Loading...
HomeMy WebLinkAboutProduct ApprovalI If e , BCIS Home Log In User Registration Hot Topics Submit Surcharge Stats & Fads Publications contact Us acts site Map links Search dbu(s _ �4'1 Product Approval USER:Public User V_m¢_pP."o-le.^.u>r :Jy_nrP.0>,ta, yjgZri^n L�;>APPlieatlan petal FL # FL9190-R6 Application Type Revision Code Version 2017 Application Status Approved Comments Archived' Product Manufacturer Address/Phone/Email Authorized Signature Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Subcategory Compliance Method LP Building Products 414 Union Street - Bank of America Plaza Suite 2000 Nashville, TN 37219 (352) 425-7457 m.macomber@lpcorp.com CW Macomber m.macomber@lpcorp.com CW Macomber 5712 SW 40th Place Ocala, FL 34474 (352) 425-7457 cw.macomber@lpcorp.com CW Macomber 5712 SW 40th Place Ocala, FL 34474 (352) 425-7457 Panel Walls Siding _ iJ �. • V Evaluation Report (ram a Florida Registered Professional Engineer Evaluation Report - Hardcopy Received FloridaEngineer or Architect Name who developed the Do Kim, P.E. Evaluation Report Florida License PE-49497 Quality Assurance Entity APA - The Engineered Wood Association Quality Assurance Contract Expiration Date 12/31/2022 Validated By James L. Buckner, P.E. @ CBUCK Engineering Validation Checklist - Hardcopy Received Certificate of Independence Referenced Standard and Year (of Standard) Equivalence of Product Standards Certified By FL91_90 R6 COI LP Certificate of Independence.pdf Florida Licensed Professional Engineer or Architect FL9190 R6 f%Lkv equivalency of standard form.pdI Florida Sections from the Code 1405 Impact Resistant: No Design Pressure: N/A Other: Refer to Evaluation Report. Product is not Impact resistant. In HVHZ, must be used in conjunction with approved impact resistant product except for uninhabitable structures such as sheds. 9190.6 LP SmartSide Strand Substrate Lap and Panel Siding Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: No Design Pressure: N/A Other: Refer to Evaluation Report for Panel Siding over SIP installation detail. Product is not Impact resistant. In HVHZ, must be used in conjunction with approved impact resistant product except for uninhabitable structures such as sheds. Verified By: APA -The Engineered Wood Association Created by Independent Third Party: Yes .Evaluation Reports FL 190 R6 AE Evaluation Report of LP_SSi�gy190_2 I.p Created by Independent Third Party: Yes Precision Series 38 and 76 Series Primed Lap Siding. Precision 38,76,190 Series Primed Panel Siding including Silvertech & Smartfinish. Installation Instructions FL9190 RG IT LPZBO512 - Precision Series - Panel.prlf FL9190 RG II LPZBOSLS -_Precision Seriess -Lap pdf FL9190 R6 it Strand Substrate SidinD Fastener Tables.p ff Verified By: APA - The Engineered Wood Association Created by Independent Third Party: Yes Evaluation Reports FL9190 R6 AE Evaluation ReportoFLP Siding 91911-R6_ ZU7FBC pdF Created by Independent Third Party: Yes Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 phone: 850.4117-1024 The State of Flonda is as AA/EEO employer. Cho yright 2007-2013 State of Florida.:: PdvaW Statement:: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. most provide the Department with an email address If they have one. The emails provided may be used for official communication with Me licensee. However email addresses are public record. If you do not wish to supply a personal address, please Provide Me Department with an email address which can be made available In the public. To determine If you are a licensee under chapter 455, Fs., please click here . Product Approval Accepts: M El WR El secnrit} mFTRICS', Imagine... a look that lasts forever! NOVI'ICSTONETM SK STACKED STONE 1 I INSTALLATION GUIDE i NOVIKSTONETM SK - STACKED STONE INSTALLATION GUIDE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW FOR THE EXPANSION / CONTRACTION OF THE MATERIAL. I -Always begin the installation at the lowest part of the structure, from left to right. 2-Always nail through the installation holes. These holes include a polymer film, which permits for precise centering of the nail, allowing the expansion and contraction of the material. Each complete panel must be nailed through the center hole, at both extremities and have a minimum of 5 nails in the nailing channel at maximal intervals of 16"(40,64cm) or less and one nail in the lateral hole (Figure I). If panels are installed on a furring wall, furring strips should be at 8"(20,32cm) center to center and a furring strip is required behind each nail. Always use non -corrosive nails or screws with a head of 0.4"(1 cm) in diameter and a body of 0.150"(0,38cm) in diameter and penetrate a minimum of I 1/4"(3,I8cm) into a solid surface. 3-Never hammer the nails in completely; leave a gap of 1/16"f0.16cm). The stoppers located around the holes stop the hammer from driving the nails in too far, and provides the required gap. (Figure 2) 4-Make sure that all pieces are proprely joined together (Figure 3). 