 3'3"73'3"21'6"8'3"78'7"1312'A
B
C D E
F
G
H
I
J
KLMN
O
PQRSTUVWX
YZAA
AB
ACADAEAFAGAH
5 12
4X5(B1)
5X8
2X4 7X10
5X6
4X4
3X5
3X3 1.5X43X3
1.5X4
5X5
3X8
1.5X6(++)
1.5X6(++)
1.5X43X3
1.5X4
3X3
3X5
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1403 /-/-/843 /564 /193
G 1403 /-/-/819 /567 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
G Brg Width = 4.0 Min Req =2.2
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1842 -2350
B - C 1764 -2314
C - D 1317 -1528
Chords Tens.Comp.
D - E 1289 -1524
E - F 1050 -1348
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 2507 -2039
J - I 2039 -1526
Chords Tens.Comp.
I - H 1221 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 1041 -1368
A - K 2653 -2084
K - B 1005 -1156
B - J 530 -475
J - C 405 -165
Webs Tens.Comp.
C - I 784 -895
D - I 641 -468
E - H 529 -598
H - F 1376 -1004
F - G 1123 -1364
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.096 J 999 360
VERT(CL):0.221 J 999 240
HORZ(LL):0.029 G - -
HORZ(TL):0.068 G - -
Creep Factor: 2.0
Max TC CSI:0.723
Max BC CSI:0.850
Max W eb CSI:0.701
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T95
Ply: 1
Qty:1
SEQN:13244 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T235
DrwNo:079.20.1313.29478
AK /DF 03/19/2020
W11
30'4"
4'3"4
4'3"4
11'5"6
7'2"2
18'4"
6'10"10
25'2"10
6'10"10
30'4"
5'1"6
3'10"4
3'10"4
11'1"14
7'3"10
18'4"
7'2"2
25'6"2
7'2"2
30'4"
4'9"142'5"23'3"78'3"7(WB1)
12'
A B
C
D
E
F
GHIJKL
5 12
4X7
2X6 3X10
5X5
5X5
3X4
5X5
5X8
3X4
4X4
4X7
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1403 /-/-/843 /564 /193
G 1403 /-/-/819 /567 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
G Brg Width = 4.0 Min Req =2.2
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1842 -2350
B - C 1764 -2314
C - D 1317 -1528
Chords Tens.Comp.
D - E 1289 -1524
E - F 1050 -1348
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 2507 -2039
J - I 2039 -1526
Chords Tens.Comp.
I - H 1221 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 1041 -1368
A - K 2653 -2084
K - B 1005 -1156
B - J 530 -475
J - C 405 -165
Webs Tens.Comp.
C - I 784 -895
D - I 641 -468
E - H 529 -598
H - F 1376 -1004
F - G 1123 -1364
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.096 J 999 360
VERT(CL):0.221 J 999 240
HORZ(LL):0.029 G - -
HORZ(TL):0.068 G - -
Creep Factor: 2.0
Max TC CSI:0.723
Max BC CSI:0.850
Max W eb CSI:0.701
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T95
Ply: 1
Qty:1
SEQN:13244 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T235
DrwNo:079.20.1313.29478
AK /DF 03/19/2020
W11
30'4"
4'3"4
4'3"4
11'5"6
7'2"2
18'4"
6'10"10
25'2"10
6'10"10
30'4"
5'1"6
3'10"4
3'10"4
11'1"14
7'3"10
18'4"
7'2"2
25'6"2
7'2"2
30'4"
4'9"142'5"23'3"78'3"7(WB1)
12'
A B
C
D
E
F
GHIJKL
5 12
4X7
2X6 3X10
5X5
5X5
3X4
5X5
5X8
3X4
4X4
4X7
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13 2x6 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1403 /-/-/872 /547 /218
H 1403 /-/-/819 /556 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 4.0 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1574 -2015
B - C 1956 -2613
C - D 1669 -2136
Chords Tens.Comp.
D - E 1297 -1494
E - F 1298 -1498
F - G 1130 -1462
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 2301 -1932
L - K 2347 -1805
Chords Tens.Comp.
K - J 1888 -1352
J - I 1298 -928
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 1037 -1372
A - M 2401 -1877
M - B 1086 -1300
C - K 536 -537
K - D 456 -306
Webs Tens.Comp.
D - J 684 -814
E - J 684 -541
F - I 435 -487
I - G 1369 -974
G - H 1120 -1346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 K 999 360
VERT(CL):0.210 K 999 240
HORZ(LL):0.031 H - -
HORZ(TL):0.071 H - -
Creep Factor: 2.0
Max TC CSI:0.557
Max BC CSI:0.622
Max W eb CSI:0.912
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T96
Ply: 1
Qty:1
SEQN:13248 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T259
DrwNo:079.20.1313.41099
AK /DF 03/19/2020
W13
30'4"
2'3"4
2'3"4
7'5"6
5'2"2
12'7"8
5'2"2
18'4"
5'8"8
24'0"8
5'8"8
30'4"
6'3"8
1'11"12
1'11"12
7'1"14
5'2"2
12'4"
5'2"2
18'4"
6'
24'4"
6'
30'4"
6'1'7"23'3"78'3"712'
A B
C
D
E
F
G
HIJKLMN
5
12
3X8
2X6 4X7
5X5(SRS)
3X4
3X4
5X5
3X4
4X4
3X8
3X4
4X4
4X8
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13 2x6 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1403 /-/-/872 /547 /218
H 1403 /-/-/819 /556 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 4.0 Min Req =2.2
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1574 -2015
B - C 1956 -2613
C - D 1669 -2136
Chords Tens.Comp.
D - E 1297 -1494
E - F 1298 -1498
F - G 1130 -1462
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 2301 -1932
L - K 2347 -1805
Chords Tens.Comp.
K - J 1888 -1352
J - I 1298 -928
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 1037 -1372
A - M 2401 -1877
M - B 1086 -1300
C - K 536 -537
K - D 456 -306
Webs Tens.Comp.
D - J 684 -814
E - J 684 -541
F - I 435 -487
I - G 1369 -974
G - H 1120 -1346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.03 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 K 999 360
VERT(CL):0.210 K 999 240
HORZ(LL):0.031 H - -
HORZ(TL):0.071 H - -
Creep Factor: 2.0
Max TC CSI:0.557
Max BC CSI:0.622
Max W eb CSI:0.912
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T96
Ply: 1
Qty:1
SEQN:13248 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T259
DrwNo:079.20.1313.41099
AK /DF 03/19/2020
W13
30'4"
2'3"4
2'3"4
7'5"6
5'2"2
12'7"8
5'2"2
18'4"
5'8"8
24'0"8
5'8"8
30'4"
6'3"8
1'11"12
1'11"12
7'1"14
5'2"2
12'4"
5'2"2
18'4"
6'
24'4"
6'
30'4"
6'1'7"23'3"78'3"712'
A B
C
D
E
F
G
HIJKLMN
5
12
3X8
2X6 4X7
5X5(SRS)
3X4
3X4
5X5
3X4
4X4
3X8
3X4
4X4
4X8
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B1 2x6 SP M-26;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 6.33
TC: From 36 plf at 6.33 to 36 plf at 31.83
BC: From 20 plf at 0.00 to 20 plf at 6.33
BC: From 10 plf at 6.33 to 10 plf at 31.83
BC: 1935 lb Conc. Load at 6.33
BC: 775 lb Conc. Load at 8.33,10.33
BC: 782 lb Conc. Load at 12.33
BC: 1067 lb Conc. Load at 14.33
BC: 1068 lb Conc. Load at 16.33,20.33
BC: 1054 lb Conc. Load at 18.33,22.33,24.33
BC: 1060 lb Conc. Load at 26.33,28.33,30.33
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 7041 /-/-/-/2727 /-
S 8537 /-/-/-/3298 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =4.3
S Brg Width = 8.0 Min Req =5.2
Bearings A & S Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1953 -5014
B - C 1938 -4987
C - D 1794 -4599
D - E 1571 -4022
E - F 1311 -3345
Chords Tens.Comp.
F - G 1166 -2977
G - H 1257 -3206
H - I 1324 -3384
I - J 1215 -3125
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 4552 -1765
R - Q 4534 -1760
Q - P 4202 -1637
P - O 3654 -1426
Chords Tens.Comp.
O - N 3081 -1205
N - M 3104 -1213
M - L 2895 -1125
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - C 422 -131
C - Q 142 -384
Q - D 816 -308
D - P 318 -828
P - E 1238 -466
E - O 450 -1165
Webs Tens.Comp.
F - O 1534 -590
N - G 1185 -456
I - L 197 -444
L - J 3106 -1205
J - K 990 -2533
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.168 P 999 360
VERT(CL):0.380 P 996 240
HORZ(LL):0.038 K - -
HORZ(TL):0.085 K - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.782
Max W eb CSI:0.701
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T97
Ply: 3
Qty:1
SEQN:13648 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T219
DrwNo:079.20.1313.42176
AK /DF 03/19/2020
3 Complete Trusses Required
B1
W15
31'10"
6'5"6
6'5"6
10'0"11
3'7"5
13'7"9
3'6"15
16'11"
3'3"7
19'9"
2'10"
23'0"7
3'3"7
26'7"5
3'6"15
31'10"
5'2"11
6'4"
6'4"
9'9"3
3'5"3
13'4"1
3'6"15
16'11"
3'6"15
19'7"4
2'8"4
23'3"15
3'8"11
26'11"5
3'7"7
31'10"
4'10"11
7"12 2'7"157'8"512'
A
B
C
D
E
F G
H
I
J
KLMNOPQRS
5 12
3X12(B2)
3X4
2X4
5X5
7X6
3X4
4X4
3X6
4X7
7X8 3X8
4X4
3X6
4X4
3X4
4X8
5X8
3X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B1 2x6 SP M-26;
Webs: 2x4 SP #2; W15 2x6 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 6.33
TC: From 36 plf at 6.33 to 36 plf at 31.83
BC: From 20 plf at 0.00 to 20 plf at 6.33
BC: From 10 plf at 6.33 to 10 plf at 31.83
BC: 1935 lb Conc. Load at 6.33
BC: 775 lb Conc. Load at 8.33,10.33
BC: 782 lb Conc. Load at 12.33
BC: 1067 lb Conc. Load at 14.33
BC: 1068 lb Conc. Load at 16.33,20.33
BC: 1054 lb Conc. Load at 18.33,22.33,24.33
BC: 1060 lb Conc. Load at 26.33,28.33,30.33
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 7041 /-/-/-/2727 /-
S 8537 /-/-/-/3298 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =4.3
S Brg Width = 8.0 Min Req =5.2
Bearings A & S Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1953 -5014
B - C 1938 -4987
C - D 1794 -4599
D - E 1571 -4022
E - F 1311 -3345
Chords Tens.Comp.
F - G 1166 -2977
G - H 1257 -3206
H - I 1324 -3384
I - J 1215 -3125
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 4552 -1765
R - Q 4534 -1760
Q - P 4202 -1637
P - O 3654 -1426
Chords Tens.Comp.
O - N 3081 -1205
N - M 3104 -1213
M - L 2895 -1125
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - C 422 -131
C - Q 142 -384
Q - D 816 -308
D - P 318 -828
P - E 1238 -466
E - O 450 -1165
Webs Tens.Comp.
F - O 1534 -590
N - G 1185 -456
I - L 197 -444
L - J 3106 -1205
J - K 990 -2533
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.168 P 999 360
VERT(CL):0.380 P 996 240
HORZ(LL):0.038 K - -
HORZ(TL):0.085 K - -
Creep Factor: 2.0
Max TC CSI:0.689
Max BC CSI:0.782
Max W eb CSI:0.701
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T97
Ply: 3
Qty:1
SEQN:13648 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T219
DrwNo:079.20.1313.42176
AK /DF 03/19/2020
3 Complete Trusses Required
B1
W15
31'10"
6'5"6
6'5"6
10'0"11
3'7"5
13'7"9
3'6"15
16'11"
3'3"7
19'9"
2'10"
23'0"7
3'3"7
26'7"5
3'6"15
31'10"
5'2"11
6'4"
6'4"
9'9"3
3'5"3
13'4"1
3'6"15
16'11"
3'6"15
19'7"4
2'8"4
23'3"15
3'8"11
26'11"5
3'7"7
31'10"
4'10"11
7"12 2'7"157'8"512'
A
B
C
D
E
F G
H
I
J
KLMNOPQRS
5 12
3X12(B2)
3X4
2X4
5X5
7X6
3X4
4X4
3X6
4X7
7X8 3X8
4X4
3X6
4X4
3X4
4X8
5X8
3X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.33
TC: From 36 plf at 2.33 to 36 plf at 6.10
BC: From 20 plf at 0.00 to 20 plf at 2.33
BC: From 10 plf at 2.33 to 10 plf at 6.10
BC: 1397 lb Conc. Load at 2.33, 4.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1533 /-/-/-/562 /-
D 1651 /-/-/-/611 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.4
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 905 -2438
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 2181 -803
Chords Tens.Comp.
E - D 2068 -763
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 1899 -661
Webs Tens.Comp.
B - D 844 -2288
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 E 999 360
VERT(CL):0.047 E 999 240
HORZ(LL):-0.006 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.526
Max W eb CSI:0.462
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T98
Ply: 1
Qty:1
SEQN:13146 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T191
DrwNo:079.20.1313.36419
AK /DF 03/19/2020
6'1"4
3'0"10
3'0"10
6'1"4
3'0"10
2'10"14
2'10"14
6'1"4
3'2"6
7"12 3'2"412'
A
B
C
DE
5
12
4X4(B1)
3X10
4X7
1.5X4
7X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.33
TC: From 36 plf at 2.33 to 36 plf at 6.10
BC: From 20 plf at 0.00 to 20 plf at 2.33
BC: From 10 plf at 2.33 to 10 plf at 6.10
BC: 1397 lb Conc. Load at 2.33, 4.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1533 /-/-/-/562 /-
D 1651 /-/-/-/611 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.4
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 905 -2438
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 2181 -803
Chords Tens.Comp.
E - D 2068 -763
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 1899 -661
Webs Tens.Comp.
B - D 844 -2288
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 E 999 360
VERT(CL):0.047 E 999 240
HORZ(LL):-0.006 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.526
Max W eb CSI:0.462
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T98
Ply: 1
Qty:1
SEQN:13146 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T191
DrwNo:079.20.1313.36419
AK /DF 03/19/2020
6'1"4
3'0"10
3'0"10
6'1"4
3'0"10
2'10"14
2'10"14
6'1"4
3'2"6
7"12 3'2"412'
A
B
C
DE
5
12
4X4(B1)
3X10
4X7
1.5X4
7X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.33
TC: From 36 plf at 2.33 to 36 plf at 6.27
BC: From 20 plf at 0.00 to 20 plf at 2.33
BC: From 10 plf at 2.33 to 10 plf at 6.27
BC: 1403 lb Conc. Load at 2.33, 4.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1584 /-/-/-/617 /-
D 1620 /-/-/-/639 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 983 -2486
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 2230 -876
Chords Tens.Comp.
E - D 2119 -834
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 1911 -717
Webs Tens.Comp.
B - D 922 -2342
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 E 999 360
VERT(CL):0.055 E 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.019 C - -
Creep Factor: 2.0
Max TC CSI:0.468
Max BC CSI:0.532
Max W eb CSI:0.495
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T99
Ply: 1
Qty:1
SEQN:13251 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T252
DrwNo:079.20.1313.31661
AK /DF 03/19/2020
6'3"4
3'1"10
3'1"10
6'3"4
3'1"10
2'11"14
2'11"14
6'3"4
3'3"6
7"12 3'3"212'
A
B
C
DE
5
12
4X4(B1)
3X10
4X7
1.5X4
8X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.33
TC: From 36 plf at 2.33 to 36 plf at 6.27
BC: From 20 plf at 0.00 to 20 plf at 2.33
BC: From 10 plf at 2.33 to 10 plf at 6.27
BC: 1403 lb Conc. Load at 2.33, 4.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1584 /-/-/-/617 /-
D 1620 /-/-/-/639 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 983 -2486
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 2230 -876
Chords Tens.Comp.
E - D 2119 -834
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - B 1911 -717
Webs Tens.Comp.
B - D 922 -2342
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 E 999 360
VERT(CL):0.055 E 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.019 C - -
Creep Factor: 2.0
Max TC CSI:0.468
Max BC CSI:0.532
Max W eb CSI:0.495
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T99
Ply: 1
Qty:1
SEQN:13251 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T252
DrwNo:079.20.1313.31661
AK /DF 03/19/2020
6'3"4
3'1"10
3'1"10
6'3"4
3'1"10
2'11"14
2'11"14
6'3"4
3'3"6
7"12 3'3"212'
A
B
C
DE
5
12
4X4(B1)
3X10
4X7
1.5X4
8X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 70 plf at 0.00 to 70 plf at 23.63
BC: From 20 plf at 0.00 to 20 plf at 23.63
BC: 190 lb Conc. Load at 1.77
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: 0.15" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1239 /-/-/-/475 /-
H 1077 /-/-/-/404 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 3.5 Min Req =1.7
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 373 -981
B - C 980 -2620
C - D 1182 -3160
Chords Tens.Comp.
D - E 1182 -3160
E - F 949 -2547
F - G 315 -852
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1116 -433
L - K 2698 -1022
Chords Tens.Comp.
K - J 2630 -992
J - I 990 -377
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 476 -1245
A - M 1575 -599
M - B 424 -956
B - L 1639 -597
L - C 295 -558
C - K 500 -174
Webs Tens.Comp.
K - E 574 -206
E - J 307 -586
J - F 1697 -624
F - I 436 -981
I - G 1367 -506
G - H 403 -1081
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 D 999 360
VERT(CL):0.336 D 844 240
HORZ(LL):0.031 A - -
HORZ(TL):0.070 A - -
Creep Factor: 2.0
Max TC CSI:0.403
Max BC CSI:0.584
Max W eb CSI:0.383
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T100
Ply: 1
Qty:1
SEQN:13571 /FLAT
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T229
DrwNo:079.20.1313.41536
AK /DF 03/19/2020
23'7"8
1'11"
1'11"
6'11"4
5'0"4
11'9"12
4'10"8
16'8"4
4'10"8
21'8"8
5'0"4
23'7"8
1'11"
1'7"8
1'7"8
6'7"12
5'0"4
11'9"12
5'2"
16'11"12
5'2"
22'
5'0"4
23'7"8
1'7"82'5"212'
A B C D E F G
HIJKLMN
4X5
3X8 4X5
4X5
4X5
3X4 5X5
3X8
3X4
7X6
4X5
4X4
4X4
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 70 plf at 0.00 to 70 plf at 23.63
BC: From 20 plf at 0.00 to 20 plf at 23.63
BC: 190 lb Conc. Load at 1.77
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: 0.15" DL: 0.19". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1239 /-/-/-/475 /-
H 1077 /-/-/-/404 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
H Brg Width = 3.5 Min Req =1.7
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 373 -981
B - C 980 -2620
C - D 1182 -3160
Chords Tens.Comp.
D - E 1182 -3160
E - F 949 -2547
F - G 315 -852
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1116 -433
L - K 2698 -1022
Chords Tens.Comp.
K - J 2630 -992
J - I 990 -377
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 476 -1245
A - M 1575 -599
M - B 424 -956
B - L 1639 -597
L - C 295 -558
C - K 500 -174
Webs Tens.Comp.
K - E 574 -206
E - J 307 -586
J - F 1697 -624
F - I 436 -981
I - G 1367 -506
G - H 403 -1081
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.149 D 999 360
VERT(CL):0.336 D 844 240
HORZ(LL):0.031 A - -
HORZ(TL):0.070 A - -
Creep Factor: 2.0
Max TC CSI:0.403
Max BC CSI:0.584
Max W eb CSI:0.383
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T100
Ply: 1
Qty:1
SEQN:13571 /FLAT
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T229
DrwNo:079.20.1313.41536
AK /DF 03/19/2020
23'7"8
1'11"
1'11"
6'11"4
5'0"4
11'9"12
4'10"8
16'8"4
4'10"8
21'8"8
5'0"4
23'7"8
1'11"
1'7"8
1'7"8
6'7"12
5'0"4
11'9"12
5'2"
16'11"12
5'2"
22'
5'0"4
23'7"8
1'7"82'5"212'
A B C D E F G
HIJKLMN
4X5
3X8 4X5
4X5
4X5
3X4 5X5
3X8
3X4
7X6
4X5
4X4
4X4
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/677 /371 /112
G 1060 /-/-/605 /392 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
G Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1530 -2141
B - C 1273 -1929
C - D 1364 -2088
Chords Tens.Comp.
D - E 1002 -1597
E - F 1002 -1597
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1728 -1295
J - I 1732 -1296
Chords Tens.Comp.
I - H 2097 -1368
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 405 -218
D - H 419 -573
E - H 322 -435
Webs Tens.Comp.
H - F 1789 -1124
F - G 650 -1011
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.081 D 999 360
VERT(CL):0.187 D 999 240
HORZ(LL):0.031 B - -
HORZ(TL):0.072 B - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.645
Max W eb CSI:0.727
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T101
Ply: 1
Qty:1
SEQN:13578 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T218
DrwNo:079.20.1313.40944
AK /DF 03/19/2020
22'11"
6'3"4
6'3"4
12'0"3
5'8"15
17'3"13
5'3"11
22'11"
5'7"3
6'5"
6'5"
11'8"11
5'3"11
17'3"13
5'7"3
22'11"
5'7"3
7"12 3'3"212'
A
B
C D E F
GHIJ
5
12
5X5(E1)
3X4
4X8
1.5X4 5X5
3X4 1.5X4
3X12
4X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/677 /371 /112
G 1060 /-/-/605 /392 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
G Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1530 -2141
B - C 1273 -1929
C - D 1364 -2088
Chords Tens.Comp.
D - E 1002 -1597
E - F 1002 -1597
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1728 -1295
J - I 1732 -1296
Chords Tens.Comp.
I - H 2097 -1368
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 405 -218
D - H 419 -573
E - H 322 -435
Webs Tens.Comp.
H - F 1789 -1124
F - G 650 -1011
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.081 D 999 360
VERT(CL):0.187 D 999 240
HORZ(LL):0.031 B - -
HORZ(TL):0.072 B - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.645
Max W eb CSI:0.727
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T101
Ply: 1
Qty:1
SEQN:13578 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T218
DrwNo:079.20.1313.40944
AK /DF 03/19/2020
22'11"
6'3"4
6'3"4
12'0"3
5'8"15
17'3"13
5'3"11
22'11"
5'7"3
6'5"
6'5"
11'8"11
5'3"11
17'3"13
5'7"3
22'11"
5'7"3
7"12 3'3"212'
A
B
C D E F
GHIJ
5
12
5X5(E1)
3X4
4X8
1.5X4 5X5
3X4 1.5X4
3X12
4X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/699 /365 /149
H 1060 /-/-/615 /395 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1659 -2178
B - C 1387 -1987
C - D 1162 -1722
Chords Tens.Comp.
D - E 1057 -1568
E - F 738 -1133
F - G 749 -1150
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 1796 -1496
Chords Tens.Comp.
O - N 1540 -1162
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 394 -283
N - L 1584 -1073
E - L 351 -481
Webs Tens.Comp.
L - G 1502 -980
I - G 672 -1027
I - H 673 -1042
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.057 O 999 360
VERT(CL):0.132 O 999 240
HORZ(LL):0.028 K - -
HORZ(TL):0.066 K - -
Creep Factor: 2.0
Max TC CSI:0.486
Max BC CSI:0.787
Max W eb CSI:0.666
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T102
Ply: 1
Qty:1
SEQN:13582 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T209
DrwNo:079.20.1313.29524
AK /DF 03/19/2020
22'11"
4'1"10
4'1"10
8'3"4
4'1"10
14'5"6
6'2"2
20'2"4
5'8"14
22'11"
2'8"12
8'3"4
8'3"4
14'3"10
6'0"6
20'4"
6'0"6
21'9"12
1'5"12
22'7"8
9"12
22'11"
3"8
7"12 4'1"21'4"12'
A
B
C
D E F G
H
IJ
KLMNO
5
12
5X5(E1)
3X4
1.5X4
4X7
5X5 5X8
3X4 1.5X4
6X81.5X4
1.5X4
1.5X4 3X3
4X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/699 /365 /149
H 1060 /-/-/615 /395 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1659 -2178
B - C 1387 -1987
C - D 1162 -1722
Chords Tens.Comp.
D - E 1057 -1568
E - F 738 -1133
F - G 749 -1150
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 1796 -1496
Chords Tens.Comp.
O - N 1540 -1162
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 394 -283
N - L 1584 -1073
E - L 351 -481
Webs Tens.Comp.
L - G 1502 -980
I - G 672 -1027
I - H 673 -1042
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.057 O 999 360
VERT(CL):0.132 O 999 240
HORZ(LL):0.028 K - -
HORZ(TL):0.066 K - -
Creep Factor: 2.0
Max TC CSI:0.486
Max BC CSI:0.787
Max W eb CSI:0.666
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T102
Ply: 1
Qty:1
SEQN:13582 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T209
DrwNo:079.20.1313.29524
AK /DF 03/19/2020
22'11"
4'1"10
4'1"10
8'3"4
4'1"10
14'5"6
6'2"2
20'2"4
5'8"14
22'11"
2'8"12
8'3"4
8'3"4
14'3"10
6'0"6
20'4"
6'0"6
21'9"12
1'5"12
22'7"8
9"12
22'11"
3"8
7"12 4'1"21'4"12'
A
B
C
D E F G
H
IJ
KLMNO
5
12
5X5(E1)
3X4
1.5X4
4X7
5X5 5X8
3X4 1.5X4
6X81.5X4
1.5X4
1.5X4 3X3
4X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/717 /357 /185
G 1060 /-/-/630 /402 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.7
G Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1503 -2021
B - C 1282 -1974
C - D 1032 -1524
Chords Tens.Comp.
D - E 780 -1131
E - F 780 -1131
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1774 -1447
J - I 1770 -1448
Chords Tens.Comp.
I - H 1341 -1051
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 479 -480
D - I 386 -213
E - H 385 -532
Webs Tens.Comp.
H - F 1402 -967
F - G 703 -1009
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.053 I 999 360
VERT(CL):0.122 I 999 240
HORZ(LL):0.017 H - -
HORZ(TL):0.040 H - -
Creep Factor: 2.0
Max TC CSI:0.625
Max BC CSI:0.649
Max W eb CSI:0.979
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T103
Ply: 1
Qty:1
SEQN:13589 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T216
DrwNo:079.20.1313.40834
AK /DF 03/19/2020
22'11"
5'3"6
5'3"6
10'3"4
4'11"14
16'7"2
6'3"14
22'11"
6'3"14
5'1"10
5'1"10
10'3"4
5'1"10
16'7"2
6'3"14
22'11"
6'3"14
7"12 4'11"212'
A
B
C
D E F
GHIJ
5
12
5X5(E1)
3X4
1.5X4
3X4
4X7
5X5
1.5X4
3X10
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1060 /-/-/717 /357 /185
G 1060 /-/-/630 /402 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.7
G Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1503 -2021
B - C 1282 -1974
C - D 1032 -1524
Chords Tens.Comp.
D - E 780 -1131
E - F 780 -1131
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1774 -1447
J - I 1770 -1448
Chords Tens.Comp.
I - H 1341 -1051
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 479 -480
D - I 386 -213
E - H 385 -532
Webs Tens.Comp.
H - F 1402 -967
F - G 703 -1009
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.053 I 999 360
VERT(CL):0.122 I 999 240
HORZ(LL):0.017 H - -
HORZ(TL):0.040 H - -
Creep Factor: 2.0
Max TC CSI:0.625
Max BC CSI:0.649
Max W eb CSI:0.979
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T103
Ply: 1
Qty:1
SEQN:13589 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T216
DrwNo:079.20.1313.40834
AK /DF 03/19/2020
22'11"
5'3"6
5'3"6
10'3"4
4'11"14
16'7"2
6'3"14
22'11"
6'3"14
5'1"10
5'1"10
10'3"4
5'1"10
16'7"2
6'3"14
22'11"
6'3"14
7"12 4'11"212'
A
B
C
D E F
GHIJ
5
12
5X5(E1)
3X4
1.5X4
3X4
4X7
5X5
1.5X4
3X10
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W9 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/846 /403 /257
I 1054 /-/-/643 /409 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1998 -2750
C - D 1909 -2685
D - E 1392 -2056
Chords Tens.Comp.
E - F 985 -1404
F - G 786 -1057
G - H 784 -1055
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2374 -2066
O - N 2237 -1953
Chords Tens.Comp.
N - M 1845 -1544
M - J 1227 -997
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - D 455 -347
D - N 411 -385
E - M 649 -734
F - M 464 -306
Webs Tens.Comp.
G - J 337 -470
J - H 1325 -984
H - I 733 -990
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 N 999 360
VERT(CL):0.233 N 999 240
HORZ(LL):0.046 I - -
HORZ(TL):0.107 I - -
Creep Factor: 2.0
Max TC CSI:0.685
Max BC CSI:0.803
Max W eb CSI:0.553
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T104
Ply: 1
Qty:1
SEQN:13593 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T126
DrwNo:079.20.1313.30522
AK /DF 03/19/2020
W9
22'11"
2'11"8
2'11"8
7'7"6
4'7"14
12'3"4
4'7"14
16'7"4
4'4"
22'11"
6'3"12
8"
8"
2'8"
2'
7'3"14
4'7"14
12'3"4
4'11"6
16'5"8
4'2"4
22'11"
6'5"81'8"
7"12 5'9"26"6'1"812'A
B
C
D
E
F G H
IJK
LMNO
5 12
3
12
3X4(E3)4X6(E3)
3X4
5X5
3X4
3X4
3X4
4X7
3X4
1.5X4
6X81.5X6(**)
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W9 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/846 /403 /257
I 1054 /-/-/643 /409 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1998 -2750
C - D 1909 -2685
D - E 1392 -2056
Chords Tens.Comp.
E - F 985 -1404
F - G 786 -1057
G - H 784 -1055
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2374 -2066
O - N 2237 -1953
Chords Tens.Comp.
N - M 1845 -1544
M - J 1227 -997
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - D 455 -347
D - N 411 -385
E - M 649 -734
F - M 464 -306
Webs Tens.Comp.
G - J 337 -470
J - H 1325 -984
H - I 733 -990
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.101 N 999 360
VERT(CL):0.233 N 999 240
HORZ(LL):0.046 I - -
HORZ(TL):0.107 I - -
Creep Factor: 2.0
Max TC CSI:0.685
Max BC CSI:0.803
Max W eb CSI:0.553
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T104
Ply: 1
Qty:1
SEQN:13593 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T126
DrwNo:079.20.1313.30522
AK /DF 03/19/2020
W9
22'11"
2'11"8
2'11"8
7'7"6
4'7"14
12'3"4
4'7"14
16'7"4
4'4"
22'11"
6'3"12
8"
8"
2'8"
2'
7'3"14
4'7"14
12'3"4
4'11"6
16'5"8
4'2"4
22'11"
6'5"81'8"
7"12 5'9"26"6'1"812'A
B
C
D
E
F G H
IJK
LMNO
5 12
3
12
3X4(E3)4X6(E3)
3X4
5X5
3X4
3X4
3X4
4X7
3X4
1.5X4
6X81.5X6(**)
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/832 /399 /338
J 1068 /-/-/703 /421 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
J Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2003 -2616
C - D 1911 -2552
D - E 2957 -3646
E - F 1581 -2269
Chords Tens.Comp.
F - G 1287 -2061
G - H 1457 -2294
H - I 1173 -1625
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 2238 -2232
U - S 3471 -3314
S - R 2061 -1842
Chords Tens.Comp.
R - O 1466 -1190
O - K 1437 -1166
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -D 486 -476
W -U 2237 -2247
D - U 1149 -1003
U - E 665 -651
E - S 1531 -1466
F - S 476 -341
Webs Tens.Comp.
R - G 731 -1085
R - H 1238 -799
H - K 1014 -1179
K - I 1936 -1568
I - J 876 -989
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.69 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.156 T 999 360
VERT(CL):0.363 T 758 240
HORZ(LL):0.081 J - -
HORZ(TL):0.190 J - -
Creep Factor: 2.0
Max TC CSI:0.775
Max BC CSI:0.858
Max W eb CSI:0.961
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T106
Ply: 1
Qty:1
SEQN:13610 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T228
DrwNo:079.20.1313.41460
AK /DF 03/19/2020
W13
22'11"
2'11"8
2'11"8
4'4"8
1'5"
8'3"4
3'10"12
14'3"4
6'
16'5"8
2'2"4
22'3"14
5'10"6
22'11"
7"2
8"
8"
2'8"
2'
4'8"
2'
8'3"4
3'7"4
14'1"8
5'10"4
14'7"3
5"11
16'5"8
1'10"5
22'11"
6'5"81'8"
7"12 7'8"54'1"26"1'7'5"27'9"812'A
B
C
D
E
F G
H
I
J
K
L
M
NOP
QRS
TUVW
5 12
3
12
3X4(E3)4X6(E3)
5X14 H05101.5X4
4X8
4X4 4X8
5X5
1.5X6(++)
3X6
7X83X31.5X6
H0310(I)
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W13 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/832 /399 /338
J 1068 /-/-/703 /421 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
J Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2003 -2616
C - D 1911 -2552
D - E 2957 -3646
E - F 1581 -2269
Chords Tens.Comp.
F - G 1287 -2061
G - H 1457 -2294
H - I 1173 -1625
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 2238 -2232
U - S 3471 -3314
S - R 2061 -1842
Chords Tens.Comp.
R - O 1466 -1190
O - K 1437 -1166
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
W -D 486 -476
W -U 2237 -2247
D - U 1149 -1003
U - E 665 -651
E - S 1531 -1466
F - S 476 -341
Webs Tens.Comp.
R - G 731 -1085
R - H 1238 -799
H - K 1014 -1179
K - I 1936 -1568
I - J 876 -989
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.69 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.156 T 999 360
VERT(CL):0.363 T 758 240
HORZ(LL):0.081 J - -
HORZ(TL):0.190 J - -
Creep Factor: 2.0
Max TC CSI:0.775
Max BC CSI:0.858
Max W eb CSI:0.961
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T106
Ply: 1
Qty:1
SEQN:13610 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T228
DrwNo:079.20.1313.41460
AK /DF 03/19/2020
W13
22'11"
2'11"8
2'11"8
4'4"8
1'5"
8'3"4
3'10"12
14'3"4
6'
16'5"8
2'2"4
22'3"14
5'10"6
22'11"
7"2
8"
8"
2'8"
2'
4'8"
2'
8'3"4
3'7"4
14'1"8
5'10"4
14'7"3
5"11
16'5"8
1'10"5
22'11"
6'5"81'8"
7"12 7'8"54'1"26"1'7'5"27'9"812'A
B
C
D
E
F G
H
I
J
K
L
M
NOP
QRS
TUVW
5 12
3
12
3X4(E3)4X6(E3)
5X14 H05101.5X4
4X8
4X4 4X8
5X5
1.5X6(++)
3X6
7X83X31.5X6
H0310(I)
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W12 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/823 /399 /352
J 1054 /-/-/735 /448 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
J Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2028 -2618
C - D 1935 -2553
D - E 3011 -3716
E - F 3197 -3852
Chords Tens.Comp.
F - G 1967 -3081
G - H 916 -1541
H - I 1128 -1586
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2239 -2273
T - R 2576 -2342
Chords Tens.Comp.
R - O 3105 -2352
O - K 3023 -2292
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - D 562 -551
V - T 2319 -2347
D - T 1184 -986
T - F 1334 -1399
F - R 569 -139
Webs Tens.Comp.
G - K 1342 -1873
H - K 512 -459
K - I 1926 -1555
I - J 900 -976
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.176 R 999 360
VERT(CL):0.408 R 674 240
HORZ(LL):0.083 J - -
HORZ(TL):0.192 J - -
Creep Factor: 2.0
Max TC CSI:0.829
Max BC CSI:0.761
Max W eb CSI:0.966
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T107
Ply: 1
Qty:1
SEQN:13613 /HIPS
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T210
DrwNo:079.20.1313.37090
AK /DF 03/19/2020
B3
W12
22'11"
2'11"8
2'11"8
4'2"12
1'3"4
6'3"4
2'0"8
12'3"4
6'
16'7"4
4'4"
22'11"
6'3"12
8"
8"
2'8"
2'
4'8"
2'
11'11"12
7'3"12
14'7"3
2'7"7
16'5"8
1'10"5
22'11"
6'5"81'8"
7"12 7'8"53'3"26"1'8'0"1112'A
B
C
D
E
F G
H
I
J
K
LM
NOP
QR
STUV
5 12
3
12
3X4(E3)4X6(E3)
5X14
1.5X4
6X81.5X4
5X5 5X5
1.5X6(++)
1.5X4
6X83X31.5X6
4X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W12 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/823 /399 /352
J 1054 /-/-/735 /448 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
J Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2028 -2618
C - D 1935 -2553
D - E 3011 -3716
E - F 3197 -3852
Chords Tens.Comp.
F - G 1967 -3081
G - H 916 -1541
H - I 1128 -1586
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2239 -2273
T - R 2576 -2342
Chords Tens.Comp.
R - O 3105 -2352
O - K 3023 -2292
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V - D 562 -551
V - T 2319 -2347
D - T 1184 -986
T - F 1334 -1399
F - R 569 -139
Webs Tens.Comp.
G - K 1342 -1873
H - K 512 -459
K - I 1926 -1555
I - J 900 -976
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.176 R 999 360
VERT(CL):0.408 R 674 240
HORZ(LL):0.083 J - -
HORZ(TL):0.192 J - -
Creep Factor: 2.0
Max TC CSI:0.829
Max BC CSI:0.761
Max W eb CSI:0.966
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T107
Ply: 1
Qty:1
SEQN:13613 /HIPS
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T210
DrwNo:079.20.1313.37090
AK /DF 03/19/2020
B3
W12
22'11"
2'11"8
2'11"8
4'2"12
1'3"4
6'3"4
2'0"8
12'3"4
6'
16'7"4
4'4"
22'11"
6'3"12
8"
8"
2'8"
2'
4'8"
2'
11'11"12
7'3"12
14'7"3
2'7"7
16'5"8
1'10"5
22'11"
6'5"81'8"
7"12 7'8"53'3"26"1'8'0"1112'A
B
C
D
E
F G
H
I
J
K
LM
NOP
QR
STUV
5 12
3
12
3X4(E3)4X6(E3)
5X14
1.5X4
6X81.5X4
5X5 5X5
1.5X6(++)
1.5X4
6X83X31.5X6
4X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6,W9 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/815 /399 /338
I 1068 /-/-/720 /421 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2021 -2588
C - D 1923 -2523
D - E 1687 -2437
Chords Tens.Comp.
E - F 2357 -3673
F - G 794 -1441
G - H 1016 -1453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2210 -2239
O - N 2111 -2126
Chords Tens.Comp.
N - M 2336 -2054
M - J 3741 -2815
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - M 1390 -824
F - J 1864 -2545
G - J 571 -518
Webs Tens.Comp.
J - H 1791 -1418
H - I 857 -994
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.69 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.197 F 999 360
VERT(CL):0.459 F 598 240
HORZ(LL):-0.059 H - -
HORZ(TL):0.138 H - -
Creep Factor: 2.0
Max TC CSI:0.798
Max BC CSI:0.799
Max W eb CSI:0.945
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T108
Ply: 1
Qty:1
SEQN:13616 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T208
DrwNo:079.20.1313.30569
AK /DF 03/19/2020
B2
W6
W9
22'11"
2'11"8
2'11"8
4'3"4
1'3"12
10'3"4
6'
16'7"4
6'4"
22'3"14
5'8"10
22'11"
7"2
8"
8"
2'8"
2'
4'3"4
1'7"4
9'11"12
5'8"8
16'5"8
6'5"12
22'11"
6'5"81'8"
7"12 7'8"52'5"26"7'5"27'9"812'A
B
C
D
E F
G
H
IJK
LMNO
5 12
3
12
3X4(E3)4X6(E3)
3X4
5X5
3X4
4X8
3X4 4X4
5X5
1.5X4
6X101.5X6(**)
H0310(I)
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W6,W9 2x4 SP 2700f-2.2E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
(I) - plates so marked were sized using 0%
Fabrication Tolerance, 0 degrees Rotational
Tolerance, and/or zero Positioning Tolerance.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1224 /-/-/815 /399 /338
I 1068 /-/-/720 /421 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2021 -2588
C - D 1923 -2523
D - E 1687 -2437
Chords Tens.Comp.
E - F 2357 -3673
F - G 794 -1441
G - H 1016 -1453
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2210 -2239
O - N 2111 -2126
Chords Tens.Comp.
N - M 2336 -2054
M - J 3741 -2815
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - M 1390 -824
F - J 1864 -2545
G - J 571 -518
Webs Tens.Comp.
J - H 1791 -1418
H - I 857 -994
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.69 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.197 F 999 360
VERT(CL):0.459 F 598 240
HORZ(LL):-0.059 H - -
HORZ(TL):0.138 H - -
Creep Factor: 2.0
Max TC CSI:0.798
Max BC CSI:0.799
Max W eb CSI:0.945
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T108
Ply: 1
Qty:1
SEQN:13616 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T208
DrwNo:079.20.1313.30569
AK /DF 03/19/2020
B2
W6
W9
22'11"
2'11"8
2'11"8
4'3"4
1'3"12
10'3"4
6'
16'7"4
6'4"
22'3"14
5'8"10
22'11"
7"2
8"
8"
2'8"
2'
4'3"4
1'7"4
9'11"12
5'8"8
16'5"8
6'5"12
22'11"
6'5"81'8"
7"12 7'8"52'5"26"7'5"27'9"812'A
B
C
D
E F
G
H
IJK
LMNO
5 12
3
12
3X4(E3)4X6(E3)
3X4
5X5
3X4
4X8
3X4 4X4
5X5
1.5X4
6X101.5X6(**)
H0310(I)
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26; B2 2x6 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2700f-2.2E;
W6 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 2.27
TC: From 36 plf at 2.27 to 36 plf at 5.94
TC: From 73 plf at 5.94 to 73 plf at 22.92
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.30
BC: From 10 plf at 2.30 to 10 plf at 5.94
BC: From 20 plf at 5.94 to 20 plf at 22.92
TC: 16 lb Conc. Load at 2.30
TC: 27 lb Conc. Load at 4.33
TC: 80 lb Conc. Load at 5.94
BC: 49 lb Conc. Load at 2.30
BC: 41 lb Conc. Load at 4.33
BC: 43 lb Conc. Load at 5.94
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1297 /-/-/-/513 /-
H 1067 /-/-/-/396 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.1
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 791 -2070
C - D 1617 -4355
Chords Tens.Comp.
D - E 727 -1903
E - F 217 -537
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 1853 -707
L - K 1862 -698
K - J 4489 -1693
Chords Tens.Comp.
J - I 1637 -616
I - H 402 -143
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 2549 -940
K - D 322 -572
D - J 1087 -2860
J - E 808 -194
Webs Tens.Comp.
E - I 559 -1462
F - I 849 -235
F - H 365 -1025
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.194 D 999 360
VERT(CL):0.446 D 612 240
HORZ(LL):-0.069 G - -
HORZ(TL):0.158 G - -
Creep Factor: 2.0
Max TC CSI:0.681
Max BC CSI:0.424
Max W eb CSI:0.908
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T109
Ply: 1
Qty:1
SEQN:13623 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T251
DrwNo:079.20.1313.36434
AK /DF 03/19/2020
T2
B2
W4
W6
22'11"
2'3"4
2'3"4
8'3"4
6'
14'5"
6'1"12
20'3"4
5'10"4
22'11"
2'7"12
2'5"
2'5"
7'11"12
5'6"12
14'1"8
6'1"12
20'3"4
6'1"12
22'11"
2'7"121'8"
7"12 6'7"21'7"26'11"812'A
B
C D
E
F G
HIJKL
5
12
3X5(B1)
6X8
1.5X4 5X6
6X6
8X8
3X4
4X7
3X5
1.5X4
7X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x6 SP M-26; B2 2x6 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2700f-2.2E;
W6 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 2.27
TC: From 36 plf at 2.27 to 36 plf at 5.94
TC: From 73 plf at 5.94 to 73 plf at 22.92
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.30
BC: From 10 plf at 2.30 to 10 plf at 5.94
BC: From 20 plf at 5.94 to 20 plf at 22.92
TC: 16 lb Conc. Load at 2.30
TC: 27 lb Conc. Load at 4.33
TC: 80 lb Conc. Load at 5.94
BC: 49 lb Conc. Load at 2.30
BC: 41 lb Conc. Load at 4.33
BC: 43 lb Conc. Load at 5.94
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1297 /-/-/-/513 /-
H 1067 /-/-/-/396 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.1
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 791 -2070
C - D 1617 -4355
Chords Tens.Comp.
D - E 727 -1903
E - F 217 -537
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 1853 -707
L - K 1862 -698
K - J 4489 -1693
Chords Tens.Comp.
J - I 1637 -616
I - H 402 -143
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 2549 -940
K - D 322 -572
D - J 1087 -2860
J - E 808 -194
Webs Tens.Comp.
E - I 559 -1462
F - I 849 -235
F - H 365 -1025
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.194 D 999 360
VERT(CL):0.446 D 612 240
HORZ(LL):-0.069 G - -
HORZ(TL):0.158 G - -
Creep Factor: 2.0
Max TC CSI:0.681
Max BC CSI:0.424
Max W eb CSI:0.908
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T109
Ply: 1
Qty:1
SEQN:13623 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T251
DrwNo:079.20.1313.36434
AK /DF 03/19/2020
T2
B2
W4
W6
22'11"
2'3"4
2'3"4
8'3"4
6'
14'5"
6'1"12
20'3"4
5'10"4
22'11"
2'7"12
2'5"
2'5"
7'11"12
5'6"12
14'1"8
6'1"12
20'3"4
6'1"12
22'11"
2'7"121'8"
7"12 6'7"21'7"26'11"812'A
B
C D
E
F G
HIJKL
5
12
3X5(B1)
6X8
1.5X4 5X6
6X6
8X8
3X4
4X7
3X5
1.5X4
7X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 782 /-/-/558 /242 /223
F 782 /-/-/512 /321 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1081 -1619
B - C 771 -1322
Chords Tens.Comp.
C - D 364 -637
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 1180 -1032
H - G 1175 -1032
Chords Tens.Comp.
G - F 492 -433
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 678 -759
D - G 483 -291
Webs Tens.Comp.
D - F 668 -760
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 B 999 360
VERT(CL):0.115 B 999 240
HORZ(LL):0.022 B - -
HORZ(TL):0.051 B - -
Creep Factor: 2.0
Max TC CSI:0.793
Max BC CSI:0.555
Max W eb CSI:0.630
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T110
Ply: 1
Qty:1
SEQN:13628 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T213
DrwNo:079.20.1313.38400
AK /DF 03/19/2020
16'11"
6'3"6
6'3"6
12'3"4
5'11"14
16'11"
4'7"12
6'1"10
6'1"10
12'3"4
6'1"10
16'11"
4'7"12
7"12 5'9"212'
A
B
C
D E
FGH
5 12
4X6(E5)
3X4
1.5X4
3X4
4X7
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.637'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 782 /-/-/558 /242 /223
F 782 /-/-/512 /321 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1081 -1619
B - C 771 -1322
Chords Tens.Comp.
C - D 364 -637
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 1180 -1032
H - G 1175 -1032
Chords Tens.Comp.
G - F 492 -433
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 678 -759
D - G 483 -291
Webs Tens.Comp.
D - F 668 -760
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 B 999 360
VERT(CL):0.115 B 999 240
HORZ(LL):0.022 B - -
HORZ(TL):0.051 B - -
Creep Factor: 2.0
Max TC CSI:0.793
Max BC CSI:0.555
Max W eb CSI:0.630
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T110
Ply: 1
Qty:1
SEQN:13628 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T213
DrwNo:079.20.1313.38400
AK /DF 03/19/2020
16'11"
6'3"6
6'3"6
12'3"4
5'11"14
16'11"
4'7"12
6'1"10
6'1"10
12'3"4
6'1"10
16'11"
4'7"12
7"12 5'9"212'
A
B
C
D E
FGH
5 12
4X6(E5)
3X4
1.5X4
3X4
4X7
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 947 /-/-/683 /308 /215
G 775 /-/-/483 /305 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 824 -1395
C - D 833 -1307
Chords Tens.Comp.
D - E 846 -1179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 1156 -1033
M - L 1032 -878
Chords Tens.Comp.
L - I 1053 -902
I - H 1047 -883
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - M 1159 -1028
E - M 519 -298
Webs Tens.Comp.
E - H 997 -1151
H - G 606 -771
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.046 L 999 360
VERT(CL):0.080 M 999 240
HORZ(LL):0.016 G - -
HORZ(TL):0.038 G - -
Creep Factor: 2.0
Max TC CSI:0.658
Max BC CSI:0.429
Max W eb CSI:0.537
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T111
Ply: 1
Qty:1
SEQN:13633 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T221
DrwNo:079.20.1313.33892
AK /DF 03/19/2020
W5
16'11"
5'3"6
5'3"6
10'3"4
4'11"14
16'11"
6'7"12
5'3"6
5'3"6
10'5"
5'1"10
14'4"
3'11"
15'9"12
1'5"12
16'7"8
9"12
16'11"
3"8
1'8"
7"12 4'11"21'4"5'3"812'A
B
C
D
E F
G
HI
JKLMNO
5 12
4X6(E5)
3X4
3X4
4X4
5X8
5X8 4X41.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 947 /-/-/683 /308 /215
G 775 /-/-/483 /305 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 824 -1395
C - D 833 -1307
Chords Tens.Comp.
D - E 846 -1179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 1156 -1033
M - L 1032 -878
Chords Tens.Comp.
L - I 1053 -902
I - H 1047 -883
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - M 1159 -1028
E - M 519 -298
Webs Tens.Comp.
E - H 997 -1151
H - G 606 -771
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.046 L 999 360
VERT(CL):0.080 M 999 240
HORZ(LL):0.016 G - -
HORZ(TL):0.038 G - -
Creep Factor: 2.0
Max TC CSI:0.658
Max BC CSI:0.429
Max W eb CSI:0.537
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T111
Ply: 1
Qty:1
SEQN:13633 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T221
DrwNo:079.20.1313.33892
AK /DF 03/19/2020
W5
16'11"
5'3"6
5'3"6
10'3"4
4'11"14
16'11"
6'7"12
5'3"6
5'3"6
10'5"
5'1"10
14'4"
3'11"
15'9"12
1'5"12
16'7"8
9"12
16'11"
3"8
1'8"
7"12 4'11"21'4"5'3"812'A
B
C
D
E F
G
HI
JKLMNO
5 12
4X6(E5)
3X4
3X4
4X4
5X8
5X8 4X41.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 947 /-/-/669 /318 /179
H 775 /-/-/464 /297 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1131 -1488
C - D 954 -1324
Chords Tens.Comp.
D - E 710 -1043
E - F 741 -912
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1183 -1099
Chords Tens.Comp.
I - H 665 -515
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 394 -302
I - F 378 -305
Webs Tens.Comp.
F - H 681 -871
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 D 999 360
VERT(CL):0.057 D 999 240
HORZ(LL):0.011 H - -
HORZ(TL):0.024 H - -
Creep Factor: 2.0
Max TC CSI:0.373
Max BC CSI:0.865
Max W eb CSI:0.485
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T112
Ply: 1
Qty:1
SEQN:13636 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T207
DrwNo:079.20.1313.31630
AK /DF 03/19/2020
16'11"
4'1"10
4'1"10
8'3"4
4'1"10
12'7"2
4'3"14
16'11"
4'3"14
8'5"
8'5"
16'11"
8'6"1'8"
7"12 4'1"24'5"812'A
B
C
D
E F G
HI
5
12
4X6(E5)
3X4
1.5X4
4X4
3X8
3X4 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 947 /-/-/669 /318 /179
H 775 /-/-/464 /297 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1131 -1488
C - D 954 -1324
Chords Tens.Comp.
D - E 710 -1043
E - F 741 -912
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1183 -1099
Chords Tens.Comp.
I - H 665 -515
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 394 -302
I - F 378 -305
Webs Tens.Comp.
F - H 681 -871
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 D 999 360
VERT(CL):0.057 D 999 240
HORZ(LL):0.011 H - -
HORZ(TL):0.024 H - -
Creep Factor: 2.0
Max TC CSI:0.373
Max BC CSI:0.865
Max W eb CSI:0.485
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T112
Ply: 1
Qty:1
SEQN:13636 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T207
DrwNo:079.20.1313.31630
AK /DF 03/19/2020
16'11"
4'1"10
4'1"10
8'3"4
4'1"10
12'7"2
4'3"14
16'11"
4'3"14
8'5"
8'5"
16'11"
8'6"1'8"
7"12 4'1"24'5"812'A
B
C
D
E F G
HI
5
12
4X6(E5)
3X4
1.5X4
4X4
3X8
3X4 1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.27
TC: From 36 plf at 6.27 to 36 plf at 16.92
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.30
BC: From 10 plf at 6.30 to 10 plf at 16.92
TC: 460 lb Conc. Load at 6.30
TC: 200 lb Conc. Load at 8.33,10.33,12.33,14.33
TC: 217 lb Conc. Load at 16.33
BC: 403 lb Conc. Load at 6.30
BC: 117 lb Conc. Load at 8.33,10.33,12.33,14.33
BC: 120 lb Conc. Load at 16.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1764 /-/-/-/671 /-
G 1935 /-/-/-/731 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.8
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1213 -3191
C - D 1184 -3144
Chords Tens.Comp.
D - E 955 -2532
E - F 955 -2531
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2829 -1054
Chords Tens.Comp.
I - H 2854 -1054
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 530 0
E - H 474 -822
Webs Tens.Comp.
H - F 2870 -1083
F - G 727 -1752
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.065 I 999 360
VERT(CL):0.149 I 999 240
HORZ(LL):-0.019 C - -
HORZ(TL):0.040 C - -
Creep Factor: 2.0
Max TC CSI:0.538
Max BC CSI:0.488
Max W eb CSI:0.648
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T113
Ply: 1
Qty:1
SEQN:13639 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T198
DrwNo:079.20.1313.40335
AK /DF 03/19/2020
T2
16'11"
6'3"4
6'3"4
11'7"2
5'3"14
16'11"
5'3"14
6'5"
6'5"
11'7"2
5'2"2
16'11"
5'3"141'8"
7"12 3'3"23'7"812'A
B
C
D E F
GHI
5
12
5X6(E1)
3X4
5X8
1.5X4
1.5X4
5X12
5X8
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.27
TC: From 36 plf at 6.27 to 36 plf at 16.92
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.30
BC: From 10 plf at 6.30 to 10 plf at 16.92
TC: 460 lb Conc. Load at 6.30
TC: 200 lb Conc. Load at 8.33,10.33,12.33,14.33
TC: 217 lb Conc. Load at 16.33
BC: 403 lb Conc. Load at 6.30
BC: 117 lb Conc. Load at 8.33,10.33,12.33,14.33
BC: 120 lb Conc. Load at 16.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1764 /-/-/-/671 /-
G 1935 /-/-/-/731 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.8
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1213 -3191
C - D 1184 -3144
Chords Tens.Comp.
D - E 955 -2532
E - F 955 -2531
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2829 -1054
Chords Tens.Comp.
I - H 2854 -1054
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 530 0
E - H 474 -822
Webs Tens.Comp.
H - F 2870 -1083
F - G 727 -1752
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.065 I 999 360
VERT(CL):0.149 I 999 240
HORZ(LL):-0.019 C - -
HORZ(TL):0.040 C - -
Creep Factor: 2.0
Max TC CSI:0.538
Max BC CSI:0.488
Max W eb CSI:0.648
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T113
Ply: 1
Qty:1
SEQN:13639 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T198
DrwNo:079.20.1313.40335
AK /DF 03/19/2020
T2
16'11"
6'3"4
6'3"4
11'7"2
5'3"14
16'11"
5'3"14
6'5"
6'5"
11'7"2
5'2"2
16'11"
5'3"141'8"
7"12 3'3"23'7"812'A
B
C
D E F
GHI
5
12
5X6(E1)
3X4
5X8
1.5X4
1.5X4
5X12
5X8
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 190 /-/-/116 /49 /45
D 190 /-/-/136 /84 /-
Wind reactions based on MWFRS
E Brg Width = 6.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 B 999 360
VERT(CL):0.002 B 999 240
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.214
Max BC CSI:0.198
Max W eb CSI:0.060
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T114
Ply: 1
Qty:1
SEQN:13567 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T201
DrwNo:079.20.1313.35592
AK /DF 03/19/2020
4'1"4
1'6"8
1'6"8
4'1"4
2'6"12
4'1"4
4'1"41'4"52'5"212'
A B
C
DE
5
12
1.5X4
5X5
5X5
1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 190 /-/-/116 /49 /45
D 190 /-/-/136 /84 /-
Wind reactions based on MWFRS
E Brg Width = 6.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.001 B 999 360
VERT(CL):0.002 B 999 240
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.214
Max BC CSI:0.198
Max W eb CSI:0.060
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T114
Ply: 1
Qty:1
SEQN:13567 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T201
DrwNo:079.20.1313.35592
AK /DF 03/19/2020
4'1"4
1'6"8
1'6"8
4'1"4
2'6"12
4'1"4
4'1"41'4"52'5"212'
A B
C
DE
5
12
1.5X4
5X5
5X5
1.5X4
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 4.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 73 plf at 9.33
BC: From 10 plf at 0.00 to 10 plf at 5.00
BC: From 20 plf at 5.00 to 20 plf at 9.33
BC: 1060 lb Conc. Load at 1.00, 3.00
BC: 1239 lb Conc. Load at 5.00
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2653 /-/-/-/979 /-
E 1518 /-/-/-/570 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.3
E Brg Width = 8.0 Min Req =1.5
Bearings A & C Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 554 -1459
Chords Tens.Comp.
B - C 556 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 1313 -492
Chords Tens.Comp.
D - C 1313 -492
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 979 -328
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 D 999 360
VERT(CL):0.053 D 999 240
HORZ(LL):0.008 D - -
HORZ(TL):0.018 D - -
Creep Factor: 2.0
Max TC CSI:0.333
Max BC CSI:0.843
Max W eb CSI:0.221
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T115
Ply: 2
Qty:1
SEQN:13585 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T260
DrwNo:079.20.1313.39554
AK /DF 03/19/2020
2 Complete Trusses Required
9'4"
4'8"
4'8"
9'4"
4'8"
4'8"
4'8"
9'4"
4'8"
7"122'7"112'
A
B
C
D E
5
12
3X4(B1)
4X4
3X8
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 4.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at 0.00 to 73 plf at 9.33
BC: From 10 plf at 0.00 to 10 plf at 5.00
BC: From 20 plf at 5.00 to 20 plf at 9.33
BC: 1060 lb Conc. Load at 1.00, 3.00
BC: 1239 lb Conc. Load at 5.00
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2653 /-/-/-/979 /-
E 1518 /-/-/-/570 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =2.3
E Brg Width = 8.0 Min Req =1.5
Bearings A & C Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 554 -1459
Chords Tens.Comp.
B - C 556 -1465
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 1313 -492
Chords Tens.Comp.
D - C 1313 -492
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 979 -328
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.024 D 999 360
VERT(CL):0.053 D 999 240
HORZ(LL):0.008 D - -
HORZ(TL):0.018 D - -
Creep Factor: 2.0
Max TC CSI:0.333
Max BC CSI:0.843
Max W eb CSI:0.221
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T115
Ply: 2
Qty:1
SEQN:13585 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T260
DrwNo:079.20.1313.39554
AK /DF 03/19/2020
2 Complete Trusses Required
9'4"
4'8"
4'8"
9'4"
4'8"
4'8"
4'8"
9'4"
4'8"
7"122'7"112'
A
B
C
D E
5
12
3X4(B1)
4X4
3X8
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x4 SP #2;
Webs: 2x4 SP #2; W3,W8 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 3.60
TC: From 36 plf at 3.60 to 36 plf at 5.73
TC: From 73 plf at 5.73 to 73 plf at 11.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.46
BC: From 10 plf at 2.46 to 10 plf at 6.87
BC: From 20 plf at 6.87 to 20 plf at 9.33
BC: From 22 plf at 9.33 to 22 plf at 11.00
TC: 262 lb Conc. Load at 3.91, 5.43
BC: 61 lb Conc. Load at 3.91, 5.43
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 851 /-/-/-/354 /-
S 851 /-/-/-/354 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
S Brg Width = 8.0 Min Req =1.5
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 794 -1888
D - E 735 -1778
E - F 692 -1691
Chords Tens.Comp.
F - G 742 -1801
G - H 799 -1903
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 1743 -727
Q - O 1749 -730
O - N 1673 -688
Chords Tens.Comp.
N - L 1762 -734
L - H 1757 -732
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 241 -541
Webs Tens.Comp.
K - H 243 -550
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 P 999 360
VERT(CL):0.134 P 812 240
HORZ(LL):0.047 K - -
HORZ(TL):0.107 K - -
Creep Factor: 2.0
Max TC CSI:0.388
Max BC CSI:0.828
Max W eb CSI:0.061
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T116
Ply: 1
Qty:1
SEQN:13909 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T130
DrwNo:079.20.1313.37417
AK /DF 03/19/2020
B2W3 W8
9'4"
1'4"4
11"8
(TYP)
4'8"8
2'5"8
2'5"8
3'7"4
1'1"12
5'8"12
2'1"8
6'10"8
1'1"12
9'4"
2'5"8
1'2"8
1'2"8
2'5"8
1'3"
3'9"
1'3"8
5'8"12
1'11"12
7'0"4
1'3"8
8'1"8
1'1"4
9'4"
1'2"81'8"
1'8"
7"1210"2'1"122'6"212'A
B
C
D
E F
G
H
I
J
KLMNO
PQR S
5
12
2X5(B1)
3X12
3X8(**)
5X5
3X8
4X7
3X4
3X8(**)
3X12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x4 SP #2;
Webs: 2x4 SP #2; W3,W8 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 3.60
TC: From 36 plf at 3.60 to 36 plf at 5.73
TC: From 73 plf at 5.73 to 73 plf at 11.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.46
BC: From 10 plf at 2.46 to 10 plf at 6.87
BC: From 20 plf at 6.87 to 20 plf at 9.33
BC: From 22 plf at 9.33 to 22 plf at 11.00
TC: 262 lb Conc. Load at 3.91, 5.43
BC: 61 lb Conc. Load at 3.91, 5.43
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 851 /-/-/-/354 /-
S 851 /-/-/-/354 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
S Brg Width = 8.0 Min Req =1.5
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 794 -1888
D - E 735 -1778
E - F 692 -1691
Chords Tens.Comp.
F - G 742 -1801
G - H 799 -1903
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 1743 -727
Q - O 1749 -730
O - N 1673 -688
Chords Tens.Comp.
N - L 1762 -734
L - H 1757 -732
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 241 -541
Webs Tens.Comp.
K - H 243 -550
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 P 999 360
VERT(CL):0.134 P 812 240
HORZ(LL):0.047 K - -
HORZ(TL):0.107 K - -
Creep Factor: 2.0
Max TC CSI:0.388
Max BC CSI:0.828
Max W eb CSI:0.061
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T116
Ply: 1
Qty:1
SEQN:13909 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T130
DrwNo:079.20.1313.37417
AK /DF 03/19/2020
B2W3 W8
9'4"
1'4"4
11"8
(TYP)
4'8"8
2'5"8
2'5"8
3'7"4
1'1"12
5'8"12
2'1"8
6'10"8
1'1"12
9'4"
2'5"8
1'2"8
1'2"8
2'5"8
1'3"
3'9"
1'3"8
5'8"12
1'11"12
7'0"4
1'3"8
8'1"8
1'1"4
9'4"
1'2"81'8"
1'8"
7"1210"2'1"122'6"212'A
B
C
D
E F
G
H
I
J
KLMNO
PQR S
5
12
2X5(B1)
3X12
3X8(**)
5X5
3X8
4X7
3X4
3X8(**)
3X12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.911'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 7.00
TC: From 36 plf at 7.00 to 36 plf at 15.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.03
BC: From 10 plf at 7.03 to 10 plf at 15.00
TC: 543 lb Conc. Load at 7.03
TC: 227 lb Conc. Load at 9.06,11.06,13.06,14.60
BC: 510 lb Conc. Load at 7.03
BC: 131 lb Conc. Load at 9.06,11.06,13.06,14.60
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1612 /-/-/606 /611 /156
G 2050 /-/-/408 /771 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.6
G Brg Width = 4.0 Min Req =3.3
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1334 -2801
C - D 1032 -2749
Chords Tens.Comp.
D - E 693 -1848
E - F 693 -1847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2467 -913
Chords Tens.Comp.
I - H 2494 -914
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 642 -24
D - H 385 -836
E - H 375 -657
Webs Tens.Comp.
H - F 2364 -886
F - G 764 -1854
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.083 C 999 360
VERT(CL):0.180 C 999 240
HORZ(LL):-0.036 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.914
Max BC CSI:0.915
Max W eb CSI:0.534
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T117
Ply: 1
Qty:1
SEQN:14029 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T149
DrwNo:079.20.1313.29383
AK /DF 03/19/2020
15'
7'
7'
11'
4'
15'
4'
7'1"12
7'1"12
11'
3'10"4
15'
4'1'8"
7"12 3'6"123'11"212'A
B
C
D E F
GHI
5
12
5X6(E1)
3X4
5X8
2X4
1.5X4
5X10
5X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.911'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 7.00
TC: From 36 plf at 7.00 to 36 plf at 15.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 7.03
BC: From 10 plf at 7.03 to 10 plf at 15.00
TC: 543 lb Conc. Load at 7.03
TC: 227 lb Conc. Load at 9.06,11.06,13.06,14.60
BC: 510 lb Conc. Load at 7.03
BC: 131 lb Conc. Load at 9.06,11.06,13.06,14.60
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1612 /-/-/606 /611 /156
G 2050 /-/-/408 /771 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.6
G Brg Width = 4.0 Min Req =3.3
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1334 -2801
C - D 1032 -2749
Chords Tens.Comp.
D - E 693 -1848
E - F 693 -1847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2467 -913
Chords Tens.Comp.
I - H 2494 -914
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - I 642 -24
D - H 385 -836
E - H 375 -657
Webs Tens.Comp.
H - F 2364 -886
F - G 764 -1854
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.083 C 999 360
VERT(CL):0.180 C 999 240
HORZ(LL):-0.036 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.914
Max BC CSI:0.915
Max W eb CSI:0.534
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T117
Ply: 1
Qty:1
SEQN:14029 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T149
DrwNo:079.20.1313.29383
AK /DF 03/19/2020
15'
7'
7'
11'
4'
15'
4'
7'1"12
7'1"12
11'
3'10"4
15'
4'1'8"
7"12 3'6"123'11"212'A
B
C
D E F
GHI
5
12
5X6(E1)
3X4
5X8
2X4
1.5X4
5X10
5X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 859 /-/-/617 /283 /182
G 685 /-/-/420 /267 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = 4.0 Min Req =1.5
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1109 -1346
C - D 860 -1127
Chords Tens.Comp.
D - E 569 -807
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1008 -1029
Chords Tens.Comp.
H - G 681 -605
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 472 -362
E - H 413 -188
Webs Tens.Comp.
E - G 680 -762
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 D 999 360
VERT(CL):0.048 D 999 240
HORZ(LL):0.009 G - -
HORZ(TL):0.020 G - -
Creep Factor: 2.0
Max TC CSI:0.889
Max BC CSI:0.727
Max W eb CSI:0.709
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T118
Ply: 1
Qty:1
SEQN:12848 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T367
DrwNo:079.20.1313.36266
AK /DF 03/19/2020
15'
4'2"8
4'2"8
8'5"
4'2"8
15'
6'7"
8'5"
8'5"
15'
6'7"1'8"
7"12 4'1"134'6"312'A
B
C
D
E F
GH
5
12
4X6(E5)
3X4
1.5X4
4X7
3X4
2X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 859 /-/-/617 /283 /182
G 685 /-/-/420 /267 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = 4.0 Min Req =1.5
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1109 -1346
C - D 860 -1127
Chords Tens.Comp.
D - E 569 -807
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1008 -1029
Chords Tens.Comp.
H - G 681 -605
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - H 472 -362
E - H 413 -188
Webs Tens.Comp.
E - G 680 -762
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.021 D 999 360
VERT(CL):0.048 D 999 240
HORZ(LL):0.009 G - -
HORZ(TL):0.020 G - -
Creep Factor: 2.0
Max TC CSI:0.889
Max BC CSI:0.727
Max W eb CSI:0.709
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T118
Ply: 1
Qty:1
SEQN:12848 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T367
DrwNo:079.20.1313.36266
AK /DF 03/19/2020
15'
4'2"8
4'2"8
8'5"
4'2"8
15'
6'7"
8'5"
8'5"
15'
6'7"1'8"
7"12 4'1"134'6"312'A
B
C
D
E F
GH
5
12
4X6(E5)
3X4
1.5X4
4X7
3X4
2X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.555'
Rt Slider: 2x4 SP #2; block length = 1.559'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1449 /-/-/940 /513 /193
N 1283 /-/-/806 /454 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.3
N Brg Width = 6.0 Min Req =2.0
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1689 -2480
C - D 1700 -2437
D - E 1419 -1920
E - F 1388 -1695
Chords Tens.Comp.
F - G 1399 -1910
G - H 1700 -2410
H - I 1873 -2476
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2187 -1474
M - L 2183 -1474
L - K 1694 -1036
Chords Tens.Comp.
K - J 2158 -1433
J - I 2162 -1432
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 488 -544
E - L 386 -218
Webs Tens.Comp.
K - F 382 -285
K - G 507 -523
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 L 999 360
VERT(CL):0.214 L 999 240
HORZ(LL):0.037 J - -
HORZ(TL):0.086 J - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.653
Max W eb CSI:0.454
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T119
Ply: 1
Qty:1
SEQN:12852 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T341
DrwNo:079.20.1313.40835
AK /DF 03/19/2020
27'10"
5'11"12
5'11"12
11'8"
5'8"4
16'4"
4'8"
22'0"4
5'8"4
27'10"
5'9"12
5'10"
5'10"
11'8"
5'10"
16'2"4
4'6"4
22'2"
5'11"12
27'10"
5'8"1'8"
7"12 8"95'6"15'10"712'A
B
C
D
E F
G
H
I
JKLM N
5 12
5X5(E1)
3X4
1.5X4
3X4
4X7
5X5 3X8
4X5
3X4
1.5X4
3X4
4X7(E5)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.555'
Rt Slider: 2x4 SP #2; block length = 1.559'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1449 /-/-/940 /513 /193
N 1283 /-/-/806 /454 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.3
N Brg Width = 6.0 Min Req =2.0
Bearings B & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1689 -2480
C - D 1700 -2437
D - E 1419 -1920
E - F 1388 -1695
Chords Tens.Comp.
F - G 1399 -1910
G - H 1700 -2410
H - I 1873 -2476
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 2187 -1474
M - L 2183 -1474
L - K 1694 -1036
Chords Tens.Comp.
K - J 2158 -1433
J - I 2162 -1432
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - L 488 -544
E - L 386 -218
Webs Tens.Comp.
K - F 382 -285
K - G 507 -523
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 L 999 360
VERT(CL):0.214 L 999 240
HORZ(LL):0.037 J - -
HORZ(TL):0.086 J - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.653
Max W eb CSI:0.454
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T119
Ply: 1
Qty:1
SEQN:12852 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T341
DrwNo:079.20.1313.40835
AK /DF 03/19/2020
27'10"
5'11"12
5'11"12
11'8"
5'8"4
16'4"
4'8"
22'0"4
5'8"4
27'10"
5'9"12
5'10"
5'10"
11'8"
5'10"
16'2"4
4'6"4
22'2"
5'11"12
27'10"
5'8"1'8"
7"12 8"95'6"15'10"712'A
B
C
D
E F
G
H
I
JKLM N
5 12
5X5(E1)
3X4
1.5X4
3X4
4X7
5X5 3X8
4X5
3X4
1.5X4
3X4
4X7(E5)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1452 /-/-/939 /513 /206
P 1452 /-/-/940 /512 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.3
P Brg Width = 8.0 Min Req =2.3
Bearings B & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1727 -2475
C - D 1734 -2434
D - E 1555 -2112
E - F 1630 -2050
Chords Tens.Comp.
F - G 1792 -2265
G - H 1917 -2439
H - I 1773 -2457
I - J 1764 -2499
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2184 -1463
O - N 2180 -1464
N - M 1894 -1159
Chords Tens.Comp.
M - L 1755 -1100
L - J 2206 -1494
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - F 820 -1089
M - G 1153 -831
Webs Tens.Comp.
