Loading...
HomeMy WebLinkAboutChecklist, PLANNING & DEVELOPMENT BOARD OF SERVICES DEPARTMENT COUNTY 41 COMMISSIONERS . . Building & Code Regulation CHECKLIST FOR RESIDENTIAL/COMMERCIAL BUILDING PERMIT q( 30 RECEIVED Date Plt o 7 2ozo Permit Number: Technician: St. Lucie Counh enr Required Documents: / Application completely filled out with Notarized Signatures ............................ Yes ✓ No_N/A_ Sub Agreements with Notarized Signatures (prior to issuance) .......................... Yes ✓ No — N/A_ Owner / Builder Affidavit (signed in office) ................................................. Yes_NNo_ N/A ✓ Filled Land Affidavit (prior to issuance) ................................................... Yes ✓ No N/A_ Recorded Warranty Deed, if applicable......................................................Yes_No _ N/A V Recorded Notice of Commencement (prior to issuance or inspection) ................. Yes ✓No _ N/A_ Utility Agreement or Payment Receipt (prior to issuance).................................Yes "/No _ N/A_ Vegetation Removal Application with copy of survey.....................................Yes V/ No _ N/A Plans, Calculations & Attachments (3 copies commercial, 2 copies residential) Complete set of plans with Engineer / Architect Raised Seal ........................... Yes '/No_N/A_ Truss Plans reviewed and approved by Engineer / Architect ............................ Yes VlNo_N/A_ Landscaping and Parking plan (under 6,000 sgli)......................................... Yes_No _ N/A Approved Site Plans........................................................................... Yes `�No_N/A_ Sealed Survey with Dimensions, Finished floor ........................................... Yes /No_N/A_ Elevations and Setbacks.............................................................. Yes I�No_N/A_ Plot plan with Setbacks............................................................... Yes _/No _ N/A_ Health Department approval stamped on survey and floor plan ........................ Yes_FioN/A '� Health Department Food Establishment Permit stamped on floor plan ................ Ye oNoN/A Manual "]" or Manual "N" Calculations.................................................... Yea ✓ No _ N/A_ Signed Energy Calculations (1 set original signatures & signed in 2 spots) ........... .Yes ✓ NON/A Sealed Wind Load Compliance Certification ............................................... Yes.VNlo_d/A Product Review Affidavit..................................................................... Yes ✓ NON/A Famvaduff a pond for fill• Site plan showing 25-foot(minimum) setback from all property boundaries, shmi Yeo No N/A shape, location and quantities of proposed excavation and fill areas Side slopes not to exceed 4 to 1 to a minimum of 3 feet below water level......... Yeo No N/AjL Depth of excavation does not exceed 12 feet in depth .................................... Yes_No N/A✓✓ if Hauling fill off site (excess of 100 cubic yards) you must have a mining permit Yes No N/A IL Other, Health Department Permit Paperwork....................................................... Yeo NoN/A/— CD for Fire Department if commercial or multi -family ................................... Yes NoN/A✓ DEP, SFWMD or Army Corp of Engineers (dock, seawall, SF on beach)............ Yeo No_V/A[ Pool Barrier Affidavit.......................................................................... Yes NoN/A�✓ Ground Sign Landscape Affidavit (signs) ................................................... Yes ---.Po _ N/A Bum Rate for Sign Cabinets.................................................................. Yes No N/A !!� RY andMebile home Tie -Do= gLV (2 copies) Permit Worksheet (Tie -Doan Diagram) ................................................... Yea No_YYA ✓ Manufacnue Set -Up and installation Mammal .............................................. Yes No_N/A ✓ Manufacnue Blocking Documents.......................................................... Yes No N/A Signed Penetrometer Test (1 copy)......................................................... Yea No N/A ✓ StairDetails Yes No Y/A, .................................................................................... ---- Mobile Home inspection Report for Relocation (used only) ........................... Yee No�Q/A ✓ Copy of Title iior Relocation (used only) ................................................... Yes NoN/Ak_l Private Property not in a mobile home park Class "A" Approval from Planning or file # ................................................ Yes No N/AZ COMMENTS Revisedlorsna