5-When using finition trim (i.e. NovikTrim 1, J-trim, etc.) leave a gap of 1/4"(0,64cm) between the trim and the siding (Figure 4). The required opening for finition trim is I"(2,54cm). Note: -To cut the material, it is recommended to use a circular saw with a finishing blade. -Keep the R-E-L number of your products (ex: REL-123456) for future references. Central hole Installation hole Lateral hole 6" Figure 2 (0,16cm) 'i Minimum ' 1//2" 11,27cm) Nlm mum I I=I/2:T 11 �(3;81cm1 F] Figure 4 1, 1�I 1/4" l 1/4.. (0,64cm) 1 (0.64cm) 12.54cm) NovikTrimI J trim, I Some elements or the Image aoove were parry removea ro understanding. p. 2/5 _NOVIKSTONETM SK - STACKED STONE INSTALLATION GUIDE INSTALLATION STEPS 1-First install the starter strips at the lowest point of the structure. Make sure that the horizontal starting line is perfectly leveled and square with the wall. Leave a 1 1/2"(3,81cm) gap at each end of the wall when using decorative corners (1). If a floor is against the wall you must leave a gap of 5/8"(1,59cm) between the starter and the floor (2). If there is no floor, starter strips should be flush with the base of the wall. Nail the starter strips through the nailing holes at maximal intervals of 8" (20,32 cm) or less. Do not forget to nail in the center hole (3). Install the next starter strip by sliding it leftward to the stopper in the previous one and nail it as mentioned above (4)(Figure A). 2-When using decorative corners, cut the left side of a panel in a straight line, insert panel into starter strip and nail [he panel at 3 1/2"(8,89cm) from the wall edge. When using J-trim corner, cut the left side of a panel in a straight line, insert panel into starter strip and slide it in the J-trim corner. Leave a space of 1/4"(0,64cm) between inside wall of J-trim and the siding (Figure B). Measure the wall length to determine where to cut your first panel in order to avoid having a very small piece at the right end of the wall. Be sure to align adjacent walls. 3-On each panel, hammer a nail into the center hole of the panel (Figure C), this will ensure even movement of panel in both directions during expansion/contraction. Also hammer a nail into the last hole on both ends and into the lateral hole. If the panel is installed on a furring wall, a furring strip is required behind these holes. -N.B.: If a panel piece does not have the initial center hole in the middle, drill a new center hole of 1/8"(0.32cm) diameter at the same height as the other installation holes. Each full length panel should besecured with a minimum of 5 nails, plus the nail into the lateral hole. Figure A 1 2 8" MAX. 120,32crrq -. Wall 5/8„ "r? (1,59cm) -- J l 11/2" II 98m1u_ (3,81[ml ; - Floor 3 _ 4 iw.. 3 1/2"18,89cm) When using decorative corners Figure C Outside corner orJ-Trim ..� .... Imo: .. Lateral hole Installation hole Central hole Installation hole ( r I I 1 p. 3/5 NOVIKSTONETM SK - STACKED STONE INSTALLATION GUIDE INSTALLATION STEPS (CONTINUATION) 4-Install the following panel by hooking it into the starter strip and sliding over the previous panel. Make sure that the tabs on both sides are locked together and spaced equally. If installed at outdoor temperature over 40°F(5-C), slide panel to the stoppers (located at the rear panel or at the front, Figure D.0). When resistance is felt, do not force insertion of part. Use the reference line to confirm the position. If installed at outdoor temperature under 40-F(S-C), adjust the panel to the temperature line indicated. (Figure D.1) 5-Start the second row by cutting the first panel with 16"(40,6cm) increment from the cutting line of the first row. Slide the hooks located at the bottom of the panel into the top of the previously installed row. (Figure E) Proceed with this row and subsequent ones following steps 3 and 4 taking care with each new row to alternate the position of the cut on the first panel. Be sure to finish one wall before beginning another. 6-For the last row or places where you may need to attach siding other than in installation holes at a concealed spot on the panel use a knife to create new slots 1/2"(1,27cm)(Figure F); the slot must be wider than the nail but not as wide as the nail head. Although not set in installation holes, this type of cutting will allow the expansion/contraction movement. -If you need to set the siding at an area other than the oblong nail hole or to set accessories on siding, at a concealed spot on the panel create a new slot 1/2"(1,27cm) larger than the nail body but smaller than the nail head to permit expansion/contraction. *Do not set accessories directly on the siding. The fasteners must be fixed on a solid surface. ara.icaa Temperature reference line Stoppers references line Figure E t- t Y p. 4/5 NOVIKSTONET"' SK - STACKED STONE INSTALLATION GUIDE DECORATIVE CORNERS INSTALLATION I -The installation of corners begins once you have completed two adjacent walls. -N.B. For proper installation and optimal corner appearance, make sure that the ends of siding panels finish at 3 1/2"(8,89cm) from the corner of the wall and at an equivalent height. 