G - L 577 -495
L - H 392 -317
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.111 F 999 360
VERT(CL):0.257 F 999 240
HORZ(LL):0.035 L - -
HORZ(TL):0.082 L - -
Creep Factor: 2.0
Max TC CSI:0.589
Max BC CSI:0.693
Max W eb CSI:0.470
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T120
Ply: 1
Qty:1
SEQN:12856 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T340
DrwNo:079.20.1313.41225
AK /DF 03/19/2020
28'
4'11"12
4'11"12
9'8"
4'8"4
15'8"
6'
17'
1'4"
22'6"
5'6"
28'
5'6"
4'10"
4'10"
9'8"
4'10"
15'6"4
5'10"4
22'4"4
6'10"
28'
5'7"121'8"1'8"
7"124'8"15'2"125'7"212'A
B
C
D
E F
G
H
I
J
K
LMNO P
5
12
5X5(E1)
3X4
1.5X4
3X4
4X8
3X4 6X8
5X5
5X5
3X4
1.5X4
3X4
5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1452 /-/-/939 /513 /206
P 1452 /-/-/940 /512 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.3
P Brg Width = 8.0 Min Req =2.3
Bearings B & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1727 -2475
C - D 1734 -2434
D - E 1555 -2112
E - F 1630 -2050
Chords Tens.Comp.
F - G 1792 -2265
G - H 1917 -2439
H - I 1773 -2457
I - J 1764 -2499
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2184 -1463
O - N 2180 -1464
N - M 1894 -1159
Chords Tens.Comp.
M - L 1755 -1100
L - J 2206 -1494
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - F 820 -1089
M - G 1153 -831
Webs Tens.Comp.
G - L 577 -495
L - H 392 -317
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.111 F 999 360
VERT(CL):0.257 F 999 240
HORZ(LL):0.035 L - -
HORZ(TL):0.082 L - -
Creep Factor: 2.0
Max TC CSI:0.589
Max BC CSI:0.693
Max W eb CSI:0.470
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T120
Ply: 1
Qty:1
SEQN:12856 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T340
DrwNo:079.20.1313.41225
AK /DF 03/19/2020
28'
4'11"12
4'11"12
9'8"
4'8"4
15'8"
6'
17'
1'4"
22'6"
5'6"
28'
5'6"
4'10"
4'10"
9'8"
4'10"
15'6"4
5'10"4
22'4"4
6'10"
28'
5'7"121'8"1'8"
7"124'8"15'2"125'7"212'A
B
C
D
E F
G
H
I
J
K
LMNO P
5
12
5X5(E1)
3X4
1.5X4
3X4
4X8
3X4 6X8
5X5
5X5
3X4
1.5X4
3X4
5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B*245 /-/-/158 /86 /31
P 1268 /-/-/822 /452 /-
Wind reactions based on MWFRS
B Brg Width = 80.0 Min Req =-
P Brg Width = 8.0 Min Req =2.0
Bearings B & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1069 -1343
C - D 1048 -1223
D - E 874 -1038
E - F 1557 -1800
Chords Tens.Comp.
F - G 1371 -1504
G - H 1341 -1537
H - I 1598 -2033
I - J 1588 -2074
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2165 -1752
O - N 922 -610
N - M 1831 -1325
Chords Tens.Comp.
M - L 1814 -1333
L - J 1818 -1332
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - O 440 -565
E - N 1034 -870
N - F 398 -376
Webs Tens.Comp.
F - M 638 -709
G - M 817 -624
M - H 451 -523
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 F 999 360
VERT(CL):0.194 F 999 240
HORZ(LL):0.023 L - -
HORZ(TL):0.053 L - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.608
Max W eb CSI:0.663
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T121
Ply: 1
Qty:1
SEQN:12860 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T266
DrwNo:079.20.1313.33595
AK /DF 03/19/2020
B2
28'
3'10"
3'10"
7'8"
3'10"
13'8"
6'
17'
3'4"
22'4"4
5'4"4
28'
5'7"12
7'8"
7'8"
13'4"8
5'8"8
17'
3'7"8
22'6"
5'6"
28'
5'6"1'8"1'8"
7"123'10"15'2"125'7"212'A
B
C
D
E F
G
H
I
J
K
LMNO P
5
12
4X6(E5)
1.5X4
4X7
5X5
5X5
4X4
3X8 1.5X4 5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B*245 /-/-/158 /86 /31
P 1268 /-/-/822 /452 /-
Wind reactions based on MWFRS
B Brg Width = 80.0 Min Req =-
P Brg Width = 8.0 Min Req =2.0
Bearings B & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1069 -1343
C - D 1048 -1223
D - E 874 -1038
E - F 1557 -1800
Chords Tens.Comp.
F - G 1371 -1504
G - H 1341 -1537
H - I 1598 -2033
I - J 1588 -2074
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2165 -1752
O - N 922 -610
N - M 1831 -1325
Chords Tens.Comp.
M - L 1814 -1333
L - J 1818 -1332
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - O 440 -565
E - N 1034 -870
N - F 398 -376
Webs Tens.Comp.
F - M 638 -709
G - M 817 -624
M - H 451 -523
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 F 999 360
VERT(CL):0.194 F 999 240
HORZ(LL):0.023 L - -
HORZ(TL):0.053 L - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.608
Max W eb CSI:0.663
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T121
Ply: 1
Qty:1
SEQN:12860 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T266
DrwNo:079.20.1313.33595
AK /DF 03/19/2020
B2
28'
3'10"
3'10"
7'8"
3'10"
13'8"
6'
17'
3'4"
22'4"4
5'4"4
28'
5'7"12
7'8"
7'8"
13'4"8
5'8"8
17'
3'7"8
22'6"
5'6"
28'
5'6"1'8"1'8"
7"123'10"15'2"125'7"212'A
B
C
D
E F
G
H
I
J
K
LMNO P
5
12
4X6(E5)
1.5X4
4X7
5X5
5X5
4X4
3X8 1.5X4 5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.550'
Rt Slider: 2x4 SP #2; block length = 1.500'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 73 plf at 29.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 28.00
BC: From 22 plf at 28.00 to 22 plf at 29.67
TC: 212 lb Conc. Load at 5.67
BC: 232 lb Conc. Load at 5.67
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 306 /-64 /-/-/88 /-
N 2141 /-/-/-/755 /-
O 1057 /-/-/-/405 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
N Brg Width = 8.0 Min Req =3.4
O Brg Width = 8.0 Min Req =1.7
Bearings B, N, & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 937 -546
C - D 815 -280
D - E 868 -304
E - F 400 -1033
Chords Tens.Comp.
F - G 408 -1047
G - H 576 -1546
H - I 601 -1615
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 196 -681
N - M 828 -314
M - L 825 -317
Chords Tens.Comp.
L - K 1369 -505
K - I 1374 -503
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 458 -912
N - E 693 -1882
Webs Tens.Comp.
F - L 386 -23
L - G 189 -527
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 C 999 360
VERT(CL):0.112 C 679 240
HORZ(LL):0.024 C - -
HORZ(TL):0.056 C - -
Creep Factor: 2.0
Max TC CSI:0.782
Max BC CSI:0.709
Max W eb CSI:0.613
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T122
Ply: 1
Qty:1
SEQN:12866 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T263
DrwNo:079.20.1313.42707
AK /DF 03/19/2020
T2
W2
6'4"21'8"
5'8"
5'8"
11'8"
6'
17'
5'4"
22'4"4
5'4"4
28'
5'7"12
6'4"
6'4"
11'6"4
5'2"4
17'
5'5"12
22'6"
5'6"
28'
5'6"1'8"1'8"
7"123'0"15'2"125'7"212'A
B
C
D E
F
G
H
I
J
KLMN O
5
12
4X6(E5)
3X4
5X5
3X5 5X5
5X12
4X4
3X8
3X4
1.5X4
3X4
5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E;
Lt Slider: 2x4 SP #2; block length = 1.550'
Rt Slider: 2x4 SP #2; block length = 1.500'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 73 plf at 29.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 28.00
BC: From 22 plf at 28.00 to 22 plf at 29.67
TC: 212 lb Conc. Load at 5.67
BC: 232 lb Conc. Load at 5.67
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 306 /-64 /-/-/88 /-
N 2141 /-/-/-/755 /-
O 1057 /-/-/-/405 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
N Brg Width = 8.0 Min Req =3.4
O Brg Width = 8.0 Min Req =1.7
Bearings B, N, & O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 937 -546
C - D 815 -280
D - E 868 -304
E - F 400 -1033
Chords Tens.Comp.
F - G 408 -1047
G - H 576 -1546
H - I 601 -1615
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 196 -681
N - M 828 -314
M - L 825 -317
Chords Tens.Comp.
L - K 1369 -505
K - I 1374 -503
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 458 -912
N - E 693 -1882
Webs Tens.Comp.
F - L 386 -23
L - G 189 -527
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 C 999 360
VERT(CL):0.112 C 679 240
HORZ(LL):0.024 C - -
HORZ(TL):0.056 C - -
Creep Factor: 2.0
Max TC CSI:0.782
Max BC CSI:0.709
Max W eb CSI:0.613
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T122
Ply: 1
Qty:1
SEQN:12866 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T263
DrwNo:079.20.1313.42707
AK /DF 03/19/2020
T2
W2
6'4"21'8"
5'8"
5'8"
11'8"
6'
17'
5'4"
22'4"4
5'4"4
28'
5'7"12
6'4"
6'4"
11'6"4
5'2"4
17'
5'5"12
22'6"
5'6"
28'
5'6"1'8"1'8"
7"123'0"15'2"125'7"212'A
B
C
D E
F
G
H
I
J
KLMN O
5
12
4X6(E5)
3X4
5X5
3X5 5X5
5X12
4X4
3X8
3X4
1.5X4
3X4
5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1012 /-/-/582 /364 /158
M 1180 /-/-/775 /412 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req =1.6
M Brg Width = 8.0 Min Req =1.9
Bearings L & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1314 -1621
B - C 1151 -1436
C - D 1162 -1246
Chords Tens.Comp.
D - E 1527 -1832
E - F 1388 -1842
F - G 1379 -1883
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1745 -1279
J - I 1209 -755
Chords Tens.Comp.
I - G 1648 -1147
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 763 -986
A - K 1848 -1501
K - B 754 -805
Webs Tens.Comp.
B - J 535 -522
D - I 561 -493
I - E 382 -316
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 J 999 360
VERT(CL):0.129 J 999 240
HORZ(LL):0.019 I - -
HORZ(TL):0.043 I - -
Creep Factor: 2.0
Max TC CSI:0.654
Max BC CSI:0.706
Max W eb CSI:0.464
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T123
Ply: 1
Qty:1
SEQN:12870 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T342
DrwNo:079.20.1313.41365
AK /DF 03/19/2020
22'
3'8"
3'8"
10'4"
6'8"
11'8"
1'4"
16'10"
5'2"
22'
5'2"
3'4"
3'4"
10'5"12
7'1"12
16'8"4
6'2"8
22'
5'3"12 1'8"2'2"17"124'11"75'3"1312'
A B
C D
E
F
G
H
IJKL M
5
12
3X8
1.5X6 3X8
5X5
4X6
5X8
4X4
3X4
1.5X4
3X4
5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1012 /-/-/582 /364 /158
M 1180 /-/-/775 /412 /-
Wind reactions based on MWFRS
L Brg Width = 8.0 Min Req =1.6
M Brg Width = 8.0 Min Req =1.9
Bearings L & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1314 -1621
B - C 1151 -1436
C - D 1162 -1246
Chords Tens.Comp.
D - E 1527 -1832
E - F 1388 -1842
F - G 1379 -1883
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1745 -1279
J - I 1209 -755
Chords Tens.Comp.
I - G 1648 -1147
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 763 -986
A - K 1848 -1501
K - B 754 -805
Webs Tens.Comp.
B - J 535 -522
D - I 561 -493
I - E 382 -316
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 J 999 360
VERT(CL):0.129 J 999 240
HORZ(LL):0.019 I - -
HORZ(TL):0.043 I - -
Creep Factor: 2.0
Max TC CSI:0.654
Max BC CSI:0.706
Max W eb CSI:0.464
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T123
Ply: 1
Qty:1
SEQN:12870 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T342
DrwNo:079.20.1313.41365
AK /DF 03/19/2020
22'
3'8"
3'8"
10'4"
6'8"
11'8"
1'4"
16'10"
5'2"
22'
5'2"
3'4"
3'4"
10'5"12
7'1"12
16'8"4
6'2"8
22'
5'3"12 1'8"2'2"17"124'11"75'3"1312'
A B
C D
E
F
G
H
IJKL M
5
12
3X8
1.5X6 3X8
5X5
4X6
5X8
4X4
3X4
1.5X4
3X4
5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1012 /-/-/638 /358 /148
L 1180 /-/-/770 /418 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.6
L Brg Width = 8.0 Min Req =1.9
Bearings A & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1758 -2100
B - C 1413 -1878
C - D 1170 -1597
D - E 1182 -1416
Chords Tens.Comp.
E - F 1180 -1578
F - G 1397 -1833
G - H 1631 -2042
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1698 -1150
K - J 1421 -800
Chords Tens.Comp.
J - H 1645 -1162
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 402 -306
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 K 999 360
VERT(CL):0.129 K 999 240
HORZ(LL):0.023 J - -
HORZ(TL):0.053 J - -
Creep Factor: 2.0
Max TC CSI:0.370
Max BC CSI:0.768
Max W eb CSI:0.365
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T124
Ply: 1
Qty:1
SEQN:12874 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T150
DrwNo:079.20.1313.36265
AK /DF 03/19/2020
22'
4'2"
4'2"
8'4"
4'2"
13'8"
5'4"
17'10"
4'2"
22'
4'2"
8'4"
8'4"
13'6"4
5'2"4
22'
8'5"12 1'8"
7"124'1"74'5"1312'
A
B
C
D E
F
G
H
I
JK L
5
12
5X5(E1)
3X4
1.5X4
4X7
3X4 5X8
4X4
1.5X4
3X4
5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1012 /-/-/638 /358 /148
L 1180 /-/-/770 /418 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.6
L Brg Width = 8.0 Min Req =1.9
Bearings A & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1758 -2100
B - C 1413 -1878
C - D 1170 -1597
D - E 1182 -1416
Chords Tens.Comp.
E - F 1180 -1578
F - G 1397 -1833
G - H 1631 -2042
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1698 -1150
K - J 1421 -800
Chords Tens.Comp.
J - H 1645 -1162
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 402 -306
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 K 999 360
VERT(CL):0.129 K 999 240
HORZ(LL):0.023 J - -
HORZ(TL):0.053 J - -
Creep Factor: 2.0
Max TC CSI:0.370
Max BC CSI:0.768
Max W eb CSI:0.365
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T124
Ply: 1
Qty:1
SEQN:12874 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T150
DrwNo:079.20.1313.36265
AK /DF 03/19/2020
22'
4'2"
4'2"
8'4"
4'2"
13'8"
5'4"
17'10"
4'2"
22'
4'2"
8'4"
8'4"
13'6"4
5'2"4
22'
8'5"12 1'8"
7"124'1"74'5"1312'
A
B
C
D E
F
G
H
I
JK L
5
12
5X5(E1)
3X4
1.5X4
4X7
3X4 5X8
4X4
1.5X4
3X4
5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.730'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1012 /-/-/630 /357 /138
L 1180 /-/-/763 /418 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.6
L Brg Width = 8.0 Min Req =1.9
Bearings A & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1693 -1994
B - C 1486 -1895
C - D 1277 -1646
D - E 1335 -1634
Chords Tens.Comp.
E - F 1345 -1633
F - G 1324 -1807
G - H 1487 -1933
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1713 -1209
K - J 1849 -1169
Chords Tens.Comp.
J - H 1613 -1059
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 378 -272
D - K 1106 -821
Webs Tens.Comp.
K - E 741 -937
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.071 E 999 360
VERT(CL):0.165 E 999 240
HORZ(LL):0.024 J - -
HORZ(TL):0.056 J - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.756
Max W eb CSI:0.373
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T125
Ply: 1
Qty:1
SEQN:12878 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T92
DrwNo:079.20.1313.29180
AK /DF 03/19/2020
22'
3'10"
3'10"
7'8"
3'10"
9'
1'4"
15'8"
6'8"
22'
6'4"
7'8"
7'8"
15'4"8
7'8"8
22'
6'7"8 1'8"
7"12 3'3"73'10"14'2"712'
A
B
C
D
E F
G
H
I
JK L
5
12
5X5(E1)
3X4
1.5X4
4X4
5X8
5X5
3X4
4X6
3X4
5X5(E1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Rt Slider: 2x4 SP #2; block length = 1.730'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1012 /-/-/630 /357 /138
L 1180 /-/-/763 /418 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.6
L Brg Width = 8.0 Min Req =1.9
Bearings A & L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1693 -1994
B - C 1486 -1895
C - D 1277 -1646
D - E 1335 -1634
Chords Tens.Comp.
E - F 1345 -1633
F - G 1324 -1807
G - H 1487 -1933
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1713 -1209
K - J 1849 -1169
Chords Tens.Comp.
J - H 1613 -1059
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 378 -272
D - K 1106 -821
Webs Tens.Comp.
K - E 741 -937
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.071 E 999 360
VERT(CL):0.165 E 999 240
HORZ(LL):0.024 J - -
HORZ(TL):0.056 J - -
Creep Factor: 2.0
Max TC CSI:0.563
Max BC CSI:0.756
Max W eb CSI:0.373
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T125
Ply: 1
Qty:1
SEQN:12878 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T92
DrwNo:079.20.1313.29180
AK /DF 03/19/2020
22'
3'10"
3'10"
7'8"
3'10"
9'
1'4"
15'8"
6'8"
22'
6'4"
7'8"
7'8"
15'4"8
7'8"8
22'
6'7"8 1'8"
7"12 3'3"73'10"14'2"712'
A
B
C
D
E F
G
H
I
JK L
5
12
5X5(E1)
3X4
1.5X4
4X4
5X8
5X5
3X4
4X6
3X4
5X5(E1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
T4 2x4 SP 2700f-2.2E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 23.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 22.00
BC: From 22 plf at 22.00 to 22 plf at 23.67
TC: 543 lb Conc. Load at 7.03, 8.30
TC: 128 lb Conc. Load at 16.94
TC: 166 lb Conc. Load at 17.67
BC: 510 lb Conc. Load at 7.03, 8.30
BC: 319 lb Conc. Load at 15.40
BC: 78 lb Conc. Load at 16.94
BC: 56 lb Conc. Load at 17.67
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2735 /-/-/-/1016 /-
P 2466 /-/-/-/917 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.4
P Brg Width = 8.0 Min Req =3.9
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1712 -4670
C - D 1952 -5341
D - E 1795 -4963
E - F 2886 -7926
Chords Tens.Comp.
F - G 2568 -7086
G - H 2239 -6163
H - I 1625 -4423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 4200 -1530
O - N 4232 -1544
N - M 5058 -1869
Chords Tens.Comp.
M - L 6289 -2293
L - K 3971 -1437
K - I 3980 -1450
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 284 -627
C - N 750 -263
D - N 1278 -313
E - M 3395 -1181
Webs Tens.Comp.
F - M 1190 -3145
M - G 965 -333
G - L 386 -905
L - H 2614 -956
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.229 F 999 360
VERT(CL):0.523 F 498 240
HORZ(LL):0.047 D - -
HORZ(TL):0.107 D - -
Creep Factor: 2.0
Max TC CSI:0.877
Max BC CSI:0.623
Max W eb CSI:0.766
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T126
Ply: 1
Qty:1
SEQN:12887 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T230
DrwNo:079.20.1313.28010
AK /DF 03/19/2020
T2
T4
22'
3'7"12
3'7"12
7'
3'4"4
8'4"
1'4"
11'
2'8"
14'2"4
3'2"4
17'8"
3'5"12
22'
4'4"
3'6"
3'6"
7'1"12
3'7"12
11'1"12
4'
14'5"12
3'4"
17'6"4
3'0"8
22'
4'5"121'8"1'8"
7"12 2'5"73'6"123'11"212'A
B
C
D E
F G H
I
J
KLMNO P
5
12
5X8(B3)
1.5X4
3X4
6X6
5X8
7X8
H0610(SRS)
H1010
3X4
5X6 1.5X4
5X10
5X8(B3)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
T4 2x4 SP 2700f-2.2E;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 72 plf at -1.67 to 72 plf at 23.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 22.00
BC: From 22 plf at 22.00 to 22 plf at 23.67
TC: 543 lb Conc. Load at 7.03, 8.30
TC: 128 lb Conc. Load at 16.94
TC: 166 lb Conc. Load at 17.67
BC: 510 lb Conc. Load at 7.03, 8.30
BC: 319 lb Conc. Load at 15.40
BC: 78 lb Conc. Load at 16.94
BC: 56 lb Conc. Load at 17.67
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2735 /-/-/-/1016 /-
P 2466 /-/-/-/917 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =4.4
P Brg Width = 8.0 Min Req =3.9
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1712 -4670
C - D 1952 -5341
D - E 1795 -4963
E - F 2886 -7926
Chords Tens.Comp.
F - G 2568 -7086
G - H 2239 -6163
H - I 1625 -4423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 4200 -1530
O - N 4232 -1544
N - M 5058 -1869
Chords Tens.Comp.
M - L 6289 -2293
L - K 3971 -1437
K - I 3980 -1450
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 284 -627
C - N 750 -263
D - N 1278 -313
E - M 3395 -1181
Webs Tens.Comp.
F - M 1190 -3145
M - G 965 -333
G - L 386 -905
L - H 2614 -956
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.229 F 999 360
VERT(CL):0.523 F 498 240
HORZ(LL):0.047 D - -
HORZ(TL):0.107 D - -
Creep Factor: 2.0
Max TC CSI:0.877
Max BC CSI:0.623
Max W eb CSI:0.766
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T126
Ply: 1
Qty:1
SEQN:12887 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T230
DrwNo:079.20.1313.28010
AK /DF 03/19/2020
T2
T4
22'
3'7"12
3'7"12
7'
3'4"4
8'4"
1'4"
11'
2'8"
14'2"4
3'2"4
17'8"
3'5"12
22'
4'4"
3'6"
3'6"
7'1"12
3'7"12
11'1"12
4'
14'5"12
3'4"
17'6"4
3'0"8
22'
4'5"121'8"1'8"
7"12 2'5"73'6"123'11"212'A
B
C
D E
F G H
I
J
KLMNO P
5
12
5X8(B3)
1.5X4
3X4
6X6
5X8
7X8
H0610(SRS)
H1010
3X4
5X6 1.5X4
5X10
5X8(B3)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.33
BC: From 20 plf at 0.00 to 20 plf at 4.33
BC: 233 lb Conc. Load at 2.40
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 315 /-/-/-/105 /-
C 319 /-/-/-/105 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 C - -
HORZ(TL):0.006 C - -
Creep Factor: 2.0
Max TC CSI:0.335
Max BC CSI:0.369
Max W eb CSI:0.049
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T127
Ply: 1
Qty:1
SEQN:12040 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T254
DrwNo:079.20.1313.41427
AK /DF 03/19/2020
4'4"
4'4"
4'4"
7"12 2'5"712'
A
B
C
5
12
2X5(B1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.33
BC: From 20 plf at 0.00 to 20 plf at 4.33
BC: 233 lb Conc. Load at 2.40
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 315 /-/-/-/105 /-
C 319 /-/-/-/105 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 C - -
HORZ(TL):0.006 C - -
Creep Factor: 2.0
Max TC CSI:0.335
Max BC CSI:0.369
Max W eb CSI:0.049
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T127
Ply: 1
Qty:1
SEQN:12040 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T254
DrwNo:079.20.1313.41427
AK /DF 03/19/2020
4'4"
4'4"
4'4"
7"12 2'5"712'
A
B
C
5
12
2X5(B1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 941 /-/-/678 /486 /338
F 949 /-/-/615 /308 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
F Brg Width = 3.4 Min Req =3.4
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 484 -1005
Chords Tens.Comp.
D - E 578 -924
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - J 485 0
Chords Tens.Comp.
I - H 991 -629
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 897 -1007
B - J 652 -470
J - C 778 -735
J - I 817 -279
Webs Tens.Comp.
I - D 375 -164
D - H 544 -726
H - E 1191 -766
E - F 489 -923
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.89 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 I 999 360
VERT(CL):0.059 I 999 240
HORZ(LL):0.017 A - -
HORZ(TL):0.039 A - -
Creep Factor: 2.0
Max TC CSI:0.787
Max BC CSI:0.721
Max W eb CSI:0.661
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T128
Ply: 1
Qty:1
SEQN:13564 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T217
DrwNo:079.20.1313.33300
AK /DF 03/19/2020
20'6"7
1'11"
1'11"
9'2"
7'3"
16'7"12
7'5"12
20'0"15
3'5"3
20'6"7
5"8
1'11"
1'11"
9'3"6
7'4"6
16'11"4
7'7"14
20'0"15
3'1"11
20'6"7
5"8 1'9'4"52'5"23'5"210'4"5(WB1)
(WB2)
12'
A
B
C
D E
F
GHI
JKLM
512
2X4
6X6
3X4
5X81.5X6
5X5
5X8
5X5
3X5
4X8
3X81.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 941 /-/-/678 /486 /338
F 949 /-/-/615 /308 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
F Brg Width = 3.4 Min Req =3.4
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 484 -1005
Chords Tens.Comp.
D - E 578 -924
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - J 485 0
Chords Tens.Comp.
I - H 991 -629
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 897 -1007
B - J 652 -470
J - C 778 -735
J - I 817 -279
Webs Tens.Comp.
I - D 375 -164
D - H 544 -726
H - E 1191 -766
E - F 489 -923
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 17.89 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 I 999 360
VERT(CL):0.059 I 999 240
HORZ(LL):0.017 A - -
HORZ(TL):0.039 A - -
Creep Factor: 2.0
Max TC CSI:0.787
Max BC CSI:0.721
Max W eb CSI:0.661
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T128
Ply: 1
Qty:1
SEQN:13564 /SPEC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T217
DrwNo:079.20.1313.33300
AK /DF 03/19/2020
20'6"7
1'11"
1'11"
9'2"
7'3"
16'7"12
7'5"12
20'0"15
3'5"3
20'6"7
5"8
1'11"
1'11"
9'3"6
7'4"6
16'11"4
7'7"14
20'0"15
3'1"11
20'6"7
5"8 1'9'4"52'5"23'5"210'4"5(WB1)
(WB2)
12'
A
B
C
D E
F
GHI
JKLM
512
2X4
6X6
3X4
5X81.5X6
5X5
5X8
5X5
3X5
4X8
3X81.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 926 /-/-/659 /481 /299
F 934 /-/-/585 /314 /-
Wind reactions based on MWFRS
M Brg Width = 5.0 Min Req =1.5
F Brg Width = 3.4 Min Req =3.4
Bearing F is a rigid surface.
Bearing M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 424 -881
Chords Tens.Comp.
D - E 573 -967
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - J 438 0
Chords Tens.Comp.
I - H 1010 -605
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 885 -986
B - J 676 -505
J - C 750 -706
J - I 718 -239
Webs Tens.Comp.
I - D 420 -321
D - H 415 -572
H - E 1113 -667
E - F 703 -1137
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 D 999 360
VERT(CL):0.059 D 999 240
HORZ(LL):0.017 A - -
HORZ(TL):0.040 A - -
Creep Factor: 2.0
Max TC CSI:0.651
Max BC CSI:0.590
Max W eb CSI:0.659
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T129
Ply: 1
Qty:1
SEQN:14271 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T376
DrwNo:079.20.1313.28806
AK /DF 03/19/2020
20'2"7
1'7"
1'7"
7'11"4
6'4"4
14'7"
6'7"12
19'8"15
5'1"15
20'2"7
5"8
1'7"
1'7"
8'1"
6'6"
14'10"8
6'9"8
19'8"15
4'10"7
20'2"7
5"8 1'9'2"113'1"124'1"1210'2"11(WB1)
(WB2)
12'
A
B
C
D E
F
GHI
JKLM
512
2X4
6X6
3X4
5X81.5X4
3X4
5X8
5X5
3X5
4X7
3X81.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 926 /-/-/659 /481 /299
F 934 /-/-/585 /314 /-
Wind reactions based on MWFRS
M Brg Width = 5.0 Min Req =1.5
F Brg Width = 3.4 Min Req =3.4
Bearing F is a rigid surface.
Bearing M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 424 -881
Chords Tens.Comp.
D - E 573 -967
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - J 438 0
Chords Tens.Comp.
I - H 1010 -605
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - B 885 -986
B - J 676 -505
J - C 750 -706
J - I 718 -239
Webs Tens.Comp.
I - D 420 -321
D - H 415 -572
H - E 1113 -667
E - F 703 -1137
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 18.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 D 999 360
VERT(CL):0.059 D 999 240
HORZ(LL):0.017 A - -
HORZ(TL):0.040 A - -
Creep Factor: 2.0
Max TC CSI:0.651
Max BC CSI:0.590
Max W eb CSI:0.659
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T129
Ply: 1
Qty:1
SEQN:14271 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T376
DrwNo:079.20.1313.28806
AK /DF 03/19/2020
20'2"7
1'7"
1'7"
7'11"4
6'4"4
14'7"
6'7"12
19'8"15
5'1"15
20'2"7
5"8
1'7"
1'7"
8'1"
6'6"
14'10"8
6'9"8
19'8"15
4'10"7
20'2"7
5"8 1'9'2"113'1"124'1"1210'2"11(WB1)
(WB2)
12'
A
B
C
D E
F
GHI
JKLM
512
2X4
6X6
3X4
5X81.5X4
3X4
5X8
5X5
3X5
4X7
3X81.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 341 /-/-/264 /103 /85
E 99 /-/-/75 /50 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.507
Max BC CSI:0.091
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T130
Ply: 1
Qty:3
SEQN:12154 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T395
DrwNo:079.20.1313.28369
AK /DF 03/19/2020
3'0"12
3'0"12
3'0"121'8"
7"12 1'11"12'3"712'A
B
C
D
E
5
12
4X6(E5)
3X4
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 341 /-/-/264 /103 /85
E 99 /-/-/75 /50 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.507
Max BC CSI:0.091
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T130
Ply: 1
Qty:3
SEQN:12154 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T395
DrwNo:079.20.1313.28369
AK /DF 03/19/2020
3'0"12
3'0"12
3'0"121'8"
7"12 1'11"12'3"712'A
B
C
D
E
5
12
4X6(E5)
3X4
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 142 /-/-/102 /33 /54
D 142 /-/-/106 /65 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 362 -461
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.301
Max BC CSI:0.103
Max W eb CSI:0.107
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T130A
Ply: 1
Qty:1
SEQN:12157 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T394
DrwNo:079.20.1313.27839
AK /DF 03/19/2020
3'0"12
3'0"12
3'0"12
7"12 1'11"112'
A
B
C
D
5
12
4X6(E5)
3X4
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 142 /-/-/102 /33 /54
D 142 /-/-/106 /65 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 362 -461
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.301
Max BC CSI:0.103
Max W eb CSI:0.107
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T130A
Ply: 1
Qty:1
SEQN:12157 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T394
DrwNo:079.20.1313.27839
AK /DF 03/19/2020
3'0"12
3'0"12
3'0"12
7"12 1'11"112'
A
B
C
D
5
12
4X6(E5)
3X4
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 71 plf at -2.48 to 71 plf at 33.81
BC: From 21 plf at -2.48 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 31.33
BC: From 21 plf at 31.33 to 21 plf at 33.81
TC: -14 lb Conc. Load at 2.40,28.93
TC: 96 lb Conc. Load at 5.23,26.11
TC: 199 lb Conc. Load at 8.06
TC: 169 lb Conc. Load at 10.88,20.45
TC: 34 lb Conc. Load at 12.60,18.73
TC: 26 lb Conc. Load at 14.06,18.06
TC: 86 lb Conc. Load at 16.06
TC: 200 lb Conc. Load at 23.28
BC: 20 lb Conc. Load at 2.40,28.93
BC: 64 lb Conc. Load at 5.23,26.11
BC: 35 lb Conc. Load at 8.06
BC: -472 lb Conc. Load at 10.88,20.45
BC: 56 lb Conc. Load at 12.60,18.73
BC: 137 lb Conc. Load at 14.06,18.06
BC: 201 lb Conc. Load at 16.06
BC: 34 lb Conc. Load at 23.28
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 822 /-/-/-/519 /-
S 1330 /-/-/-/1392 /-
N 1382 /-/-/-/1419 /-
U 820 /-/-/-/518 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
S Brg Width = 8.5 Min Req =1.5
N Brg Width = 8.5 Min Req =1.5
U Brg Width = 11.3 Min Req =1.5
Bearings B, S, N, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 253 -490
Chords Tens.Comp.
H - I 251 -487
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 439 -215
T - S 433 -218
Chords Tens.Comp.
L - K 431 -216
K - I 437 -213
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 308 -562
S - R 383 -688
R - D 401 -731
D - P 468 -188
Webs Tens.Comp.
O - G 499 -210
G - M 419 -753
M - L 397 -715
L - H 309 -562
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 Q 999 360
VERT(CL):-0.041 Q 999 240
HORZ(LL):-0.014 N - -
HORZ(TL):0.026 N - -
Creep Factor: 2.0
Max TC CSI:0.416
Max BC CSI:0.432
Max W eb CSI:0.174
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T131
Ply: 2
Qty:1
SEQN:12361 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T107
DrwNo:079.20.1313.41693
AK /DF 03/19/2020
2 Complete Trusses Required
10'8"4 9'11"8 10'8"4
5'7"5
5'7"5
10'7"15
5'0"9
12'7"3
1'11"4
18'8"13
6'1"10
20'8"1
1'11"4
25'8"11
5'0"9
31'4"
5'7"5
5'5"9
5'5"9
10'11"7
5'5"13
12'7"3
1'7"12
18'7"1
5'11"14
20'8"1
2'1"
25'10"7
5'2"5
31'4"
5'5"92'5"12 2'5"12
6"31'4'3"34'9"824'0"12A
B
C
D
E F
G
H
I
J
K
LMNOP
QRST U
3.57 12
3X4(B1)1.5X4
3X4
6X63X3
3X4
5X8
3X4 3X8
5X5
3X4
3X36X6
3X4
1.5X4 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 71 plf at -2.48 to 71 plf at 33.81
BC: From 21 plf at -2.48 to 21 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 31.33
BC: From 21 plf at 31.33 to 21 plf at 33.81
TC: -14 lb Conc. Load at 2.40,28.93
TC: 96 lb Conc. Load at 5.23,26.11
TC: 199 lb Conc. Load at 8.06
TC: 169 lb Conc. Load at 10.88,20.45
TC: 34 lb Conc. Load at 12.60,18.73
TC: 26 lb Conc. Load at 14.06,18.06
TC: 86 lb Conc. Load at 16.06
TC: 200 lb Conc. Load at 23.28
BC: 20 lb Conc. Load at 2.40,28.93
BC: 64 lb Conc. Load at 5.23,26.11
BC: 35 lb Conc. Load at 8.06
BC: -472 lb Conc. Load at 10.88,20.45
BC: 56 lb Conc. Load at 12.60,18.73
BC: 137 lb Conc. Load at 14.06,18.06
BC: 201 lb Conc. Load at 16.06
BC: 34 lb Conc. Load at 23.28
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 822 /-/-/-/519 /-
S 1330 /-/-/-/1392 /-
N 1382 /-/-/-/1419 /-
U 820 /-/-/-/518 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
S Brg Width = 8.5 Min Req =1.5
N Brg Width = 8.5 Min Req =1.5
U Brg Width = 11.3 Min Req =1.5
Bearings B, S, N, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 253 -490
Chords Tens.Comp.
H - I 251 -487
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 439 -215
T - S 433 -218
Chords Tens.Comp.
L - K 431 -216
K - I 437 -213
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 308 -562
S - R 383 -688
R - D 401 -731
D - P 468 -188
Webs Tens.Comp.
O - G 499 -210
G - M 419 -753
M - L 397 -715
L - H 309 -562
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.13 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 Q 999 360
VERT(CL):-0.041 Q 999 240
HORZ(LL):-0.014 N - -
HORZ(TL):0.026 N - -
Creep Factor: 2.0
Max TC CSI:0.416
Max BC CSI:0.432
Max W eb CSI:0.174
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T131
Ply: 2
Qty:1
SEQN:12361 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T107
DrwNo:079.20.1313.41693
AK /DF 03/19/2020
2 Complete Trusses Required
10'8"4 9'11"8 10'8"4
5'7"5
5'7"5
10'7"15
5'0"9
12'7"3
1'11"4
18'8"13
6'1"10
20'8"1
1'11"4
25'8"11
5'0"9
31'4"
5'7"5
5'5"9
5'5"9
10'11"7
5'5"13
12'7"3
1'7"12
18'7"1
5'11"14
20'8"1
2'1"
25'10"7
5'2"5
31'4"
5'5"92'5"12 2'5"12
6"31'4'3"34'9"824'0"12A
B
C
D
E F
G
H
I
J
K
LMNOP
QRST U
3.57 12
3X4(B1)1.5X4
3X4
6X63X3
3X4
5X8
3X4 3X8
5X5
3X4
3X36X6
3X4
1.5X4 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 473 /-/-/263 /297 /204
AG 1266 /-/-/807 /669 /-
AI 1265 /-/-/742 /669 /-
AJ 473 /-/-/359 /297 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
AG Brg Width = 8.5 Min Req =2.0
AI Brg Width = 8.5 Min Req =2.0
AJ Brg Width = 3.5 Min Req =1.5
Bearings B, AG, AI, & AJ Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 635 -378
E - F 1055 -922
F - G 1030 -862
G - H 1009 -806
Chords Tens.Comp.
H - I 1015 -861
I - J 1046 -922
J - K 654 -378
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 871 -535
Y - X 804 -406
Chords Tens.Comp.
X - U 871 -550
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AG 381 -317
D -AF 927 -1062
D -AE 876 -684
AG-AF 929 -1087
AE-AD 448 -531
AD- E 517 -624
AD-AA 430 -252
E -AA 510 -338
Webs Tens.Comp.
U - J 510 -347
U - S 430 -244
J - S 510 -624
S - R 444 -531
R - K 876 -676
Q - K 926 -1061
Q - P 928 -1086
P - L 386 -317
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 Y 999 360
VERT(CL):0.087 Y 999 240
HORZ(LL):0.024 T - -
HORZ(TL):0.065 T - -
Creep Factor: 2.0
Max TC CSI:0.502
Max BC CSI:0.442
Max W eb CSI:0.651
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T132
Ply: 1
Qty:1
SEQN:16295 COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T261
DrwNo:080.20.1107.27980
JB /DF 03/20/2020
4"7'4"4 17'11"8 7'4"4 4"
3'10"12
3'10"12
7'6"
3'7"4
10'4"
2'10"
13'1"15
2'9"15
15'2"6
2'0"8
18'1"10
2'11"3
20'2"1
2'0"8
23'
2'9"15
25'10"
2'10"
29'5"4
3'7"4
33'4"
3'10"12
3'9"
3'9"
7'9"8
4'0"8
10'7"8
2'10"
13'5"7
2'9"15
15'2"6
1'9"
17'11"14
2'9"7
20'2"1
2'2"4
23'
2'9"15
25'6"8
2'6"8
29'7"
4'0"8
33'4"
3'9"1'8"1'8"
6"33'7"111'1'6"2'5'11"36'5"224'0"12A
B
C
D
E
F
G H
I
J
K
L
M
N
O
P QRST
U VWXY
ZAA
ABACAD
AEAFAGAH AI AJ
5
12
3.57 12
3X4(B1)1.5X4
5X8
6X63X3 4X45X5 6X81.5X4
5X8
3X8
5X5
6X81.5X4 5X54X4
3X3
5X8
6X6 1.5X4 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 473 /-/-/263 /297 /204
AG 1266 /-/-/807 /669 /-
AI 1265 /-/-/742 /669 /-
AJ 473 /-/-/359 /297 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
AG Brg Width = 8.5 Min Req =2.0
AI Brg Width = 8.5 Min Req =2.0
AJ Brg Width = 3.5 Min Req =1.5
Bearings B, AG, AI, & AJ Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 635 -378
E - F 1055 -922
F - G 1030 -862
G - H 1009 -806
Chords Tens.Comp.
H - I 1015 -861
I - J 1046 -922
J - K 654 -378
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 871 -535
Y - X 804 -406
Chords Tens.Comp.
X - U 871 -550
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AG 381 -317
D -AF 927 -1062
D -AE 876 -684
AG-AF 929 -1087
AE-AD 448 -531
AD- E 517 -624
AD-AA 430 -252
E -AA 510 -338
Webs Tens.Comp.
U - J 510 -347
U - S 430 -244
J - S 510 -624
S - R 444 -531
R - K 876 -676
Q - K 926 -1061
Q - P 928 -1086
P - L 386 -317
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 Y 999 360
VERT(CL):0.087 Y 999 240
HORZ(LL):0.024 T - -
HORZ(TL):0.065 T - -
Creep Factor: 2.0
Max TC CSI:0.502
Max BC CSI:0.442
Max W eb CSI:0.651
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T132
Ply: 1
Qty:1
SEQN:16295 COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T261
DrwNo:080.20.1107.27980
JB /DF 03/20/2020
4"7'4"4 17'11"8 7'4"4 4"
3'10"12
3'10"12
7'6"
3'7"4
10'4"
2'10"
13'1"15
2'9"15
15'2"6
2'0"8
18'1"10
2'11"3
20'2"1
2'0"8
23'
2'9"15
25'10"
2'10"
29'5"4
3'7"4
33'4"
3'10"12
3'9"
3'9"
7'9"8
4'0"8
10'7"8
2'10"
13'5"7
2'9"15
15'2"6
1'9"
17'11"14
2'9"7
20'2"1
2'2"4
23'
2'9"15
25'6"8
2'6"8
29'7"
4'0"8
33'4"
3'9"1'8"1'8"
6"33'7"111'1'6"2'5'11"36'5"224'0"12A
B
C
D
E
F
G H
I
J
K
L
M
N
O
P QRST
U VWXY
ZAA
ABACAD
AEAFAGAH AI AJ
5
12
3.57 12
3X4(B1)1.5X4
5X8
6X63X3 4X45X5 6X81.5X4
5X8
3X8
5X5
6X81.5X4 5X54X4
3X3
5X8
6X6 1.5X4 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 563 /-/-/348 /342 /166
Y 1145 /-/-/688 /614 /-
AA 1145 /-/-/652 /616 /-
AB 563 /-/-/402 /341 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.5 Min Req =1.8
AA Brg Width = 8.5 Min Req =1.8
AB Brg Width = 8.0 Min Req =1.5
Bearings B, Y, AA, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 810 -667
D - E 616 -436
E - F 702 -552
F - G 704 -520
Chords Tens.Comp.
G - H 688 -558
H - I 597 -436
J - K 826 -667
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 584 -590
Z - Y 591 -581
V - T 389 -133
T - S 519 -174
Chords Tens.Comp.
S - P 388 -140
N - M 591 -571
M - K 584 -581
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 710 -681
Y - X 779 -963
X - D 754 -917
D - V 522 -260
Webs Tens.Comp.
P - I 523 -272
I - O 763 -918
O - N 789 -964
N - J 705 -682
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 Z 999 360
VERT(CL):0.046 Z 999 240
HORZ(LL):0.012 J - -
HORZ(TL):0.014 J - -
Creep Factor: 2.0
Max TC CSI:0.822
Max BC CSI:0.510
Max W eb CSI:0.603
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T131A
Ply: 1
Qty:1
SEQN:12364 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T124
DrwNo:079.20.1313.36576
AK /DF 03/19/2020
9'8"4 13'11"8 9'8"4
2'6"
2'6"
9'9"15
7'3"15
12'4"
2'6"1
14'4"13
2'0"13
18'11"3
4'6"6
21'
2'0"13
23'6"1
2'6"1
30'10"
7'3"15
33'4"
2'6"
2'7"12
2'7"12
9'9"15
7'2"3
12'7"8
2'9"9
14'4"13
1'9"5
18'9"7
4'4"10
21'
2'2"9
23'6"1
2'6"1
30'8"4
7'2"3
33'4"
2'7"121'8"
1'8"
6"3
1'6"111'1'6"5'1"35'7"224'0"12A
B
C
D
E
F G
H
I
J
K
L
M
N OPQRST
UVW
XYZ AA AB
5
12
3.57 12
3X4(B1)1.5X4 6X65X5
3X4
1.5X4
3X4
3X4 3X8
5X5
3X4
1.5X4
3X4
5X56X6 1.5X4 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 563 /-/-/348 /342 /166
Y 1145 /-/-/688 /614 /-
AA 1145 /-/-/652 /616 /-
AB 563 /-/-/402 /341 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.5 Min Req =1.8
AA Brg Width = 8.5 Min Req =1.8
AB Brg Width = 8.0 Min Req =1.5
Bearings B, Y, AA, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 810 -667
D - E 616 -436
E - F 702 -552
F - G 704 -520
Chords Tens.Comp.
G - H 688 -558
H - I 597 -436
J - K 826 -667
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 584 -590
Z - Y 591 -581
V - T 389 -133
T - S 519 -174
Chords Tens.Comp.
S - P 388 -140
N - M 591 -571
M - K 584 -581
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 710 -681
Y - X 779 -963
X - D 754 -917
D - V 522 -260
Webs Tens.Comp.
P - I 523 -272
I - O 763 -918
O - N 789 -964
N - J 705 -682
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 Z 999 360
VERT(CL):0.046 Z 999 240
HORZ(LL):0.012 J - -
HORZ(TL):0.014 J - -
Creep Factor: 2.0
Max TC CSI:0.822
Max BC CSI:0.510
Max W eb CSI:0.603
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T131A
Ply: 1
Qty:1
SEQN:12364 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T124
DrwNo:079.20.1313.36576
AK /DF 03/19/2020
9'8"4 13'11"8 9'8"4
2'6"
2'6"
9'9"15
7'3"15
12'4"
2'6"1
14'4"13
2'0"13
18'11"3
4'6"6
21'
2'0"13
23'6"1
2'6"1
30'10"
7'3"15
33'4"
2'6"
2'7"12
2'7"12
9'9"15
7'2"3
12'7"8
2'9"9
14'4"13
1'9"5
18'9"7
4'4"10
21'
2'2"9
23'6"1
2'6"1
30'8"4
7'2"3
33'4"
2'7"121'8"
1'8"
6"3
1'6"111'1'6"5'1"35'7"224'0"12A
B
C
D
E
F G
H
I
J
K
L
M
N OPQRST
UVW
XYZ AA AB
5
12
3.57 12
3X4(B1)1.5X4 6X65X5
3X4
1.5X4
3X4
3X4 3X8
5X5
3X4
1.5X4
3X4
5X56X6 1.5X4 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 489 /-/-/270 /313 /242
AI 1232 /-/-/813 /668 /-
O 1230 /-/-/712 /666 /-
AJ 490 /-/-/372 /314 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AI Brg Width = 6.0 Min Req =2.0
O Brg Width = 6.0 Min Req =2.0
AJ Brg Width = 8.0 Min Req =1.5
Bearings B, AI, O, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 849 -638
E - F 1180 -917
F - G 1280 -876
G - H 1165 -788
Chords Tens.Comp.
H - I 1150 -857
I - J 1167 -907
J - K 843 -641
L - M 382 -293
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AE-AB 565 -426
AB- Z 582 -439
Z - Y 777 -498
Chords Tens.Comp.
Y - X 801 -633
X - U 585 -457
U - Q 570 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AI-AH 998 -1022
AH- D 891 -936
D -AE 767 -693
AE- E 471 -421
Webs Tens.Comp.
J - Q 469 -415
Q - K 768 -704
K - P 902 -937
P - O 1003 -1021
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.018 Y 999 360
VERT(CL):0.041 Y 999 240
HORZ(LL):0.019 O - -
HORZ(TL):0.023 T - -
Creep Factor: 2.0
Max TC CSI:0.577
Max BC CSI:0.483
Max W eb CSI:0.402
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T133
Ply: 1
Qty:1
SEQN:12375 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T108
DrwNo:079.20.1313.31692
AK /DF 03/19/2020
7'7"18'2"7'7"
9'4"12 2'(TYP)10'6"8
3'11"15
3'11"15
7'9"4
3'9"5
9'6"8
1'9"4
12'6"
2'11"8
16'
3'6"
17'4"
1'4"
20'10"
3'6"
23'9"8
2'11"8
25'6"12
1'9"4
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
11'10"
2'
12'7"12
9"12
17'2"4
4'6"8
20'10"
3'7"12
21'11"15
1'1"15
23'9"8
1'9"9
25'6"12
1'9"4
33'4"
7'9"41'8"1'8"
6"35'8"111'1'6"2'6'9"37'3"224'0"12A
B
C
D
E
F
G H
I
J
K
L
M
NOP
QR
S
TUVWXYZAAAB
ACADAE
AFAGAHAI AJ
5 12
3.57 12
3X4(B1)
1.5X4
6X65X5
3X4
5X83X31.5X4
3X4
1.5X6(++)
5X5
3X8
5X5
3X8
5X5
5X8
3X41.5X6(++)
3X4
5X83X31.5X4
3X4
5X56X6
1.5X4
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 489 /-/-/270 /313 /242
AI 1232 /-/-/813 /668 /-
O 1230 /-/-/712 /666 /-
AJ 490 /-/-/372 /314 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AI Brg Width = 6.0 Min Req =2.0
O Brg Width = 6.0 Min Req =2.0
AJ Brg Width = 8.0 Min Req =1.5
Bearings B, AI, O, & M Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 849 -638
E - F 1180 -917
F - G 1280 -876
G - H 1165 -788
Chords Tens.Comp.
H - I 1150 -857
I - J 1167 -907
J - K 843 -641
L - M 382 -293
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AE-AB 565 -426
AB- Z 582 -439
Z - Y 777 -498
Chords Tens.Comp.
Y - X 801 -633
X - U 585 -457
U - Q 570 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AI-AH 998 -1022
AH- D 891 -936
D -AE 767 -693
AE- E 471 -421
Webs Tens.Comp.
J - Q 469 -415
Q - K 768 -704
K - P 902 -937
P - O 1003 -1021
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.018 Y 999 360
VERT(CL):0.041 Y 999 240
HORZ(LL):0.019 O - -
HORZ(TL):0.023 T - -
Creep Factor: 2.0
Max TC CSI:0.577
Max BC CSI:0.483
Max W eb CSI:0.402
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T133
Ply: 1
Qty:1
SEQN:12375 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T108
DrwNo:079.20.1313.31692
AK /DF 03/19/2020
7'7"18'2"7'7"
9'4"12 2'(TYP)10'6"8
3'11"15
3'11"15
7'9"4
3'9"5
9'6"8
1'9"4
12'6"
2'11"8
16'
3'6"
17'4"
1'4"
20'10"
3'6"
23'9"8
2'11"8
25'6"12
1'9"4
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
11'10"
2'
12'7"12
9"12
17'2"4
4'6"8
20'10"
3'7"12
21'11"15
1'1"15
23'9"8
1'9"9
25'6"12
1'9"4
33'4"
7'9"41'8"1'8"
6"35'8"111'1'6"2'6'9"37'3"224'0"12A
B
C
D
E
F
G H
I
J
K
L
M
NOP
QR
S
TUVWXYZAAAB
ACADAE
AFAGAHAI AJ
5 12
3.57 12
3X4(B1)
1.5X4
6X65X5
3X4
5X83X31.5X4
3X4
1.5X6(++)
5X5
3X8
5X5
3X8
5X5
5X8
3X41.5X6(++)
3X4
5X83X31.5X4
3X4
5X56X6
1.5X4
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 494 /-/-/270 /297 /250
AC 1234 /-/-/823 /697 /-
K 1244 /-/-/739 /702 /-
AD 323 /-/-/226 /200 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 6.0 Min Req =2.0
K Brg Width = 6.0 Min Req =2.0
AD Brg Width = 8.0 Min Req =1.5
Bearings B, AC, K, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 711 -721
E - F 911 -917
F - G 916 -917
Chords Tens.Comp.
G - H 741 -729
I - J 481 -357
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - V 705 -419
V - T 710 -455
Chords Tens.Comp.
T - Q 715 -460
Q - M 710 -424
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AC-AB 806 -1020
AB- D 695 -937
D - Y 926 -706
Y - E 500 -488
G - M 485 -478
Webs Tens.Comp.
M - H 920 -695
H - L 686 -927
L - K 787 -999
K - I 522 -392
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 S 999 360
VERT(CL):0.094 U 999 240
HORZ(LL):0.012 AA - -
HORZ(TL):0.022 P - -
Creep Factor: 2.0
Max TC CSI:0.797
Max BC CSI:0.579
Max W eb CSI:0.357
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T134
Ply: 1
Qty:3
SEQN:12381 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T133
DrwNo:079.20.1313.26934
AK /DF 03/19/2020
7'7"18'2"7'7"
9'4"12 2'(TYP)10'6"8
3'11"15
3'11"15
7'8"14
3'8"15
9'6"8
1'9"10
16'8"
7'1"8
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
11'10"
2'
16'8"
4'10"
21'11"15
5'3"15
23'9"8
1'9"9
25'6"12
1'9"4
33'4"
7'9"41'8"
6"31'1'6"2'7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
JKLMN
O
PQRST
UVW
XYZ
AAABAC AD
5
12
3X4(B1)
6X65X5
5X5
5X83X3
3X4
1.5X6(++)
6X6
3X8 1.5X6(++)
5X5
5X83X3
3X4
5X56X6 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 494 /-/-/270 /297 /250
AC 1234 /-/-/823 /697 /-
K 1244 /-/-/739 /702 /-
AD 323 /-/-/226 /200 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 6.0 Min Req =2.0
K Brg Width = 6.0 Min Req =2.0
AD Brg Width = 8.0 Min Req =1.5
Bearings B, AC, K, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 711 -721
E - F 911 -917
F - G 916 -917
Chords Tens.Comp.
G - H 741 -729
I - J 481 -357
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - V 705 -419
V - T 710 -455
Chords Tens.Comp.
T - Q 715 -460
Q - M 710 -424
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AC-AB 806 -1020
AB- D 695 -937
D - Y 926 -706
Y - E 500 -488
G - M 485 -478
Webs Tens.Comp.
M - H 920 -695
H - L 686 -927
L - K 787 -999
K - I 522 -392
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 S 999 360
VERT(CL):0.094 U 999 240
HORZ(LL):0.012 AA - -
HORZ(TL):0.022 P - -
Creep Factor: 2.0
Max TC CSI:0.797
Max BC CSI:0.579
Max W eb CSI:0.357
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T134
Ply: 1
Qty:3
SEQN:12381 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T133
DrwNo:079.20.1313.26934
AK /DF 03/19/2020
7'7"18'2"7'7"
9'4"12 2'(TYP)10'6"8
3'11"15
3'11"15
7'8"14
3'8"15
9'6"8
1'9"10
16'8"
7'1"8
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
11'10"
2'
16'8"
4'10"
21'11"15
5'3"15
23'9"8
1'9"9
25'6"12
1'9"4
33'4"
7'9"41'8"
6"31'1'6"2'7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
JKLMN
O
PQRST
UVW
XYZ
AAABAC AD
5
12
3X4(B1)
6X65X5
5X5
5X83X3
3X4
1.5X6(++)
6X6
3X8 1.5X6(++)
5X5
5X83X3
3X4
5X56X6 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 501 /-/-/264 /316 /250
AD 1212 /-/-/830 /669 /-
L 1251 /-/-/733 /712 /-
AE 323 /-/-/226 /198 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AD Brg Width = 6.0 Min Req =1.9
L Brg Width = 6.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =1.5
Bearings B, AD, L, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 388 -318
D - E 920 -964
E - F 985 -954
F - G 948 -838
Chords Tens.Comp.
G - H 915 -910
H - I 758 -741
J - K 476 -356
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 835 -520
U - R 735 -480
Chords Tens.Comp.
R - N 734 -440
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AD-AC 773 -1002
AC- D 759 -969
D - Z 963 -646
Z - V 762 -466
H - N 520 -495
Webs Tens.Comp.
N - I 950 -725
I - M 693 -931
M - L 800 -1005
L - J 525 -394
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.054 T 999 360
VERT(CL):0.113 T 999 240
HORZ(LL):0.014 L - -
HORZ(TL):0.023 Q - -
Creep Factor: 2.0
Max TC CSI:0.712
Max BC CSI:0.507
Max W eb CSI:0.345
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T135
Ply: 1
Qty:1
SEQN:12385 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T80
DrwNo:079.20.1313.40664
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"15
3'11"15
7'8"14
3'8"15
9'8"4
1'11"6
13'2"2
3'5"14
16'8"
3'5"14
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'6"8
1'9"4
11'10"
2'3"8
13'0"6
1'2"6
16'8"
3'7"10
21'11"10
5'3"10
23'9"8
1'9"14
25'6"12
1'9"4
33'4"
7'9"41'8"
6"32'5"91'6"2'1'7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
J
KLM
NO
P
QRSTUV
WXY
Z
AA AB
AC
AD AE
5
12
3X4(B1)6X6
3X35X5
6X83X3 1.5X6(++)
3X4
3X8
5X5
3X8 1.5X6(++)
5X5
5X83X3
3X4
5X56X6 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 501 /-/-/264 /316 /250
AD 1212 /-/-/830 /669 /-
L 1251 /-/-/733 /712 /-
AE 323 /-/-/226 /198 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AD Brg Width = 6.0 Min Req =1.9
L Brg Width = 6.0 Min Req =2.0
AE Brg Width = 8.0 Min Req =1.5
Bearings B, AD, L, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 388 -318
D - E 920 -964
E - F 985 -954
F - G 948 -838
Chords Tens.Comp.
G - H 915 -910
H - I 758 -741
J - K 476 -356
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 835 -520
U - R 735 -480
Chords Tens.Comp.
R - N 734 -440
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
AD-AC 773 -1002
AC- D 759 -969
D - Z 963 -646
Z - V 762 -466
H - N 520 -495
Webs Tens.Comp.
N - I 950 -725
I - M 693 -931
M - L 800 -1005
L - J 525 -394
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.054 T 999 360
VERT(CL):0.113 T 999 240
HORZ(LL):0.014 L - -
HORZ(TL):0.023 Q - -
Creep Factor: 2.0
Max TC CSI:0.712
Max BC CSI:0.507
Max W eb CSI:0.345
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T135
Ply: 1
Qty:1
SEQN:12385 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T80
DrwNo:079.20.1313.40664
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"15
3'11"15
7'8"14
3'8"15
9'8"4
1'11"6
13'2"2
3'5"14
16'8"
3'5"14
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'6"8
1'9"4
11'10"
2'3"8
13'0"6
1'2"6
16'8"
3'7"10
21'11"10
5'3"10
23'9"8
1'9"14
25'6"12
1'9"4
33'4"
7'9"41'8"
6"32'5"91'6"2'1'7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
J
KLM
NO
P
QRSTUV
WXY
Z
AA AB
AC
AD AE
5
12
3X4(B1)6X6
3X35X5
6X83X3 1.5X6(++)
3X4
3X8
5X5
3X8 1.5X6(++)
5X5
5X83X3
3X4
5X56X6 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 497 /-/-/273 /305 /250
U 1225 /-/-/818 /690 /-
K 1233 /-/-/736 /695 /-
V 326 /-/-/227 /207 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
U Brg Width = 6.0 Min Req =1.9
K Brg Width = 6.0 Min Req =2.0
V Brg Width = 8.0 Min Req =1.5
Bearings B, U, K, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 662 -585
E - F 898 -870
F - G 903 -870
Chords Tens.Comp.
G - H 689 -591
I - J 505 -364
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - P 587 -399
Chords Tens.Comp.
P - M 591 -403
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - T 792 -1009
T - D 754 -970
D - R 866 -696
R - E 529 -558
G - M 514 -548
Webs Tens.Comp.
M - H 857 -681
H - L 740 -961
L - K 773 -992
K - I 521 -391
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.017 P 999 360
VERT(CL):0.036 P 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.018 K - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.704
Max W eb CSI:0.306
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T136
Ply: 1
Qty:1
SEQN:12389 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T134
DrwNo:079.20.1313.36013
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"15
3'11"15
7'8"14
3'8"15
9'6"8
1'9"10
16'8"
7'1"8
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
16'8"
6'10"
23'9"8
7'1"8
25'6"12
1'9"4
33'4"
7'9"41'8"
6"31'1'6"7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
JKLMNOP
QRS
TU V
5
12
3X4(B1)
1.5X4
6X65X5
5X5
5X81.5X4
3X4
6X6
3X8
5X5
5X81.5X4
3X4
5X56X6
1.5X4
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 497 /-/-/273 /305 /250
U 1225 /-/-/818 /690 /-
K 1233 /-/-/736 /695 /-
V 326 /-/-/227 /207 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
U Brg Width = 6.0 Min Req =1.9
K Brg Width = 6.0 Min Req =2.0
V Brg Width = 8.0 Min Req =1.5
Bearings B, U, K, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 662 -585
E - F 898 -870
F - G 903 -870
Chords Tens.Comp.
G - H 689 -591
I - J 505 -364
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - P 587 -399
Chords Tens.Comp.
P - M 591 -403
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - T 792 -1009
T - D 754 -970
D - R 866 -696
R - E 529 -558
G - M 514 -548
Webs Tens.Comp.
M - H 857 -681
H - L 740 -961
L - K 773 -992
K - I 521 -391
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.017 P 999 360
VERT(CL):0.036 P 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.018 K - -
Creep Factor: 2.0
Max TC CSI:0.794
Max BC CSI:0.704
Max W eb CSI:0.306
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T136
Ply: 1
Qty:1
SEQN:12389 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T134
DrwNo:079.20.1313.36013
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"15
3'11"15
7'8"14
3'8"15
9'6"8
1'9"10
16'8"
7'1"8
23'9"14
7'1"14
25'6"12
1'8"14
29'4"1
3'9"5
33'4"
3'11"15
7'9"4
7'9"4
9'10"
2'0"12
16'8"
6'10"
23'9"8
7'1"8
25'6"12
1'9"4
33'4"
7'9"41'8"
6"31'1'6"7'5"87'11"724'0"12A
B
C
D
E
F
G
H
I
JKLMNOP
QRS
TU V
5
12
3X4(B1)
1.5X4
6X65X5
5X5
5X81.5X4
3X4
6X6
3X8
5X5
5X81.5X4
3X4
5X56X6
1.5X4
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 319 /-/-/190 /196 /219
Q 1250 /-/-/835 /717 /-
J 1250 /-/-/745 /717 /-
R 319 /-/-/216 /196 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
Q Brg Width = 6.0 Min Req =2.0
J Brg Width = 6.0 Min Req =2.0
R Brg Width = 8.0 Min Req =1.5
Bearings A, Q, J, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 438 -338
C - D 902 -921
D - E 1135 -902
Chords Tens.Comp.
E - F 1135 -902
F - G 903 -921
H - I 440 -338
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - L 624 -245
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 421 -345
Q - P 840 -1043
P - C 831 -968
C - N 766 -485
D - N 652 -464
N - E 406 -565
Webs Tens.Comp.
E - L 406 -565
L - F 652 -464
L - G 766 -486
G - K 831 -973
K - J 841 -1047
J - H 421 -346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.024 D 999 360
VERT(CL):0.050 D 999 240
HORZ(LL):0.013 J - -
HORZ(TL):0.022 J - -
Creep Factor: 2.0
Max TC CSI:0.637
Max BC CSI:0.529
Max W eb CSI:0.454
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T137
Ply: 1
Qty:1
SEQN:12393 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T26
DrwNo:079.20.1313.37169
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"9
3'11"9
7'9"4
3'9"11
14'8"12
6'11"8
16'8"
1'11"4
18'7"4
1'11"4
25'6"12
6'11"8
29'4"7
3'9"11
33'4"
3'11"9
7'9"4
7'9"4
14'10"8
7'1"4
18'5"8
3'7"
25'6"12
7'1"4
33'4"
7'9"4
6"31'1'6"7'5"824'0"12
A
B
C
D
E
F
G
H
IJKLMNO
PQ R
5
12
3X4(B1)
5X5
6X65X5
3X4
1.5X4
5X81.5X4
5X5
5X81.5X4
1.5X4
3X4
5X56X6
5X5
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 319 /-/-/190 /196 /219
Q 1250 /-/-/835 /717 /-
J 1250 /-/-/745 /717 /-
R 319 /-/-/216 /196 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
Q Brg Width = 6.0 Min Req =2.0
J Brg Width = 6.0 Min Req =2.0
R Brg Width = 8.0 Min Req =1.5
Bearings A, Q, J, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 438 -338
C - D 902 -921
D - E 1135 -902
Chords Tens.Comp.
E - F 1135 -902
F - G 903 -921
H - I 440 -338
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - L 624 -245
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 421 -345
Q - P 840 -1043
P - C 831 -968
C - N 766 -485
D - N 652 -464
N - E 406 -565
Webs Tens.Comp.
E - L 406 -565
L - F 652 -464
L - G 766 -486
G - K 831 -973
K - J 841 -1047
J - H 421 -346
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.33 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.024 D 999 360
VERT(CL):0.050 D 999 240
HORZ(LL):0.013 J - -
HORZ(TL):0.022 J - -
Creep Factor: 2.0
Max TC CSI:0.637
Max BC CSI:0.529
Max W eb CSI:0.454
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T137
Ply: 1
Qty:1
SEQN:12393 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T26
DrwNo:079.20.1313.37169
AK /DF 03/19/2020
7'7"18'2"7'7"
3'11"9
3'11"9
7'9"4
3'9"11
14'8"12
6'11"8
16'8"
1'11"4
18'7"4
1'11"4
25'6"12
6'11"8
29'4"7
3'9"11
33'4"
3'11"9
7'9"4
7'9"4
14'10"8
7'1"4
18'5"8
3'7"
25'6"12
7'1"4
33'4"
7'9"4
6"31'1'6"7'5"824'0"12
A
B
C
D
E
F
G
H
IJKLMNO
PQ R
5
12
3X4(B1)
5X5
6X65X5
3X4
1.5X4
5X81.5X4
5X5
5X81.5X4
1.5X4
3X4
5X56X6
5X5
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x6 SP M-26;
Webs: 2x4 SP #2; W1,W14 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 9.33
TC: From 73 plf at 9.33 to 73 plf at 18.67
BC: From 10 plf at 0.00 to 10 plf at 18.67
BC: 1274 lb Conc. Load at 1.94, 3.94, 5.94
BC: 830 lb Conc. Load at 7.94
BC: 843 lb Conc. Load at 9.94
BC: 566 lb Conc. Load at 11.94
BC: 759 lb Conc. Load at 13.94
BC: 766 lb Conc. Load at 15.94
BC: 774 lb Conc. Load at 17.94
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 4942 /-/-/-/3204 /-
P 4620 /-/-/-/2628 /-
Wind reactions based on MWFRS
O Brg Width = 6.0 Min Req =4.4
P Brg Width = 6.0 Min Req =4.1
Bearings O & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1635 -2609
C - D 1629 -2599
Chords Tens.Comp.
D - E 1514 -2538
E - F 1512 -2534
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 1718 -1108
L - J 1968 -1216
Chords Tens.Comp.
I - H 1344 -777
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - B 1763 -2736
B - N 551 -390
B - L 852 -484
N - L 1933 -1243
L - D 1282 -840
Webs Tens.Comp.
D - J 743 -339
J - F 1279 -784
J - I 1507 -868
F - H 1379 -2384
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.58 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.067 L 999 360
VERT(CL):0.112 L 999 240
HORZ(LL):-0.044 H - -
HORZ(TL):0.075 H - -
Creep Factor: 2.0
Max TC CSI:0.353
Max BC CSI:0.821
Max W eb CSI:0.792
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T138
Ply: 2
Qty:1
SEQN:16318 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T31
DrwNo:080.20.1107.35927
JB /DF 03/20/2020
2 Complete Trusses Required
B2
W1
W14
18'8"
3'9"4
3'9"4
7'4"12
3'7"8
9'4"
1'11"4
12'3"12
2'11"12
15'7"8
3'3"12
18'8"
3'0"8
3'11"8
3'11"8
7'6"8
3'7"
12'2"
4'7"8
15'7"8
3'5"8
18'8"
3'0"83'6"144'10"11'6"7'5"824'0"12
A
B
C
D
E
F G
HI
J
KLMNO P
5
12
1.5X4
10X10
4X12
5X8
1.5X4
8X83X8
5X5
7X81.5X6
1.5X4
5X14
3X6
1.5X4
10X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x6 SP M-26;
Webs: 2x4 SP #2; W1,W14 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 9.33
TC: From 73 plf at 9.33 to 73 plf at 18.67
BC: From 10 plf at 0.00 to 10 plf at 18.67
BC: 1274 lb Conc. Load at 1.94, 3.94, 5.94
BC: 830 lb Conc. Load at 7.94
BC: 843 lb Conc. Load at 9.94
BC: 566 lb Conc. Load at 11.94
BC: 759 lb Conc. Load at 13.94
BC: 766 lb Conc. Load at 15.94
BC: 774 lb Conc. Load at 17.94
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 4942 /-/-/-/3204 /-
P 4620 /-/-/-/2628 /-
Wind reactions based on MWFRS
O Brg Width = 6.0 Min Req =4.4
P Brg Width = 6.0 Min Req =4.1
Bearings O & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1635 -2609
C - D 1629 -2599
Chords Tens.Comp.
D - E 1514 -2538
E - F 1512 -2534
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
O - N 1718 -1108
L - J 1968 -1216
Chords Tens.Comp.
I - H 1344 -777
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - B 1763 -2736
B - N 551 -390
B - L 852 -484
N - L 1933 -1243
L - D 1282 -840
Webs Tens.Comp.
D - J 743 -339
J - F 1279 -784
J - I 1507 -868
F - H 1379 -2384
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.58 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.067 L 999 360
VERT(CL):0.112 L 999 240
HORZ(LL):-0.044 H - -
HORZ(TL):0.075 H - -
Creep Factor: 2.0
Max TC CSI:0.353
Max BC CSI:0.821
Max W eb CSI:0.792
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T138
Ply: 2
Qty:1
SEQN:16318 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T31
DrwNo:080.20.1107.35927
JB /DF 03/20/2020
2 Complete Trusses Required
B2
W1
W14
18'8"
3'9"4
3'9"4
7'4"12
3'7"8
9'4"
1'11"4
12'3"12
2'11"12
15'7"8
3'3"12
18'8"
3'0"8
3'11"8
3'11"8
7'6"8
3'7"
12'2"
4'7"8
15'7"8
3'5"8
18'8"
3'0"83'6"144'10"11'6"7'5"824'0"12
A
B
C
D
E
F G
HI
J
KLMNO P
5
12
1.5X4
10X10
4X12
5X8
1.5X4
8X83X8
5X5
7X81.5X6
1.5X4
5X14
3X6
1.5X4
10X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2352 /-/-/-/1559 /-
I 2296 /-/-/-/1518 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
I Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 973 -1458
B - C 1809 -2719
C - D 1639 -2468
D - E 1820 -2727
Chords Tens.Comp.
E - F 1820 -2727
F - G 1588 -2397
G - H 1755 -2643
H - I 948 -1422
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 1303 -869
R - P 2705 -1797
P - O 2391 -1587
Chords Tens.Comp.
O - N 2324 -1538
N - K 2629 -1742
J - I 1272 -846
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 1435 -958
T - R 1040 -687
O - F 438 -306
Webs Tens.Comp.
K - J 1016 -669
K - H 1390 -925
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.85 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.264 E 999 360
VERT(CL):0.434 E 767 240
HORZ(LL):-0.075 J - -
HORZ(TL):0.124 J - -
Creep Factor: 2.0
Max TC CSI:0.400
Max BC CSI:0.310
Max W eb CSI:0.343
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T139
Ply: 3
Qty:1
SEQN:12399 /COMN
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T90
DrwNo:079.20.1313.26952
AK /DF 03/19/2020
3 Complete Trusses Required
28'
2'1"14
2'1"14
5'1"14
3'
8'8"13
3'6"15
14'
5'3"3
19'3"3
5'3"3
22'10"2
3'6"15
25'10"2
3'
28'
2'1"14
2'5"6
2'5"6
5'5"6
3'
8'8"13
3'3"7
14'
5'3"3
19'3"3
5'3"3
22'10"2
3'6"15
25'6"10
2'8"8
28'
2'5"6
6"31'5"6"3'0"1124'0"12
A
B
C
D E F
G
H
I
JKL
MNOP
QRST
5 12
3 12
3X4(B1)
6X8
3X4 5X81.5X4
3X4
4X7
3X4
1.5X4
3X8
4X7
3X4
3X4
5X81.5X4 3X4
6X8
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2352 /-/-/-/1559 /-
I 2296 /-/-/-/1518 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
I Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 973 -1458
B - C 1809 -2719
C - D 1639 -2468
D - E 1820 -2727
Chords Tens.Comp.
E - F 1820 -2727
F - G 1588 -2397
G - H 1755 -2643
H - I 948 -1422
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 1303 -869
R - P 2705 -1797
P - O 2391 -1587
Chords Tens.Comp.
O - N 2324 -1538
N - K 2629 -1742
J - I 1272 -846
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - R 1435 -958
T - R 1040 -687
O - F 438 -306
Webs Tens.Comp.
