Loading...
HomeMy WebLinkAboutGenPad pg 1.pdf 20180 Y 10 �o N 0 N O GENERATOR UNIT BY SEPARATE SUBMITTAL (SEE CONCRETE PAD SCHEDULE FOR MINIMUM ¢ : WEIGHT REQUIRE) FRONT VIEW PAD LENGTH I ANCHOR FG3154-4G LOCATION r 9.859 r1.063" o I i `� ` N \ :- 17.625" } rl 53.56" (PAD LENGTH) P�L^AN VIEW <J WIND LOAD i RESULTANT x w H z L7 w x I z 95* SIDE VIEW PAD WIDTH HURRICANE CONC (GENERAC A (ON-GRADI a 2 ui x PAD THICKNESS _ PAD THICKNESS o d ID Ln o TYPICAL ANCHORAGE: (4) 3/8" DIA. AMIFAST CONCRETE INSERTS (PART# 165003 & TEST REPORT 95329 BY ELEMENT MATERIALS TECHNOLOGY) W/ 3/8" DIA. BOLT ASTM A307, 3" MIN. EDGE DISTANCE, 1-3/8" EMBED. INTO CONCRETE (BASE PAN MIN. THICKNESS = 0.69" AND MIN. BEARING STRENGTH = 6 KSI) ITEM GENERATOR 01W LENGTH 1 8KW 2 10KW 3 14KW 4 16KW 5 16KW 6 17KW 7 17KW B 2OKW 9 2OKW 10 22KW NQTESJ ! 1- CONCRETE PADS WE: 2- FULL THICKNESS OF 3- ALL OTHER UNITS N( PAD 4- CONTRACTOR SHALL THICKNESS EMBED. AS PER CURREP FROM ANY CONCRETE F