2-For the first corner, insert the hooks into the starter strip (G.1) and be sure to overlap the ends of each row's panels. Fold back the top of the part toward the corner of the wall (G.2), then nail through the oblong holes (G.3). (Figure G) 3-For all subsequent corners, insert the hooks into the nailing strip of the previous corner. Fold back the top of the corner toward the wall, then nail through the oblong holes. Repeat this step to the top of the wall. (Figure H) 4-For the last corner only, cut excess from part. On each side of the corner, make a hole wider than the shaft of the nail, but smaller than the head. Affix a nailing strip behind these locations to fasten corners firmly. Fold back the top of the corner and nail it down. (Figure 1) INSTALLATION TIP (INSIDE CORNERS) I -Many solutions are possible to finish an inside corner: inside corner post (A), two J-trims (B) or two NovikTriml (C) (Figure J). It is important to seal the inside corner of the wall prior to installation the trims. Figure G ^" G.1 G.2 G.3 Figure H — 2 _ g e-' H.1 H. H.3 NOVIKTRIMTM - NOVIKTRIM 1 INSTALLATION GUIDE CAUTION: REMEMBER THAT POLYMERS UNDERGO EXPANSION AND CONTRACTION WITH VARIATIONS OF TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW FOR THIS EXPANSION AND CONTRACTION OF THE MATERIAL. Parts description NoviTrim Base NoviTriml Top < <LL VW SIDING SECTION - INSTALLATION STEPS 1-Locate where you want to install NoviTrim and make sure you have nailing in these locations. If installing on a furred wall, make sure to install furring on the nailing locations. 2.A-Installation around windows and doors or under soffit: Position NoviTrim base on the wall keeping 13/,V(4,45cm) between the base and the window, door or soffit (Figure I). Nail as specified in Step 3. 23-Installation of an inside corner: Position NoviTrim base on the wall keeping required distance according to product depth (See chart below and Figure 2). Nail as specified in Step 3. Siding depth Distance from the inside corner 5/8"(,1,59cm) 213/16"(7,14cm) 3/4"(1,91 cm) 27/8"(7,30cm) 7/8"(2,22cm) 215/16"(7,46cm) I"(2,54cm) 31/16"(7,78cm) Fiqure 2 I 2/—'-"_--_ Distance -�- I _:3�T from the ihside com& Distancefrom I Distance from - theimide I theinside I "" comer comer ;t P. 1/5 NOVIKTRIMTM - NOVIKTRIM 1 INSTALLATION GUIDE SIDING SECTION - INSTALLATION STEPS (CONTINUATION) 2.0 Installation back to back: Position base according to desired division of the wall (Figure 3, #11 and nail as specified in Step 3. Install siding for the first section of the wall IStep 5) and clip NoviTrim top (Step 6). Pre -assemble the bases and caps (Figure 3, #2) for the other side of the wall division, place back to back with previously installed NoviTrim (Figure 3, #3) and nail as specified in Step 3. Remove NoviTrim tops from the basesyou just nailed in (Figure 3, #4) so you can install siding on the section of the wall (Figure 3, #5 and Step 5) then clip NoviTrim tops back on bases (Step 6). 3-Nail down the center nail first. Make sure the base is straight and leveled. Put nails in the center of each nailing slot do each side of the center hole. A minimum of 7 nails is required per full-length base. Never hammer the nails completely down. Always leave 1/16" (0,16cm). Figure 4 4-To install a second base, align the end of the base on the guide line (Figure 51 and nail base as specified in Step 3. 5-Install siding or roofing following the guide line located on the base (Figure 6, #11. 6-Clip NoviTrim tops on the base starting with one end of the top. Press gradually along the trim until top is clipped uniformly and at the right depth (Figure 6, #2). Make sure each clip is engaged. 7-To put two tops together, slide second part in the first part following the guide line (Figure 6, #3). Figure 4 Central hole 0 1/16" fJ; 7x d7� i0.l6cml 1.7 Figure 6 MIMI p. 2/5 ' NOVIKTRIMTM - NOVIKTRIM 1 INSTALLATION GUIDE SIDING SECTION - INSTALLATION STEPS (CONTINUATION) 8-Finishing the corner of a window or door., Install bases around window or door as specified in Step 2.A and make sure that they don't exceed the window or door frame on each side (Figure 7, #1). Install siding as specified in Step 6. Cut the horizontal NoviTrim tops in straight edge and make sure they exceed by 13/16" (3,02cm) the window or door framing on both sides and, clip them onto the bases (Figure 7, #2). Cut the vertical NoviTrim tops with an angle of 45` and make sure they overlap horizontal NoviTrim tops. Clip them on the bases (Figure 7, #3). Engage properly all hooks of NoviTrim tops. Do not push too much on vertical NoviTrim tops to not deform the ends that overlapping the horizontal NoviTrim tops (Figure 7, #41. SIDING SECTION - INSTALLATION TIPS I -Pay special attention to the position of NoviTrim moldings junctions. For example, when finishing around the door, make sure the seams are at the bottom of the door to make it more subtle (Figure 8). 2-To facilitate the installation of Nov7rIm bases around windows and doors, you can use waste pieces of NoviTrim tops to help positioning the bases. To do so, assemble the NoviTrim cap pieces on bases before positioning them on the wall. Push the assembly on the window or door frame and nail on each side of the pieces. Nail gradually throughout the base by sliding the pieces to maintain a proper positioning. Remove the pieces once nailing is completed and continue with the installation of another base or installation of siding (Figure 9). Fioure 8 V1 Figure 9 ;��" !