K - J 1016 -669
K - H 1390 -925
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.85 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.264 E 999 360
VERT(CL):0.434 E 767 240
HORZ(LL):-0.075 J - -
HORZ(TL):0.124 J - -
Creep Factor: 2.0
Max TC CSI:0.400
Max BC CSI:0.310
Max W eb CSI:0.343
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T139
Ply: 3
Qty:1
SEQN:12399 /COMN
FROM:
Page 1 of 2
Cust: R 761 JRef:1WTP7610004 T90
DrwNo:079.20.1313.26952
AK /DF 03/19/2020
3 Complete Trusses Required
28'
2'1"14
2'1"14
5'1"14
3'
8'8"13
3'6"15
14'
5'3"3
19'3"3
5'3"3
22'10"2
3'6"15
25'10"2
3'
28'
2'1"14
2'5"6
2'5"6
5'5"6
3'
8'8"13
3'3"7
14'
5'3"3
19'3"3
5'3"3
22'10"2
3'6"15
25'6"10
2'8"8
28'
2'5"6
6"31'5"6"3'0"1124'0"12
A
B
C
D E F
G
H
I
JKL
MNOP
QRST
5 12
3 12
3X4(B1)
6X8
3X4 5X81.5X4
3X4
4X7
3X4
1.5X4
3X8
4X7
3X4
3X4
5X81.5X4 3X4
6X8
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.16
TC: From 35 plf at 2.16 to 35 plf at 25.84
TC: From 72 plf at 25.84 to 72 plf at 28.00
BC: From 20 plf at 0.00 to 20 plf at 2.16
BC: From 10 plf at 2.16 to 10 plf at 25.84
BC: From 20 plf at 25.84 to 20 plf at 28.00
TC: 39 lb Conc. Load at 2.16,25.84
TC: 79 lb Conc. Load at 3.66,24.34
TC: 46 lb Conc. Load at 6.48
TC: 242 lb Conc. Load at 8.80
TC: 108 lb Conc. Load at 10.52,12.52,14.52,16.27
18.27
TC: 134 lb Conc. Load at 19.26
TC: 18 lb Conc. Load at 21.52
BC: 49 lb Conc. Load at 2.16,25.84
BC: 59 lb Conc. Load at 3.66,24.34
BC: 170 lb Conc. Load at 6.48
BC: 385 lb Conc. Load at 8.80
BC: 150 lb Conc. Load at 10.52,12.52,14.52,16.27
18.27
BC: 235 lb Conc. Load at 19.26
BC: 199 lb Conc. Load at 21.52
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T139
Ply: 3
Qty:1
SEQN:12399 /COMN
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T90
DrwNo:079.20.1313.26952
AK /DF 03/19/2020
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 2.16
TC: From 35 plf at 2.16 to 35 plf at 25.84
TC: From 72 plf at 25.84 to 72 plf at 28.00
BC: From 20 plf at 0.00 to 20 plf at 2.16
BC: From 10 plf at 2.16 to 10 plf at 25.84
BC: From 20 plf at 25.84 to 20 plf at 28.00
TC: 39 lb Conc. Load at 2.16,25.84
TC: 79 lb Conc. Load at 3.66,24.34
TC: 46 lb Conc. Load at 6.48
TC: 242 lb Conc. Load at 8.80
TC: 108 lb Conc. Load at 10.52,12.52,14.52,16.27
18.27
TC: 134 lb Conc. Load at 19.26
TC: 18 lb Conc. Load at 21.52
BC: 49 lb Conc. Load at 2.16,25.84
BC: 59 lb Conc. Load at 3.66,24.34
BC: 170 lb Conc. Load at 6.48
BC: 385 lb Conc. Load at 8.80
BC: 150 lb Conc. Load at 10.52,12.52,14.52,16.27
18.27
BC: 235 lb Conc. Load at 19.26
BC: 199 lb Conc. Load at 21.52
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T139
Ply: 3
Qty:1
SEQN:12399 /COMN
FROM:
Page 2 of 2
Cust: R 761 JRef:1WTP7610004 T90
DrwNo:079.20.1313.26952
AK /DF 03/19/2020
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
V 1275 /-/-/734 /802 /48
J 1275 /-/-/734 /802 /-
Wind reactions based on MWFRS
V Brg Width = 6.0 Min Req =1.5
J Brg Width = -Min Req =-
Bearing V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1016 -1101
B - C 1630 -1726
C - D 1320 -1449
D - E 1369 -1495
Chords Tens.Comp.
E - F 1369 -1495
F - G 1320 -1449
G - H 1630 -1727
H - I 1016 -1101
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1640 -1540
Q - P 1385 -1207
Chords Tens.Comp.
P - O 1385 -1207
O - L 1640 -1540
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 564 -615
A - U 1227 -1132
U - B 895 -942
U - S 1173 -1081
B - S 456 -453
Webs Tens.Comp.
L - H 456 -453
L - K 1173 -1081
H - K 895 -942
K - I 1227 -1133
I - J 564 -615
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.89 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 E 999 360
VERT(CL):0.222 E 999 240
HORZ(LL):-0.042 J - -
HORZ(TL):0.084 J - -
Creep Factor: 2.0
Max TC CSI:0.260
Max BC CSI:0.399
Max W eb CSI:0.277
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T140
Ply: 2
Qty:1
SEQN:12414 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T12
DrwNo:079.20.1313.40148
AK /DF 03/19/2020
2 Complete Trusses Required
28'
3'2"8
3'2"8
4'9"12
1'7"4
9'11"
5'1"4
14'
4'1"
18'1"
4'1"
23'2"4
5'1"4
24'9"8
1'7"4
28'
3'2"8
3'0"12
3'0"12
5'5"6
2'4"10
9'11"
4'5"10
14'
4'1"
18'1"
4'1"
22'10"12
4'9"12
24'11"4
2'0"8
28'
3'0"121'10"42'6"46"3'9"924'0"12
A B
C
D E F
G
H I
JKLM
NOPQ
RSTUV
5
12
3 12
4X7
1.5X6 4X12
5X6(SRS)
5X8
H0510
4X8
3X4 3X8
4X8
3X4
H0510
5X8
5X6(SRS)
4X12
4X7
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
V 1275 /-/-/734 /802 /48
J 1275 /-/-/734 /802 /-
Wind reactions based on MWFRS
V Brg Width = 6.0 Min Req =1.5
J Brg Width = -Min Req =-
Bearing V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1016 -1101
B - C 1630 -1726
C - D 1320 -1449
D - E 1369 -1495
Chords Tens.Comp.
E - F 1369 -1495
F - G 1320 -1449
G - H 1630 -1727
H - I 1016 -1101
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1640 -1540
Q - P 1385 -1207
Chords Tens.Comp.
P - O 1385 -1207
O - L 1640 -1540
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 564 -615
A - U 1227 -1132
U - B 895 -942
U - S 1173 -1081
B - S 456 -453
Webs Tens.Comp.
L - H 456 -453
L - K 1173 -1081
H - K 895 -942
K - I 1227 -1133
I - J 564 -615
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.89 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 E 999 360
VERT(CL):0.222 E 999 240
HORZ(LL):-0.042 J - -
HORZ(TL):0.084 J - -
Creep Factor: 2.0
Max TC CSI:0.260
Max BC CSI:0.399
Max W eb CSI:0.277
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T140
Ply: 2
Qty:1
SEQN:12414 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T12
DrwNo:079.20.1313.40148
AK /DF 03/19/2020
2 Complete Trusses Required
28'
3'2"8
3'2"8
4'9"12
1'7"4
9'11"
5'1"4
14'
4'1"
18'1"
4'1"
23'2"4
5'1"4
24'9"8
1'7"4
28'
3'2"8
3'0"12
3'0"12
5'5"6
2'4"10
9'11"
4'5"10
14'
4'1"
18'1"
4'1"
22'10"12
4'9"12
24'11"4
2'0"8
28'
3'0"121'10"42'6"46"3'9"924'0"12
A B
C
D E F
G
H I
JKLM
NOPQ
RSTUV
5
12
3 12
4X7
1.5X6 4X12
5X6(SRS)
5X8
H0510
4X8
3X4 3X8
4X8
3X4
H0510
5X8
5X6(SRS)
4X12
4X7
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W3,W26 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 1277 /-/-/733 /824 /51
I 1277 /-/-/733 /824 /-
Wind reactions based on MWFRS
AH Brg Width = 6.0 Min Req =1.5
I Brg Width = -Min Req =-
Bearing AH Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1476 -1505
B - C 1998 -1979
C - D 1521 -1498
D - E 1500 -1442
Chords Tens.Comp.
E - F 1509 -1488
F - G 1997 -1979
G - H 1476 -1505
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 1804 -1806
Y - X 1788 -1791
X - W 1429 -1367
W -T 1443 -1382
Chords Tens.Comp.
T - S 1429 -1367
S - R 1788 -1790
R - O 1804 -1805
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AH 577 -598
A -AF 1579 -1551
AF- B 1019 -992
AF-AA 1597 -1568
AA- C 537 -499
C - X 501 -423
Webs Tens.Comp.
S - F 508 -429
F - O 536 -497
O - J 1596 -1567
G - J 1019 -992
J - H 1579 -1551
H - I 577 -598
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.72 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.147 U 999 360
VERT(CL):0.290 V 999 240
HORZ(LL):-0.063 I - -
HORZ(TL):0.121 I - -
Creep Factor: 2.0
Max TC CSI:0.296
Max BC CSI:0.279
Max W eb CSI:0.360
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T141
Ply: 2
Qty:1
SEQN:12411 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T165
DrwNo:079.20.1313.27965
AK /DF 03/19/2020
2 Complete Trusses Required
B3
W3 W26
28'
5'2"8
5'2"8
7'9"12
2'7"4
11'3"
3'5"4
16'9"
5'6"
20'2"4
3'5"4
22'9"8
2'7"4
28'
5'2"8
5'0"12
5'0"12
6'6"14
1'6"2
7'9"12
1'2"14
9'3"12
1'6"
9'5"8
1"12
11'3"
1'9"8
13'0"8
1'9"8
13'2"4
1"12
14'9"12
1'7"8
14'11"8
1"12
16'7"4
1'7"12
18'6"8
1'11"4
18'8"4
1"12
20'2"4
1'6"
22'9"8
2'7"4
28'
5'2"82'8"43'9"46"1'4"4'7"924'0"12
A B
C
D E
F
G H
IJKL
MN
O PQ
RS
TUV
WX
YZ
AA AB
ACAD
AE
AFAGAH
5 12
3 12
3X6
6X6 6X8
5X5
1.5X6(++)
5X8
5X6
3X4
4X7
3X4 3X3 3X3 3X8
4X4
3X4
5X6
5X8
1.5X6(++)
5X5
6X8
3X6
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B3 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W3,W26 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 1277 /-/-/733 /824 /51
I 1277 /-/-/733 /824 /-
Wind reactions based on MWFRS
AH Brg Width = 6.0 Min Req =1.5
I Brg Width = -Min Req =-
Bearing AH Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1476 -1505
B - C 1998 -1979
C - D 1521 -1498
D - E 1500 -1442
Chords Tens.Comp.
E - F 1509 -1488
F - G 1997 -1979
G - H 1476 -1505
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 1804 -1806
Y - X 1788 -1791
X - W 1429 -1367
W -T 1443 -1382
Chords Tens.Comp.
T - S 1429 -1367
S - R 1788 -1790
R - O 1804 -1805
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AH 577 -598
A -AF 1579 -1551
AF- B 1019 -992
AF-AA 1597 -1568
AA- C 537 -499
C - X 501 -423
Webs Tens.Comp.
S - F 508 -429
F - O 536 -497
O - J 1596 -1567
G - J 1019 -992
J - H 1579 -1551
H - I 577 -598
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.72 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.147 U 999 360
VERT(CL):0.290 V 999 240
HORZ(LL):-0.063 I - -
HORZ(TL):0.121 I - -
Creep Factor: 2.0
Max TC CSI:0.296
Max BC CSI:0.279
Max W eb CSI:0.360
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T141
Ply: 2
Qty:1
SEQN:12411 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T165
DrwNo:079.20.1313.27965
AK /DF 03/19/2020
2 Complete Trusses Required
B3
W3 W26
28'
5'2"8
5'2"8
7'9"12
2'7"4
11'3"
3'5"4
16'9"
5'6"
20'2"4
3'5"4
22'9"8
2'7"4
28'
5'2"8
5'0"12
5'0"12
6'6"14
1'6"2
7'9"12
1'2"14
9'3"12
1'6"
9'5"8
1"12
11'3"
1'9"8
13'0"8
1'9"8
13'2"4
1"12
14'9"12
1'7"8
14'11"8
1"12
16'7"4
1'7"12
18'6"8
1'11"4
18'8"4
1"12
20'2"4
1'6"
22'9"8
2'7"4
28'
5'2"82'8"43'9"46"1'4"4'7"924'0"12
A B
C
D E
F
G H
IJKL
MN
O PQ
RS
TUV
WX
YZ
AA AB
ACAD
AE
AFAGAH
5 12
3 12
3X6
6X6 6X8
5X5
1.5X6(++)
5X8
5X6
3X4
4X7
3X4 3X3 3X3 3X8
4X4
3X4
5X6
5X8
1.5X6(++)
5X5
6X8
3X6
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1,T7 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W13 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1279 /-/-/736 /849 /54
I 1279 /-/-/736 /849 /-
Wind reactions based on MWFRS
O Brg Width = 6.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2060 -2134
B - C 2052 -2022
C - D 1937 -1787
D - E 1909 -1728
Chords Tens.Comp.
E - F 2049 -1867
F - G 2042 -2015
G - H 2060 -2133
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 2210 -2147
M - L 1799 -1781
Chords Tens.Comp.
L - K 1716 -1671
K - J 2210 -2146
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - O 1149 -1215
A - N 2326 -2254
N - B 952 -855
B - M 495 -552
C - M 388 -328
Webs Tens.Comp.
K - G 498 -550
G - J 953 -861
J - H 2325 -2254
H - I 1148 -1214
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 L 999 360
VERT(CL):0.210 L 999 240
HORZ(LL):-0.031 A - -
HORZ(TL):0.058 A - -
Creep Factor: 2.0
Max TC CSI:0.592
Max BC CSI:0.745
Max W eb CSI:0.808
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T142
Ply: 1
Qty:1
SEQN:12421 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T129
DrwNo:079.20.1313.38884
AK /DF 03/19/2020
T1 T7
W2
W13
28'
7'2"8
7'2"8
10'9"12
3'7"4
12'7"
1'9"4
15'5"
2'10"
17'2"4
1'9"4
20'9"8
3'7"4
28'
7'2"8
6'10"8
6'10"8
10'9"12
3'11"4
12'8"12
1'11"
17'0"8
4'3"12
21'1"8
4'1"
28'
6'10"83'6"45'0"45'5"9(WB1)(WB1)
24'0"12
A B
C
D E
F
G H
IJKLMNO
5
12
3 12
4X7
1.5X6 3X8
5X5
5X8
3X4
4X4
5X8
4X4
3X8
5X5
5X5
3X8
4X7
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1,T7 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W13 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1279 /-/-/736 /849 /54
I 1279 /-/-/736 /849 /-
Wind reactions based on MWFRS
O Brg Width = 6.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing O Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2060 -2134
B - C 2052 -2022
C - D 1937 -1787
D - E 1909 -1728
Chords Tens.Comp.
E - F 2049 -1867
F - G 2042 -2015
G - H 2060 -2133
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 2210 -2147
M - L 1799 -1781
Chords Tens.Comp.
L - K 1716 -1671
K - J 2210 -2146
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - O 1149 -1215
A - N 2326 -2254
N - B 952 -855
B - M 495 -552
C - M 388 -328
Webs Tens.Comp.
K - G 498 -550
G - J 953 -861
J - H 2325 -2254
H - I 1148 -1214
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 L 999 360
VERT(CL):0.210 L 999 240
HORZ(LL):-0.031 A - -
HORZ(TL):0.058 A - -
Creep Factor: 2.0
Max TC CSI:0.592
Max BC CSI:0.745
Max W eb CSI:0.808
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T142
Ply: 1
Qty:1
SEQN:12421 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T129
DrwNo:079.20.1313.38884
AK /DF 03/19/2020
T1 T7
W2
W13
28'
7'2"8
7'2"8
10'9"12
3'7"4
12'7"
1'9"4
15'5"
2'10"
17'2"4
1'9"4
20'9"8
3'7"4
28'
7'2"8
6'10"8
6'10"8
10'9"12
3'11"4
12'8"12
1'11"
17'0"8
4'3"12
21'1"8
4'1"
28'
6'10"83'6"45'0"45'5"9(WB1)(WB1)
24'0"12
A B
C
D E
F
G H
IJKLMNO
5
12
3 12
4X7
1.5X6 3X8
5X5
5X8
3X4
4X4
5X8
4X4
3X8
5X5
5X5
3X8
4X7
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1274 /-/-/725 /865 /56
H 1274 /-/-/725 /865 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1554 -1882
C - D 1436 -1657
Chords Tens.Comp.
D - E 1365 -1657
E - F 1523 -1939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1161 -904
K - J 1921 -1541
Chords Tens.Comp.
J - I 1975 -1561
I - H 1211 -956
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 1307 -1584
B - K 1017 -841
K - C 582 -544
C - J 501 -587
D - J 854 -672
Webs Tens.Comp.
J - E 625 -657
E - I 522 -504
I - F 999 -779
F - H 1275 -1615
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.39 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.086 J 999 360
VERT(CL):0.156 J 999 240
HORZ(LL):-0.033 A - -
HORZ(TL):0.059 A - -
Creep Factor: 2.0
Max TC CSI:0.470
Max BC CSI:0.986
Max W eb CSI:0.949
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T143
Ply: 1
Qty:1
SEQN:12425 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T22
DrwNo:079.20.1313.28759
AK /DF 03/19/2020
B2
W10
27'6"8
4'4"8
4'4"8
8'9"
4'4"8
13'5"
4'8"
18'4"
4'11"
22'11"4
4'7"4
27'6"8
4'7"4
8'5"8
8'5"8
18'7"8
10'2"
27'6"8
8'11"4'4"46'3"924'0"12
A B C
D
E F G
HIJKL
5
12
1.5X4
6X6
3X5
3X4
5X5
4X4
5X8
5X5
3X4
3X5 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1274 /-/-/725 /865 /56
H 1274 /-/-/725 /865 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1554 -1882
C - D 1436 -1657
Chords Tens.Comp.
D - E 1365 -1657
E - F 1523 -1939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1161 -904
K - J 1921 -1541
Chords Tens.Comp.
J - I 1975 -1561
I - H 1211 -956
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 1307 -1584
B - K 1017 -841
K - C 582 -544
C - J 501 -587
D - J 854 -672
Webs Tens.Comp.
J - E 625 -657
E - I 522 -504
I - F 999 -779
F - H 1275 -1615
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.39 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.086 J 999 360
VERT(CL):0.156 J 999 240
HORZ(LL):-0.033 A - -
HORZ(TL):0.059 A - -
Creep Factor: 2.0
Max TC CSI:0.470
Max BC CSI:0.986
Max W eb CSI:0.949
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T143
Ply: 1
Qty:1
SEQN:12425 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T22
DrwNo:079.20.1313.28759
AK /DF 03/19/2020
B2
W10
27'6"8
4'4"8
4'4"8
8'9"
4'4"8
13'5"
4'8"
18'4"
4'11"
22'11"4
4'7"4
27'6"8
4'7"4
8'5"8
8'5"8
18'7"8
10'2"
27'6"8
8'11"4'4"46'3"924'0"12
A B C
D
E F G
HIJKL
5
12
1.5X4
6X6
3X5
3X4
5X5
4X4
5X8
5X5
3X4
3X5 1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W11 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1274 /-/-/721 /875 /33
H 1274 /-/-/720 /875 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 960 -1148
B - C 1525 -1716
C - D 1763 -1929
Chords Tens.Comp.
D - E 1788 -1959
E - F 1547 -1742
F - G 990 -1189
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1205 -1013
K - J 1452 -1321
Chords Tens.Comp.
J - I 1246 -1043
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 1034 -1231
A - L 1572 -1315
L - B 889 -959
B - K 709 -711
K - C 963 -984
K - D 671 -532
Webs Tens.Comp.
D - J 733 -583
E - J 980 -1005
J - F 675 -686
F - I 878 -944
I - G 1598 -1330
G - H 1028 -1230
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.095 E 999 360
VERT(CL):0.169 E 999 240
HORZ(LL):-0.034 A - -
HORZ(TL):0.060 A - -
Creep Factor: 2.0
Max TC CSI:0.621
Max BC CSI:0.513
Max W eb CSI:0.642
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T144
Ply: 1
Qty:1
SEQN:12429 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T96
DrwNo:079.20.1313.26701
AK /DF 03/19/2020
W2
W11
27'6"8
5'6"4
5'6"4
10'9"
5'2"12
13'6"8
2'9"8
16'4"
2'9"8
21'9"8
5'5"8
27'6"8
5'9"
5'2"12
5'2"12
10'7"4
5'4"8
16'5"12
5'10"8
22'1"
5'7"4
27'6"8
5'5"85'2"46'4"324'0"12
A B C
D
E F G
HIJKLM
5 12
4X5
1.5X6 4X5
3X4
3X8
5X5
4X4
5X5
5X8
3X4
4X5
4X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W11 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1274 /-/-/721 /875 /33
H 1274 /-/-/720 /875 /-
Wind reactions based on MWFRS
M Brg Width = -Min Req =-
H Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 960 -1148
B - C 1525 -1716
C - D 1763 -1929
Chords Tens.Comp.
D - E 1788 -1959
E - F 1547 -1742
F - G 990 -1189
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1205 -1013
K - J 1452 -1321
Chords Tens.Comp.
J - I 1246 -1043
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 1034 -1231
A - L 1572 -1315
L - B 889 -959
B - K 709 -711
K - C 963 -984
K - D 671 -532
Webs Tens.Comp.
D - J 733 -583
E - J 980 -1005
J - F 675 -686
F - I 878 -944
I - G 1598 -1330
G - H 1028 -1230
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.83 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.095 E 999 360
VERT(CL):0.169 E 999 240
HORZ(LL):-0.034 A - -
HORZ(TL):0.060 A - -
Creep Factor: 2.0
Max TC CSI:0.621
Max BC CSI:0.513
Max W eb CSI:0.642
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T144
Ply: 1
Qty:1
SEQN:12429 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T96
DrwNo:079.20.1313.26701
AK /DF 03/19/2020
W2
W11
27'6"8
5'6"4
5'6"4
10'9"
5'2"12
13'6"8
2'9"8
16'4"
2'9"8
21'9"8
5'5"8
27'6"8
5'9"
5'2"12
5'2"12
10'7"4
5'4"8
16'5"12
5'10"8
22'1"
5'7"4
27'6"8
5'5"85'2"46'4"324'0"12
A B C
D
E F G
HIJKLM
5 12
4X5
1.5X6 4X5
3X4
3X8
5X5
4X4
5X5
5X8
3X4
4X5
4X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W11 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1274 /-/-/714 /888 /45
I 1274 /-/-/721 /866 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
I Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 868 -1162
B - C 868 -1162
C - D 1330 -1695
Chords Tens.Comp.
D - E 1325 -1681
E - F 988 -1267
F - G 988 -1267
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1550 -1119
L - K 1469 -1060
Chords Tens.Comp.
K - J 1548 -1124
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 934 -1223
A - M 1562 -1167
B - M 471 -548
M - C 446 -522
C - L 440 -537
L - D 628 -452
Webs Tens.Comp.
D - K 610 -490
E - K 481 -559
E - J 305 -393
F - J 431 -501
J - G 1337 -938
G - I 907 -1200
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.072 E 999 360
VERT(CL):0.128 C 999 240
HORZ(LL):-0.027 A - -
HORZ(TL):0.049 A - -
Creep Factor: 2.0
Max TC CSI:0.833
Max BC CSI:0.793
Max W eb CSI:0.756
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T145
Ply: 1
Qty:1
SEQN:12433 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T82
DrwNo:079.20.1313.27402
AK /DF 03/19/2020
W2
W11
27'6"8
6'4"8
6'4"8
12'9"
6'4"8
13'6"8
9"8
14'4"
9"8
20'2"
5'10"
26'
5'10"
27'6"8
1'6"8
6'4"8
6'4"8
12'9"
6'4"8
14'4"
1'7"
20'2"
5'10"
27'6"8
7'4"86'0"45'4"86'4"3(WB1)
24'0"12
A B C D E F G
H
IJKLMN
5 12
4X5
1.5X6
1.5X4
5X8
5X10(SRS)
3X4
4X4
5X10(SRS)
5X5
1.5X4
4X8
4X6
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2,W11 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1274 /-/-/714 /888 /45
I 1274 /-/-/721 /866 /-
Wind reactions based on MWFRS
N Brg Width = -Min Req =-
I Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 868 -1162
B - C 868 -1162
C - D 1330 -1695
Chords Tens.Comp.
D - E 1325 -1681
E - F 988 -1267
F - G 988 -1267
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1550 -1119
L - K 1469 -1060
Chords Tens.Comp.
K - J 1548 -1124
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 934 -1223
A - M 1562 -1167
B - M 471 -548
M - C 446 -522
C - L 440 -537
L - D 628 -452
Webs Tens.Comp.
D - K 610 -490
E - K 481 -559
E - J 305 -393
F - J 431 -501
J - G 1337 -938
G - I 907 -1200
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.072 E 999 360
VERT(CL):0.128 C 999 240
HORZ(LL):-0.027 A - -
HORZ(TL):0.049 A - -
Creep Factor: 2.0
Max TC CSI:0.833
Max BC CSI:0.793
Max W eb CSI:0.756
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T145
Ply: 1
Qty:1
SEQN:12433 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T82
DrwNo:079.20.1313.27402
AK /DF 03/19/2020
W2
W11
27'6"8
6'4"8
6'4"8
12'9"
6'4"8
13'6"8
9"8
14'4"
9"8
20'2"
5'10"
26'
5'10"
27'6"8
1'6"8
6'4"8
6'4"8
12'9"
6'4"8
14'4"
1'7"
20'2"
5'10"
27'6"8
7'4"86'0"45'4"86'4"3(WB1)
24'0"12
A B C D E F G
H
IJKLMN
5 12
4X5
1.5X6
1.5X4
5X8
5X10(SRS)
3X4
4X4
5X10(SRS)
5X5
1.5X4
4X8
4X6
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AA 830 /-/-/441 /485 /354
V 2164 /-/-/1307 /1140 /-
I 637 /-/-/435 /328 /-
Wind reactions based on MWFRS
AA Brg Width = -Min Req =-
V Brg Width = 4.0 Min Req =3.4
I Brg Width = -Min Req =-
Bearing V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 539 -753
B - C 472 -611
C - D 685 -387
Chords Tens.Comp.
D - E 870 -493
F - G 393 -441
G - H 785 -945
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 544 -6
Z - Y 777 -272
W -V 970 -738
Chords Tens.Comp.
V - T 551 -284
T - R 550 -281
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AA 581 -777
A - Z 949 -680
Z - B 436 -432
Y - W 594 -208
C - W 974 -1369
W -D 626 -271
D - V 613 -1057
Webs Tens.Comp.
V - E 916 -1029
R - E 603 -551
R - F 783 -653
K - G 689 -549
K - J 825 -599
J - H 714 -481
H - I 626 -587
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.83 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 B 999 360
VERT(CL):0.053 B 999 240
HORZ(LL):0.010 G - -
HORZ(TL):0.017 A - -
Creep Factor: 2.0
Max TC CSI:0.753
Max BC CSI:0.554
Max W eb CSI:0.802
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T146
Ply: 1
Qty:1
SEQN:12480 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T193
DrwNo:079.20.1313.31380
AK /DF 03/19/2020
W7
20'8"8 17'7"8
6'10"9
6'10"9
13'7"7
6'8"13
20'2"8
6'7"1
24'
3'9"8
26'6"8
2'6"8
32'3"8
5'9"
38'4"
6'0"8
6'7"1
6'7"1
13'5"11
6'10"9
20'2"8
6'8"13
20'10"4
7"12
21'4"4
6"
23'8"8
2'4"4
26'6"8
2'10"
32'5"4
5'10"12
38'4"
5'10"12
1'6"5'4"410"92'6"1'6'10"4(WB1)
25'6"12
26'6"12
24'0"12
A B C D E
F
G
H
IJ
KLMNOPQ
RSTUV
W XYZAA
5
124X4
1.5X6 5X5
3X4
3X8
5X5
5X8
3X4
4X5 5X8
5X8
1.5X6 (++)
3X4
5X83X3
3X4
3X8 3X10 (++)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AA 830 /-/-/441 /485 /354
V 2164 /-/-/1307 /1140 /-
I 637 /-/-/435 /328 /-
Wind reactions based on MWFRS
AA Brg Width = -Min Req =-
V Brg Width = 4.0 Min Req =3.4
I Brg Width = -Min Req =-
Bearing V Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 539 -753
B - C 472 -611
C - D 685 -387
Chords Tens.Comp.
D - E 870 -493
F - G 393 -441
G - H 785 -945
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 544 -6
Z - Y 777 -272
W -V 970 -738
Chords Tens.Comp.
V - T 551 -284
T - R 550 -281
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AA 581 -777
A - Z 949 -680
Z - B 436 -432
Y - W 594 -208
C - W 974 -1369
W -D 626 -271
D - V 613 -1057
Webs Tens.Comp.
V - E 916 -1029
R - E 603 -551
R - F 783 -653
K - G 689 -549
K - J 825 -599
J - H 714 -481
H - I 626 -587
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.83 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 B 999 360
VERT(CL):0.053 B 999 240
HORZ(LL):0.010 G - -
HORZ(TL):0.017 A - -
Creep Factor: 2.0
Max TC CSI:0.753
Max BC CSI:0.554
Max W eb CSI:0.802
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T146
Ply: 1
Qty:1
SEQN:12480 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T193
DrwNo:079.20.1313.31380
AK /DF 03/19/2020
W7
20'8"8 17'7"8
6'10"9
6'10"9
13'7"7
6'8"13
20'2"8
6'7"1
24'
3'9"8
26'6"8
2'6"8
32'3"8
5'9"
38'4"
6'0"8
6'7"1
6'7"1
13'5"11
6'10"9
20'2"8
6'8"13
20'10"4
7"12
21'4"4
6"
23'8"8
2'4"4
26'6"8
2'10"
32'5"4
5'10"12
38'4"
5'10"12
1'6"5'4"410"92'6"1'6'10"4(WB1)
25'6"12
26'6"12
24'0"12
A B C D E
F
G
H
IJ
KLMNOPQ
RSTUV
W XYZAA
5
124X4
1.5X6 5X5
3X4
3X8
5X5
5X8
3X4
4X5 5X8
5X8
1.5X6 (++)
3X4
5X83X3
3X4
3X8 3X10 (++)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 843 /-/-/513 /457 /205
W 2151 /-/-/1283 /1204 /-
J 633 /-/-/412 /332 /-
Wind reactions based on MWFRS
AB Brg Width = -Min Req =-
W Brg Width = 4.0 Min Req =3.4
J Brg Width = -Min Req =-
Bearing W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 626 -763
B - C 558 -589
C - D 539 -287
D - E 687 -390
Chords Tens.Comp.
E - F 636 -382
F - G 331 -417
G - H 696 -790
H - I 711 -728
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 639 -195
X - W 875 -597
Chords Tens.Comp.
W -T 839 -555
L - K 827 -824
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 736 -793
A -AA 712 -498
Z - X 570 -194
C - X 1025 -1231
X - D 591 -324
D - W 706 -1010
W -E 631 -760
T - E 424 -316
Webs Tens.Comp.
T - F 952 -895
F - M 438 -410
M - G 584 -410
M - L 711 -535
H - K 584 -518
K - I 926 -907
I - J 558 -620
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.80 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.83 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 S 999 360
VERT(CL):0.061 S 999 240
HORZ(LL):0.007 E - -
HORZ(TL):0.017 E - -
Creep Factor: 2.0
Max TC CSI:0.915
Max BC CSI:0.566
Max W eb CSI:0.777
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T147
Ply: 1
Qty:1
SEQN:12483 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T115
DrwNo:079.20.1313.42987
AK /DF 03/19/2020
20'8"8 17'7"8
6'1"
6'1"
13'3"8
7'2"8
20'2"8
6'11"
22'
1'9"8
26'6"8
4'6"8
31'2"8
4'8"
36'2"
4'11"8
38'4"
2'2"
6'1"
6'1"
13'1"12
7'0"12
20'2"8
7'0"12
21'8"8
1'6"
26'6"8
4'10"
31'4"4
4'9"12
36'5"8
5'1"4
38'4"
1'10"8
1'6"3'7"131'9"62'6"1'7'8"4(WB1)(WB1)
25'6"12
26'6"12
24'0"12
A
B C D E
F
G
H I
JKL
MNOPQRS
TUVWXYZAAAB
5 12
4X5
1.5X6
5X8
5X8 5X8
1.5X4
4X5
5X8
1.5X4
5X8
1.5X6 (++)
5X83X3
1.5X4
3X8
5X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 843 /-/-/513 /457 /205
W 2151 /-/-/1283 /1204 /-
J 633 /-/-/412 /332 /-
Wind reactions based on MWFRS
AB Brg Width = -Min Req =-
W Brg Width = 4.0 Min Req =3.4
J Brg Width = -Min Req =-
Bearing W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 626 -763
B - C 558 -589
C - D 539 -287
D - E 687 -390
Chords Tens.Comp.
E - F 636 -382
F - G 331 -417
G - H 696 -790
H - I 711 -728
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 639 -195
X - W 875 -597
Chords Tens.Comp.
W -T 839 -555
L - K 827 -824
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 736 -793
A -AA 712 -498
Z - X 570 -194
C - X 1025 -1231
X - D 591 -324
D - W 706 -1010
W -E 631 -760
T - E 424 -316
Webs Tens.Comp.
T - F 952 -895
F - M 438 -410
M - G 584 -410
M - L 711 -535
H - K 584 -518
K - I 926 -907
I - J 558 -620
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.80 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.83 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 S 999 360
VERT(CL):0.061 S 999 240
HORZ(LL):0.007 E - -
HORZ(TL):0.017 E - -
Creep Factor: 2.0
Max TC CSI:0.915
Max BC CSI:0.566
Max W eb CSI:0.777
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T147
Ply: 1
Qty:1
SEQN:12483 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T115
DrwNo:079.20.1313.42987
AK /DF 03/19/2020
20'8"8 17'7"8
6'1"
6'1"
13'3"8
7'2"8
20'2"8
6'11"
22'
1'9"8
26'6"8
4'6"8
31'2"8
4'8"
36'2"
4'11"8
38'4"
2'2"
6'1"
6'1"
13'1"12
7'0"12
20'2"8
7'0"12
21'8"8
1'6"
26'6"8
4'10"
31'4"4
4'9"12
36'5"8
5'1"4
38'4"
1'10"8
1'6"3'7"131'9"62'6"1'7'8"4(WB1)(WB1)
25'6"12
26'6"12
24'0"12
A
B C D E
F
G
H I
JKL
MNOPQRS
TUVWXYZAAAB
5 12
4X5
1.5X6
5X8
5X8 5X8
1.5X4
4X5
5X8
1.5X4
5X8
1.5X6 (++)
5X83X3
1.5X4
3X8
5X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B4 2x4 SP 2250f-1.9E;
B7 2x6 SP #2;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 45.88
BC: From 20 plf at 0.00 to 20 plf at 38.40
BC: From 10 plf at 38.40 to 10 plf at 39.17
BC: From 20 plf at 39.17 to 20 plf at 44.21
BC: From 22 plf at 44.21 to 22 plf at 45.88
TC: 252 lb Conc. Load at 39.17
BC: 705 lb Conc. Load at 38.40
BC: 81 lb Conc. Load at 39.17
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 566 /-/-/-/196 /-
Y 3269 /-/-/-/1725 /-
AI 1598 /-/-/-/880 /-
Wind reactions based on MWFRS
AH Brg Width = -Min Req =-
Y Brg Width = 4.0 Min Req =2.9
AI Brg Width = 8.0 Min Req =1.5
Bearings Y & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 907 -492
E - F 1037 -562
F - G 1055 -582
Chords Tens.Comp.
H - I 678 -1271
I - J 583 -1109
J - K 799 -1441
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 529 -973
Y - W 532 -984
Chords Tens.Comp.
N - M 1319 -720
M - K 1296 -712
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AC 211 -394
AC- D 442 -166
D -AA 513 -958
E - Y 361 -694
W -G 427 -813
Webs Tens.Comp.
G - P 515 -224
P - H 319 -592
H - N 1169 -637
I - N 379 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.052 I 999 360
VERT(CL):0.122 I 999 240
HORZ(LL):0.015 J - -
HORZ(TL):0.038 J - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.474
Max W eb CSI:0.274
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T148
Ply: 2
Qty:1
SEQN:12533 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T248
DrwNo:079.20.1313.40413
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B4
B7
W10
20'8"8 23'6"
1'5"4
1'5"4
8'1"
6'7"12
14'2"4
6'1"4
20'
5'9"12
21'2"8
1'2"8
26'6"8
5'4"
30'4"4
3'9"12
34'2"
3'9"12
39'2"
5'
44'2"8
5'0"8
1'3"8
1'3"8
8'1"
6'9"8
14'0"8
5'11"8
20'2"8
6'2"
21'2"8
1'
26'6"8
5'4"
30'2"8
3'8"
34'3"12
4'1"4
39'0"4
4'8"8
44'2"8
5'2"4 1'8"
1'6"3'7"136"3 2'7"61'2'6"8'6"49'0"325'6"12
26'6"12
24'0"12
A B
C D E F
G
H
I J
K
L
MNO
PQRST
UV
W X
YZAA
AB
ACADAEAFAG
AH
AI
5
12
3X3
1.5X4
1.5X4
1.5X4
3X4
4X4
6X8
1.5X4
5X6
3X5
3X4
1.5X4
1.5X6 (++)
3X5
3X4
1.5X6
3X4
4X12
5X6
5X10 3X5
4X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B4 2x4 SP 2250f-1.9E;
B7 2x6 SP #2;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 45.88
BC: From 20 plf at 0.00 to 20 plf at 38.40
BC: From 10 plf at 38.40 to 10 plf at 39.17
BC: From 20 plf at 39.17 to 20 plf at 44.21
BC: From 22 plf at 44.21 to 22 plf at 45.88
TC: 252 lb Conc. Load at 39.17
BC: 705 lb Conc. Load at 38.40
BC: 81 lb Conc. Load at 39.17
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AH 566 /-/-/-/196 /-
Y 3269 /-/-/-/1725 /-
AI 1598 /-/-/-/880 /-
Wind reactions based on MWFRS
AH Brg Width = -Min Req =-
Y Brg Width = 4.0 Min Req =2.9
AI Brg Width = 8.0 Min Req =1.5
Bearings Y & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 907 -492
E - F 1037 -562
F - G 1055 -582
Chords Tens.Comp.
H - I 678 -1271
I - J 583 -1109
J - K 799 -1441
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Y 529 -973
Y - W 532 -984
Chords Tens.Comp.
N - M 1319 -720
M - K 1296 -712
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AC 211 -394
AC- D 442 -166
D -AA 513 -958
E - Y 361 -694
W -G 427 -813
Webs Tens.Comp.
G - P 515 -224
P - H 319 -592
H - N 1169 -637
I - N 379 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.052 I 999 360
VERT(CL):0.122 I 999 240
HORZ(LL):0.015 J - -
HORZ(TL):0.038 J - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.474
Max W eb CSI:0.274
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T148
Ply: 2
Qty:1
SEQN:12533 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T248
DrwNo:079.20.1313.40413
AK /DF 03/19/2020
2 Complete Trusses Required
T2
B4
B7
W10
20'8"8 23'6"
1'5"4
1'5"4
8'1"
6'7"12
14'2"4
6'1"4
20'
5'9"12
21'2"8
1'2"8
26'6"8
5'4"
30'4"4
3'9"12
34'2"
3'9"12
39'2"
5'
44'2"8
5'0"8
1'3"8
1'3"8
8'1"
6'9"8
14'0"8
5'11"8
20'2"8
6'2"
21'2"8
1'
26'6"8
5'4"
30'2"8
3'8"
34'3"12
4'1"4
39'0"4
4'8"8
44'2"8
5'2"4 1'8"
1'6"3'7"136"3 2'7"61'2'6"8'6"49'0"325'6"12
26'6"12
24'0"12
A B
C D E F
G
H
I J
K
L
MNO
PQRST
UV
W X
YZAA
AB
ACADAEAFAG
AH
AI
5
12
3X3
1.5X4
1.5X4
1.5X4
3X4
4X4
6X8
1.5X4
5X6
3X5
3X4
1.5X4
1.5X6 (++)
3X5
3X4
1.5X6
3X4
4X12
5X6
5X10 3X5
4X5(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W12 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.542' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AA 759 /-/-/436 /364 /326
U 2667 /-/-/1608 /1302 /-
AB 968 /-/-/698 /496 /-
Wind reactions based on MWFRS
AA Brg Width = -Min Req =-
U Brg Width = 4.0 Min Req =-
AB Brg Width = 8.0 Min Req =1.5
Bearings U & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 473 -498
B - C 544 -444
E - F 1147 -541
Chords Tens.Comp.
F - G 1205 -702
H - I 1114 -954
I - J 1195 -1272
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 534 -195
Z - Y 543 -265
W -U 1052 -616
U - R 392 -73
Chords Tens.Comp.
R - N 409 -45
M - L 1084 -889
L - J 1079 -888
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AA 732 -720
A - Z 573 -459
C - Y 288 -409
C - W 713 -529
Y - W 529 -215
W -E 1010 -766
Webs Tens.Comp.
E - U 1098 -1578
U - F 588 -359
U - G 1259 -1195
G - N 638 -509
N - H 1132 -1009
N - M 991 -755
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.65 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 H 999 360
VERT(CL):0.097 H 999 240
HORZ(LL):0.016 I - -
HORZ(TL):0.021 F - -
Creep Factor: 2.0
Max TC CSI:0.816
Max BC CSI:0.536
Max W eb CSI:0.940
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T149
Ply: 1
Qty:1
SEQN:12497 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T143
DrwNo:079.20.1313.40709
AK /DF 03/19/2020
W10 W12
BL1
20'8"8 23'6"
5'2"4
5'2"4
10'1"
4'10"12
14'6"12
4'5"12
18'
3'5"4
20'8"8
2'8"8
26'6"8
5'10"
32'2"
5'7"8
37'2"
5'
44'2"8
7'0"8
4'10"12
4'10"12
10'2"12
5'4"
15'
4'9"4
20'8"8
5'8"8
26'6"8
5'10"
32'3"12
5'9"4
37'0"4
4'8"8
44'2"8
7'2"4 1'8"5'1"136"3 3'5"61'6"1'9'4"49'10"3(WB1)(WB1)
24'0"12
25'6"12
A
B
C D E
F
G
H I
J
K
LM
NOPQR
S
TU
VWXYZAA AB
5 12
4X4
1.5X6 3X4
3X4
3X8
1.5X4
1.5X4
5X6
1.5X4
1.5X6(++)
3X4
3X4
1.5X4
5X6
3X8 1.5X4 3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W12 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.542' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AA 759 /-/-/436 /364 /326
U 2667 /-/-/1608 /1302 /-
AB 968 /-/-/698 /496 /-
Wind reactions based on MWFRS
AA Brg Width = -Min Req =-
U Brg Width = 4.0 Min Req =-
AB Brg Width = 8.0 Min Req =1.5
Bearings U & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 473 -498
B - C 544 -444
E - F 1147 -541
Chords Tens.Comp.
F - G 1205 -702
H - I 1114 -954
I - J 1195 -1272
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AA- Z 534 -195
Z - Y 543 -265
W -U 1052 -616
U - R 392 -73
Chords Tens.Comp.
R - N 409 -45
M - L 1084 -889
L - J 1079 -888
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AA 732 -720
A - Z 573 -459
C - Y 288 -409
C - W 713 -529
Y - W 529 -215
W -E 1010 -766
Webs Tens.Comp.
E - U 1098 -1578
U - F 588 -359
U - G 1259 -1195
G - N 638 -509
N - H 1132 -1009
N - M 991 -755
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.65 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 H 999 360
VERT(CL):0.097 H 999 240
HORZ(LL):0.016 I - -
HORZ(TL):0.021 F - -
Creep Factor: 2.0
Max TC CSI:0.816
Max BC CSI:0.536
Max W eb CSI:0.940
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T149
Ply: 1
Qty:1
SEQN:12497 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T143
DrwNo:079.20.1313.40709
AK /DF 03/19/2020
W10 W12
BL1
20'8"8 23'6"
5'2"4
5'2"4
10'1"
4'10"12
14'6"12
4'5"12
18'
3'5"4
20'8"8
2'8"8
26'6"8
5'10"
32'2"
5'7"8
37'2"
5'
44'2"8
7'0"8
4'10"12
4'10"12
10'2"12
5'4"
15'
4'9"4
20'8"8
5'8"8
26'6"8
5'10"
32'3"12
5'9"4
37'0"4
4'8"8
44'2"8
7'2"4 1'8"5'1"136"3 3'5"61'6"1'9'4"49'10"3(WB1)(WB1)
24'0"12
25'6"12
A
B
C D E
F
G
H I
J
K
LM
NOPQR
S
TU
VWXYZAA AB
5 12
4X4
1.5X6 3X4
3X4
3X8
1.5X4
1.5X4
5X6
1.5X4
1.5X6(++)
3X4
3X4
1.5X4
5X6
3X8 1.5X4 3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W12 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.542' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AC 766 /-/-/443 /367 /343
W 2648 /-/-/1586 /1309 /-
AD 976 /-/-/708 /500 /-
Wind reactions based on MWFRS
AC Brg Width = -Min Req =-
W Brg Width = 4.0 Min Req =-
AD Brg Width = 8.0 Min Req =1.6
Bearings W & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 484 -528
B - C 507 -415
E - F 1126 -484
F - G 1172 -728
Chords Tens.Comp.
H - I 760 -577
I - J 1017 -1026
J - K 1308 -1384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AC-AB 535 -211
AB-AA 571 -283
Y - W 914 -465
W -T 470 -56
Chords Tens.Comp.
T - P 481 -32
O - N 896 -611
N - M 1202 -1064
M - K 1203 -1061
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AC 725 -723
A -AB 575 -451
B -AA 409 -307
C -AA 330 -549
C - Y 824 -557
AA- Y 604 -227
Y - E 891 -682
E - W 1099 -1587
Webs Tens.Comp.
W -F 623 -409
W -G 1250 -1183
G - P 708 -553
P - H 799 -683
P - O 634 -331
O - I 483 -427
N - J 503 -342
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 N 999 360
VERT(CL):0.104 N 999 240
HORZ(LL):0.017 O - -
HORZ(TL):0.025 M - -
Creep Factor: 2.0
Max TC CSI:0.771
Max BC CSI:0.678
Max W eb CSI:0.882
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T150
Ply: 1
Qty:1
SEQN:12506 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T118
DrwNo:079.20.1313.39008
AK /DF 03/19/2020
W10 W12
BL1
20'8"8 23'6"
5'9"
5'9"
11'2"9
5'5"8
14'6"12
3'4"3
16'10"7
2'3"11
20'8"8
3'10"1
26'6"8
5'10"
30'2"
3'7"8
35'2"
5'
39'6"8
4'4"8
44'2"8
4'8"
5'5"8
5'5"8
11'4"5
5'10"12
15'
3'7"11
20'8"8
5'8"8
26'6"8
5'10"
30'3"12
3'9"4
35'2"
4'10"4
39'8"4
4'6"4
44'2"8
4'6"4 1'8"5'1"136"3 4'3"61'6"1'9'9"1410'3"13(WB1)(WB2)
(a)(WB3)
24'0"12
25'6"12
A
B
C D E
F
G
H I
J
K
L
MNO
PQRST
UV
W
XYZAAABAC AD
5
12
4X4
1.5X6
5X8
3X8
1.5X4
5X81.5X4
5X6
5X8
1.5X4
1.5X6(++)5X8
1.5X4
5X6
3X8
5X8
1.5X4 3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W12 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.542' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AC 766 /-/-/443 /367 /343
W 2648 /-/-/1586 /1309 /-
AD 976 /-/-/708 /500 /-
Wind reactions based on MWFRS
AC Brg Width = -Min Req =-
W Brg Width = 4.0 Min Req =-
AD Brg Width = 8.0 Min Req =1.6
Bearings W & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 484 -528
B - C 507 -415
E - F 1126 -484
F - G 1172 -728
Chords Tens.Comp.
H - I 760 -577
I - J 1017 -1026
J - K 1308 -1384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AC-AB 535 -211
AB-AA 571 -283
Y - W 914 -465
W -T 470 -56
Chords Tens.Comp.
T - P 481 -32
O - N 896 -611
N - M 1202 -1064
M - K 1203 -1061
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AC 725 -723
A -AB 575 -451
B -AA 409 -307
C -AA 330 -549
C - Y 824 -557
AA- Y 604 -227
Y - E 891 -682
E - W 1099 -1587
Webs Tens.Comp.
W -F 623 -409
W -G 1250 -1183
G - P 708 -553
P - H 799 -683
P - O 634 -331
O - I 483 -427
N - J 503 -342
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.044 N 999 360
VERT(CL):0.104 N 999 240
HORZ(LL):0.017 O - -
HORZ(TL):0.025 M - -
Creep Factor: 2.0
Max TC CSI:0.771
Max BC CSI:0.678
Max W eb CSI:0.882
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T150
Ply: 1
Qty:1
SEQN:12506 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T118
DrwNo:079.20.1313.39008
AK /DF 03/19/2020
W10 W12
BL1
20'8"8 23'6"
5'9"
5'9"
11'2"9
5'5"8
14'6"12
3'4"3
16'10"7
2'3"11
20'8"8
3'10"1
26'6"8
5'10"
30'2"
3'7"8
35'2"
5'
39'6"8
4'4"8
44'2"8
4'8"
5'5"8
5'5"8
11'4"5
5'10"12
15'
3'7"11
20'8"8
5'8"8
26'6"8
5'10"
30'3"12
3'9"4
35'2"
4'10"4
39'8"4
4'6"4
44'2"8
4'6"4 1'8"5'1"136"3 4'3"61'6"1'9'9"1410'3"13(WB1)(WB2)
(a)(WB3)
24'0"12
25'6"12
A
B
C D E
F
G
H I
J
K
L
MNO
PQRST
UV
W
XYZAAABAC AD
5
12
4X4
1.5X6
5X8
3X8
1.5X4
5X81.5X4
5X6
5X8
1.5X4
1.5X6(++)5X8
1.5X4
5X6
3X8
5X8
1.5X4 3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x4 SP #2;
Webs: 2x4 SP #2; W2,W3,W6,W7,W8,
W10 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 774 /-/-/466 /346 /343
N 2624 /-/-/1587 /1348 /-
S 985 /-/-/711 /482 /-
Wind reactions based on MWFRS
R Brg Width = -Min Req =-
N Brg Width = 8.0 Min Req =4.2
S Brg Width = 8.0 Min Req =1.6
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 444 -533
B - C 473 -433
D - E 859 -304
E - F 936 -608
Chords Tens.Comp.
F - G 452 -329
G - H 754 -846
H - I 1164 -1391
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 535 -211
Q - P 587 -290
P - O 593 -213
O - N 807 -361
Chords Tens.Comp.
M - L 710 -315
L - K 1201 -919
K - I 1204 -918
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 679 -731
A - Q 579 -422
B - P 420 -274
C - P 393 -345
C - O 737 -792
O - D 759 -643
D - N 1009 -1420
Webs Tens.Comp.
N - E 720 -491
N - F 1268 -1247
F - M 564 -475
M - G 657 -558
G - L 376 -317
L - H 672 -547
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 H 999 360
VERT(CL):0.087 H 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.034 K - -
Creep Factor: 2.0
Max TC CSI:0.935
Max BC CSI:0.373
Max W eb CSI:0.715
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T151
Ply: 1
Qty:1
SEQN:16306 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T139
DrwNo:080.20.1107.43987
JB /DF 03/20/2020
T5
B1
W2
W3
W6
W7
W8 W10
20'8"8 23'6"
5'9"
5'9"
11'2"9
5'5"8
16'10"7
5'7"14
20'8"8
3'10"1
28'2"
7'5"8
33'2"
5'
38'5"3
5'3"3
44'2"8
5'9"5
5'5"8
5'5"8
11'2"9
5'9"
16'8"11
5'6"2
20'8"8
3'11"13
28'5"8
7'9"
33'2"
4'8"8
38'6"15
5'4"15
44'2"8
5'7"9 1'8"5'1"136"3 5'1"69'9"1410'3"13(WB1)(WB2)(WB3)
(WB4)
24'0"12
A
B
C D
E
F G
H
I
J
KLMNOPQR S
5 12
4X4
1.5X6 3X4
3X4
5X8
3X4 5X8
5X6
5X8
1.5X4
5X6
5X6
5X8
3X4
3X4
1.5X4 3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B1 2x4 SP #2;
Webs: 2x4 SP #2; W2,W3,W6,W7,W8,
W10 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 774 /-/-/466 /346 /343
N 2624 /-/-/1587 /1348 /-
S 985 /-/-/711 /482 /-
Wind reactions based on MWFRS
R Brg Width = -Min Req =-
N Brg Width = 8.0 Min Req =4.2
S Brg Width = 8.0 Min Req =1.6
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 444 -533
B - C 473 -433
D - E 859 -304
E - F 936 -608
Chords Tens.Comp.
F - G 452 -329
G - H 754 -846
H - I 1164 -1391
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 535 -211
Q - P 587 -290
P - O 593 -213
O - N 807 -361
Chords Tens.Comp.
M - L 710 -315
L - K 1201 -919
K - I 1204 -918
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 679 -731
A - Q 579 -422
B - P 420 -274
C - P 393 -345
C - O 737 -792
O - D 759 -643
D - N 1009 -1420
Webs Tens.Comp.
N - E 720 -491
N - F 1268 -1247
F - M 564 -475
M - G 657 -558
G - L 376 -317
L - H 672 -547
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.42 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 H 999 360
VERT(CL):0.087 H 999 240
HORZ(LL):0.015 K - -
HORZ(TL):0.034 K - -
Creep Factor: 2.0
Max TC CSI:0.935
Max BC CSI:0.373
Max W eb CSI:0.715
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T151
Ply: 1
Qty:1
SEQN:16306 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T139
DrwNo:080.20.1107.43987
JB /DF 03/20/2020
T5
B1
W2
W3
W6
W7
W8 W10
20'8"8 23'6"
5'9"
5'9"
11'2"9
5'5"8
16'10"7
5'7"14
20'8"8
3'10"1
28'2"
7'5"8
33'2"
5'
38'5"3
5'3"3
44'2"8
5'9"5
5'5"8
5'5"8
11'2"9
5'9"
16'8"11
5'6"2
20'8"8
3'11"13
28'5"8
7'9"
33'2"
4'8"8
38'6"15
5'4"15
44'2"8
5'7"9 1'8"5'1"136"3 5'1"69'9"1410'3"13(WB1)(WB2)(WB3)
(WB4)
24'0"12
A
B
C D
E
F G
H
I
J
KLMNOPQR S
5 12
4X4
1.5X6 3X4
3X4
5X8
3X4 5X8
5X6
5X8
1.5X4
5X6
5X6
5X8
3X4
3X4
1.5X4 3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B4,B5,
B6 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16,W17,W19,
W20 2x4 SP 2250f-1.9E;
Rt W edge: 2x4 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 795 /-/-/474 /378 /344
P 2610 /-/-/1542 /1302 /-
AC 1010 /-/-/739 /501 /-
Wind reactions based on MWFRS
AB Brg Width = 6.0 Min Req =1.5
P Brg Width = 8.0 Min Req =4.2
AC Brg Width = 8.0 Min Req =1.6
Bearings AB, P, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 290 -507
B - C 534 -633
C - D 510 -465
D - E 573 -369
E - F 529 -349
Chords Tens.Comp.
F - G 849 -223
G - H 887 -479
I - J 673 -713
J - K 1174 -1416
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Z - X 731 -379
X - W 701 -377
W -V 646 -326
V - T 666 -327
T - R 654 -230
Chords Tens.Comp.
Q - P 721 -308
P - O 389 -62
O - N 573 -195
N - M 1216 -913
M - K 1219 -913
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 461 -766
A - Z 680 -323
AB- Z 593 -245
Z - B 528 -406
C - T 410 -342
T - E 289 -405
E - R 635 -627
R - Q 745 -319
Webs Tens.Comp.
R - F 755 -442
F - P 977 -1454
P - G 616 -387
P - H 1055 -1069
H - O 707 -639
O - I 827 -794
I - N 465 -362
N - J 796 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 M 999 360
VERT(CL):0.089 M 999 240
HORZ(LL):0.017 M - -
HORZ(TL):0.039 M - -
Creep Factor: 2.0
Max TC CSI:0.625
Max BC CSI:0.493
Max W eb CSI:0.732
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T152
Ply: 1
Qty:1
SEQN:16309 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T100
DrwNo:080.20.1107.48927
JB /DF 03/20/2020
T5
B4 B5 B6
W16
W17
W19
W20
21'2"23'6"
2'10"
2'10"
7'4"12
4'6"12
11'8"1
4'3"4
17'3"15
5'7"14
21'2"
3'10"1
26'7"8
5'5"8
31'7"8
5'
37'10"11
6'3"3
44'8"
6'9"5
2'10"
2'10"
4'3"12
1'5"12
4'5"8
1"12
7'1"4
2'7"12
10'10"8
3'9"4
11'0"4
1"12
12'6"
1'5"12
17'0"7
4'6"7
21'2"
4'1"9
26'9"4
5'7"4
31'7"8
4'10"4
38'0"7
6'4"15
44'8"
6'7"9 1'8"4'11"86"3 5'11"61'4"9'9"1410'3"13(WB2)(a)
(WB1)
24'0"12
A
B
C
D E F
G
H I
J
K
L
MNOPQ
R
S
T
U
V
W
X
YZAAAB AC
5
12
5X5
6X6 7X8
4X4
4X4 3X4
3X4
3X4
5X6
3X8
3X5
5X8
2X4
3X4
5X8
5X8
5X6(SRS)
5X8
5X8
5X6
3X4
5X8(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B4,B5,
B6 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W16,W17,W19,
W20 2x4 SP 2250f-1.9E;
Rt W edge: 2x4 SP #2;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AB 795 /-/-/474 /378 /344
P 2610 /-/-/1542 /1302 /-
AC 1010 /-/-/739 /501 /-
Wind reactions based on MWFRS
AB Brg Width = 6.0 Min Req =1.5
P Brg Width = 8.0 Min Req =4.2
AC Brg Width = 8.0 Min Req =1.6
Bearings AB, P, & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 290 -507
B - C 534 -633
C - D 510 -465
D - E 573 -369
E - F 529 -349
Chords Tens.Comp.
F - G 849 -223
G - H 887 -479
I - J 673 -713
J - K 1174 -1416
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Z - X 731 -379
X - W 701 -377
W -V 646 -326
V - T 666 -327
T - R 654 -230
Chords Tens.Comp.
Q - P 721 -308
P - O 389 -62
O - N 573 -195
N - M 1216 -913
M - K 1219 -913
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AB 461 -766
A - Z 680 -323
AB- Z 593 -245
Z - B 528 -406
C - T 410 -342
T - E 289 -405
E - R 635 -627
R - Q 745 -319
Webs Tens.Comp.
R - F 755 -442
F - P 977 -1454
P - G 616 -387
P - H 1055 -1069
H - O 707 -639
O - I 827 -794
I - N 465 -362
N - J 796 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.037 M 999 360
VERT(CL):0.089 M 999 240
HORZ(LL):0.017 M - -
HORZ(TL):0.039 M - -
Creep Factor: 2.0
Max TC CSI:0.625
Max BC CSI:0.493
Max W eb CSI:0.732
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T152
Ply: 1
Qty:1
SEQN:16309 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T100
DrwNo:080.20.1107.48927
JB /DF 03/20/2020
T5
B4 B5 B6
W16
W17
W19
W20
21'2"23'6"
2'10"
2'10"
7'4"12
4'6"12
11'8"1
4'3"4
17'3"15
5'7"14
21'2"
3'10"1
26'7"8
5'5"8
31'7"8
5'
37'10"11
6'3"3
44'8"
6'9"5
2'10"
2'10"
4'3"12
1'5"12
4'5"8
1"12
7'1"4
2'7"12
10'10"8
3'9"4
11'0"4
1"12
12'6"
1'5"12
17'0"7
4'6"7
21'2"
4'1"9
26'9"4
5'7"4
31'7"8
4'10"4
38'0"7
6'4"15
44'8"
6'7"9 1'8"4'11"86"3 5'11"61'4"9'9"1410'3"13(WB2)(a)
(WB1)
24'0"12
A
B
C
D E F
G
H I
J
K
L
MNOPQ
R
S
T
U
V
W
X
YZAAAB AC
5
12
5X5
6X6 7X8
4X4
4X4 3X4
3X4
3X4
5X6
3X8
3X5
5X8
2X4
3X4
5X8
5X8
5X6(SRS)
5X8
5X8
5X6
3X4
5X8(B2)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 976 /-/-/582 /634 /149
H 1269 /-/-/719 /952 /-
G 259 /-/-/153 /151 /-
Wind reactions based on MWFRS
L Brg Width = 6.0 Min Req =1.6
H Brg Width = 8.0 Min Req =2.0
G Brg Width = -Min Req =-
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 615 -732
B - C 705 -691
Chords Tens.Comp.
C - D 531 -333
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 627 -618
Chords Tens.Comp.
J - I 559 -471
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 850 -930
A - K 794 -597
K - B 392 -372
C - I 512 -461
Webs Tens.Comp.
I - D 481 -450
D - H 866 -967
H - E 478 -283
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.026 J 999 360
VERT(CL):0.042 J 999 240
HORZ(LL):-0.012 B - -
HORZ(TL):0.014 B - -
Creep Factor: 2.0
Max TC CSI:0.822
Max BC CSI:0.454
Max W eb CSI:0.924
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T153
Ply: 1
Qty:1
SEQN:16312 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T104
DrwNo:080.20.1108.36433
JB /DF 03/20/2020
T3
21'2"5'10"
5'11"12
5'11"12
11'8"1
5'8"4
17'3"15
5'7"14
24'7"8
7'3"9
27'
2'4"8
5'8"4
5'8"4
11'8"1
5'11"12
17'0"7
5'4"6
21'2"
4'1"9
27'
5'10"4'11"86'9"69'9"14(WB1)(WB2)
(WB1)
24'0"12
A
B
C D
E F
GHIJKL
5 12
4X4
1.5X6 3X4
3X4
5X8
5X5 3X4
5X5
4X4
5X5 1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 976 /-/-/582 /634 /149
H 1269 /-/-/719 /952 /-
G 259 /-/-/153 /151 /-
Wind reactions based on MWFRS
L Brg Width = 6.0 Min Req =1.6
H Brg Width = 8.0 Min Req =2.0
G Brg Width = -Min Req =-
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 615 -732
B - C 705 -691
Chords Tens.Comp.
C - D 531 -333
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 627 -618
Chords Tens.Comp.
J - I 559 -471
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 850 -930
A - K 794 -597
K - B 392 -372
C - I 512 -461
Webs Tens.Comp.
I - D 481 -450
D - H 866 -967
H - E 478 -283
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.026 J 999 360
VERT(CL):0.042 J 999 240
HORZ(LL):-0.012 B - -
HORZ(TL):0.014 B - -
Creep Factor: 2.0
Max TC CSI:0.822
Max BC CSI:0.454
Max W eb CSI:0.924
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T153
Ply: 1
Qty:1
SEQN:16312 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T104
DrwNo:080.20.1108.36433
JB /DF 03/20/2020
T3
21'2"5'10"
5'11"12
5'11"12
11'8"1
5'8"4
17'3"15
5'7"14
24'7"8
7'3"9
27'
2'4"8
5'8"4
5'8"4
11'8"1
5'11"12
17'0"7
5'4"6
21'2"
4'1"9
27'
5'10"4'11"86'9"69'9"14(WB1)(WB2)
(WB1)
24'0"12
A
B
C D
E F
GHIJKL
5 12
4X4
1.5X6 3X4
3X4
5X8
5X5 3X4
5X5
4X4
5X5 1.5X4
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W11 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1249 /-/-/731 /823 /195
G 1249 /-/-/709 /915 /-
Wind reactions based on MWFRS
L Brg Width = 6.0 Min Req =2.0
G Brg Width = -Min Req =-
Bearing L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 809 -956
B - C 1046 -1058
C - D 992 -841
Chords Tens.Comp.
D - E 973 -976
E - F 578 -606
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 842 -891
J - I 901 -859
Chords Tens.Comp.
I - H 645 -619
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 1081 -1205
A - K 1077 -866
K - B 548 -569
Webs Tens.Comp.
E - H 1029 -986
H - F 1243 -1187
F - G 1133 -1217
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 J 999 360
VERT(CL):0.066 J 999 240
HORZ(LL):-0.018 B - -
HORZ(TL):0.023 H - -
Creep Factor: 2.0
Max TC CSI:0.679
Max BC CSI:0.462
Max W eb CSI:0.931
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T154
Ply: 1
Qty:1
SEQN:12542 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T97
DrwNo:079.20.1313.27966
AK /DF 03/19/2020
W10
W11
27'
5'9"12
5'9"12
11'4"
5'6"4
17'8"
6'4"
22'7"8
4'11"8
27'
4'4"8
5'6"4
5'6"4
11'4"
5'9"12
17'6"4
6'2"4
22'11"
5'4"12
27'
4'1"4'11"87'7"69'8"3(WB1)
(WB2)
24'0"12
A
B
C D
E F
GHIJKL
5 12
4X4
1.5X6 3X5
3X4
5X8
5X5 3X8
5X5
5X5
4X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W10,W11 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1249 /-/-/731 /823 /195
G 1249 /-/-/709 /915 /-
Wind reactions based on MWFRS
L Brg Width = 6.0 Min Req =2.0
G Brg Width = -Min Req =-
Bearing L Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 809 -956
B - C 1046 -1058
C - D 992 -841
Chords Tens.Comp.
D - E 973 -976
E - F 578 -606
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 842 -891
J - I 901 -859
Chords Tens.Comp.
I - H 645 -619
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 1081 -1205
A - K 1077 -866
K - B 548 -569
Webs Tens.Comp.
E - H 1029 -986
H - F 1243 -1187
F - G 1133 -1217
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 J 999 360
VERT(CL):0.066 J 999 240
HORZ(LL):-0.018 B - -
HORZ(TL):0.023 H - -
Creep Factor: 2.0
Max TC CSI:0.679
Max BC CSI:0.462
Max W eb CSI:0.931
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T154
Ply: 1
Qty:1
SEQN:12542 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T97
DrwNo:079.20.1313.27966
AK /DF 03/19/2020
W10
W11
27'
5'9"12
5'9"12
11'4"
5'6"4
17'8"
6'4"
22'7"8
4'11"8
27'
4'4"8
5'6"4
5'6"4
11'4"
5'9"12
17'6"4
6'2"4
22'11"
5'4"12
27'
4'1"4'11"87'7"69'8"3(WB1)
(WB2)
24'0"12
A
B
C D
E F
GHIJKL
5 12
4X4
1.5X6 3X5
3X4
5X8
5X5 3X8
5X5
5X5
4X4
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W15,W17,W18 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 1249 /-/-/749 /816 /215
I 1249 /-/-/702 /916 /-
Wind reactions based on MWFRS
W Brg Width = 8.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 881 -1018
B - C 1103 -1182
C - D 1121 -1139
Chords Tens.Comp.
D - E 1121 -1139
E - F 906 -956
F - G 805 -861
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 911 -1008
Q - P 1029 -997
Chords Tens.Comp.
P - M 902 -773
M - K 882 -752
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 1062 -1202
A - R 1106 -899
W -V 1024 -1239
R - B 495 -591
D - P 361 -403
P - E 418 -399
Webs Tens.Comp.
F - K 545 -573
K - G 1135 -969
J - G 994 -1124
J - H 1186 -995
H - I 1093 -1250
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.060 D 999 360
VERT(CL):0.096 D 999 240
HORZ(LL):-0.055 J - -
HORZ(TL):0.062 J - -
Creep Factor: 2.0
Max TC CSI:0.481
Max BC CSI:0.432
Max W eb CSI:0.690
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T155
Ply: 1
Qty:1
SEQN:12546 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T49
DrwNo:079.20.1313.33128
AK /DF 03/19/2020
W15
W17
W18
27'
4'11"8
4'11"8
9'4"
4'4"8
14'6"
5'2"
19'8"
5'2"
20'7"8
11"8
25'7"8
5'
27'
1'4"8
1'2"12
1'2"12
1'8"
5"4
4'8"
3'
9'4"
4'8"
14'6"
5'2"
20'7"8
6'1"8
25'5"12
4'10"4
27'
1'6"44'11"87'10"88'5"61'8'10"3(a)
(WB1)
24'0"12
A
B
C D E F G
H
IJ
K LM
N
OPQR
STUVW
5 12
4X5
1.5X64X4
3X4
3X5
3X4
4X7
5X5 3X8
5X5 5X5
6X8 3X10
4X8
3X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W15,W17,W18 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
W 1249 /-/-/749 /816 /215
I 1249 /-/-/702 /916 /-
Wind reactions based on MWFRS
W Brg Width = 8.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 881 -1018
B - C 1103 -1182
C - D 1121 -1139
Chords Tens.Comp.
D - E 1121 -1139
E - F 906 -956
F - G 805 -861
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 911 -1008
Q - P 1029 -997
Chords Tens.Comp.
P - M 902 -773
M - K 882 -752
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 1062 -1202
A - R 1106 -899
W -V 1024 -1239
R - B 495 -591
D - P 361 -403
P - E 418 -399
Webs Tens.Comp.
F - K 545 -573
K - G 1135 -969
J - G 994 -1124
J - H 1186 -995
H - I 1093 -1250
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.060 D 999 360
VERT(CL):0.096 D 999 240
HORZ(LL):-0.055 J - -
HORZ(TL):0.062 J - -
Creep Factor: 2.0
Max TC CSI:0.481
Max BC CSI:0.432
Max W eb CSI:0.690
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T155
Ply: 1
Qty:1
SEQN:12546 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T49
DrwNo:079.20.1313.33128
AK /DF 03/19/2020
W15
W17
W18
27'
4'11"8
4'11"8
9'4"
4'4"8
14'6"
5'2"
19'8"
5'2"
20'7"8
11"8
25'7"8
5'
27'
1'4"8
1'2"12
1'2"12
1'8"
5"4
4'8"
3'
9'4"
4'8"
14'6"
5'2"
20'7"8
6'1"8
25'5"12
4'10"4
27'
1'6"44'11"87'10"88'5"61'8'10"3(a)
(WB1)
24'0"12
A
B
C D E F G
H
IJ
K LM
N
OPQR
STUVW
5 12
4X5
1.5X64X4
3X4
3X5
3X4
4X7
5X5 3X8
5X5 5X5
6X8 3X10
4X8
3X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W15,W17,
W18 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 612 /-/-/407 /196 /492
Y 1849 /-/-/1214 /1159 /-
K 1207 /-/-/686 /691 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.0 Min Req =2.9
K Brg Width = -Min Req =-
Bearings B & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 38 -500
C - D 236 -506
D - E 798 -1087
E - F 1053 -1181
Chords Tens.Comp.
F - G 993 -1084
G - H 794 -797
H - I 801 -689
I - J 505 -495
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 383 -358
Z - Y 379 -358
T - S 914 -875
Chords Tens.Comp.
S - R 1192 -1043
R - O 1075 -972
O - M 1060 -956
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 517 -571
Y - X 1458 -1427
X - D 1465 -1440
D - T 1135 -1011
E - T 488 -429
E - S 445 -342
Webs Tens.Comp.
G - M 805 -887
M - L 414 -373
M - I 955 -855
L - I 942 -976
L - J 993 -902
J - K 1182 -1183
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.61 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.045 F 999 360
VERT(CL):0.096 F 999 240
HORZ(LL):-0.023 L - -
HORZ(TL):0.032 L - -
Creep Factor: 2.0
Max TC CSI:0.694
Max BC CSI:0.492
Max W eb CSI:0.851
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T156
Ply: 1
Qty:1
SEQN:12565 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T110
DrwNo:079.20.1313.40008
AK /DF 03/19/2020
W4
W15
W17
W18
11'26'8"
6'2"15
6'2"15
11'1"12
4'10"13
18'
6'10"4
23'5"12
5'5"12
28'8"
5'2"4
31'8"8
3'0"8
34'3"8
2'7"
37'8"
3'4"8
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
18'
5'8"
23'2"4
5'2"4
28'4"8
5'2"4
30'9"4
2'4"12
31'8"8
11"4
34'1"12
2'5"4
37'8"
3'6"41'8"
6"3 7'10"88'0"31'9'3"69'9"5(WB1)
(a)(WB1)
24'0"12A
B
C
D
E F G
H I
J
KL
MNO
P
QRST
UVWXYZ
5
12
3X4(B1)
5X5
5X53X3
3X6
5X8
3X5 5X5
3X4
3X4
5X5
5X5
6X8 4X7
5X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4,W15,W17,
W18 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 612 /-/-/407 /196 /492
Y 1849 /-/-/1214 /1159 /-
K 1207 /-/-/686 /691 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.0 Min Req =2.9
K Brg Width = -Min Req =-
Bearings B & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 38 -500
C - D 236 -506
D - E 798 -1087
E - F 1053 -1181
Chords Tens.Comp.
F - G 993 -1084
G - H 794 -797
H - I 801 -689
I - J 505 -495
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 383 -358
Z - Y 379 -358
T - S 914 -875
Chords Tens.Comp.