/ %l L� y, 211 lJ€ _) - 3 I NOVIKTRIMTM - NOVIKTRIM INSTALLATION GUIDE ROOFING SECTION - INSTALLATION STEPS I -Locate where you want to install NoviTrim and make sure you have nailing in these locations. 2.A-Installation at the edge of a roof or near a wall: Mark a line at 1 3/4"(4,45 cm) from the edge of the roof or walls and position the rear of the bases at the line (Figure 1). Then nailed as specified in step 3. 2.B-Installation in a valley: Mark a line at 2 13/16" (7,14cm) on both sides of the valley. Position bases back to back on each side of the valley and align the rear edge of the bases on the line (Figure 2). Then nail as specified in Step 3. 3-Nail down the center nail first. Make'sure the base is straight and nail in the center of each nailing slot on each side of the center hole. A minimum of 7 nails -is required per full-length base. Never hammer the nails completely down. Always leave 1/16"(0,16cm). Figure 3 - 4-To install a second base, align the end of the base on the guide line (Figure 4) and nail base as specified in Step 3. I&EI Figure 2 H S s i'- WWI al 17% tom' I p. 4/5 • , NOVIKTRIMTM - NOVIKTRIM INSTALLATION GUIDE ROOFING SECTION - INSTALLATION STEPS (CONTINUATION) 5-Install siding or roofing following the guide line located on the base (Figure's, #11. 6-Clip NoviTrim tops on the base starting with one end of the top. Press gradually along the trim until top is clipped uniformly and at the right depth (Figure 5, #2(. Make sure each clip is engaged. 7-To put two tops together, slide second part in the first part following the guide line (Figure 6). 9 U p. 5/5 S MARTS I D E® PRECISION SERIES 38 SERIES, 76 SERIES,190 SERIES TRIM 65101NG PRIMED PANEL SIDING INCLUDING SILVERSIDE 6' SMARTFINISH. (smooth square edge panel siding is approved At the time of manufacture, LP's Precision Series primed panel siding meets or exceeds the performance standards set forth In ICC-ES acceptance criteria ACC321 and has achieved code recog- nition under the ICC-ES Report ESR-1301, and HUD recognition under HUD-MR-1318. For copies of ESR-1301, call LP Customer Support at 1-800-648-6893 or go on-line at http://www.icc-es. org/reports/pdf—files/ICC-ES/ESR-1301.pdf. Minimum 6 in. clearance must be maintained between siding and finish grade. Siding applied adjacent to porches, patios, walks, etc. must have a clearance of at least 1 in, above any surface. Minimum 1" clearance at intersection with roof line • Apply siding in a mannerthat prevents moisture Intrusion and water buildup. • All exposed wood substrate must be primed and painted in a mannerthat prevents moisture intrusion and water buildup. • In non-traditional ICF and SIP assemblies, the ICF or SIP manu- facturer must prescribe the fastening specifications. Note: LP does not recommend LP SmartSide for use in these non- tradi-tional assemblies. If used, LP will notwarrant for Buckling and Shrinkage. However, balance of warranty does remain intact, • When using wet blown cellulose insulation, the insulation must not be in direct contact with the siding and it must be allowed to dry a minimum of 24 hours or longer if specified by the insu- lation manufacturer. • DO NOT USE STAPLES • Store off the ground well supported, on a flat surface, under a roof or separate waterproof covering • Keep siding clean and dry. Inspect prior to application. • Allow siding to adjust to atmospheric conditions before application. STUD SPACING • Precision Series 38 Series and 76 Series panel siding must be installed on 16 in. OC framing only. When installing on 241n. CC framing, Precision Series 190 Series panel siding is required. • Moisture control and moisture vapor control are critical elements of proper housing design. Check your local building codes for application procedures for handling moisture and moisture vapor in your area. • As with all wood products, do not apply engineered wood siding to a structure having excessive moisture conditions such as drying con- crete or plaster. If such conditions exist, the building should be well ventilated to allow it to dry prior to the application of the siding. • Siding must not be applied to green or crooked structural framing members. Do not apply siding over rain -soaked or buckled sheath- ing materials. • Gutters are recommended for control of roof water run off. for use with Carrara Stucco Finish ONLY) VAPOR RETARD ER/WEATHER BARRIER • A properly installed breathable water -resistive barrier is required behind the siding. • Consult your local building code for details, • LP will assume no responsibility for water penetration. GAPS & SEALANTS Seal all gaps with a high -quality, non -hardening, palritable sealant with a minimum stated service life of 30 years. Follow the sealant manufacturer's instructions for application. WINDOWS,DOORS & OPENINGS All openings must be properly sealed or flashed in a mannerthat prevents moisture intrusion or buildup. Several examples that accomplish this are shown on the following pages. Trim should be thick enough so the siding does not extend be- yond the face of the trim. • Trim and fascia must be applied in a manner that will not allow moisture intrusion or.water buildup. • LP° SmartSide° siding is not designed and/or manufactured to be used as trim or fascia. LP SmartSide trim and fascia are avail- able in a variety of dimensions. FINISHING INSTRUCTIONS 00 • Priming all exposed wood substrates before painting is highly recommended. • Paint all exposed siding surfaces including drip edges. • Thoroughly paint the bottom edges of siding especially all cut ends next to the roof line. • Apply paint as soon as possible and within 180 days of applica- tion. • Follow the coating manufacturer's application and mainte- nance instructions. High -quality acrylic latex paint, specially formulated for use on wood and engineered wood substrates, is highly recommend- ed. Semi -gloss or satin finish oil or alkyd paints are acceptable. For flat alkyd paint, please check with the coating manufac- turers for their recommendations for use on composite wood siding. Application instructions (cont.) Use minimum lid, corrosion resistant according to ASTM 641, box style nails for 38 Series and 76 Series panels and minimum ed for190 Series panels.. Do not use electroplated fasteners. • Penetrate studs or studs and wood sheathing a combined minimum of 1 1/21n. Nail penetration min.11/2 in bead in. min. from in. gap Single row of nails ?/8 in. gap Double row of nails • For 38 Series panels, double nailing procedure meets wall bracing requirements and 5/16 in. shear wall design values. • For 76 Series and 190 Series panels, single nailing meets wall bracing requirements. To meet the equivalent 3/8" shear wall design values, double nailing procedures must be used. It may be necessary to angle drive the second nail in order to pen- etrate the framing. Seal nails driven below the surface. •Shear values for panels applied directly to studs shall be no greater than noted in Table 1 of the ]CC -ES report ESR-1301. • Not warranted for application on SIP and ICF assemblies. CAUTION • 38 Series and 76 Series panels must be installed on 16 in. OC framing only. When installing on 24 in. OC framing,190 Series panels are required. • Backside of panel must not come in contact with masonry foundation. • Do not force siding into place. Maintain the illustrated 1/8 in. space behind the joint to allow for expansion while the panel equilibrates with the local environment. • LP° SmartSide® Panel siding must not be attached by stapling. • DO NOT INSTALL OVER ALIGNMENT BEAD. Install panels in light contact to the edge of alignment bead. (see above drawing) 6 in. max. v perimeter nail spacing Do not let panel I contact masonry CONDITION Snug Flush Visible fiber Countersunkl/16 in. 1/8 in. - Countersunk more than 1/8 in. Nail a min 3/8 in. from edge 12 in. max. field nail spacing 6 in, max. perimeter nail spacing Nail corner first 6 in. min. ground clearance CORRECTION Seal with caulking — Seal with caulk and renail 4 FT. X 8 FT. LlNGROOVED SHIPLAP PANEL �will� �ii► 1/8 in. gap in. gap LP SMARTSIDE PANEL SIDING JOINT DETAILS HORIZONTAL WALL JOINTS BUTT 6 FLASH LAP 3/8 in. min. ea 1 in. rlap min. L Sloped flashing oveoverbotpi (galv.oraluminum) panel LAPPED HORIZONTAL WALL JOINT Siding Framing (band joist, truss chord, etc.) 1 in. min. Wall Framing overlap LPSMARTS IOEPANELSIDINGJOINTE) ETAILS(CONTIINU Application instructions (cont.) HORIZONTAL BELTLINE JOINTS For multi -story buildings, matte provisions at horizontal joints for "setting" shrinkage of framing, especially when applying siding directly to studs. Siding (4 ft. x 8ft.) iAluminum or galy. flashing BAND BOARD OVER PANEL FILLER 2 in. x 10 in. band board Bottom plate Extend siding below sill plate Min.1/e )n. or flashing between siding and masonry. W Filler Siding (4 ft. x 8 ft.) Stud OR Floor system Flashing c moisture barrier IN. ROOF E CHIMNEY CLEARANCE M;vGhhS, 'y}�aI x. F3'TY"#9fA F''S#ti'e h .YaM`u �iYta.Ri bXF%� m PY �. Yd=F` +4ipa u x- x P@d1r<� b`�FK AdKs4��R+'� Y Yirt'A a - anroofing Interior Wall . Finish Header Code Approved Breathable Water -Resistive Barrier in. gap Trim Space according Nail fin to the window/door (do not damage) manufacturer's instruction The Louisiana-Pacific Corporation ("LP") LP SmartSideSiding (the "Products") limited warranty (the "Warranty") applies only to structures on which the Products have been applied, finished and maintained in accordance with the published application; finishing and maintenance instructions in effect at the time of application. The failure to follow such application, finishing or maintenance instructions will void the Warranty as to the portion of the Products affected by the variance (the "Affected Products"). LP assumes no liability for any loss or damage sustained by the Affected Products and is expressly released by the purchaser or owner from any such loss or liability. Any modification of the Warranty's application; finishing or maintenance requirements is void and unenforceable unless approved in writing prior to application bythe Siding General Manager or his designee and a member of the LP Legal Department. For a copy of the warranty or for installation and technical support, visit the LP SmartSide product support Web site at: www.lptorp/smartside.com or for additional support call 800.450.6106. WARRANTY REMEDIES ARE NOT AVAILABLE IF REQUIREMENTS ARE NOT FOLLOWED. Cal. Prop 65 Warning: Use of this product may result in exposure to wood dust, known to the State of California