S - R 1192 -1043
R - O 1075 -972
O - M 1060 -956
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 517 -571
Y - X 1458 -1427
X - D 1465 -1440
D - T 1135 -1011
E - T 488 -429
E - S 445 -342
Webs Tens.Comp.
G - M 805 -887
M - L 414 -373
M - I 955 -855
L - I 942 -976
L - J 993 -902
J - K 1182 -1183
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.61 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.045 F 999 360
VERT(CL):0.096 F 999 240
HORZ(LL):-0.023 L - -
HORZ(TL):0.032 L - -
Creep Factor: 2.0
Max TC CSI:0.694
Max BC CSI:0.492
Max W eb CSI:0.851
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T156
Ply: 1
Qty:1
SEQN:12565 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T110
DrwNo:079.20.1313.40008
AK /DF 03/19/2020
W4
W15
W17
W18
11'26'8"
6'2"15
6'2"15
11'1"12
4'10"13
18'
6'10"4
23'5"12
5'5"12
28'8"
5'2"4
31'8"8
3'0"8
34'3"8
2'7"
37'8"
3'4"8
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
18'
5'8"
23'2"4
5'2"4
28'4"8
5'2"4
30'9"4
2'4"12
31'8"8
11"4
34'1"12
2'5"4
37'8"
3'6"41'8"
6"3 7'10"88'0"31'9'3"69'9"5(WB1)
(a)(WB1)
24'0"12A
B
C
D
E F G
H I
J
KL
MNO
P
QRST
UVWXYZ
5
12
3X4(B1)
5X5
5X53X3
3X6
5X8
3X5 5X5
3X4
3X4
5X5
5X5
6X8 4X7
5X8
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W18,W20,W21 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 606 /-/-/397 /189 /496
AA 1873 /-/-/1209 /1180 /-
L 1201 /-/-/690 /690 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AA Brg Width = 8.0 Min Req =3.0
L Brg Width = -Min Req =-
Bearings B & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 52 -492
C - D 290 -561
D - E 621 -909
E - F 1337 -1603
F - G 1433 -1719
Chords Tens.Comp.
G - H 1428 -1713
H - I 913 -957
I - J 1040 -913
J - K 633 -598
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AB 377 -335
T - R 1622 -1405
Chords Tens.Comp.
Q - N 1320 -1199
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 562 -598
AA- Z 1468 -1448
Z - D 1477 -1456
D - V 1158 -1030
E - V 862 -853
E - T 1179 -993
V - T 772 -743
T - F 467 -514
R - Q 1350 -1225
Webs Tens.Comp.
R - H 578 -473
Q - H 442 -393
H - N 717 -844
N - J 1249 -1212
N - M 539 -501
J - M 976 -957
M - K 953 -894
K - L 1231 -1165
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.069 G 999 360
VERT(CL):0.148 G 999 240
HORZ(LL):-0.032 M - -
HORZ(TL):0.052 M - -
Creep Factor: 2.0
Max TC CSI:0.545
Max BC CSI:0.425
Max W eb CSI:0.850
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T157
Ply: 1
Qty:1
SEQN:12569 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T99
DrwNo:079.20.1313.40553
AK /DF 03/19/2020
W18
W20
W21
11'26'8"
6'3"5
6'3"5
11'1"6
4'10"1
16'
4'10"10
20'8"
4'8"
22'1"12
1'5"12
26'8"
4'6"4
30'9"4
4'1"4
33'
2'2"12
37'8"
4'8"
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'1"12
3'9"12
20'8"
4'6"4
22'
1'4"
26'4"8
4'4"8
30'7"8
4'3"
33'
2'4"8
37'8"
4'8"1'8"
6"3 7'10"87'2"31'2'4"9'9"1410'3"13(WB1)
24'0"12A
B
C
D
E F G H
I
J
K
LM
NOPQ
R
STUV
WXYZ
AA
AB
5 12
3X4(B1)
3X4
5X53X3
5X6
5X8
4X7 5X8
3X4
5X8 3X5
5X10(SRS)
6X8
6X8
3X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W18,W20,W21 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 606 /-/-/397 /189 /496
AA 1873 /-/-/1209 /1180 /-
L 1201 /-/-/690 /690 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AA Brg Width = 8.0 Min Req =3.0
L Brg Width = -Min Req =-
Bearings B & AA Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 52 -492
C - D 290 -561
D - E 621 -909
E - F 1337 -1603
F - G 1433 -1719
Chords Tens.Comp.
G - H 1428 -1713
H - I 913 -957
I - J 1040 -913
J - K 633 -598
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AB 377 -335
T - R 1622 -1405
Chords Tens.Comp.
Q - N 1320 -1199
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 562 -598
AA- Z 1468 -1448
Z - D 1477 -1456
D - V 1158 -1030
E - V 862 -853
E - T 1179 -993
V - T 772 -743
T - F 467 -514
R - Q 1350 -1225
Webs Tens.Comp.
R - H 578 -473
Q - H 442 -393
H - N 717 -844
N - J 1249 -1212
N - M 539 -501
J - M 976 -957
M - K 953 -894
K - L 1231 -1165
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.069 G 999 360
VERT(CL):0.148 G 999 240
HORZ(LL):-0.032 M - -
HORZ(TL):0.052 M - -
Creep Factor: 2.0
Max TC CSI:0.545
Max BC CSI:0.425
Max W eb CSI:0.850
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T157
Ply: 1
Qty:1
SEQN:12569 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T99
DrwNo:079.20.1313.40553
AK /DF 03/19/2020
W18
W20
W21
11'26'8"
6'3"5
6'3"5
11'1"6
4'10"1
16'
4'10"10
20'8"
4'8"
22'1"12
1'5"12
26'8"
4'6"4
30'9"4
4'1"4
33'
2'2"12
37'8"
4'8"
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'1"12
3'9"12
20'8"
4'6"4
22'
1'4"
26'4"8
4'4"8
30'7"8
4'3"
33'
2'4"8
37'8"
4'8"1'8"
6"3 7'10"87'2"31'2'4"9'9"1410'3"13(WB1)
24'0"12A
B
C
D
E F G H
I
J
K
LM
NOPQ
R
STUV
WXYZ
AA
AB
5 12
3X4(B1)
3X4
5X53X3
5X6
5X8
4X7 5X8
3X4
5X8 3X5
5X10(SRS)
6X8
6X8
3X8
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11,W14,W16,
W17 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 613 /-/-/406 /197 /496
W 1856 /-/-/1189 /1171 /-
K 1206 /-/-/697 /694 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 8.0 Min Req =3.0
K Brg Width = -Min Req =-
Bearings B & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 52 -509
C - D 267 -536
D - E 348 -631
E - F 993 -1317
Chords Tens.Comp.
F - G 1320 -1593
G - H 909 -1004
H - I 1088 -957
I - J 630 -600
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 393 -373
X - W 389 -373
R - Q 550 -510
Chords Tens.Comp.
Q - P 1354 -1149
P - M 1603 -1460
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 579 -604
W -V 1440 -1432
V - D 1450 -1447
D - R 1116 -943
E - R 758 -823
E - Q 1079 -888
Q - F 610 -654
F - P 349 -419
Webs Tens.Comp.
P - G 397 -161
G - M 849 -964
H - M 502 -329
M - I 1325 -1293
M - L 547 -497
I - L 968 -963
L - J 956 -887
J - K 1226 -1171
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.063 G 999 360
VERT(CL):0.136 G 999 240
HORZ(LL):-0.024 L - -
HORZ(TL):0.048 I - -
Creep Factor: 2.0
Max TC CSI:0.600
Max BC CSI:0.616
Max W eb CSI:0.906
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T158
Ply: 1
Qty:1
SEQN:12573 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T101
DrwNo:079.20.1313.38899
AK /DF 03/19/2020
W11
W14
W16
W17
11'26'8"
6'3"5
6'3"5
11'1"12
4'10"7
14'
2'10"4
19'5"12
5'5"12
24'8"
5'2"4
30'9"4
6'1"4
33'
2'2"12
37'8"
4'8"
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
14'
1'8"
19'2"4
5'2"4
24'4"8
5'2"4
30'7"8
6'3"
33'
2'4"8
37'8"
4'8"1'8"
6"3 7'10"86'4"31'9'9"1410'3"13(WB1)
24'0"12A
B
C
D
E F G
H
I
J
KL
MNOPQR
STUVWX
5
12
3X4(B1)
3X4
5X53X3
4X5
5X8
3X5 5X5
3X4
3X4
5X5
6X8
6X8
3X8
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W11,W14,W16,
W17 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 613 /-/-/406 /197 /496
W 1856 /-/-/1189 /1171 /-
K 1206 /-/-/697 /694 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 8.0 Min Req =3.0
K Brg Width = -Min Req =-
Bearings B & W Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 52 -509
C - D 267 -536
D - E 348 -631
E - F 993 -1317
Chords Tens.Comp.
F - G 1320 -1593
G - H 909 -1004
H - I 1088 -957
I - J 630 -600
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 393 -373
X - W 389 -373
R - Q 550 -510
Chords Tens.Comp.
Q - P 1354 -1149
P - M 1603 -1460
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 579 -604
W -V 1440 -1432
V - D 1450 -1447
D - R 1116 -943
E - R 758 -823
E - Q 1079 -888
Q - F 610 -654
F - P 349 -419
Webs Tens.Comp.
P - G 397 -161
G - M 849 -964
H - M 502 -329
M - I 1325 -1293
M - L 547 -497
I - L 968 -963
L - J 956 -887
J - K 1226 -1171
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.063 G 999 360
VERT(CL):0.136 G 999 240
HORZ(LL):-0.024 L - -
HORZ(TL):0.048 I - -
Creep Factor: 2.0
Max TC CSI:0.600
Max BC CSI:0.616
Max W eb CSI:0.906
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T158
Ply: 1
Qty:1
SEQN:12573 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T101
DrwNo:079.20.1313.38899
AK /DF 03/19/2020
W11
W14
W16
W17
11'26'8"
6'3"5
6'3"5
11'1"12
4'10"7
14'
2'10"4
19'5"12
5'5"12
24'8"
5'2"4
30'9"4
6'1"4
33'
2'2"12
37'8"
4'8"
6'1"9
6'1"9
10'10"4
4'8"11
11'1"12
3"8
11'10"12
9"
12'4"
5"4
14'
1'8"
19'2"4
5'2"4
24'4"8
5'2"4
30'7"8
6'3"
33'
2'4"8
37'8"
4'8"1'8"
6"3 7'10"86'4"31'9'9"1410'3"13(WB1)
24'0"12A
B
C
D
E F G
H
I
J
KL
MNOPQR
STUVWX
5
12
3X4(B1)
3X4
5X53X3
4X5
5X8
3X5 5X5
3X4
3X4
5X5
6X8
6X8
3X8
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W21,W30 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 558 /-/-/351 /144 /496
AM 1991 /-/-/1253 /1241 /-
N 1168 /-/-/674 /670 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AM Brg Width = 8.0 Min Req =3.2
N Brg Width = -Min Req =-
Bearings B & AM Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 132 -477
C - D 487 -690
E - F 1002 -1411
F - G 1011 -1422
G - H 1372 -1836
Chords Tens.Comp.
H - I 1944 -2264
I - J 1697 -1866
J - K 1841 -1922
K - L 763 -659
L - M 708 -685
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AF-AD 1835 -1556
Chords Tens.Comp.
AA- Y 2045 -1910
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AM 617 -594
AM-AL 1456 -1502
AL- D 1430 -1485
D -AI 1128 -907
E -AI 948 -1111
E -AF 1790 -1494
AF- G 757 -874
G -AD 510 -451
AD-AC 1733 -1552
AC- H 1504 -1600
AC-AA 2074 -1852
Webs Tens.Comp.
H -AA 479 -558
AA- I 864 -652
I - Y 763 -821
Y - K 1565 -1502
Y - V 814 -761
K - T 713 -760
V - T 815 -754
T - M 936 -869
O - M 1182 -1124
O - N 1185 -1141
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.104 AA 999 360
VERT(CL):0.233 AA 999 240
HORZ(LL):-0.039 L - -
HORZ(TL):0.090 L - -
Creep Factor: 2.0
Max TC CSI:0.569
Max BC CSI:0.451
Max W eb CSI:0.976
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T159
Ply: 1
Qty:1
SEQN:12576 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T52
DrwNo:079.20.1313.40243
AK /DF 03/19/2020
W21
W30
11'26'8"
6'3"1
6'3"1
11'1"12
4'10"11
12'
10"4
16'3"5
4'3"5
17'9"1
1'5"12
22'8"
4'10"15
24'10"15
2'2"15
26'4"11
1'5"12
30'8"12
4'4"1
33'
2'3"4
37'8"
4'8"
6'1"5
6'1"5
10'10"4
4'8"15
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'5"1
4'1"1
17'9"1
1'4"
22'6"4
4'9"3
24'10"15
2'4"11
26'2"15
1'4"
30'7"8
4'4"9
32'10"4
2'2"12
34'
1'1"12
35'5"12
1'5"12
37'4"8
1'10"12
37'8"
3"81'8"
6"3 7'10"85'6"31'2'4"1'4"9'9"1410'3"1324'0"12A
B
C
D E F G H
I
J
K
L
M
N
OP
QRSTU
VWX
Y
ZAAABAC
AD
AEAFAG
AHAIAJAK
AL
AMAN
5 12
3X4(B1)
3X4
5X5
3X3
3X6
5X8
3X10
6X8
3X4
5X8 4X10
5X10(SRS)
5X8
3X5
6X8
3X12
5X8
3X4
5X5
5X8 3X3
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W21,W30 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 558 /-/-/351 /144 /496
AM 1991 /-/-/1253 /1241 /-
N 1168 /-/-/674 /670 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AM Brg Width = 8.0 Min Req =3.2
N Brg Width = -Min Req =-
Bearings B & AM Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 132 -477
C - D 487 -690
E - F 1002 -1411
F - G 1011 -1422
G - H 1372 -1836
Chords Tens.Comp.
H - I 1944 -2264
I - J 1697 -1866
J - K 1841 -1922
K - L 763 -659
L - M 708 -685
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AF-AD 1835 -1556
Chords Tens.Comp.
AA- Y 2045 -1910
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AM 617 -594
AM-AL 1456 -1502
AL- D 1430 -1485
D -AI 1128 -907
E -AI 948 -1111
E -AF 1790 -1494
AF- G 757 -874
G -AD 510 -451
AD-AC 1733 -1552
AC- H 1504 -1600
AC-AA 2074 -1852
Webs Tens.Comp.
H -AA 479 -558
AA- I 864 -652
I - Y 763 -821
Y - K 1565 -1502
Y - V 814 -761
K - T 713 -760
V - T 815 -754
T - M 936 -869
O - M 1182 -1124
O - N 1185 -1141
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.104 AA 999 360
VERT(CL):0.233 AA 999 240
HORZ(LL):-0.039 L - -
HORZ(TL):0.090 L - -
Creep Factor: 2.0
Max TC CSI:0.569
Max BC CSI:0.451
Max W eb CSI:0.976
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T159
Ply: 1
Qty:1
SEQN:12576 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T52
DrwNo:079.20.1313.40243
AK /DF 03/19/2020
W21
W30
11'26'8"
6'3"1
6'3"1
11'1"12
4'10"11
12'
10"4
16'3"5
4'3"5
17'9"1
1'5"12
22'8"
4'10"15
24'10"15
2'2"15
26'4"11
1'5"12
30'8"12
4'4"1
33'
2'3"4
37'8"
4'8"
6'1"5
6'1"5
10'10"4
4'8"15
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'5"1
4'1"1
17'9"1
1'4"
22'6"4
4'9"3
24'10"15
2'4"11
26'2"15
1'4"
30'7"8
4'4"9
32'10"4
2'2"12
34'
1'1"12
35'5"12
1'5"12
37'4"8
1'10"12
37'8"
3"81'8"
6"3 7'10"85'6"31'2'4"1'4"9'9"1410'3"1324'0"12A
B
C
D E F G H
I
J
K
L
M
N
OP
QRSTU
VWX
Y
ZAAABAC
AD
AEAFAG
AHAIAJAK
AL
AMAN
5 12
3X4(B1)
3X4
5X5
3X3
3X6
5X8
3X10
6X8
3X4
5X8 4X10
5X10(SRS)
5X8
3X5
6X8
3X12
5X8
3X4
5X5
5X8 3X3
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W16,W17 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 583 /-/-/376 /173 /496
X 1931 /-/-/1212 /1205 /-
K 1185 /-/-/687 /684 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 8.0 Min Req =3.1
K Brg Width = -Min Req =-
Bearings B & X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 38 -514
C - D 148 -492
D - E 325 -501
E - F 667 -1104
Chords Tens.Comp.
F - G 1524 -1986
G - H 1319 -1628
H - I 683 -722
I - J 689 -663
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 411 -535
S - R 1187 -993
R - Q 2029 -1824
Chords Tens.Comp.
Q - N 1431 -1328
N - L 1423 -1303
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 557 -380
Y - D 695 -804
D - X 676 -436
X - W 1141 -1349
W -E 1154 -1368
E - S 1708 -1417
S - F 874 -971
Webs Tens.Comp.
F - R 1011 -982
R - G 577 -511
G - Q 589 -704
Q - H 548 -322
H - L 1026 -1068
L - J 970 -914
J - K 1191 -1140
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.073 G 999 360
VERT(CL):0.170 G 999 240
HORZ(LL):-0.041 I - -
HORZ(TL):0.094 I - -
Creep Factor: 2.0
Max TC CSI:0.817
Max BC CSI:0.630
Max W eb CSI:0.806
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T160
Ply: 1
Qty:1
SEQN:12580 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T95
DrwNo:079.20.1313.38837
AK /DF 03/19/2020
W16
W17
11'26'8"
5'1"5
5'1"5
10'
4'10"11
11'1"12
1'1"12
15'10"14
4'9"2
20'8"
4'9"2
25'9"8
5'1"8
33'
7'2"8
37'8"
4'8"
5'3"1
5'3"1
10'10"4
5'7"3
11'1"12
3"8
11'10"12
9"
12'4"
5"4
15'7"6
3'3"6
20'4"8
4'9"2
25'6"
5'1"8
30'9"4
5'3"4
32'10"4
2'1"
37'8"
4'9"121'8"
6"3 7'10"84'8"31'9'9"1410'3"13(WB1)
(a)
24'0"12A
B
C
D E F G
H
I
J
K
LMNOPQRS
TUVW
X
Y
5 12
3X4(B1)3X4
5X5
5X53X3
4X5
4X5
3X4
5X5
5X5
3X4
3X4
5X5
5X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W16,W17 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 583 /-/-/376 /173 /496
X 1931 /-/-/1212 /1205 /-
K 1185 /-/-/687 /684 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
X Brg Width = 8.0 Min Req =3.1
K Brg Width = -Min Req =-
Bearings B & X Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 38 -514
C - D 148 -492
D - E 325 -501
E - F 667 -1104
Chords Tens.Comp.
F - G 1524 -1986
G - H 1319 -1628
H - I 683 -722
I - J 689 -663
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 411 -535
S - R 1187 -993
R - Q 2029 -1824
Chords Tens.Comp.
Q - N 1431 -1328
N - L 1423 -1303
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 557 -380
Y - D 695 -804
D - X 676 -436
X - W 1141 -1349
W -E 1154 -1368
E - S 1708 -1417
S - F 874 -971
Webs Tens.Comp.
F - R 1011 -982
R - G 577 -511
G - Q 589 -704
Q - H 548 -322
H - L 1026 -1068
L - J 970 -914
J - K 1191 -1140
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.073 G 999 360
VERT(CL):0.170 G 999 240
HORZ(LL):-0.041 I - -
HORZ(TL):0.094 I - -
Creep Factor: 2.0
Max TC CSI:0.817
Max BC CSI:0.630
Max W eb CSI:0.806
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T160
Ply: 1
Qty:1
SEQN:12580 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T95
DrwNo:079.20.1313.38837
AK /DF 03/19/2020
W16
W17
11'26'8"
5'1"5
5'1"5
10'
4'10"11
11'1"12
1'1"12
15'10"14
4'9"2
20'8"
4'9"2
25'9"8
5'1"8
33'
7'2"8
37'8"
4'8"
5'3"1
5'3"1
10'10"4
5'7"3
11'1"12
3"8
11'10"12
9"
12'4"
5"4
15'7"6
3'3"6
20'4"8
4'9"2
25'6"
5'1"8
30'9"4
5'3"4
32'10"4
2'1"
37'8"
4'9"121'8"
6"3 7'10"84'8"31'9'9"1410'3"13(WB1)
(a)
24'0"12A
B
C
D E F G
H
I
J
K
LMNOPQRS
TUVW
X
Y
5 12
3X4(B1)3X4
5X5
5X53X3
4X5
4X5
3X4
5X5
5X5
3X4
3X4
5X5
5X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W12,W18 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 584 /-/-/380 /185 /496
Y 1934 /-/-/1196 /1189 /-
L 1184 /-/-/690 /688 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.0 Min Req =3.1
L Brg Width = -Min Req =-
Bearings B & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 -515
C - D 156 -423
D - E 412 -652
E - F 549 -1069
F - G 1675 -2247
Chords Tens.Comp.
G - H 1381 -1765
H - I 1604 -1751
I - J 698 -662
J - K 687 -661
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 421 -689
V - T 315 -390
T - S 1186 -968
Chords Tens.Comp.
S - R 2324 -2075
R - O 1024 -956
O - M 1027 -934
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 585 -374
D - Y 756 -605
Y - X 1141 -1371
X - E 1153 -1365
E - T 1775 -1466
T - F 904 -1024
F - S 1330 -1271
Webs Tens.Comp.
S - G 747 -692
G - R 697 -833
H - R 552 -402
R - I 1017 -969
I - M 807 -858
M - K 953 -889
K - L 1202 -1146
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.082 G 999 360
VERT(CL):0.191 Q 999 240
HORZ(LL):-0.044 J - -
HORZ(TL):0.103 J - -
Creep Factor: 2.0
Max TC CSI:0.582
Max BC CSI:0.827
Max W eb CSI:0.987
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T161
Ply: 1
Qty:1
SEQN:12584 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T103
DrwNo:079.20.1313.26950
AK /DF 03/19/2020
W12
W18
11'26'8"
4'1"5
4'1"5
8'
3'10"11
11'1"12
3'1"12
14'10"14
3'9"2
18'8"
3'9"2
24'7"12
5'11"12
28'9"14
4'2"2
33'
4'2"2
37'8"
4'8"
8'
8'
10'10"4
2'10"4
11'1"12
3"8
11'10"12
9"
12'4"
5"4
14'7"6
2'3"6
18'4"8
3'9"2
24'7"12
6'3"4
30'9"4
6'1"8
32'10"4
2'1"
37'8"
4'9"121'8"
6"3 7'10"83'10"31'9'9"1410'3"1324'0"12A
B
C
D E F G
H
I
J
K
L
MNOPQRST
UVWXYZ
5 12
3X4(B1)
5X8
3X4
4X63X3
4X5
4X5
4X4
4X4
5X5
5X8
3X5
5X5
5X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W12,W18 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 584 /-/-/380 /185 /496
Y 1934 /-/-/1196 /1189 /-
L 1184 /-/-/690 /688 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 8.0 Min Req =3.1
L Brg Width = -Min Req =-
Bearings B & Y Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 -515
C - D 156 -423
D - E 412 -652
E - F 549 -1069
F - G 1675 -2247
Chords Tens.Comp.
G - H 1381 -1765
H - I 1604 -1751
I - J 698 -662
J - K 687 -661
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Z 421 -689
V - T 315 -390
T - S 1186 -968
Chords Tens.Comp.
S - R 2324 -2075
R - O 1024 -956
O - M 1027 -934
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 585 -374
D - Y 756 -605
Y - X 1141 -1371
X - E 1153 -1365
E - T 1775 -1466
T - F 904 -1024
F - S 1330 -1271
Webs Tens.Comp.
S - G 747 -692
G - R 697 -833
H - R 552 -402
R - I 1017 -969
I - M 807 -858
M - K 953 -889
K - L 1202 -1146
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.88 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.082 G 999 360
VERT(CL):0.191 Q 999 240
HORZ(LL):-0.044 J - -
HORZ(TL):0.103 J - -
Creep Factor: 2.0
Max TC CSI:0.582
Max BC CSI:0.827
Max W eb CSI:0.987
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T161
Ply: 1
Qty:1
SEQN:12584 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T103
DrwNo:079.20.1313.26950
AK /DF 03/19/2020
W12
W18
11'26'8"
4'1"5
4'1"5
8'
3'10"11
11'1"12
3'1"12
14'10"14
3'9"2
18'8"
3'9"2
24'7"12
5'11"12
28'9"14
4'2"2
33'
4'2"2
37'8"
4'8"
8'
8'
10'10"4
2'10"4
11'1"12
3"8
11'10"12
9"
12'4"
5"4
14'7"6
2'3"6
18'4"8
3'9"2
24'7"12
6'3"4
30'9"4
6'1"8
32'10"4
2'1"
37'8"
4'9"121'8"
6"3 7'10"83'10"31'9'9"1410'3"1324'0"12A
B
C
D E F G
H
I
J
K
L
MNOPQRST
UVWXYZ
5 12
3X4(B1)
5X8
3X4
4X63X3
4X5
4X5
4X4
4X4
5X5
5X8
3X5
5X5
5X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.00
TC: From 36 plf at 6.00 to 36 plf at 9.06
TC: From 72 plf at 9.06 to 72 plf at 37.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.00
BC: From 10 plf at 6.00 to 10 plf at 9.06
BC: From 20 plf at 9.06 to 20 plf at 37.67
TC: 229 lb Conc. Load at 6.00
TC: 183 lb Conc. Load at 7.06, 9.06
BC: 267 lb Conc. Load at 6.00
BC: 111 lb Conc. Load at 7.06, 9.06
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 893 /-/-/-/501 /-
U 2587 /-/-/-/1514 /-
J 1169 /-/-/-/671 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
U Brg Width = 8.0 Min Req =2.3
J Brg Width = -Min Req =-
Bearings B & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 289 -560
D - E 646 -1158
E - F 557 -956
Chords Tens.Comp.
F - G 303 -496
G - H 275 -462
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 470 -227
V - U 483 -228
Chords Tens.Comp.
P - O 1234 -699
O - L 835 -479
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 450 -792
U - T 521 -756
T - D 530 -778
D - P 1523 -848
P - E 318 -453
E - O 227 -403
Webs Tens.Comp.
F - L 287 -505
L - H 635 -376
H - K 310 -462
K - I 460 -263
I - J 346 -567
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.81 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.064 E 999 360
VERT(CL):0.137 E 999 240
HORZ(LL):0.026 H - -
HORZ(TL):0.059 H - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.488
Max W eb CSI:0.408
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T162
Ply: 2
Qty:1
SEQN:12589 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T102
DrwNo:079.20.1313.27761
AK /DF 03/19/2020
2 Complete Trusses Required
11'26'8"
6'
6'
11'1"12
5'1"12
16'8"
5'6"4
23'9"8
7'1"8
30'9"4
6'11"12
32'8"
1'10"12
37'8"
5'
6'1"12
6'1"12
10'10"4
4'8"8
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'4"8
4'0"8
23'6"
7'1"8
30'7"8
7'1"8
37'8"
7'0"81'8"
6"3 7'10"83'0"31'9'8"310'2"224'0"12A
B
C D E
F
G
H
I
JK
LMNOP
QRSTUV
5 12
3X4(B1)
5X8
3X43X3
4X4
4X4
5X5
5X5
3X4
5X8
5X8
3X8
3X3
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.00
TC: From 36 plf at 6.00 to 36 plf at 9.06
TC: From 72 plf at 9.06 to 72 plf at 37.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.00
BC: From 10 plf at 6.00 to 10 plf at 9.06
BC: From 20 plf at 9.06 to 20 plf at 37.67
TC: 229 lb Conc. Load at 6.00
TC: 183 lb Conc. Load at 7.06, 9.06
BC: 267 lb Conc. Load at 6.00
BC: 111 lb Conc. Load at 7.06, 9.06
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 893 /-/-/-/501 /-
U 2587 /-/-/-/1514 /-
J 1169 /-/-/-/671 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
U Brg Width = 8.0 Min Req =2.3
J Brg Width = -Min Req =-
Bearings B & U Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 289 -560
D - E 646 -1158
E - F 557 -956
Chords Tens.Comp.
F - G 303 -496
G - H 275 -462
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 470 -227
V - U 483 -228
Chords Tens.Comp.
P - O 1234 -699
O - L 835 -479
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 450 -792
U - T 521 -756
T - D 530 -778
D - P 1523 -848
P - E 318 -453
E - O 227 -403
Webs Tens.Comp.
F - L 287 -505
L - H 635 -376
H - K 310 -462
K - I 460 -263
I - J 346 -567
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.81 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.064 E 999 360
VERT(CL):0.137 E 999 240
HORZ(LL):0.026 H - -
HORZ(TL):0.059 H - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.488
Max W eb CSI:0.408
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T162
Ply: 2
Qty:1
SEQN:12589 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T102
DrwNo:079.20.1313.27761
AK /DF 03/19/2020
2 Complete Trusses Required
11'26'8"
6'
6'
11'1"12
5'1"12
16'8"
5'6"4
23'9"8
7'1"8
30'9"4
6'11"12
32'8"
1'10"12
37'8"
5'
6'1"12
6'1"12
10'10"4
4'8"8
11'1"12
3"8
11'10"12
9"
12'4"
5"4
16'4"8
4'0"8
23'6"
7'1"8
30'7"8
7'1"8
37'8"
7'0"81'8"
6"3 7'10"83'0"31'9'8"310'2"224'0"12A
B
C D E
F
G
H
I
JK
LMNOP
QRSTUV
5 12
3X4(B1)
5X8
3X43X3
4X4
4X4
5X5
5X5
3X4
5X8
5X8
3X8
3X3
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W14,W16,
W17 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: -0.23" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1249 /-/-/765 /774 /408
I 1249 /-/-/715 /917 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing T Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2341 -2091
B - C 2495 -2220
C - D 2291 -2845
D - E 1459 -1836
Chords Tens.Comp.
E - F 921 -1034
F - G 965 -882
G - H 397 -390
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - P 4617 -4655
P - O 4661 -4713
Chords Tens.Comp.
O - N 2533 -2414
N - K 1597 -1519
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 1345 -1172
A - R 2376 -2660
T - R 1 -592
R - C 1721 -2440
P - C 494 -413
C - O 2299 -2121
O - D 526 -441
Webs Tens.Comp.
D - N 1112 -1062
N - E 626 -539
E - K 957 -997
K - G 1066 -1043
J - G 1013 -1033
J - H 1091 -994
H - I 1209 -1235
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.58 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.227 O 999 360
VERT(CL):0.370 O 876 240
HORZ(LL):-0.143 J - -
HORZ(TL):0.212 J - -
Creep Factor: 2.0
Max TC CSI:0.681
Max BC CSI:0.697
Max W eb CSI:0.991
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T163
Ply: 1
Qty:1
SEQN:12593 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T152
DrwNo:079.20.1313.29087
AK /DF 03/19/2020
B2
W7
W14
W16
W17
27'
1'2"12
1'2"12
4'
2'9"4
9'5"
5'5"
14'10"
5'5"
20'
5'2"
24'8"
4'8"
27'
2'4"
1'8"
1'8"
9'1"8
7'5"8
14'6"8
5'5"
19'11"8
5'5"
24'6"4
4'6"12
27'
2'5"122'2"37'10"81'8'10"3(WB1)
24'0"12
A B C
D
E
F G
H
IJ
KLMNOP
QRST
5 12
3X8
6X6
7X10 6X12(SRS)
5X8
3X4
3X4
3X4
5X5
6X8 4X8
4X7
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W7,W14,W16,
W17 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Deflection
Max JT VERT DEFL: LL: -0.23" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1249 /-/-/765 /774 /408
I 1249 /-/-/715 /917 /-
Wind reactions based on MWFRS
T Brg Width = 8.0 Min Req =2.0
I Brg Width = -Min Req =-
Bearing T Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2341 -2091
B - C 2495 -2220
C - D 2291 -2845
D - E 1459 -1836
Chords Tens.Comp.
E - F 921 -1034
F - G 965 -882
G - H 397 -390
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - P 4617 -4655
P - O 4661 -4713
Chords Tens.Comp.
O - N 2533 -2414
N - K 1597 -1519
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - T 1345 -1172
A - R 2376 -2660
T - R 1 -592
R - C 1721 -2440
P - C 494 -413
C - O 2299 -2121
O - D 526 -441
Webs Tens.Comp.
D - N 1112 -1062
N - E 626 -539
E - K 957 -997
K - G 1066 -1043
J - G 1013 -1033
J - H 1091 -994
H - I 1209 -1235
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.58 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.227 O 999 360
VERT(CL):0.370 O 876 240
HORZ(LL):-0.143 J - -
HORZ(TL):0.212 J - -
Creep Factor: 2.0
Max TC CSI:0.681
Max BC CSI:0.697
Max W eb CSI:0.991
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T163
Ply: 1
Qty:1
SEQN:12593 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T152
DrwNo:079.20.1313.29087
AK /DF 03/19/2020
B2
W7
W14
W16
W17
27'
1'2"12
1'2"12
4'
2'9"4
9'5"
5'5"
14'10"
5'5"
20'
5'2"
24'8"
4'8"
27'
2'4"
1'8"
1'8"
9'1"8
7'5"8
14'6"8
5'5"
19'11"8
5'5"
24'6"4
4'6"12
27'
2'5"122'2"37'10"81'8'10"3(WB1)
24'0"12
A B C
D
E
F G
H
IJ
KLMNOP
QRST
5 12
3X8
6X6
7X10 6X12(SRS)
5X8
3X4
3X4
3X4
5X5
6X8 4X8
4X7
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Negative reaction(s) of -456# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 797 /-/-/495 /435 /472
I 2032 /-/-/1268 /1432 /-
H -/-456 /-/226 /250 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req =1.5
I Brg Width = 8.0 Min Req =3.2
H Brg Width = -Min Req =-
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 982 -1235
B - C 764 -1223
C - D 273 -532
Chords Tens.Comp.
D - E 523 -548
E - F 487 -334
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 5 -549
L - K 1427 -1707
Chords Tens.Comp.
K - J 1047 -1097
I - H 318 -394
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 569 -780
A - L 1446 -1154
L - B 661 -721
B - K 611 -373
C - J 777 -732
Webs Tens.Comp.
D - J 599 -476
J - E 1198 -1148
E - I 1170 -1197
I - F 696 -736
F - H 692 -560
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.13 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.053 C 999 360
VERT(CL):0.091 K 999 240
HORZ(LL):-0.018 A - -
HORZ(TL):0.027 A - -
Creep Factor: 2.0
Max TC CSI:0.717
Max BC CSI:0.554
Max W eb CSI:0.966
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T164
Ply: 1
Qty:1
SEQN:12605 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T135
DrwNo:079.20.1313.28026
AK /DF 03/19/2020
W8
21'6'
2'
2'
7'11"15
5'11"15
13'9"11
5'9"13
19'10"
6'0"5
21'8"
1'10"
27'
5'4"
1'8"8
1'8"8
7'8"7
5'11"15
13'10"1
6'1"11
21'
7'1"15
27'
6'
1'4"3 8'0"38'9"6(WB2)(WB1)
24'0"12
A B
C
D
E
F G
HIJKLM
5
12
4X4
1.5X6 4X4
5X5
3X4
3X4
5X5
6X8
4X5
5X5
5X5 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Negative reaction(s) of -456# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 797 /-/-/495 /435 /472
I 2032 /-/-/1268 /1432 /-
H -/-456 /-/226 /250 /-
Wind reactions based on MWFRS
M Brg Width = 8.0 Min Req =1.5
I Brg Width = 8.0 Min Req =3.2
H Brg Width = -Min Req =-
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 982 -1235
B - C 764 -1223
C - D 273 -532
Chords Tens.Comp.
D - E 523 -548
E - F 487 -334
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 5 -549
L - K 1427 -1707
Chords Tens.Comp.
K - J 1047 -1097
I - H 318 -394
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 569 -780
A - L 1446 -1154
L - B 661 -721
B - K 611 -373
C - J 777 -732
Webs Tens.Comp.
D - J 599 -476
J - E 1198 -1148
E - I 1170 -1197
I - F 696 -736
F - H 692 -560
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.13 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.053 C 999 360
VERT(CL):0.091 K 999 240
HORZ(LL):-0.018 A - -
HORZ(TL):0.027 A - -
Creep Factor: 2.0
Max TC CSI:0.717
Max BC CSI:0.554
Max W eb CSI:0.966
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T164
Ply: 1
Qty:1
SEQN:12605 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T135
DrwNo:079.20.1313.28026
AK /DF 03/19/2020
W8
21'6'
2'
2'
7'11"15
5'11"15
13'9"11
5'9"13
19'10"
6'0"5
21'8"
1'10"
27'
5'4"
1'8"8
1'8"8
7'8"7
5'11"15
13'10"1
6'1"11
21'
7'1"15
27'
6'
1'4"3 8'0"38'9"6(WB2)(WB1)
24'0"12
A B
C
D
E
F G
HIJKLM
5
12
4X4
1.5X6 4X4
5X5
3X4
3X4
5X5
6X8
4X5
5X5
5X5 1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Negative reaction(s) of -509# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 785 /-/-/497 /442 /467
H 2103 /-/-/1288 /1420 /-
G -/-509 /-/226 /295 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
H Brg Width = 8.0 Min Req =3.3
G Brg Width = -Min Req =-
Bearings A & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 898 -1303
B - C 414 -570
Chords Tens.Comp.
C - D 655 -588
D - E 583 -301
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1118 -1178
Chords Tens.Comp.
J - I 1115 -1178
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - I 749 -740
C - I 641 -524
I - D 1241 -1180
Webs Tens.Comp.
D - H 1275 -1325
H - E 638 -677
E - G 654 -349
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.71 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.049 B 999 360
VERT(CL):0.090 J 999 240
HORZ(LL):-0.019 B - -
HORZ(TL):0.025 B - -
Creep Factor: 2.0
Max TC CSI:0.811
Max BC CSI:0.597
Max W eb CSI:0.867
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T165
Ply: 1
Qty:1
SEQN:12601 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T75
DrwNo:079.20.1313.41694
AK /DF 03/19/2020
W4
21'6'
6'10"14
6'10"14
13'3"3
6'4"5
19'10"
6'6"13
23'8"
3'10"
27'
3'4"
6'9"2
6'9"2
13'3"9
6'6"7
21'
7'8"7
27'
6'
6"3 7'2"38'9"6(WB2)(WB1)
24'0"12
A
B
C
D
E F
GHIJ
5 12
3X4(B1)1.5X4
3X4
5X5
6X8
4X5
5X5
5X5 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W4 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Negative reaction(s) of -509# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 785 /-/-/497 /442 /467
H 2103 /-/-/1288 /1420 /-
G -/-509 /-/226 /295 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
H Brg Width = 8.0 Min Req =3.3
G Brg Width = -Min Req =-
Bearings A & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 898 -1303
B - C 414 -570
Chords Tens.Comp.
C - D 655 -588
D - E 583 -301
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 1118 -1178
Chords Tens.Comp.
J - I 1115 -1178
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - I 749 -740
C - I 641 -524
I - D 1241 -1180
Webs Tens.Comp.
D - H 1275 -1325
H - E 638 -677
E - G 654 -349
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.71 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.049 B 999 360
VERT(CL):0.090 J 999 240
HORZ(LL):-0.019 B - -
HORZ(TL):0.025 B - -
Creep Factor: 2.0
Max TC CSI:0.811
Max BC CSI:0.597
Max W eb CSI:0.867
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T165
Ply: 1
Qty:1
SEQN:12601 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T75
DrwNo:079.20.1313.41694
AK /DF 03/19/2020
W4
21'6'
6'10"14
6'10"14
13'3"3
6'4"5
19'10"
6'6"13
23'8"
3'10"
27'
3'4"
6'9"2
6'9"2
13'3"9
6'6"7
21'
7'8"7
27'
6'
6"3 7'2"38'9"6(WB2)(WB1)
24'0"12
A
B
C
D
E F
GHIJ
5 12
3X4(B1)1.5X4
3X4
5X5
6X8
4X5
5X5
5X5 1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 5 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 873 /-/-/591 /404 /353
Q 2721 /-/-/1581 /1329 /-
W 1000 /-/-/743 /485 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 3.5 Min Req =-
W Brg Width = 8.0 Min Req =1.6
Bearings B, Q, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 769 -1085
D - E 1030 -512
E - F 1336 -796
Chords Tens.Comp.
F - G 450 -117
G - H 584 -582
H - I 1138 -1375
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 913 -504
V - U 910 -504
S - Q 1277 -903
Q - O 630 -465
Chords Tens.Comp.
O - M 627 -461
L - K 1174 -874
K - I 1178 -873
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 708 -737
U - D 528 -401
U - S 379 -297
D - S 1172 -1098
E - S 546 -396
E - Q 1373 -1730
Webs Tens.Comp.
Q - F 1177 -1126
F - M 809 -650
M - L 477 -111
M - G 955 -941
L - G 416 -360
L - H 863 -815
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.041 K 999 360
VERT(CL):0.109 K 999 240
HORZ(LL):0.012 K - -
HORZ(TL):0.027 K - -
Creep Factor: 2.0
Max TC CSI:0.939
Max BC CSI:0.599
Max W eb CSI:0.860
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T166
Ply: 1
Qty:1
SEQN:12611 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T94
DrwNo:079.20.1313.41241
AK /DF 03/19/2020
W5
W7
BL1
21'23'8"
6'10"14
6'10"14
13'4"15
6'6"1
19'10"
6'5"1
25'8"
5'10"
30'8"
5'
37'4"15
6'8"15
44'8"
7'3"1
6'9"2
6'9"2
13'1"13
6'4"11
20'6"
7'4"3
21'
6"
21'7"12
7"12
25'8"
4'0"4
30'6"4
4'10"4
37'6"11
7'0"7
44'8"
7'1"51'8"1'8"
6"3 6'4"31'6"8'9"69'3"524'0"12
25'6"12
A
B
C
D
E
F G
H
I
J
KL
M
N
O
PQRSTUV W
5
12
3X5(B1)
3X4
5X10
5X6
6X8
5X85X5
5X6
5X8 5X8
5X8
3X4
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 5 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 873 /-/-/591 /404 /353
Q 2721 /-/-/1581 /1329 /-
W 1000 /-/-/743 /485 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 3.5 Min Req =-
W Brg Width = 8.0 Min Req =1.6
Bearings B, Q, & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 769 -1085
D - E 1030 -512
E - F 1336 -796
Chords Tens.Comp.
F - G 450 -117
G - H 584 -582
H - I 1138 -1375
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 913 -504
V - U 910 -504
S - Q 1277 -903
Q - O 630 -465
Chords Tens.Comp.
O - M 627 -461
L - K 1174 -874
K - I 1178 -873
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 708 -737
U - D 528 -401
U - S 379 -297
D - S 1172 -1098
E - S 546 -396
E - Q 1373 -1730
Webs Tens.Comp.
Q - F 1177 -1126
F - M 809 -650
M - L 477 -111
M - G 955 -941
L - G 416 -360
L - H 863 -815
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.041 K 999 360
VERT(CL):0.109 K 999 240
HORZ(LL):0.012 K - -
HORZ(TL):0.027 K - -
Creep Factor: 2.0
Max TC CSI:0.939
Max BC CSI:0.599
Max W eb CSI:0.860
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T166
Ply: 1
Qty:1
SEQN:12611 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T94
DrwNo:079.20.1313.41241
AK /DF 03/19/2020
W5
W7
BL1
21'23'8"
6'10"14
6'10"14
13'4"15
6'6"1
19'10"
6'5"1
25'8"
5'10"
30'8"
5'
37'4"15
6'8"15
44'8"
7'3"1
6'9"2
6'9"2
13'1"13
6'4"11
20'6"
7'4"3
21'
6"
21'7"12
7"12
25'8"
4'0"4
30'6"4
4'10"4
37'6"11
7'0"7
44'8"
7'1"51'8"1'8"
6"3 6'4"31'6"8'9"69'3"524'0"12
25'6"12
A
B
C
D
E
F G
H
I
J
KL
M
N
O
PQRSTUV W
5
12
3X5(B1)
3X4
5X10
5X6
6X8
5X85X5
5X6
5X8 5X8
5X8
3X4
3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8,W9,W10,
W14 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 6 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 781 /-/-/508 /337 /353
Y 2935 /-/-/1750 /1453 /-
N 918 /-/-/684 /426 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 3.5 Min Req =-
N Brg Width = 8.0 Min Req =1.5
Bearings B, Y, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 383 -285
C - D 752 -1208
D - E 439 -782
E - F 567 -103
F - G 1379 -794
G - H 1592 -857
Chords Tens.Comp.
H - I 1650 -1083
I - J 468 -242
J - K 580 -610
K - L 1109 -1274
L - M 1345 -1649
M - N 410 -351
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AF 1061 -588
AF-AD 1095 -626
AD-AC 649 -439
AA- Y 1556 -1241
Y - W 1710 -1531
Chords Tens.Comp.
V - U 503 -112
U - T 1109 -789
T - Q 1507 -1125
Q - M 1452 -1077
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AD 467 -447
AD- E 382 -169
E -AC 672 -785
AC- F 599 -461
AC-AA 681 -499
F -AA 1166 -1099
G -AA 504 -336
G - Y 1079 -1661
Webs Tens.Comp.
Y - H 717 -597
W -I 1293 -1255
W -V 509 -490
I - V 830 -696
V - J 844 -904
J - U 434 -392
U - K 784 -701
T - L 425 -397
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 AE 999 360
VERT(CL):0.202 AE 999 240
HORZ(LL):0.033 P - -
HORZ(TL):0.076 P - -
Creep Factor: 2.0
Max TC CSI:0.896
Max BC CSI:0.705
Max W eb CSI:0.750
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T167
Ply: 1
Qty:1
SEQN:12619 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T63
DrwNo:079.20.1313.29213
AK /DF 03/19/2020
W8
W9
W10 W14
BL1
21'23'8"
10"6
1'4"6
(TYP)
40'2"8
4'0"7
4'0"7
8'2"15
4'2"8
14'0"15
5'10"1
19'10"
5'9"1
21'6"
1'8"
27'8"
6'2"
32'8"
5'
37'4"
4'8"
40'11"3
3'7"3
44'8"
3'8"13
9"
9"
10"10
1"11
2'8"
1'9"6
7'11"7
5'3"7
13'9"13
5'10"7
20'6"
6'8"3
21'6"
1'
27'9"12
6'3"12
32'8"
4'10"4
37'7"8
4'11"8
42'4"9
4'9"1
43'11"6
1'6"13
44'8"
8"10
1'8"1'8"
6"3 5'6"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K
L
MN
O
PQRSTUV
W X
YZAA
AB
ACADAEAF
AGAH
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
1.5X4
5X10
5X6
6X8
5X8
1.5X4
5X5
5X8
1.5X4
5X6
3X8
5X8
5X6
1.5X4
1.5X6(++)
3X8(++)
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8,W9,W10,
W14 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 6 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 781 /-/-/508 /337 /353
Y 2935 /-/-/1750 /1453 /-
N 918 /-/-/684 /426 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 3.5 Min Req =-
N Brg Width = 8.0 Min Req =1.5
Bearings B, Y, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 383 -285
C - D 752 -1208
D - E 439 -782
E - F 567 -103
F - G 1379 -794
G - H 1592 -857
Chords Tens.Comp.
H - I 1650 -1083
I - J 468 -242
J - K 580 -610
K - L 1109 -1274
L - M 1345 -1649
M - N 410 -351
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AF 1061 -588
AF-AD 1095 -626
AD-AC 649 -439
AA- Y 1556 -1241
Y - W 1710 -1531
Chords Tens.Comp.
V - U 503 -112
U - T 1109 -789
T - Q 1507 -1125
Q - M 1452 -1077
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AD 467 -447
AD- E 382 -169
E -AC 672 -785
AC- F 599 -461
AC-AA 681 -499
F -AA 1166 -1099
G -AA 504 -336
G - Y 1079 -1661
Webs Tens.Comp.
Y - H 717 -597
W -I 1293 -1255
W -V 509 -490
I - V 830 -696
V - J 844 -904
J - U 434 -392
U - K 784 -701
T - L 425 -397
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 AE 999 360
VERT(CL):0.202 AE 999 240
HORZ(LL):0.033 P - -
HORZ(TL):0.076 P - -
Creep Factor: 2.0
Max TC CSI:0.896
Max BC CSI:0.705
Max W eb CSI:0.750
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T167
Ply: 1
Qty:1
SEQN:12619 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T63
DrwNo:079.20.1313.29213
AK /DF 03/19/2020
W8
W9
W10 W14
BL1
21'23'8"
10"6
1'4"6
(TYP)
40'2"8
4'0"7
4'0"7
8'2"15
4'2"8
14'0"15
5'10"1
19'10"
5'9"1
21'6"
1'8"
27'8"
6'2"
32'8"
5'
37'4"
4'8"
40'11"3
3'7"3
44'8"
3'8"13
9"
9"
10"10
1"11
2'8"
1'9"6
7'11"7
5'3"7
13'9"13
5'10"7
20'6"
6'8"3
21'6"
1'
27'9"12
6'3"12
32'8"
4'10"4
37'7"8
4'11"8
42'4"9
4'9"1
43'11"6
1'6"13
44'8"
8"10
1'8"1'8"
6"3 5'6"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K
L
MN
O
PQRSTUV
W X
YZAA
AB
ACADAEAF
AGAH
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
1.5X4
5X10
5X6
6X8
5X8
1.5X4
5X5
5X8
1.5X4
5X6
3X8
5X8
5X6
1.5X4
1.5X6(++)
3X8(++)
3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 5X6 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 774 /-/-/504 /329 /353
Y 2962 /-/-/1756 /1471 /-
L 910 /-/-/679 /418 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 3.5 Min Req =-
L Brg Width = 8.0 Min Req =1.5
Bearings B, Y, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 466 -352
C - D 437 -930
D - E 613 -113
E - F 1423 -839
F - G 1774 -1146
Chords Tens.Comp.
G - H 1037 -611
I - J 754 -844
J - K 1275 -1498
K - L 459 -403
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AF 692 -427
AF-AD 782 -489
AD-AC 776 -487
AA- Y 1583 -1274
Y - W 1077 -914
Chords Tens.Comp.
W -U 1067 -901
T - S 720 -322
S - R 1323 -1022
R - O 1330 -1024
O - K 1241 -951
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AH 439 -416
D -AC 783 -895
AC- E 606 -462
AC-AA 693 -555
E -AA 1180 -1118
F -AA 495 -338
F - Y 1511 -1968
Y - G 1070 -1031
Webs Tens.Comp.
G - U 628 -448
U - H 976 -952
U - T 271 -380
H - T 598 -550
T - I 747 -765
I - S 403 -349
S - J 785 -676
N - K 387 -415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.106 AE 999 360
VERT(CL):0.284 AE 882 240
HORZ(LL):0.039 N - -
HORZ(TL):0.091 N - -
Creep Factor: 2.0
Max TC CSI:0.887
Max BC CSI:0.779
Max W eb CSI:0.888
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T168
Ply: 1
Qty:1
SEQN:12626 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T93
DrwNo:079.20.1313.40788
AK /DF 03/19/2020
W7
W9
BL1
21'23'8"
10"6
1'4"6
(TYP)
19'5"20'9"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
25'5"4
5'7"4
29'8"
4'2"12
34'8"
5'
38'9"12
4'1"12
44'8"
5'10"4
9"2
9"2
10"10
1"9
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'
6"
21'7"12
7"12
25'5"4
3'9"8
29'9"12
4'4"8
34'8"
4'10"4
38'11"8
4'3"8
42'4"9
3'5"1
43'11"6
1'6"13
44'8"
8"101'8"
1'8"
6"3 4'8"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H I
J
K L
M
NOPQRST
UVWX
YZAA
AB
ACADAEAF
AGAH
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
3X4
3X8
6X8
5X8
1.5X4 1.5X4
1.5X4
3X4
5X81.5X4 3X8
5X8
3X4
1.5X4
1.5X6(++)3X10(++)3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 5X6 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 774 /-/-/504 /329 /353
Y 2962 /-/-/1756 /1471 /-
L 910 /-/-/679 /418 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Y Brg Width = 3.5 Min Req =-
L Brg Width = 8.0 Min Req =1.5
Bearings B, Y, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 466 -352
C - D 437 -930
D - E 613 -113
E - F 1423 -839
F - G 1774 -1146
Chords Tens.Comp.
G - H 1037 -611
I - J 754 -844
J - K 1275 -1498
K - L 459 -403
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AF 692 -427
AF-AD 782 -489
AD-AC 776 -487
AA- Y 1583 -1274
Y - W 1077 -914
Chords Tens.Comp.
W -U 1067 -901
T - S 720 -322
S - R 1323 -1022
R - O 1330 -1024
O - K 1241 -951
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AH 439 -416
D -AC 783 -895
AC- E 606 -462
AC-AA 693 -555
E -AA 1180 -1118
F -AA 495 -338
F - Y 1511 -1968
Y - G 1070 -1031
Webs Tens.Comp.
G - U 628 -448
U - H 976 -952
U - T 271 -380
H - T 598 -550
T - I 747 -765
I - S 403 -349
S - J 785 -676
N - K 387 -415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.106 AE 999 360
VERT(CL):0.284 AE 882 240
HORZ(LL):0.039 N - -
HORZ(TL):0.091 N - -
Creep Factor: 2.0
Max TC CSI:0.887
Max BC CSI:0.779
Max W eb CSI:0.888
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T168
Ply: 1
Qty:1
SEQN:12626 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T93
DrwNo:079.20.1313.40788
AK /DF 03/19/2020
W7
W9
BL1
21'23'8"
10"6
1'4"6
(TYP)
19'5"20'9"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
25'5"4
5'7"4
29'8"
4'2"12
34'8"
5'
38'9"12
4'1"12
44'8"
5'10"4
9"2
9"2
10"10
1"9
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'
6"
21'7"12
7"12
25'5"4
3'9"8
29'9"12
4'4"8
34'8"
4'10"4
38'11"8
4'3"8
42'4"9
3'5"1
43'11"6
1'6"13
44'8"
8"101'8"
1'8"
6"3 4'8"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H I
J
K L
M
NOPQRST
UVWX
YZAA
AB
ACADAEAF
AGAH
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
3X4
3X8
6X8
5X8
1.5X4 1.5X4
1.5X4
3X4
5X81.5X4 3X8
5X8
3X4
1.5X4
1.5X6(++)3X10(++)3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.27
BC: From 20 plf at 0.00 to 20 plf at 4.27
BC: 1114 lb Conc. Load at 2.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 728 /-/-/-/258 /-
C 781 /-/-/-/277 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.380
Max BC CSI:0.511
Max W eb CSI:0.066
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T168
Ply: 1
Qty:1
SEQN:13096 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T168
DrwNo:079.20.1313.28260
AK /DF 03/19/2020
4'3"4
4'3"4
4'3"4
7"12 2'5"112'
A
B
C
5
12
2X4(B1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.27
BC: From 20 plf at 0.00 to 20 plf at 4.27
BC: 1114 lb Conc. Load at 2.33
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 728 /-/-/-/258 /-
C 781 /-/-/-/277 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.380
Max BC CSI:0.511
Max W eb CSI:0.066
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T168
Ply: 1
Qty:1
SEQN:13096 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T168
DrwNo:079.20.1313.28260
AK /DF 03/19/2020
4'3"4
4'3"4
4'3"4
7"12 2'5"112'
A
B
C
5
12
2X4(B1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9,W18 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 777 /-/-/505 /325 /353
AC 2981 /-/-/1767 /1475 /-
N 892 /-/-/657 /415 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 3.5 Min Req =-
N Brg Width = 8.0 Min Req =1.5
Bearings B, AC, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 461 -354
C - D 413 -940
D - E 655 -135
E - F 1455 -891
F - G 1715 -994
G - H 1584 -952
Chords Tens.Comp.
H - I 1495 -964
I - J 1328 -913
J - K 642 -600
K - L 917 -1080
L - M 1453 -1536
M - N 411 -324
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AJ 701 -452
AJ-AH 792 -515
AH-AG 785 -514
AE-AC 1610 -1304
Chords Tens.Comp.
X - V 1350 -1143
U - T 943 -535
T - Q 1402 -1233
Q - M 1358 -1187
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AL 435 -420
D -AG 782 -898
AG- E 609 -465
AG-AE 712 -593
E -AE 1188 -1122
F -AE 501 -327
F -AC 1366 -1812
AC- G 668 -618
AC- X 1766 -1540
Webs Tens.Comp.
G - X 567 -436
X - I 1071 -937
I - V 516 -390
V - J 1562 -1460
V - U 586 -212
J - U 452 -276
U - K 540 -534
T - L 737 -485
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.103 AI 999 360
VERT(CL):0.283 AI 886 240
HORZ(LL):0.038 P - -
HORZ(TL):0.089 P - -
Creep Factor: 2.0
Max TC CSI:0.969
Max BC CSI:0.761
Max W eb CSI:0.814
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T169
Ply: 1
Qty:1
SEQN:12633 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T68
DrwNo:079.20.1313.39492
AK /DF 03/19/2020
W7
W9
W18
BL1
21'23'8"
10"6
1'4"6
(TYP)
19'5"1'6"8 19'3"
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'1"12
1'3"12
23'2"4
2'0"8
24'8"
1'5"12
31'8"
7'
36'8"
5'
40'7"9
3'11"9
44'8"
4'0"7
9"1
9"1
10"10
1"10
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'
6"
21'7"12
7"12
23'0"8
1'4"12
23'4"
3"8
24'8"
1'4"
31'9"12
7'1"12
36'8"
4'10"4
42'5"1
5'9"1
43'11"6
1'6"5
44'8"
8"10
1'8"1'8"
6"3 3'10"36"
1'6"1'10"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F G
H I
J K
L
MN
O
PQRSTU
V
W
XYZAAABACADAE
AF
AGAHAIAJ
AKAL
5 12
3X5
3X8(**)
1.5X4(**)1.5X6(++)
3X4
5X8
5X6
6X8
5X85X8
3X4
5X8
3X4
3X4
5X8
5X6
3X8
5X8
5X6
1.5X6(++)
3X8(++)
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9,W18 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 777 /-/-/505 /325 /353
AC 2981 /-/-/1767 /1475 /-
N 892 /-/-/657 /415 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
AC Brg Width = 3.5 Min Req =-
N Brg Width = 8.0 Min Req =1.5
Bearings B, AC, & P Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 461 -354
C - D 413 -940
D - E 655 -135
E - F 1455 -891
F - G 1715 -994
G - H 1584 -952
Chords Tens.Comp.
H - I 1495 -964
I - J 1328 -913
J - K 642 -600
K - L 917 -1080
L - M 1453 -1536
M - N 411 -324
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AJ 701 -452
AJ-AH 792 -515
AH-AG 785 -514
AE-AC 1610 -1304
Chords Tens.Comp.
X - V 1350 -1143
U - T 943 -535
T - Q 1402 -1233
Q - M 1358 -1187
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AL 435 -420
D -AG 782 -898
AG- E 609 -465
AG-AE 712 -593
E -AE 1188 -1122
F -AE 501 -327
F -AC 1366 -1812
AC- G 668 -618
AC- X 1766 -1540
Webs Tens.Comp.
G - X 567 -436
X - I 1071 -937
I - V 516 -390
V - J 1562 -1460
V - U 586 -212
J - U 452 -276
U - K 540 -534
T - L 737 -485
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.103 AI 999 360
VERT(CL):0.283 AI 886 240
HORZ(LL):0.038 P - -
HORZ(TL):0.089 P - -
Creep Factor: 2.0
Max TC CSI:0.969
Max BC CSI:0.761
Max W eb CSI:0.814
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T169
Ply: 1
Qty:1
SEQN:12633 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T68
DrwNo:079.20.1313.39492
AK /DF 03/19/2020
W7
W9
W18
BL1
21'23'8"
10"6
1'4"6
(TYP)
19'5"1'6"8 19'3"
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'1"12
1'3"12
23'2"4
2'0"8
24'8"
1'5"12
31'8"
7'
36'8"
5'
40'7"9
3'11"9
44'8"
4'0"7
9"1
9"1
10"10
1"10
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'
6"
21'7"12
7"12
23'0"8
1'4"12
23'4"
3"8
24'8"
1'4"
31'9"12
7'1"12
36'8"
4'10"4
42'5"1
5'9"1
43'11"6
1'6"5
44'8"
8"10
1'8"1'8"
6"3 3'10"36"
1'6"1'10"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F G
H I
J K
L
MN
O
PQRSTU
V
W
XYZAAABACADAE
AF
AGAHAIAJ
AKAL
5 12
3X5
3X8(**)
1.5X4(**)1.5X6(++)
3X4
5X8
5X6
6X8
5X85X8
3X4
5X8
3X4
3X4
5X8
5X6
3X8
5X8
5X6
1.5X6(++)
3X8(++)
3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9,W13 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 5X6 except as noted.
(++) - This plate works for both joints covered.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 747 /-/-/487 /296 /353
W 3062 /-/-/1811 /1525 /-
L 861 /-/-/632 /396 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 3.5 Min Req =-
L Brg Width = 8.0 Min Req =1.5
Bearings B, W, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 435 -336
C - D 301 -854
D - E 785 -285
E - F 1611 -1076
F - G 1822 -1147
Chords Tens.Comp.
G - H 1856 -1268
H - I 698 -356
I - J 908 -961
J - K 1030 -1320
K - L 463 -377
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AD 625 -458
AD-AB 712 -522
AB-AA 706 -520
Y - W 1791 -1459
W -U 1986 -1714
Chords Tens.Comp.
T - S 937 -538
S - R 1172 -754
R - O 1161 -748
O - K 1077 -638
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AF 416 -400
D -AA 775 -891
AA- E 625 -484
AA- Y 824 -713
E - Y 1215 -1146
F - Y 443 -234
F - W 1375 -1780
Webs Tens.Comp.
W -G 633 -557
U - H 1420 -1282
U - T 751 -615
H - T 692 -603
T - I 1317 -1303
S - J 497 -535
N - K 588 -389
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 AC 999 360
VERT(CL):0.275 AC 906 240
HORZ(LL):0.037 N - -
HORZ(TL):0.086 N - -
Creep Factor: 2.0
Max TC CSI:0.981
Max BC CSI:0.744
Max W eb CSI:0.974
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T170
Ply: 1
Qty:1
SEQN:12638 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T70
DrwNo:079.20.1313.29336
AK /DF 03/19/2020
W7
W9
W13
BL1
21'23'8"
10"6
1'4"6
(TYP)
40'2"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
27'5"4
5'11"4
33'8"
6'2"12
38'8"
5'
44'8"
6'
8"14
8"14
10"10
1"13
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
27'7"
6'1"
33'11"8
6'4"8
38'6"4
4'6"12
42'4"14
3'10"10
43'11"6
1'6"8
44'8"
8"101'8"
1'8"
6"3 3'0"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K L
M
NOPQRST
U V
WXYZAAABACAD
AEAF
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
3X4
3X8
6X8
5X8
1.5X4
5X5
3X4
5X8
1.5X4
3X4
3X8 1.5X4
5X8
1.5X6(++)1.5X4(**)
3X8(**)
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W9,W13 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 5X6 except as noted.
(++) - This plate works for both joints covered.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 7 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 747 /-/-/487 /296 /353
W 3062 /-/-/1811 /1525 /-
L 861 /-/-/632 /396 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 3.5 Min Req =-
L Brg Width = 8.0 Min Req =1.5
Bearings B, W, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 435 -336
C - D 301 -854
D - E 785 -285
E - F 1611 -1076
F - G 1822 -1147
Chords Tens.Comp.
G - H 1856 -1268
H - I 698 -356
I - J 908 -961
J - K 1030 -1320
K - L 463 -377
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C -AD 625 -458
AD-AB 712 -522
AB-AA 706 -520
Y - W 1791 -1459
W -U 1986 -1714
Chords Tens.Comp.
T - S 937 -538
S - R 1172 -754
R - O 1161 -748
O - K 1077 -638
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AF 416 -400
D -AA 775 -891
AA- E 625 -484
AA- Y 824 -713
E - Y 1215 -1146
F - Y 443 -234
F - W 1375 -1780
Webs Tens.Comp.
W -G 633 -557
U - H 1420 -1282
U - T 751 -615
H - T 692 -603
T - I 1317 -1303
S - J 497 -535
N - K 588 -389
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.102 AC 999 360
VERT(CL):0.275 AC 906 240
HORZ(LL):0.037 N - -
HORZ(TL):0.086 N - -
Creep Factor: 2.0
Max TC CSI:0.981
Max BC CSI:0.744
Max W eb CSI:0.974
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T170
Ply: 1
Qty:1
SEQN:12638 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T70
DrwNo:079.20.1313.29336
AK /DF 03/19/2020
W7
W9
W13
BL1
21'23'8"
10"6
1'4"6
(TYP)
40'2"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
27'5"4
5'11"4
33'8"
6'2"12
38'8"
5'
44'8"
6'
8"14
8"14
10"10
1"13
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
27'7"
6'1"
33'11"8
6'4"8
38'6"4
4'6"12
42'4"14
3'10"10
43'11"6
1'6"8
44'8"
8"101'8"
1'8"
6"3 3'0"36"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K L
M
NOPQRST
U V
WXYZAAABACAD
AEAF
5 12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
3X4
3X8
6X8
5X8
1.5X4
5X5
3X4
5X8
1.5X4
3X4
3X8 1.5X4
5X8
1.5X6(++)1.5X4(**)
3X8(**)
3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B5,B6 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 46.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 39.73
BC: From 10 plf at 39.73 to 10 plf at 40.67
BC: From 20 plf at 40.67 to 20 plf at 44.67
BC: From 22 plf at 44.67 to 22 plf at 46.33
TC: 106 lb Conc. Load at 40.67
BC: 482 lb Conc. Load at 39.73
BC: 78 lb Conc. Load at 40.67
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 598 /-15 /-/-/221 /-
W 3535 /-/-/-/1817 /-
L 1217 /-/-/-/631 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 3.5 Min Req =3.1
L Brg Width = 8.0 Min Req =1.5
Bearings B, W, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 432 -216
D - E 654 -302
E - F 1093 -574
F - G 1215 -622
Chords Tens.Comp.
G - H 1249 -652
H - I 451 -250
I - J 479 -1096
J - K 713 -1413
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AD-AB 160 -378
AB-AA 157 -380
Y - W 516 -1000
W -U 591 -1155
Chords Tens.Comp.
T - S 1067 -473
S - R 1335 -663
R - O 1292 -646
O - K 1247 -624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AA 215 -436
AA- Y 246 -597
E - Y 316 -615
F - W 518 -1035
U - H 415 -816
Webs Tens.Comp.
H - T 381 -116
T - I 676 -1346
S - J 191 -468
R - J 386 -155
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 I 999 360
VERT(CL):0.179 I 999 240
HORZ(LL):0.016 N - -
HORZ(TL):0.039 N - -
Creep Factor: 2.0
Max TC CSI:0.763
Max BC CSI:0.399
Max W eb CSI:0.578
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T171
Ply: 2
Qty:1
SEQN:12654 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T64
DrwNo:079.20.1313.33985
AK /DF 03/19/2020
2 Complete Trusses Required
B5 B6
21'23'8"
10"6
1'4"6
(TYP)40'2"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
28'5"4
6'11"4
35'8"
7'2"12
40'8"
5'
44'8"
4'
8"14
8"14
10"10
1"12
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
28'7"
7'1"
35'11"8
7'4"8
40'6"4
4'6"12
42'4"9
1'10"5
43'11"6
1'6"13
44'8"
8"101'8"
1'8"
6"3
2'2"3
6"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K L
M
NOPQRST
UVWXYZAAABACAD
AEAF
5
12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
1.5X4
3X4
5X6
1.5X4
3X4
3X4
1.5X4
3X4
3X8
5X6
7X6 2X4
1.5X6(++)3X10(++)3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B5,B6 2x6 SP #2;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 46.33
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 39.73
BC: From 10 plf at 39.73 to 10 plf at 40.67
BC: From 20 plf at 40.67 to 20 plf at 44.67
BC: From 22 plf at 44.67 to 22 plf at 46.33
TC: 106 lb Conc. Load at 40.67
BC: 482 lb Conc. Load at 39.73
BC: 78 lb Conc. Load at 40.67
Plating Notes
All plates are 5X8 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 598 /-15 /-/-/221 /-
W 3535 /-/-/-/1817 /-
L 1217 /-/-/-/631 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
W Brg Width = 3.5 Min Req =3.1
L Brg Width = 8.0 Min Req =1.5
Bearings B, W, & N Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 432 -216
D - E 654 -302
E - F 1093 -574
F - G 1215 -622
Chords Tens.Comp.
G - H 1249 -652
H - I 451 -250
I - J 479 -1096
J - K 713 -1413
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AD-AB 160 -378
AB-AA 157 -380
Y - W 516 -1000
W -U 591 -1155
Chords Tens.Comp.
T - S 1067 -473
S - R 1335 -663
R - O 1292 -646
O - K 1247 -624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D -AA 215 -436
AA- Y 246 -597
E - Y 316 -615
F - W 518 -1035
U - H 415 -816
Webs Tens.Comp.
H - T 381 -116
T - I 676 -1346
S - J 191 -468
R - J 386 -155
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 4.47 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.068 I 999 360
VERT(CL):0.179 I 999 240
HORZ(LL):0.016 N - -
HORZ(TL):0.039 N - -
Creep Factor: 2.0
Max TC CSI:0.763
Max BC CSI:0.399
Max W eb CSI:0.578
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T171
Ply: 2
Qty:1
SEQN:12654 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T64
DrwNo:079.20.1313.33985
AK /DF 03/19/2020
2 Complete Trusses Required
B5 B6
21'23'8"
10"6
1'4"6
(TYP)40'2"8
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
28'5"4
6'11"4
35'8"
7'2"12
40'8"
5'
44'8"
4'
8"14
8"14
10"10
1"12
2'8"
1'9"6
7'6"2
4'10"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
28'7"
7'1"
35'11"8
7'4"8
40'6"4
4'6"12
42'4"9
1'10"5
43'11"6
1'6"13
44'8"
8"101'8"
1'8"
6"3
2'2"3
6"
1'6"8'9"69'3"524'0"12
25'6"12
A
B C
D
E
F
G
H
I J
K L
M
NOPQRST
UVWXYZAAABACAD
AEAF
5
12
3X5(B1)
3X8(**)
1.5X4(**)1.5X6(++)
1.5X4
3X4
5X6
1.5X4
3X4
3X4
1.5X4
3X4
3X8
5X6
7X6 2X4
1.5X6(++)3X10(++)3X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 902 /-/-/614 /445 /305
Q 2449 /-/-/1423 /1319 /-
K 612 /-/-/416 /291 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 3.5 Min Req =-
K Brg Width = -Min Req =-
Bearings B & Q Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 717 -1103
C - D 298 -376
D - E 846 -453
E - F 987 -461
Chords Tens.Comp.
F - G 999 -564
H - I 640 -814
I - J 877 -917
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 922 -529
V - U 918 -529
S - Q 961 -746
Chords Tens.Comp.
Q - O 1089 -919
N - M 676 -438
M - L 1056 -1033
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 701 -756
U - D 524 -377
D - S 1072 -1024
E - S 531 -382
E - Q 1006 -1318
Q - F 678 -611
O - G 978 -960
Webs Tens.Comp.
G - N 540 -507
N - H 802 -699
M - I 596 -403
I - L 585 -519
L - J 1074 -1029
J - K 511 -596
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.97 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 V 999 360
VERT(CL):0.072 V 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.019 S - -
Creep Factor: 2.0
Max TC CSI:0.793
Max BC CSI:0.537
Max W eb CSI:0.998
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T172
Ply: 1
Qty:1
SEQN:12644 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T62
DrwNo:079.20.1313.42520
AK /DF 03/19/2020
W7
BL1
21'18'8"
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
26'9"5
5'3"5
32'2"7
5'5"3
37'8"
5'5"9
39'8"
2'
7'6"2
7'6"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
26'10"11
5'4"11
32'5"15
5'7"5
37'11"8
5'5"9
39'8"
1'8"81'8"
6"3
1'4"31'6"8'9"69'3"524'0"12
25'6"12
A
B
C
D
E
F
G
H
I J
KLMN
O
PQRSTUV
5
12
3X5(B1)5X5
3X4
3X8
5X5
5X8
5X8
1.5X4
4X6
3X4
5X8
1.5X4
5X5
3X8
3X4
5X5
5X5
3X4
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7 2x4 SP 2250f-1.9E;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 20.854' 1 12" 4 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 902 /-/-/614 /445 /305
Q 2449 /-/-/1423 /1319 /-
K 612 /-/-/416 /291 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
Q Brg Width = 3.5 Min Req =-
K Brg Width = -Min Req =-
Bearings B & Q Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 717 -1103
C - D 298 -376
D - E 846 -453
E - F 987 -461
Chords Tens.Comp.
F - G 999 -564
H - I 640 -814
I - J 877 -917
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 922 -529
V - U 918 -529
S - Q 961 -746
Chords Tens.Comp.