to cause cancer. SMARTS10F TRIM 5 SIDING 02011 Louisiana-Pacific Cerporanon. All rights teconmd. LP and SmartSIds arc.,TMo.d trademarks of Louisiana-Pacific Corporation. Printed In U.S.A. NOTE: Louisiana-Pacific Corporatlon perlodically updates and revises Its product Information. To verity that this version is cunent call 8004SO-6106. LP260S12 i alternate inside corner details 610 VH µ naaanI gap 3l16" and caulk Shlplaip Edge Banal bottom coarse detail panel joint gap 3116" and caulk vapor barrier If raqulmd bycnde Breathable weather barriea ground clearance NOVIKLEDGETM - PREMIUM LEDGE INSTALLATION GUIDE qGENERAL INFORMATION �Lziuc CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW FOR THE EXPANSION / CONTRACTION OF THE MATERIAL. I -Locate where you want to install Novistone Premium Ledge and make sure you have solid nailing surface in these locations. If installing on afurred wall, make sure to install furring on these nailing locations. 2-Always nail through the installation holes. These holes include a polymer film, which permits for precise centering of the nail, allowing the expansion and contraction of the material. Each complete ledge must be nailed through the center hole and at both ends (Figure 1(. Always use non -corrosive nails or screws with a Bead of 0.4" (Icm( in diameter and a body of 0.150"(0,38cm( in diameter and penetrate a minimum of 3/4"(1,91cm( into a solid surface. 3-Never hammer the nails in completely, leave a gap of 1/16"(0,16cm(. The stoppers located around the holes stop the hammer from driving the nails in too far, and provides the required gap (Figure 2(. 4-Make sure that all pieces are properly inserted into one another and spaced correctly. Adjust ledges to the stopper and/or to the reference line (Figure 3(. Note: -To cut the material, it is recommended to use a circular saw with a finishing blade. -Keep the R-E-L number of your products (ex: REL-123456( for future references. L 3 Stopper line p. 1/5 NOVIKLEDGETM - PREMIUM LEDGE INSTALLATION GUIDE INSTALLATION STEPS I -Begin with the installation of the siding on the lower section of the wall upto the desired height. For an installation. without cutting the bottom of the ledges, go directly to the next step. Otherwise, measure the siding thickness and cut the bottom of ledges to allow a proper insertion of siding under the ledges. If needed, pre-cut at I"(2,54cm) and at 2" (5,08cm) which are integrated on the lower walls of ledges. The initial gap is the precise distance for the nailing zones of Novik siding panels (Figure A). 2-It is recommended to begin the installation of Novistone Premium Ledge by installing the ledge corners. See section FINISH AT A WALL CORNER for details. For installation without corner, go directly to the next step. 3-Measure the length of the wall and spread the cut of the first and last.ledgeto center the installation of ledges on the wall. If needed, cap the end pieces before installing on the wall (see sections: FINISH AT END OF WALL for details). Install the first ledge, previously cut according to the finish option chosen, over the siding. Nail the ledge making sure it is level (Figure B). 4-Install each successive ledge into the previous one. Leave the required space between each then nail it in place while making sure to keep them level (Figure C). Repeat until the end of the wall. Finish the wall according to the finish option chosen (see sections: FINISH AT END OF WALL et FINISH AT WALL CORNER) 5-Once the installation of ledges is done, install the siding on the upper section of the wall. According to the type of siding used, it is possible to install starter strips directly on the ledges (Figure D). Note: Pay attention to not constrain the expansion and contraction movement of the ledges. Fiqure A 10,4 cm I" Fiqure D -' NovlkStone: :' woiatone: NovikStone: = NovikShake: *' HGPHGSR RR-FS OS RS-PS.RSS -: NovlkBric: NovikPlank: -_ HL-DIAL SB-Db - _' NovikShake: Y HS 'r 5 8" ;� (I. cm] x r p. 2/5 NOVIKLEDGE' - PREMIUM LEDGE INSTALLATION GUIDE INSTALLATION STEPS (CONTINUATION) 6-Finish at end of wall with a cut corner end: Cut the rear portion of a Novistone Premium Ledge Corner straight to form a ledge cap according to which side of the wall to complete (Figure E). Nail the ledge cap making sure it is level. 7-Finish with flat end (option 1): Cut the end of the ledge at 90' to the desired length (Figure F, #1). Trim a piece ofwood similar to the opening at the end of the ledge. Paint it with a matching color and attach it to the ledge with small screws at conceal spots. Install the assembly on the wall, nailing as mentioned in point 2 of the GENERAL INFORMATION section of the guide (Figure F, #2). Note: Pay attention to not constrain the expansion and contraction movement of the ledge or siding. B-Finish with flat end (option 2): Cut the end of the ledge at 90'to the desired length (Figure G, #1). Blockthe end with a cardboard attached to the ledge with masking tape (Figure G #21. Fill the opening at the end of the ledge using low expansion polyurethane foam on approximately 2" (5,0Bcm) long (Figure G, #3). Let harden. Secure the hardened foam in the ledge with a small screw in a concealed spot. Remove the cardboard and masking tape. Cutoff the excess foam protruding from the end of the ledge and paint the end with a matching color to the ledge. Install the assembly on the wall, nailing as mentioned in point 2 of the GENERAL INFORMATION section of the guide (Figure G, #4). Note: Pay attention to not constrain the expansion and contraction movement of the ledge or siding. Figure E Left End Cap RightEndCap LN —0 Figure F T.5ien9tn+s ' s%r pee #2 Figure G Y � 'M r v yam. � Tt 00; ME 1 p. 3/5 ' NOVIKLEDGET" -PREMIUM LEDGE INSTALLATION GUIDE FINISH AT A WALL CORNER 1-Finish an outside corner: Install a first Novistone Premium Ledge Corner on an outside corner of two adjacent walls and nail into the installation holes located on each side. Make sure the ledge corner is level on both sides and secure it with a nail the closest of the wall corner (Figure H). It is recommended to install all the ledge corners on the walls before proceeding with the installation of regular ledges. 2-Finish an inside corner: Cut the end of the two ledges that forming the inside corner of the wall to the desired length with a 45° angle (Figure I, #1). Temporarily attaching the two ledge pieces together with masking tape. Also apply a masking tape inside the corner at the junction of the two ledge pieces (Figure I, #2). Fill the inside of corner with low expansion polyurethane foam on a minimum of 2"(5,09cm) long on each side of corner (Figure I, #3). Let harden. Secure the hardened foam in the ledge with small screws in concealed spots. Remove the masking tape and cut off the excess foam protruding from the ledge. Apply sealant over the cornerjoint as needed. Install the assembly on the wall and nailing as mentioned in point 2 of the GENERAL INFORMATION section of the guide (Figure I, #4). Note: Pay attention to not constrain the expansion and contraction movement of the ledge or siding. Figure H i -- i" Figure I IC roveMUI p. 4/5 NOVIKLEDGET°" - PREMIUM LEDGE INSTALLATION GUIDE PARTICULAR CASES In a situation where it is impossible to install ledges with their nailing channel, for example under a window, follow the instructions below: I -Carefully cut the nailing channel of ledges required to cover the full length of the window.Do not throw the rest of the ledges, it will be reused at the next step. Install this nailing channel upside down at a distance of 1 5/16" (3,33cm) below the window (Figure J). Nail it as mentioned in point 2 of the GENERAL INFORMATION section of the guide. Figure K 2-Collect ledges previously cut and; if necessary, cut the bottom of ledges to allow a proper insertion of siding on lower section of the wall (Figure A). Slide the ledges into the nailing channels previously installed on the wall (Figure K). Make sure to leave the required gap between each of them (Figure C). 3-Install siding under the ledges taking care to rise it up as close as possible of ledges beneath windows to stabilize them. To do this, it may be necessary to partially remove some of the ribs inside ledges (Figure L). 4-For the finish at ends, refer to the FINISH AT END OF WALL section of this guide. p. 5/5 BUILDING DROPS A Perfect Solution in Every Dropl Certificate of Authorization: 29578 Manufacturer: Derby Building Products Inc. Product Category: Product Sub -Category: Compliance Method: Product Name: Panel Walls Siding State Product Approval Method 1D Various, See Table on sheet 3 FL#: FL14428 Date: 12/10/2018 Report No: 6049 Scope: This is a Product Evaluation Report issued by Hermes F. Norero, P.E. (FL # 73778) for Derby Building Products Inc. based on Method 1d of the State of Florida Product Approval, Florida Department of Business and Professional Regulation - Florida Building Commission. Limits of Use: Hermes F. Norero, P.E. does not have nor will acquire financial interest in the company manufacturing or distributing the product or in any other entity involved in the approval process of the product named herein. This product has been evaluated for use in locations adhering to the 61h Edition (2017) Florida Building Code. See Installation Instructions reviewed by Hermes F. Norero, P.E. (FL # 73778) for specific use parameters. 1. This product has been evaluated and is in compliance with the 61h Edition (2017) Florida Building Code, excluding the "High Velocity Hurricane Zone" (HVHZ). 2. Product anchors shall be as listed and spaced as shown on details. Anchor embedment into substrate material shall be beyond wall dressing or stucco. 3. Site conditions that deviate from the details of drawing or those described herein require further engineering analysis by a licensed engineer or registered architect. 