Q - O 1089 -919
N - M 676 -438
M - L 1056 -1033
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 701 -756
U - D 524 -377
D - S 1072 -1024
E - S 531 -382
E - Q 1006 -1318
Q - F 678 -611
O - G 978 -960
Webs Tens.Comp.
G - N 540 -507
N - H 802 -699
M - I 596 -403
I - L 585 -519
L - J 1074 -1029
J - K 511 -596
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.97 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.026 V 999 360
VERT(CL):0.072 V 999 240
HORZ(LL):-0.008 C - -
HORZ(TL):0.019 S - -
Creep Factor: 2.0
Max TC CSI:0.793
Max BC CSI:0.537
Max W eb CSI:0.998
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T172
Ply: 1
Qty:1
SEQN:12644 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T62
DrwNo:079.20.1313.42520
AK /DF 03/19/2020
W7
BL1
21'18'8"
7'7"14
7'7"14
13'10"5
6'2"7
19'10"
5'11"11
21'6"
1'8"
26'9"5
5'3"5
32'2"7
5'5"3
37'8"
5'5"9
39'8"
2'
7'6"2
7'6"2
13'8"15
6'2"13
20'6"
6'9"1
21'6"
1'
26'10"11
5'4"11
32'5"15
5'7"5
37'11"8
5'5"9
39'8"
1'8"81'8"
6"3
1'4"31'6"8'9"69'3"524'0"12
25'6"12
A
B
C
D
E
F
G
H
I J
KLMN
O
PQRSTUV
5
12
3X5(B1)5X5
3X4
3X8
5X5
5X8
5X8
1.5X4
4X6
3X4
5X8
1.5X4
5X5
3X8
3X4
5X5
5X5
3X4
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W4,W9 2x4 SP 2250f-1.9E;
W6 2x6 SP #2; W 7 2x6 SP M-26;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 5.83
TC: From 36 plf at 5.83 to 36 plf at 35.83
TC: From 73 plf at 35.83 to 73 plf at 39.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.83
BC: From 10 plf at 5.83 to 10 plf at 35.83
BC: From 20 plf at 35.83 to 20 plf at 39.67
BC: 1973 lb Conc. Load at 5.83
BC: 1006 lb Conc. Load at 7.83, 9.83,11.83,15.83
17.83,19.83,21.83,23.83,27.83,29.83,33.83
BC: 1090 lb Conc. Load at 13.83,25.83
BC: 1000 lb Conc. Load at 31.83
BC: 1801 lb Conc. Load at 35.83
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2888 /-/-/-/1886 /-
Q 15308 /-/-/-/9629 /-
J 2338 /-/-/-/1154 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.6
Q Brg Width = 14.0 Min Req =13.5
J Brg Width = 6.0 Min Req =2.1
Bearings B, Q, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1964 -2954
C - D 764 -1015
D - E 1460 -788
E - F 1443 -772
Chords Tens.Comp.
F - G 2749 -1610
G - H 2790 -1642
H - I 485 -338
I - J 881 -1986
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 2681 -1776
P - O 2635 -1749
O - N 803 -617
N - M 1031 -1810
Chords Tens.Comp.
M - L 359 -551
L - K 1745 -761
K - J 1802 -788
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - C 1396 -826
C - O 1161 -1884
O - D 2605 -1630
D - N 1757 -2769
N - F 2876 -1909
Webs Tens.Comp.
F - M 2807 -4469
M - H 1504 -2693
H - L 2555 -1398
L - I 1160 -2297
I - K 1711 -815
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.97 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.111 P 999 360
VERT(CL):0.175 P 999 240
HORZ(LL):-0.023 C - -
HORZ(TL):0.037 C - -
Creep Factor: 2.0
Max TC CSI:0.886
Max BC CSI:0.574
Max W eb CSI:0.880
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T173
Ply: 2
Qty:1
SEQN:12753 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T27
DrwNo:079.20.1313.40665
AK /DF 03/19/2020
2 Complete Trusses Required
W4
W6
W7
W9
21'3"18'5"
6'2"4
6'2"4
12'4"8
6'2"4
18'5"
6'0"8
19'10"
1'5"
21'3"
1'5"
27'3"8
6'0"8
33'5"12
6'2"4
39'8"
6'2"4
6'0"8
6'0"8
12'1"
6'0"8
18'5"
6'4"
21'3"
2'10"
27'7"
6'4"
33'7"8
6'0"8
39'8"
6'0"81'8"
6"38'9"69'3"524'0"12A
B
C
D
E
F
G
H
I
J
KLMNOPQ
5
12
4X5(A1)
3X10
4X7
8X8
7X6
1.5X4
8X10
SS0612
8X10
1.5X4
7X6
8X8
4X7
3X10
4X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W4,W9 2x4 SP 2250f-1.9E;
W6 2x6 SP #2; W 7 2x6 SP M-26;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 5.83
TC: From 36 plf at 5.83 to 36 plf at 35.83
TC: From 73 plf at 35.83 to 73 plf at 39.67
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.83
BC: From 10 plf at 5.83 to 10 plf at 35.83
BC: From 20 plf at 35.83 to 20 plf at 39.67
BC: 1973 lb Conc. Load at 5.83
BC: 1006 lb Conc. Load at 7.83, 9.83,11.83,15.83
17.83,19.83,21.83,23.83,27.83,29.83,33.83
BC: 1090 lb Conc. Load at 13.83,25.83
BC: 1000 lb Conc. Load at 31.83
BC: 1801 lb Conc. Load at 35.83
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2888 /-/-/-/1886 /-
Q 15308 /-/-/-/9629 /-
J 2338 /-/-/-/1154 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =2.6
Q Brg Width = 14.0 Min Req =13.5
J Brg Width = 6.0 Min Req =2.1
Bearings B, Q, & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1964 -2954
C - D 764 -1015
D - E 1460 -788
E - F 1443 -772
Chords Tens.Comp.
F - G 2749 -1610
G - H 2790 -1642
H - I 485 -338
I - J 881 -1986
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 2681 -1776
P - O 2635 -1749
O - N 803 -617
N - M 1031 -1810
Chords Tens.Comp.
M - L 359 -551
L - K 1745 -761
K - J 1802 -788
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - C 1396 -826
C - O 1161 -1884
O - D 2605 -1630
D - N 1757 -2769
N - F 2876 -1909
Webs Tens.Comp.
F - M 2807 -4469
M - H 1504 -2693
H - L 2555 -1398
L - I 1160 -2297
I - K 1711 -815
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.97 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.111 P 999 360
VERT(CL):0.175 P 999 240
HORZ(LL):-0.023 C - -
HORZ(TL):0.037 C - -
Creep Factor: 2.0
Max TC CSI:0.886
Max BC CSI:0.574
Max W eb CSI:0.880
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T173
Ply: 2
Qty:1
SEQN:12753 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T27
DrwNo:079.20.1313.40665
AK /DF 03/19/2020
2 Complete Trusses Required
W4
W6
W7
W9
21'3"18'5"
6'2"4
6'2"4
12'4"8
6'2"4
18'5"
6'0"8
19'10"
1'5"
21'3"
1'5"
27'3"8
6'0"8
33'5"12
6'2"4
39'8"
6'2"4
6'0"8
6'0"8
12'1"
6'0"8
18'5"
6'4"
21'3"
2'10"
27'7"
6'4"
33'7"8
6'0"8
39'8"
6'0"81'8"
6"38'9"69'3"524'0"12A
B
C
D
E
F
G
H
I
J
KLMNOPQ
5
12
4X5(A1)
3X10
4X7
8X8
7X6
1.5X4
8X10
SS0612
8X10
1.5X4
7X6
8X8
4X7
3X10
4X5(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 5.77
TC: From 36 plf at 5.77 to 36 plf at 22.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.77
BC: From 10 plf at 5.77 to 10 plf at 22.00
TC: 213 lb Conc. Load at 5.77
TC: 175 lb Conc. Load at 7.06,21.06
TC: 126 lb Conc. Load at 9.06,13.06,15.06,17.06
19.06
TC: 183 lb Conc. Load at 11.06
BC: 241 lb Conc. Load at 5.77
BC: 107 lb Conc. Load at 7.06,21.06
BC: 129 lb Conc. Load at 9.06,13.06,15.06,17.06
19.06
BC: 52 lb Conc. Load at 11.06
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1993 /-/-/-/1254 /-
H 1973 /-/-/-/1265 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =3.2
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2311 -3644
C - D 3306 -5169
D - E 3107 -4819
Chords Tens.Comp.
E - F 3107 -4819
F - G 997 -1520
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3253 -2043
N - L 5262 -3370
Chords Tens.Comp.
L - I 1660 -1091
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 537 -523
C - N 2478 -1659
P - N 3038 -1876
N - D 355 -392
D - L 278 -467
Webs Tens.Comp.
E - L 541 -633
L - F 3365 -2146
F - I 1192 -1674
I - G 2441 -1602
G - H 1239 -1891
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.257 M 999 360
VERT(CL):0.443 M 592 240
HORZ(LL):-0.083 H - -
HORZ(TL):0.142 H - -
Creep Factor: 2.0
Max TC CSI:0.847
Max BC CSI:0.842
Max W eb CSI:0.791
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T174
Ply: 1
Qty:1
SEQN:12659 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T246
DrwNo:079.20.1313.33658
AK /DF 03/19/2020
B3
W7
W8
22'
5'9"4
5'9"4
8'6"8
2'9"4
14'5"
5'10"8
20'2"
5'9"
22'
1'10"
6'1"4
6'1"4
8'10"
2'8"12
14'5"
5'7"
20'3"8
5'10"8
22'
1'8"81'8"
6"3 2'11"16"3'5"24'0"12A
B
C D E F G
HIJ
KL
MNOP
5 12
4X7(B2)
6X8
5X8 H06151.5X4
3X4 2X4
5X12
3X10
7X81.5X4
5X8
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2; W7,W8 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 5.77
TC: From 36 plf at 5.77 to 36 plf at 22.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.77
BC: From 10 plf at 5.77 to 10 plf at 22.00
TC: 213 lb Conc. Load at 5.77
TC: 175 lb Conc. Load at 7.06,21.06
TC: 126 lb Conc. Load at 9.06,13.06,15.06,17.06
19.06
TC: 183 lb Conc. Load at 11.06
BC: 241 lb Conc. Load at 5.77
BC: 107 lb Conc. Load at 7.06,21.06
BC: 129 lb Conc. Load at 9.06,13.06,15.06,17.06
19.06
BC: 52 lb Conc. Load at 11.06
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1993 /-/-/-/1254 /-
H 1973 /-/-/-/1265 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =3.2
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2311 -3644
C - D 3306 -5169
D - E 3107 -4819
Chords Tens.Comp.
E - F 3107 -4819
F - G 997 -1520
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3253 -2043
N - L 5262 -3370
Chords Tens.Comp.
L - I 1660 -1091
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 537 -523
C - N 2478 -1659
P - N 3038 -1876
N - D 355 -392
D - L 278 -467
Webs Tens.Comp.
E - L 541 -633
L - F 3365 -2146
F - I 1192 -1674
I - G 2441 -1602
G - H 1239 -1891
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.257 M 999 360
VERT(CL):0.443 M 592 240
HORZ(LL):-0.083 H - -
HORZ(TL):0.142 H - -
Creep Factor: 2.0
Max TC CSI:0.847
Max BC CSI:0.842
Max W eb CSI:0.791
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T174
Ply: 1
Qty:1
SEQN:12659 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T246
DrwNo:079.20.1313.33658
AK /DF 03/19/2020
B3
W7
W8
22'
5'9"4
5'9"4
8'6"8
2'9"4
14'5"
5'10"8
20'2"
5'9"
22'
1'10"
6'1"4
6'1"4
8'10"
2'8"12
14'5"
5'7"
20'3"8
5'10"8
22'
1'8"81'8"
6"3 2'11"16"3'5"24'0"12A
B
C D E F G
HIJ
KL
MNOP
5 12
4X7(B2)
6X8
5X8 H06151.5X4
3X4 2X4
5X12
3X10
7X81.5X4
5X8
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2; B1,B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/765 /682 /252
H 1006 /-/-/573 /621 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 135 -485
C - D 3585 -4058
D - E 3490 -3834
Chords Tens.Comp.
E - F 1364 -1783
F - G 1364 -1782
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - T 3797 -3602
T - R 3842 -3645
Chords Tens.Comp.
O - M 1841 -1621
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 1293 -1342
T - S 962 -911
D - R 435 -312
R - E 2018 -2043
R - O 1656 -1455
Webs Tens.Comp.
F - M 487 -585
M - G 1895 -1455
I - G 736 -942
I - H 737 -973
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.85 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.278 S 945 360
VERT(CL):0.520 R 504 240
HORZ(LL):-0.150 L - -
HORZ(TL):0.282 L - -
Creep Factor: 2.0
Max TC CSI:0.770
Max BC CSI:0.861
Max W eb CSI:0.756
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T175
Ply: 1
Qty:1
SEQN:12666 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T41
DrwNo:079.20.1313.27730
AK /DF 03/19/2020
T2
B1
B2
W10
22'
4'3"12
4'3"12
7'9"4
3'5"8
14'10"10
7'1"6
22'
7'1"6
2'4"8
2'4"8
2'10"
5"8
4'2"
1'4"
7'11"
3'9"
8'10"
11"
14'10"10
6'0"10
20'5"3
5'6"9
21'8"8
1'3"5
22'
3"8
1'8"
6"3 3'9"11'6"4'3"24'0"12A
B
C
D
E F G
HIJK
LM
NOP
Q R
STU
5
12
3X4(B1)1.5X6
7X8(++)
2X6
H0612
4X4
6X8
6X8
3X12
1.5X6(++)3X3
4X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2; B1,B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W10 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/765 /682 /252
H 1006 /-/-/573 /621 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 135 -485
C - D 3585 -4058
D - E 3490 -3834
Chords Tens.Comp.
E - F 1364 -1783
F - G 1364 -1782
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - T 3797 -3602
T - R 3842 -3645
Chords Tens.Comp.
O - M 1841 -1621
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 1293 -1342
T - S 962 -911
D - R 435 -312
R - E 2018 -2043
R - O 1656 -1455
Webs Tens.Comp.
F - M 487 -585
M - G 1895 -1455
I - G 736 -942
I - H 737 -973
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.85 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.278 S 945 360
VERT(CL):0.520 R 504 240
HORZ(LL):-0.150 L - -
HORZ(TL):0.282 L - -
Creep Factor: 2.0
Max TC CSI:0.770
Max BC CSI:0.861
Max W eb CSI:0.756
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T175
Ply: 1
Qty:1
SEQN:12666 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T41
DrwNo:079.20.1313.27730
AK /DF 03/19/2020
T2
B1
B2
W10
22'
4'3"12
4'3"12
7'9"4
3'5"8
14'10"10
7'1"6
22'
7'1"6
2'4"8
2'4"8
2'10"
5"8
4'2"
1'4"
7'11"
3'9"
8'10"
11"
14'10"10
6'0"10
20'5"3
5'6"9
21'8"8
1'3"5
22'
3"8
1'8"
6"3 3'9"11'6"4'3"24'0"12A
B
C
D
E F G
HIJK
LM
NOP
Q R
STU
5
12
3X4(B1)1.5X6
7X8(++)
2X6
H0612
4X4
6X8
6X8
3X12
1.5X6(++)3X3
4X6
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/779 /685 /309
H 1006 /-/-/582 /640 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1384 -1847
C - D 1519 -1835
D - E 1405 -1592
Chords Tens.Comp.
E - F 1013 -1256
F - G 1013 -1256
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 1625 -1553
P - N 1657 -1570
Chords Tens.Comp.
N - M 1464 -1326
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - P 1509 -1447
P - D 383 -356
D - N 654 -517
E - N 465 -504
Webs Tens.Comp.
F - M 426 -509
M - G 1458 -1179
I - G 772 -950
I - H 774 -978
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.087 Q 999 360
VERT(CL):0.170 Q 999 240
HORZ(LL):-0.030 L - -
HORZ(TL):0.058 L - -
Creep Factor: 2.0
Max TC CSI:0.649
Max BC CSI:0.904
Max W eb CSI:0.998
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T176
Ply: 1
Qty:1
SEQN:12669 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T37
DrwNo:079.20.1313.28478
AK /DF 03/19/2020
22'
4'6"5
4'6"5
8'6"8
4'0"3
9'9"4
1'2"12
15'10"10
6'1"6
22'
6'1"6
4'6"5
4'6"5
8'10"
4'3"11
9'9"4
11"4
15'10"10
6'1"6
20'5"3
4'6"9
21'8"8
1'3"5
22'
3"8
1'8"
6"3 4'7"16"5'1"24'0"12A
B
C
D
E F G
HIJK
LMN
OPQR
5 12
3X5(B1)4X4 5X81.5X4
4X7 1.5X4
3X10
1.5X6(++)3X3
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/779 /685 /309
H 1006 /-/-/582 /640 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1384 -1847
C - D 1519 -1835
D - E 1405 -1592
Chords Tens.Comp.
E - F 1013 -1256
F - G 1013 -1256
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 1625 -1553
P - N 1657 -1570
Chords Tens.Comp.
N - M 1464 -1326
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - P 1509 -1447
P - D 383 -356
D - N 654 -517
E - N 465 -504
Webs Tens.Comp.
F - M 426 -509
M - G 1458 -1179
I - G 772 -950
I - H 774 -978
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.087 Q 999 360
VERT(CL):0.170 Q 999 240
HORZ(LL):-0.030 L - -
HORZ(TL):0.058 L - -
Creep Factor: 2.0
Max TC CSI:0.649
Max BC CSI:0.904
Max W eb CSI:0.998
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T176
Ply: 1
Qty:1
SEQN:12669 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T37
DrwNo:079.20.1313.28478
AK /DF 03/19/2020
22'
4'6"5
4'6"5
8'6"8
4'0"3
9'9"4
1'2"12
15'10"10
6'1"6
22'
6'1"6
4'6"5
4'6"5
8'10"
4'3"11
9'9"4
11"4
15'10"10
6'1"6
20'5"3
4'6"9
21'8"8
1'3"5
22'
3"8
1'8"
6"3 4'7"16"5'1"24'0"12A
B
C
D
E F G
HIJK
LMN
OPQR
5 12
3X5(B1)4X4 5X81.5X4
4X7 1.5X4
3X10
1.5X6(++)3X3
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/787 /683 /368
H 1006 /-/-/590 /660 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1330 -1852
C - D 2741 -3125
D - E 1611 -1844
Chords Tens.Comp.
E - F 1069 -1255
F - G 1069 -1255
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AB 1629 -1568
Y - W 2829 -2748
W -T 2859 -2781
Chords Tens.Comp.
T - S 2849 -2772
S - R 1653 -1561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 804 -765
C - Y 1227 -1212
AB- Y 1701 -1636
Y - D 924 -826
D - S 1402 -1384
E - S 661 -600
Webs Tens.Comp.
E - R 595 -486
F - R 354 -423
R - G 1469 -1259
I - G 810 -948
I - H 816 -993
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.164 X 999 360
VERT(CL):0.301 X 871 240
HORZ(LL):-0.089 M - -
HORZ(TL):0.178 M - -
Creep Factor: 2.0
Max TC CSI:0.651
Max BC CSI:0.907
Max W eb CSI:0.747
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T177
Ply: 1
Qty:1
SEQN:12672 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T56
DrwNo:079.20.1313.42426
AK /DF 03/19/2020
22'
8'4"12
1'7"8
(TYP)
5'6"8
4'6"5
4'6"5
8'6"8
4'0"3
11'9"4
3'2"12
16'10"10
5'1"6
22'
5'1"6
4'6"5
4'6"5
8'10"
4'3"11
10'2"
1'4"
11'9"4
1'7"4
16'10"10
5'1"6
17'2"4
3"10
18'9"12
1'7"8
20'3"8
1'5"12
21'8"8
1'5"
22'
3"8
1'8"
6"3 5'5"16"1'10"5'11"24'0"12A
B
C
D
E F G
H
I
J
K
L
M
N
OP
QRST
UVW
X
Y
ZAAAB
5 12
3X5(B1)
3X4
5X5
5X8
3X3
3X5
4X7
3X5 3X10
3X33X4 4X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/787 /683 /368
H 1006 /-/-/590 /660 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1330 -1852
C - D 2741 -3125
D - E 1611 -1844
Chords Tens.Comp.
E - F 1069 -1255
F - G 1069 -1255
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AB 1629 -1568
Y - W 2829 -2748
W -T 2859 -2781
Chords Tens.Comp.
T - S 2849 -2772
S - R 1653 -1561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 804 -765
C - Y 1227 -1212
AB- Y 1701 -1636
Y - D 924 -826
D - S 1402 -1384
E - S 661 -600
Webs Tens.Comp.
E - R 595 -486
F - R 354 -423
R - G 1469 -1259
I - G 810 -948
I - H 816 -993
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.164 X 999 360
VERT(CL):0.301 X 871 240
HORZ(LL):-0.089 M - -
HORZ(TL):0.178 M - -
Creep Factor: 2.0
Max TC CSI:0.651
Max BC CSI:0.907
Max W eb CSI:0.747
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T177
Ply: 1
Qty:1
SEQN:12672 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T56
DrwNo:079.20.1313.42426
AK /DF 03/19/2020
22'
8'4"12
1'7"8
(TYP)
5'6"8
4'6"5
4'6"5
8'6"8
4'0"3
11'9"4
3'2"12
16'10"10
5'1"6
22'
5'1"6
4'6"5
4'6"5
8'10"
4'3"11
10'2"
1'4"
11'9"4
1'7"4
16'10"10
5'1"6
17'2"4
3"10
18'9"12
1'7"8
20'3"8
1'5"12
21'8"8
1'5"
22'
3"8
1'8"
6"3 5'5"16"1'10"5'11"24'0"12A
B
C
D
E F G
H
I
J
K
L
M
N
OP
QRST
UVW
X
Y
ZAAAB
5 12
3X5(B1)
3X4
5X5
5X8
3X3
3X5
4X7
3X5 3X10
3X33X4 4X4
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1205 /-/-/793 /679 /429
G 1090 /-/-/600 /683 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1255 -1848
C - D 795 -1142
Chords Tens.Comp.
D - E 867 -963
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1612 -1537
I - H 1610 -1537
Chords Tens.Comp.
H - G 594 -515
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 733 -713
H - E 666 -635
Webs Tens.Comp.
E - G 907 -1045
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.072 C 999 360
VERT(CL):0.144 I 999 240
HORZ(LL):-0.028 G - -
HORZ(TL):0.049 G - -
Creep Factor: 2.0
Max TC CSI:0.758
Max BC CSI:0.899
Max W eb CSI:0.934
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T178
Ply: 1
Qty:2
SEQN:12676 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T19
DrwNo:079.20.1313.36310
AK /DF 03/19/2020
22'
7'1"11
7'1"11
13'9"4
6'7"9
17'10"10
4'1"6
22'
4'1"6
6'11"15
6'11"15
13'11"
6'11"1
22'
8'1"1'8"
6"3 6'3"16'9"24'0"12A
B
C
D E F
GHI
5
12
3X5(B1)1.5X4
3X4
4X6
5X8
3X4 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1205 /-/-/793 /679 /429
G 1090 /-/-/600 /683 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1255 -1848
C - D 795 -1142
Chords Tens.Comp.
D - E 867 -963
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 1612 -1537
I - H 1610 -1537
Chords Tens.Comp.
H - G 594 -515
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 733 -713
H - E 666 -635
Webs Tens.Comp.
E - G 907 -1045
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.072 C 999 360
VERT(CL):0.144 I 999 240
HORZ(LL):-0.028 G - -
HORZ(TL):0.049 G - -
Creep Factor: 2.0
Max TC CSI:0.758
Max BC CSI:0.899
Max W eb CSI:0.934
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T178
Ply: 1
Qty:2
SEQN:12676 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T19
DrwNo:079.20.1313.36310
AK /DF 03/19/2020
22'
7'1"11
7'1"11
13'9"4
6'7"9
17'10"10
4'1"6
22'
4'1"6
6'11"15
6'11"15
13'11"
6'11"1
22'
8'1"1'8"
6"3 6'3"16'9"24'0"12A
B
C
D E F
GHI
5
12
3X5(B1)1.5X4
3X4
4X6
5X8
3X4 1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/798 /672 /490
G 1006 /-/-/610 /708 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1198 -1853
C - D 983 -1411
Chords Tens.Comp.
D - E 601 -813
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1625 -1567
J - I 1623 -1569
Chords Tens.Comp.
I - H 1228 -1215
H - G 669 -653
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 381 -420
D - H 760 -756
Webs Tens.Comp.
E - H 648 -518
E - G 965 -989
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.069 C 999 360
VERT(CL):0.130 C 999 240
HORZ(LL):-0.030 G - -
HORZ(TL):0.050 G - -
Creep Factor: 2.0
Max TC CSI:0.865
Max BC CSI:0.829
Max W eb CSI:0.710
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T179
Ply: 1
Qty:1
SEQN:12693 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T20
DrwNo:079.20.1313.26918
AK /DF 03/19/2020
T3
22'
5'3"14
5'3"14
10'8"8
5'4"10
15'9"4
5'0"12
22'
6'2"12
5'2"8
5'2"8
10'5"
5'2"8
15'9"4
5'4"4
22'
6'2"121'8"
6"3 7'1"17'7"(WB1)
24'0"12A
B
C
D
E F
GHIJ
5
12
3X5(B1)1.5X4
5X5
5X5
3X4
4X7
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/798 /672 /490
G 1006 /-/-/610 /708 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1198 -1853
C - D 983 -1411
Chords Tens.Comp.
D - E 601 -813
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1625 -1567
J - I 1623 -1569
Chords Tens.Comp.
I - H 1228 -1215
H - G 669 -653
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 381 -420
D - H 760 -756
Webs Tens.Comp.
E - H 648 -518
E - G 965 -989
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.069 C 999 360
VERT(CL):0.130 C 999 240
HORZ(LL):-0.030 G - -
HORZ(TL):0.050 G - -
Creep Factor: 2.0
Max TC CSI:0.865
Max BC CSI:0.829
Max W eb CSI:0.710
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T179
Ply: 1
Qty:1
SEQN:12693 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T20
DrwNo:079.20.1313.26918
AK /DF 03/19/2020
T3
22'
5'3"14
5'3"14
10'8"8
5'4"10
15'9"4
5'0"12
22'
6'2"12
5'2"8
5'2"8
10'5"
5'2"8
15'9"4
5'4"4
22'
6'2"121'8"
6"3 7'1"17'7"(WB1)
24'0"12A
B
C
D
E F
GHIJ
5
12
3X5(B1)1.5X4
5X5
5X5
3X4
4X7
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/798 /672 /490
G 1006 /-/-/610 /708 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1182 -1834
C - D 1789 -2268
Chords Tens.Comp.
D - E 719 -999
E - F 811 -826
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 1609 -1558
Chords Tens.Comp.
N - L 2077 -2046
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 503 -455
C - N 481 -506
P - N 1607 -1551
N - D 531 -393
D - L 1308 -1327
Webs Tens.Comp.
E - L 434 -202
L - F 1137 -1118
H - F 901 -960
H - G 903 -985
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.115 M 999 360
VERT(CL):0.208 O 999 240
HORZ(LL):-0.050 K - -
HORZ(TL):0.088 K - -
Creep Factor: 2.0
Max TC CSI:0.808
Max BC CSI:0.896
Max W eb CSI:0.781
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T179A
Ply: 1
Qty:1
SEQN:12697 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T23
DrwNo:079.20.1313.28589
AK /DF 03/19/2020
W5
W7
22'
4'5"15
4'5"15
8'6"8
4'0"9
15'9"4
7'2"12
22'
6'2"12
4'6"5
4'6"5
8'10"
4'3"11
15'11"
7'1"
20'5"4
4'6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 7'1"11'7'7"24'0"12A
B
C
D
E F
GHIJKL
MNOP
5 12
3X5(B1)
5X5
4X5 5X8
3X4
6X6
4X7
3X3
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5,W7 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/798 /672 /490
G 1006 /-/-/610 /708 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1182 -1834
C - D 1789 -2268
Chords Tens.Comp.
D - E 719 -999
E - F 811 -826
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 1609 -1558
Chords Tens.Comp.
N - L 2077 -2046
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 503 -455
C - N 481 -506
P - N 1607 -1551
N - D 531 -393
D - L 1308 -1327
Webs Tens.Comp.
E - L 434 -202
L - F 1137 -1118
H - F 901 -960
H - G 903 -985
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.52 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.115 M 999 360
VERT(CL):0.208 O 999 240
HORZ(LL):-0.050 K - -
HORZ(TL):0.088 K - -
Creep Factor: 2.0
Max TC CSI:0.808
Max BC CSI:0.896
Max W eb CSI:0.781
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T179A
Ply: 1
Qty:1
SEQN:12697 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T23
DrwNo:079.20.1313.28589
AK /DF 03/19/2020
W5
W7
22'
4'5"15
4'5"15
8'6"8
4'0"9
15'9"4
7'2"12
22'
6'2"12
4'6"5
4'6"5
8'10"
4'3"11
15'11"
7'1"
20'5"4
4'6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 7'1"11'7'7"24'0"12A
B
C
D
E F
GHIJKL
MNOP
5 12
3X5(B1)
5X5
4X5 5X8
3X4
6X6
4X7
3X3
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8,W10 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/800 /664 /553
H 1006 /-/-/622 /736 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1123 -1844
C - D 1648 -2245
D - E 1810 -2286
Chords Tens.Comp.
E - F 466 -656
F - G 531 -540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1620 -1576
Chords Tens.Comp.
O - M 1154 -1181
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 516 -470
C - O 436 -398
Q - O 1636 -1576
O - E 1245 -1081
Webs Tens.Comp.
E - M 898 -850
M - G 1031 -1011
I - G 953 -1003
I - H 952 -993
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.115 D 999 360
VERT(CL):0.210 D 999 240
HORZ(LL):-0.046 L - -
HORZ(TL):0.073 H - -
Creep Factor: 2.0
Max TC CSI:0.650
Max BC CSI:0.964
Max W eb CSI:0.836
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T180
Ply: 1
Qty:2
SEQN:12680 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T57
DrwNo:079.20.1313.40056
AK /DF 03/19/2020
W8
W10
22'
4'5"15
4'5"15
8'4"12
3'10"13
13'1"14
4'9"2
17'9"4
4'7"6
22'
4'2"12
4'6"5
4'6"5
8'10"
4'3"11
17'11"
9'1"
20'5"4
2'6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 7'11"11'8'5"24'0"12A
B
C
D
E
F G
HIJKLM
NOPQ
5 12
3X5(B1)
5X5
4X5 6X8
3X6
5X5
4X7
3X3
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W8,W10 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/800 /664 /553
H 1006 /-/-/622 /736 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1123 -1844
C - D 1648 -2245
D - E 1810 -2286
Chords Tens.Comp.
E - F 466 -656
F - G 531 -540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1620 -1576
Chords Tens.Comp.
O - M 1154 -1181
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 516 -470
C - O 436 -398
Q - O 1636 -1576
O - E 1245 -1081
Webs Tens.Comp.
E - M 898 -850
M - G 1031 -1011
I - G 953 -1003
I - H 952 -993
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.115 D 999 360
VERT(CL):0.210 D 999 240
HORZ(LL):-0.046 L - -
HORZ(TL):0.073 H - -
Creep Factor: 2.0
Max TC CSI:0.650
Max BC CSI:0.964
Max W eb CSI:0.836
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T180
Ply: 1
Qty:2
SEQN:12680 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T57
DrwNo:079.20.1313.40056
AK /DF 03/19/2020
W8
W10
22'
4'5"15
4'5"15
8'4"12
3'10"13
13'1"14
4'9"2
17'9"4
4'7"6
22'
4'2"12
4'6"5
4'6"5
8'10"
4'3"11
17'11"
9'1"
20'5"4
2'6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 7'11"11'8'5"24'0"12A
B
C
D
E
F G
HIJKLM
NOPQ
5 12
3X5(B1)
5X5
4X5 6X8
3X6
5X5
4X7
3X3
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W10 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/801 /652 /618
H 1006 /-/-/633 /766 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1039 -1842
C - D 1549 -2235
Chords Tens.Comp.
D - E 753 -1217
E - F 186 -381
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 1619 -1565
P - N 2034 -1933
Chords Tens.Comp.
N - M 1029 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 505 -458
C - P 429 -385
R - P 1611 -1561
P - D 515 -432
D - N 1008 -1092
N - E 595 -412
Webs Tens.Comp.
E - M 974 -1022
F - M 389 -190
M - G 995 -1047
I - G 998 -994
I - H 1003 -988
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 O 999 360
VERT(CL):0.203 Q 999 240
HORZ(LL):-0.055 L - -
HORZ(TL):0.089 L - -
Creep Factor: 2.0
Max TC CSI:0.650
Max BC CSI:0.893
Max W eb CSI:0.758
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T181
Ply: 1
Qty:1
SEQN:12685 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T59
DrwNo:079.20.1313.41677
AK /DF 03/19/2020
W7
W10
22'
4'6"5
4'6"5
8'6"2
3'11"13
14'3"10
5'9"8
19'9"4
5'5"10
22'
2'2"12
4'6"5
4'6"5
8'10"
4'3"11
14'0"2
5'2"2
19'11"
5'10"14
20'5"4
6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 8'9"11'9'3"(a)
24'0"12A
B
C
D
E
F G
HIJKLMN
OPQR
5
12
3X5(B1)4X5 5X81.5X4
5X5
4X4
3X101.5X4
1.5X4
3X3
3X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W7,W10 2x4 SP 2250f-1.9E;
Bracing
(a) scab reinforcement. 80% length of web member.
Same size, species & grade or better. Attach with 10d
Box or Gun (0.128"x3",min.)nails @ 6" oc.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/801 /652 /618
H 1006 /-/-/633 /766 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
H Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1039 -1842
C - D 1549 -2235
Chords Tens.Comp.
D - E 753 -1217
E - F 186 -381
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 1619 -1565
P - N 2034 -1933
Chords Tens.Comp.
N - M 1029 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 505 -458
C - P 429 -385
R - P 1611 -1561
P - D 515 -432
D - N 1008 -1092
N - E 595 -412
Webs Tens.Comp.
E - M 974 -1022
F - M 389 -190
M - G 995 -1047
I - G 998 -994
I - H 1003 -988
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.113 O 999 360
VERT(CL):0.203 Q 999 240
HORZ(LL):-0.055 L - -
HORZ(TL):0.089 L - -
Creep Factor: 2.0
Max TC CSI:0.650
Max BC CSI:0.893
Max W eb CSI:0.758
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T181
Ply: 1
Qty:1
SEQN:12685 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T59
DrwNo:079.20.1313.41677
AK /DF 03/19/2020
W7
W10
22'
4'6"5
4'6"5
8'6"2
3'11"13
14'3"10
5'9"8
19'9"4
5'5"10
22'
2'2"12
4'6"5
4'6"5
8'10"
4'3"11
14'0"2
5'2"2
19'11"
5'10"14
20'5"4
6"4
21'8"8
1'3"4
22'
3"8
1'8"
6"3 8'9"11'9'3"(a)
24'0"12A
B
C
D
E
F G
HIJKLMN
OPQR
5
12
3X5(B1)4X5 5X81.5X4
5X5
4X4
3X101.5X4
1.5X4
3X3
3X5
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/787 /683 /368
G 1006 /-/-/590 /660 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1339 -1841
C - D 995 -1277
Chords Tens.Comp.
D - E 684 -812
E - F 684 -812
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1612 -1561
J - I 1610 -1562
Chords Tens.Comp.
I - H 1105 -1043
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 577 -561
D - I 416 -276
D - H 508 -414
Webs Tens.Comp.
E - H 341 -414
H - F 1150 -969
F - G 813 -963
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.075 C 999 360
VERT(CL):0.148 C 999 240
HORZ(LL):-0.026 H - -
HORZ(TL):0.046 H - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.845
Max W eb CSI:0.833
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T182
Ply: 1
Qty:1
SEQN:12701 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T18
DrwNo:079.20.1313.32395
AK /DF 03/19/2020
22'
6'1"11
6'1"11
11'9"4
5'7"9
16'10"10
5'1"6
22'
5'1"6
5'11"15
5'11"15
11'9"4
5'9"5
16'10"10
5'1"6
22'
5'1"61'8"
6"3 5'5"15'11"24'0"12A
B
C
D E F
GHIJ
5 12
3X5(B1)1.5X4
3X4
4X7
5X5
1.5X4
4X7
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/787 /683 /368
G 1006 /-/-/590 /660 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
G Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1339 -1841
C - D 995 -1277
Chords Tens.Comp.
D - E 684 -812
E - F 684 -812
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1612 -1561
J - I 1610 -1562
Chords Tens.Comp.
I - H 1105 -1043
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 577 -561
D - I 416 -276
D - H 508 -414
Webs Tens.Comp.
E - H 341 -414
H - F 1150 -969
F - G 813 -963
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.68 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.075 C 999 360
VERT(CL):0.148 C 999 240
HORZ(LL):-0.026 H - -
HORZ(TL):0.046 H - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.845
Max W eb CSI:0.833
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T182
Ply: 1
Qty:1
SEQN:12701 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T18
DrwNo:079.20.1313.32395
AK /DF 03/19/2020
22'
6'1"11
6'1"11
11'9"4
5'7"9
16'10"10
5'1"6
22'
5'1"6
5'11"15
5'11"15
11'9"4
5'9"5
16'10"10
5'1"6
22'
5'1"61'8"
6"3 5'5"15'11"24'0"12A
B
C
D E F
GHIJ
5 12
3X5(B1)1.5X4
3X4
4X7
5X5
1.5X4
4X7
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/779 /685 /309
I 1006 /-/-/582 /640 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -548
C - D 1968 -2431
D - E 1330 -1649
Chords Tens.Comp.
E - F 1191 -1427
F - G 1183 -1417
G - H 642 -809
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 2108 -2008
Q - O 2210 -2122
Chords Tens.Comp.
O - N 2201 -2117
N - K 1458 -1336
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 630 -588
D - N 831 -792
K - G 799 -711
K - J 784 -624
Webs Tens.Comp.
G - J 772 -883
J - H 1170 -930
H - I 776 -972
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.102 P 999 360
VERT(CL):0.181 P 999 240
HORZ(LL):-0.049 J - -
HORZ(TL):0.085 J - -
Creep Factor: 2.0
Max TC CSI:0.542
Max BC CSI:0.601
Max W eb CSI:0.527
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T183
Ply: 1
Qty:1
SEQN:12719 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T54
DrwNo:079.20.1313.40616
AK /DF 03/19/2020
B2
22'
4'11"10
4'11"10
9'9"4
4'9"10
13'11"4
4'2"
17'9"
3'9"12
22'
4'3"
1'0"10
1'0"10
2'6"
1'5"6
4'9"14
2'3"14
9'9"4
4'11"6
13'9"8
4'0"4
17'10"12
4'1"4
22'
4'1"41'8"
6"3 4'7"16"5'1"24'0"12A
B C
D
E F G H
IJKL
MNO
PQRS
5
12
3X4(B1)4X7(++)1.5X6(++)
3X4
4X7
3X4
6X8
3X4
3X10
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(++) - This plate works for both joints covered.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/779 /685 /309
I 1006 /-/-/582 /640 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -548
C - D 1968 -2431
D - E 1330 -1649
Chords Tens.Comp.
E - F 1191 -1427
F - G 1183 -1417
G - H 642 -809
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 2108 -2008
Q - O 2210 -2122
Chords Tens.Comp.
O - N 2201 -2117
N - K 1458 -1336
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 630 -588
D - N 831 -792
K - G 799 -711
K - J 784 -624
Webs Tens.Comp.
G - J 772 -883
J - H 1170 -930
H - I 776 -972
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.27 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.102 P 999 360
VERT(CL):0.181 P 999 240
HORZ(LL):-0.049 J - -
HORZ(TL):0.085 J - -
Creep Factor: 2.0
Max TC CSI:0.542
Max BC CSI:0.601
Max W eb CSI:0.527
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T183
Ply: 1
Qty:1
SEQN:12719 /HIPM
FROM:
Cust: R 761 JRef:1WTP7610004 T54
DrwNo:079.20.1313.40616
AK /DF 03/19/2020
B2
22'
4'11"10
4'11"10
9'9"4
4'9"10
13'11"4
4'2"
17'9"
3'9"12
22'
4'3"
1'0"10
1'0"10
2'6"
1'5"6
4'9"14
2'3"14
9'9"4
4'11"6
13'9"8
4'0"4
17'10"12
4'1"4
22'
4'1"41'8"
6"3 4'7"16"5'1"24'0"12A
B C
D
E F G H
IJKL
MNO
PQRS
5
12
3X4(B1)4X7(++)1.5X6(++)
3X4
4X7
3X4
6X8
3X4
3X10
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1176 /-/-/678 /443 /260
I 1000 /-/-/382 /107 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 48 -548
C - D 1198 -2374
D - E 757 -1836
Chords Tens.Comp.
E - F 770 -1696
F - G 483 -1799
G - H 210 -990
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 2047 -1263
Q - O 2152 -1346
Chords Tens.Comp.
O - N 2143 -1342
N - K 1832 -495
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 466 -604
D - N 650 -527
E - N 405 -130
K - G 962 -330
Webs Tens.Comp.
K - J 938 -198
G - J 201 -880
J - H 1286 -275
H - I 177 -963
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.90 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.082 N 999 360
VERT(CL):0.189 N 999 240
HORZ(LL):0.038 I - -
HORZ(TL):0.089 I - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.619
Max W eb CSI:0.290
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T184
Ply: 1
Qty:1
SEQN:12714 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T58
DrwNo:079.20.1313.37760
AK /DF 03/19/2020
B2
22'
4'11"10
4'11"10
8'
3'0"6
13'9"8
5'9"8
17'9"
3'11"8
22'
4'3"
10"1
10"1
10"10
0"10
2'6"
1'7"6
4'9"14
2'3"14
8'4"8
3'6"10
13'9"8
5'5"
17'10"12
4'1"4
22'
4'1"41'8"
6"3 3'9"16"3'10"34'4"224'0"12A
B C
D
E F G H
IJKL
MNO
PQRS
5
12
3X4(B1)
3X12(**)
1.5X4(**)
1.5X6(++)
1.5X4
5X5
3X8
5X81.5X4 3X10
3X5
2X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1176 /-/-/678 /443 /260
I 1000 /-/-/382 /107 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 48 -548
C - D 1198 -2374
D - E 757 -1836
Chords Tens.Comp.
E - F 770 -1696
F - G 483 -1799
G - H 210 -990
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - Q 2047 -1263
Q - O 2152 -1346
Chords Tens.Comp.
O - N 2143 -1342
N - K 1832 -495
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 466 -604
D - N 650 -527
E - N 405 -130
K - G 962 -330
Webs Tens.Comp.
K - J 938 -198
G - J 201 -880
J - H 1286 -275
H - I 177 -963
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.90 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.082 N 999 360
VERT(CL):0.189 N 999 240
HORZ(LL):0.038 I - -
HORZ(TL):0.089 I - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.619
Max W eb CSI:0.290
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T184
Ply: 1
Qty:1
SEQN:12714 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T58
DrwNo:079.20.1313.37760
AK /DF 03/19/2020
B2
22'
4'11"10
4'11"10
8'
3'0"6
13'9"8
5'9"8
17'9"
3'11"8
22'
4'3"
10"1
10"1
10"10
0"10
2'6"
1'7"6
4'9"14
2'3"14
8'4"8
3'6"10
13'9"8
5'5"
17'10"12
4'1"4
22'
4'1"41'8"
6"3 3'9"16"3'10"34'4"224'0"12A
B C
D
E F G H
IJKL
MNO
PQRS
5
12
3X4(B1)
3X12(**)
1.5X4(**)
1.5X6(++)
1.5X4
5X5
3X8
5X81.5X4 3X10
3X5
2X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/739 /689 /200
I 1006 /-/-/569 /613 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 420 -587
C - D 1804 -2032
D - E 1894 -1976
Chords Tens.Comp.
E - F 2163 -2571
F - G 2129 -2528
G - H 1047 -1316
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 390 -503
C - P 1668 -1558
Chords Tens.Comp.
P - N 1797 -1720
N - K 2630 -2400
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 899 -687
D - N 989 -722
N - E 921 -1121
K - G 1310 -1171
Webs Tens.Comp.
K - J 1206 -954
G - J 817 -938
J - H 1551 -1236
H - I 775 -968
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.90 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.198 O 999 360
VERT(CL):0.378 O 694 240
HORZ(LL):-0.072 I - -
HORZ(TL):0.135 I - -
Creep Factor: 2.0
Max TC CSI:0.767
Max BC CSI:0.721
Max W eb CSI:0.459
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T185
Ply: 1
Qty:1
SEQN:12724 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T17
DrwNo:079.20.1313.30709
AK /DF 03/19/2020
T1
B2
22'
8'
8'
10'2"12
2'2"12
13'11"4
3'8"8
17'9"
3'9"12
22'
4'3"
9"13
9"13
10"11
0"14
2'6"
1'7"5
8'1"12
5'7"12
13'9"8
5'7"12
17'10"12
4'1"4
22'
4'1"41'8"
6"3 2'11"16"3'10"34'4"224'0"12A
B C
D
E F G H
IJKL
MN
OPQR
5
12
3X4(B1)
3X12(**)
2X4(**)
2X6(++)
5X5
3X5
5X5 1.5X4
5X81.5X4
3X5
3X12
4X5
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1186 /-/-/739 /689 /200
I 1006 /-/-/569 /613 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.9
I Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 420 -587
C - D 1804 -2032
D - E 1894 -1976
Chords Tens.Comp.
E - F 2163 -2571
F - G 2129 -2528
G - H 1047 -1316
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 390 -503
C - P 1668 -1558
Chords Tens.Comp.
P - N 1797 -1720
N - K 2630 -2400
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 899 -687
D - N 989 -722
N - E 921 -1121
K - G 1310 -1171
Webs Tens.Comp.
K - J 1206 -954
G - J 817 -938
J - H 1551 -1236
H - I 775 -968
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.90 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.198 O 999 360
VERT(CL):0.378 O 694 240
HORZ(LL):-0.072 I - -
HORZ(TL):0.135 I - -
Creep Factor: 2.0
Max TC CSI:0.767
Max BC CSI:0.721
Max W eb CSI:0.459
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T185
Ply: 1
Qty:1
SEQN:12724 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T17
DrwNo:079.20.1313.30709
AK /DF 03/19/2020
T1
B2
22'
8'
8'
10'2"12
2'2"12
13'11"4
3'8"8
17'9"
3'9"12
22'
4'3"
9"13
9"13
10"11
0"14
2'6"
1'7"5
8'1"12
5'7"12
13'9"8
5'7"12
17'10"12
4'1"4
22'
4'1"41'8"
6"3 2'11"16"3'10"34'4"224'0"12A
B C
D
E F G H
IJKL
MN
OPQR
5
12
3X4(B1)
3X12(**)
2X4(**)
2X6(++)
5X5
3X5
5X5 1.5X4
5X81.5X4
3X5
3X12
4X5
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2,T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x6 SP #2;
Webs: 2x4 SP #2; W2,W10 2x4 SP 2700f-2.2E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.10
TC: From 36 plf at 6.10 to 36 plf at 22.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.10
BC: From 10 plf at 6.10 to 10 plf at 22.00
TC: -28 lb Conc. Load at 6.10, 9.90
TC: 202 lb Conc. Load at 7.06, 8.94
TC: 97 lb Conc. Load at 17.85,19.85,21.44
BC: 546 lb Conc. Load at 6.10, 9.90
BC: 85 lb Conc. Load at 7.06, 8.94
BC: 339 lb Conc. Load at 16.06
BC: 65 lb Conc. Load at 17.85,19.85,21.44
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2091 /-/-/-/1270 /-
L 1801 /-/-/-/1087 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.8
L Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 323 -520
C - D 1574 -2583
D - E 1441 -2404
E - F 1538 -2561
F - G 1629 -2706
Chords Tens.Comp.
G - H 2339 -3897
H - I 2494 -4152
I - J 1397 -2329
J - K 787 -1312
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - V 2285 -1384
V - T 2393 -1450
T - S 2208 -1320
S - R 3970 -2384
Chords Tens.Comp.
R - O 4383 -2634
P - N 379 -228
N - M 1433 -867
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 309 -449
E - T 514 -245
E - S 416 -256
S - F 862 -472
S - G 988 -1650
R - H 365 -601
H - O 472 -276
Webs Tens.Comp.
O - I 1962 -1179
O - N 2123 -1275
I - N 622 -1009
N - J 1056 -625
J - M 478 -717
M - K 1517 -909
K - L 532 -848
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.212 G 999 360
VERT(CL):0.392 G 669 240
HORZ(LL):-0.065 L - -
HORZ(TL):0.123 L - -
Creep Factor: 2.0
Max TC CSI:0.415
Max BC CSI:0.500
Max W eb CSI:0.479
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T186
Ply: 2
Qty:1
SEQN:12745 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T4
DrwNo:079.20.1313.27231
AK /DF 03/19/2020
2 Complete Trusses Required
T2
T3
B3
W2
W10
22'
3'6"
3'6"
6'1"4
2'7"4
9'10"12
3'9"8
12'2"12
2'4"
13'9"8
1'6"12
15'10"8
2'1"
18'9"12
2'11"4
22'
3'2"4
1'0"6
1'0"6
2'6"
1'5"10
6'1"4
3'7"4
9'9"
3'7"12
12'6"4
2'9"4
13'9"8
1'3"4
16'0"12
2'3"4
19'1"4
3'0"8
22'
2'10"121'8"
6"3 2'1"16"3'0"113'6"1024'0"12A
B C
D
E F
G H I J K
LMNOP
QRST
UVWX
5
12
3X4(B1)
3X10(++)
1.5X6(++)
1.5X4
4X7
3X10
4X5 5X5
H0612(**)1.5X4(**)
3X8
4X10 3X6
3X6
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2,T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x6 SP #2;
Webs: 2x4 SP #2; W2,W10 2x4 SP 2700f-2.2E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 6.10
TC: From 36 plf at 6.10 to 36 plf at 22.00
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.10
BC: From 10 plf at 6.10 to 10 plf at 22.00
TC: -28 lb Conc. Load at 6.10, 9.90
TC: 202 lb Conc. Load at 7.06, 8.94
TC: 97 lb Conc. Load at 17.85,19.85,21.44
BC: 546 lb Conc. Load at 6.10, 9.90
BC: 85 lb Conc. Load at 7.06, 8.94
BC: 339 lb Conc. Load at 16.06
BC: 65 lb Conc. Load at 17.85,19.85,21.44
Plating Notes
All plates are 3X4 except as noted.
(++) - This plate works for both joints covered.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2091 /-/-/-/1270 /-
L 1801 /-/-/-/1087 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.8
L Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 323 -520
C - D 1574 -2583
D - E 1441 -2404
E - F 1538 -2561
F - G 1629 -2706
Chords Tens.Comp.
G - H 2339 -3897
H - I 2494 -4152
I - J 1397 -2329
J - K 787 -1312
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - V 2285 -1384
V - T 2393 -1450
T - S 2208 -1320
S - R 3970 -2384
Chords Tens.Comp.
R - O 4383 -2634
P - N 379 -228
N - M 1433 -867
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 309 -449
E - T 514 -245
E - S 416 -256
S - F 862 -472
S - G 988 -1650
R - H 365 -601
H - O 472 -276
Webs Tens.Comp.
O - I 1962 -1179
O - N 2123 -1275
I - N 622 -1009
N - J 1056 -625
J - M 478 -717
M - K 1517 -909
K - L 532 -848
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.212 G 999 360
VERT(CL):0.392 G 669 240
HORZ(LL):-0.065 L - -
HORZ(TL):0.123 L - -
Creep Factor: 2.0
Max TC CSI:0.415
Max BC CSI:0.500
Max W eb CSI:0.479
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T186
Ply: 2
Qty:1
SEQN:12745 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T4
DrwNo:079.20.1313.27231
AK /DF 03/19/2020
2 Complete Trusses Required
T2
T3
B3
W2
W10
22'
3'6"
3'6"
6'1"4
2'7"4
9'10"12
3'9"8
12'2"12
2'4"
13'9"8
1'6"12
15'10"8
2'1"
18'9"12
2'11"4
22'
3'2"4
1'0"6
1'0"6
2'6"
1'5"10
6'1"4
3'7"4
9'9"
3'7"12
12'6"4
2'9"4
13'9"8
1'3"4
16'0"12
2'3"4
19'1"4
3'0"8
22'
2'10"121'8"
6"3 2'1"16"3'0"113'6"1024'0"12A
B C
D
E F
G H I J K
LMNOP
QRST
UVWX
5
12
3X4(B1)
3X10(++)
1.5X6(++)
1.5X4
4X7
3X10
4X5 5X5
H0612(**)1.5X4(**)
3X8
4X10 3X6
3X6
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.77
BC: From 10 plf at 0.00 to 10 plf at 3.77
BC: 146 lb Conc. Load at 0.73
BC: 233 lb Conc. Load at 2.73
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 351 /-/-/-/201 /-
C 339 /-/-/-/201 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.006 C - -
Creep Factor: 2.0
Max TC CSI:0.228
Max BC CSI:0.278
Max W eb CSI:0.035
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T187
Ply: 1
Qty:1
SEQN:12231 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T25
DrwNo:079.20.1313.27013
AK /DF 03/19/2020
3'9"4
3'9"4
3'9"4
6"3 2'1"124'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.77
BC: From 10 plf at 0.00 to 10 plf at 3.77
BC: 146 lb Conc. Load at 0.73
BC: 233 lb Conc. Load at 2.73
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 351 /-/-/-/201 /-
C 339 /-/-/-/201 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.36 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.006 C - -
Creep Factor: 2.0
Max TC CSI:0.228
Max BC CSI:0.278
Max W eb CSI:0.035
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T187
Ply: 1
Qty:1
SEQN:12231 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T25
DrwNo:079.20.1313.27013
AK /DF 03/19/2020
3'9"4
3'9"4
3'9"4
6"3 2'1"124'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.00
BC: From 20 plf at 0.00 to 20 plf at 4.00
BC: 612 lb Conc. Load at 2.06
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 499 /-/-/-/260 /-
D 482 /-/-/-/251 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 297 -558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 483 -249
Chords Tens.Comp.
F - D 650 -340
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - G 537 -231
F - B 488 -199
Webs Tens.Comp.
B - D 396 -757
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.41 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 F 999 360
VERT(CL):0.018 F 999 240
HORZ(LL):-0.006 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.141
Max BC CSI:0.331
Max W eb CSI:0.507
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T188
Ply: 1
Qty:1
SEQN:12650 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T65
DrwNo:079.20.1313.29243
AK /DF 03/19/2020
B2
4'
2'8"8
2'8"8
4'
1'3"8
3'
3'
4'
1'
6"3 6"1'8"32'2"324'0"12
24'6"12A
B
C
D
EFG
5 12
2X4(A1)
3X33X10(**)
3X4
1.5X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 4.00
BC: From 20 plf at 0.00 to 20 plf at 4.00
BC: 612 lb Conc. Load at 2.06
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 499 /-/-/-/260 /-
D 482 /-/-/-/251 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 297 -558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 483 -249
Chords Tens.Comp.
F - D 650 -340
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - G 537 -231
F - B 488 -199
Webs Tens.Comp.
B - D 396 -757
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.41 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 F 999 360
VERT(CL):0.018 F 999 240
HORZ(LL):-0.006 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.141
Max BC CSI:0.331
Max W eb CSI:0.507
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T188
Ply: 1
Qty:1
SEQN:12650 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T65
DrwNo:079.20.1313.29243
AK /DF 03/19/2020
B2
4'
2'8"8
2'8"8
4'
1'3"8
3'
3'
4'
1'
6"3 6"1'8"32'2"324'0"12
24'6"12A
B
C
D
EFG
5 12
2X4(A1)
3X33X10(**)
3X4
1.5X4
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.35
TC: From 36 plf at 3.35 to 36 plf at 11.37
TC: From 73 plf at 11.37 to 73 plf at 13.83
BC: From 10 plf at 0.00 to 10 plf at 13.83
BC: 2296 lb Conc. Load at 1.65
BC: 1275 lb Conc. Load at 3.35
BC: 1277 lb Conc. Load at 5.35
BC: 1279 lb Conc. Load at 7.27
BC: 1274 lb Conc. Load at 9.27,11.27,13.27
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 5580 /-/-/-/3684 /-
E 5219 /-/-/-/3519 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =4.9
E Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2693 -4072
Chords Tens.Comp.
B - C 840 -1244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 3735 -2461
G - F 3660 -2414
Chords Tens.Comp.
F - E 1127 -755
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 2141 -1365
B - F 1833 -2800
Webs Tens.Comp.
C - F 2620 -1731
C - E 1676 -2502
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.95 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.096 G 999 360
VERT(CL):0.150 G 999 240
HORZ(LL):0.019 D - -
HORZ(TL):0.030 D - -
Creep Factor: 2.0
Max TC CSI:0.674
Max BC CSI:0.652
Max W eb CSI:0.918
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T189
Ply: 2
Qty:1
SEQN:12461 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T250
DrwNo:079.20.1313.42222
AK /DF 03/19/2020
2 Complete Trusses Required
13'10"
5'11"5
5'11"5
11'4"8
5'5"3
13'10"
2'5"8
5'9"9
5'9"9
11'4"8
5'6"15
13'5"
2'0"8
13'10"
5"
6"3 5'3"124'0"12
A
B
C D
EFG
5 12
4X7(A1)
3X10
4X8
6X8
6X6
1.5X4
10X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.35
TC: From 36 plf at 3.35 to 36 plf at 11.37
TC: From 73 plf at 11.37 to 73 plf at 13.83
BC: From 10 plf at 0.00 to 10 plf at 13.83
BC: 2296 lb Conc. Load at 1.65
BC: 1275 lb Conc. Load at 3.35
BC: 1277 lb Conc. Load at 5.35
BC: 1279 lb Conc. Load at 7.27
BC: 1274 lb Conc. Load at 9.27,11.27,13.27
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 5580 /-/-/-/3684 /-
E 5219 /-/-/-/3519 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =4.9
E Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2693 -4072
Chords Tens.Comp.
B - C 840 -1244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 3735 -2461
G - F 3660 -2414
Chords Tens.Comp.
F - E 1127 -755
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - B 2141 -1365
B - F 1833 -2800
Webs Tens.Comp.
C - F 2620 -1731
C - E 1676 -2502
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.95 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.096 G 999 360
VERT(CL):0.150 G 999 240
HORZ(LL):0.019 D - -
HORZ(TL):0.030 D - -
Creep Factor: 2.0
Max TC CSI:0.674
Max BC CSI:0.652
Max W eb CSI:0.918
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T189
Ply: 2
Qty:1
SEQN:12461 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T250
DrwNo:079.20.1313.42222
AK /DF 03/19/2020
2 Complete Trusses Required
13'10"
5'11"5
5'11"5
11'4"8
5'5"3
13'10"
2'5"8
5'9"9
5'9"9
11'4"8
5'6"15
13'5"
2'0"8
13'10"
5"
6"3 5'3"124'0"12
A
B
C D
EFG
5 12
4X7(A1)
3X10
4X8
6X8
6X6
1.5X4
10X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 813 /-/-/557 /443 /298
F 624 /-/-/377 /416 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 844 -1004
Chords Tens.Comp.
C - D 455 -589
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 862 -1070
Chords Tens.Comp.
G - F 475 -520
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 609 -428
D - G 425 -249
Webs Tens.Comp.
D - F 708 -646
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 C 999 360
VERT(CL):0.053 C 999 240
HORZ(LL):-0.013 F - -
HORZ(TL):0.018 F - -
Creep Factor: 2.0
Max TC CSI:0.738
Max BC CSI:0.737
Max W eb CSI:0.374
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T190
Ply: 1
Qty:1
SEQN:12549 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T172
DrwNo:079.20.1313.37901
AK /DF 03/19/2020
13'10"
4'9"9
4'9"9
9'4"8
4'6"15
13'10"
4'5"8
9'4"8
9'4"8
13'10"
4'5"81'8"
6"3 4'5"14'11"24'0"12A
B
C
D E
FG
5
12
3X4(B1)
1.5X4
4X7
3X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 813 /-/-/557 /443 /298
F 624 /-/-/377 /416 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 844 -1004
Chords Tens.Comp.
C - D 455 -589
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 862 -1070
Chords Tens.Comp.
G - F 475 -520
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - G 609 -428
D - G 425 -249
Webs Tens.Comp.
D - F 708 -646
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 C 999 360
VERT(CL):0.053 C 999 240
HORZ(LL):-0.013 F - -
HORZ(TL):0.018 F - -
Creep Factor: 2.0
Max TC CSI:0.738
Max BC CSI:0.737
Max W eb CSI:0.374
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T190
Ply: 1
Qty:1
SEQN:12549 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T172
DrwNo:079.20.1313.37901
AK /DF 03/19/2020
13'10"
4'9"9
4'9"9
9'4"8
4'6"15
13'10"
4'5"8
9'4"8
9'4"8
13'10"
4'5"81'8"
6"3 4'5"14'11"24'0"12A
B
C
D E
FG
5
12
3X4(B1)
1.5X4
4X7
3X4
1.5X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 813 /-/-/550 /451 /241
E 624 /-/-/366 /397 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 629 -840
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 668 -725
Chords Tens.Comp.
F - E 675 -726
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 789 -729
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 F 999 360
VERT(CL):0.022 F 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.011 F - -
Creep Factor: 2.0
Max TC CSI:0.850
Max BC CSI:0.568
Max W eb CSI:0.608
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T191
Ply: 1
Qty:1
SEQN:12552 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T171
DrwNo:079.20.1313.28182
AK /DF 03/19/2020
T2
13'10"
7'4"8
7'4"8
13'10"
6'5"8
7'6"4
7'6"4
13'10"
6'3"121'8"
6"3 3'7"14'1"24'0"12A
B
C D
EF
5
12
3X4(B1)
4X7
1.5X4
3X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 813 /-/-/550 /451 /241
E 624 /-/-/366 /397 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 629 -840
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 668 -725
Chords Tens.Comp.
F - E 675 -726
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 789 -729
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 F 999 360
VERT(CL):0.022 F 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.011 F - -
Creep Factor: 2.0
Max TC CSI:0.850
Max BC CSI:0.568
Max W eb CSI:0.608
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T191
Ply: 1
Qty:1
SEQN:12552 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T171
DrwNo:079.20.1313.28182
AK /DF 03/19/2020
T2
13'10"
7'4"8
7'4"8
13'10"
6'5"8
7'6"4
7'6"4
13'10"
6'3"121'8"
6"3 3'7"14'1"24'0"12A
B
C D
EF
5
12
3X4(B1)
4X7
1.5X4
3X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 13.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 13.83
TC: 160 lb Conc. Load at 12.06
BC: 631 lb Conc. Load at 3.44
BC: 493 lb Conc. Load at 10.56
BC: 98 lb Conc. Load at 12.06
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1445 /-/-/-/898 /-
F 1374 /-/-/-/849 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =2.3
F Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1258 -2020
C - D 1061 -1713
Chords Tens.Comp.
D - E 1061 -1713
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1800 -1103
Chords Tens.Comp.
H - G 1831 -1117
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 513 -221
D - G 379 -419
Webs Tens.Comp.
G - E 1943 -1200
E - F 780 -1169
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 D 999 360
VERT(CL):0.075 D 999 240
HORZ(LL):-0.007 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.739
Max BC CSI:0.379
Max W eb CSI:0.439
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T192
Ply: 1
Qty:1
SEQN:12555 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T48
DrwNo:079.20.1313.26889
AK /DF 03/19/2020
13'10"
5'4"8
5'4"8
9'7"4
4'2"12
13'10"
4'2"12
5'6"4
5'6"4
9'7"4
4'1"
13'10"
4'2"121'8"
6"3 2'9"13'3"24'0"12A
B
C D E
FGH
5
12
3X5(A1)
4X7
3X3
1.5X4
5X8
5X5
3X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.67 to 73 plf at 13.83
BC: From 22 plf at -1.67 to 22 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 13.83
TC: 160 lb Conc. Load at 12.06
BC: 631 lb Conc. Load at 3.44
BC: 493 lb Conc. Load at 10.56
BC: 98 lb Conc. Load at 12.06
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1445 /-/-/-/898 /-
F 1374 /-/-/-/849 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =2.3
F Brg Width = -Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1258 -2020
C - D 1061 -1713
Chords Tens.Comp.
D - E 1061 -1713
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1800 -1103
Chords Tens.Comp.
H - G 1831 -1117
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 513 -221
D - G 379 -419
Webs Tens.Comp.
G - E 1943 -1200
E - F 780 -1169
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 D 999 360
VERT(CL):0.075 D 999 240
HORZ(LL):-0.007 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.739
Max BC CSI:0.379
Max W eb CSI:0.439
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T192
Ply: 1
Qty:1
SEQN:12555 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T48
DrwNo:079.20.1313.26889
AK /DF 03/19/2020
13'10"
5'4"8
5'4"8
9'7"4
4'2"12
13'10"
4'2"12
5'6"4
5'6"4
9'7"4
4'1"
13'10"
4'2"121'8"
6"3 2'9"13'3"24'0"12A
B
C D E
FGH
5
12
3X5(A1)
4X7
3X3
1.5X4
5X8
5X5
3X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 314 /-/-/180 /195 /-
D 314 /-/-/181 /196 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1401 -955
Chords Tens.Comp.
B - C 1055 -719
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - G 441 -292
A - E 1016 -1492
B - E 661 -377
Webs Tens.Comp.
E - C 687 -1020
C - D 430 -240
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.98 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 B 999 360
VERT(CL):0.039 B 999 240
HORZ(LL):-0.009 A - -
HORZ(TL):0.016 A - -
Creep Factor: 2.0
Max TC CSI:0.678
Max BC CSI:0.359
Max W eb CSI:0.552
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T193
Ply: 1
Qty:1
SEQN:11649 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T147
DrwNo:079.20.1313.27029
AK /DF 03/19/2020
7'
1'1"8
1'1"8
7'
5'10"81'11"11'11"125'0"12
24'0"12
A B C
D
EFG
4X4
1.5X6(**)
1.5X45X8
1.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 314 /-/-/180 /195 /-
D 314 /-/-/181 /196 /-
Wind reactions based on MWFRS
G Brg Width = -Min Req =-
D Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1401 -955
Chords Tens.Comp.
B - C 1055 -719
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - G 441 -292
A - E 1016 -1492
B - E 661 -377
Webs Tens.Comp.
E - C 687 -1020
C - D 430 -240
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.98 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.021 B 999 360
VERT(CL):0.039 B 999 240
HORZ(LL):-0.009 A - -
HORZ(TL):0.016 A - -
Creep Factor: 2.0
Max TC CSI:0.678
Max BC CSI:0.359
Max W eb CSI:0.552
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T193
Ply: 1
Qty:1
SEQN:11649 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T147
DrwNo:079.20.1313.27029
AK /DF 03/19/2020
7'
1'1"8
1'1"8
7'
5'10"81'11"11'11"125'0"12
24'0"12
A B C
D
EFG
4X4
1.5X6(**)
1.5X45X8
1.5X4
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 324 /-/-/189 /183 /43
C 324 /-/-/189 /183 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
C Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 641 -425
Chords Tens.Comp.
B - C 641 -425
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 348 -481
Chords Tens.Comp.
D - C 348 -481
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.005 D 999 360
VERT(CL):0.011 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.123
Max W eb CSI:0.029
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T194
Ply: 1
Qty:1
SEQN:11644 /HIPS
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T32
DrwNo:079.20.1313.40085
AK /DF 03/19/2020
7'
3'4"8
3'4"8
7'
3'7"8
7'
7'
6"31'11"124'0"12
A
B
C
D
5
12
3X4(B1)
4X4
1.5X4 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 324 /-/-/189 /183 /43
C 324 /-/-/189 /183 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
C Brg Width = -Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 641 -425
Chords Tens.Comp.
B - C 641 -425
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 348 -481
Chords Tens.Comp.
D - C 348 -481
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.005 D 999 360
VERT(CL):0.011 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.123
Max W eb CSI:0.029
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T194
Ply: 1
Qty:1
SEQN:11644 /HIPS
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T32
DrwNo:079.20.1313.40085
AK /DF 03/19/2020
7'
3'4"8
3'4"8
7'
3'7"8
7'
7'
6"31'11"124'0"12
A
B
C
D
5
12
3X4(B1)
4X4
1.5X4 3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.37
TC: From 36 plf at 3.37 to 36 plf at 5.37
BC: From 10 plf at 0.00 to 10 plf at 5.37
TC: 93 lb Conc. Load at 3.37
TC: 80 lb Conc. Load at 4.94
BC: 324 lb Conc. Load at 1.44
BC: 329 lb Conc. Load at 3.44
BC: 57 lb Conc. Load at 4.94
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 623 /-/-/-/393 /-
F 631 /-/-/-/397 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 556 -852
Chords Tens.Comp.
C - D 528 -823
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 757 -489
Chords Tens.Comp.
J - H 822 -528
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 391 -561
J - I 565 -357
H - G 273 -401
Webs Tens.Comp.
G - E 546 -346
E - F 400 -606
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.096 K 656 360
VERT(CL):0.166 K 381 240
HORZ(LL):-0.099 F - -
HORZ(TL):0.171 F - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.779
Max W eb CSI:0.688
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T195
Ply: 1
Qty:1
SEQN:11669 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T30
DrwNo:079.20.1313.40584
AK /DF 03/19/2020
B1
5'4"8
3'4"8
3'4"8
5'4"8
2'
1'11"1
1'11"1
2'10"
10"15
4'2"
1'4"
5'4"8
1'2"8
6"3 1'11"11'24'0"12
A
B
C D E
F
G
H
IJK
5
12
3X4(B1)
3X8
1.5X4
3X4
1.5X6
3X4 1.5X43X4
4X4
4X4
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 3.37
TC: From 36 plf at 3.37 to 36 plf at 5.37
BC: From 10 plf at 0.00 to 10 plf at 5.37
TC: 93 lb Conc. Load at 3.37
TC: 80 lb Conc. Load at 4.94
BC: 324 lb Conc. Load at 1.44
BC: 329 lb Conc. Load at 3.44
BC: 57 lb Conc. Load at 4.94
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 623 /-/-/-/393 /-
F 631 /-/-/-/397 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
F Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 556 -852
Chords Tens.Comp.
C - D 528 -823
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 757 -489
Chords Tens.Comp.
J - H 822 -528
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 391 -561
J - I 565 -357
H - G 273 -401
Webs Tens.Comp.
G - E 546 -346
E - F 400 -606
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.096 K 656 360
VERT(CL):0.166 K 381 240
HORZ(LL):-0.099 F - -
HORZ(TL):0.171 F - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.779
Max W eb CSI:0.688
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T195
Ply: 1
Qty:1
SEQN:11669 /HIPM
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T30
DrwNo:079.20.1313.40584
AK /DF 03/19/2020
B1
5'4"8
3'4"8
3'4"8
5'4"8
2'
1'11"1
1'11"1
2'10"
10"15
4'2"
1'4"
5'4"8
1'2"8
6"3 1'11"11'24'0"12
A
B
C D E
F
G
H
IJK
5
12
3X4(B1)
3X8
1.5X4
3X4
1.5X6
3X4 1.5X43X4
4X4
4X4
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.37
BC: From 10 plf at 0.00 to 10 plf at 5.37
BC: 324 lb Conc. Load at 1.44
BC: 314 lb Conc. Load at 3.44
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 588 /-/-/-/377 /-
C 493 /-/-/-/327 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.012 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.534
Max BC CSI:0.733
Max W eb CSI:0.094
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T196
Ply: 1
Qty:1
SEQN:12322 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T111
DrwNo:079.20.1313.36591
AK /DF 03/19/2020
5'4"8
5'4"8
5'4"8
6"3 2'9"124'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.37
BC: From 10 plf at 0.00 to 10 plf at 5.37
BC: 324 lb Conc. Load at 1.44
BC: 314 lb Conc. Load at 3.44
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 588 /-/-/-/377 /-
C 493 /-/-/-/327 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.70 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.012 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.534
Max BC CSI:0.733
Max W eb CSI:0.094
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T196
Ply: 1
Qty:1
SEQN:12322 /MONO
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T111
DrwNo:079.20.1313.36591
AK /DF 03/19/2020
5'4"8
5'4"8
5'4"8
6"3 2'9"124'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W5,W6 2x4 SP 2250f-1.9E;
Rt Bearing Leg: 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.44
TC: From 36 plf at 5.44 to 36 plf at 13.44
TC: From 73 plf at 13.44 to 73 plf at 18.67
BC: From 20 plf at 0.00 to 20 plf at 5.44
BC: From 10 plf at 5.44 to 10 plf at 11.52
BC: From 20 plf at 11.52 to 20 plf at 18.21
BC: 1374 lb Conc. Load at 5.44
BC: 624 lb Conc. Load at 7.44, 9.44
BC: 5219 lb Conc. Load at 11.52
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 4316 /-/-/-/2828 /-
F 4891 /-/-/-/3280 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =3.8
F Brg Width = 4.0 Min Req =4.0
Bearing F is a rigid surface.
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 3075 -4649
B - C 2358 -3528
Chords Tens.Comp.