4. See Design Pressure Table A.1 on Sheet 3 of this document for size and design pressure limitations. Quality Assurance: The manufacturer has demonstrated compliance of manufacturing siding products in accordance with the Florida Building Code for manufacturing under a quality assurance program audited by an approved quality assurance entity through Intertek Testing Services NA Inc. — ETL/Warnock Hersey (FBC Organization #: QUA1673). Performance Standards: • ASTM D7254-07 • ASTM E84-09 • Chapter 14 of the 61h Edition FBC, Polypropylene Siding • ICC ES AC366 — Polypropylene Siding Systems Hermes F. Norero, P.E. Florida No. 73778 Page 2 of 4 BUILDING DROPS A Perfect Solution in Every Drop! Certificate of Authorization: 29578 FL#: FL14428 Date: 12/10/2018 Report No: 6049 Design Pressure & Ratings: Design negative wind pressures were calculated per Annex Al of ASTM D 7254-07 DP=Pt / (0.36 x 1.5) Table A.1: Oual!fied Product Summary Allowable Panel Nominal Panel Typical Pressure (psf) Siding Name Configuration/Description Dimensions Thickness Nails (in.) (in.) 16" O.C. NovikShakeTM HS HAND -SPLIT SHAKE 48.38 x 18.75 0.09 33.00 NovikShakeT' RS ROUGH SAWN SHAKE 48.75 x 14.5 0.085 33.00 NovikShakeTM SE STAGGERED EDGE SHAKE 51.13 x 8.5 0.085 46.30 Portsmouth Cedar Shake D7 Portsmouth Cedar Shake 53.85 x 16.25 0.09 33.00 NovikShakeTM PS PERFECT SHAKE 74.25 x 15 0.085 33.00 NovikStoneTMSK STACKED STONE 45 x 20.25 0.09 33.00 NovikPlankTM D6 DOUBLE 6" PLANK 99 x 13.5 0.095 46.30 NovikPlanVm S8 or TandoShakeTM SINGLE 8" PLANK 98 x 9.75 0.095 46.30 Beveled 8 NovikShakeTM RS8 or TandoShakeTM ROUGH SAWN 8' SHAKE 96.5 x 8.5 0.085 46.30 Rustic Cedar 6 NovikStoneTM RR or TandoStoneT"" RIVER ROCK 50 x 19.13 0.125 33.00 Stream Stone NovikStoneTM FS or TandoStoneTM FIELDSTONE 50 x 19.13 0.125 33.00 Bank Stone NovikStoneTm DS or TandoStoneT^^ DRY STACK STONE 41.5 x 13.13 0.11 46.30 Flat Stone NovikShakeTM HR HALF -ROUND 32 x 10 0.085 33.00 Portsmouth 8 foot S7 Portsmouth Cedar Shake 92.75 x 8.75 0.085 46.30 NovikBrickTM HL HAND -LAID BRICK 48 x 18.5 0.09 33.00 NovikBrickTM DHL DECO HAND -LAID BRICK 48 x 18.5 0.09 33.00 NovikStoneTM HC HAND -CUT STONE 48 x 18.5 0.09 33.00 NovikStoneTMPHCorTandoStoneTM PREMIUM HAND -CUT 48 x 18.5 0.1 33.00 Hand -Cut Stone STONE TandoShakeTM Beach House Shake"' BEACH HOUSE SHAKE 46.88 x 16.5 0.080 33.00 TandoShakeTM Cape Cod Perfection Cape Cod Perfection 46.88 x 16.5 0.080 33.00 NovikShakeTM NP Northern Perfection 46.88 x 16.5 0.080 33.00 Hermes F. Norero, P.E. Florida No. 73778 Page 3 of 4 -Z BUILDING DROPS A Perfect Solution in Every Drop! Certificate of Authorization: 29578 Installation: FL#: FL14428 Date: 12/10/2018 Report No: 6049 1. Approved anchor types and substrates areas follows: a. Use non -corrosive nails or screws with minimum head diameter of 0.4 in. (10 mm) and minimum shank diameter of 0.148 in. (3.8 mm) anchored into supporting wood framing members (min. S.G. _ 0.55). An edge distance of 1/2" shall be maintained with a minimum of 1 1/4" embedment into wood supporting member. Nail capacities have been developed in accordance with the current National Design Specification for Wood Construction (NDS). 2. Nail pattern for installation of siding panels shall not exceed 16" maximum O.C. Refer to Installation Instructions for more details of the installation requirements. Referenced Data: Equivalence of Test Standards: 1. Product Testing performed by Intertek Testing Services Ltd. (FBC Organization # TST1509) Report #: 3180745TOR-002b, Report Date: 05/20/12 Report M 101817859COQ-002R3, Report Date: 11/20/14 Report M 101817859COQ-005.1, Report Date: 02/18/15 Report M 101817859COQ-005.2, Report Date: 04/13/15 Report M 101817859COQ-005.3, Report Date: 04/13/15 2. Quality Assurance Intertek Testing Services NA Inc. — ETL/Warnock Hersey. (FBC Organization M QUA1673) 3. Installation Guides DIV0219C, DIV0228B, DIV0284A, DIV3009A, DIV3010A, DIV3021A, DIV5068D, DIV5110F, DIV5129A, DIV5195H, DIV5207F, DIV5211G, DIV5212D, DIV5217D, DIV5218C, DIV5220E, DIV5276C, DIV5277C, DIV5283C, DIV528613, DIV5299A Various test standards have been evaluated for differences in test methodology, if any, between tested editions of the test standards listed below and those editions referenced in the current Florida Building Code. The manufacturer has tested their products to the following test standard edition(s): 1) ASTM E84-09 Chapter 35 of the current Florida Building Code references the following editions of the above -mentioned test standards: 1) ASTM E84-13A After review of the above mentioned referenced standards and editions, it has been found that the results and tests carried out meet the requirements for compliance with all referenced standards. All referenced standards have been found to be equivalent. Hermes F. Norero, P.E. Florida No. 73778 Page 4 of 4 i i2r BUILDING DROPS A Perfect Solution in Every Drop! Certificate of Authorization: 29578 Product Evaluation Deport Of Derby Building Products Inc. Novik & Tando Polymer Siding for Florida Product Approval 6t' Edition (2017) Florida Building Code Method: Category: Sub — Category: Product: Material: Product Dimensions: 398 E Dania Beach Blvd. Suite 338 Dania Beach, FL 33004 954.399.8478 PH 954.744.4738 FX contact@buildingdrops.com 1-D (Engineering Evalua Panel Walls Siding ^11 Various, See Table A. bp Polypropylene 0 N See Table A.1 on Sheeti Prepared For: Derby Building Products Inc. 160 Grands-Lacs Street St. Augustin-des-Desmaures, NON -US 3GA 21<1 Prepared by: Hermes F. Norero, P.E. Florida Professional Engineer#73778 Date:12/10/2018 Contents: Evaluation Report Pages 1-4 Digitally signed by Hermes F. Norero, P.E. Reason: I am approving this document Date: 2018.12.16 15:12:23-05'00' G�Q�. ``````sru0��''''4 -N.77 S A OF ' tY :SOT O IDP: �<V� O HermVel' NO0 61)'.E. Florida No. 73778