C - D 2334 -3493
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 4243 -2794
I - H 4214 -2777
Chords Tens.Comp.
H - G 2028 -1365
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 946 -554
B - H 744 -1174
H - D 3687 -2416
Webs Tens.Comp.
D - G 2027 -3014
F - G 2365 -1557
E - F 3997 -3948
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.126 I 999 360
VERT(CL):0.201 I 999 240
HORZ(LL):-0.028 G - -
HORZ(TL):0.044 G - -
Creep Factor: 2.0
Max TC CSI:0.376
Max BC CSI:0.466
Max W eb CSI:0.832
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T197
Ply: 2
Qty:1
SEQN:12561 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T109
DrwNo:079.20.1313.41395
AK /DF 03/19/2020
2 Complete Trusses Required
T2
W5
W6
18'8"
6'11"11
6'11"11
11'5"6
4'5"11
13'5"4
1'11"14
18'2"8
4'9"4
18'8"
5"8
6'9"15
6'9"15
11'5"6
4'7"7
18'2"8
6'9"2
18'8"
5"8 2'6"6"3 3'7"66'1"624'0"12
26'6"12
A
B
C
D E
F
GHI
5 12
4X8(B1)
7X6
3X5
1.5X4
10X10
7X6 5X6
3X55X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W5,W6 2x4 SP 2250f-1.9E;
Rt Bearing Leg: 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.50" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.44
TC: From 36 plf at 5.44 to 36 plf at 13.44
TC: From 73 plf at 13.44 to 73 plf at 18.67
BC: From 20 plf at 0.00 to 20 plf at 5.44
BC: From 10 plf at 5.44 to 10 plf at 11.52
BC: From 20 plf at 11.52 to 20 plf at 18.21
BC: 1374 lb Conc. Load at 5.44
BC: 624 lb Conc. Load at 7.44, 9.44
BC: 5219 lb Conc. Load at 11.52
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 4316 /-/-/-/2828 /-
F 4891 /-/-/-/3280 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =3.8
F Brg Width = 4.0 Min Req =4.0
Bearing F is a rigid surface.
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 3075 -4649
B - C 2358 -3528
Chords Tens.Comp.
C - D 2334 -3493
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 4243 -2794
I - H 4214 -2777
Chords Tens.Comp.
H - G 2028 -1365
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 946 -554
B - H 744 -1174
H - D 3687 -2416
Webs Tens.Comp.
D - G 2027 -3014
F - G 2365 -1557
E - F 3997 -3948
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.126 I 999 360
VERT(CL):0.201 I 999 240
HORZ(LL):-0.028 G - -
HORZ(TL):0.044 G - -
Creep Factor: 2.0
Max TC CSI:0.376
Max BC CSI:0.466
Max W eb CSI:0.832
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T197
Ply: 2
Qty:1
SEQN:12561 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T109
DrwNo:079.20.1313.41395
AK /DF 03/19/2020
2 Complete Trusses Required
T2
W5
W6
18'8"
6'11"11
6'11"11
11'5"6
4'5"11
13'5"4
1'11"14
18'2"8
4'9"4
18'8"
5"8
6'9"15
6'9"15
11'5"6
4'7"7
18'2"8
6'9"2
18'8"
5"8 2'6"6"3 3'7"66'1"624'0"12
26'6"12
A
B
C
D E
F
GHI
5 12
4X8(B1)
7X6
3X5
1.5X4
10X10
7X6 5X6
3X55X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.04
BC: From 10 plf at 0.00 to 10 plf at 5.04
BC: 637 lb Conc. Load at 1.10
BC: 633 lb Conc. Load at 3.10
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 981 /-/-/-/554 /-
C 705 /-/-/-/410 /-
Wind reactions based on MWFRS
A Brg Width = 4.0 Min Req =1.6
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.451
Max W eb CSI:0.086
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T198
Ply: 1
Qty:1
SEQN:12448 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T28
DrwNo:079.20.1313.30335
AK /DF 03/19/2020
2"4'10"8
5'0"8
5'0"8
6"3 2'7"624'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at 0.00 to 73 plf at 5.04
BC: From 10 plf at 0.00 to 10 plf at 5.04
BC: 637 lb Conc. Load at 1.10
BC: 633 lb Conc. Load at 3.10
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 981 /-/-/-/554 /-
C 705 /-/-/-/410 /-
Wind reactions based on MWFRS
A Brg Width = 4.0 Min Req =1.6
C Brg Width = -Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.63 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.451
Max W eb CSI:0.086
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T198
Ply: 1
Qty:1
SEQN:12448 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T28
DrwNo:079.20.1313.30335
AK /DF 03/19/2020
2"4'10"8
5'0"8
5'0"8
6"3 2'7"624'0"12
A
B
C
5
12
2X4(A1)
1.5X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W1,W13 2x6 SP #2; W4,
W10 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 25.33
BC: From 10 plf at 0.00 to 10 plf at 25.33
BC: 259 lb Conc. Load at 0.27
BC: 1249 lb Conc. Load at 2.27, 4.27,20.27
BC: 1207 lb Conc. Load at 6.27,10.27
BC: 1201 lb Conc. Load at 8.27
BC: 1168 lb Conc. Load at 12.27,18.19
BC: 1185 lb Conc. Load at 14.27,16.27
BC: -87 lb Conc. Load at 22.27
BC: -111 lb Conc. Load at 24.27
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 2 12" 13 SPf(S) Standard
2 25.000' 1 12" 10 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 7559 /-/-/-/4862 /-
H 5741 /-/-/-/4201 /-
Wind reactions based on MWFRS
N Brg Width = 4.0 Min Req =-
H Brg Width = 4.0 Min Req =-
Bearings N & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 929 -1440
B - C 1955 -3146
C - D 1885 -3023
Chords Tens.Comp.
D - E 1885 -3023
E - F 1915 -3030
F - G 765 -1087
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1325 -854
L - K 3165 -1968
Chords Tens.Comp.
K - J 3057 -1931
J - I 1001 -704
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 2485 -3853
A - M 3546 -2285
B - M 1056 -1712
B - L 2831 -1712
L - C 326 -462
C - K 541 -863
D - K 2229 -1367
Webs Tens.Comp.
K - E 458 -620
E - J 403 -682
J - F 3107 -1853
F - I 1214 -2035
I - G 2868 -2019
G - H 2191 -3111
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 32.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.139 K 999 360
VERT(CL):0.227 K 999 240
HORZ(LL):-0.050 B - -
HORZ(TL):0.082 B - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.513
Max W eb CSI:0.880
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T199
Ply: 2
Qty:1
SEQN:16315 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T69
DrwNo:080.20.1108.45550
JB /DF 03/20/2020
2 Complete Trusses Required
W1
W4
W10
W13
BL1 BL2
25'4"
2'6"8
2'6"8
9'0"6
6'5"14
12'8"
3'7"10
16'3"10
3'7"10
22'11"8
6'7"14
25'4"
2'4"8
2'5"
2'5"
8'8"14
6'3"14
12'8"
3'11"2
16'7"2
3'11"2
23'
6'4"14
25'4"
2'4"6'8"66'9"37'9"19'3"424'0"12
A
B C
D
E F
G
HIJKLMN
5 12
8X8
5X10
5X10
8X10 7X6
5X5
5X5
8X8
5X5
7X6
7X8
8X8
8X8
4X10
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP M-26;
Webs: 2x4 SP #2; W1,W13 2x6 SP #2; W4,
W10 2x4 SP 2250f-1.9E;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @ 3.25" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 36 plf at 0.00 to 36 plf at 25.33
BC: From 10 plf at 0.00 to 10 plf at 25.33
BC: 259 lb Conc. Load at 0.27
BC: 1249 lb Conc. Load at 2.27, 4.27,20.27
BC: 1207 lb Conc. Load at 6.27,10.27
BC: 1201 lb Conc. Load at 8.27
BC: 1168 lb Conc. Load at 12.27,18.19
BC: 1185 lb Conc. Load at 14.27,16.27
BC: -87 lb Conc. Load at 22.27
BC: -111 lb Conc. Load at 24.27
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Bearing Block(s)
Brg blocks:0.128"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 2 12" 13 SPf(S) Standard
2 25.000' 1 12" 10 SPf(S) Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 7559 /-/-/-/4862 /-
H 5741 /-/-/-/4201 /-
Wind reactions based on MWFRS
N Brg Width = 4.0 Min Req =-
H Brg Width = 4.0 Min Req =-
Bearings N & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 929 -1440
B - C 1955 -3146
C - D 1885 -3023
Chords Tens.Comp.
D - E 1885 -3023
E - F 1915 -3030
F - G 765 -1087
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1325 -854
L - K 3165 -1968
Chords Tens.Comp.
K - J 3057 -1931
J - I 1001 -704
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 2485 -3853
A - M 3546 -2285
B - M 1056 -1712
B - L 2831 -1712
L - C 326 -462
C - K 541 -863
D - K 2229 -1367
Webs Tens.Comp.
K - E 458 -620
E - J 403 -682
J - F 3107 -1853
F - I 1214 -2035
I - G 2868 -2019
G - H 2191 -3111
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 32.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.139 K 999 360
VERT(CL):0.227 K 999 240
HORZ(LL):-0.050 B - -
HORZ(TL):0.082 B - -
Creep Factor: 2.0
Max TC CSI:0.489
Max BC CSI:0.513
Max W eb CSI:0.880
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T199
Ply: 2
Qty:1
SEQN:16315 SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T69
DrwNo:080.20.1108.45550
JB /DF 03/20/2020
2 Complete Trusses Required
W1
W4
W10
W13
BL1 BL2
25'4"
2'6"8
2'6"8
9'0"6
6'5"14
12'8"
3'7"10
16'3"10
3'7"10
22'11"8
6'7"14
25'4"
2'4"8
2'5"
2'5"
8'8"14
6'3"14
12'8"
3'11"2
16'7"2
3'11"2
23'
6'4"14
25'4"
2'4"6'8"66'9"37'9"19'3"424'0"12
A
B C
D
E F
G
HIJKLMN
5 12
8X8
5X10
5X10
8X10 7X6
5X5
5X5
8X8
5X5
7X6
7X8
8X8
8X8
4X10
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W16 2x6 SP #2; W3,W14,
W15 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 1172 /-/-/673 /816 /74
J 1172 /-/-/672 /819 /-
Wind reactions based on MWFRS
S Brg Width = 4.0 Min Req =1.9
J Brg Width = 4.0 Min Req =1.9
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 962 -945
C - D 1174 -1102
D - E 1265 -1045
Chords Tens.Comp.
E - F 1266 -1049
F - G 1168 -1097
G - H 954 -940
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - L 890 -825
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - B 1013 -1078
B - R 1075 -1000
R - C 906 -828
R - P 952 -892
P - E 308 -412
Webs Tens.Comp.
E - L 314 -411
L - K 947 -882
G - K 884 -797
K - H 1047 -985
H - J 1142 -1225
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 32.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.048 O 999 360
VERT(CL):0.082 O 999 240
HORZ(LL):-0.020 B - -
HORZ(TL):0.032 B - -
Creep Factor: 2.0
Max TC CSI:0.764
Max BC CSI:0.598
Max W eb CSI:0.940
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T200
Ply: 1
Qty:1
SEQN:12838 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T77
DrwNo:079.20.1313.42348
AK /DF 03/19/2020
W1 W3
W14
W15
W16
25'4"
1'6"
1'6"
7'11"14
6'5"14
10'11"4
2'11"6
12'8"
1'8"12
14'4"12
1'8"12
17'4"2
2'11"6
24'
6'7"14
25'4"
1'4"
7'10"2
7'10"2
11'4"8
3'6"6
14'3"
2'10"8
17'5"14
3'2"14
25'4"
7'10"26'8"66'9"37'3"146"9'3"424'0"12
A
B C
D
E
F
G H
I
JKLM
N
OPQRS
5 12
6X6
5X5
4X7
5X5
5X8
4X4
5X8
5X5
4X7
5X5
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W16 2x6 SP #2; W3,W14,
W15 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
S 1172 /-/-/673 /816 /74
J 1172 /-/-/672 /819 /-
Wind reactions based on MWFRS
S Brg Width = 4.0 Min Req =1.9
J Brg Width = 4.0 Min Req =1.9
Bearings S & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 962 -945
C - D 1174 -1102
D - E 1265 -1045
Chords Tens.Comp.
E - F 1266 -1049
F - G 1168 -1097
G - H 954 -940
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - L 890 -825
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - B 1013 -1078
B - R 1075 -1000
R - C 906 -828
R - P 952 -892
P - E 308 -412
Webs Tens.Comp.
E - L 314 -411
L - K 947 -882
G - K 884 -797
K - H 1047 -985
H - J 1142 -1225
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 32.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.048 O 999 360
VERT(CL):0.082 O 999 240
HORZ(LL):-0.020 B - -
HORZ(TL):0.032 B - -
Creep Factor: 2.0
Max TC CSI:0.764
Max BC CSI:0.598
Max W eb CSI:0.940
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T200
Ply: 1
Qty:1
SEQN:12838 /SPEC
FROM:
Cust: R 761 JRef:1WTP7610004 T77
DrwNo:079.20.1313.42348
AK /DF 03/19/2020
W1 W3
W14
W15
W16
25'4"
1'6"
1'6"
7'11"14
6'5"14
10'11"4
2'11"6
12'8"
1'8"12
14'4"12
1'8"12
17'4"2
2'11"6
24'
6'7"14
25'4"
1'4"
7'10"2
7'10"2
11'4"8
3'6"6
14'3"
2'10"8
17'5"14
3'2"14
25'4"
7'10"26'8"66'9"37'3"146"9'3"424'0"12
A
B C
D
E
F
G H
I
JKLM
N
OPQRS
5 12
6X6
5X5
4X7
5X5
5X8
4X4
5X8
5X5
4X7
5X5
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2; W3,
W10 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1172 /-/-/673 /820 /80
F 1172 /-/-/673 /820 /-
Wind reactions based on MWFRS
N Brg Width = 4.0 Min Req =1.9
F Brg Width = 4.0 Min Req =1.9
Bearings N & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 950 -992
B - C 1084 -1087
Chords Tens.Comp.
C - D 1084 -1087
D - E 950 -992
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - J 1014 -974
Chords Tens.Comp.
J - G 1014 -973
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 1037 -1114
A - L 1366 -1309
L - B 870 -804
C - J 385 -166
Webs Tens.Comp.
D - G 870 -804
G - E 1366 -1309
E - F 1037 -1114
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.045 J 999 360
VERT(CL):0.077 J 999 240
HORZ(LL):-0.022 A - -
HORZ(TL):0.037 A - -
Creep Factor: 2.0
Max TC CSI:0.779
Max BC CSI:0.698
Max W eb CSI:0.743
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T201
Ply: 1
Qty:1
SEQN:12832 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T333
DrwNo:079.20.1313.36700
AK /DF 03/19/2020
W1
W3
W10
W11
25'4"
5'11"14
5'11"14
12'8"
6'8"2
19'4"2
6'8"2
25'4"
5'11"14
5'10"2
5'10"2
6'6"1
7"15
12'8"
6'1"15
19'4"2
6'8"2
25'4"
5'11"146'5"146"9'3"4(WB1)(WB1)
24'0"12
A B
C
D E
FGH
IJ
KLMN
5 12
4X4
6X6 6X81.5X6(**)
5X5
5X5
3X8
5X5
6X81.5X6(**)
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2; W3,
W10 2x4 SP 2250f-1.9E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1172 /-/-/673 /820 /80
F 1172 /-/-/673 /820 /-
Wind reactions based on MWFRS
N Brg Width = 4.0 Min Req =1.9
F Brg Width = 4.0 Min Req =1.9
Bearings N & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 950 -992
B - C 1084 -1087
Chords Tens.Comp.
C - D 1084 -1087
D - E 950 -992
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - J 1014 -974
Chords Tens.Comp.
J - G 1014 -973
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - N 1037 -1114
A - L 1366 -1309
L - B 870 -804
C - J 385 -166
Webs Tens.Comp.
D - G 870 -804
G - E 1366 -1309
E - F 1037 -1114
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.94 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.045 J 999 360
VERT(CL):0.077 J 999 240
HORZ(LL):-0.022 A - -
HORZ(TL):0.037 A - -
Creep Factor: 2.0
Max TC CSI:0.779
Max BC CSI:0.698
Max W eb CSI:0.743
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T201
Ply: 1
Qty:1
SEQN:12832 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T333
DrwNo:079.20.1313.36700
AK /DF 03/19/2020
W1
W3
W10
W11
25'4"
5'11"14
5'11"14
12'8"
6'8"2
19'4"2
6'8"2
25'4"
5'11"14
5'10"2
5'10"2
6'6"1
7"15
12'8"
6'1"15
19'4"2
6'8"2
25'4"
5'11"146'5"146"9'3"4(WB1)(WB1)
24'0"12
A B
C
D E
FGH
IJ
KLMN
5 12
4X4
6X6 6X81.5X6(**)
5X5
5X5
3X8
5X5
6X81.5X6(**)
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W17 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
V 1172 /-/-/678 /815 /104
H 1172 /-/-/678 /815 /-
Wind reactions based on MWFRS
V Brg Width = 4.0 Min Req =1.9
H Brg Width = 4.0 Min Req =1.9
Bearings V & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 796 -830
B - C 1227 -1255
C - D 1193 -1087
Chords Tens.Comp.
D - E 1193 -1087
E - F 1226 -1255
F - G 796 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - O 1107 -1015
Chords Tens.Comp.
O - L 1107 -1014
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 1060 -1132
A - T 1310 -1257
T - B 1053 -1018
T - Q 812 -786
C - O 376 -287
D - O 504 -530
Webs Tens.Comp.
O - E 375 -287
L - I 811 -784
F - I 1053 -1018
I - G 1310 -1256
G - H 1060 -1132
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.53 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.052 P 999 360
VERT(CL):0.085 O 999 240
HORZ(LL):-0.029 H - -
HORZ(TL):0.051 H - -
Creep Factor: 2.0
Max TC CSI:0.385
Max BC CSI:0.385
Max W eb CSI:0.757
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T202
Ply: 1
Qty:1
SEQN:12829 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T339
DrwNo:079.20.1313.29960
AK /DF 03/19/2020
W1
W17
25'4"
3'11"14
3'11"14
8'6"14
4'7"
12'8"
4'1"2
16'9"3
4'1"3
21'4"2
4'7"
25'4"
3'11"14
3'10"2
3'10"2
4'9"3
11"1
8'5"2
3'7"15
9'2"1
9"
12'8"
3'5"15
16'9"3
4'1"3
21'4"2
4'7"
25'4"
3'11"145'7"146"1'9'3"424'0"12
A B
C
D
E
F G
HIJ
KLM
NO
PQR
STUV
5 12
4X4
6X6 6X8
5X5
5X8
3X4
4X4
3X8
3X4
5X8
5X5
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W17 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
V 1172 /-/-/678 /815 /104
H 1172 /-/-/678 /815 /-
Wind reactions based on MWFRS
V Brg Width = 4.0 Min Req =1.9
H Brg Width = 4.0 Min Req =1.9
Bearings V & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 796 -830
B - C 1227 -1255
C - D 1193 -1087
Chords Tens.Comp.
D - E 1193 -1087
E - F 1226 -1255
F - G 796 -830
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - O 1107 -1015
Chords Tens.Comp.
O - L 1107 -1014
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - V 1060 -1132
A - T 1310 -1257
T - B 1053 -1018
T - Q 812 -786
C - O 376 -287
D - O 504 -530
Webs Tens.Comp.
O - E 375 -287
L - I 811 -784
F - I 1053 -1018
I - G 1310 -1256
G - H 1060 -1132
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.53 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.052 P 999 360
VERT(CL):0.085 O 999 240
HORZ(LL):-0.029 H - -
HORZ(TL):0.051 H - -
Creep Factor: 2.0
Max TC CSI:0.385
Max BC CSI:0.385
Max W eb CSI:0.757
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T202
Ply: 1
Qty:1
SEQN:12829 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T339
DrwNo:079.20.1313.29960
AK /DF 03/19/2020
W1
W17
25'4"
3'11"14
3'11"14
8'6"14
4'7"
12'8"
4'1"2
16'9"3
4'1"3
21'4"2
4'7"
25'4"
3'11"14
3'10"2
3'10"2
4'9"3
11"1
8'5"2
3'7"15
9'2"1
9"
12'8"
3'5"15
16'9"3
4'1"3
21'4"2
4'7"
25'4"
3'11"145'7"146"1'9'3"424'0"12
A B
C
D
E
F G
HIJ
KLM
NO
PQR
STUV
5 12
4X4
6X6 6X8
5X5
5X8
3X4
4X4
3X8
3X4
5X8
5X5
6X8
4X4
6X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AJ 1172 /-/-/683 /811 /128
J 1172 /-/-/683 /811 /-
Wind reactions based on MWFRS
AJ Brg Width = 4.0 Min Req =1.9
J Brg Width = 4.0 Min Req =1.9
Bearings AJ & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 406 -423
B - C 1486 -1568
C - D 1463 -1444
D - E 1342 -1223
Chords Tens.Comp.
E - F 1342 -1223
F - G 1463 -1444
G - H 1486 -1568
H - I 406 -423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AD-AB 1401 -1263
AB- Z 1410 -1274
Z - X 1279 -1086
X - W 1261 -1078
Chords Tens.Comp.
W -V 1261 -1080
V - T 1279 -1088
T - R 1410 -1272
R - N 1400 -1261
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AJ 1109 -1189
A -AI 1205 -1158
AI-AH 1031 -1017
AH- B 1281 -1261
AH-AD 581 -565
B -AD 952 -817
D - W 395 -364
E - W 653 -678
Webs Tens.Comp.
W -F 396 -364
N - H 952 -816
N - L 581 -563
H - L 1281 -1261
L - K 1031 -1017
K - I 1205 -1158
I - J 1109 -1189
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.086 Y 999 360
VERT(CL):0.148 Y 999 240
HORZ(LL):-0.136 M - -
HORZ(TL):0.240 M - -
Creep Factor: 2.0
Max TC CSI:0.358
Max BC CSI:0.484
Max W eb CSI:0.842
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T203
Ply: 1
Qty:1
SEQN:12822 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T105
DrwNo:079.20.1313.37168
AK /DF 03/19/2020
W1
W23
25'4"
5'11"4 1'9"8
1'7"8
(TYP)
6'7"8 1'9"8
1'11"14
1'11"14
6'1"
4'1"2
9'4"4
3'3"4
12'8"
3'3"12
15'11"12
3'3"12
19'3"
3'3"4
23'4"2
4'1"2
25'4"
1'11"14
1'8"6
1'8"6
1'11"14
3"8
3'3"2
1'3"4
6'8"11
3'5"9
7'10"8
1'1"13
9'0"12
1'2"4
12'8"
3'7"4
15'11"12
3'3"12
16'3"4
3"8
19'3"
2'11"12
23'4"2
4'1"2
25'4"
1'11"144'9"146"1'2'2"9'3"424'0"12
A B
C
D
E
F
G
H I
J
K
L
M
N
O
P
Q
R
S
T
U
VWX
Y
Z
AAAB
ACAD
AE AFAGAHAIAJ
5
12
4X4
1.5X6 4X44X4
5X5(SRS)
5X83X3
3X4
3X4
3X4
4X4
3X8
3X4
3X4
3X4
5X83X3
5X5(SRS)
4X44X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AJ 1172 /-/-/683 /811 /128
J 1172 /-/-/683 /811 /-
Wind reactions based on MWFRS
AJ Brg Width = 4.0 Min Req =1.9
J Brg Width = 4.0 Min Req =1.9
Bearings AJ & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 406 -423
B - C 1486 -1568
C - D 1463 -1444
D - E 1342 -1223
Chords Tens.Comp.
E - F 1342 -1223
F - G 1463 -1444
G - H 1486 -1568
H - I 406 -423
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AD-AB 1401 -1263
AB- Z 1410 -1274
Z - X 1279 -1086
X - W 1261 -1078
Chords Tens.Comp.
W -V 1261 -1080
V - T 1279 -1088
T - R 1410 -1272
R - N 1400 -1261
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A -AJ 1109 -1189
A -AI 1205 -1158
AI-AH 1031 -1017
AH- B 1281 -1261
AH-AD 581 -565
B -AD 952 -817
D - W 395 -364
E - W 653 -678
Webs Tens.Comp.
W -F 396 -364
N - H 952 -816
N - L 581 -563
H - L 1281 -1261
L - K 1031 -1017
K - I 1205 -1158
I - J 1109 -1189
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.086 Y 999 360
VERT(CL):0.148 Y 999 240
HORZ(LL):-0.136 M - -
HORZ(TL):0.240 M - -
Creep Factor: 2.0
Max TC CSI:0.358
Max BC CSI:0.484
Max W eb CSI:0.842
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T203
Ply: 1
Qty:1
SEQN:12822 /MONO
FROM:
Cust: R 761 JRef:1WTP7610004 T105
DrwNo:079.20.1313.37168
AK /DF 03/19/2020
W1
W23
25'4"
5'11"4 1'9"8
1'7"8
(TYP)
6'7"8 1'9"8
1'11"14
1'11"14
6'1"
4'1"2
9'4"4
3'3"4
12'8"
3'3"12
15'11"12
3'3"12
19'3"
3'3"4
23'4"2
4'1"2
25'4"
1'11"14
1'8"6
1'8"6
1'11"14
3"8
3'3"2
1'3"4
6'8"11
3'5"9
7'10"8
1'1"13
9'0"12
1'2"4
12'8"
3'7"4
15'11"12
3'3"12
16'3"4
3"8
19'3"
2'11"12
23'4"2
4'1"2
25'4"
1'11"144'9"146"1'2'2"9'3"424'0"12
A B
C
D
E
F
G
H I
J
K
L
M
N
O
P
Q
R
S
T
U
VWX
Y
Z
AAAB
ACAD
AE AFAGAHAIAJ
5
12
4X4
1.5X6 4X44X4
5X5(SRS)
5X83X3
3X4
3X4
3X4
4X4
3X8
3X4
3X4
3X4
5X83X3
5X5(SRS)
4X44X4
4X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF 1357 /-/-/748 /925 /482
AG 1357 /-/-/748 /925 /-
Wind reactions based on MWFRS
AF Brg Width = 4.0 Min Req =2.2
AG Brg Width = 4.0 Min Req =2.2
Bearings AF & AG Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 790 -632
C - D 1206 -1131
D - E 1424 -1345
E - F 1261 -1168
Chords Tens.Comp.
F - G 1304 -1167
G - H 1365 -1345
H - I 1077 -1131
I - J 691 -632
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 1214 -1279
Chords Tens.Comp.
V - S 1214 -1151
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AF 1199 -1314
B -AD 995 -778
AF-AD 547 -458
AD- C 715 -863
AD-AA 686 -830
C -AA 693 -537
AA- D 464 -550
AA- X 994 -1139
E - V 488 -310
Webs Tens.Comp.
F - V 511 -531
V - G 396 -297
S - P 994 -961
H - P 526 -549
P - I 693 -605
P - M 531 -559
I - M 788 -863
M - J 995 -872
L - J 1367 -1314
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.049 V 999 360
VERT(CL):0.086 V 999 240
HORZ(LL):-0.033 L - -
HORZ(TL):0.069 L - -
Creep Factor: 2.0
Max TC CSI:0.411
Max BC CSI:0.470
Max W eb CSI:0.516
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T204
Ply: 1
Qty:2
SEQN:12801 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T78
DrwNo:079.20.1313.40382
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
2'3"10
2'3"10
5'3"1
2'11"7
8'3"6
3'0"6
12'11"4
4'7"14
17'7"1
4'7"13
20'7"7
3'0"6
23'6"14
2'11"7
25'10"8
2'3"10
2'5"10
2'5"10
5'5"1
2'11"7
8'5"6
3'0"6
12'9"12
4'4"6
17'5"9
4'7"13
20'5"15
3'0"6
23'5"6
2'11"7
25'7"8
2'2"21'8"12
1'8"123'11"36"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
L
M NOPQRSTUV
WXY
ZAA
ABACAD
AE
AF AG
5
12
3X8
6X6
1.5X4
3X4
1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4
3X4
1.5X4 6X6
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF 1357 /-/-/748 /925 /482
AG 1357 /-/-/748 /925 /-
Wind reactions based on MWFRS
AF Brg Width = 4.0 Min Req =2.2
AG Brg Width = 4.0 Min Req =2.2
Bearings AF & AG Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 790 -632
C - D 1206 -1131
D - E 1424 -1345
E - F 1261 -1168
Chords Tens.Comp.
F - G 1304 -1167
G - H 1365 -1345
H - I 1077 -1131
I - J 691 -632
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 1214 -1279
Chords Tens.Comp.
V - S 1214 -1151
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AF 1199 -1314
B -AD 995 -778
AF-AD 547 -458
AD- C 715 -863
AD-AA 686 -830
C -AA 693 -537
AA- D 464 -550
AA- X 994 -1139
E - V 488 -310
Webs Tens.Comp.
F - V 511 -531
V - G 396 -297
S - P 994 -961
H - P 526 -549
P - I 693 -605
P - M 531 -559
I - M 788 -863
M - J 995 -872
L - J 1367 -1314
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.049 V 999 360
VERT(CL):0.086 V 999 240
HORZ(LL):-0.033 L - -
HORZ(TL):0.069 L - -
Creep Factor: 2.0
Max TC CSI:0.411
Max BC CSI:0.470
Max W eb CSI:0.516
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T204
Ply: 1
Qty:2
SEQN:12801 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T78
DrwNo:079.20.1313.40382
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
2'3"10
2'3"10
5'3"1
2'11"7
8'3"6
3'0"6
12'11"4
4'7"14
17'7"1
4'7"13
20'7"7
3'0"6
23'6"14
2'11"7
25'10"8
2'3"10
2'5"10
2'5"10
5'5"1
2'11"7
8'5"6
3'0"6
12'9"12
4'4"6
17'5"9
4'7"13
20'5"15
3'0"6
23'5"6
2'11"7
25'7"8
2'2"21'8"12
1'8"123'11"36"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
L
M NOPQRSTUV
WXY
ZAA
ABACAD
AE
AF AG
5
12
3X8
6X6
1.5X4
3X4
1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4
3X4
1.5X4 6X6
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AN 1357 /-/-/753 /922 /463
AO 1360 /-/-/758 /928 /-
Wind reactions based on MWFRS
AN Brg Width = 4.0 Min Req =2.2
AO Brg Width = 4.0 Min Req =2.2
Bearings AN & AO Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1138 -976
C - D 1398 -1355
D - E 1585 -1356
Chords Tens.Comp.
E - F 1488 -1356
F - G 1332 -1355
G - H 888 -974
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AL 604 -524
AM-AJ 424 -409
AJ-AH 478 -438
AH-AF 528 -477
Chords Tens.Comp.
AF-AD 954 -1131
AD-AA 931 -1090
U - T 865 -817
T - R 891 -848
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AM 1115 -1173
B -AF 1052 -882
AN-AM 1156 -1143
AM-AL 403 -382
AL-AK 440 -257
AJ-AK 393 -216
AF- C 689 -636
C -AA 376 -390
D -AA 458 -344
AA- E 413 -621
Webs Tens.Comp.
AA- Y 798 -676
E - U 402 -467
Y - U 799 -705
U - F 456 -353
U - G 418 -302
G - R 601 -639
R - H 1013 -803
K - H 1195 -1151
K - J 1097 -1079
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.068 F 999 360
VERT(CL):0.111 F 999 240
HORZ(LL):-0.043 J - -
HORZ(TL):0.053 J - -
Creep Factor: 2.0
Max TC CSI:0.492
Max BC CSI:0.740
Max W eb CSI:0.768
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T205
Ply: 1
Qty:1
SEQN:12810 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T74
DrwNo:079.20.1313.29945
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
3'8"15
3'8"15
8'1"10
4'4"11
12'11"4
4'9"10
17'8"13
4'9"9
22'1"9
4'4"12
25'10"8
3'8"15
2'0"6
2'0"6
2'5"10
5"4
3'3"12
10"2
5'3"5
1'11"9
7'10"6
2'7"2
8'5"6
7"
12'9"12
4'4"6
17'5"9
4'7"13
20'5"15
3'0"6
22'3"9
1'9"10
22'5"8
1"15
23'5"6
11"14
25'3"8
1'10"2
25'9"
5"8
1'8"12 1'8"123'11"33'10"91'8"6"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
L
M
NO
P
Q
R
ST
U V WXY
Z
AA
AB
AC
AD AEAF
AG
AH
AIAJ
AK
ALAMAN AO
5 12
3X8
2X65X5
4X43X3
3X4
3X4
8X8(**)3X3
4X7
3X8 8X8(**)3X3
3X4
3X4 3X34X4 5X5
3X8
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AN 1357 /-/-/753 /922 /463
AO 1360 /-/-/758 /928 /-
Wind reactions based on MWFRS
AN Brg Width = 4.0 Min Req =2.2
AO Brg Width = 4.0 Min Req =2.2
Bearings AN & AO Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1138 -976
C - D 1398 -1355
D - E 1585 -1356
Chords Tens.Comp.
E - F 1488 -1356
F - G 1332 -1355
G - H 888 -974
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
AN-AL 604 -524
AM-AJ 424 -409
AJ-AH 478 -438
AH-AF 528 -477
Chords Tens.Comp.
AF-AD 954 -1131
AD-AA 931 -1090
U - T 865 -817
T - R 891 -848
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AM 1115 -1173
B -AF 1052 -882
AN-AM 1156 -1143
AM-AL 403 -382
AL-AK 440 -257
AJ-AK 393 -216
AF- C 689 -636
C -AA 376 -390
D -AA 458 -344
AA- E 413 -621
Webs Tens.Comp.
AA- Y 798 -676
E - U 402 -467
Y - U 799 -705
U - F 456 -353
U - G 418 -302
G - R 601 -639
R - H 1013 -803
K - H 1195 -1151
K - J 1097 -1079
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.068 F 999 360
VERT(CL):0.111 F 999 240
HORZ(LL):-0.043 J - -
HORZ(TL):0.053 J - -
Creep Factor: 2.0
Max TC CSI:0.492
Max BC CSI:0.740
Max W eb CSI:0.768
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T205
Ply: 1
Qty:1
SEQN:12810 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T74
DrwNo:079.20.1313.29945
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
3'8"15
3'8"15
8'1"10
4'4"11
12'11"4
4'9"10
17'8"13
4'9"9
22'1"9
4'4"12
25'10"8
3'8"15
2'0"6
2'0"6
2'5"10
5"4
3'3"12
10"2
5'3"5
1'11"9
7'10"6
2'7"2
8'5"6
7"
12'9"12
4'4"6
17'5"9
4'7"13
20'5"15
3'0"6
22'3"9
1'9"10
22'5"8
1"15
23'5"6
11"14
25'3"8
1'10"2
25'9"
5"8
1'8"12 1'8"123'11"33'10"91'8"6"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
L
M
NO
P
Q
R
ST
U V WXY
Z
AA
AB
AC
AD AEAF
AG
AH
AIAJ
AK
ALAMAN AO
5 12
3X8
2X65X5
4X43X3
3X4
3X4
8X8(**)3X3
4X7
3X8 8X8(**)3X3
3X4
3X4 3X34X4 5X5
3X8
2X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF 1357 /-/-/748 /925 /482
AG 1357 /-/-/748 /925 /-
Wind reactions based on MWFRS
AF Brg Width = 4.0 Min Req =2.2
AG Brg Width = 4.0 Min Req =2.2
Bearings AF & AG Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 792 -637
C - D 1252 -1214
D - E 1387 -1313
E - F 1292 -1130
Chords Tens.Comp.
F - G 1323 -1130
G - H 1370 -1313
H - I 1154 -1213
I - J 693 -637
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 1161 -1178
Chords Tens.Comp.
V - S 1161 -1095
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AF 1199 -1319
B -AD 1011 -790
AF-AD 548 -454
AD- C 730 -841
AD-AA 685 -828
C -AA 673 -537
AA- D 398 -429
AA- X 1040 -1153
E - V 558 -373
Webs Tens.Comp.
F - V 641 -736
V - G 469 -373
S - P 1040 -1004
H - P 433 -429
P - I 673 -585
P - M 535 -560
I - M 778 -841
M - J 1011 -885
L - J 1367 -1319
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.051 W 999 360
VERT(CL):0.086 Y 999 240
HORZ(LL):-0.031 L - -
HORZ(TL):0.063 L - -
Creep Factor: 2.0
Max TC CSI:0.384
Max BC CSI:0.302
Max W eb CSI:0.716
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T206
Ply: 1
Qty:1
SEQN:12805 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T72
DrwNo:079.20.1313.42629
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
2'3"10
2'3"10
6'2"13
3'11"3
10'1"10
3'10"13
12'11"4
2'9"10
15'8"14
2'9"10
19'7"11
3'10"13
23'6"14
3'11"3
25'10"8
2'3"10
2'0"6
2'0"6
3'1"2
1'0"12
6'4"13
3'3"11
10'3"10
3'10"13
12'9"12
2'6"2
15'7"6
2'9"10
19'6"3
3'10"13
23'5"6
3'11"3
25'7"8
2'2"21'8"12
1'8"123'11"36"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
LMNOPQRSTUV
WXY
ZAA
ABACAD
AE
AF AG
5
12
4X6
6X6
1.5X4
3X4
1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4
3X4
1.5X4 6X6
4X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W23 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
AF 1357 /-/-/748 /925 /482
AG 1357 /-/-/748 /925 /-
Wind reactions based on MWFRS
AF Brg Width = 4.0 Min Req =2.2
AG Brg Width = 4.0 Min Req =2.2
Bearings AF & AG Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 792 -637
C - D 1252 -1214
D - E 1387 -1313
E - F 1292 -1130
Chords Tens.Comp.
F - G 1323 -1130
G - H 1370 -1313
H - I 1154 -1213
I - J 693 -637
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 1161 -1178
Chords Tens.Comp.
V - S 1161 -1095
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B -AF 1199 -1319
B -AD 1011 -790
AF-AD 548 -454
AD- C 730 -841
AD-AA 685 -828
C -AA 673 -537
AA- D 398 -429
AA- X 1040 -1153
E - V 558 -373
Webs Tens.Comp.
F - V 641 -736
V - G 469 -373
S - P 1040 -1004
H - P 433 -429
P - I 673 -585
P - M 535 -560
I - M 778 -841
M - J 1011 -885
L - J 1367 -1319
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.051 W 999 360
VERT(CL):0.086 Y 999 240
HORZ(LL):-0.031 L - -
HORZ(TL):0.063 L - -
Creep Factor: 2.0
Max TC CSI:0.384
Max BC CSI:0.302
Max W eb CSI:0.716
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T206
Ply: 1
Qty:1
SEQN:12805 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T72
DrwNo:079.20.1313.42629
AK /DF 03/19/2020
W1
W23
3"4 25'4"3"4
2'3"10
2'3"10
6'2"13
3'11"3
10'1"10
3'10"13
12'11"4
2'9"10
15'8"14
2'9"10
19'7"11
3'10"13
23'6"14
3'11"3
25'10"8
2'3"10
2'0"6
2'0"6
3'1"2
1'0"12
6'4"13
3'3"11
10'3"10
3'10"13
12'9"12
2'6"2
15'7"6
2'9"10
19'6"3
3'10"13
23'5"6
3'11"3
25'7"8
2'2"21'8"12
1'8"123'11"36"1'1'6"9'3"424'0"12
A
B
C
D
E
F
G
H
I
J
K
LMNOPQRSTUV
WXY
ZAA
ABACAD
AE
AF AG
5
12
4X6
6X6
1.5X4
3X4
1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4
3X4
1.5X4 6X6
4X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W17 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1360 /-/-/739 /928 /482
Y 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
X Brg Width = 7.3 Min Req =2.2
Y Brg Width = 7.3 Min Req =2.2
Bearings X & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 982 -931
C - D 1298 -1252
D - E 1192 -1109
Chords Tens.Comp.
E - F 1237 -1109
F - G 1238 -1252
G - H 896 -930
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1117 -1187
Chords Tens.Comp.
Q - N 1117 -1061
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 1271 -1311
B - V 1070 -829
X - V 522 -438
V - C 609 -687
V - S 781 -972
C - S 425 -312
D - Q 429 -267
Webs Tens.Comp.
E - Q 463 -452
N - G 425 -358
N - K 781 -773
G - K 658 -688
K - H 1070 -935
J - H 1366 -1311
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.044 Q 999 360
VERT(CL):0.075 Q 999 240
HORZ(LL):-0.023 J - -
HORZ(TL):0.049 J - -
Creep Factor: 2.0
Max TC CSI:0.443
Max BC CSI:0.502
Max W eb CSI:0.502
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T208
Ply: 1
Qty:1
SEQN:12797 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T79
DrwNo:079.20.1313.41505
AK /DF 03/19/2020
W1
W17
25'10"8
3'11"4
3'11"4
7'10"10
3'11"6
12'11"4
5'0"10
17'11"14
5'0"10
21'11"4
3'11"6
25'10"8
3'11"4
1"8
1"8
4'2"12
4'1"4
8'2"2
3'11"6
12'11"4
4'9"2
17'11"14
5'0"10
21'11"4
3'11"6
25'9"
3'9"12
25'10"8
1"8
1'8"12 1'8"123'10"96"1'9'3"424'0"12
A
B
C
D
E
F
G
H
I
JKLM
N OPQ
RST
UVWX Y
5 12
3X8
6X6 1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4 6X6
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W17 2x6 SP #2;
Plating Notes
All plates are 5X8 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
X 1360 /-/-/739 /928 /482
Y 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
X Brg Width = 7.3 Min Req =2.2
Y Brg Width = 7.3 Min Req =2.2
Bearings X & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 982 -931
C - D 1298 -1252
D - E 1192 -1109
Chords Tens.Comp.
E - F 1237 -1109
F - G 1238 -1252
G - H 896 -930
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
S - Q 1117 -1187
Chords Tens.Comp.
Q - N 1117 -1061
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 1271 -1311
B - V 1070 -829
X - V 522 -438
V - C 609 -687
V - S 781 -972
C - S 425 -312
D - Q 429 -267
Webs Tens.Comp.
E - Q 463 -452
N - G 425 -358
N - K 781 -773
G - K 658 -688
K - H 1070 -935
J - H 1366 -1311
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.044 Q 999 360
VERT(CL):0.075 Q 999 240
HORZ(LL):-0.023 J - -
HORZ(TL):0.049 J - -
Creep Factor: 2.0
Max TC CSI:0.443
Max BC CSI:0.502
Max W eb CSI:0.502
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T208
Ply: 1
Qty:1
SEQN:12797 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T79
DrwNo:079.20.1313.41505
AK /DF 03/19/2020
W1
W17
25'10"8
3'11"4
3'11"4
7'10"10
3'11"6
12'11"4
5'0"10
17'11"14
5'0"10
21'11"4
3'11"6
25'10"8
3'11"4
1"8
1"8
4'2"12
4'1"4
8'2"2
3'11"6
12'11"4
4'9"2
17'11"14
5'0"10
21'11"4
3'11"6
25'9"
3'9"12
25'10"8
1"8
1'8"12 1'8"123'10"96"1'9'3"424'0"12
A
B
C
D
E
F
G
H
I
JKLM
N OPQ
RST
UVWX Y
5 12
3X8
6X6 1.5X4
3X4
1.5X4
3X4
4X4
3X8
3X4
1.5X4
3X4
1.5X4 6X6
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1360 /-/-/739 /928 /482
Q 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
P Brg Width = 7.3 Min Req =2.2
Q Brg Width = 7.3 Min Req =2.2
Bearings P & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1130 -1139
C - D 1132 -1109
Chords Tens.Comp.
D - E 1170 -1109
E - F 1050 -1139
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - L 998 -1136
Chords Tens.Comp.
L - I 998 -964
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 1295 -1297
B - N 1158 -925
P - N 513 -416
N - C 488 -413
Webs Tens.Comp.
E - I 442 -413
I - F 1158 -1013
H - F 1364 -1297
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 L 999 360
VERT(CL):0.068 L 999 240
HORZ(LL):-0.017 C - -
HORZ(TL):0.036 H - -
Creep Factor: 2.0
Max TC CSI:0.827
Max BC CSI:0.813
Max W eb CSI:0.621
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T209
Ply: 1
Qty:1
SEQN:12792 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T14
DrwNo:079.20.1313.39476
AK /DF 03/19/2020
W1
W11
25'10"8
5'7"1
5'7"1
12'11"4
7'4"3
20'3"7
7'4"3
25'10"8
5'7"1
1"8
1"8
5'10"9
5'9"1
12'11"4
7'0"11
20'3"7
7'4"3
25'9"
5'5"9
25'10"8
1"8
1'8"12 1'8"123'10"96"9'3"4(WB1)(WB1)
24'0"12
A
B
C
D
E
F
G
HIJKL
MNOP Q
5 12
3X6
6X6 6X81.5X4
3X4
6X6
3X8
3X4
6X81.5X4 6X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
P 1360 /-/-/739 /928 /482
Q 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
P Brg Width = 7.3 Min Req =2.2
Q Brg Width = 7.3 Min Req =2.2
Bearings P & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1130 -1139
C - D 1132 -1109
Chords Tens.Comp.
D - E 1170 -1109
E - F 1050 -1139
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - L 998 -1136
Chords Tens.Comp.
L - I 998 -964
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 1295 -1297
B - N 1158 -925
P - N 513 -416
N - C 488 -413
Webs Tens.Comp.
E - I 442 -413
I - F 1158 -1013
H - F 1364 -1297
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 L 999 360
VERT(CL):0.068 L 999 240
HORZ(LL):-0.017 C - -
HORZ(TL):0.036 H - -
Creep Factor: 2.0
Max TC CSI:0.827
Max BC CSI:0.813
Max W eb CSI:0.621
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T209
Ply: 1
Qty:1
SEQN:12792 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T14
DrwNo:079.20.1313.39476
AK /DF 03/19/2020
W1
W11
25'10"8
5'7"1
5'7"1
12'11"4
7'4"3
20'3"7
7'4"3
25'10"8
5'7"1
1"8
1"8
5'10"9
5'9"1
12'11"4
7'0"11
20'3"7
7'4"3
25'9"
5'5"9
25'10"8
1"8
1'8"12 1'8"123'10"96"9'3"4(WB1)(WB1)
24'0"12
A
B
C
D
E
F
G
HIJKL
MNOP Q
5 12
3X6
6X6 6X81.5X4
3X4
6X6
3X8
3X4
6X81.5X4 6X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W15 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1360 /-/-/739 /928 /482
U 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
T Brg Width = 7.3 Min Req =2.2
U Brg Width = 7.3 Min Req =2.2
Bearings T & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 900 -901
C - D 1196 -1155
D - E 1149 -1028
Chords Tens.Comp.
E - F 1187 -1028
F - G 1166 -1155
G - H 900 -901
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
T - S 522 -447
Q - O 1017 -1059
Chords Tens.Comp.
O - L 1017 -963
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - T 1360 -1322
B - S 1050 -893
S - C 586 -675
S - Q 744 -886
D - O 405 -239
Webs Tens.Comp.
E - O 452 -496
L - K 744 -725
G - K 667 -675
K - H 1050 -895
J - H 1358 -1322
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 O 999 360
VERT(CL):0.068 O 999 240
HORZ(LL):-0.016 C - -
HORZ(TL):0.032 K - -
Creep Factor: 2.0
Max TC CSI:0.418
Max BC CSI:0.388
Max W eb CSI:0.624
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T210
Ply: 1
Qty:1
SEQN:12789 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T343
DrwNo:079.20.1313.29664
AK /DF 03/19/2020
W1
W15
25'10"8
4'6"4
4'6"4
8'9"1
4'2"12
12'11"4
4'2"3
17'1"7
4'2"3
21'4"4
4'2"12
25'10"8
4'6"4
1"8
1"8
4'4"8
4'3"
9'0"9
4'8"
12'11"4
3'10"11
17'1"7
4'2"3
21'6"
4'4"8
25'9"
4'3"
25'10"8
1"8
1'8"12 1'8"123'10"96"9'3"424'0"12
A
B
C
D
E
F
G
H
I
JKLMNO
PQRST U
5 12
3X8
2X6 3X8
3X4
5X81.5X4
3X4
4X4
3X8
3X4
5X81.5X4
3X4
3X8 2X6
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W15 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1360 /-/-/739 /928 /482
U 1360 /-/-/739 /928 /-
Wind reactions based on MWFRS
T Brg Width = 7.3 Min Req =2.2
U Brg Width = 7.3 Min Req =2.2
Bearings T & J Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 900 -901
C - D 1196 -1155
D - E 1149 -1028
Chords Tens.Comp.
E - F 1187 -1028
F - G 1166 -1155
G - H 900 -901
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
T - S 522 -447
Q - O 1017 -1059
Chords Tens.Comp.
O - L 1017 -963
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - T 1360 -1322
B - S 1050 -893
S - C 586 -675
S - Q 744 -886
D - O 405 -239
Webs Tens.Comp.
E - O 452 -496
L - K 744 -725
G - K 667 -675
K - H 1050 -895
J - H 1358 -1322
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 O 999 360
VERT(CL):0.068 O 999 240
HORZ(LL):-0.016 C - -
HORZ(TL):0.032 K - -
Creep Factor: 2.0
Max TC CSI:0.418
Max BC CSI:0.388
Max W eb CSI:0.624
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T210
Ply: 1
Qty:1
SEQN:12789 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T343
DrwNo:079.20.1313.29664
AK /DF 03/19/2020
W1
W15
25'10"8
4'6"4
4'6"4
8'9"1
4'2"12
12'11"4
4'2"3
17'1"7
4'2"3
21'4"4
4'2"12
25'10"8
4'6"4
1"8
1"8
4'4"8
4'3"
9'0"9
4'8"
12'11"4
3'10"11
17'1"7
4'2"3
21'6"
4'4"8
25'9"
4'3"
25'10"8
1"8
1'8"12 1'8"123'10"96"9'3"424'0"12
A
B
C
D
E
F
G
H
I
JKLMNO
PQRST U
5 12
3X8
2X6 3X8
3X4
5X81.5X4
3X4
4X4
3X8
3X4
5X81.5X4
3X4
3X8 2X6
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W9 2x6 SP #2; W4,
W6 2x4 SP 2700f-2.2E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1452 /-/-/738 /924 /481
M 1451 /-/-/738 /924 /-
Wind reactions based on MWFRS
L Brg Width = 7.3 Min Req =2.3
M Brg Width = 7.3 Min Req =2.3
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1027 -1196
C - D 1124 -1113
Chords Tens.Comp.
D - E 1124 -1113
E - F 1027 -1195
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 504 -436
K - J 1035 -1020
Chords Tens.Comp.
J - I 1033 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 1350 -1400
B - K 1190 -908
K - C 460 -365
Webs Tens.Comp.
E - I 461 -367
I - F 1189 -909
H - F 1348 -1399
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.040 J 999 360
VERT(CL):0.070 J 999 240
HORZ(LL):-0.012 C - -
HORZ(TL):0.022 I - -
Creep Factor: 2.0
Max TC CSI:0.700
Max BC CSI:0.543
Max W eb CSI:0.833
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T211
Ply: 1
Qty:2
SEQN:12786 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T76
DrwNo:079.20.1313.35654
AK /DF 03/19/2020
W1
W4
W6
W9
25'10"8
6'9"4
6'9"4
12'11"4
6'2"
19'1"4
6'2"
25'10"8
6'9"4
1"8
1"8
6'5"12
6'4"4
12'11"4
6'5"8
19'4"12
6'5"8
25'9"
6'4"4
25'10"8
1"8
1'8"12 1'8"123'10"99'3"4(WB1)(WB1)
24'0"12
A
B
C
D
E
F
G
HIJKL M
5 12
3X8
2X6 3X5
3X4
4X5
5X8
3X4
3X5 2X6
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W9 2x6 SP #2; W4,
W6 2x4 SP 2700f-2.2E;
Bracing
WB: Web-Block, meaning 2x4 same grade/species
as web. Fastened to web with 3X3 or larger plates.
See DRWG BRWEBLOK1014 for further details.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1452 /-/-/738 /924 /481
M 1451 /-/-/738 /924 /-
Wind reactions based on MWFRS
L Brg Width = 7.3 Min Req =2.3
M Brg Width = 7.3 Min Req =2.3
Bearings L & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1027 -1196
C - D 1124 -1113
Chords Tens.Comp.
D - E 1124 -1113
E - F 1027 -1195
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 504 -436
K - J 1035 -1020
Chords Tens.Comp.
J - I 1033 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 1350 -1400
B - K 1190 -908
K - C 460 -365
Webs Tens.Comp.
E - I 461 -367
I - F 1189 -909
H - F 1348 -1399
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 30.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.040 J 999 360
VERT(CL):0.070 J 999 240
HORZ(LL):-0.012 C - -
HORZ(TL):0.022 I - -
Creep Factor: 2.0
Max TC CSI:0.700
Max BC CSI:0.543
Max W eb CSI:0.833
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T211
Ply: 1
Qty:2
SEQN:12786 /COMN
FROM:
Cust: R 761 JRef:1WTP7610004 T76
DrwNo:079.20.1313.35654
AK /DF 03/19/2020
W1
W4
W6
W9
25'10"8
6'9"4
6'9"4
12'11"4
6'2"
19'1"4
6'2"
25'10"8
6'9"4
1"8
1"8
6'5"12
6'4"4
12'11"4
6'5"8
19'4"12
6'5"8
25'9"
6'4"4
25'10"8
1"8
1'8"12 1'8"123'10"99'3"4(WB1)(WB1)
24'0"12
A
B
C
D
E
F
G
HIJKL M
5 12
3X8
2X6 3X5
3X4
4X5
5X8
3X4
3X5 2X6
3X8
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1360 /-/-/759 /923 /458
O 1360 /-/-/759 /923 /-
Wind reactions based on MWFRS
N Brg Width = 7.3 Min Req =2.2
O Brg Width = 7.3 Min Req =2.2
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 971 -1001
C - D 1096 -1065
D - E 1127 -909
Chords Tens.Comp.
E - F 1093 -1065
F - G 971 -1001
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 512 -420
M - L 873 -988
Chords Tens.Comp.
L - K 908 -878
K - J 874 -815
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 1330 -1314
B - M 1069 -878
M - C 485 -480
Webs Tens.Comp.
F - J 486 -478
J - G 1069 -880
I - G 1327 -1314
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 L 999 360
VERT(CL):0.059 L 999 240
HORZ(LL):-0.012 C - -
HORZ(TL):0.022 J - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.445
Max W eb CSI:0.600
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T212
Ply: 1
Qty:1
SEQN:12780 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T338
DrwNo:079.20.1313.28244
AK /DF 03/19/2020
W1
W11
25'10"8
5'7"6
5'7"6
10'11"4
5'3"14
14'11"4
4'
20'3"2
5'3"14
25'10"8
5'7"6
1"8
1"8
5'3"14
5'2"6
10'11"4
5'7"6
14'9"8
3'10"4
20'6"10
5'9"2
25'9"
5'2"6
25'10"8
1"8
1'8"12 1'8"123'10"98'5"424'0"12
A
B
C
D E
F
G
H
IJKLMN O
5 12
3X6
2X6 3X4
3X4
4X7
3X4 5X8
4X4
3X4
3X4 2X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 1360 /-/-/759 /923 /458
O 1360 /-/-/759 /923 /-
Wind reactions based on MWFRS
N Brg Width = 7.3 Min Req =2.2
O Brg Width = 7.3 Min Req =2.2
Bearings N & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 971 -1001
C - D 1096 -1065
D - E 1127 -909
Chords Tens.Comp.
E - F 1093 -1065
F - G 971 -1001
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
N - M 512 -420
M - L 873 -988
Chords Tens.Comp.
L - K 908 -878
K - J 874 -815
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 1330 -1314
B - M 1069 -878
M - C 485 -480
Webs Tens.Comp.
F - J 486 -478
J - G 1069 -880
I - G 1327 -1314
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 L 999 360
VERT(CL):0.059 L 999 240
HORZ(LL):-0.012 C - -
HORZ(TL):0.022 J - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.445
Max W eb CSI:0.600
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T212
Ply: 1
Qty:1
SEQN:12780 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T338
DrwNo:079.20.1313.28244
AK /DF 03/19/2020
W1
W11
25'10"8
5'7"6
5'7"6
10'11"4
5'3"14
14'11"4
4'
20'3"2
5'3"14
25'10"8
5'7"6
1"8
1"8
5'3"14
5'2"6
10'11"4
5'7"6
14'9"8
3'10"4
20'6"10
5'9"2
25'9"
5'2"6
25'10"8
1"8
1'8"12 1'8"123'10"98'5"424'0"12
A
B
C
D E
F
G
H
IJKLMN O
5 12
3X6
2X6 3X4
3X4
4X7
3X4 5X8
4X4
3X4
3X4 2X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W13 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1362 /-/-/798 /906 /435
K 1357 /-/-/798 /906 /-
Wind reactions based on MWFRS
O Brg Width = 3.5 Min Req =2.2
K Brg Width = 3.5 Min Req =2.2
Bearings O & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 997 -977
D - E 1024 -931
Chords Tens.Comp.
E - F 1024 -931
F - G 997 -983
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 654 -522
O - N 623 -819
N - M 841 -841
Chords Tens.Comp.
M - L 846 -719
L - K 639 -581
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 301 -479
B - O 475 -155
O - C 977 -1121
Webs Tens.Comp.
G - K 978 -1114
K - H 476 -154
J - H 300 -483
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.036 E 999 360
VERT(CL):0.062 E 999 240
HORZ(LL):-0.013 J - -
HORZ(TL):0.028 K - -
Creep Factor: 2.0
Max TC CSI:0.403
Max BC CSI:0.592
Max W eb CSI:0.849
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T213
Ply: 1
Qty:1
SEQN:12776 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T98
DrwNo:079.20.1313.33205
AK /DF 03/19/2020
W1
W13
6"8 24'9"8 6"8
4'5"10
4'5"10
8'11"4
4'5"10
12'11"4
4'
16'11"4
4'
21'4"14
4'5"10
25'10"8
4'5"10
8"12
8"12
8'9"12
8'1"
12'9"12
4'
16'8"
3'10"4
24'10"12
8'2"12
25'7"8
8"12
1'8"12 1'8"123'11"37'7"424'0"12
A
B
C
D E F
G
H
I
JKLMNOP
5 12
3X6
1.5X63X4
3X4
4X7
3X4
1.5X4
3X8
4X7
5X8
3X4
3X41.5X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W13 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals exposed to wind pressure. Deflection
meets L/180.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1362 /-/-/798 /906 /435
K 1357 /-/-/798 /906 /-
Wind reactions based on MWFRS
O Brg Width = 3.5 Min Req =2.2
K Brg Width = 3.5 Min Req =2.2
Bearings O & K Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 997 -977
D - E 1024 -931
Chords Tens.Comp.
E - F 1024 -931
F - G 997 -983
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 654 -522
O - N 623 -819
N - M 841 -841
Chords Tens.Comp.
M - L 846 -719
L - K 639 -581
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 301 -479
B - O 475 -155
O - C 977 -1121
Webs Tens.Comp.
G - K 978 -1114
K - H 476 -154
J - H 300 -483
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.036 E 999 360
VERT(CL):0.062 E 999 240
HORZ(LL):-0.013 J - -
HORZ(TL):0.028 K - -
Creep Factor: 2.0
Max TC CSI:0.403
Max BC CSI:0.592
Max W eb CSI:0.849
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T213
Ply: 1
Qty:1
SEQN:12776 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T98
DrwNo:079.20.1313.33205
AK /DF 03/19/2020
W1
W13
6"8 24'9"8 6"8
4'5"10
4'5"10
8'11"4
4'5"10
12'11"4
4'
16'11"4
4'
21'4"14
4'5"10
25'10"8
4'5"10
8"12
8"12
8'9"12
8'1"
12'9"12
4'
16'8"
3'10"4
24'10"12
8'2"12
25'7"8
8"12
1'8"12 1'8"123'11"37'7"424'0"12
A
B
C
D E F
G
H
I
JKLMNOP
5 12
3X6
1.5X63X4
3X4
4X7
3X4
1.5X4
3X8
4X7
5X8
3X4
3X41.5X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.85 to 73 plf at 6.81
TC: From 36 plf at 6.81 to 36 plf at 18.81
TC: From 73 plf at 18.81 to 73 plf at 27.48
BC: From 22 plf at -1.85 to 22 plf at -0.13
BC: From 20 plf at 0.00 to 20 plf at 6.84
BC: From 10 plf at 6.84 to 10 plf at 18.78
BC: From 20 plf at 18.78 to 20 plf at 25.75
BC: From 22 plf at 25.75 to 22 plf at 27.48
TC: 433 lb Conc. Load at 6.84,18.78
TC: 183 lb Conc. Load at 8.88,10.88,12.88,14.75
16.75
BC: 397 lb Conc. Load at 6.84,18.78
BC: 113 lb Conc. Load at 8.88,10.88,12.88,14.75
16.75
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 2653 /-/-/-/2513 /-
I 2653 /-/-/-/2515 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =2.3
I Brg Width = 3.5 Min Req =2.3
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 1404 -1331
Chords Tens.Comp.
D - E 1404 -1331
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1040 -1050
L - K 1046 -1056
Chords Tens.Comp.
K - J 1052 -1057
J - I 1045 -1052
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - C 1508 -1478
C - K 418 -511
D - K 394 -403
Webs Tens.Comp.
K - E 414 -509
E - I 1510 -1477
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.03 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.089 D 999 360
VERT(CL):0.093 D 999 240
HORZ(LL):-0.039 H - -
HORZ(TL):0.041 H - -
Creep Factor: 2.0
Max TC CSI:0.662
Max BC CSI:0.523
Max W eb CSI:0.926
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T214
Ply: 2
Qty:1
SEQN:12766 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T73
DrwNo:079.20.1313.32924
AK /DF 03/19/2020
2 Complete Trusses Required
W1
W11
6"8 24'9"8 6"8
6'11"4
6'11"4
12'11"4
6'
18'11"4
6'
25'10"8
6'11"4
8"12
8"12
6'11"8
6'2"12
12'9"12
5'10"4
18'8"
5'10"4
24'10"12
6'2"12
25'7"8
8"12
1'8"12 1'8"123'11"36'9"424'0"12
A
B
C D E
F
G
HIJKLMN
5
12
3X6
1.5X64X4
5X8
1.5X4
1.5X4
5X8 1.5X4
5X8
4X41.5X6
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1,W11 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 73 plf at -1.85 to 73 plf at 6.81
TC: From 36 plf at 6.81 to 36 plf at 18.81
TC: From 73 plf at 18.81 to 73 plf at 27.48
BC: From 22 plf at -1.85 to 22 plf at -0.13
BC: From 20 plf at 0.00 to 20 plf at 6.84
BC: From 10 plf at 6.84 to 10 plf at 18.78
BC: From 20 plf at 18.78 to 20 plf at 25.75
BC: From 22 plf at 25.75 to 22 plf at 27.48
TC: 433 lb Conc. Load at 6.84,18.78
TC: 183 lb Conc. Load at 8.88,10.88,12.88,14.75
16.75
BC: 397 lb Conc. Load at 6.84,18.78
BC: 113 lb Conc. Load at 8.88,10.88,12.88,14.75
16.75
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Left and right cantilevers are exposed to wind
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 2653 /-/-/-/2513 /-
I 2653 /-/-/-/2515 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =2.3
I Brg Width = 3.5 Min Req =2.3
Bearings M & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 1404 -1331
Chords Tens.Comp.
D - E 1404 -1331
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1040 -1050
L - K 1046 -1056
Chords Tens.Comp.
K - J 1052 -1057
J - I 1045 -1052
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - C 1508 -1478
C - K 418 -511
D - K 394 -403
Webs Tens.Comp.
K - E 414 -509
E - I 1510 -1477
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.03 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.089 D 999 360
VERT(CL):0.093 D 999 240
HORZ(LL):-0.039 H - -
HORZ(TL):0.041 H - -
Creep Factor: 2.0
Max TC CSI:0.662
Max BC CSI:0.523
Max W eb CSI:0.926
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:T214
Ply: 2
Qty:1
SEQN:12766 /HIPS
FROM:
Cust: R 761 JRef:1WTP7610004 T73
DrwNo:079.20.1313.32924
AK /DF 03/19/2020
2 Complete Trusses Required
W1
W11
6"8 24'9"8 6"8
6'11"4
6'11"4
12'11"4
6'
18'11"4
6'
25'10"8
6'11"4
8"12
8"12
6'11"8
6'2"12
12'9"12
5'10"4
18'8"
5'10"4
24'10"12
6'2"12
25'7"8
8"12
1'8"12 1'8"123'11"36'9"424'0"12
A
B
C D E
F
G
HIJKLMN
5
12
3X6
1.5X64X4
5X8
1.5X4
1.5X4
5X8 1.5X4
5X8
4X41.5X6
3X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
See DWG VAL160101014 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*92 /-/-/58 /23 /13
Wind reactions based on MWFRS
D Brg Width = 33.4 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.101
Max BC CSI:0.106
Max W eb CSI:0.035
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:v1
Ply: 1
Qty:1
SEQN:13574 /VAL
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T214
DrwNo:079.20.1313.38150
AK /DF 03/19/2020
2'9"6
2'9"6
2'9"6
0"4 1'2"313'4"15
A
B
CD
5
12
3X4(D1)
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
See DWG VAL160101014 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*92 /-/-/58 /23 /13
Wind reactions based on MWFRS
D Brg Width = 33.4 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.101
Max BC CSI:0.106
Max W eb CSI:0.035
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:v1
Ply: 1
Qty:1
SEQN:13574 /VAL
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T214
DrwNo:079.20.1313.38150
AK /DF 03/19/2020
2'9"6
2'9"6
2'9"6
0"4 1'2"313'4"15
A
B
CD
5
12
3X4(D1)
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.911'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/376 /144 /156
E 131 /-/-/102 /11 /-
D 227 /-/-/124 /128 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1577 -1822
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.043 C - -
HORZ(TL):0.099 C - -
Creep Factor: 2.0
Max TC CSI:0.607
Max BC CSI:0.542
Max W eb CSI:0.490
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J1
Ply: 1
Qty:7
SEQN:14023 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T360
DrwNo:079.20.1313.34874
AK /DF 03/19/2020
7'
7'1'8"
7"12 3'6"123'11"212'
15'3"4
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.911'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/376 /144 /156
E 131 /-/-/102 /11 /-
D 227 /-/-/124 /128 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1577 -1822
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.043 C - -
HORZ(TL):0.099 C - -
Creep Factor: 2.0
Max TC CSI:0.607
Max BC CSI:0.542
Max W eb CSI:0.490
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J1
Ply: 1
Qty:7
SEQN:14023 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T360
DrwNo:079.20.1313.34874
AK /DF 03/19/2020
7'
7'1'8"
7"12 3'6"123'11"212'
15'3"4
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Stub Wedge: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 388 /-/-/296 /113 /108
D 78 /-/-/65 /7 /-
C 128 /-/-/68 /74 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.528
Max BC CSI:0.251
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J3
Ply: 1
Qty:1
SEQN:11897 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T222
DrwNo:079.20.1313.42427
AK /DF 03/19/2020
4'4"
4'4"1'8"
7"12 2'5"72'9"1312'
14'1"15
A
B
C
D
5
12
3X5(G1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Stub Wedge: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 388 /-/-/296 /113 /108
D 78 /-/-/65 /7 /-
C 128 /-/-/68 /74 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.528
Max BC CSI:0.251
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J3
Ply: 1
Qty:1
SEQN:11897 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T222
DrwNo:079.20.1313.42427
AK /DF 03/19/2020
4'4"
4'4"1'8"
7"12 2'5"72'9"1312'
14'1"15
A
B
C
D
5
12
3X5(G1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 370 /-/-/284 /110 /99
F 29 /-/-/26 /12 /-
E 118 /-/-/83 /57 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 297 -412
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 C 999 360
VERT(CL):0.019 C 999 240
HORZ(LL):-0.005 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.594
Max BC CSI:0.111
Max W eb CSI:0.100
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J4
Ply: 1
Qty:2
SEQN:12139 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T81
DrwNo:079.20.1313.42395
AK /DF 03/19/2020
3'0"12
3'0"12
3'10"8
9"12
3'2"8
3'2"8
3'10"8
8"1'8"
7"12 10"1'5"22'3"22'7"812'
12'10"
13'11"10
A
B
C
D
E
F
GH
5
12
4X6(E5)
3X4
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 370 /-/-/284 /110 /99
F 29 /-/-/26 /12 /-
E 118 /-/-/83 /57 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 297 -412
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 C 999 360
VERT(CL):0.019 C 999 240
HORZ(LL):-0.005 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.594
Max BC CSI:0.111
Max W eb CSI:0.100
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J4
Ply: 1
Qty:2
SEQN:12139 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T81
DrwNo:079.20.1313.42395
AK /DF 03/19/2020
3'0"12
3'0"12
3'10"8
9"12
3'2"8
3'2"8
3'10"8
8"1'8"
7"12 10"1'5"22'3"22'7"812'
12'10"
13'11"10
A
B
C
D
E
F
GH
5
12
4X6(E5)
3X4
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 329 /-/-/256 /101 /78
E 48 /-/-/39 /2 /-
D 50 /-/-/30 /38 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.062
Max W eb CSI:0.045
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J5
Ply: 1
Qty:5
SEQN:12148 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T204
DrwNo:079.20.1313.27870
AK /DF 03/19/2020
2'8"
2'8"1'8"
7"12 1'9"12'1"712'
13'5"9
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 329 /-/-/256 /101 /78
E 48 /-/-/39 /2 /-
D 50 /-/-/30 /38 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.062
Max W eb CSI:0.045
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J5
Ply: 1
Qty:5
SEQN:12148 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T204
DrwNo:079.20.1313.27870
AK /DF 03/19/2020
2'8"
2'8"1'8"
7"12 1'9"12'1"712'
13'5"9
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 123 /-/-/88 /28 /47
D 51 /-/-/40 /4 /-
C 93 /-/-/52 /53 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 B - -
HORZ(TL):0.007 B - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.070
Max W eb CSI:0.072
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J5A
Ply: 1
Qty:1
SEQN:12145 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T205
DrwNo:079.20.1313.42566
AK /DF 03/19/2020
2'8"
2'8"
7"12 1'9"112'
13'5"9
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 123 /-/-/88 /28 /47
D 51 /-/-/40 /4 /-
C 93 /-/-/52 /53 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 B - -
HORZ(TL):0.007 B - -
Creep Factor: 2.0
Max TC CSI:0.244
Max BC CSI:0.070
Max W eb CSI:0.072
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J5A
Ply: 1
Qty:1
SEQN:12145 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T205
DrwNo:079.20.1313.42566
AK /DF 03/19/2020
2'8"
2'8"
7"12 1'9"112'
13'5"9
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 320 /-/-/250 /104 /70
E 41 /-/-/33 /2 /-
D 27 /-/-/29 /27 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.043
Max W eb CSI:0.025
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J6
Ply: 1
Qty:2
SEQN:12133 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T227
DrwNo:079.20.1313.42457
AK /DF 03/19/2020
2'3"4
2'3"41'8"
7"12 1'7"21'11"812'
13'3"10
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 320 /-/-/250 /104 /70
E 41 /-/-/33 /2 /-
D 27 /-/-/29 /27 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.043
Max W eb CSI:0.025
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J6
Ply: 1
Qty:2
SEQN:12133 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T227
DrwNo:079.20.1313.42457
AK /DF 03/19/2020
2'3"4
2'3"41'8"
7"12 1'7"21'11"812'
13'3"10
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 105 /-/-/75 /23 /40
D 43 /-/-/34 /3 /-
C 80 /-/-/45 /46 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 B - -
HORZ(TL):0.004 B - -
Creep Factor: 2.0
Max TC CSI:0.184
Max BC CSI:0.048
Max W eb CSI:0.041
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J6A
Ply: 1
Qty:1
SEQN:12130 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T247
DrwNo:079.20.1313.41489
AK /DF 03/19/2020
2'3"4
2'3"4
7"12 1'7"212'
13'3"10
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 105 /-/-/75 /23 /40
D 43 /-/-/34 /3 /-
C 80 /-/-/45 /46 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 B - -
HORZ(TL):0.004 B - -
Creep Factor: 2.0
Max TC CSI:0.184
Max BC CSI:0.048
Max W eb CSI:0.041
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J6A
Ply: 1
Qty:1
SEQN:12130 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T247
DrwNo:079.20.1313.41489
AK /DF 03/19/2020
2'3"4
2'3"4
7"12 1'7"212'
13'3"10
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/354 /136 /143
E 117 /-/-/90 /9 /-
D 200 /-/-/108 /113 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1284 -1511
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.026 C - -
HORZ(TL):0.061 C - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.425
Max W eb CSI:0.397
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J7
Ply: 1
Qty:6
SEQN:12122 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T224
DrwNo:079.20.1313.40756
AK /DF 03/19/2020
6'3"4
6'3"41'8"
7"12 3'3"23'7"812'
14'11"10
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 468 /-/-/354 /136 /143
E 117 /-/-/90 /9 /-
D 200 /-/-/108 /113 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1284 -1511
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.026 C - -
HORZ(TL):0.061 C - -
Creep Factor: 2.0
Max TC CSI:0.509
Max BC CSI:0.425
Max W eb CSI:0.397
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J7
Ply: 1
Qty:6
SEQN:12122 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T224
DrwNo:079.20.1313.40756
AK /DF 03/19/2020
6'3"4
6'3"41'8"
7"12 3'3"23'7"812'
14'11"10
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 290 /-/-/209 /73 /112
D 120 /-/-/94 /11 /-
C 217 /-/-/122 /119 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1679 -1868
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.035 B - -
HORZ(TL):0.081 B - -
Creep Factor: 2.0
Max TC CSI:0.547
Max BC CSI:0.443
Max W eb CSI:0.479
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J7A
Ply: 1
Qty:2
SEQN:12119 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T225
DrwNo:079.20.1313.27091
AK /DF 03/19/2020
6'3"4
6'3"4
7"12 3'3"212'
14'11"10
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.713'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 290 /-/-/209 /73 /112
D 120 /-/-/94 /11 /-
C 217 /-/-/122 /119 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1679 -1868
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.035 B - -
HORZ(TL):0.081 B - -
Creep Factor: 2.0
Max TC CSI:0.547
Max BC CSI:0.443
Max W eb CSI:0.479
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J7A
Ply: 1
Qty:2
SEQN:12119 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T225
DrwNo:079.20.1313.27091
AK /DF 03/19/2020
6'3"4
6'3"4
7"12 3'3"212'
14'11"10
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.668'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 461 /-/-/349 /134 /140
E 116 /-/-/90 /11 /-
D 190 /-/-/103 /108 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1442 -1663
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.030 C - -
HORZ(TL):0.069 C - -
Creep Factor: 2.0
Max TC CSI:0.967
Max BC CSI:0.419
Max W eb CSI:0.441
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J8
Ply: 1
Qty:1
SEQN:12113 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T344
DrwNo:079.20.1313.41458
AK /DF 03/19/2020
6'1"4
6'1"41'8"
7"12 3'2"43'6"1012'
14'10"12
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.668'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 461 /-/-/349 /134 /140
E 116 /-/-/90 /11 /-
D 190 /-/-/103 /108 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1442 -1663
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.030 C - -
HORZ(TL):0.069 C - -
Creep Factor: 2.0
Max TC CSI:0.967
Max BC CSI:0.419
Max W eb CSI:0.441
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J8
Ply: 1
Qty:1
SEQN:12113 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T344
DrwNo:079.20.1313.41458
AK /DF 03/19/2020
6'1"4
6'1"41'8"
7"12 3'2"43'6"1012'
14'10"12
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.668'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 282 /-/-/203 /71 /109
D 117 /-/-/92 /10 /-
C 211 /-/-/118 /116 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1613 -1799
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.031 B - -
HORZ(TL):0.073 B - -
Creep Factor: 2.0
Max TC CSI:0.525
Max BC CSI:0.422
Max W eb CSI:0.458
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J8A
Ply: 1
Qty:1
SEQN:12107 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T257
DrwNo:079.20.1313.38166
AK /DF 03/19/2020
6'1"4
6'1"4
7"12 3'2"412'
14'10"12
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.668'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 282 /-/-/203 /71 /109
D 117 /-/-/92 /10 /-
C 211 /-/-/118 /116 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1613 -1799
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.031 B - -
HORZ(TL):0.073 B - -
Creep Factor: 2.0
Max TC CSI:0.525
Max BC CSI:0.422
Max W eb CSI:0.458
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J8A
Ply: 1
Qty:1
SEQN:12107 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T257
DrwNo:079.20.1313.38166
AK /DF 03/19/2020
6'1"4
6'1"4
7"12 3'2"412'
14'10"12
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 198 /-/-/142 /48 /76
D 83 /-/-/66 /8 /-
C 146 /-/-/81 /82 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 917 -1051
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 B - -
HORZ(TL):0.029 B - -
Creep Factor: 2.0
Max TC CSI:0.578
Max BC CSI:0.232
Max W eb CSI:0.262
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J9
Ply: 1
Qty:1
SEQN:12101 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T265
DrwNo:079.20.1313.34360
AK /DF 03/19/2020
4'3"4
4'3"4
7"12 2'5"112'
14'1"9
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 198 /-/-/142 /48 /76
D 83 /-/-/66 /8 /-
C 146 /-/-/81 /82 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 917 -1051
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 B - -
HORZ(TL):0.029 B - -
Creep Factor: 2.0
Max TC CSI:0.578
Max BC CSI:0.232
Max W eb CSI:0.262
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J9
Ply: 1
Qty:1
SEQN:12101 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T265
DrwNo:079.20.1313.34360
AK /DF 03/19/2020
4'3"4
4'3"4
7"12 2'5"112'
14'1"9
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4(**) except as noted.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/319 /132 /93
F 70 /-/-/54 /14 /-
E 130 /-/-/79 /65 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.028 J 999 360
VERT(CL):0.065 J 868 240
HORZ(LL):0.012 H - -
HORZ(TL):0.027 H - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.146
Max W eb CSI:0.101
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J10
Ply: 1
Qty:3
SEQN:12069 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T268
DrwNo:079.20.1313.42752
AK /DF 03/19/2020
2'10"2
2'10"2
4'9"12
1'11"10
1'4"2
1'4"2
2'8"
1'3"14
3'10"12
1'2"12
4'9"12
11"1'8"
6"1 1'1'1"52'1"52'5"1012'
13'
13'9"13
A
B
C
D
E
F
GHI
JKL
4 12
2X5(B1)
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4(**) except as noted.
(**) 4 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/319 /132 /93
F 70 /-/-/54 /14 /-
E 130 /-/-/79 /65 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.028 J 999 360
VERT(CL):0.065 J 868 240
HORZ(LL):0.012 H - -
HORZ(TL):0.027 H - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.146
Max W eb CSI:0.101
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J10
Ply: 1
Qty:3
SEQN:12069 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T268
DrwNo:079.20.1313.42752
AK /DF 03/19/2020
2'10"2
2'10"2
4'9"12
1'11"10
1'4"2
1'4"2
2'8"
1'3"14
3'10"12
1'2"12
4'9"12
11"1'8"
6"1 1'1'1"52'1"52'5"1012'
13'
13'9"13
A
B
C
D
E
F
GHI
JKL
4 12
2X5(B1)
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 489 /-/-/398 /171 /96
E 66 /-/-/64 /12 /-
D 115 /-/-/45 /62 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1503 -1575
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 E 738 360
VERT(CL):0.027 C 999 240
HORZ(LL):0.010 C - -
HORZ(TL):0.018 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.254
Max W eb CSI:0.344
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J11
Ply: 1
Qty:2
SEQN:12084 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T351
DrwNo:079.20.1313.39305
AK /DF 03/19/2020
8"
5'0"4
5'0"41'8"
6"1 2'2"22'6"712'
13'10"10
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 489 /-/-/398 /171 /96
E 66 /-/-/64 /12 /-
D 115 /-/-/45 /62 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1503 -1575
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 E 738 360
VERT(CL):0.027 C 999 240
HORZ(LL):0.010 C - -
HORZ(TL):0.018 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.254
Max W eb CSI:0.344
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J11
Ply: 1
Qty:2
SEQN:12084 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T351
DrwNo:079.20.1313.39305
AK /DF 03/19/2020
8"
5'0"4
5'0"41'8"
6"1 2'2"22'6"712'
13'10"10
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 274 /-/-/221 /71 /72
D 80 /-/-/63 /12 /-
C 136 /-/-/75 /75 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1080 -1173
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 B 999 360
VERT(CL):0.052 B 973 240
HORZ(LL):-0.015 B - -
HORZ(TL):0.034 B - -
Creep Factor: 2.0
Max TC CSI:0.534
Max BC CSI:0.340
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J11A
Ply: 1
Qty:1
SEQN:12087 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T352
DrwNo:079.20.1313.31100
AK /DF 03/19/2020
8"
5'0"4
5'0"4
6"1 2'2"212'
13'10"10
A
B
C
D
4 12
2X5(C3)
3X4(C3)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 274 /-/-/221 /71 /72
D 80 /-/-/63 /12 /-
C 136 /-/-/75 /75 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1080 -1173
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 B 999 360
VERT(CL):0.052 B 973 240
HORZ(LL):-0.015 B - -
HORZ(TL):0.034 B - -
Creep Factor: 2.0
Max TC CSI:0.534
Max BC CSI:0.340
Max W eb CSI:0.299
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J11A
Ply: 1
Qty:1
SEQN:12087 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T352
DrwNo:079.20.1313.31100
AK /DF 03/19/2020
8"
5'0"4
5'0"4
6"1 2'2"212'
13'10"10
A
B
C
D
4 12
2X5(C3)
3X4(C3)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.925'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/366 /206 /203
E 131 /-/-/103 /18 /-
D 226 /-/-/109 /176 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1464 -1723
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.063 C - -
HORZ(TL):0.103 C - -
Creep Factor: 2.0
Max TC CSI:0.662
Max BC CSI:0.546
Max W eb CSI:0.483
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J12
Ply: 1
Qty:20
SEQN:11506 /EJAC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T16
DrwNo:079.20.1313.40725
AK /DF 03/19/2020
7'
7'1'8"
8"3 3'7"33'11"220'
23'3"11
A
B
C
D
E
5
12
3X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.925'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/366 /206 /203
E 131 /-/-/103 /18 /-
D 226 /-/-/109 /176 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1464 -1723
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.063 C - -
HORZ(TL):0.103 C - -
Creep Factor: 2.0
Max TC CSI:0.662
Max BC CSI:0.546
Max W eb CSI:0.483
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J12
Ply: 1
Qty:20
SEQN:11506 /EJAC
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T16
DrwNo:079.20.1313.40725
AK /DF 03/19/2020
7'
7'1'8"
8"3 3'7"33'11"220'
23'3"11
A
B
C
D
E
5
12
3X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/329 /223 /196
D 107 /-/-/85 /16 /-
C 175 /-/-/73 /157 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.008 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.928
Max BC CSI:0.363
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13
Ply: 1
Qty:2
SEQN:11926 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T45
DrwNo:079.20.1313.42628
AK /DF 03/19/2020
5'9"4
5'9"41'8"
6"3 2'11"13'5"24'0"12
26'8"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/329 /223 /196
D 107 /-/-/85 /16 /-
C 175 /-/-/73 /157 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.008 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.928
Max BC CSI:0.363
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13
Ply: 1
Qty:2
SEQN:11926 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T45
DrwNo:079.20.1313.42628
AK /DF 03/19/2020
5'9"4
5'9"41'8"
6"3 2'11"13'5"24'0"12
26'8"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/329 /223 /196
E 129 /-/-/101 /66 /-
D 126 /-/-/57 /107 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 229 -470
Chords Tens.Comp.
H - F 409 -833
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 846 -415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.024 G 999 360
VERT(CL):0.039 G 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.014 F - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.200
Max W eb CSI:0.405
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13A
Ply: 1
Qty:5
SEQN:12190 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T47
DrwNo:079.20.1313.40225
AK /DF 03/19/2020
2'2"8
2'2"8
5'9"4
3'6"12
2'6"
2'6"
5'7"12
3'1"12
5'9"4
1"81'8"
6"3 6"2'5"12'11"13'5"24'0"12
24'6"12
26'8"5
A
B
C
D
E F
GHI
5
12
3X4(B1)3X31.5X4
3X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/329 /223 /196
E 129 /-/-/101 /66 /-
D 126 /-/-/57 /107 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 229 -470
Chords Tens.Comp.
H - F 409 -833
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 846 -415
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.024 G 999 360
VERT(CL):0.039 G 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.014 F - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.200
Max W eb CSI:0.405
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13A
Ply: 1
Qty:5
SEQN:12190 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T47
DrwNo:079.20.1313.40225
AK /DF 03/19/2020
2'2"8
2'2"8
5'9"4
3'6"12
2'6"
2'6"
5'7"12
3'1"12
5'9"4
1"81'8"
6"3 6"2'5"12'11"13'5"24'0"12
24'6"12
26'8"5
A
B
C
D
E F
GHI
5
12
3X4(B1)3X31.5X4
3X4
3X3
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/328 /223 /196
G 52 /-/-/35 /37 /-
F 183 /-/-/116 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.118 L 577 360
VERT(CL):0.183 L 371 240
HORZ(LL):-0.103 H - -
HORZ(TL):0.160 H - -
Creep Factor: 2.0
Max TC CSI:0.731
Max BC CSI:0.181
Max W eb CSI:0.195
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13B
Ply: 1
Qty:1
SEQN:12193 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T236
DrwNo:079.20.1313.27559
AK /DF 03/19/2020
2'0"12
2'0"12
5'9"4
3'8"8
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
5'9"4
7"4
1'8"
6"3 6"2'5"11'6"2'11"13'5"24'0"12
24'6"12
26'8"5
A
B
C
D
E F
G
HI
JK
LMN
5
12
3X4(B1)
1.5X4
3X31.5X4
1.5X4(**)4X4
1.5X4
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 455 /-/-/328 /223 /196
G 52 /-/-/35 /37 /-
F 183 /-/-/116 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.43 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.118 L 577 360
VERT(CL):0.183 L 371 240
HORZ(LL):-0.103 H - -
HORZ(TL):0.160 H - -
Creep Factor: 2.0
Max TC CSI:0.731
Max BC CSI:0.181
Max W eb CSI:0.195
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J13B
Ply: 1
Qty:1
SEQN:12193 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T236
DrwNo:079.20.1313.27559
AK /DF 03/19/2020
2'0"12
2'0"12
5'9"4
3'8"8
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
5'9"4
7"4
1'8"
6"3 6"2'5"11'6"2'11"13'5"24'0"12
24'6"12
26'8"5
A
B
C
D
E F
G
HI
JK
LMN
5
12
3X4(B1)
1.5X4
3X31.5X4
1.5X4(**)4X4
1.5X4
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 469 /-/-/338 /230 /205
E 85 /-/-/67 /14 /-
D 202 /-/-/99 /171 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.122 F 589 360
VERT(CL):0.184 F 391 240
HORZ(LL):-0.053 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.225
Max W eb CSI:0.114
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J14
Ply: 1
Qty:2
SEQN:12225 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T60
DrwNo:079.20.1313.40242
AK /DF 03/19/2020
2'0"12
2'0"12
6'1"4
4'0"8
2'6"
2'6"
6'1"4
3'7"41'8"
6"3 6"2'6"113'0"113'6"1024'0"12
24'6"12
26'9"15
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 469 /-/-/338 /230 /205
E 85 /-/-/67 /14 /-
D 202 /-/-/99 /171 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.122 F 589 360
VERT(CL):0.184 F 391 240
HORZ(LL):-0.053 C - -
HORZ(TL):0.078 C - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.225
Max W eb CSI:0.114
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J14
Ply: 1
Qty:2
SEQN:12225 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T60
DrwNo:079.20.1313.40242
AK /DF 03/19/2020
2'0"12
2'0"12
6'1"4
4'0"8
2'6"
2'6"
6'1"4
3'7"41'8"
6"3 6"2'6"113'0"113'6"1024'0"12
24'6"12
26'9"15
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 377 /-/-/278 /186 /141
D 65 /-/-/58 /8 /-
C 97 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.132
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J15
Ply: 1
Qty:3
SEQN:11936 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T36
DrwNo:079.20.1313.41348
AK /DF 03/19/2020
3'9"4
3'9"41'8"
6"3 2'1"12'7"24'0"12
25'10"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 377 /-/-/278 /186 /141
D 65 /-/-/58 /8 /-
C 97 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.132
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J15
Ply: 1
Qty:3
SEQN:11936 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T36
DrwNo:079.20.1313.41348
AK /DF 03/19/2020
3'9"4
3'9"41'8"
6"3 2'1"12'7"24'0"12
25'10"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 557 /-/-/344 /197 /403
E 113 /-/-/146 /223 /-
D 183 /-/-/68 /179 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 105 -656
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - C 515 -415
Webs Tens.Comp.
C - F 780 -125
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.03 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.019 H 358 360
VERT(CL):-0.020 H 999 240
HORZ(LL):-0.008 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.529
Max BC CSI:0.370
Max W eb CSI:0.273
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J16
Ply: 1
Qty:7
SEQN:12304 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T83
DrwNo:079.20.1313.40913
AK /DF 03/19/2020
6"8
10"
10"
6'11"4
6'1"4
6"12
6"12
6'7"1
6'0"5
6'9"12
2"111'8"123'11"36'9"424'0"12
30'6"8
A
B
C
D
E FGH
5 12
1.5X4
2X41.5X4
3X4
5X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 557 /-/-/344 /197 /403
E 113 /-/-/146 /223 /-
D 183 /-/-/68 /179 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 105 -656
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - C 515 -415
Webs Tens.Comp.
C - F 780 -125
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.03 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.019 H 358 360
VERT(CL):-0.020 H 999 240
HORZ(LL):-0.008 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.529
Max BC CSI:0.370
Max W eb CSI:0.273
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J16
Ply: 1
Qty:7
SEQN:12304 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T83
DrwNo:079.20.1313.40913
AK /DF 03/19/2020
6"8
10"
10"
6'11"4
6'1"4
6"12
6"12
6'7"1
6'0"5
6'9"12
2"111'8"123'11"36'9"424'0"12
30'6"8
A
B
C
D
E FGH
5 12
1.5X4
2X41.5X4
3X4
5X5
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 439 /-/-/318 /215 /185
D 98 /-/-/80 /14 /-
C 160 /-/-/66 /144 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.007 D - -
Creep Factor: 2.0
Max TC CSI:0.814
Max BC CSI:0.306
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J18
Ply: 1
Qty:1
SEQN:11955 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T163
DrwNo:079.20.1313.41520
AK /DF 03/19/2020
5'4"8
5'4"81'8"
6"3 2'9"13'3"24'0"12
26'6"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 439 /-/-/318 /215 /185
D 98 /-/-/80 /14 /-
C 160 /-/-/66 /144 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.35 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.007 D - -
Creep Factor: 2.0
Max TC CSI:0.814
Max BC CSI:0.306
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J18
Ply: 1
Qty:1
SEQN:11955 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T163
DrwNo:079.20.1313.41520
AK /DF 03/19/2020
5'4"8
5'4"81'8"
6"3 2'9"13'3"24'0"12
26'6"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 364 /-/-/270 /180 /130
D 57 /-/-/53 /9 /-
C 80 /-/-/28 /79 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.113
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J19
Ply: 1
Qty:1
SEQN:11664 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T166
DrwNo:079.20.1313.42598
AK /DF 03/19/2020
3'4"8
3'4"81'8"
6"3 1'11"12'5"24'0"12
25'8"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 364 /-/-/270 /180 /130
D 57 /-/-/53 /9 /-
C 80 /-/-/28 /79 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.93 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.113
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J19
Ply: 1
Qty:1
SEQN:11664 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T166
DrwNo:079.20.1313.42598
AK /DF 03/19/2020
3'4"8
3'4"81'8"
6"3 1'11"12'5"24'0"12
25'8"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 465 /-/-/335 /228 /202
D 111 /-/-/88 /17 /-
C 183 /-/-/77 /164 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.48 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.009 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.996
Max BC CSI:0.398
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J20
Ply: 1
Qty:2
SEQN:11925 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T138
DrwNo:079.20.1313.42739
AK /DF 03/19/2020
6'
6'1'8"
6"3 3'0"33'6"224'0"12
26'9"7
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 465 /-/-/335 /228 /202
D 111 /-/-/88 /17 /-
C 183 /-/-/77 /164 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.48 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.009 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.996
Max BC CSI:0.398
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J20
Ply: 1
Qty:2
SEQN:11925 /EJAC
FROM:
Cust: R 761 JRef:1WTP7610004 T138
DrwNo:079.20.1313.42739
AK /DF 03/19/2020
6'
6'1'8"
6"3 3'0"33'6"224'0"12
26'9"7
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 517 /-/-/384 /233 /287
H 454 /-/-/197 /371 /-
F 137 /-/-/138 /33 /-
E 26 /-28 /-/15 /5 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 275 -392
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 474 -318
H - G 585 -244
Webs Tens.Comp.
G - D 593 -229
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 C 999 360
VERT(CL):0.008 C 999 240
HORZ(LL):-0.005 H - -
HORZ(TL):0.006 H - -
Creep Factor: 2.0
Max TC CSI:0.529
Max BC CSI:0.492
Max W eb CSI:0.170
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J21
Ply: 1
Qty:2
SEQN:12273 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T346
DrwNo:079.20.1313.36263
AK /DF 03/19/2020
7'7"
3'11"15
3'11"15
7'8"13
3'8"13
9'
1'3"3
7'9"4
7'9"4
8'10"2
1'0"14
9'
1"14
1'8"
6"3 1'3'3"34'3"34'9"224'0"12
25'0"12
28'0"7
A
B
C
D
E
F
GH
5
12
3X4(B1)
1.5X4
6X63X3
3X8
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 517 /-/-/384 /233 /287
H 454 /-/-/197 /371 /-
F 137 /-/-/138 /33 /-
E 26 /-28 /-/15 /5 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
H Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & H Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 275 -392
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 474 -318
H - G 585 -244
Webs Tens.Comp.
G - D 593 -229
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 C 999 360
VERT(CL):0.008 C 999 240
HORZ(LL):-0.005 H - -
HORZ(TL):0.006 H - -
Creep Factor: 2.0
Max TC CSI:0.529
Max BC CSI:0.492
Max W eb CSI:0.170
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J21
Ply: 1
Qty:2
SEQN:12273 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T346
DrwNo:079.20.1313.36263
AK /DF 03/19/2020
7'7"
3'11"15
3'11"15
7'8"13
3'8"13
9'
1'3"3
7'9"4
7'9"4
8'10"2
1'0"14
9'
1"14
1'8"
6"3 1'3'3"34'3"34'9"224'0"12
25'0"12
28'0"7
A
B
C
D
E
F
GH
5
12
3X4(B1)
1.5X4
6X63X3
3X8
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W1 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 573 /-/-/397 /281 /287
G 195 /-/-/154 /71 /-
F 201 /-/-/99 /166 /-
E 86 /-/-/28 /66 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 190 -458
Chords Tens.Comp.
C - D 1056 -965
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 348 -484
K - I 382 -590
Chords Tens.Comp.
I - H 377 -591
H - F 381 -593
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 417 -276
K - D 614 -768
Webs Tens.Comp.
D - F 732 -470
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.071 K 999 360
VERT(CL):0.112 K 823 240
HORZ(LL):-0.059 G - -
HORZ(TL):0.097 G - -
Creep Factor: 2.0
Max TC CSI:0.296
Max BC CSI:0.154
Max W eb CSI:0.585
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J21A
Ply: 1
Qty:1
SEQN:12278 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T136
DrwNo:079.20.1313.42551
AK /DF 03/19/2020
B2W1
7'7"
3'10"4
3'10"4
6'4"4
2'6"
9'
2'7"12
4'
4'
5'5"12
1'5"12
7'7"8
2'1"12
9'
1'4"81'8"
6"3 4'3"31'4'9"224'0"12
25'0"12
28'0"7
A
B
C
D
E
FGHIJ
K L
5
12
3X4(B1)
4X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W1 2x4 SP 2250f-1.9E;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 573 /-/-/397 /281 /287
G 195 /-/-/154 /71 /-
F 201 /-/-/99 /166 /-
E 86 /-/-/28 /66 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
G Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 190 -458
Chords Tens.Comp.
C - D 1056 -965
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 348 -484
K - I 382 -590
Chords Tens.Comp.
I - H 377 -591
H - F 381 -593
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - K 417 -276
K - D 614 -768
Webs Tens.Comp.
D - F 732 -470
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.11 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.071 K 999 360
VERT(CL):0.112 K 823 240
HORZ(LL):-0.059 G - -
HORZ(TL):0.097 G - -
Creep Factor: 2.0
Max TC CSI:0.296
Max BC CSI:0.154
Max W eb CSI:0.585
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J21A
Ply: 1
Qty:1
SEQN:12278 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T136
DrwNo:079.20.1313.42551
AK /DF 03/19/2020
B2W1
7'7"
3'10"4
3'10"4
6'4"4
2'6"
9'
2'7"12
4'
4'
5'5"12
1'5"12
7'7"8
2'1"12
9'
1'4"81'8"
6"3 4'3"31'4'9"224'0"12
25'0"12
28'0"7
A
B
C
D
E
FGHIJ
K L
5
12
3X4(B1)
4X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 469 /-/-/338 /230 /205
E 150 /-/-/116 /95 /-
D 108 /-/-/51 /90 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 242 -452
Chords Tens.Comp.
H - F 358 -672
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 706 -375
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.020 G 999 360
VERT(CL):0.035 G 999 240
HORZ(LL):-0.009 F - -
HORZ(TL):0.013 F - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.184
Max W eb CSI:0.383
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J22
Ply: 1
Qty:6
SEQN:12340 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T15
DrwNo:079.20.1313.31240
AK /DF 03/19/2020
3'0"9
3'0"9
6'1"4
3'0"11
3'6"9
3'6"9
5'11"4
2'4"11
6'1"4
2"1'8"
6"3 6"2'6"113'0"113'6"1024'0"12
24'6"12
26'9"15
A
B
C
D
EF
GHI
5
12
3X4(B1)3X31.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 469 /-/-/338 /230 /205
E 150 /-/-/116 /95 /-
D 108 /-/-/51 /90 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 242 -452
Chords Tens.Comp.
H - F 358 -672
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 706 -375
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.50 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.020 G 999 360
VERT(CL):0.035 G 999 240
HORZ(LL):-0.009 F - -
HORZ(TL):0.013 F - -
Creep Factor: 2.0
Max TC CSI:0.596
Max BC CSI:0.184
Max W eb CSI:0.383
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:J22
Ply: 1
Qty:6
SEQN:12340 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T15
DrwNo:079.20.1313.31240
AK /DF 03/19/2020
3'0"9
3'0"9
6'1"4
3'0"11
3'6"9
3'6"9
5'11"4
2'4"11
6'1"4
2"1'8"
6"3 6"2'6"113'0"113'6"1024'0"12
24'6"12
26'9"15
A
B
C
D
EF
GHI
5
12
3X4(B1)3X31.5X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/178 /-
F 378 /-/-/-/69 /-
E 316 /-/-/-/181 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 316 -854
Chords Tens.Comp.
C - D 311 -847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 787 -293
Chords Tens.Comp.
H - G 780 -296
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 317 -833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):-0.063 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.478
Max W eb CSI:0.409
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ1
Ply: 1
Qty:3
SEQN:12060 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T371
DrwNo:079.20.1313.29633
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'6"15
4'8"
9'10"13
3"142'4"5
7"8 3'6"83'11"12'
15'3"
A
B
C
D
E
FGH
3.54 12
4X5(E1)
3X4
1.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/178 /-
F 378 /-/-/-/69 /-
E 316 /-/-/-/181 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 316 -854
Chords Tens.Comp.
C - D 311 -847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 787 -293
Chords Tens.Comp.
H - G 780 -296
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 317 -833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):-0.063 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.478
Max W eb CSI:0.409
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ1
Ply: 1
Qty:3
SEQN:12060 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T371
DrwNo:079.20.1313.29633
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'6"15
4'8"
9'10"13
3"142'4"5
7"8 3'6"83'11"12'
15'3"
A
B
C
D
E
FGH
3.54 12
4X5(E1)
3X4
1.5X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/178 /-
F 378 /-/-/-/69 /-
E 316 /-/-/-/181 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 316 -854
Chords Tens.Comp.
C - D 311 -847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 787 -293
Chords Tens.Comp.
H - G 780 -296
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 317 -833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):-0.063 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.478
Max W eb CSI:0.409
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ1
Ply: 1
Qty:1
SEQN:14014 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T6
DrwNo:079.20.1313.39759
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'6"15
4'8"
9'10"13
3"142'4"5
7"8 3'6"83'11"12'
15'3"
A
B
C
D
E
FGH
3.54 12
4X5(E1)
3X4
1.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/178 /-
F 378 /-/-/-/69 /-
E 316 /-/-/-/181 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 316 -854
Chords Tens.Comp.
C - D 311 -847
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 787 -293
Chords Tens.Comp.
H - G 780 -296
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 317 -833
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.027 C 999 360
VERT(CL):-0.063 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.881
Max BC CSI:0.478
Max W eb CSI:0.409
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ1
Ply: 1
Qty:1
SEQN:14014 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T6
DrwNo:079.20.1313.39759
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'6"15
4'8"
9'10"13
3"142'4"5
7"8 3'6"83'11"12'
15'3"
A
B
C
D
E
FGH
3.54 12
4X5(E1)
3X4
1.5X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 5-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/-/123 /-
F 232 /-/-/-/37 /-
E 212 /-/-/-/124 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 302 -719
Chords Tens.Comp.
C - D 258 -439
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 409 -240
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 255 -434
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.009 C 999 360
VERT(CL):0.020 D 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.008 C - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.457
Max W eb CSI:0.221
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ2
Ply: 1
Qty:1
SEQN:12054 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T262
DrwNo:079.20.1313.35015
AK /DF 03/19/2020
3'11"9
3'11"9
8'0"3
4'0"9
7'8"2
7'8"2
8'0"3
4"2'4"5
7"8 2'11"143'4"512'
14'8"6
A
B
C
D
E
FG
3.54 12
4X5(E1)
3X4
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 5-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 414 /-/-/-/123 /-
F 232 /-/-/-/37 /-
E 212 /-/-/-/124 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 302 -719
Chords Tens.Comp.
C - D 258 -439
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 409 -240
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 255 -434
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.009 C 999 360
VERT(CL):0.020 D 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.008 C - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.457
Max W eb CSI:0.221
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ2
Ply: 1
Qty:1
SEQN:12054 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T262
DrwNo:079.20.1313.35015
AK /DF 03/19/2020
3'11"9
3'11"9
8'0"3
4'0"9
7'8"2
7'8"2
8'0"3
4"2'4"5
7"8 2'11"143'4"512'
14'8"6
A
B
C
D
E
FG
3.54 12
4X5(E1)
3X4
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 4-4-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/-/101 /-
E 56 /-/-/22 /-/-
D 166 /-/-/-/107 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.869
Max BC CSI:0.179
Max W eb CSI:0.094
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ3
Ply: 1
Qty:1
SEQN:12043 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T7
DrwNo:079.20.1313.27230
AK /DF 03/19/2020
6'1"9
6'1"92'4"5
7"8 2'5"32'9"1012'
14'1"11
A
B
C
D
E
3.54 12
4X5(E1)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 4-4-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/-/101 /-
E 56 /-/-/22 /-/-
D 166 /-/-/-/107 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.869
Max BC CSI:0.179
Max W eb CSI:0.094
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ3
Ply: 1
Qty:1
SEQN:12043 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T7
DrwNo:079.20.1313.27230
AK /DF 03/19/2020
6'1"9
6'1"92'4"5
7"8 2'5"32'9"1012'
14'1"11
A
B
C
D
E
3.54 12
4X5(E1)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 3-10-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 298 /-/-/-/81 /-
F 32 /-/-/-/6 /-
E 144 /-/-/-/62 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.017 G 999 360
VERT(CL):0.039 G 999 240
HORZ(LL):0.005 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.066
Max W eb CSI:0.057
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ4
Ply: 1
Qty:2
SEQN:12142 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T197
DrwNo:079.20.1313.32550
AK /DF 03/19/2020
4'3"7
4'3"7
5'5"12
1'2"6
4'8"11
4'8"11
5'5"12
9"22'4"5
7"8 10"1'4"142'2"142'7"612'
12'10"
13'11"6
A
B
C
D
E
F
GHI
3.54 12
4X5(E1)
3X4
3X31.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 3-10-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 298 /-/-/-/81 /-
F 32 /-/-/-/6 /-
E 144 /-/-/-/62 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.017 G 999 360
VERT(CL):0.039 G 999 240
HORZ(LL):0.005 D - -
HORZ(TL):0.013 D - -
Creep Factor: 2.0
Max TC CSI:0.673
Max BC CSI:0.066
Max W eb CSI:0.057
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ4
Ply: 1
Qty:2
SEQN:12142 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T197
DrwNo:079.20.1313.32550
AK /DF 03/19/2020
4'3"7
4'3"7
5'5"12
1'2"6
4'8"11
4'8"11
5'5"12
9"22'4"5
7"8 10"1'4"142'2"142'7"612'
12'10"
13'11"6
A
B
C
D
E
F
GHI
3.54 12
4X5(E1)
3X4
3X31.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 2-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 297 /-/-/-/73 /-
E 14 /-/-/10 /-/-
D 14 /-/-/-/29 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.734
Max BC CSI:0.068
Max W eb CSI:0.075
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ5
Ply: 1
Qty:1
SEQN:12151 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T196
DrwNo:079.20.1313.28229
AK /DF 03/19/2020
3'9"4
3'9"42'4"5
7"8 1'8"142'1"512'
13'5"6
A
B
C
D
E
3.54 12
4X5(E1)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 2-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 297 /-/-/-/73 /-
E 14 /-/-/10 /-/-
D 14 /-/-/-/29 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.734
Max BC CSI:0.068
Max W eb CSI:0.075
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ5
Ply: 1
Qty:1
SEQN:12151 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T196
DrwNo:079.20.1313.28229
AK /DF 03/19/2020
3'9"4
3'9"42'4"5
7"8 1'8"142'1"512'
13'5"6
A
B
C
D
E
3.54 12
4X5(E1)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 2-3-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 269 /-/-/-/65 /-
E 9 /-/-/8 /-/-
D -/-11 /-/-/16 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.004 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.635
Max BC CSI:0.047
Max W eb CSI:0.053
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ6
Ply: 1
Qty:1
SEQN:12136 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T256
DrwNo:079.20.1313.38509
AK /DF 03/19/2020
3'2"9
3'2"92'4"5
7"8 1'6"141'11"512'
13'3"6
A
B
C
D
E
3.54 12
4X5(E1)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 2-3-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 269 /-/-/-/65 /-
E 9 /-/-/8 /-/-
D -/-11 /-/-/16 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.004 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.635
Max BC CSI:0.047
Max W eb CSI:0.053
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ6
Ply: 1
Qty:1
SEQN:12136 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T256
DrwNo:079.20.1313.38509
AK /DF 03/19/2020
3'2"9
3'2"92'4"5
7"8 1'6"141'11"512'
13'3"6
A
B
C
D
E
3.54 12
4X5(E1)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 6-3-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 512 /-/-/-/153 /-
F 285 /-/-/-/45 /-
E 259 /-/-/-/152 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 447 -1003
Chords Tens.Comp.
C - D 323 -551
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 512 -300
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 318 -543
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 C 999 360
VERT(CL):-0.037 C 999 240
HORZ(LL):0.006 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.888
Max BC CSI:0.601
Max W eb CSI:0.336
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ7
Ply: 1
Qty:2
SEQN:12127 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T232
DrwNo:079.20.1313.29493
AK /DF 03/19/2020
4'4"11
4'4"11
8'10"7
4'5"11
8'6"6
8'6"6
8'10"7
4"2'4"5
7"8 3'2"143'7"512'
14'11"6
A
B
C
D
E
FG
3.54 12
4X5(E1)
3X4
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 6-3-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 512 /-/-/-/153 /-
F 285 /-/-/-/45 /-
E 259 /-/-/-/152 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 447 -1003
Chords Tens.Comp.
C - D 323 -551
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 512 -300
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 318 -543
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 C 999 360
VERT(CL):-0.037 C 999 240
HORZ(LL):0.006 C - -
HORZ(TL):0.014 C - -
Creep Factor: 2.0
Max TC CSI:0.888
Max BC CSI:0.601
Max W eb CSI:0.336
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ7
Ply: 1
Qty:2
SEQN:12127 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T232
DrwNo:079.20.1313.29493
AK /DF 03/19/2020
4'4"11
4'4"11
8'10"7
4'5"11
8'6"6
8'6"6
8'10"7
4"2'4"5
7"8 3'2"143'7"512'
14'11"6
A
B
C
D
E
FG
3.54 12
4X5(E1)
3X4
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.654'
Loading
Hipjack supports 6-1-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 498 /-/-/-/147 /-
F 266 /-/-/-/41 /-
E 247 /-/-/-/145 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 428 -937
Chords Tens.Comp.
C - D 298 -504
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 466 -275
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 293 -496
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.015 C 999 360
VERT(CL):-0.035 C 999 240
HORZ(LL):0.006 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.899
Max BC CSI:0.554
Max W eb CSI:0.312
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ8
Ply: 1
Qty:1
SEQN:12116 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T199
DrwNo:079.20.1313.28323
AK /DF 03/19/2020
4'3"5
4'3"5
8'7"9
4'4"5
8'3"6
8'3"6
8'7"9
4"42'4"5
7"12 3'2"43'6"812'
14'10"12
A
B
C
D
E
FG
3.54 12
4X6(E5)
3X4
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.654'
Loading
Hipjack supports 6-1-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 498 /-/-/-/147 /-
F 266 /-/-/-/41 /-
E 247 /-/-/-/145 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 428 -937
Chords Tens.Comp.
C - D 298 -504
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 466 -275
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 293 -496
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.015 C 999 360
VERT(CL):-0.035 C 999 240
HORZ(LL):0.006 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.899
Max BC CSI:0.554
Max W eb CSI:0.312
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ8
Ply: 1
Qty:1
SEQN:12116 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T199
DrwNo:079.20.1313.28323
AK /DF 03/19/2020
4'3"5
4'3"5
8'7"9
4'4"5
8'3"6
8'3"6
8'7"9
4"42'4"5
7"12 3'2"43'6"812'
14'10"12
A
B
C
D
E
FG
3.54 12
4X6(E5)
3X4
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 4-3-3 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/-/100 /-
F 39 /-/-/-/2 /-
E 173 /-/-/-/79 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 G 999 360
VERT(CL):0.071 G 999 240
HORZ(LL):0.010 D - -
HORZ(TL):0.023 D - -
Creep Factor: 2.0
Max TC CSI:0.980
Max BC CSI:0.084
Max W eb CSI:0.085
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ9
Ply: 1
Qty:1
SEQN:12104 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T167
DrwNo:079.20.1313.40101
AK /DF 03/19/2020
4'5"6
4'5"6
6'0"7
1'7"1
4'8"10
4'8"10
6'0"7
1'3"132'4"6
7"8 1'1'4"142'4"142'9"512'
13'
14'1"6
A
B
C
D
E
F
GHI
3.54 12
4X5(E1)
3X4
3X31.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.774'
Loading
Hipjack supports 4-3-3 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/-/100 /-
F 39 /-/-/-/2 /-
E 173 /-/-/-/79 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.030 G 999 360
VERT(CL):0.071 G 999 240
HORZ(LL):0.010 D - -
HORZ(TL):0.023 D - -
Creep Factor: 2.0
Max TC CSI:0.980
Max BC CSI:0.084
Max W eb CSI:0.085
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ9
Ply: 1
Qty:1
SEQN:12104 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T167
DrwNo:079.20.1313.40101
AK /DF 03/19/2020
4'5"6
4'5"6
6'0"7
1'7"1
4'8"10
4'8"10
6'0"7
1'3"132'4"6
7"8 1'1'4"142'4"142'9"512'
13'
14'1"6
A
B
C
D
E
F
GHI
3.54 12
4X5(E1)
3X4
3X31.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 4-9-12 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 562 /-/-/-/117 /-
F 55 /-/-/-/1 /-
E 226 /-/-/-/106 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.093 J 856 360
VERT(CL):0.245 J 325 240
HORZ(LL):0.022 C - -
HORZ(TL):0.057 C - -
Creep Factor: 2.0
Max TC CSI:0.799
Max BC CSI:0.185
Max W eb CSI:0.126
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ10
Ply: 1
Qty:1
SEQN:12093 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T294
DrwNo:079.20.1313.26639
AK /DF 03/19/2020
3'2"9
3'2"9
6'9"11
3'7"2
3'7"13
3'7"13
5'4"11
1'8"14
6'9"11
1'5"2'4"5
5"14 1'1'1"22'1"22'5"812'
13'
13'9"10
A
B
C
D
E
F
GHI
JKL
2.83 12
2X4(A1)
1.5X43X3
1.5X4
3X31.5X4(**)
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 4-9-12 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 562 /-/-/-/117 /-
F 55 /-/-/-/1 /-
E 226 /-/-/-/106 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.093 J 856 360
VERT(CL):0.245 J 325 240
HORZ(LL):0.022 C - -
HORZ(TL):0.057 C - -
Creep Factor: 2.0
Max TC CSI:0.799
Max BC CSI:0.185
Max W eb CSI:0.126
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ10
Ply: 1
Qty:1
SEQN:12093 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T294
DrwNo:079.20.1313.26639
AK /DF 03/19/2020
3'2"9
3'2"9
6'9"11
3'7"2
3'7"13
3'7"13
5'4"11
1'8"14
6'9"11
1'5"2'4"5
5"14 1'1'1"22'1"22'5"812'
13'
13'9"10
A
B
C
D
E
F
GHI
JKL
2.83 12
2X4(A1)
1.5X43X3
1.5X4
3X31.5X4(**)
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.475'
Loading
The following trusses need concentrated loads at the
end of their overhangs: 4-0-0 span/setback member
on the 0-8-0 cant side requires 87 lbs and the 4-0-0
span/setback member on the 0-8-0 cant side requires
87 lbs.
Sub-fascia beam assumptions: 5-8-0 sub-fascia beam
on the 0-8-0 cantilever side. 5-8-0 sub-fascia beam on
the 0-8-0 cantilever side.
Hipjack supports 5-0-4 setback jacks with 0-8-0
cantilever one face; 0-8-0 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 589 /-/-/-/157 /-
E 53 /-/-/28 /-/-
D 164 /-/-/-/94 /-
Wind reactions based on MWFRS
B Brg Width = 4.9 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 857 -382
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 408 -913
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 E 339 360
VERT(CL):0.092 C 778 240
HORZ(LL):-0.022 C - -
HORZ(TL):0.050 C - -
Creep Factor: 2.0
Max TC CSI:0.577
Max BC CSI:0.551
Max W eb CSI:0.170
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ11
Ply: 1
Qty:1
SEQN:12090 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T331
DrwNo:079.20.1313.33065
AK /DF 03/19/2020
11"5
7'1"3
7'1"32'4"5
5"14 2'2"2'6"612'
13'10"8
A
B
C
D
E
2.83 12
2X4(C6)
3X6(C6)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.475'
Loading
The following trusses need concentrated loads at the
end of their overhangs: 4-0-0 span/setback member
on the 0-8-0 cant side requires 87 lbs and the 4-0-0
span/setback member on the 0-8-0 cant side requires
87 lbs.
Sub-fascia beam assumptions: 5-8-0 sub-fascia beam
on the 0-8-0 cantilever side. 5-8-0 sub-fascia beam on
the 0-8-0 cantilever side.
Hipjack supports 5-0-4 setback jacks with 0-8-0
cantilever one face; 0-8-0 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 589 /-/-/-/157 /-
E 53 /-/-/28 /-/-
D 164 /-/-/-/94 /-
Wind reactions based on MWFRS
B Brg Width = 4.9 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 857 -382
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - C 408 -913
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.040 E 339 360
VERT(CL):0.092 C 778 240
HORZ(LL):-0.022 C - -
HORZ(TL):0.050 C - -
Creep Factor: 2.0
Max TC CSI:0.577
Max BC CSI:0.551
Max W eb CSI:0.170
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ11
Ply: 1
Qty:1
SEQN:12090 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T331
DrwNo:079.20.1313.33065
AK /DF 03/19/2020
11"5
7'1"3
7'1"32'4"5
5"14 2'2"2'6"612'
13'10"8
A
B
C
D
E
2.83 12
2X4(C6)
3X6(C6)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.536'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/264 /-
E 318 /-/-/-/241 /-
F 376 /-/-/-/113 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 438 -838
Chords Tens.Comp.
C - D 434 -833
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 770 -405
Chords Tens.Comp.
H - G 762 -408
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 441 -824
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.025 C 999 360
VERT(CL):-0.058 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.883
Max BC CSI:0.635
Max W eb CSI:0.365
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ12
Ply: 1
Qty:4
SEQN:11503 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T158
DrwNo:079.20.1313.42239
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'3"10
4'4"12
9'10"13
7"32'4"5
7"15 3'6"153'11"20'
23'3"5
A
B
C
D
E
FGH
3.54 12
4X6(E5)
3X4
1.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.536'
Loading
Hipjack supports 7-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 582 /-/-/-/264 /-
E 318 /-/-/-/241 /-
F 376 /-/-/-/113 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 438 -838
Chords Tens.Comp.
C - D 434 -833
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 770 -405
Chords Tens.Comp.
H - G 762 -408
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 441 -824
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.77 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.025 C 999 360
VERT(CL):-0.058 C 999 240
HORZ(LL):-0.010 C - -
HORZ(TL):0.023 C - -
Creep Factor: 2.0
Max TC CSI:0.883
Max BC CSI:0.635
Max W eb CSI:0.365
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ12
Ply: 1
Qty:4
SEQN:11503 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T158
DrwNo:079.20.1313.42239
AK /DF 03/19/2020
5'0"10
5'0"10
9'10"13
4'10"2
4'10"14
4'10"14
9'3"10
4'4"12
9'10"13
7"32'4"5
7"15 3'6"153'11"20'
23'3"5
A
B
C
D
E
FGH
3.54 12
4X6(E5)
3X4
1.5X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 5-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 430 /-/-/-/227 /-
E 241 /-/-/-/78 /-
D 213 /-/-/-/191 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 394 -467
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 428 -357
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 381 -456
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.41 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.023 C 999 360
VERT(CL):0.030 C 999 240
HORZ(LL):-0.007 F - -
HORZ(TL):0.008 F - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.528
Max W eb CSI:0.149
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ13
Ply: 1
Qty:1
SEQN:12204 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T46
DrwNo:079.20.1313.42066
AK /DF 03/19/2020
4'3"
4'3"
8'1"15
3'10"15
7'9"14
7'9"14
8'1"15
4"12'4"5
5"15 2'10"133'4"1324'0"12
26'8"1
A
B
C
D
E F
3.54 12
2X4(A1)
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 5-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 430 /-/-/-/227 /-
E 241 /-/-/-/78 /-
D 213 /-/-/-/191 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 394 -467
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 428 -357
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 381 -456
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.41 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.023 C 999 360
VERT(CL):0.030 C 999 240
HORZ(LL):-0.007 F - -
HORZ(TL):0.008 F - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.528
Max W eb CSI:0.149
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ13
Ply: 1
Qty:1
SEQN:12204 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T46
DrwNo:079.20.1313.42066
AK /DF 03/19/2020
4'3"
4'3"
8'1"15
3'10"15
7'9"14
7'9"14
8'1"15
4"12'4"5
5"15 2'10"133'4"1324'0"12
26'8"1
A
B
C
D
E F
3.54 12
2X4(A1)
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 6-1-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide hanger or special connection at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 648 /-/-/-/266 /-
G 546 /-/1 /-/316 /0
F -/-99 /-/15 /-/-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 305 -529
Chords Tens.Comp.
D - E 376 -602
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 451 -270
O - M 802 -488
Chords Tens.Comp.
L - I 633 -388
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 361 -639
Webs Tens.Comp.
E - H 446 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.48 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.156 D 652 360
VERT(CL):0.328 D 310 240
HORZ(LL):-0.108 H - -
HORZ(TL):0.227 H - -
Creep Factor: 2.0
Max TC CSI:0.572
Max BC CSI:0.409
Max W eb CSI:0.907
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ14
Ply: 1
Qty:2
SEQN:12228 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T29
DrwNo:079.20.1313.30553
AK /DF 03/19/2020
3'1"8
3'1"8
5'7"1
2'5"9
8'7"9
3'0"9
3'5"
3'5"
5'9"5
2'4"5
7'3"11
1'6"6
8'4"15
1'1"4
8'7"9
2"10
2'4"5
5"15 2'6"81'6"3'0"83'6"824'0"12
24'6"12
26'9"12
A
B
C
D
E
F
GH
IJK
LM
NOP
3.54 12
2X4(A1)3X41.5X4
3X4
3X3
1.5X4(**)3X3
3X3
1.5X6
6X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 6-1-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide hanger or special connection at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 648 /-/-/-/266 /-
G 546 /-/1 /-/316 /0
F -/-99 /-/15 /-/-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 305 -529
Chords Tens.Comp.
D - E 376 -602
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 451 -270
O - M 802 -488
Chords Tens.Comp.
L - I 633 -388
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 361 -639
Webs Tens.Comp.
E - H 446 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.48 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.156 D 652 360
VERT(CL):0.328 D 310 240
HORZ(LL):-0.108 H - -
HORZ(TL):0.227 H - -
Creep Factor: 2.0
Max TC CSI:0.572
Max BC CSI:0.409
Max W eb CSI:0.907
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ14
Ply: 1
Qty:2
SEQN:12228 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T29
DrwNo:079.20.1313.30553
AK /DF 03/19/2020
3'1"8
3'1"8
5'7"1
2'5"9
8'7"9
3'0"9
3'5"
3'5"
5'9"5
2'4"5
7'3"11
1'6"6
8'4"15
1'1"4
8'7"9
2"10
2'4"5
5"15 2'6"81'6"3'0"83'6"824'0"12
24'6"12
26'9"12
A
B
C
D
E
F
GH
IJK
LM
NOP
3.54 12
2X4(A1)3X41.5X4
3X4
3X3
1.5X4(**)3X3
3X3
1.5X6
6X6
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 4-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 312 /-/-/-/154 /-
E 78 /-/-/-/28 /-
D 106 /-/-/-/84 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 G 999 360
VERT(CL):0.021 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.005 F - -
Creep Factor: 2.0
Max TC CSI:0.574
Max BC CSI:0.174
Max W eb CSI:0.113
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ15
Ply: 1
Qty:1
SEQN:12240 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T164
DrwNo:079.20.1313.39601
AK /DF 03/19/2020
3'4"5
3'4"5
5'7"14
2'3"9
3'7"13
3'7"13
5'5"10
1'9"13
5'7"14
2"42'4"5
5"15 1'7"152'1"152'8"24'0"12
24'6"12
25'11"3
A
B
C
D
E F
GHI
3.54 12
2X4(A1)3X31.5X4
3X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 4-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 312 /-/-/-/154 /-
E 78 /-/-/-/28 /-
D 106 /-/-/-/84 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.05 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 G 999 360
VERT(CL):0.021 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.005 F - -
Creep Factor: 2.0
Max TC CSI:0.574
Max BC CSI:0.174
Max W eb CSI:0.113
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ15
Ply: 1
Qty:1
SEQN:12240 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T164
DrwNo:079.20.1313.39601
AK /DF 03/19/2020
3'4"5
3'4"5
5'7"14
2'3"9
3'7"13
3'7"13
5'5"10
1'9"13
5'7"14
2"42'4"5
5"15 1'7"152'1"152'8"24'0"12
24'6"12
25'11"3
A
B
C
D
E F
GHI
3.54 12
2X4(A1)3X31.5X4
3X4
3X3
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
The following trusses need concentrated loads at the
end of their overhangs: 0-0-0 span/setback member
on the 0-6-0 cant side requires 59 lbs and the 0-0-0
span/setback member on the 0-6-0 cant side requires
59 lbs.
Sub-fascia beam assumptions: 1-8-12 sub-fascia
beam on the 0-6-0 cantilever side. 1-8-12 sub-fascia
beam on the 0-6-0 cantilever side.
Hipjack supports 6-10-12 setback jacks with 0-6-0
cantilever one face; 0-6-0 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 807 /-/-/-/382 /-
F 284 /-/-/-/119 /-
E 250 /-/-/-/244 /-
Wind reactions based on MWFRS
H Brg Width = 4.9 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.019 G 999 360
VERT(CL):0.041 G 999 240
HORZ(LL):0.011 D - -
HORZ(TL):0.026 D - -
Creep Factor: 2.0
Max TC CSI:0.944
Max BC CSI:0.760
Max W eb CSI:0.289
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ16
Ply: 1
Qty:2
SEQN:12307 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T264
DrwNo:079.20.1313.40100
AK /DF 03/19/2020
8"7
10"15
10"15
5'4"7
4'5"8
9'9"
4'4"8
9"7
9"7
9'4"8
8'7"1
9'7"8
3"2'5"63'11"6'9"24'0"12
30'6"4
A
B C
D
E
FGHI
3.54 12
3X4
1.5X4
1.5X4
3X8
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
The following trusses need concentrated loads at the
end of their overhangs: 0-0-0 span/setback member
on the 0-6-0 cant side requires 59 lbs and the 0-0-0
span/setback member on the 0-6-0 cant side requires
59 lbs.
Sub-fascia beam assumptions: 1-8-12 sub-fascia
beam on the 0-6-0 cantilever side. 1-8-12 sub-fascia
beam on the 0-6-0 cantilever side.
Hipjack supports 6-10-12 setback jacks with 0-6-0
cantilever one face; 0-6-0 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
H 807 /-/-/-/382 /-
F 284 /-/-/-/119 /-
E 250 /-/-/-/244 /-
Wind reactions based on MWFRS
H Brg Width = 4.9 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing H Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 29.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.019 G 999 360
VERT(CL):0.041 G 999 240
HORZ(LL):0.011 D - -
HORZ(TL):0.026 D - -
Creep Factor: 2.0
Max TC CSI:0.944
Max BC CSI:0.760
Max W eb CSI:0.289
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ16
Ply: 1
Qty:2
SEQN:12307 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T264
DrwNo:079.20.1313.40100
AK /DF 03/19/2020
8"7
10"15
10"15
5'4"7
4'5"8
9'9"
4'4"8
9"7
9"7
9'4"8
8'7"1
9'7"8
3"2'5"63'11"6'9"24'0"12
30'6"4
A
B C
D
E
FGHI
3.54 12
3X4
1.5X4
1.5X4
3X8
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-0-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 374 /-/-/-/192 /-
D 81 /-/-/24 /-/-
C 252 /-/-/-/222 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.26 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 D - -
HORZ(TL):0.012 D - -
Creep Factor: 2.0
Max TC CSI:0.849
Max BC CSI:0.323
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ17
Ply: 1
Qty:1
SEQN:12316 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T35
DrwNo:079.20.1313.27544
AK /DF 03/19/2020
7'1"9
7'1"92'4"5
5"15 2'7"33'1"324'0"12
26'4"7
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-0-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 374 /-/-/-/192 /-
D 81 /-/-/24 /-/-
C 252 /-/-/-/222 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.26 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 D - -
HORZ(TL):0.012 D - -
Creep Factor: 2.0
Max TC CSI:0.849
Max BC CSI:0.323
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ17
Ply: 1
Qty:1
SEQN:12316 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T35
DrwNo:079.20.1313.27544
AK /DF 03/19/2020
7'1"9
7'1"92'4"5
5"15 2'7"33'1"324'0"12
26'4"7
A
B
C
D
3.54 12
2X4(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-4-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 285 /-/-/-/136 /-
D 22 /-/-/17 /-/-
C 87 /-/-/-/86 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.92 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.147
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ18
Ply: 1
Qty:2
SEQN:12319 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T131
DrwNo:079.20.1313.28494
AK /DF 03/19/2020
4'9"4
4'9"42'4"5
5"15 1'10"132'4"1424'0"12
25'8"1
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-4-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 285 /-/-/-/136 /-
D 22 /-/-/17 /-/-
C 87 /-/-/-/86 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.92 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.147
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ18
Ply: 1
Qty:2
SEQN:12319 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T131
DrwNo:079.20.1313.28494
AK /DF 03/19/2020
4'9"4
4'9"42'4"5
5"15 1'10"132'4"1424'0"12
25'8"1
A
B
C
D
3.54 12
2X4(A1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 3-4-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 285 /-/-/-/136 /-
E 15 /-/-/-/9 /-
D 93 /-/-/-/60 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.92 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.007 F 999 360
VERT(CL):0.009 F 999 240
HORZ(LL):-0.002 H - -
HORZ(TL):0.004 H - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.153
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ19
Ply: 1
Qty:1
SEQN:11661 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T145
DrwNo:079.20.1313.32394
AK /DF 03/19/2020
3'11"14
3'11"14
4'9"5
9"6
4'4"8
4'4"8
4'9"5
4"132'4"4
5"15 1'10"13
1'10"132'4"1424'0"12
25'0"12
25'8"1
A
B
C D
EFGH
3.54 12
2X4(A1)
3X3
1.5X4(**)
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 3-4-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 285 /-/-/-/136 /-
E 15 /-/-/-/9 /-
D 93 /-/-/-/60 /-
Wind reactions based on MWFRS
B Brg Width = 8.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.92 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.007 F 999 360
VERT(CL):0.009 F 999 240
HORZ(LL):-0.002 H - -
HORZ(TL):0.004 H - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.153
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ19
Ply: 1
Qty:1
SEQN:11661 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T145
DrwNo:079.20.1313.32394
AK /DF 03/19/2020
3'11"14
3'11"14
4'9"5
9"6
4'4"8
4'4"8
4'9"5
4"132'4"4
5"15 1'10"13
1'10"132'4"1424'0"12
25'0"12
25'8"1
A
B
C D
EFGH
3.54 12
2X4(A1)
3X3
1.5X4(**)
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 449 /-/-/-/239 /-
E 267 /-/-/-/87 /-
D 229 /-/-/-/207 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 435 -521
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 480 -396
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 422 -511
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.46 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.026 C 999 360
VERT(CL):0.034 C 999 240
HORZ(LL):-0.008 E - -
HORZ(TL):0.010 E - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.581
Max W eb CSI:0.180
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ20
Ply: 1
Qty:1
SEQN:12187 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T132
DrwNo:079.20.1313.42799
AK /DF 03/19/2020
4'4"15
4'4"15
8'5"13
4'0"14
8'1"13
8'1"13
8'5"13
4"12'4"5
5"15 2'11"153'6"24'0"12
26'9"3
A
B
C
D
E F
3.54 12
2X4(A1)
1.5X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 449 /-/-/-/239 /-
E 267 /-/-/-/87 /-
D 229 /-/-/-/207 /-
Wind reactions based on MWFRS
B Brg Width = 11.3 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 435 -521
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 480 -396
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 422 -511
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.46 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.026 C 999 360
VERT(CL):0.034 C 999 240
HORZ(LL):-0.008 E - -
HORZ(TL):0.010 E - -
Creep Factor: 2.0
Max TC CSI:0.598
Max BC CSI:0.581
Max W eb CSI:0.180
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ20
Ply: 1
Qty:1
SEQN:12187 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T132
DrwNo:079.20.1313.42799
AK /DF 03/19/2020
4'4"15
4'4"15
8'5"13
4'0"14
8'1"13
8'1"13
8'5"13
4"12'4"5
5"15 2'11"153'6"24'0"12
26'9"3
A
B
C
D
E F
3.54 12
2X4(A1)
1.5X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-10-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 550 /-/-/-/171 /-
I 758 /-/-/-/583 /-
F 56 /-/-/96 /-/-
E 34 /-23 /-/-/16 /-
Wind reactions based on MWFRS
B Brg Width = 8.7 Min Req =1.5
I Brg Width = 6.5 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 223 -390
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - H 521 -509
Webs Tens.Comp.
H - D 526 -488
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 C 999 360
VERT(CL):-0.017 G 999 240
HORZ(LL):-0.005 I - -
HORZ(TL):0.006 E - -
Creep Factor: 2.0
Max TC CSI:0.448
Max BC CSI:0.376
Max W eb CSI:0.132
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ21
Ply: 1
Qty:2
SEQN:12358 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T114
DrwNo:079.20.1313.29058
AK /DF 03/19/2020
8'2"11
4'3"1
4'3"1
8'3"2
4'
9'8"5
1'5"3
8'3"15
8'3"15
9'6"1
1'2"2
9'8"5
2"4
1'9"9
6"1 1'3'3"14'3"14'9"124'0"12
25'0"12
28'0"5
A
B
C
D
E
F
GH
I
4.64 12
3X4(B1)
1.5X4
6X63X3
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-10-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 550 /-/-/-/171 /-
I 758 /-/-/-/583 /-
F 56 /-/-/96 /-/-
E 34 /-23 /-/-/16 /-
Wind reactions based on MWFRS
B Brg Width = 8.7 Min Req =1.5
I Brg Width = 6.5 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearings B & I Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 223 -390
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - H 521 -509
Webs Tens.Comp.
H - D 526 -488
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.10 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.013 C 999 360
VERT(CL):-0.017 G 999 240
HORZ(LL):-0.005 I - -
HORZ(TL):0.006 E - -
Creep Factor: 2.0
Max TC CSI:0.448
Max BC CSI:0.376
Max W eb CSI:0.132
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ21
Ply: 1
Qty:2
SEQN:12358 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T114
DrwNo:079.20.1313.29058
AK /DF 03/19/2020
8'2"11
4'3"1
4'3"1
8'3"2
4'
9'8"5
1'5"3
8'3"15
8'3"15
9'6"1
1'2"2
9'8"5
2"4
1'9"9
6"1 1'3'3"14'3"14'9"124'0"12
25'0"12
28'0"5
A
B
C
D
E
F
GH
I
4.64 12
3X4(B1)
1.5X4
6X63X3
3X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 98 /-/-/77 /56 /55
C 49 /-/-/38 /8 /-
B 39 /-/-/30 /70 /-
Wind reactions based on MWFRS
A Brg Width = 7.2 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.198
Max BC CSI:0.081
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ22
Ply: 1
Qty:2
SEQN:11969 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T175
DrwNo:079.20.1313.31084
AK /DF 03/19/2020
2'7"2
2'7"2
6"2 1'4"1524'0"12
25'2"3
A
B
C
4.16 12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 98 /-/-/77 /56 /55
C 49 /-/-/38 /8 /-
B 39 /-/-/30 /70 /-
Wind reactions based on MWFRS
A Brg Width = 7.2 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.198
Max BC CSI:0.081
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ22
Ply: 1
Qty:2
SEQN:11969 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T175
DrwNo:079.20.1313.31084
AK /DF 03/19/2020
2'7"2
2'7"2
6"2 1'4"1524'0"12
25'2"3
A
B
C
4.16 12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 5-2-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/-/178 /-
E 235 /-/-/-/107 /-
D 134 /-/-/-/109 /-
Wind reactions based on MWFRS
B Brg Width = 7.2 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 273 -420
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.49 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.017 G 999 360
VERT(CL):0.034 G 999 240
HORZ(LL):-0.008 F - -
HORZ(TL):0.016 F - -
Creep Factor: 2.0
Max TC CSI:0.415
Max BC CSI:0.244
Max W eb CSI:0.393
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ23
Ply: 1
Qty:2
SEQN:12349 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T182
DrwNo:079.20.1313.28947
AK /DF 03/19/2020
4'9"7
4'9"7
7'4"1
2'6"10
5'0"15
5'0"15
7'0"6
1'11"7
7'4"1
3"112'0"1
6"2'6"93'0"93'6"924'0"12
24'6"12
26'9"13
A
B
C
D
EF
GHI
4.16 12
2X5(B1)3X31.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 5-2-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (3) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/-/178 /-
E 235 /-/-/-/107 /-
D 134 /-/-/-/109 /-
Wind reactions based on MWFRS
B Brg Width = 7.2 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 273 -420
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.49 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.017 G 999 360
VERT(CL):0.034 G 999 240
HORZ(LL):-0.008 F - -
HORZ(TL):0.016 F - -
Creep Factor: 2.0
Max TC CSI:0.415
Max BC CSI:0.244
Max W eb CSI:0.393
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:KJ23
Ply: 1
Qty:2
SEQN:12349 /HIP_
FROM:
Cust: R 761 JRef:1WTP7610004 T182
DrwNo:079.20.1313.28947
AK /DF 03/19/2020
4'9"7
4'9"7
7'4"1
2'6"10
5'0"15
5'0"15
7'0"6
1'11"7
7'4"1
3"112'0"1
6"2'6"93'0"93'6"924'0"12
24'6"12
26'9"13
A
B
C
D
EF
GHI
4.16 12
2X5(B1)3X31.5X4
3X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 385 /-/-/310 /161 /48
D -/-27 /-/27 /26 /-
C -/-105 /-/65 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.037
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C1
Ply: 1
Qty:13
SEQN:12025 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T177
DrwNo:079.20.1313.36747
AK /DF 03/19/2020
1'0"7
1'0"71'8"
7"12 1'0"151'5"512'
12'9"7
A
B
C
D
5
12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 385 /-/-/310 /161 /48
D -/-27 /-/27 /26 /-
C -/-105 /-/65 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.037
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C1
Ply: 1
Qty:13
SEQN:12025 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T177
DrwNo:079.20.1313.36747
AK /DF 03/19/2020
1'0"7
1'0"71'8"
7"12 1'0"151'5"512'
12'9"7
A
B
C
D
5
12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/264 /103 /84
E 55 /-/-/44 /3 /-
D 68 /-/-/31 /47 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.531
Max BC CSI:0.083
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C2
Ply: 1
Qty:10
SEQN:12016 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T174
DrwNo:079.20.1313.30694
AK /DF 03/19/2020
3'0"7
3'0"71'8"
7"12 1'10"152'3"512'
13'7"7
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/264 /103 /84
E 55 /-/-/44 /3 /-
D 68 /-/-/31 /47 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.531
Max BC CSI:0.083
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C2
Ply: 1
Qty:10
SEQN:12016 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T174
DrwNo:079.20.1313.30694
AK /DF 03/19/2020
3'0"7
3'0"71'8"
7"12 1'10"152'3"512'
13'7"7
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 140 /-/-/101 /32 /54
D 59 /-/-/46 /5 /-
C 105 /-/-/59 /60 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 366 -469
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.314
Max BC CSI:0.095
Max W eb CSI:0.107
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C2A
Ply: 1
Qty:1
SEQN:12034 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T356
DrwNo:079.20.1313.27622
AK /DF 03/19/2020
3'0"7
3'0"7
7"12 1'10"1512'
13'7"7
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 140 /-/-/101 /32 /54
D 59 /-/-/46 /5 /-
C 105 /-/-/59 /60 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 366 -469
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.004 B - -
HORZ(TL):0.010 B - -
Creep Factor: 2.0
Max TC CSI:0.314
Max BC CSI:0.095
Max W eb CSI:0.107
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C2A
Ply: 1
Qty:1
SEQN:12034 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T356
DrwNo:079.20.1313.27622
AK /DF 03/19/2020
3'0"7
3'0"7
7"12 1'10"1512'
13'7"7
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/317 /122 /121
E 95 /-/-/73 /8 /-
D 151 /-/-/79 /88 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 929 -1115
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.015 C - -
HORZ(TL):0.030 C - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.275
Max W eb CSI:0.294
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C3
Ply: 1
Qty:5
SEQN:12019 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T223
DrwNo:079.20.1313.31099
AK /DF 03/19/2020
5'0"7
5'0"71'8"
7"12 2'8"153'1"512'
14'5"7
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/317 /122 /121
E 95 /-/-/73 /8 /-
D 151 /-/-/79 /88 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 929 -1115
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.015 C - -
HORZ(TL):0.030 C - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.275
Max W eb CSI:0.294
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C3
Ply: 1
Qty:5
SEQN:12019 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T223
DrwNo:079.20.1313.31099
AK /DF 03/19/2020
5'0"7
5'0"71'8"
7"12 2'8"153'1"512'
14'5"7
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 233 /-/-/168 /58 /90
D 99 /-/-/78 /10 /-
C 171 /-/-/95 /95 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1346 -1503
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.021 B - -
HORZ(TL):0.048 B - -
Creep Factor: 2.0
Max TC CSI:0.765
Max BC CSI:0.343
Max W eb CSI:0.377
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C3A
Ply: 1
Qty:1
SEQN:12051 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T363
DrwNo:079.20.1313.33425
AK /DF 03/19/2020
5'0"7
5'0"7
7"12 2'8"1512'
14'5"7
A
B
C
D
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 233 /-/-/168 /58 /90
D 99 /-/-/78 /10 /-
C 171 /-/-/95 /95 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1346 -1503
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.021 B - -
HORZ(TL):0.048 B - -
Creep Factor: 2.0
Max TC CSI:0.765
Max BC CSI:0.343
Max W eb CSI:0.377
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C3A
Ply: 1
Qty:1
SEQN:12051 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T363
DrwNo:079.20.1313.33425
AK /DF 03/19/2020
5'0"7
5'0"7
7"12 2'8"1512'
14'5"7
A
B
C
D
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 385 /-/-/310 /161 /48
D -/-27 /-/27 /26 /-
C -/-105 /-/65 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.037
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C4
Ply: 1
Qty:12
SEQN:12028 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T362
DrwNo:079.20.1313.36575
AK /DF 03/19/2020
1'0"7
1'0"71'8"
7"12 1'0"151'5"512'
12'9"7
A
B
C
D
5
12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 385 /-/-/310 /161 /48
D -/-27 /-/27 /26 /-
C -/-105 /-/65 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.037
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C4
Ply: 1
Qty:12
SEQN:12028 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T362
DrwNo:079.20.1313.36575
AK /DF 03/19/2020
1'0"7
1'0"71'8"
7"12 1'0"151'5"512'
12'9"7
A
B
C
D
5
12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Stub Wedge: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 48 /-/-/34 /7 /18
C 21 /-/-/16 /3 /-
B 36 /-/-/20 /22 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 B - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.033
Max BC CSI:0.017
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C4A
Ply: 1
Qty:1
SEQN:11992 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T203
DrwNo:079.20.1313.41785
AK /DF 03/19/2020
1'0"7
1'0"77"121'0"1512'
12'9"7
A
B
C
5
12
3X5(G1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Stub Wedge: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 48 /-/-/34 /7 /18
C 21 /-/-/16 /3 /-
B 36 /-/-/20 /22 /-
Wind reactions based on MWFRS
A Brg Width = 8.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 B - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.033
Max BC CSI:0.017
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C4A
Ply: 1
Qty:1
SEQN:11992 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T203
DrwNo:079.20.1313.41785
AK /DF 03/19/2020
1'0"7
1'0"77"121'0"1512'
12'9"7
A
B
C
5
12
3X5(G1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/264 /103 /84
E 55 /-/-/44 /3 /-
D 68 /-/-/31 /47 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.531
Max BC CSI:0.083
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C5
Ply: 1
Qty:11
SEQN:12022 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T361
DrwNo:079.20.1313.40054
AK /DF 03/19/2020
3'0"7
3'0"71'8"
7"12 1'10"152'3"512'
13'7"7
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/264 /103 /84
E 55 /-/-/44 /3 /-
D 68 /-/-/31 /47 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.531
Max BC CSI:0.083
Max W eb CSI:0.073
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C5
Ply: 1
Qty:11
SEQN:12022 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T361
DrwNo:079.20.1313.40054
AK /DF 03/19/2020
3'0"7
3'0"71'8"
7"12 1'10"152'3"512'
13'7"7
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/317 /122 /121
E 95 /-/-/73 /8 /-
D 151 /-/-/79 /88 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 929 -1115
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.015 C - -
HORZ(TL):0.030 C - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.275
Max W eb CSI:0.294
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C6
Ply: 1
Qty:7
SEQN:12031 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T359
DrwNo:079.20.1313.34906
AK /DF 03/19/2020
5'0"7
5'0"71'8"
7"12 2'8"153'1"512'
14'5"7
A
B
C
D
E
5
12
4X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/317 /122 /121
E 95 /-/-/73 /8 /-
D 151 /-/-/79 /88 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 929 -1115
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.015 C - -
HORZ(TL):0.030 C - -
Creep Factor: 2.0
Max TC CSI:0.687
Max BC CSI:0.275
Max W eb CSI:0.294
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C6
Ply: 1
Qty:7
SEQN:12031 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T359
DrwNo:079.20.1313.34906
AK /DF 03/19/2020
5'0"7
5'0"71'8"
7"12 2'8"153'1"512'
14'5"7
A
B
C
D
E
5
12
4X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 233 /-/-/139 /65 /48
D 147 /-/-/117 /53 /-
C 86 /-/-/47 /47 /-
Wind reactions based on MWFRS
F Brg Width = -Min Req =-
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 201 -434
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 488 -224
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.002 B 999 360
VERT(CL):0.006 E 999 240
HORZ(LL):0.001 A - -
HORZ(TL):0.002 A - -
Creep Factor: 2.0
Max TC CSI:0.190
Max BC CSI:0.297
Max W eb CSI:0.098
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C7
Ply: 1
Qty:1
SEQN:12037 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T253
DrwNo:079.20.1313.29305
AK /DF 03/19/2020
2'4"
2'4"
5'0"7
2'8"7
4'8"12
4'8"12
5'0"7
3"111'7"72'8"1512'
14'5"7
A B
C
DEF
5
12
1.5X4
5X5
5X5
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 233 /-/-/139 /65 /48
D 147 /-/-/117 /53 /-
C 86 /-/-/47 /47 /-
Wind reactions based on MWFRS
F Brg Width = -Min Req =-
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 201 -434
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - E 488 -224
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.002 B 999 360
VERT(CL):0.006 E 999 240
HORZ(LL):0.001 A - -
HORZ(TL):0.002 A - -
Creep Factor: 2.0
Max TC CSI:0.190
Max BC CSI:0.297
Max W eb CSI:0.098
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C7
Ply: 1
Qty:1
SEQN:12037 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T253
DrwNo:079.20.1313.29305
AK /DF 03/19/2020
2'4"
2'4"
5'0"7
2'8"7
4'8"12
4'8"12
5'0"7
3"111'7"72'8"1512'
14'5"7
A B
C
DEF
5
12
1.5X4
5X5
5X5
3X3
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 378 /-/-/306 /187 /43
D -/-22 /-/26 /21 /-
C -/-106 /-/71 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.071
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C8
Ply: 1
Qty:1
SEQN:11907 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T293
DrwNo:079.20.1313.28651
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"1 10"31'2"812'
12'6"11
A
B
C
D
4 12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 378 /-/-/306 /187 /43
D -/-22 /-/26 /21 /-
C -/-106 /-/71 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.071
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C8
Ply: 1
Qty:1
SEQN:11907 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T293
DrwNo:079.20.1313.28651
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"1 10"31'2"812'
12'6"11
A
B
C
D
4 12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 82 /-/-/53 /36 /44
D 223 /-/-/165 /126 /-
D -/-137 /-/83 /96 /-
C 46 /-/-/27 /25 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
D Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 D 999 360
VERT(CL):0.007 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.102
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C8A
Ply: 1
Qty:1
SEQN:12075 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T348
DrwNo:079.20.1313.34172
AK /DF 03/19/2020
8"
1'9"8
1'9"8
2'9"15
1'0"71"8
3"11 10"34"5 1'2"811'7"11
12'
12'6"11
A
B
C
D
4 12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 82 /-/-/53 /36 /44
D 223 /-/-/165 /126 /-
D -/-137 /-/83 /96 /-
C 46 /-/-/27 /25 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
D Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 D 999 360
VERT(CL):0.007 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.102
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C8A
Ply: 1
Qty:1
SEQN:12075 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T348
DrwNo:079.20.1313.34172
AK /DF 03/19/2020
8"
1'9"8
1'9"8
2'9"15
1'0"71"8
3"11 10"34"5 1'2"811'7"11
12'
12'6"11
A
B
C
D
4 12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 352 /-/-/276 /131 /68
E 16 /-/-/18 /4 /-
D 71 /-/-/50 /35 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.003 G 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.095
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C9
Ply: 1
Qty:1
SEQN:12063 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T285
DrwNo:080.20.1108.48093
JB /DF 03/20/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"1 1'0"31'6"31'10"812'
12'6"
13'2"11
A
B
C
D
EFGH
4 12
2X5(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 352 /-/-/276 /131 /68
E 16 /-/-/18 /4 /-
D 71 /-/-/50 /35 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.003 G 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.095
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C9
Ply: 1
Qty:1
SEQN:12063 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T285
DrwNo:080.20.1108.48093
JB /DF 03/20/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"1 1'0"31'6"31'10"812'
12'6"
13'2"11
A
B
C
D
EFGH
4 12
2X5(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 377 /-/-/306 /187 /43
D -/-22 /-/26 /21 /-
C -/-106 /-/71 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.071
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C10
Ply: 1
Qty:1
SEQN:11908 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T295
DrwNo:079.20.1313.36044
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"1 10"31'2"812'
12'6"11
A
B
C
D
4 12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 377 /-/-/306 /187 /43
D -/-22 /-/26 /21 /-
C -/-106 /-/71 /97 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.071
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C10
Ply: 1
Qty:1
SEQN:11908 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T295
DrwNo:079.20.1313.36044
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"1 10"31'2"812'
12'6"11
A
B
C
D
4 12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 82 /-/-/53 /36 /44
D 223 /-/-/165 /126 /-
D -/-137 /-/83 /96 /-
C 46 /-/-/27 /25 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
D Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 D 999 360
VERT(CL):0.007 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.102
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C10A
Ply: 1
Qty:1
SEQN:12078 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T350
DrwNo:079.20.1313.42676
AK /DF 03/19/2020
8"
1'9"8
1'9"8
2'9"15
1'0"71"8
3"11 10"34"5 1'2"811'7"11
12'
12'6"11
A
B
C
D
4 12
2X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 82 /-/-/53 /36 /44
D 223 /-/-/165 /126 /-
D -/-137 /-/83 /96 /-
C 46 /-/-/27 /25 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
D Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing D Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 D 999 360
VERT(CL):0.007 D 999 240
HORZ(LL):0.002 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.182
Max BC CSI:0.102
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C10A
Ply: 1
Qty:1
SEQN:12078 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T350
DrwNo:079.20.1313.42676
AK /DF 03/19/2020
8"
1'9"8
1'9"8
2'9"15
1'0"71"8
3"11 10"34"5 1'2"811'7"11
12'
12'6"11
A
B
C
D
4 12
2X5(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 352 /-/-/276 /131 /68
E 16 /-/-/18 /4 /-
D 71 /-/-/50 /35 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.003 G 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.095
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C11
Ply: 1
Qty:1
SEQN:12066 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T278
DrwNo:080.20.1108.55330
JB /DF 03/20/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"1 1'0"31'6"31'10"812'
12'6"
13'2"11
A
B
C
D
EFGH
4 12
2X5(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 352 /-/-/276 /131 /68
E 16 /-/-/18 /4 /-
D 71 /-/-/50 /35 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.003 G 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.095
Max W eb CSI:0.024
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C11
Ply: 1
Qty:1
SEQN:12066 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T278
DrwNo:080.20.1108.55330
JB /DF 03/20/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"1 1'0"31'6"31'10"812'
12'6"
13'2"11
A
B
C
D
EFGH
4 12
2X5(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 459 /-/-/382 /193 /68
E 18 /-19 /-/42 /23 /-
D 27 /-52 /-/32 /34 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -1334
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 E 999 360
VERT(CL):0.019 E 522 240
HORZ(LL):0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.308
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C13
Ply: 1
Qty:1
SEQN:12072 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T347
DrwNo:080.20.1108.57143
JB /DF 03/20/2020
8"
3'0"7
3'0"71'8"
6"1 1'6"31'10"812'
13'2"11
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 459 /-/-/382 /193 /68
E 18 /-19 /-/42 /23 /-
D 27 /-52 /-/32 /34 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -1334
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 E 999 360
VERT(CL):0.019 E 522 240
HORZ(LL):0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.308
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C13
Ply: 1
Qty:1
SEQN:12072 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T347
DrwNo:080.20.1108.57143
JB /DF 03/20/2020
8"
3'0"7
3'0"71'8"
6"1 1'6"31'10"812'
13'2"11
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 459 /-/-/382 /193 /68
E 18 /-19 /-/42 /23 /-
D 27 /-52 /-/32 /34 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -1334
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 E 999 360
VERT(CL):0.019 E 522 240
HORZ(LL):0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.308
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C15
Ply: 1
Qty:1
SEQN:12081 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T349
DrwNo:080.20.1109.00370
JB /DF 03/20/2020
8"
3'0"7
3'0"71'8"
6"1 1'6"31'10"812'
13'2"11
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.750'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 459 /-/-/382 /193 /68
E 18 /-19 /-/42 /23 /-
D 27 /-52 /-/32 /34 /-
Wind reactions based on MWFRS
B Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1336 -1334
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 E 999 360
VERT(CL):0.019 E 522 240
HORZ(LL):0.005 C - -
HORZ(TL):0.012 C - -
Creep Factor: 2.0
Max TC CSI:0.560
Max BC CSI:0.308
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C15
Ply: 1
Qty:1
SEQN:12081 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T349
DrwNo:080.20.1109.00370
JB /DF 03/20/2020
8"
3'0"7
3'0"71'8"
6"1 1'6"31'10"812'
13'2"11
A
B
C
D
E
4 12
2X5(C3)
3X4(C3)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/295 /186 /60
D 1 /-21 /-/27 /21 /-
C -/-97 /-/70 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.587
Max BC CSI:0.036
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C16
Ply: 1
Qty:4
SEQN:11485 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T157
DrwNo:079.20.1313.42942
AK /DF 03/19/2020
1'0"7
1'0"71'8"8"31'1"61'5"520'
20'9"14
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/295 /186 /60
D 1 /-21 /-/27 /21 /-
C -/-97 /-/70 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.587
Max BC CSI:0.036
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C16
Ply: 1
Qty:4
SEQN:11485 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T157
DrwNo:079.20.1313.42942
AK /DF 03/19/2020
1'0"7
1'0"71'8"8"31'1"61'5"520'
20'9"14
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/259 /139 /106
E 55 /-/-/45 /6 /-
D 68 /-/-/25 /63 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.604
Max BC CSI:0.087
Max W eb CSI:0.059
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C17
Ply: 1
Qty:4
SEQN:11488 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T155
DrwNo:079.20.1313.42128
AK /DF 03/19/2020
3'0"7
3'0"71'8"8"31'11"62'3"520'
21'7"14
A
B
C
D
E
5
12
3X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/259 /139 /106
E 55 /-/-/45 /6 /-
D 68 /-/-/25 /63 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.604
Max BC CSI:0.087
Max W eb CSI:0.059
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C17
Ply: 1
Qty:4
SEQN:11488 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T155
DrwNo:079.20.1313.42128
AK /DF 03/19/2020
3'0"7
3'0"71'8"8"31'11"62'3"520'
21'7"14
A
B
C
D
E
5
12
3X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/309 /170 /154
E 95 /-/-/74 /13 /-
D 151 /-/-/70 /119 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 821 -1017
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.022 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.324
Max W eb CSI:0.282
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C18
Ply: 1
Qty:4
SEQN:11491 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T156
DrwNo:079.20.1313.27418
AK /DF 03/19/2020
5'0"7
5'0"71'8"8"32'9"63'1"520'
22'5"14
A
B
C
D
E
5
12
3X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/309 /170 /154
E 95 /-/-/74 /13 /-
D 151 /-/-/70 /119 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 821 -1017
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.022 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.324
Max W eb CSI:0.282
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C18
Ply: 1
Qty:4
SEQN:11491 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T156
DrwNo:079.20.1313.27418
AK /DF 03/19/2020
5'0"7
5'0"71'8"8"32'9"63'1"520'
22'5"14
A
B
C
D
E
5
12
3X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/295 /186 /60
D 1 /-21 /-/27 /21 /-
C -/-97 /-/70 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.587
Max BC CSI:0.036
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C19
Ply: 1
Qty:4
SEQN:11494 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T9
DrwNo:079.20.1313.37402
AK /DF 03/19/2020
1'0"7
1'0"71'8"8"31'1"61'5"520'
20'9"14
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/295 /186 /60
D 1 /-21 /-/27 /21 /-
C -/-97 /-/70 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.55 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.587
Max BC CSI:0.036
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C19
Ply: 1
Qty:4
SEQN:11494 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T9
DrwNo:079.20.1313.37402
AK /DF 03/19/2020
1'0"7
1'0"71'8"8"31'1"61'5"520'
20'9"14
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/259 /139 /106
E 55 /-/-/45 /6 /-
D 68 /-/-/25 /63 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.604
Max BC CSI:0.087
Max W eb CSI:0.059
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C20
Ply: 1
Qty:4
SEQN:11497 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T50
DrwNo:079.20.1313.40523
AK /DF 03/19/2020
3'0"7
3'0"71'8"8"31'11"62'3"520'
21'7"14
A
B
C
D
E
5
12
3X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 340 /-/-/259 /139 /106
E 55 /-/-/45 /6 /-
D 68 /-/-/25 /63 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 20.97 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.604
Max BC CSI:0.087
Max W eb CSI:0.059
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C20
Ply: 1
Qty:4
SEQN:11497 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T50
DrwNo:079.20.1313.40523
AK /DF 03/19/2020
3'0"7
3'0"71'8"8"31'11"62'3"520'
21'7"14
A
B
C
D
E
5
12
3X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/309 /170 /154
E 95 /-/-/74 /13 /-
D 151 /-/-/70 /119 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 821 -1017
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.022 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.324
Max W eb CSI:0.282
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C21
Ply: 1
Qty:4
SEQN:11500 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T151
DrwNo:079.20.1313.29057
AK /DF 03/19/2020
5'0"7
5'0"71'8"8"32'9"63'1"520'
22'5"14
A
B
C
D
E
5
12
3X6(E5)
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 1.500'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 416 /-/-/309 /170 /154
E 95 /-/-/74 /13 /-
D 151 /-/-/70 /119 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 821 -1017
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.38 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.022 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.746
Max BC CSI:0.324
Max W eb CSI:0.282
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C21
Ply: 1
Qty:4
SEQN:11500 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T151
DrwNo:079.20.1313.29057
AK /DF 03/19/2020
5'0"7
5'0"71'8"8"32'9"63'1"520'
22'5"14
A
B
C
D
E
5
12
3X6(E5)
3X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/290 /209 /68
D 1 /-19 /-/27 /17 /-
C -/-99 /-/78 /93 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.610
Max BC CSI:0.078
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C22
Ply: 1
Qty:8
SEQN:11672 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T44
DrwNo:079.20.1313.27137
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"3 11"61'5"524'0"12
24'8"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/290 /209 /68
D 1 /-19 /-/27 /17 /-
C -/-99 /-/78 /93 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.610
Max BC CSI:0.078
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C22
Ply: 1
Qty:8
SEQN:11672 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T44
DrwNo:079.20.1313.27137
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"3 11"61'5"524'0"12
24'8"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 54 /-/-/35 /16 /25
C 18 /-/-/14 /3 /-
B 32 /-/-/14 /30 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.031
Max BC CSI:0.009
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C22A
Ply: 1
Qty:1
SEQN:11949 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T162
DrwNo:079.20.1313.29961
AK /DF 03/19/2020
1'0"7
1'0"7
6"3 11"624'0"12
24'8"10A
B
C
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 54 /-/-/35 /16 /25
C 18 /-/-/14 /3 /-
B 32 /-/-/14 /30 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.031
Max BC CSI:0.009
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C22A
Ply: 1
Qty:1
SEQN:11949 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T162
DrwNo:079.20.1313.29961
AK /DF 03/19/2020
1'0"7
1'0"7
6"3 11"624'0"12
24'8"10A
B
C
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
D 50 /-/-/49 /9 /-
C 64 /-/-/23 /66 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.109
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C23
Ply: 1
Qty:3
SEQN:11923 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T43
DrwNo:079.20.1313.29244
AK /DF 03/19/2020
3'0"7
3'0"71'8"
6"3 1'9"62'3"524'0"12
25'6"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
D 50 /-/-/49 /9 /-
C 64 /-/-/23 /66 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.109
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C23
Ply: 1
Qty:3
SEQN:11923 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T43
DrwNo:079.20.1313.29244
AK /DF 03/19/2020
3'0"7
3'0"71'8"
6"3 1'9"62'3"524'0"12
25'6"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 146 /-/-/98 /59 /78
C 58 /-/-/46 /10 /-
B 100 /-/-/45 /89 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.305
Max BC CSI:0.126
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C23A
Ply: 1
Qty:1
SEQN:11658 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T179
DrwNo:079.20.1313.36138
AK /DF 03/19/2020
3'0"7
3'0"7
6"3 1'9"624'0"12
25'6"10
A
B
C
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 146 /-/-/98 /59 /78
C 58 /-/-/46 /10 /-
B 100 /-/-/45 /89 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.305
Max BC CSI:0.126
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C23A
Ply: 1
Qty:1
SEQN:11658 /HIP_
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T179
DrwNo:079.20.1313.36138
AK /DF 03/19/2020
3'0"7
3'0"7
6"3 1'9"624'0"12
25'6"10
A
B
C
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
D 92 /-/-/75 /12 /-
C 148 /-/-/60 /134 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.721
Max BC CSI:0.260
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C24
Ply: 1
Qty:2
SEQN:11924 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T42
DrwNo:079.20.1313.39913
AK /DF 03/19/2020
5'0"7
5'0"71'8"
6"3 2'7"63'1"524'0"12
26'4"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
D 92 /-/-/75 /12 /-
C 148 /-/-/60 /134 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.721
Max BC CSI:0.260
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C24
Ply: 1
Qty:2
SEQN:11924 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T42
DrwNo:079.20.1313.39913
AK /DF 03/19/2020
5'0"7
5'0"71'8"
6"3 2'7"63'1"524'0"12
26'4"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/290 /209 /68
D 1 /-19 /-/27 /17 /-
C -/-99 /-/78 /93 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.610
Max BC CSI:0.078
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C25
Ply: 1
Qty:7
SEQN:11652 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T40
DrwNo:079.20.1313.35342
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"3 11"61'5"524'0"12
24'8"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 371 /-/-/290 /209 /68
D 1 /-19 /-/27 /17 /-
C -/-99 /-/78 /93 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.45 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.610
Max BC CSI:0.078
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C25
Ply: 1
Qty:7
SEQN:11652 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T40
DrwNo:079.20.1313.35342
AK /DF 03/19/2020
1'0"7
1'0"71'8"
6"3 11"61'5"524'0"12
24'8"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 54 /-/-/35 /16 /25
C 18 /-/-/14 /3 /-
B 32 /-/-/14 /30 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.031
Max BC CSI:0.009
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C25A
Ply: 1
Qty:2
SEQN:11952 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T53
DrwNo:079.20.1313.34236
AK /DF 03/19/2020
1'0"7
1'0"7
6"3 11"624'0"12
24'8"10A
B
C
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 54 /-/-/35 /16 /25
C 18 /-/-/14 /3 /-
B 32 /-/-/14 /30 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.000 C - -
Creep Factor: 2.0
Max TC CSI:0.031
Max BC CSI:0.009
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C25A
Ply: 1
Qty:2
SEQN:11952 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T53
DrwNo:079.20.1313.34236
AK /DF 03/19/2020
1'0"7
1'0"7
6"3 11"624'0"12
24'8"10A
B
C
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
D 50 /-/-/49 /9 /-
C 64 /-/-/23 /66 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.109
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C26
Ply: 1
Qty:4
SEQN:11655 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T39
DrwNo:079.20.1313.29570
AK /DF 03/19/2020
3'0"7
3'0"71'8"
6"3 1'9"62'3"524'0"12
25'6"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
D 50 /-/-/49 /9 /-
C 64 /-/-/23 /66 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.109
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C26
Ply: 1
Qty:4
SEQN:11655 /JACK
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T39
DrwNo:079.20.1313.29570
AK /DF 03/19/2020
3'0"7
3'0"71'8"
6"3 1'9"62'3"524'0"12
25'6"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
D 92 /-/-/75 /12 /-
C 148 /-/-/60 /134 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.721
Max BC CSI:0.260
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C27
Ply: 1
Qty:2
SEQN:11922 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T38
DrwNo:079.20.1313.28151
AK /DF 03/19/2020
5'0"7
5'0"71'8"
6"3 2'7"63'1"524'0"12
26'4"10
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
D 92 /-/-/75 /12 /-
C 148 /-/-/60 /134 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.005 D - -
Creep Factor: 2.0
Max TC CSI:0.721
Max BC CSI:0.260
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C27
Ply: 1
Qty:2
SEQN:11922 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T38
DrwNo:079.20.1313.28151
AK /DF 03/19/2020
5'0"7
5'0"71'8"
6"3 2'7"63'1"524'0"12
26'4"10
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 19 /-/-/20 /6 /-
D 73 /-/-/48 /62 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.005 F 999 360
VERT(CL):0.006 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.612
Max BC CSI:0.082
Max W eb CSI:0.027
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C28
Ply: 1
Qty:2
SEQN:12207 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T33
DrwNo:079.20.1313.41724
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 19 /-/-/20 /6 /-
D 73 /-/-/48 /62 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.005 F 999 360
VERT(CL):0.006 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.612
Max BC CSI:0.082
Max W eb CSI:0.027
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C28
Ply: 1
Qty:2
SEQN:12207 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T33
DrwNo:079.20.1313.41724
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
E 65 /-/-/51 /13 /-
D 158 /-/-/79 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.074 F 799 360
VERT(CL):0.109 F 540 240
HORZ(LL):-0.032 C - -
HORZ(TL):0.046 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.137
Max W eb CSI:0.082
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C29
Ply: 1
Qty:2
SEQN:12213 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T24
DrwNo:079.20.1313.40178
AK /DF 03/19/2020
2'0"12
2'0"12
5'0"7
2'11"11
2'6"
2'6"
5'0"7
2'6"71'8"
6"3 6"2'1"62'7"63'1"524'0"12
24'6"12
26'4"10
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
E 65 /-/-/51 /13 /-
D 158 /-/-/79 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.074 F 799 360
VERT(CL):0.109 F 540 240
HORZ(LL):-0.032 C - -
HORZ(TL):0.046 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.137
Max W eb CSI:0.082
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C29
Ply: 1
Qty:2
SEQN:12213 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T24
DrwNo:079.20.1313.40178
AK /DF 03/19/2020
2'0"12
2'0"12
5'0"7
2'11"11
2'6"
2'6"
5'0"7
2'6"71'8"
6"3 6"2'1"62'7"63'1"524'0"12
24'6"12
26'4"10
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 19 /-/-/20 /6 /-
D 73 /-/-/48 /62 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.005 F 999 360
VERT(CL):0.006 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.612
Max BC CSI:0.082
Max W eb CSI:0.027
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C30
Ply: 1
Qty:1
SEQN:12210 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T61
DrwNo:079.20.1313.41738
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 19 /-/-/20 /6 /-
D 73 /-/-/48 /62 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.005 F 999 360
VERT(CL):0.006 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.612
Max BC CSI:0.082
Max W eb CSI:0.027
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C30
Ply: 1
Qty:1
SEQN:12210 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T61
DrwNo:079.20.1313.41738
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 146 /-/-/98 /59 /78
D 25 /-/-/21 /12 /-
C 113 /-/-/70 /86 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 E 999 360
VERT(CL):0.016 E 999 240
HORZ(LL):-0.005 B - -
HORZ(TL):0.008 B - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.059
Max W eb CSI:0.040
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C30A
Ply: 1
Qty:1
SEQN:12222 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T51
DrwNo:079.20.1313.41116
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"7
6"3 6"1'3"61'9"624'0"12
24'6"12
25'6"10
A
B
C
D
EFG
5
12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 146 /-/-/98 /59 /78
D 25 /-/-/21 /12 /-
C 113 /-/-/70 /86 /-
Wind reactions based on MWFRS
A Brg Width = -Min Req =-
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.21 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.010 E 999 360
VERT(CL):0.016 E 999 240
HORZ(LL):-0.005 B - -
HORZ(TL):0.008 B - -
Creep Factor: 2.0
Max TC CSI:0.298
Max BC CSI:0.059
Max W eb CSI:0.040
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C30A
Ply: 1
Qty:1
SEQN:12222 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T51
DrwNo:079.20.1313.41116
AK /DF 03/19/2020
2'0"12
2'0"12
3'0"7
11"11
2'6"
2'6"
3'0"7
6"7
6"3 6"1'3"61'9"624'0"12
24'6"12
25'6"10
A
B
C
D
EFG
5
12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
E 65 /-/-/51 /13 /-
D 158 /-/-/79 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.074 F 799 360
VERT(CL):0.109 F 540 240
HORZ(LL):-0.032 C - -
HORZ(TL):0.046 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.137
Max W eb CSI:0.082
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C31
Ply: 1
Qty:1
SEQN:12216 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T55
DrwNo:079.20.1313.42349
AK /DF 03/19/2020
2'0"12
2'0"12
5'0"7
2'11"11
2'6"
2'6"
5'0"7
2'6"71'8"
6"3 6"2'1"62'7"63'1"524'0"12
24'6"12
26'4"10
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 425 /-/-/309 /209 /175
E 65 /-/-/51 /13 /-
D 158 /-/-/79 /133 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.28 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.074 F 799 360
VERT(CL):0.109 F 540 240
HORZ(LL):-0.032 C - -
HORZ(TL):0.046 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.137
Max W eb CSI:0.082
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C31
Ply: 1
Qty:1
SEQN:12216 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T55
DrwNo:079.20.1313.42349
AK /DF 03/19/2020
2'0"12
2'0"12
5'0"7
2'11"11
2'6"
2'6"
5'0"7
2'6"71'8"
6"3 6"2'1"62'7"63'1"524'0"12
24'6"12
26'4"10
A
B
C
D
E
FGH
5
12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 233 /-/-/137 /117 /63
E 151 /-/-/113 /89 /-
D 82 /-/-/35 /73 /-
Wind reactions based on MWFRS
J Brg Width = -Min Req =-
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 605 -363
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - F 389 -795
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 846 -413
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 G 999 360
VERT(CL):0.027 G 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.017 F - -
Creep Factor: 2.0
Max TC CSI:0.205
Max BC CSI:0.177
Max W eb CSI:0.465
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C31A
Ply: 1
Qty:1
SEQN:12219 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T21
DrwNo:079.20.1313.30834
AK /DF 03/19/2020
2'8"
2'8"
5'0"7
2'4"7
2'6"
2'6"
4'7"4
2'1"4
5'0"7
5"41'7"86"2'1"62'7"624'0"12
24'6"12
26'4"10
A B C
D
EF
GHIJ
5
12
3X3
1.5X6 4X4
1.5X4
4X4
5X5
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 233 /-/-/137 /117 /63
E 151 /-/-/113 /89 /-
D 82 /-/-/35 /73 /-
Wind reactions based on MWFRS
J Brg Width = -Min Req =-
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 605 -363
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - F 389 -795
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 846 -413
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 26.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 G 999 360
VERT(CL):0.027 G 999 240
HORZ(LL):-0.010 F - -
HORZ(TL):0.017 F - -
Creep Factor: 2.0
Max TC CSI:0.205
Max BC CSI:0.177
Max W eb CSI:0.465
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C31A
Ply: 1
Qty:1
SEQN:12219 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T21
DrwNo:079.20.1313.30834
AK /DF 03/19/2020
2'8"
2'8"
5'0"7
2'4"7
2'6"
2'6"
4'7"4
2'1"4
5'0"7
5"41'7"86"2'1"62'7"624'0"12
24'6"12
26'4"10
A B C
D
EF
GHIJ
5
12
3X3
1.5X6 4X4
1.5X4
4X4
5X5
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 10 /-/-/16 /12 /-
D 74 /-/-/53 /55 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 F 999 360
VERT(CL):0.002 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.100
Max W eb CSI:0.034
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C32
Ply: 1
Qty:1
SEQN:12237 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T91
DrwNo:079.20.1313.28900
AK /DF 03/19/2020
2'6"12
2'6"12
3'0"7
5"11
3'
3'
3'0"7
0"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 10 /-/-/16 /12 /-
D 74 /-/-/53 /55 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.002 F 999 360
VERT(CL):0.002 F 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.100
Max W eb CSI:0.034
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C32
Ply: 1
Qty:1
SEQN:12237 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T91
DrwNo:079.20.1313.28900
AK /DF 03/19/2020
2'6"12
2'6"12
3'0"7
5"11
3'
3'
3'0"7
0"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 16 /-/-/18 /7 /-
D 74 /-/-/50 /61 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.004 F 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.098
Max W eb CSI:0.029
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C33
Ply: 1
Qty:1
SEQN:12234 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T66
DrwNo:079.20.1313.41333
AK /DF 03/19/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/264 /175 /121
E 16 /-/-/18 /7 /-
D 74 /-/-/50 /61 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.004 F 999 360
VERT(CL):0.005 F 999 240
HORZ(LL):0.003 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.098
Max W eb CSI:0.029
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C33
Ply: 1
Qty:1
SEQN:12234 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T66
DrwNo:079.20.1313.41333
AK /DF 03/19/2020
2'2"12
2'2"12
3'0"7
9"11
2'8"
2'8"
3'0"7
4"71'8"
6"3 6"1'3"61'9"62'3"524'0"12
24'6"12
25'6"10
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 78 /-/-/43 /47 /84
E 226 /-/-/142 /229 /-
D -/-148 /-/159 /84 /-
C 57 /-/-/27 /56 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
E Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.006 B 999 360
VERT(CL):0.007 B 999 240
HORZ(LL):-0.035 F - -
HORZ(TL):0.038 F - -
Creep Factor: 2.0
Max TC CSI:0.197
Max BC CSI:0.158
Max W eb CSI:0.044
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C34
Ply: 1
Qty:2
SEQN:12286 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T85
DrwNo:079.20.1313.31864
AK /DF 03/19/2020
6"8
1'11"12
1'11"12
2'6"11
6"15
2'9"15
3"4
1"8 1'10"42'10"23"13
4'3"726'10"14
24'0"12
28'0"11
A
B
C
DEF
5 12
3X4
1.5X41.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 78 /-/-/43 /47 /84
E 226 /-/-/142 /229 /-
D -/-148 /-/159 /84 /-
C 57 /-/-/27 /56 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
E Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.006 B 999 360
VERT(CL):0.007 B 999 240
HORZ(LL):-0.035 F - -
HORZ(TL):0.038 F - -
Creep Factor: 2.0
Max TC CSI:0.197
Max BC CSI:0.158
Max W eb CSI:0.044
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C34
Ply: 1
Qty:2
SEQN:12286 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T85
DrwNo:079.20.1313.31864
AK /DF 03/19/2020
6"8
1'11"12
1'11"12
2'6"11
6"15
2'9"15
3"4
1"8 1'10"42'10"23"13
4'3"726'10"14
24'0"12
28'0"11
A
B
C
DEF
5 12
3X4
1.5X41.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 449 /-/-/320 /244 /282
E -/-46 /-/169 /312 /-
D 32 /-10 /-/16 /39 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 103 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 538 -239
G - C 255 -808
Webs Tens.Comp.
C - F 1010 -234
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.011 B 716 360
VERT(CL):0.020 B 409 240
HORZ(LL):-0.024 B - -
HORZ(TL):0.026 B - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.426
Max W eb CSI:0.330
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C35
Ply: 1
Qty:2
SEQN:12313 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T88
DrwNo:080.20.1109.02410
JB /DF 03/20/2020
6"8
10"
10"
2'11"11
2'1"11
6"12
6"12
2'6"12
2'
2'10"3
3"71'8"123'11"35'1"724'0"12
28'10"11
A
B
C
D
EFGH
5
12
1.5X4
2X51.5X4
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 449 /-/-/320 /244 /282
E -/-46 /-/169 /312 /-
D 32 /-10 /-/16 /39 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 103 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 538 -239
G - C 255 -808
Webs Tens.Comp.
C - F 1010 -234
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.011 B 716 360
VERT(CL):0.020 B 409 240
HORZ(LL):-0.024 B - -
HORZ(TL):0.026 B - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.426
Max W eb CSI:0.330
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C35
Ply: 1
Qty:2
SEQN:12313 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T88
DrwNo:080.20.1109.02410
JB /DF 03/20/2020
6"8
10"
10"
2'11"11
2'1"11
6"12
6"12
2'6"12
2'
2'10"3
3"71'8"123'11"35'1"724'0"12
28'10"11
A
B
C
D
EFGH
5
12
1.5X4
2X51.5X4
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 486 /-/-/295 /201 /342
E 64 /-/-/134 /237 /-
D 116 /-/-/40 /116 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 100 -561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 427 -227
Webs Tens.Comp.
C - F 797 -143
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.62 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 B 527 360
VERT(CL):0.012 B 658 240
HORZ(LL):-0.016 B - -
HORZ(TL):0.017 B - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.383
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C36
Ply: 1
Qty:2
SEQN:12292 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T71
DrwNo:079.20.1313.37324
AK /DF 03/19/2020
6"8
10"
10"
4'11"11
4'1"11
6"12
6"12
4'6"
3'11"4
4'10"3
4"31'8"123'11"35'11"724'0"12
29'8"11
A
B
C
D
EFGH
5 12
2X4
1.5X41.5X4
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 486 /-/-/295 /201 /342
E 64 /-/-/134 /237 /-
D 116 /-/-/40 /116 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 100 -561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 427 -227
Webs Tens.Comp.
C - F 797 -143
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.62 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 B 527 360
VERT(CL):0.012 B 658 240
HORZ(LL):-0.016 B - -
HORZ(TL):0.017 B - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.383
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C36
Ply: 1
Qty:2
SEQN:12292 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T71
DrwNo:079.20.1313.37324
AK /DF 03/19/2020
6"8
10"
10"
4'11"11
4'1"11
6"12
6"12
4'6"
3'11"4
4'10"3
4"31'8"123'11"35'11"724'0"12
29'8"11
A
B
C
D
EFGH
5 12
2X4
1.5X41.5X4
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 78 /-/-/43 /47 /84
E 226 /-/-/142 /229 /-
D -/-148 /-/159 /84 /-
C 57 /-/-/27 /56 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
E Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.006 B 999 360
VERT(CL):0.007 B 999 240
HORZ(LL):-0.035 F - -
HORZ(TL):0.038 F - -
Creep Factor: 2.0
Max TC CSI:0.197
Max BC CSI:0.158
Max W eb CSI:0.044
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C37
Ply: 1
Qty:2
SEQN:12295 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T89
DrwNo:079.20.1313.30413
AK /DF 03/19/2020
6"8
1'11"12
1'11"12
2'6"11
6"15
2'9"15
3"4
1"8 1'10"42'10"23"13
4'3"726'10"14
24'0"12
28'0"11
A
B
C
DEF
5 12
3X4
1.5X41.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Shim all supports to solid bearing.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 78 /-/-/43 /47 /84
E 226 /-/-/142 /229 /-
D -/-148 /-/159 /84 /-
C 57 /-/-/27 /56 /-
Wind reactions based on MWFRS
A Brg Width = 1.5 Min Req =-
E Brg Width = 3.5 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 27.79 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.006 B 999 360
VERT(CL):0.007 B 999 240
HORZ(LL):-0.035 F - -
HORZ(TL):0.038 F - -
Creep Factor: 2.0
Max TC CSI:0.197
Max BC CSI:0.158
Max W eb CSI:0.044
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C37
Ply: 1
Qty:2
SEQN:12295 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T89
DrwNo:079.20.1313.30413
AK /DF 03/19/2020
6"8
1'11"12
1'11"12
2'6"11
6"15
2'9"15
3"4
1"8 1'10"42'10"23"13
4'3"726'10"14
24'0"12
28'0"11
A
B
C
DEF
5 12
3X4
1.5X41.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 449 /-/-/320 /244 /282
E -/-46 /-/169 /312 /-
D 32 /-10 /-/16 /39 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 103 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 538 -239
G - C 255 -808
Webs Tens.Comp.
C - F 1010 -234
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.011 B 716 360
VERT(CL):0.020 B 409 240
HORZ(LL):-0.024 B - -
HORZ(TL):0.026 B - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.426
Max W eb CSI:0.330
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C38
Ply: 1
Qty:2
SEQN:12310 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T84
DrwNo:080.20.1109.09220
JB /DF 03/20/2020
6"8
10"
10"
2'11"11
2'1"11
6"12
6"12
2'6"12
2'
2'10"3
3"71'8"123'11"35'1"724'0"12
28'10"11
A
B
C
D
EFGH
5
12
1.5X4
2X51.5X4
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 449 /-/-/320 /244 /282
E -/-46 /-/169 /312 /-
D 32 /-10 /-/16 /39 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 103 -444
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 538 -239
G - C 255 -808
Webs Tens.Comp.
C - F 1010 -234
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.20 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.011 B 716 360
VERT(CL):0.020 B 409 240
HORZ(LL):-0.024 B - -
HORZ(TL):0.026 B - -
Creep Factor: 2.0
Max TC CSI:0.583
Max BC CSI:0.426
Max W eb CSI:0.330
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C38
Ply: 1
Qty:2
SEQN:12310 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T84
DrwNo:080.20.1109.09220
JB /DF 03/20/2020
6"8
10"
10"
2'11"11
2'1"11
6"12
6"12
2'6"12
2'
2'10"3
3"71'8"123'11"35'1"724'0"12
28'10"11
A
B
C
D
EFGH
5
12
1.5X4
2X51.5X4
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 486 /-/-/295 /201 /342
E 64 /-/-/134 /237 /-
D 116 /-/-/40 /116 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 100 -561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 427 -227
Webs Tens.Comp.
C - F 797 -143
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.62 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 B 527 360
VERT(CL):0.012 B 658 240
HORZ(LL):-0.016 B - -
HORZ(TL):0.017 B - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.383
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C39
Ply: 1
Qty:2
SEQN:12301 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T87
DrwNo:079.20.1313.41271
AK /DF 03/19/2020
6"8
10"
10"
4'11"11
4'1"11
6"12
6"12
4'6"
3'11"4
4'10"3
4"31'8"123'11"35'11"724'0"12
29'8"11
A
B
C
D
EFGH
5 12
2X4
1.5X41.5X4
3X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical exposed to wind pressure.
Deflection meets L/180.
Left cantilever is exposed to wind
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 486 /-/-/295 /201 /342
E 64 /-/-/134 /237 /-
D 116 /-/-/40 /116 /-
Wind reactions based on MWFRS
G Brg Width = 3.5 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing G Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - F 100 -561
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 427 -227
Webs Tens.Comp.
C - F 797 -143
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 28.62 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 B 527 360
VERT(CL):0.012 B 658 240
HORZ(LL):-0.016 B - -
HORZ(TL):0.017 B - -
Creep Factor: 2.0
Max TC CSI:0.657
Max BC CSI:0.383
Max W eb CSI:0.298
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C39
Ply: 1
Qty:2
SEQN:12301 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T87
DrwNo:079.20.1313.41271
AK /DF 03/19/2020
6"8
10"
10"
4'11"11
4'1"11
6"12
6"12
4'6"
3'11"4
4'10"3
4"31'8"123'11"35'11"724'0"12
29'8"11
A
B
C
D
EFGH
5 12
2X4
1.5X41.5X4
3X4
1.5X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 338 /-/-/255 /169 /105
D 36 /-/-/40 /11 /-
C 32 /-/-/23 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.613
Max BC CSI:0.104
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C40
Ply: 1
Qty:1
SEQN:11954 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T34
DrwNo:079.20.1313.36872
AK /DF 03/19/2020
2'4"15
2'4"151'8"
6"3 1'6"42'0"324'0"12
25'3"8
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 338 /-/-/255 /169 /105
D 36 /-/-/40 /11 /-
C 32 /-/-/23 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.613
Max BC CSI:0.104
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C40
Ply: 1
Qty:1
SEQN:11954 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T34
DrwNo:079.20.1313.36872
AK /DF 03/19/2020
2'4"15
2'4"151'8"
6"3 1'6"42'0"324'0"12
25'3"8
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 117 /-/-/78 /46 /62
C 46 /-/-/36 /8 /-
B 79 /-/-/35 /71 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.187
Max BC CSI:0.070
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C40A
Ply: 1
Qty:1
SEQN:11950 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T144
DrwNo:079.20.1313.37058
AK /DF 03/19/2020
2'4"15
2'4"15
6"3 1'6"424'0"12
25'3"8
A
B
C
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 117 /-/-/78 /46 /62
C 46 /-/-/36 /8 /-
B 79 /-/-/35 /71 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.187
Max BC CSI:0.070
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C40A
Ply: 1
Qty:1
SEQN:11950 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T144
DrwNo:079.20.1313.37058
AK /DF 03/19/2020
2'4"15
2'4"15
6"3 1'6"424'0"12
25'3"8
A
B
C
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 338 /-/-/255 /169 /105
D 36 /-/-/40 /11 /-
C 32 /-/-/23 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.613
Max BC CSI:0.104
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C43
Ply: 1
Qty:1
SEQN:11951 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T141
DrwNo:079.20.1313.40679
AK /DF 03/19/2020
2'4"15
2'4"151'8"
6"3 1'6"42'0"324'0"12
25'3"8
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 338 /-/-/255 /169 /105
D 36 /-/-/40 /11 /-
C 32 /-/-/23 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.613
Max BC CSI:0.104
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C43
Ply: 1
Qty:1
SEQN:11951 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T141
DrwNo:079.20.1313.40679
AK /DF 03/19/2020
2'4"15
2'4"151'8"
6"3 1'6"42'0"324'0"12
25'3"8
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 117 /-/-/78 /46 /62
C 46 /-/-/36 /8 /-
B 79 /-/-/35 /71 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.187
Max BC CSI:0.070
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C43A
Ply: 1
Qty:1
SEQN:11953 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T142
DrwNo:079.20.1313.42863
AK /DF 03/19/2020
2'4"15
2'4"15
6"3 1'6"424'0"12
25'3"8
A
B
C
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 117 /-/-/78 /46 /62
C 46 /-/-/36 /8 /-
B 79 /-/-/35 /71 /-
Wind reactions based on MWFRS
A Brg Width = 6.0 Min Req =1.5
C Brg Width = 1.5 Min Req =-
B Brg Width = 1.5 Min Req =-
Bearing A Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.08 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.187
Max BC CSI:0.070
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C43A
Ply: 1
Qty:1
SEQN:11953 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T142
DrwNo:079.20.1313.42863
AK /DF 03/19/2020
2'4"15
2'4"15
6"3 1'6"424'0"12
25'3"8
A
B
C
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/258 /171 /111
D 41 /-/-/43 /10 /-
C 45 /-/-/21 /51 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.78 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.106
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C44
Ply: 1
Qty:1
SEQN:11977 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T122
DrwNo:079.20.1313.34422
AK /DF 03/19/2020
2'7"12
2'7"121'8"
6"3 1'7"72'1"624'0"12
25'4"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/258 /171 /111
D 41 /-/-/43 /10 /-
C 45 /-/-/21 /51 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.78 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.106
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C44
Ply: 1
Qty:1
SEQN:11977 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T122
DrwNo:079.20.1313.34422
AK /DF 03/19/2020
2'7"12
2'7"121'8"
6"3 1'7"72'1"624'0"12
25'4"11
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 535 /-/-/381 /264 /248
D 142 /-/-/111 /22 /-
C 246 /-/-/106 /219 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.741
Max BC CSI:0.622
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C45
Ply: 1
Qty:1
SEQN:12166 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T123
DrwNo:079.20.1313.41583
AK /DF 03/19/2020
7'7"12
7'7"121'8"
6"3 3'8"74'2"624'0"12
27'5"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 535 /-/-/381 /264 /248
D 142 /-/-/111 /22 /-
C 246 /-/-/106 /219 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.741
Max BC CSI:0.622
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C45
Ply: 1
Qty:1
SEQN:12166 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T123
DrwNo:079.20.1313.41583
AK /DF 03/19/2020
7'7"12
7'7"121'8"
6"3 3'8"74'2"624'0"12
27'5"11
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/258 /171 /111
D 41 /-/-/43 /10 /-
C 45 /-/-/21 /51 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.78 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.106
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C46
Ply: 1
Qty:1
SEQN:12178 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T119
DrwNo:079.20.1313.38119
AK /DF 03/19/2020
2'7"12
2'7"121'8"
6"3 1'7"72'1"624'0"12
25'4"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 343 /-/-/258 /171 /111
D 41 /-/-/43 /10 /-
C 45 /-/-/21 /51 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.78 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.672
Max BC CSI:0.106
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C46
Ply: 1
Qty:1
SEQN:12178 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T119
DrwNo:079.20.1313.38119
AK /DF 03/19/2020
2'7"12
2'7"121'8"
6"3 1'7"72'1"624'0"12
25'4"11
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 535 /-/-/381 /264 /248
D 142 /-/-/111 /22 /-
C 246 /-/-/106 /219 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.741
Max BC CSI:0.622
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C47
Ply: 1
Qty:1
SEQN:12175 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T120
DrwNo:079.20.1313.38432
AK /DF 03/19/2020
7'7"12
7'7"121'8"
6"3 3'8"74'2"624'0"12
27'5"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 535 /-/-/381 /264 /248
D 142 /-/-/111 /22 /-
C 246 /-/-/106 /219 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.82 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.017 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.741
Max BC CSI:0.622
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C47
Ply: 1
Qty:1
SEQN:12175 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T120
DrwNo:079.20.1313.38432
AK /DF 03/19/2020
7'7"12
7'7"121'8"
6"3 3'8"74'2"624'0"12
27'5"11
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 337 /-/-/255 /167 /107
D 37 /-/-/41 /10 /-
C 36 /-/-/22 /45 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.101
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C48
Ply: 1
Qty:1
SEQN:11985 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T127
DrwNo:079.20.1313.40506
AK /DF 03/19/2020
2'5"10
2'5"101'7"13
6"3 1'6"102'0"924'0"12
25'3"14
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 337 /-/-/255 /167 /107
D 37 /-/-/41 /10 /-
C 36 /-/-/22 /45 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.101
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C48
Ply: 1
Qty:1
SEQN:11985 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T127
DrwNo:079.20.1313.40506
AK /DF 03/19/2020
2'5"10
2'5"101'7"13
6"3 1'6"102'0"924'0"12
25'3"14
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 511 /-/-/367 /250 /236
D 132 /-/-/104 /20 /-
C 228 /-/-/100 /204 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.014 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.666
Max BC CSI:0.538
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C49
Ply: 1
Qty:1
SEQN:11986 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T128
DrwNo:079.20.1313.36389
AK /DF 03/19/2020
7'1"10
7'1"101'7"13
6"3 3'6"34'0"324'0"12
27'3"7
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 511 /-/-/367 /250 /236
D 132 /-/-/104 /20 /-
C 228 /-/-/100 /204 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.014 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.666
Max BC CSI:0.538
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C49
Ply: 1
Qty:1
SEQN:11986 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T128
DrwNo:079.20.1313.36389
AK /DF 03/19/2020
7'1"10
7'1"101'7"13
6"3 3'6"34'0"324'0"12
27'3"7
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Negative reaction(s) of -590# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/373 /251 /253
F 771 /-/-/526 /575 /-
E -/-590 /-/461 /376 /-
D 169 /-/-/84 /144 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 5.1 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 1043 -687
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.134 H 668 360
VERT(CL):0.216 H 413 240
HORZ(LL):-0.063 C - -
HORZ(TL):0.098 C - -
Creep Factor: 2.0
Max TC CSI:0.669
Max BC CSI:0.488
Max W eb CSI:0.341
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C50
Ply: 1
Qty:1
SEQN:12355 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T192
DrwNo:080.20.1109.14283
JB /DF 03/20/2020
7'6"3
3'7"9
3'7"9
7'8"12
4'1"2
3'7"9
3'7"9
3'9"5
1"12
7'6"11
3'9"5
7'8"12
2"11'7"13
6"3 1'2'9"43'9"44'3"324'0"12
25'0"12
27'6"8
A
B
C
D
EF
G
H I
5.05
12
3X4(B1)
3X3
2X63X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Negative reaction(s) of -590# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/373 /251 /253
F 771 /-/-/526 /575 /-
E -/-590 /-/461 /376 /-
D 169 /-/-/84 /144 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 5.1 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 1043 -687
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.134 H 668 360
VERT(CL):0.216 H 413 240
HORZ(LL):-0.063 C - -
HORZ(TL):0.098 C - -
Creep Factor: 2.0
Max TC CSI:0.669
Max BC CSI:0.488
Max W eb CSI:0.341
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C50
Ply: 1
Qty:1
SEQN:12355 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T192
DrwNo:080.20.1109.14283
JB /DF 03/20/2020
7'6"3
3'7"9
3'7"9
7'8"12
4'1"2
3'7"9
3'7"9
3'9"5
1"12
7'6"11
3'9"5
7'8"12
2"11'7"13
6"3 1'2'9"43'9"44'3"324'0"12
25'0"12
27'6"8
A
B
C
D
EF
G
H I
5.05
12
3X4(B1)
3X3
2X63X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 452 /-/-/327 /220 /196
F 34 /-/-/24 /22 /-
E 200 /-/-/127 /146 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 299 -598
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 654 -325
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 I 999 360
VERT(CL):0.025 I 999 240
HORZ(LL):-0.022 G - -
HORZ(TL):0.034 G - -
Creep Factor: 2.0
Max TC CSI:0.591
Max BC CSI:0.146
Max W eb CSI:0.506
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C51
Ply: 1
Qty:1
SEQN:11989 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T190
DrwNo:079.20.1313.38572
AK /DF 03/19/2020
4'1"4
4'1"4
5'4"10
1'3"5
5'8"12
4"2
4'1"4
4'1"4
5'2"14
1'1"9
5'8"12
5"14
1'7"13
6"3 2'11"21'3'5"124'0"12
26'8"6
A
B
C
D E
F
G
H
I J
5.05
12
3X4(B1)
3X3
1.5X4
3X4
4X4
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 452 /-/-/327 /220 /196
F 34 /-/-/24 /22 /-
E 200 /-/-/127 /146 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 299 -598
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 654 -325
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 I 999 360
VERT(CL):0.025 I 999 240
HORZ(LL):-0.022 G - -
HORZ(TL):0.034 G - -
Creep Factor: 2.0
Max TC CSI:0.591
Max BC CSI:0.146
Max W eb CSI:0.506
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C51
Ply: 1
Qty:1
SEQN:11989 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T190
DrwNo:079.20.1313.38572
AK /DF 03/19/2020
4'1"4
4'1"4
5'4"10
1'3"5
5'8"12
4"2
4'1"4
4'1"4
5'2"14
1'1"9
5'8"12
5"14
1'7"13
6"3 2'11"21'3'5"124'0"12
26'8"6
A
B
C
D E
F
G
H
I J
5.05
12
3X4(B1)
3X3
1.5X4
3X4
4X4
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/277 /183 /141
D 64 /-/-/58 /8 /-
C 96 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.129
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C52
Ply: 1
Qty:1
SEQN:11990 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T1
DrwNo:079.20.1313.34828
AK /DF 03/19/2020
3'8"12
3'8"121'7"13
6"3 2'1"2'6"1524'0"12
25'10"4
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/277 /183 /141
D 64 /-/-/58 /8 /-
C 96 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.129
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C52
Ply: 1
Qty:1
SEQN:11990 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T1
DrwNo:079.20.1313.34828
AK /DF 03/19/2020
3'8"12
3'8"121'7"13
6"3 2'1"2'6"1524'0"12
25'10"4
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/255 /167 /87
D 20 /-2 /-/32 /12 /-
C -/-14 /-/31 /33 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.59 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.086
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C53
Ply: 1
Qty:1
SEQN:11991 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T121
DrwNo:079.20.1313.36871
AK /DF 03/19/2020
1'8"12
1'8"121'7"13
6"3 1'2"151'8"1424'0"12
25'0"3
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/255 /167 /87
D 20 /-2 /-/32 /12 /-
C -/-14 /-/31 /33 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.59 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.086
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C53
Ply: 1
Qty:1
SEQN:11991 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T121
DrwNo:079.20.1313.36871
AK /DF 03/19/2020
1'8"12
1'8"121'7"13
6"3 1'2"151'8"1424'0"12
25'0"3
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 337 /-/-/255 /167 /107
D 37 /-/-/41 /10 /-
C 36 /-/-/22 /45 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.101
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C54
Ply: 1
Qty:1
SEQN:11970 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T112
DrwNo:079.20.1313.34079
AK /DF 03/19/2020
2'5"10
2'5"101'7"13
6"3 1'6"102'0"924'0"12
25'3"14
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 337 /-/-/255 /167 /107
D 37 /-/-/41 /10 /-
C 36 /-/-/22 /45 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.75 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.602
Max BC CSI:0.101
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C54
Ply: 1
Qty:1
SEQN:11970 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T112
DrwNo:079.20.1313.34079
AK /DF 03/19/2020
2'5"10
2'5"101'7"13
6"3 1'6"102'0"924'0"12
25'3"14
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 511 /-/-/367 /250 /236
D 132 /-/-/104 /20 /-
C 228 /-/-/100 /204 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.014 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.666
Max BC CSI:0.538
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C55
Ply: 1
Qty:1
SEQN:11971 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T113
DrwNo:079.20.1313.40943
AK /DF 03/19/2020
7'1"10
7'1"101'7"13
6"3 3'6"34'0"324'0"12
27'3"7
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 511 /-/-/367 /250 /236
D 132 /-/-/104 /20 /-
C 228 /-/-/100 /204 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.73 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.014 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.666
Max BC CSI:0.538
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C55
Ply: 1
Qty:1
SEQN:11971 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T113
DrwNo:079.20.1313.40943
AK /DF 03/19/2020
7'1"10
7'1"101'7"13
6"3 3'6"34'0"324'0"12
27'3"7
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Negative reaction(s) of -590# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/373 /251 /253
F 771 /-/-/526 /575 /-
E -/-590 /-/461 /376 /-
D 169 /-/-/84 /144 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 5.1 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 1043 -687
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.134 H 668 360
VERT(CL):0.216 H 413 240
HORZ(LL):-0.063 C - -
HORZ(TL):0.098 C - -
Creep Factor: 2.0
Max TC CSI:0.669
Max BC CSI:0.488
Max W eb CSI:0.341
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C56
Ply: 1
Qty:1
SEQN:12352 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T202
DrwNo:080.20.1109.18960
JB /DF 03/20/2020
7'6"3
3'7"9
3'7"9
7'8"12
4'1"2
3'7"9
3'7"9
3'9"5
1"12
7'6"11
3'9"5
7'8"12
2"11'7"13
6"3 1'2'9"43'9"44'3"324'0"12
25'0"12
27'6"8
A
B
C
D
EF
G
H I
5.05
12
3X4(B1)
3X3
2X63X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Negative reaction(s) of -590# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/373 /251 /253
F 771 /-/-/526 /575 /-
E -/-590 /-/461 /376 /-
D 169 /-/-/84 /144 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 5.1 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearings B & F Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - F 1043 -687
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.86 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.134 H 668 360
VERT(CL):0.216 H 413 240
HORZ(LL):-0.063 C - -
HORZ(TL):0.098 C - -
Creep Factor: 2.0
Max TC CSI:0.669
Max BC CSI:0.488
Max W eb CSI:0.341
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C56
Ply: 1
Qty:1
SEQN:12352 JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T202
DrwNo:080.20.1109.18960
JB /DF 03/20/2020
7'6"3
3'7"9
3'7"9
7'8"12
4'1"2
3'7"9
3'7"9
3'9"5
1"12
7'6"11
3'9"5
7'8"12
2"11'7"13
6"3 1'2'9"43'9"44'3"324'0"12
25'0"12
27'6"8
A
B
C
D
EF
G
H I
5.05
12
3X4(B1)
3X3
2X63X6
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 452 /-/-/327 /220 /196
F 35 /-/-/25 /23 /-
E 199 /-/-/126 /145 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 304 -608
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 658 -328
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 I 999 360
VERT(CL):0.026 I 999 240
HORZ(LL):-0.022 G - -
HORZ(TL):0.034 G - -
Creep Factor: 2.0
Max TC CSI:0.591
Max BC CSI:0.144
Max W eb CSI:0.510
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C57
Ply: 1
Qty:1
SEQN:12160 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T125
DrwNo:079.20.1313.42004
AK /DF 03/19/2020
4'0"13
4'0"13
5'4"11
1'3"14
5'8"12
4"
4'0"13
4'0"13
5'2"15
1'2"2
5'8"12
5"12
1'7"13
6"3 2'11"21'3'5"124'0"12
26'8"6
A
B
C
D E
F
G
H
I J
5.05
12
3X4(B1)
3X3
1.5X4
3X4
4X4
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 452 /-/-/327 /220 /196
F 35 /-/-/25 /23 /-
E 199 /-/-/126 /145 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 304 -608
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - H 658 -328
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.44 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 I 999 360
VERT(CL):0.026 I 999 240
HORZ(LL):-0.022 G - -
HORZ(TL):0.034 G - -
Creep Factor: 2.0
Max TC CSI:0.591
Max BC CSI:0.144
Max W eb CSI:0.510
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C57
Ply: 1
Qty:1
SEQN:12160 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T125
DrwNo:079.20.1313.42004
AK /DF 03/19/2020
4'0"13
4'0"13
5'4"11
1'3"14
5'8"12
4"
4'0"13
4'0"13
5'2"15
1'2"2
5'8"12
5"12
1'7"13
6"3 2'11"21'3'5"124'0"12
26'8"6
A
B
C
D E
F
G
H
I J
5.05
12
3X4(B1)
3X3
1.5X4
3X4
4X4
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/277 /183 /141
D 64 /-/-/58 /8 /-
C 96 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.129
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C58
Ply: 1
Qty:1
SEQN:11975 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T116
DrwNo:079.20.1313.35967
AK /DF 03/19/2020
3'8"12
3'8"121'7"13
6"3 2'1"2'6"1524'0"12
25'10"4
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 373 /-/-/277 /183 /141
D 64 /-/-/58 /8 /-
C 96 /-/-/34 /92 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.02 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.661
Max BC CSI:0.129
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C58
Ply: 1
Qty:1
SEQN:11975 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T116
DrwNo:079.20.1313.35967
AK /DF 03/19/2020
3'8"12
3'8"121'7"13
6"3 2'1"2'6"1524'0"12
25'10"4
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/255 /167 /87
D 20 /-2 /-/32 /12 /-
C -/-14 /-/31 /33 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.59 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.086
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C59
Ply: 1
Qty:1
SEQN:11976 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T117
DrwNo:079.20.1313.28978
AK /DF 03/19/2020
1'8"12
1'8"121'7"13
6"3 1'2"151'8"1424'0"12
25'0"3
A
B
C
D
5.05
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 331 /-/-/255 /167 /87
D 20 /-2 /-/32 /12 /-
C -/-14 /-/31 /33 /-
Wind reactions based on MWFRS
B Brg Width = 8.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.59 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.086
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C59
Ply: 1
Qty:1
SEQN:11976 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T117
DrwNo:079.20.1313.28978
AK /DF 03/19/2020
1'8"12
1'8"121'7"13
6"3 1'2"151'8"1424'0"12
25'0"3
A
B
C
D
5.05
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 413 /-/-/284 /214 /123
D 59 /-/-/59 /11 /-
C 79 /-/-/28 /76 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.87 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.907
Max BC CSI:0.172
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C60
Ply: 1
Qty:1
SEQN:11956 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T180
DrwNo:079.20.1313.42051
AK /DF 03/19/2020
3'7"9
3'7"91'11"9
6"3 1'9"102'3"724'0"12
25'6"14
A
B
C
D
4.24 12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 413 /-/-/284 /214 /123
D 59 /-/-/59 /11 /-
C 79 /-/-/28 /76 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.87 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.907
Max BC CSI:0.172
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C60
Ply: 1
Qty:1
SEQN:11956 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T180
DrwNo:079.20.1313.42051
AK /DF 03/19/2020
3'7"9
3'7"91'11"9
6"3 1'9"102'3"724'0"12
25'6"14
A
B
C
D
4.24 12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 484 /-/-/324 /251 /169
F 170 /-/-/114 /114 /-
E 46 /-/-/20 /37 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 414 -313
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - K 309 -595
Chords Tens.Comp.
K - H 281 -538
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 621 -274
K - J 233 -491
Webs Tens.Comp.
D - G 497 -258
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.030 J 999 360
VERT(CL):0.045 J 999 240
HORZ(LL):-0.017 G - -
HORZ(TL):0.028 G - -
Creep Factor: 2.0
Max TC CSI:0.894
Max BC CSI:0.328
Max W eb CSI:0.267
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C61
Ply: 1
Qty:1
SEQN:12346 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T183
DrwNo:079.20.1313.26779
AK /DF 03/19/2020
2'3"6
2'3"6
2'10"15
7"9
4'1"1
1'2"2
5'3"14
1'2"13
5'7"9
3"12
1'11"9
6"3 6"2'0"11'2'6"12'11"1524'0"12
24'6"12
26'3"5
A
B
C
D
E
FG
H I
JK
4.24 12
3X4(B1)
3X81.5X4
3X3
3X31.5X4
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 484 /-/-/324 /251 /169
F 170 /-/-/114 /114 /-
E 46 /-/-/20 /37 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 414 -313
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - K 309 -595
Chords Tens.Comp.
K - H 281 -538
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 621 -274
K - J 233 -491
Webs Tens.Comp.
D - G 497 -258
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.030 J 999 360
VERT(CL):0.045 J 999 240
HORZ(LL):-0.017 G - -
HORZ(TL):0.028 G - -
Creep Factor: 2.0
Max TC CSI:0.894
Max BC CSI:0.328
Max W eb CSI:0.267
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C61
Ply: 1
Qty:1
SEQN:12346 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T183
DrwNo:079.20.1313.26779
AK /DF 03/19/2020
2'3"6
2'3"6
2'10"15
7"9
4'1"1
1'2"2
5'3"14
1'2"13
5'7"9
3"12
1'11"9
6"3 6"2'0"11'2'6"12'11"1524'0"12
24'6"12
26'3"5
A
B
C
D
E
FG
H I
JK
4.24 12
3X4(B1)
3X81.5X4
3X3
3X31.5X4
4X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 471 /-/-/317 /244 /161
E 46 /-/-/36 /20 /-
D 162 /-/-/89 /120 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 F 999 360
VERT(CL):0.090 F 693 240
HORZ(LL):-0.021 C - -
HORZ(TL):0.031 C - -
Creep Factor: 2.0
Max TC CSI:0.840
Max BC CSI:0.154
Max W eb CSI:0.104
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C62
Ply: 1
Qty:1
SEQN:12337 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T187
DrwNo:079.20.1313.42129
AK /DF 03/19/2020
3'8"2
3'8"2
5'3"11
1'7"9
4'3"14
4'3"14
5'3"11
11"131'11"9
6"3 6"1'10"112'4"112'10"924'0"12
24'6"12
26'1"15
A
B
C
D
E
FGH
4.24 12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 471 /-/-/317 /244 /161
E 46 /-/-/36 /20 /-
D 162 /-/-/89 /120 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 F 999 360
VERT(CL):0.090 F 693 240
HORZ(LL):-0.021 C - -
HORZ(TL):0.031 C - -
Creep Factor: 2.0
Max TC CSI:0.840
Max BC CSI:0.154
Max W eb CSI:0.104
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C62
Ply: 1
Qty:1
SEQN:12337 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T187
DrwNo:079.20.1313.42129
AK /DF 03/19/2020
3'8"2
3'8"2
5'3"11
1'7"9
4'3"14
4'3"14
5'3"11
11"131'11"9
6"3 6"1'10"112'4"112'10"924'0"12
24'6"12
26'1"15
A
B
C
D
E
FGH
4.24 12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 336 /-/-/259 /174 /82
D 16 /-5 /-/30 /13 /-
C -/-29 /-/38 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.56 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.087
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C63
Ply: 1
Qty:1
SEQN:11960 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T185
DrwNo:079.20.1313.28199
AK /DF 03/19/2020
1'6"14
1'6"141'8"
6"3 1'2"11'8"24'0"12
24'11"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 336 /-/-/259 /174 /82
D 16 /-5 /-/30 /13 /-
C -/-29 /-/38 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.56 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.087
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C63
Ply: 1
Qty:1
SEQN:11960 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T185
DrwNo:079.20.1313.28199
AK /DF 03/19/2020
1'6"14
1'6"141'8"
6"3 1'2"11'8"24'0"12
24'11"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 407 /-/-/297 /199 /163
E 147 /-/-/100 /118 /-
D 26 /-/-/24 /17 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 480 -193
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 G 999 360
VERT(CL):0.006 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.004 F - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.110
Max W eb CSI:0.184
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C64
Ply: 1
Qty:1
SEQN:11961 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T170
DrwNo:079.20.1313.40398
AK /DF 03/19/2020
3'6"11
3'6"11
4'6"14
1'0"4
3'6"11
3'6"11
4'2"10
8"
4'6"14
4"4
1'8"
6"3 6"1'11"12'5"12'11"24'0"12
24'6"12
26'2"5
A
B
C
D
EF
G H
5
12
3X4(B1)3X31.5X4
4X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 407 /-/-/297 /199 /163
E 147 /-/-/100 /118 /-
D 26 /-/-/24 /17 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 480 -193
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 G 999 360
VERT(CL):0.006 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.004 F - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.110
Max W eb CSI:0.184
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C64
Ply: 1
Qty:1
SEQN:11961 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T170
DrwNo:079.20.1313.40398
AK /DF 03/19/2020
3'6"11
3'6"11
4'6"14
1'0"4
3'6"11
3'6"11
4'2"10
8"
4'6"14
4"4
1'8"
6"3 6"1'11"12'5"12'11"24'0"12
24'6"12
26'2"5
A
B
C
D
EF
G H
5
12
3X4(B1)3X31.5X4
4X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 407 /-/-/297 /199 /163
E 146 /-/-/99 /117 /-
D 27 /-/-/24 /17 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 478 -192
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 G 999 360
VERT(CL):0.006 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.004 F - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.110
Max W eb CSI:0.185
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C65
Ply: 1
Qty:1
SEQN:11963 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T176
DrwNo:079.20.1313.26716
AK /DF 03/19/2020
3'6"8
3'6"8
4'6"14
1'0"6
3'6"8
3'6"8
4'2"10
8"2
4'6"14
4"4
1'8"
6"3 6"1'11"12'5"12'11"24'0"12
24'6"12
26'2"5
A
B
C
D
EF
G H
5
12
3X4(B1)3X31.5X4
4X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 407 /-/-/297 /199 /163
E 146 /-/-/99 /117 /-
D 27 /-/-/24 /17 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 478 -192
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.18 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 G 999 360
VERT(CL):0.006 G 999 240
HORZ(LL):-0.003 F - -
HORZ(TL):0.004 F - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.110
Max W eb CSI:0.185
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C65
Ply: 1
Qty:1
SEQN:11963 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T176
DrwNo:079.20.1313.26716
AK /DF 03/19/2020
3'6"8
3'6"8
4'6"14
1'0"6
3'6"8
3'6"8
4'2"10
8"2
4'6"14
4"4
1'8"
6"3 6"1'11"12'5"12'11"24'0"12
24'6"12
26'2"5
A
B
C
D
EF
G H
5
12
3X4(B1)3X31.5X4
4X4
4X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 336 /-/-/259 /174 /82
D 16 /-5 /-/30 /13 /-
C -/-29 /-/38 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.56 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.087
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C66
Ply: 1
Qty:1
SEQN:11964 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T188
DrwNo:079.20.1313.33782
AK /DF 03/19/2020
1'6"14
1'6"141'8"
6"3 1'2"11'8"24'0"12
24'11"5
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 336 /-/-/259 /174 /82
D 16 /-5 /-/30 /13 /-
C -/-29 /-/38 /42 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.56 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.611
Max BC CSI:0.087
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C66
Ply: 1
Qty:1
SEQN:11964 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T188
DrwNo:079.20.1313.33782
AK /DF 03/19/2020
1'6"14
1'6"141'8"
6"3 1'2"11'8"24'0"12
24'11"5
A
B
C
D
5
12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 471 /-/-/317 /244 /161
E 46 /-/-/36 /20 /-
D 162 /-/-/89 /120 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 F 999 360
VERT(CL):0.090 F 693 240
HORZ(LL):-0.021 C - -
HORZ(TL):0.031 C - -
Creep Factor: 2.0
Max TC CSI:0.840
Max BC CSI:0.154
Max W eb CSI:0.104
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C67
Ply: 1
Qty:1
SEQN:12334 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T184
DrwNo:079.20.1313.26951
AK /DF 03/19/2020
3'8"1
3'8"1
5'3"11
1'7"9
4'3"13
4'3"13
5'3"11
11"131'11"9
6"3 6"1'10"112'4"112'10"924'0"12
24'6"12
26'1"15
A
B
C
D
E
FGH
4.24 12
3X4(B1)3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 471 /-/-/317 /244 /161
E 46 /-/-/36 /20 /-
D 162 /-/-/89 /120 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.17 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.057 F 999 360
VERT(CL):0.090 F 693 240
HORZ(LL):-0.021 C - -
HORZ(TL):0.031 C - -
Creep Factor: 2.0
Max TC CSI:0.840
Max BC CSI:0.154
Max W eb CSI:0.104
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C67
Ply: 1
Qty:1
SEQN:12334 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T184
DrwNo:079.20.1313.26951
AK /DF 03/19/2020
3'8"1
3'8"1
5'3"11
1'7"9
4'3"13
4'3"13
5'3"11
11"131'11"9
6"3 6"1'10"112'4"112'10"924'0"12
24'6"12
26'1"15
A
B
C
D
E
FGH
4.24 12
3X4(B1)3X3
1.5X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 484 /-/-/325 /251 /169
F 199 /-/-/125 /137 /-
E 18 /-3 /-/9 /14 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - K 244 -473
Chords Tens.Comp.
K - H 217 -416
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 627 -274
K - J 233 -496
Webs Tens.Comp.
D - G 556 -287
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.032 J 999 360
VERT(CL):0.050 J 999 240
HORZ(LL):-0.018 G - -
HORZ(TL):0.029 G - -
Creep Factor: 2.0
Max TC CSI:0.894
Max BC CSI:0.337
Max W eb CSI:0.230
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C68
Ply: 1
Qty:1
SEQN:12329 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T173
DrwNo:079.20.1313.28400
AK /DF 03/19/2020
2'3"6
2'3"6
2'10"15
7"9
4'5"5
1'6"6
5'7"9
1'2"41'11"9
6"3 6"2'0"11'2'6"12'11"1524'0"12
24'6"12
26'3"5
A
B
C
D
E
FG
H I
JK
4.24 12
3X4(B1)
3X81.5X4
3X3
3X31.5X4
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace at chord
ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 484 /-/-/325 /251 /169
F 199 /-/-/125 /137 /-
E 18 /-3 /-/9 /14 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - K 244 -473
Chords Tens.Comp.
K - H 217 -416
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 627 -274
K - J 233 -496
Webs Tens.Comp.
D - G 556 -287
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 25.23 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.032 J 999 360
VERT(CL):0.050 J 999 240
HORZ(LL):-0.018 G - -
HORZ(TL):0.029 G - -
Creep Factor: 2.0
Max TC CSI:0.894
Max BC CSI:0.337
Max W eb CSI:0.230
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C68
Ply: 1
Qty:1
SEQN:12329 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T173
DrwNo:079.20.1313.28400
AK /DF 03/19/2020
2'3"6
2'3"6
2'10"15
7"9
4'5"5
1'6"6
5'7"9
1'2"41'11"9
6"3 6"2'0"11'2'6"12'11"1524'0"12
24'6"12
26'3"5
A
B
C
D
E
FG
H I
JK
4.24 12
3X4(B1)
3X81.5X4
3X3
3X31.5X4
4X4
1.5X4
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 413 /-/-/284 /214 /123
D 59 /-/-/59 /11 /-
C 79 /-/-/28 /76 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.87 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.907
Max BC CSI:0.172
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C69
Ply: 1
Qty:1
SEQN:11968 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T178
DrwNo:079.20.1313.42191
AK /DF 03/19/2020
3'7"9
3'7"91'11"9
6"3 1'9"102'3"724'0"12
25'6"14
A
B
C
D
4.24 12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 413 /-/-/284 /214 /123
D 59 /-/-/59 /11 /-
C 79 /-/-/28 /76 /-
Wind reactions based on MWFRS
B Brg Width = 6.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B Fcperp = 335psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:10.00
Soffit:10.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.87 ft
TCDL: 5.0 psf
BCDL: 5.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.003 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.907
Max BC CSI:0.172
Max W eb CSI:0.000
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:C69
Ply: 1
Qty:1
SEQN:11968 /JACK
FROM:
Cust: R 761 JRef:1WTP7610004 T178
DrwNo:079.20.1313.42191
AK /DF 03/19/2020
3'7"9
3'7"91'11"9
6"3 1'9"102'3"724'0"12
25'6"14
A
B
C
D
4.24 12
3X4(B1)
03/20/2020
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B*75 /-/-/46 /65 /7
Wind reactions based on MWFRS
B Brg Width = 51.4 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.67 ft
TCDL: 5.0 psf
BCDL: 2.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.001 F 999 360
VERT(CL):0.001 F 999 240
HORZ(LL):-0.001 F - -
HORZ(TL):0.001 F - -
Creep Factor: 2.0
Max TC CSI:0.079
Max BC CSI:0.045
Max W eb CSI:0.021
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:P1
Ply: 1
Qty:21
SEQN:14005 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T3
DrwNo:079.20.1313.27355
AK /DF 03/19/2020
4'3"6
2'1"11
2'1"11
4'3"6
2'1"11
4'3"6
4'3"6 4"3
4"11'2"121'4"430'11"12A
B
C
D
E
F
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing,any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses.A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitabilityand use of this drawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see this job's general notes page and these web sites: ALPINE: www.alpineitw.com; TPI: www.tpinst.org; SBCA: www.sbcindustry.com; ICC: www.iccsafe.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Additional Notes
Refer to General Notes for additional information
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B*75 /-/-/46 /65 /7
Wind reactions based on MWFRS
B Brg Width = 51.4 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:45.00
NCBCLL:0.00
Soffit:10.00
Load Duration: 1.25
Spacing: 19.2 "
Wind Criteria
Wind Std:ASCE 7-10
Speed:160 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 31.67 ft
TCDL: 5.0 psf
BCDL: 2.0 psf
MW FRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Code / Misc Criteria
Bldg Code:FBC 2017 RES
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.001 F 999 360
VERT(CL):0.001 F 999 240
HORZ(LL):-0.001 F - -
HORZ(TL):0.001 F - -
Creep Factor: 2.0
Max TC CSI:0.079
Max BC CSI:0.045
Max W eb CSI:0.021
VIEW Ver: 17.02.01A.1115.21
Job Number:20-0005
/CHRISTOPHER BURTON HOMES / /MACK RESIDENCE
Truss Label:P1
Ply: 1
Qty:21
SEQN:14005 /COMN
FROM: GLM
Cust: R 761 JRef:1WTP7610004 T3
DrwNo:079.20.1313.27355
AK /DF 03/19/2020
4'3"6
2'1"11
2'1"11
4'3"6
2'1"11
4'3"6
4'3"6 4"3
4"11'2"121'4"430'11"12A
B
C
D
E
F
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
03/20/2020
COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043 03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043 03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043 03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043
03/20/2020COA #0 278
03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043 03/20/2020COA #0 278
13723 Riverport Drive
Suite 200
Maryland Heights, MO 63043 03/20/2020COA #0 278